Transportation plan creation support device, transportation plan creation support method and program

The transportation plan creation support device addresses power shortages in electric vehicles by predicting SOC transitions based on cargo loading and unloading, ensuring accurate power management during transportation.

JP7736088B2Active Publication Date: 2025-09-09NEC CORP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023570580
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-12-28
Publication Date
2025-09-09
Estimated Expiration
2041-12-28

AI Technical Summary

Technical Problem

Existing technologies fail to account for changes in load capacity and electricity consumption of electric vehicles due to loading and unloading of goods during transportation, leading to potential power shortages.

Method used

A transportation plan creation support device that acquires a transportation plan, predicts the state of charge (SOC) transition based on cargo loading and unloading, and determines if the SOC will fall below a reference value, providing a determination result.

Benefits of technology

Enables the creation of transportation plans that accurately prevent power shortages by accurately predicting SOC transitions and identifying potential power depletion points.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007736088000001
    Figure 0007736088000001
  • Figure 0007736088000002
    Figure 0007736088000002
  • Figure 0007736088000003
    Figure 0007736088000003
Patent Text Reader

Abstract

The present invention provides a transportation plan creation support device (10) having: a transportation plan acquisition unit (11) which acquires a transportation plan including a transportation destination, an order of transportation, and a cargo weight; a terminal departure time state of charge (SOC) acquisition unit (12) which acquires a vehicle SOC at the time of departure from a terminal; a SOC change prediction unit (13) which specifies a load during transport on the basis of the transportation plan, said load changing in response to the unloading of cargo during transport, and predicts, on the basis of the specified load, a change in the vehicle SOC during transport if transportation is carried out according to the transportation plan; a determination unit (14) which determines whether there is a point in the change of the vehicle SOC during transport at which the SOC drops below a reference value; and a determination results output unit (15) which outputs the determination results.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to a transportation planning support device, a transportation planning support method, and a program. [Background technology]

[0002] Patent Documents 1 and 2 disclose techniques related to electric vehicles.

[0003] Patent Document 1 discloses a technology that determines whether a power shortage will occur when a delivery is made based on a delivery plan, and if it is determined that a power shortage will occur, lowers the upper limit of the total travel distance and re-creates the delivery plan.

[0004] Patent Document 2 discloses a technique for estimating the electricity consumption of an electric vehicle by taking into consideration the load of the electric vehicle, the operating state of the air conditioner, the driving habits of the driver, weather conditions, and the congestion status of the driving route. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] International Publication No. 2020 / 158073 [Patent Document 2] Japanese Patent Application Publication No. 2019-86430 Summary of the Invention [Problem to be solved by the invention]

[0006] However, when transporting goods using an electric vehicle, the load capacity of the electric vehicle changes depending on the loading and unloading of goods during transport, and the electricity consumption also changes accordingly. Neither of the technologies disclosed in Patent Documents 1 and 2 takes this into consideration.

[0007] An object of the present invention is to create a transportation plan with high accuracy so that power shortages do not occur along the way. [Means for solving the problem]

[0008] According to the present invention, a transportation plan acquisition means for acquiring a transportation plan including a transportation destination, a transportation order, and a weight of a package; a base departure SOC (state of charge) acquisition means for acquiring a vehicle SOC at the time of departure from the base; an SOC transition prediction means for specifying a load amount during transportation that changes in accordance with loading and unloading of cargo during transportation based on the transportation plan, and predicting a transition of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan based on the specified load amount; a determination means for determining whether there is a point where the SOC of the vehicle is below a reference value in the transition of the SOC of the vehicle during transportation; a determination result output means for outputting the result of the determination; A transportation planning support device having the above configuration is provided.

[0009] Further, according to the present invention, The computer a transportation plan acquisition step of acquiring a transportation plan including a transportation destination, a transportation order, and a weight of the package; a base departure SOC acquisition step for acquiring a SOC of a vehicle at the time of departure from the base; an SOC transition prediction step of identifying a load amount during transportation that changes in response to loading and unloading of cargo during transportation based on the transportation plan, and predicting a transition of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan based on the identified load amount; a determining step of determining whether there is a point where the SOC of the vehicle during transportation is below a reference value; a determination result output step of outputting the result of the determination; A transportation planning support method for carrying out the above is provided.

[0010] Further, according to the present invention, Computer, a transportation plan acquisition means for acquiring a transportation plan including a transportation destination, a transportation order, and a weight of a package; A means for acquiring a SOC of a vehicle at the time of departure from the base; an SOC transition prediction means for identifying a load amount during transportation that changes in response to loading and unloading of cargo during transportation based on the transportation plan, and predicting a transition of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan based on the identified load amount; a determination means for determining whether there is a point where the SOC of the vehicle is below a reference value in the transition of the SOC of the vehicle during transportation; a determination result output means for outputting the result of the determination; A program is provided to function as a [Effects of the Invention]

[0011] According to the present invention, a transportation plan can be created with high accuracy so that power shortages do not occur along the way. [Brief explanation of the drawings]

[0012] [Figure 1] FIG. 2 is a diagram illustrating an example of a hardware configuration of a transportation plan creation support device. [Figure 2] FIG. 2 is an example of a functional block diagram of a transportation plan creation support device. [Figure 3] FIG. 2 is a diagram illustrating an example of information processed by the transportation plan creation support device. [Figure 4] FIG. 2 is a diagram schematically illustrating an example of information output by the transportation plan creation support device. [Figure 5] 10 is a flowchart illustrating an example of a processing flow of a transportation plan creation support device. [Figure 6] 10 is a flowchart illustrating an example of a processing flow of a transportation plan creation support device. [Figure 7] FIG. 2 is a diagram schematically illustrating an example of information output by the transportation plan creation support device. [Figure 8] FIG. 2 is a diagram schematically illustrating an example of information output by the transportation plan creation support device. [Figure 9] 10 is a flowchart illustrating an example of a processing flow of a transportation plan creation support device. [Figure 10] FIG. 2 is a diagram schematically illustrating an example of information output by the transportation plan creation support device. [Figure 11] FIG. 2 is a diagram schematically illustrating an example of information output by the transportation plan creation support device. DETAILED DESCRIPTION OF THE INVENTION

[0013] Hereinafter, embodiments of the present invention will be described with reference to the drawings. In all drawings, like components are designated by like reference numerals, and descriptions thereof will be omitted where appropriate. In the following, an "electric vehicle" powered by electricity will be simply referred to as a "vehicle." In other words, the "vehicle" referred to below refers to an "electric vehicle." In addition, in this specification, "transportation" is a concept that includes both delivering a package to a destination and collecting the package at the destination.

[0014] First Embodiment "overview" The transportation plan creation support device of this embodiment has a function of determining, upon acquiring a transportation plan, whether or not a vehicle will run out of power if transportation is performed according to the acquired transportation plan.

[0015] More specifically, the transportation plan creation support device acquires a "transportation plan including the transportation destination, transportation order, and cargo weight" and a "vehicle SOC at the time of departure from the base." Next, the transportation plan creation support device identifies the load amount during transportation, which changes in accordance with the loading and unloading of cargo during transportation, based on the transportation plan. Next, the transportation plan creation support device predicts the transition of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan, based on the identified load amount. The transportation plan creation support device then determines whether there is a point in the transition of the SOC of the vehicle during transportation where the SOC is below the reference value, and outputs the result of the determination.

[0016] "Hardware Configuration" Next, an example of the hardware configuration of the transportation plan creation support device will be described. Each functional unit of the transportation plan creation support device is realized by any combination of hardware and software, centered around a CPU (Central Processing Unit) of any computer, memory, programs loaded into the memory, a storage unit such as a hard disk that stores the programs (this can store programs that are pre-loaded when the device is shipped, as well as programs downloaded from storage media such as CDs (Compact Discs) or servers on the Internet), and a network connection interface. Those skilled in the art will understand that there are many variations in the realization method and device.

[0017] FIG. 1 is a block diagram illustrating an example of the hardware configuration of a transportation plan creation support device. As shown in FIG. 1, the transportation plan creation support device has a processor 1A, a memory 2A, an input / output interface 3A, a peripheral circuit 4A, and a bus 5A. The peripheral circuit 4A includes various modules. The transportation plan creation support device does not necessarily have to have the peripheral circuit 4A. The transportation plan creation support device may also be composed of multiple devices that are physically and / or logically separated. In this case, each of the multiple devices can have the above hardware configuration.

