Control system, control method, program, and interconnection system

The control system optimizes load operation to maximize profits from both power generation and grid systems, addressing the suboptimal revenue issue in existing systems by balancing power usage between these sources.

JP7796367B2Active Publication Date: 2026-01-09PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2022091099
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-06-03
Publication Date
2026-01-09
Estimated Expiration
2042-06-03

AI Technical Summary

Technical Problem

Existing systems do not effectively maximize profits from both a power generation system and a grid power system in the sale of electricity, leading to suboptimal revenue generation for users and operators.

Method used

A control system that includes a load control unit and a determination unit to manage the operation period of loads, optimizing the operation to maximize the sum of profits from the power generation system and grid power system by controlling loads such as electric water heaters.

Benefits of technology

The system enables increased profit by strategically managing the operation of loads to balance power usage between the power generation and grid systems, enhancing overall revenue generation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007796367000001
    Figure 0007796367000001
  • Figure 0007796367000002
    Figure 0007796367000002
  • Figure 0007796367000003
    Figure 0007796367000003
Patent Text Reader

Abstract

To get a larger profit in sales of electricity through a power generation system by controlling load and by selling electricity through a grid electricity system.SOLUTION: A control system 1 includes a load control unit 163 and a determination unit 162. The load control unit 163 controls a load 6 (e.g. electric water heater) installed in a facility 5. The determination unit 162 determines the operation period of the load. The determination unit 162 determines the operation period in which the sum of a first profit on the sale of power transmitted from a power generation system 30 installed in the facility 5 and a second profit on the sale of power transmitted from a grid power system is the maximum. The load control unit 163 controls the load so that the load operates for the operation period determined by the determination unit 162.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present disclosure generally relates to a control system, a control method, a program, and an interconnected system, and more particularly to a control system, a control method, a program, and an interconnected system for controlling a load. [Background technology]

[0002] BACKGROUND ART Conventionally, there is known a device (control system) that controls home appliances (loads) installed in a consumer (facility) (see Patent Document 1).

[0003] Patent Document 1 describes a home appliance control device that controls home appliances in response to fluctuating electricity prices without compromising convenience. The home appliance control device in Patent Document 1 includes a control unit that determines a time period during which power consumption of home appliances should be reduced based on an electricity tariff, and a command generation unit that generates control commands for controlling operations to reduce power consumption of the home appliances during the time period and transmits the generated control commands to the home appliances. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Japanese Patent Application Laid-Open No. 2011-142753 Summary of the Invention [Problem to be solved by the invention]

[0005] Recently, there has been a service in which users of a facility purchase power from a power generation system installed in the facility and use it for the load of the facility. In this service, the user of the facility uses the power from the power generation system, and a large profit is sought from the sale of the power via the power generation system and the sale of the power via a system that transmits grid power (grid power system).

[0006] The present disclosure has been made in consideration of the above-mentioned problems, and aims to provide a control system, a control method, a program, and an interconnection system that can control loads and obtain greater profits by selling electricity through a power generation system and through a grid power system. [Means for solving the problem]

[0007] A control system according to an aspect of the present disclosure includes a load control unit and a determination unit. The load control unit controls a load installed in a facility. The determination unit determines an operation period of the load. The determination unit determines an operation period of the load. , owned by PPA operators who provide Power Purchase Agreement services In the sale of electricity transmitted from the power generation system The PPA operator First profit and Used by electricity retailers when supplying electricity In the sale of electricity transmitted from the grid power system The electricity retailer The load control unit controls the load so that the load operates during the operation period determined by the determination unit. The first profit is the sum of a first power sales amount for the amount of power sent from the power generation system and used at the facility and a surplus power sales amount for the amount of power sent from the power generation system to the grid power system. The second profit is a value obtained by subtracting a power procurement cost and a power wheeling cost when power is sent from the grid power system from a second power sales amount for the amount of power sent from the grid power system and used at the facility.

[0008] A control method according to an aspect of the present disclosure includes a load control step and a determination step. The load control step controls a load installed in a facility. The determination step determines an operation period of the load. In the determination step, , owned by PPA operators who provide Power Purchase Agreement services In the sale of electricity transmitted from the power generation system The PPA operator First profit and Used by electricity retailers when supplying electricity In the sale of electricity transmitted from the grid power system The electricity retailer The load control step determines an operation period during which the total of the first profit and the second profit is maximized. The load control step controls the load so that the load operates during the operation period determined in the determination step. The first profit is the sum of a first power sales amount for the amount of power sent from the power generation system and used at the facility and a surplus power sales amount for the amount of power sent from the power generation system to the grid power system. The second profit is a value obtained by subtracting a power procurement cost and a power wheeling cost when power is sent from the grid power system from a second power sales amount for the amount of power sent from the grid power system and used at the facility.