[0018] The bus 5A is a data transmission path for the processor 1A, memory 2A, peripheral circuit 4A, and input / output interface 3A to transmit and receive data among them. The processor 1A is an arithmetic processing device such as a CPU or a GPU (Graphics Processing Unit). The memory 2A is a memory such as a RAM (Random Access Memory) or a ROM (Read Only Memory). The input / output interface 3A includes an interface for acquiring information from an input device, an external device, an external server, an external sensor, a camera, etc., and an interface for outputting information to an output device, an external device, an external server, etc. Examples of input devices include a keyboard, a mouse, a microphone, physical buttons, a touch panel, etc. Examples of output devices include a display, a speaker, a printer, a mailer, etc. The processor 1A can issue commands to each module and perform calculations based on the results of those calculations.

[0019] "Function Configuration" Next, the functional configuration of the transportation plan creation support device will be described. Fig. 2 shows an example of a functional block diagram of the transportation plan creation support device 10. As shown in the figure, the transportation plan creation support device 10 includes a transportation plan acquisition unit 11, a base departure SOC acquisition unit 12, an SOC transition prediction unit 13, a determination unit 14, and a determination result output unit 15.

[0020] The transportation plan acquisition unit 11 acquires a transportation plan including the transportation destination, the transportation order, and the weight of the cargo (the cargo to be delivered or the cargo to be collected).

[0021] The transportation plan acquisition unit 11 may acquire a transportation plan by receiving an input of the transportation plan. Alternatively, the transportation plan acquisition unit 11 may create a transportation plan. The creation of a transportation plan may be realized using any technology. For example, the transportation plan acquisition unit 11 may create a transportation plan using the technology described in Non-Patent Document 1.

[0022] FIG. 3 schematically shows an example of a transportation plan acquired by the transportation plan acquisition unit 11. FIG. 3 displays a list of multiple delivery plans for November 19, 2021. In FIG. 3, plan identification information, vehicle identification information, transportation information, and base departure times are linked to one another. Note that the transportation plan may include other information.

[0023] "Plan identification information" is information that identifies multiple transportation plans from each other. The "vehicle identification information" is information for identifying multiple vehicles used for transportation from one another. Each piece of plan identification information is linked to the vehicle identification information of a vehicle assigned to each transportation plan. The "transportation information" includes the order, destination, classification, work time, package weight, work start time, and work end time.

[0024] "Order" indicates the order of transportation. "Destination" indicates the name and address of the party to whom the package is to be delivered or the party from whom the package is to be collected. "Classification" indicates the type of work, ie, delivery or collection. "Work time" indicates the time required for work (delivery or collection) to be performed at the destination. "Luggage weight" indicates the weight of the luggage to be delivered to the delivery destination or the weight of the luggage to be collected at the collection destination. The "work start time" indicates the time when work (delivery or collection) starts at the destination. The "work completion time" indicates the time when the work (delivery or collection) ends at the destination.

[0025] The "Departure time from base" indicates the time when the vehicle departs from a base such as an office. After departing from the base, the vehicle travels to multiple destinations and then returns to the base. The departure base and the return base may be the same or different.

[0026] 2, the base departure SOC acquisition unit 12 acquires the SOC of the vehicle at the time of departure from the base. The base departure SOC acquisition unit 12 acquires the SOC of the vehicle at the time of departure from the base at any timing before the vehicle departs from the base.

[0027] For example, a user may input the SOC of a vehicle at the time of departure from the base into the transportation plan creation support device 10. Then, the base departure SOC acquisition unit 12 may acquire the SOC of the vehicle at the time of departure from the base input by the user. For example, the user may check the SOC of the vehicle at that time by visually checking information displayed by an on-board device or the like installed in the vehicle at any time between the end of work on the previous day and the time of departure from the base on the current day. Then, the user inputs the checked SOC of the vehicle into the transportation plan creation support device 10 as the SOC of the vehicle at the time of departure from the base.

[0028] Alternatively, the base departure SOC acquisition unit 12 may communicate with an on-board device installed in each of multiple vehicles used for transportation and acquire the SOC of each vehicle from each on-board device. For example, the base departure SOC acquisition unit 12 may acquire the current SOC of each vehicle from each on-board device at any timing between the end of business on the previous day and the departure from the base on the current day as the vehicle's SOC at the time of departure from the base.

[0029] Alternatively, the base departure SOC acquisition unit 12 may acquire the SOC of each vehicle from a management device that manages the SOC of each of the multiple vehicles used for transportation. The management device acquires the current SOC of each vehicle from each on-board device at any time between the end of business on the previous day and the departure from the base on the current day. The base departure SOC acquisition unit 12 then acquires the SOC from the management device as the SOC of the vehicle at the time of departure from the base.

[0030] The SOC transition prediction unit 13 identifies the load amount during transportation, which changes depending on the loading and unloading of cargo during transportation, based on the transportation plan. Then, based on the identified load amount, the SOC transition prediction unit 13 predicts the transition (time change) of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan.

[0031] -How to identify the load during transportation- As shown in Figure 3, the transportation plan indicates the order of transportation and the weight of the cargo to be transported at each destination. This information can be used to identify the load capacity during transportation.

[0032] First, by adding up the cargo weights corresponding to the "Delivery" category in Figure 3, the load volume from the departure base to the first destination (hereinafter referred to as "Departure Load Volume") can be calculated.

[0033] If the classification of the first destination is "delivery," the load capacity between the first destination and the second destination can be calculated by subtracting the weight of the cargo to be delivered at the first destination from the load capacity at departure.

[0034] On the other hand, if the classification of the first destination is "collection," the load volume between the first destination and the second destination can be calculated by adding the weight of the cargo to be collected at the first destination to the load volume at departure.

[0035] Similarly, the load amount from one transport destination to the next transport destination and the load amount from the last transport destination to the return base can be calculated.

[0036] -Method for predicting the transition (time change) of SOC of a vehicle during transportation- The SOC transition prediction unit 13 divides the distance from the departure base to the return base into multiple sections. Specifically, the SOC transition prediction unit 13 defines each of the following as one section: "from the departure base to the first transport destination," "from the first transport destination to the second transport destination," "from the second transport destination to the third transport destination," ... "from the final transport destination to the return base."

[0037] The SOC transition prediction unit 13 then calculates the transition of the SOC for each section, taking into account the load of each section and the SOC at the start of each section (synonymous with the SOC at the end of the immediately preceding section), and predicts the transition of the SOC of the vehicle from the departure point to the return point by connecting the calculated values ​​in chronological order. There are no particular limitations on the method for predicting the transition of the SOC taking the load into account, and any technology can be used. For example, machine learning or other existing technology may be used. An example will be described below, but the present invention is not limited to this.

[0038] For example, the SOC transition prediction unit 13 determines the vehicle's electricity consumption (km / kWh) for each section. The electricity consumption is determined taking into consideration the load capacity of each section, information about the route taken in each section (road pavement condition, predicted road congestion, road inclination, radius of curvature of curves in the route, number of right and left turns in the route, etc.), weather conditions on the day (weather, temperature, humidity, wind speed, etc.), vehicle type, air resistance depending on the vehicle type, power consumption due to bodywork, etc. The information about the route taken in each section is determined based on map data prepared in advance. The map data indicates the pavement condition, general congestion, inclination, radius of curvature of curves, etc. at each location.

[0039] A reference table may be registered in advance in the storage unit of the transportation plan creation support device 10. The reference table registers the electricity cost when each condition is satisfied for each condition generated by connecting these items with logical operators. The SOC trend prediction unit 13 may then search for the conditions satisfied by each section to identify the electricity cost of each section. The conditions may be, for example, "load capacity: X1 [kg] or more, and weather: sunny, and temperature: 15°C or more and 25°C or less, and..."

[0040] Alternatively, an arithmetic expression for calculating the electricity cost when the values ​​of the above items are input may be generated in advance and registered in the storage unit of the transportation plan creation support device 10. Then, the SOC transition prediction unit 13 may input the values ​​of the above items into the arithmetic expression for each section to identify the electricity cost for each section.

[0041] Alternatively, a learning model that estimates electricity consumption from a combination of values ​​of the plurality of items may be generated by machine learning based on training data that associates a combination of values ​​of the plurality of items with electricity consumption when the plurality of items take those values.The SOC trend prediction unit 13 may then input the values ​​of the items for each section into the learning model to identify the electricity consumption for each section.

[0042] Then, the SOC transition prediction unit 13 calculates the transition of the SOC of the vehicle during transportation, i.e., the transition of the SOC of the vehicle from the departure point to the return point, assuming that electricity is consumed at the electricity efficiency of each section in each section.

[0043] The determination unit 14 determines whether there is a point in the transition of the SOC of the vehicle during transportation where the SOC is below a reference value. The reference value is set in advance. For example, any value such as "5%, " "15%, " "30%, " etc. can be set as the reference value. The reference value may also be set by the user.

[0044] The determination result output unit 15 outputs the result of the determination made by the determination unit 14. The determination result output unit 15 can output the result of the determination via any output device such as a display, a projection device, a speaker, a printer, or the like.

[0045] The result of the determination indicates whether or not there is a point in the transition of the SOC of the vehicle during transportation where the SOC is below the reference value.

[0046] Furthermore, if there is a point in the transition of the SOC of the vehicle during transportation where the SOC falls below the reference value, the point may be displayed. The "point" may be displayed by time, such as "after 2:50 PM," or by using destination information, such as "between the sixth and seventh destinations." This information indicates how far the vehicle can go without the SOC falling below the reference value.

[0047] Furthermore, if there is a point in the transition of the SOC of the vehicle during transportation where the SOC falls below a reference value, the amount of power that is insufficient to carry out the transportation plan without the SOC falling below the reference value may be displayed.The power cost identified for each section as described above can be used to calculate the amount of power required after the SOC falls below the reference value.

[0048] If there are no locations where the SOC is below the standard value, it can be determined that there is no problem with the transportation plan (theoretically, there is no possibility of running out of power during transportation). On the other hand, if there are locations where the SOC is below the standard value, it can be determined that there is a problem with the transportation plan (theoretically, there is a possibility of running out of power during transportation). This means that it is necessary to review the transportation plan, re-create it, or provide feedback to the system that creates the transportation plan.

[0049] If the transportation plan acquisition unit 11 acquires multiple transportation plans, the determination result output unit 15 may display a list of the determination results for each of the multiple transportation plans, as shown in Fig. 4. In the example shown, the result of a transportation plan in which there is no point where the SOC falls below the reference value in the transition of the SOC of the vehicle during transportation is "OK," and the result of a transportation plan in which there is a point where the SOC falls below the reference value is "NG." In addition, the SOC at the point where the SOC is lowest in the transition of the SOC of the vehicle during transportation may be displayed as a result.

[0050] Next, an example of the processing flow of the transportation plan creation support device 10 will be described with reference to the flowchart of FIG.

[0051] In S10, the transportation plan creation support device 10 acquires a transportation plan including the transportation destination, transportation order, and cargo weight. The transportation plan creation support device 10 acquires a transportation plan before it is executed. For example, the transportation plan creation support device 10 may acquire a transportation plan on the day before the execution date. The transportation plan creation support device 10 may acquire one transportation plan or multiple transportation plans. Furthermore, the transportation plan creation support device 10 may create a transportation plan or may accept input of a transport plan that has already been created.

[0052] In S11, the transportation plan creation support device 10 acquires the SOC of the vehicle at the time of departure from the base. The transportation plan creation support device 10 acquires the SOC of the vehicle assigned to the transportation plan acquired in S10 at the time of departure from the base. The method of acquiring the SOC of the vehicle at the time of departure from the base is as described above.

[0053] In S12, the transportation plan creation support device 10 identifies the load amount during transportation, which changes depending on the loading and unloading of cargo during transportation, based on the transportation plan, and predicts the transition of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan, based on the identified load amount. Details of this process are as described above.

[0054] In S13, the transportation plan creation support device 10 determines whether there is a point in the transition of the SOC of the vehicle during transportation predicted in S12 where the SOC falls below a reference value.

[0055] In S14, the transportation plan creation support device 10 outputs the result of the determination in S13.

[0056] "Action and effect" The transportation plan creation support device 10 of this embodiment identifies the load amount during transportation, which changes depending on the loading and unloading of cargo during transportation, based on a transportation plan including the transportation destination, transportation order, and cargo weight, and predicts the transition of the vehicle's SOC during transportation when transportation is performed according to the transportation plan based on the identified load amount.The transportation plan creation support device 10 then determines, based on the predicted transition of the SOC, whether the vehicle will run out of power when transportation is performed according to the transportation plan.

[0057] In this way, by predicting the transition of the vehicle's SOC during transportation while taking into account the load amount during transportation, which changes depending on the loading and unloading of cargo, it is possible to accurately predict the transition of the vehicle's SOC, and as a result, it is possible to accurately determine whether the vehicle will run out of power during transportation.

[0058] Furthermore, by identifying the load amount during transportation, which changes depending on the loading and unloading of cargo during transportation, based on a transportation plan that includes the destination, transportation order, and cargo weight, the load amount during transportation can be identified with high accuracy. As a result, it is possible to predict the transition of SOC with high accuracy and accurately determine whether the vehicle will run out of power during transportation.

[0059] <Second embodiment> The transportation plan creation support device 10 of this embodiment differs from the first embodiment in that it has a function of reviewing (correcting) a transportation plan in which there is a point where the SOC of a vehicle during transportation falls below a reference value, as will be described in detail below.

[0060] In a transportation plan in which the SOC of a vehicle during transportation falls below a reference value, the determination unit 14 determines whether the vehicle can be charged before departing from the base. If the vehicle can be charged before departing from the base, the determination unit 14 calculates the amount of charge to be performed before departing from the base (hereinafter referred to as the "first amount of charge"). The determination unit 14 then determines whether there is a point in the SOC of the vehicle during transportation where the SOC falls below the reference value when the vehicle is charged by the first amount of charge before departing from the base. Each process will be described in detail below.

[0061] -Process to determine whether the vehicle can be charged before leaving the base- The determination unit 14 determines whether the vehicle can be charged before departing from the base in a transportation plan in which the SOC of the vehicle during transportation falls below a reference value. The determination unit 14 determines whether the vehicle can be charged before departing from the base based on at least one of the vehicle's SOC at the time of departure from the base, the time between the worker's arrival time at work and the base departure time, and the reservation status of the charging facility.

[0062] For example, the determination unit 14 may determine that "Condition 1: the SOC of the vehicle at the time of departure from the base acquired by the base departure SOC acquisition unit 12 is not 100%." ​​If Condition 1 is not satisfied, that is, if the SOC of the vehicle at the time of departure from the base is 100%, the determination unit 14 determines that charging of the vehicle before departure from the base is not possible. If Condition 1 is satisfied, that is, if the SOC of the vehicle at the time of departure from the base is not 100%, the determination unit 14 determines that charging of the vehicle before departure from the base is possible.

[0063] Alternatively, the determination unit 14 may determine that "Condition 2: the time between the base departure time indicated in the transportation plan (see FIG. 3) and the worker's arrival time at work is equal to or longer than a reference time." If Condition 2 is not met, that is, if the time between the base departure time and the worker's arrival time at work is not equal to or longer than the reference time, the determination unit 14 determines that charging of the vehicle before departure from the base is not possible. If Condition 2 is met, that is, if the time between the base departure time and the worker's arrival time at work is equal to or longer than the reference time, the determination unit 14 determines that charging of the vehicle before departure from the base is possible. The reference time may be a predetermined fixed value.

[0064] Alternatively, the reference time may be determined based on the amount of power to be charged to the vehicle. In this case, the reference time is calculated as "the time required to charge the vehicle with the amount of power at the charging speed" calculated based on the charging speed of the charging equipment and the amount of power to be charged to the vehicle.