[0009] A program according to one aspect of the present disclosure is a program for causing a computer system to execute the control method.

[0010] A grid-connected system according to one aspect of the present disclosure includes the control system and the power generation system. [Effects of the Invention]

[0011] According to the present disclosure, it is possible to control the load and obtain a large profit by selling power through the power generation system and the grid power system. [Brief explanation of the drawings]

[0012] [Figure 1] FIG. 1 is a system configuration diagram showing the configuration of an interconnection system including a control system according to one embodiment. [Figure 2] FIG. 2 is a block diagram showing the configuration of the control system of the above embodiment. [Figure 3] FIG. 3 is a graph showing the relationship between time and the power used in the facility and the power generated by the power generation system when an electric water heater controlled by the control system of the same is operated for a predetermined period at night. [Figure 4] Figure 4 is a graph showing the relationship between time and the electricity used in the facility and the electricity generated by the power generation system when an electric water heater controlled by the above-mentioned control system is operated during at least part of a specified period instead of during another period. [Figure 5] FIG. 5 is a flowchart showing the operation of a process related to determining an operating period of a load, which is performed by the control system of the above embodiment. [Figure 6] FIG. 6 is a flowchart showing the operation of a process related to load control performed by the control system of the above embodiment. DETAILED DESCRIPTION OF THE INVENTION

[0013] The embodiments and modifications described below are merely examples of the present disclosure, and the present disclosure is not limited to the embodiments and modifications. Various modifications other than the embodiments and modifications are possible depending on the design, etc., as long as they do not deviate from the technical idea of ​​the present disclosure.

[0014] (Embodiment) The control system 1 according to this embodiment will be described below with reference to FIGS.

[0015] (1) Overview A control system 1 according to this embodiment is installed in a facility 5 (see FIG. 1 ). The control system 1 controls the operation of a load 6 (here, an electric water heater 20) installed in the facility 5. In this disclosure, the term "facility" includes non-residential facilities such as business establishments, factories, buildings, stores, offices, schools, welfare facilities, or hospitals, as well as residential facilities such as detached houses, apartment buildings, or individual dwelling units in apartment buildings. Non-residential facilities also include theaters, movie theaters, public halls, amusement parks, complexes, restaurants, department stores, hotels, inns, kindergartens, libraries, museums, art galleries, underground shopping malls, stations, airports, and the like. Furthermore, in this disclosure, the term "facility" includes outdoor facilities such as baseball stadiums, gardens, parking lots, grounds, and parks.

[0016] As shown in FIG. 2, the control system 1 according to this embodiment includes a load control unit 163 and a determination unit 162. The load control unit 163 controls a load 6 (see FIG. 1) provided in a facility 5 (see FIG. 1). The determination unit 162 determines an operation period of the load 6. The determination unit 162 determines an operation period that maximizes the sum of a first profit from the sale of power transmitted from a power generation system 30 provided in the facility 5 and a second profit from the sale of power transmitted from a grid power system 7. The load control unit 163 controls the load 6 so that the load 6 operates within the operation period determined by the determination unit 162. Here, the grid power system 7 is a system that transmits power to the facility 5. The load 6 is, for example, an electric water heater 20.

[0017] According to this configuration, the control system 1 controls the load 6 (electric water heater 20) in an operating period in which the sum of the first profit and the second profit is maximized. That is, by controlling the load 6, it is possible to obtain a large profit by selling power through the power generation system 30 and the grid power system 7. More specifically, it is possible to obtain a large profit by selling power through the power generation system 30 and the grid power system 7 while having users of the facility 5 use the power of the power generation system 30.

[0018] (2) Composition The configurations of the control system 1 according to this embodiment and the interconnection system 2 including the control system 1 will be described below.

[0019] 1, the grid-connected system 2 includes a control device 10 as a control system 1, an electric water heater 20 as a load 6, a power generation system 30, a grid-connected device 40, a sensor 50, and a measuring device 60. The facility 5 also includes a distribution board 70 and a load (hereinafter referred to as a normal load 80) different from the electric water heater 20. The normal load 80 is, for example, an electric device such as a lighting device or an air-conditioning device.