[0065] Alternatively, the determination unit 14 may check reservation information indicating the reservation status of charging equipment installed at the base and determine that "Condition 3: there is an available reservation for charging equipment between the worker's arrival time at work and the base departure time." If condition 3 is not met, that is, if there is no available reservation, the determination unit 14 determines that charging of the vehicle before departure from the base is not possible. If condition 3 is met, that is, if there is an available reservation, the determination unit 14 determines that charging of the vehicle before departure from the base is possible.

[0066] The worker's arrival time at work is a time common to all workers (e.g., 8:30), and may be registered in advance in the transportation plan creation support device 10. Alternatively, work schedule information indicating the worker's arrival time for each day may be created in advance and registered in the transportation plan creation support device 10. Then, the determination unit 14 may identify the worker's arrival time at work based on this information.

[0067] Alternatively, the determination unit 14 may determine whether a condition obtained by connecting any two or more of the above conditions 1 to 3 with an AND condition is satisfied. If the condition is not satisfied, the determination unit 14 may determine that charging of the vehicle before departure from the base is not permitted, and if the condition is satisfied, the determination unit 14 may determine that charging of the vehicle before departure from the base is permitted.

[0068] - Calculating the amount of charge to be carried out before departing from the base - The determination unit 14 calculates a first charge amount to be charged to the vehicle before departure from the base based on at least one of the time between the worker's arrival time at work and the time the vehicle departs from the base and the reservation status of the charging facility.

[0069] "Method 1" For example, the determination unit 14 calculates the charging time T2 based on the time T1 between the worker's arrival time at work and the time the worker leaves the base. For example, T2 may be calculated by subtracting a predetermined preparation time (a predetermined value) from T1. Then, the determination unit 14 calculates the first charging amount as the smaller of the product of T2 and the charging speed of the charging equipment and the available capacity of the vehicle (100% - (the SOC of the vehicle at the time of departure from the base) capacity).

[0070] "Method 2" Additionally, the determination unit 14 calculates the charging time T2 based on the reservation status of the charging facility. For example, the length of the available reservation slot (time slot) is T2. The determination unit 14 then calculates the first charging amount as the smaller of the product of T2 and the charging speed of the charging facility and the available capacity of the vehicle (100% - (the SOC of the vehicle at the time of departure from the base) capacity).

[0071] "Method 3" Alternatively, the determination unit 14 may calculate T2 as the shorter of the value obtained by subtracting a predetermined preparation time (a predetermined value) from T1 or the length of the available reservation slot (time slot).The determination unit 14 then calculates the first charge amount as the smaller of the product of T2 and the charging speed of the charging equipment and the available capacity of the vehicle (100% - (the SOC of the vehicle at the time of departure from the base) capacity).

[0072] "Method 4" Alternatively, the determination unit 14 may calculate the available capacity of the vehicle (100% - (the SOC of the vehicle at the time of departure from the base)) as the first amount of charge.

[0073] -Processing for determining whether there is a point where the SOC falls below a reference value in the transition of the SOC of a vehicle during transportation when the vehicle is charged by a first charge amount before departing from the base- There are various ways to make this determination, and any method can be adopted.

[0074] For example, as described in the first embodiment, if there is a point in the transition of the SOC of a vehicle during transportation where the SOC falls below the reference value, the electricity efficiency identified for each section can be used to calculate the amount of electricity required after the SOC falls below the reference value. If the first charge amount is equal to or greater than the amount of electricity required after the SOC falls below the reference value, the determination unit 14 may determine that there is no point in the transition of the SOC of the vehicle during transportation where the SOC would fall below the reference value if the vehicle were charged by the first charge amount before leaving the base. Then, if the first charge amount is less than the amount of electricity required after the SOC falls below the reference value, the determination unit 14 may determine that there is a point in the transition of the SOC of the vehicle during transportation where the SOC would fall below the reference value if the vehicle were charged by the first charge amount before leaving the base.

[0075] As another method, the SOC transition prediction unit 13 may set the "value obtained by adding the first charge amount to the SOC of the vehicle at the time of departure from the base acquired by the base departure SOC acquisition unit 12" as the "SOC of the vehicle at the time of departure from the base," and may re-predict the transition of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan. Then, the determination unit 14 may determine whether there is a point in the transition of the SOC where the SOC is below the reference value.

[0076] The determination result output unit 15 outputs the result of the determination made by the determination unit 14 .

[0077] The result of the determination indicates at least one of "whether charging before departure from the base is possible," "the first charge amount," "whether there are any points in the SOC progression of the vehicle during transportation when it is charged by the first charge amount before departure from the base where the SOC falls below the reference value," "if there are any points where the SOC falls below the reference value," and "if there are any points where the SOC falls below the reference value, the amount of power that is insufficient to carry out the transportation plan without the SOC falling below the reference value."

[0078] Furthermore, when there is no point where the SOC falls below the reference value in the transition of the SOC of the vehicle during transportation when the vehicle is charged by the first charge amount before leaving the base, the determination result output unit 15 may transmit an instruction to create and register a charging plan for charging the vehicle by the first charge amount before leaving the base to a charging planning system that manages charging at charging facilities. The charging planning system is a system connected to the charging facilities via a network, and makes reservations for charging, plans the start and end of charging, and monitors the status.

[0079] The determination result output unit 15 transmits to the charging planning system an instruction to create and register a charging plan for charging the first amount of charge by, for example, T1 o'clock the next morning. In response to this, the charging planning system checks the reservation status and searches for a time slot that is a time slot until T1 o'clock the next morning and in which the first amount of charge is possible. Then, the charging planning system registers a reservation for the searched time slot. Note that the registration instruction output by the determination result output unit 15 may include vehicle identification information of the vehicle that is the target of the charging process. Then, the charging planning system can make a reservation for charging the vehicle during the searched time slot.

[0080] Next, an example of the flow of the above-mentioned review process executed by the transportation plan creation support device 10 will be described with reference to the flowchart of FIG.

[0081] The review process may be executed in response to a user input. For example, as shown in Fig. 7, in a list display of the determination results of a plurality of transportation plans, a button for starting the review process may be displayed in association with a transportation plan for which the determination result is NG. Then, in response to receiving an operation on the button, the review process for the transportation plan may be started.

[0082] In addition, if it is determined in S13 of Figure 5 that "there is a point in the SOC transition of the vehicle during transportation where the SOC is below the reference value," a review process for the transportation plan may be automatically initiated.

[0083] In S20, the transportation plan creation support device 10 determines whether the vehicle can be charged before departing from the base. If it is determined that charging is not possible (No in S20), the transportation plan creation support device 10 outputs the determination result (S23).

[0084] On the other hand, if it is determined that charging is possible (Yes in S20), the transportation plan creation support device 10 calculates a first charge amount to be charged before departing from the base (S21). Next, the transportation plan creation support device 10 determines whether there is a point where the SOC falls below a reference value in the transition of the SOC of the vehicle during transportation when the vehicle is charged by the first charge amount before departing from the base (S22). Then, the transportation plan creation support device 10 outputs the determination result (S23).

[0085] Figure 7 shows the results output in S23. For transportation plans for which the review process is marked as "executed," the above-mentioned review process has already been carried out. The result (OK / NG) associated with this transportation plan indicates the judgment result after the review process. As a result of the review process, there are some transportation plans for which the judgment result is "OK" (for example, plan identification information: 0001), and there are also transportation plans for which the judgment result remains "NG" even after the review process is carried out (for example, plan identification information: 0004).

[0086] In addition, when an operation on a display button for a final plan associated with each transportation plan is accepted, the determination result output unit 15 may display the final transportation plan. If a review process is performed, the transportation plan after the review process becomes the final transportation plan. If a review process is not performed, the transportation plan acquired by the transportation plan acquisition unit 11 becomes the final transportation plan.

[0087] FIG. 8 shows a schematic example of a final transportation plan for a transportation plan (plan identification information: 0001) that has been judged to be "OK" as a result of the review process. In the example shown, the work date, plan identification information, precautions, and transportation schedule are displayed. The work date, plan identification information, and transportation schedule are the same as those in the transportation plan acquired by the transportation plan acquisition unit 11. The precautions indicate that charging should be performed before departing from the base, and the amount of charging. In other words, this transportation plan is the transportation plan acquired by the transportation plan acquisition unit 11 with charging before departing from the base added.