[0020] The control device 10, the power generation system 30, the grid-connected device 40, and the sensor 50 are owned by a PPA company that provides a PPA (Power Purchase Agreement) service. The PPA company installs the control device 10, the power generation system 30, the grid-connected device 40, and the sensor 50 in the facility 5 based on a contract with the facility user through the PPA service, and sells the electricity generated by the power generation system 30 to the facility user on a priority basis. In other words, based on a contract with the facility user through the PPA service, the PPA company allows the facility user 5 to use the electricity generated by the power generation system 30 on a priority basis.

[0021] The electric water heater 20 is owned by a user of the facility 5. The user of the facility 5 operates the electric water heater 20 and the normal load 80 using power purchased from the PPA provider and power purchased from an electricity retailer. In other words, the user of the facility 5 operates the electric water heater 20 and the normal load 80 using power transmitted from the power generation system 30 and power transmitted from the grid power system 7 that the electricity retailer uses to supply electricity. Here, the PPA provider and the electricity retailer belong to the same corporate group. Alternatively, the PPA provider and the electricity retailer may be the same company.

[0022] The electric water heater 20 may be owned by the PPA company. When the PPA company owns the electric water heater 20, the user of the facility 5 is permitted to use the electric water heater 20 based on a contract with the user of the facility through the PPA service.

[0023] (2.1) Sensors The sensor 50 detects the power output from the interconnection device 40 .

[0024] (2.2) Power generation system As shown in FIG. 1, the power generation system 30 includes a solar power generation facility 31 and a power conditioner (PCS: Power Conditioning System) 32.

[0025] The solar power generation facility 31 generates electrical energy using sunlight as an energy source.

[0026] The PCS 32 has a converter and an inverter. The converter is provided in a path connecting the inverter and the photovoltaic power generation facility 31. The converter has a function as a DC / DC converter. The converter outputs electrical energy (power) output from the photovoltaic power generation facility 31 to the inverter via the DC / DC converter. The inverter is electrically connected to the grid-connection device 40. The inverter is connected to the converter. The inverter converts DC power into AC power and outputs it to the grid-connection device 40.

[0027] The PCS 32 measures the power value (first power value) to be sent to the grid-connection device 40, and outputs the measurement result to the control device 10. The PCS 32 also acquires the power value detected by the sensor 50 from the sensor 50 as the power value (second power value) to be sent from the grid-connection device 40 to the grid power system 7. The PCS 32 outputs the acquired second power value to the control device 10.

[0028] (2.3) Measuring equipment The measuring device 60 is, for example, a smart meter. The measuring device 60 measures the amount of power transmitted from the grid power system 7. That is, the measuring device 60 measures the value of power received by the facility 5 from the grid power system 7 (received power value). The measuring device 60 outputs the measured received power value to the control device 10.

[0029] (2.4) Interconnection device The grid-connection device 40 switches the output destination of the power received from the PCS 32. Specifically, the grid-connection device 40 switches the output destination of the power received from the PCS 32 to either the distribution board 70 or the grid power system 7. That is, the grid-connection device 40 outputs the power received from the PCS 32 to either the distribution board 70 or the grid power system 7. Furthermore, the grid-connection device 40 outputs the power received from the grid power system 7 to the distribution board 70 and the control device 10.

[0030] (2.5) Distribution board The distribution board 70 includes a main breaker electrically connected to the grid-connection device 40 and a plurality of branch breakers electrically connected to the secondary side of the main breaker. Each of the normal loads 80 and the electric water heater 20 is electrically connected to one of the plurality of branch breakers. The distribution board 70 outputs the power received from the grid-connection device 40 via the branch breakers electrically connected to the normal loads 80 and the electric water heater 20.

[0031] (2.6) Normal Load and Electric Water Heaters As described above, the normal loads 80 are electrical devices such as lighting equipment, air conditioning equipment, etc. The normal loads 80 are operated by receiving power from the distribution board 70.

[0032] The electric water heater 20 heats water using power supplied from the distribution board 70. For example, the electric water heater 20 heats water using a heat pump system. The electric water heater 20 stores the heated water (hot water) in a water storage tank.