[0088] Furthermore, although not shown, in a transportation plan in which the review process results in a judgment result of "NG," a notice may be added to the transportation plan to change the vehicle to be used for that transportation to another vehicle (another electric vehicle, gasoline vehicle, diesel vehicle, etc.). That is, the judgment result output unit 15 may create and output a transportation plan in which the vehicle to be used is changed to another vehicle.

[0089] Other configurations of the transportation plan creation support device 10 of this embodiment are the same as those of the first embodiment.

[0090] The transportation plan creation support device 10 of this embodiment achieves the same effects as the first embodiment. Furthermore, the transportation plan creation support device 10 of this embodiment can determine whether charging is possible before departing from the base, and whether the vehicle will run out of power during transportation if it is charged. In this way, the transportation plan creation support device 10 of this embodiment supports the creation of a transportation plan.

[0091] <Third embodiment> The transportation plan creation support device 10 of this embodiment differs from the first embodiment in that it has a function of reviewing (correcting) a transportation plan in which there is a point in the transition of the SOC of a vehicle during transportation where the SOC falls below a reference value. The transportation plan review function of this embodiment differs from that of the second embodiment. This will be described in detail below.

[0092] First, the transportation plan specifies rest periods. These periods include time to eat lunch and time to take a break at 10:00, 15:00, etc. The length of the rest periods is a design issue.

[0093] The determination unit 14 searches for charging facilities around the vehicle's location during rest periods in a transportation plan where the SOC of the vehicle during transport falls below a reference value. If there is a charging facility, the determination unit 14 calculates the amount of charging to be performed during the rest period (hereinafter referred to as the "second amount of charging"). The determination unit 14 then determines whether there is a point in the SOC of the vehicle during transport where the SOC falls below the reference value when the vehicle is charged by the second amount of charging during the rest period. Each process will be described in detail below.

[0094] - Searching for charging facilities near the vehicle's location during breaks - First, the determination unit 14 identifies the location of the vehicle during the rest period (hereinafter referred to as the "rest location"). The rest location is identified based on the transportation plan. For example, the start time and end time of the rest period are determined in advance. The location of the vehicle at the start time of the rest period on the transportation route identified based on the transportation plan is the rest location. Alternatively, the transport destination immediately before the rest period may be identified as the rest location. Alternatively, the transport destination immediately after the rest period may be identified as the rest location.

[0095] Next, the determination unit 14 searches for charging equipment whose distance from the rest position is equal to or less than a threshold value from a charging equipment list (information indicating the location of each of a plurality of charging equipment) previously stored in the transportation plan creation support device 10. The threshold value may be a predetermined fixed value. Alternatively, the determination unit 14 may calculate the fixed value based on the length of the rest time. In this case, the longer the rest time, the larger the fixed value.

[0096] Note that the search may take into consideration the size of the vehicle. For example, the charging facility list may indicate the size of vehicles that can use each charging facility, linked to each charging facility. If the site where the charging facility is installed is small, a situation may occur in which large vehicles cannot use the facility. The determination unit 14 may then identify the size of the vehicle assigned to the transportation plan being processed based on vehicle information previously stored in the transportation plan creation support device 10, and then search for charging facilities that are within a threshold distance from the rest location and can be used by vehicles of the identified size.

[0097] -Processing to calculate the amount of charge during breaks- The determination unit 14 calculates a second amount of charge to be applied to the vehicle during the rest period based on the distance between the location of the searched charging facility and the rest position, and the length of the rest period.

[0098] "Method 1" For example, the determination unit 14 calculates the length of the rest period indicated in the transportation plan as the charging time T3. Then, the determination unit 14 calculates the second charging amount as the smaller of the product of T3 and the charging speed of the charging equipment, and the available capacity of the vehicle (100% - (the SOC of the vehicle at the time of the rest) capacity).

[0099] "Method 2" For example, the determination unit 14 calculates the time required to travel from the rest position to the location of the charging facility based on the distance between the location of the searched charging facility and the rest position. For example, the time may be calculated by dividing the "distance between the location of the charging facility and the rest position" by a "reference speed." The reference speed is a predetermined value, and may be, for example, 50 km / h, 60 km / h, etc.

[0100] Next, the determination unit 14 calculates the charging time T3 by subtracting the time required for the travel from the length of the rest period indicated in the transportation plan.The determination unit 14 then calculates the second charging amount as the smaller of the product of T3 and the charging speed of the charging equipment, or the available capacity of the vehicle (100% - (the SOC of the vehicle at the time of the rest) capacity).

[0101] "Method 3" As another example, the determination unit 14 may calculate the available capacity of the vehicle (100% - (the SOC of the vehicle at the time of rest)) as the second charge amount.

[0102] -Processing for determining whether there is a point where the SOC falls below a reference value in the transition of the SOC of a vehicle during transportation when the vehicle is charged by the second charge amount during a break- There are various ways to make this determination, and any method can be adopted.

[0103] For example, as described in the first embodiment, if there is a point in the transition of the SOC of a vehicle during transportation where the SOC falls below the reference value, the electricity efficiency identified for each section can be used to calculate the amount of power required after the SOC falls below the reference value. If the second charge amount is equal to or greater than the amount of power required after the SOC falls below the reference value, the determination unit 14 may determine that there is no point in the transition of the SOC of the vehicle during transportation when the vehicle is charged by the second charge amount during the rest period. Then, if the second charge amount is less than the amount of power required after the SOC falls below the reference value, the determination unit 14 may determine that there is a point in the transition of the SOC of the vehicle during transportation when the vehicle is charged by the second charge amount during the rest period.

[0104] As another method, the SOC transition prediction unit 13 may add a condition that "charging is performed by the second charge amount during rest periods" and re-predict the transition of the SOC of the vehicle during transportation according to the transportation plan. Then, the determination unit 14 may determine whether there is a point in the transition of the SOC where the SOC is below the reference value.

[0105] The determination result output unit 15 outputs the result of the determination made by the determination unit 14 .

[0106] The result of the determination indicates at least one of the following: "Whether charging during the break is possible," "The second charge amount," "Details of the charging equipment to be used for charging during the break (such as location)," "Whether there are any points in the SOC progression of the vehicle during transportation when charging only the second charge amount during the break where the SOC falls below the standard value," "If there are any points where the SOC falls below the standard value, those points," and "If there are any points where the SOC falls below the standard value, the amount of power that is insufficient to carry out the transportation plan without the SOC falling below the standard value."

[0107] Furthermore, when there is no point where the SOC falls below the reference value in the transition of the SOC of the vehicle during transportation when charging by the second charge amount during the break, the determination result output unit 15 may transmit an instruction to create and register a charging plan for charging the vehicle by the second charge amount during the break to a charging planning system that manages charging at a target charging facility (charging facility used for charging during the break). The charging planning system is a system connected to the charging facility through a network, and makes reservations for charging, plans the start and end of charging, and monitors the status.

[0108] The determination result output unit 15 transmits to the charging planning system an instruction to create and register a charging plan for charging the second amount of charge, for example, between T2 and T3 on the next day. In response to this, the charging planning system checks the reservation status and searches for a time slot between T2 and T3 on the next day in which the second amount of charge is possible. Then, the charging planning system registers a reservation for the searched time slot. Note that the registration instruction output by the determination result output unit 15 may include vehicle identification information of the vehicle that is the target of the charging process. Then, the charging planning system can make a reservation for charging the vehicle during the searched time slot.

[0109] Next, an example of the flow of the above-mentioned review process executed by the transportation plan creation support device 10 will be described with reference to the flowchart of FIG.

[0110] The review process may be executed in response to a user input. For example, as shown in Fig. 7, in a list display of the determination results of a plurality of transportation plans, a button for starting the review process may be displayed in association with a transportation plan for which the determination result is NG. Then, in response to receiving an operation on the button, the review process for the transportation plan may be started.

[0111] In addition, in response to a determination in S13 of FIG. 5 that "there is a point in the transition of the SOC of the vehicle during transportation where the SOC is below the reference value," a review process for the transportation plan may be initiated.

[0112] In S30, the transportation plan creation support device 10 identifies rest times and the positions of the vehicles at those times (rest positions) based on the transportation plan.