[0033] The operation period (operation period) of the electric water heater 20 is controlled by the control device 10. That is, the electric water heater 20 is configured so that the operation period can be changed by the control device 10.

[0034] (2.7) Control device As shown in FIG. 2, the control device 10 includes a storage unit 11, a first communication unit 12, a second communication unit 13, a third communication unit 14, a fourth communication unit 15, and a control unit 16.

[0035] The control device 10 has, for example, a computer system having one or more processors and a memory. The processor executes a program stored in the memory, causing the computer system to function as the control unit 16. The program executed by the processor is pre-recorded in the memory of the computer system here, but may also be provided by being recorded on a non-transitory recording medium such as a memory card, or via a telecommunications line such as the Internet.

[0036] The storage unit 11 is configured by a device selected from a ROM (Read Only Memory), a RAM (Random Access Memory), an EEPROM (Electrically Erasable Programmable Read Only Memory), and the like.

[0037] The storage unit 11 stores the measured power values ​​in chronological order. Specifically, the storage unit 11 stores the first power values ​​measured by the PCS 32 in chronological order. The storage unit 11 stores the second power values ​​acquired by the PCS 32 from the sensor 50 in chronological order. Furthermore, the storage unit 11 stores the received power values ​​measured by the measurement device 60 in chronological order. At this time, the storage unit 11 stores each power value in association with weather information relating to the weather in the area including the facility 5 on the day the power value was measured. The weather information is information output from the information providing device 700 shown in FIG. 1.

[0038] Furthermore, the memory unit 11 stores the operating period of the electric water heater 20. The memory unit 11 also stores information related to power procurement costs and information related to power wheeling costs. Power procurement costs are costs incurred when a power retailer procures power, and vary depending on the time of day. When providing power to facility 5, the power retailer uses a grid power system 7 that transmits power to facility 5. Power wheeling costs are costs paid by the power retailer to a grid operator that operates the grid power system 7 used when transmitting power.

[0039] The first communication unit 12 has a communication interface for communicating with the electric water heater 20. The first communication unit 12 is configured to be able to communicate with the electric water heater 20 wirelessly or via a wire.

[0040] The second communication unit 13 has a communication interface for communicating with the PCS 32. The second communication unit 13 is configured to be able to communicate with the PCS 32 wirelessly or via a wire.

[0041] The third communication unit 14 has a communication interface for communicating with the measurement device 60. The third communication unit 14 is configured to be able to communicate with the measurement device 60 wirelessly or via a wire.

[0042] The fourth communication unit 15 has a communication interface for communicating with a server 3 installed outside the facility 5 and an information providing device 700 via a network NT1 such as the Internet. Here, the server 3 stores the operation period of the electric water heater 20 determined by the control device 10. The server 3 stores a first profit from the sale of electricity transmitted from the power generation system 30 installed in the facility 5, a second profit from the sale of electricity transmitted from the grid power system 7, and the sum of the first profit and the second profit. The information providing device 700 transmits weather forecast information indicating the forecast weather in an area including the facility 5.

[0043] As shown in FIG. 2, the control unit 16 includes an acquisition unit 160, a determination unit 161, a decision unit 162, and a load control unit 163.

[0044] The acquisition unit 160 acquires power values ​​from the PCS 32 and the measurement device 60. The acquisition unit 160 acquires a first power value from the PCS 32 via the second communication unit 13. The acquisition unit 160 stores the acquired first power value in chronological order in the storage unit 11. The acquisition unit 160 acquires a second power value from the PCS 32 via the second communication unit 13. The acquisition unit 160 stores the acquired second power value in chronological order in the storage unit 11. The acquisition unit 160 acquires a received power value from the measurement device 60 via the third communication unit 14. The acquisition unit 160 stores the acquired received power value in chronological order in the storage unit 11.

[0045] Furthermore, the acquisition unit 160 acquires weather information relating to the weather on the day when the power values ​​in the area including the facility 5 were measured from the information providing device 700 via the fourth communication unit 15. The acquisition unit 160 stores the acquired weather information in the storage unit 11. Specifically, the acquisition unit 160 associates each power value acquired from the PCS 32 and the measuring device 60 with the weather information on the day when the power values ​​in the area including the facility 5 were measured, and stores the associated information in chronological order in the storage unit 11.

[0046] The acquisition unit 160 also acquires weather forecast information including forecast weather on the scheduled operation date of the electric water heater 20 from the information providing device 700 via the fourth communication unit.