[0113] Next, the transportation plan creation support device 10 searches whether there is a charging facility near the identified rest position (S31). If there is no charging facility near the rest position (No in S31), the transportation plan creation support device 10 outputs the determination result (S34).

[0114] On the other hand, if there is a charging facility near the rest position (Yes in S31), the transportation plan creation support device 10 calculates the charge amount (second charge amount) to be charged during the rest period (S32). Next, the transportation plan creation support device 10 determines whether there is a point where the SOC falls below the reference value in the transition of the SOC of the vehicle during transportation when the vehicle is charged by the second charge amount during the rest period (S33). Then, the transportation plan creation support device 10 outputs the determination result (S34).

[0115] Figure 7 shows the results output in S34. For transportation plans for which the review process is marked as "executed," the above-mentioned review process has already been carried out. The result (OK / NG) associated with this transportation plan indicates the judgment result after the review process. As a result of the review process, there are some transportation plans for which the judgment result is "OK" (for example, plan identification information: 0001), and there are also transportation plans for which the judgment result remains "NG" even after the review process is carried out (for example, plan identification information: 0004).

[0116] In addition, the final plan linked to each transportation plan is displayed. button When the determination result output unit 15 receives an operation for the transportation plan, the determination result output unit 15 may display the final transportation plan. If the review process has been performed, the transportation plan after the review process becomes the final transportation plan. If the review process has not been performed, the transportation plan acquired by the transportation plan acquisition unit 11 becomes the final transportation plan.

[0117] FIG. 10 schematically shows an example of a final transportation plan for a transportation plan (plan identification information: 0001) that has been judged to be "OK" as a result of the review process. In the example shown, the work date, plan identification information, precautions, and transportation schedule are displayed. The work date, plan identification information, and transportation schedule are the same as those in the transportation plan acquired by the transportation plan acquisition unit 11. The precautions indicate that charging should be performed during breaks, the charging location, and the amount of charging. In other words, this transportation plan is a transportation plan acquired by the transportation plan acquisition unit 11 with charging during breaks added.

[0118] Furthermore, although not shown, in a transportation plan in which the review process results in a judgment result of "NG," a notice may be added to the transportation plan to change the vehicle to be used for that transportation to another vehicle (another electric vehicle, gasoline vehicle, diesel vehicle, etc.). That is, the judgment result output unit 15 may create and output a transportation plan in which the vehicle to be used is changed to another vehicle.

[0119] Other configurations of the transportation plan creation support device 10 of this embodiment are the same as those of the first embodiment.

[0120] The transportation plan creation support device 10 of this embodiment achieves the same effects as the first embodiment. Furthermore, the transportation plan creation support device 10 of this embodiment can determine whether charging is possible during rest periods, and whether the vehicle will run out of power during transportation if it is charged. In this way, the transportation plan creation support device 10 of this embodiment supports the creation of a transportation plan.

[0121] <Fourth embodiment> The transportation plan creation support device 10 of this embodiment executes both the review processes of the second embodiment and the third embodiment.

[0122] For example, if there is a point in the SOC transition of a vehicle during transportation where the SOC falls below a reference value even after performing the review process described in the second embodiment, the transportation plan creation support device 10 may further perform the review process described in the third embodiment.

[0123] In addition, if there is a point in the transition of the SOC of a vehicle during transportation where the SOC falls below the reference value even after performing the review process described in the third embodiment, the transportation plan creation support device 10 may further perform the review process described in the second embodiment.

[0124] In these cases, as shown in FIG. 11, both charging before departure from the base and charging during rest periods may be added to the final transportation plan.

[0125] Furthermore, in a transportation plan in which the determination result is still "NG" even after taking into consideration both charging before departure from the base and charging during rest periods, a notice may be added to the effect that the vehicle used for that transportation will be changed to another vehicle (another electric vehicle, gasoline vehicle, diesel vehicle, etc.). That is, the determination result output unit 15 may create and output a transportation plan in which the vehicle to be used is changed to another vehicle.

[0126] Other configurations of the transportation plan creation support device 10 of this embodiment are the same as those of the first to third embodiments.

[0127] According to the transportation plan creation support device 10 of this embodiment, the same effects as those of the first to third embodiments are realized.

[0128] <Fifth embodiment> The transportation plan creation support device 10 of this embodiment has a function of calculating the SOC of a vehicle at the time of departure from a base based on the charging reservation status of the vehicle, as will be described in detail below.

[0129] The base departure SOC acquisition unit 12 acquires the SOC of the vehicle at the time of departure from the base in the same manner as in the first to fourth embodiments. The base departure SOC acquisition unit 12 also acquires reservation information indicating the reservation status of the charging facility. The reservation information indicates the reservation time (reservation start time and reservation end time) and the vehicle identification information of the vehicle to be charged at the reservation time.

[0130] Then, the base departure SOC acquisition unit 12 acquires the SOC of the vehicle at the time of departure from the base (hereinafter referred to as the "first SOC") using the same method as in the first to fourth embodiments, and then, for a vehicle for which a reservation for charging equipment has been made thereafter and before departure from the base, calculates the SOC of the vehicle at the time of departure from the base as the SOC obtained by adding the amount of charging for the reservation to the first SOC. The amount of charging for the reservation can be the smaller of the product of the time from the reservation start time to the reservation end time and the charging rate of the charging equipment, and the available capacity of the vehicle (100% - (first SOC) capacity).

[0131] Other configurations of the transportation plan creation support device 10 of this embodiment are the same as those of the first to fourth embodiments.

[0132] The transportation plan creation support device 10 of this embodiment achieves the same effects as the first to fourth embodiments. Furthermore, the transportation plan creation support device 10 of this embodiment can identify the vehicle's SOC at the time of departure from the base, taking into account the charging process that has already been scheduled before judging the transportation plan, and can determine whether there is a point in the transition of the vehicle's SOC during transportation where the SOC falls below a reference value. As a result, the accuracy of the determination is improved.

[0133] Sixth Embodiment The transportation plan creation support device 10 of this embodiment has a function of predicting the transition of the SOC of a vehicle during transportation based on the type of cargo, as will be described in detail below.

[0134] The SOC transition prediction unit 13 determines whether the cargo contains any items of the first type based on the transportation plan. In this case, the transportation plan indicates whether the cargo belongs to the first type in addition to the weight of the cargo.

[0135] The first type of items are frozen items, refrigerated items, etc., that require the use of special functions of the vehicle (refrigeration function, freezing function, etc.). Depending on whether or not the special function is used, the way the vehicle consumes electricity also changes.

[0136] When the cargo contains a first type of item, the SOC transition prediction unit 13 predicts the transition of the SOC of the vehicle during transportation on the assumption that the transportation work will be performed with the vehicle powered on at the destination. In this case, in the transition of the SOC of the vehicle during transportation predicted by the SOC transition prediction unit 13, the vehicle continues to consume power even while the transportation work is being performed at the destination.

[0137] On the other hand, if the cargo does not include the first type of item, the SOC transition prediction unit 13 predicts the transition of the SOC of the vehicle during transportation on the assumption that the transportation work will be performed with the vehicle powered off at the destination. In this case, in the transition of the SOC of the vehicle during transportation predicted by the SOC transition prediction unit 13, the vehicle does not consume power while the transportation work is being performed at the destination.

[0138] In addition, the SOC transition prediction unit 13 may further consider whether or not the package contains a first type of object when determining the electricity consumption rate described in the first embodiment. If the package contains a first type of object, the electricity consumption rate will be higher than if the package does not contain the first type of object.

[0139] Other configurations of the transportation plan creation support device 10 of this embodiment are the same as those of the first to fifth embodiments.

[0140] The transportation plan creation support device 10 of this embodiment achieves the same effects as those of the first to fifth embodiments. Furthermore, the transportation plan creation support device 10 of this embodiment can predict the transition of the SOC of a vehicle during transportation based on the type of cargo. As a result, the accuracy of the prediction is improved.

[0141] Although the embodiments of the present invention have been described above with reference to the drawings, these are merely examples of the present invention, and various other configurations may be adopted. The configurations of the above-described embodiments may be combined with each other, or some of the configurations may be replaced with other configurations. Furthermore, various modifications may be made to the configurations of the above-described embodiments without departing from the spirit of the invention. Furthermore, the configurations and processes disclosed in the above-described embodiments and modified examples may be combined with each other.