[0047] The determination unit 161 determines whether or not power generation by the power generation system 30 is possible on the scheduled operation day, based on the forecast weather in an area including the facility 5 on the scheduled operation day of the electric water heater 20, which is the load 6. Specifically, if the weather forecast information acquired by the acquisition unit 160 indicates that the weather on the scheduled operation day is sunny, the determination unit 161 determines that power generation by the power generation system 30 is possible on the scheduled operation day. If the weather forecast information indicates that the weather on the scheduled operation day is different from sunny, the determination unit 161 determines that power generation by the power generation system 30 is impossible on the scheduled operation day.

[0048] The determination unit 162 determines an operation period for the electric water heater 20, which is the load 6. The determination unit 162 determines an operation period that maximizes the sum of a first profit from the sale of power transmitted from the power generation system 30 installed in the facility 5 and a second profit from the sale of power transmitted from the grid power system 7. More specifically, when the determination unit 161 determines that power generation by the power generation system 30, i.e., by the solar power generation facility 31, is possible on the scheduled operation date of the electric water heater 20 (load 6), the determination unit 162 determines the operation period on the scheduled operation date.

[0049] The first profit is the sum of the first power sales amount for the amount of power sent from the power generation system 30 and used at the facility 5, and the surplus power sales amount for the amount of power sent from the power generation system 30 to the grid power system 7. In other words, the first power sales amount and the surplus power sales amount are sales amounts for the amount of power output from the solar power generation facility 31. The second profit is a value obtained by subtracting the power procurement cost and power wheeling cost when the power is sent from the grid power system 7 from the second power sales amount for the amount of power sent from the grid power system 7 and used at the facility 5. The amount of power used at the facility 5 is the amount of power predicted to be used by the electric water heater 20 and the normal load 80 on the scheduled operation day. For example, the first profit and the second profit are the profits earned in one day.

[0050] The determination unit 162 changes the operating period of the load 6 (electric water heater 20) at predetermined intervals (for example, 60 minutes, 90 minutes) and determines the operating period that maximizes the sum of the first profit and the second profit obtained during the operating period at each predetermined interval.

[0051] The determination unit 162 changes the period during which the electric water heater 20 is operated to determine the operation period that maximizes the sum of the first profit and the second profit. That is, the sum of the first profit and the second profit depends on the first electricity sales amount, the surplus electricity sales amount, the second electricity sales amount, the electricity procurement cost, and the electricity wheeling cost during the period during which the electric water heater 20 is operated. Therefore, the determination unit 162 may determine the operation period so that the profit (target profit) is larger than the reference profit. The reference profit is the profit obtained in the predetermined period T1 (see FIG. 3) when the load 6 is operated in the predetermined period T1 using power from the grid power system 7. That is, the determination unit 162 may determine another period T12 (see FIG. 4) as the operation period so that the target profit is larger than the profit obtained in the predetermined period T1 (see FIG. 3) when the load 6 is operated in the predetermined period T1. Here, the target profit is the profit obtained in the other period T12 when the load 6 (electric water heater 20) is operated using power from at least the power generation system 30 out of the power generation system 30 and the grid power system 7 in place of at least a part of the period T10 of the predetermined period T1 in the other period T12. Furthermore, the target profit is the profit included in the sum of the first profit and the second profit. Here, the predetermined period T1 is a time period during the night, and the other period T12 is a time period during the day T2 (see Figures 3 and 4). The night is, for example, the time period from 10 PM to 6 AM the next day. The daytime T2 is, for example, 7 AM to 6 PM.

[0052] Here, the determination of the operating period will be explained using a specific example.

[0053] 3 shows a graph G0 representing the relationship between time and the power used in the facility and the power generated by the power generation system 30 when the electric water heater 20 is operated during a predetermined period (nighttime) T1 using power from the grid power system 7. FIG. 4 also shows a graph G10 representing the relationship between time and the power used in the facility and the power generated by the power generation system 30 when the electric water heater 20 is operated during a period T12 using power from at least the power generation system 30 of the power generation system 30 and the grid power system 7 instead of during at least a portion of the predetermined period T10.

[0054] Data G1 shown in Fig. 3 represents the power consumed when the electric water heater 20 operates on power from the grid power system 7 during a predetermined period T1. The area of ​​data G1 represents the amount of power consumed during the predetermined period. In this embodiment, data G1 is stored in advance in the storage unit 11.