[0142] In this specification, "acquisition" includes at least one of the following: "the device retrieves data stored in another device or storage medium (active acquisition)" based on user input or program instructions, such as receiving data by making a request or inquiry to another device, or accessing and reading out another device or storage medium; "the device inputs data output from another device (passive acquisition)" based on user input or program instructions, such as receiving data that is distributed (or transmitted, push notification, etc.), and selecting and acquiring data from received data or information; and "the device generates new data by editing data (converting it to text, rearranging data, extracting some data, changing the file format, etc.), and then acquires the new data."

[0143] Some or all of the above-described embodiments can be described as, but are not limited to, the following supplementary notes. 1. A transportation plan acquisition means for acquiring a transportation plan including a transportation destination, a transportation order, and a weight of a package; a base departure SOC acquisition means for acquiring a vehicle SOC at the time of departure from the base; an SOC transition prediction means for specifying a load amount during transportation that changes in accordance with loading and unloading of the cargo during transportation based on the transportation plan, and predicting a transition of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan based on the specified load amount; a determination means for determining whether there is a point where the SOC of the vehicle is below a reference value in the transition of the SOC of the vehicle during transportation; a determination result output means for outputting the result of the determination; A transportation planning support device having the above configuration. 2. The determination means 2. A transportation plan creation support device as described in 1, which determines whether charging of the vehicle is possible before departure from the base in the transportation plan where the SOC of the vehicle during transportation falls below the reference value in the transition of the SOC of the vehicle during transportation, and if possible, determines whether there is a point in the transition of the SOC of the vehicle during transportation where the SOC falls below the reference value if the vehicle is charged before departure from the base. 3. The determination means 3. A transportation plan creation support device as described in 2, which determines whether the vehicle can be charged before departing from the base based on at least one of the SOC of the vehicle at the time of departure from the base, the time between the worker's arrival time at work and the time of departure from the base, and the reservation status of the charging equipment. 4. The determination means When it is determined that the vehicle can be charged before leaving the base, a first charge amount to be charged to the vehicle before leaving the base is calculated based on at least one of the time between the worker's arrival time at work and the time the vehicle leaves the base and the reservation status of the charging facility; 4. A transportation plan creation support device according to claim 2 or 3, which determines whether there is a point in the evolution of the SOC of the vehicle during transportation where the SOC falls below a reference value when the vehicle is charged by the first charge amount before departing from the base. 5. A transportation plan creation support device described in any one of 2 to 4, wherein the determination result output means creates and outputs the transportation plan in which the vehicle to be used is changed to another vehicle if there is a point in the SOC transition of the vehicle during transportation where the SOC falls below a reference value, even when taking into account charging of the vehicle before departure from the base. 6. A transportation plan creation support device according to 4 or 5, wherein the determination result output means transmits an instruction to create and register a charging plan for charging the vehicle to the first charge amount before departure from the base to a charging plan system that manages charging at charging equipment. 7. The transportation plan specifies rest periods, The determination means 7. The transportation plan creation support device according to any one of 1 to 6, wherein, in the transportation plan where the SOC of the vehicle during transportation falls below the reference value in the transition of the SOC of the vehicle, the device searches for charging facilities around the position of the vehicle during the rest period, and if so, determines whether there is a point where the SOC falls below the reference value in the transition of the SOC of the vehicle during transportation when the vehicle is charged during the rest period. 8. The determination means if there is a charging facility near the location of the vehicle during the break time, calculate a second charge amount to be charged to the vehicle during the break time based on the distance between the location of the charging facility and the location of the vehicle during the break time and the length of the break time; 7. A transportation plan creation support device as described in 7, which determines whether there is a point in the progression of the SOC of the vehicle during transportation when the vehicle is charged by the second charge amount during the rest period where the SOC falls below a reference value. 9. A transportation plan creation support device as described in 7 or 8, wherein the determination result output means creates and outputs the transportation plan in which the vehicle to be used is changed to another vehicle if there is a point in the SOC transition of the vehicle during transportation where the SOC falls below a reference value, even when taking into account charging of the vehicle during the rest period. 10. A transportation plan creation support device as described in 8 or 9, wherein the determination result output means transmits an instruction to create and register a charging plan to charge the vehicle with the second charge amount during the break time to a charging plan system that manages charging at charging equipment. 11. The SOC acquisition means at the time of departure from the base is 11. The transportation plan creation support device according to any one of 1 to 10, wherein the SOC of the vehicle at the time of departure from the base is calculated based on the charging reservation status of the vehicle. 12. The SOC transition prediction means If the cargo includes a first type of item, predicting a transition in the SOC of the vehicle during transportation on the assumption that the vehicle will be powered on and the cargo will be loaded and unloaded at the destination; 12. A transportation plan creation support device according to any one of claims 1 to 11, which, if the cargo does not include the first type of item, predicts the change in SOC of the vehicle during transportation on the assumption that the loading and unloading of the cargo will be carried out with the vehicle's power turned off at the destination. 13. The computer a transportation plan acquisition step of acquiring a transportation plan including a transportation destination, a transportation order, and a weight of the package; a base departure SOC acquisition step for acquiring a SOC of a vehicle at the time of departure from the base; an SOC transition prediction step of identifying a load amount during transportation that changes in response to loading and unloading of the cargo based on the transportation plan, and predicting a transition of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan based on the identified load amount; a determining step of determining whether there is a point where the SOC of the vehicle during transportation is below a reference value; a determination result output step of outputting the result of the determination; A transportation planning support method that implements the above. 14. Computer, a transportation plan acquisition means for acquiring a transportation plan including a transportation destination, a transportation order, and a weight of a package; A means for acquiring a SOC of a vehicle at the time of departure from the base; an SOC transition prediction means for identifying a load amount during transportation that changes depending on the transportation based on the transportation plan, and predicting a transition of the SOC of the vehicle during transportation when transportation is performed according to the transportation plan based on the identified load amount; a determination means for determining whether there is a point where the SOC of the vehicle is below a reference value in the transition of the SOC of the vehicle during transportation; a determination result output means for outputting the result of the determination; A program that functions as a [Explanation of symbols]

[0144] 10. Transportation planning support device 11 Transportation Planning and Acquisition Department 12 SOC acquisition section at the time of departure from base 13 SOC transition prediction section 14 Judgment section 15. Judgment result output section 1A processor 2A Memory 3A input / output I / F 4A peripheral circuit 5A Bus

Claims

1. a transportation plan acquisition means for acquiring a transportation plan including addresses of transportation destinations, transportation order, and weights of packages to be delivered to each transportation destination; a base departure SOC acquisition means for acquiring a state of charge (SOC) of the vehicle when the vehicle departs from the base; an SOC transition prediction means for predicting a transition of the SOC of the vehicle when the vehicle moves from the base point to the end point based on the transportation plan; a determination means for determining whether there is a location where the SOC falls below a reference value in a predicted result of a transition of the SOC of the vehicle when the vehicle moves from the base to the end point based on the transportation plan; a determination result output means for outputting the result of the determination; and The SOC transition prediction means Dividing the route from the base to the end point into a plurality of sections by dividing the route into sections by the transportation destinations; Identifying the load capacity of the vehicle when traveling in each of the sections based on the weight of the cargo to be delivered to each of the destinations; Calculating an electricity consumption [km / kWh] of the vehicle when traveling in each of the sections based on the load of the vehicle when traveling in each of the sections; predicting a transition in the SOC of the vehicle while traveling in each of the sections based on the SOC of the vehicle when departing from the base and the electric power consumption [km / kWh] of the vehicle while traveling in each of the sections, on the assumption that electric power will be consumed at a rate indicated by the electric power consumption [km / kWh] of the vehicle while traveling in each of the sections; The determination means determining whether a predetermined condition is satisfied when there is a location where the SOC falls below the reference value in a predicted result of a transition of the SOC of the vehicle when the vehicle moves from the base to the end point based on the transportation plan; The predetermined condition is: The SOC of the vehicle when departing from the base is not 100%; and The time between the worker's arrival time at work and the worker's departure time from the base is equal to or greater than a threshold value, and There is an available reservation for charging equipment between the time the worker arrives at work and the time the worker departs from the base.

2. The determination means When it is determined that the predetermined condition is satisfied, a charging time for charging the vehicle before leaving the base is calculated based on the time between the worker's arrival time at work and the time the worker leaves the base and the reservation status of the charging facility, and a first charging amount for charging the vehicle before leaving the base is calculated based on the charging time; The SOC transition prediction means a value obtained by adding the first charge amount to the SOC of the vehicle at the time of departure from the base, which is acquired by the base departure SOC acquisition means, is set as the SOC of the vehicle at the time of departure from the base, and a transition of the SOC of the vehicle while traveling in each of the sections is predicted based on the electricity consumption [km / kWh] of the vehicle while traveling in each of the sections; The determination means 2. The transportation plan creation support device according to claim 1, wherein the SOC of the vehicle at the time of departure from the base is determined by adding the first charge amount to the SOC of the vehicle at the time of departure from the base, and the predicted result of the change in the SOC of the vehicle determines whether there are any points where the SOC is below a reference value.

3. The determination result output means transmitting an instruction to create and register a charging plan for charging the vehicle with the first charge amount to a charging planning system that manages charging at a charging facility before the vehicle departs from the base; 3. The transportation plan creation support device according to claim 2, wherein, in a prediction result of the transition of the SOC of the vehicle when the SOC of the vehicle at the time of departure from the base, acquired by the base departure SOC acquisition means, is set to the value obtained by adding the first charge amount to the SOC of the vehicle at the time of departure from the base, if there is a location where the SOC is below a reference value, the transportation plan is created and output in which the vehicle to be used is changed to another vehicle.

4. The transportation plan specifies rest periods, The determination means 4. The transportation plan creation support device according to claim 1, wherein, when a point where the SOC falls below the reference value exists in the predicted result of the change in the SOC of the vehicle, a search is made for charging facilities in the vicinity of the position of the vehicle during the break, and when a charging facility is found in the vicinity of the position of the vehicle during the break, a determination is made as to whether a point where the SOC falls below the reference value exists in the predicted result of the change in the SOC of the vehicle when the vehicle is charged during the break.

5. The determination means if there is a charging facility near the location of the vehicle during the break time, calculate a second charge amount to be charged to the vehicle during the break time based on the distance between the location of the charging facility and the location of the vehicle during the break time and the length of the break time; determining whether or not there is a point where the SOC falls below a reference value in a predicted result of a transition of the SOC of the vehicle when the vehicle is charged by the second charge amount during the rest period; The determination result output means transmitting an instruction to create and register a charging plan for charging the vehicle with the second charge amount during the break to a charging planning system that manages charging at charging equipment; 5. The transportation plan creation support device according to claim 4, wherein even if the vehicle is charged with the second charge amount during the rest period, if the predicted result of the change in SOC of the vehicle indicates that there is a location where the SOC falls below a reference value, the transportation plan is created and output in which the vehicle to be used is changed to another vehicle.

6. The base departure SOC acquisition means Identifying a charging reservation status of the vehicle based on reservation information indicating a reservation start time, a reserved charging time, and vehicle identification information of the vehicle to be charged; Calculating a reserved charging time based on the reservation start time and reservation end time of the vehicle; Calculating a reserved charging amount to be charged to the vehicle in the reserved charging based on the reserved charging time; 6. A transportation plan creation support device according to claim 1, wherein the SOC of the vehicle when departing from the base is obtained by adding the reserved charging amount to the SOC of the vehicle before the reserved charging.

7. The SOC transition prediction means If the cargo includes refrigerated or frozen goods, predicting a transition in the SOC of the vehicle when traveling from the base to the end point on the assumption that power will be consumed by a refrigeration function or a freezing function of the vehicle while the cargo is being loaded and unloaded at the destination; 7. A transportation plan creation support device according to claim 1, wherein, if the cargo does not include refrigerated or frozen goods, the device predicts the change in the SOC of the vehicle when traveling from the base to the end point, assuming that no power is consumed by the refrigeration or freezing function of the vehicle while the cargo is being loaded and unloaded at the destination.

8. The computer a transportation plan acquisition step of acquiring a transportation plan including addresses of transportation destinations, transportation order, and weights of packages to be delivered to each transportation destination; a base departure SOC acquisition step of acquiring an SOC of the vehicle when the vehicle departs from the base; an SOC transition prediction step of predicting a transition of the SOC of the vehicle when the vehicle moves from the base point to an end point based on the transportation plan; a determination step of determining whether there is a location where the SOC is below a reference value in a predicted result of a transition of the SOC of the vehicle when the vehicle moves from the base to the end point based on the transportation plan; a determination result output step of outputting the result of the determination; and In the SOC transition prediction step, Dividing the route from the base to the end point into a plurality of sections by dividing the route into sections by the transportation destinations; Identifying the load capacity of the vehicle when traveling in each of the sections based on the weight of the cargo to be delivered to each of the destinations; Calculating an electricity consumption [km / kWh] of the vehicle when traveling in each of the sections based on the load of the vehicle when traveling in each of the sections; predicting a transition in the SOC of the vehicle while traveling in each of the sections based on the SOC of the vehicle when departing from the base and the electric power consumption [km / kWh] of the vehicle while traveling in each of the sections, on the assumption that electric power will be consumed at a rate indicated by the electric power consumption [km / kWh] of the vehicle while traveling in each of the sections; In the determination step, determining whether a predetermined condition is satisfied when there is a location where the SOC falls below the reference value in a predicted result of a transition of the SOC of the vehicle when the vehicle moves from the base to the end point based on the transportation plan; The predetermined condition is: The SOC of the vehicle when departing from the base is not 100%; and The time between the worker's arrival time at work and the worker's departure time from the base is equal to or greater than a threshold value, and and there is an available reservation for charging equipment between the worker's arrival time at work and the time the worker departs from the base.

9. Computer, a transportation plan acquisition means for acquiring a transportation plan including addresses of transportation destinations, transportation order, and weights of packages to be delivered to each transportation destination; a base departure SOC acquisition means for acquiring the SOC of the vehicle when it departs from the base; an SOC transition prediction means for predicting a transition of the SOC of the vehicle when the vehicle moves from the base point to the end point based on the transportation plan; a determination means for determining whether there is a location where the SOC falls below a reference value in a predicted result of a transition of the SOC of the vehicle when the vehicle moves from the base to the end point based on the transportation plan; a determination result output means for outputting the result of the determination; It functions as The SOC transition prediction means Dividing the route from the base to the end point into a plurality of sections by dividing the route into sections by the transportation destinations; Identifying the load capacity of the vehicle when traveling in each of the sections based on the weight of the cargo to be delivered to each of the destinations; Calculating an electricity consumption [km / kWh] of the vehicle when traveling in each of the sections based on the load of the vehicle when traveling in each of the sections; predicting a transition in the SOC of the vehicle while traveling in each of the sections based on the SOC of the vehicle when departing from the base and the electric power consumption [km / kWh] of the vehicle while traveling in each of the sections, on the assumption that electric power will be consumed at a rate indicated by the electric power consumption [km / kWh] of the vehicle while traveling in each of the sections; The determination means determining whether a predetermined condition is satisfied when there is a location where the SOC falls below the reference value in a predicted result of a transition of the SOC of the vehicle when the vehicle moves from the base to the end point based on the transportation plan; The predetermined condition is: The SOC of the vehicle when departing from the base is not 100%; and The time between the worker's arrival time at work and the worker's departure time from the base is equal to or greater than a threshold value, and There is an available reservation for charging equipment between the time when the worker arrives at work and the time when the worker leaves the base.

Citation Information

Patent Citations

  • Battery charging system, vehicle management server, car sharing server, management method, program, and recording medium

    JP2010231258A

  • Power expense prediction method of electric vehicle, server, and electric vehicle

    JP2019086430A

  • Delivery plan generation device, computer program, and delivery plan generation method

    WO2020090252A1

  • Information processing method and information processing system

    WO2020105249A1

  • Information processing method and information processing system

    WO2020158073A1