[0055] 3 and 4 represents the power from the grid power system 7 used by the normal load 80 installed in the facility 5. Furthermore, a value a1 represents the standby power received from the grid power system 7. The standby power is stable power during the period when the electric water heater 20 and the normal load 80 are considered not to be operating.

[0056] 3 and 4 represents the power generated during daytime T2 by the power generation system 30, that is, the photovoltaic power generation facility 31. The area of ​​the data G3 represents the amount of power.

[0057] 3 and 4 represents the amount of power used by the normal load 80 of the facility 5 out of the power generated by the power generation system 30. The area of ​​data G4 is the amount of power used by the normal load 80 of the facility 5 out of the power generated by the power generation system 30. The amount of power generated by the power generation system 30 that is not used by the normal load 80 of the facility 5, i.e., the difference between the power generated by the power generation system 30 and the power used by the normal load 80, is the surplus power. The amount of surplus power is obtained by subtracting the area of ​​data G4 from the area of ​​data G3.

[0058] Data G2, G3, and G4 represent average power values ​​for a predetermined number of days (e.g., 10 days) with clear weather in the past month, for example, based on the day on which the process for determining the operating period is executed. When determining that power generation is possible in the solar power generation facility 31, the determination unit 162 calculates average values ​​of the first power value, the second power value, and the received power value for the predetermined number of days (e.g., 10 days) with clear weather in the past month. The determination unit 162 generates data G3 from the average value of the first power value, data G4 from the result of subtracting the average value of the second power value from the average value of the first power value, and data G2 from the average value of the received power value. The determination unit 162 generates graph G0 using pre-stored data G1 and the generated data G2 to G4.

[0059] 4 represents the power used when operating on power from the grid power system 7 during the remaining period T11 of the predetermined period T1, excluding the period T10 that has been replaced by another period T12. The area of ​​the data G11 represents the amount of power used during the remaining period T11.

[0060] 4 represents the power used when the electric water heater 20 is operated using power from at least the power generation system 30 of the power generation system 30 and the grid power system 7 during another period T12 instead of the period T10. The area of ​​the data G12 represents the amount of power used during the other period T12.

[0061] Data G12 includes data G13 and data G14. Data G13 represents the power used when the electric water heater 20 is operated using power from the grid power system 7 during another period T12. Data G13 is represented by an area including a value greater than the power value represented by data G3 during another period T12. The area of ​​data G13 represents the amount of power used when the electric water heater 20 is operated using power from the grid power system 7 during another period T12. Data G14 represents the power used when the electric water heater 20 is operated using power from the power generation system 30 during another period T12. Data G14 is represented by an area including a value equal to or less than the power value represented by data G3 during another period T12. The area of ​​data G14 represents the amount of power used when the electric water heater 20 is operated using power from the power generation system 30 during another period T12.

[0062] The determination unit 162 acquires the amount of power required to operate the electric water heater 20 for the predetermined period T1. That is, the determination unit 162 acquires the amount of power required according to the data G1. The determination unit 162 acquires the power procurement cost and the power wheeling cost for the predetermined period T1 from the storage unit 11, and calculates a reference profit which is the result of subtracting the acquired power procurement cost and the power wheeling cost from the second sales amount for the amount of power according to the data G1.

[0063] The determination unit 162 allocates another period T12 to a part of the daytime T2 in place of at least a part of the period T10 of the predetermined period T1. The determination unit 162 calculates the profit for the allocated period (the other period T12). For example, in the other period T12 shown in FIG. 4, the electric water heater 20 operates using both power from the power generation system 30 and power from the grid power system 7. The determination unit 162 calculates the profit for the sale of power transmitted from the power generation system 30 in the other period T12 (first target profit). The determination unit 162 calculates the sum of the profit for the sale of power transmitted from the grid power system 7 in the remaining period T11 and the profit for the sale of power transmitted from the grid power system 7 in the other period T12 as the second target profit.

[0064] The determination unit 162 calculates the sum of the first target profit and the second target profit. More specifically, the determination unit 162 calculates, as the first target profit, the sum of a first power sales amount for the amount of power sent from the power generation system 30 and used in the electric water heater 20 and a surplus power sales amount for the amount of power sent from the power generation system 30 to the grid power system, during the other period T12. The determination unit 162 calculates, for each of the remaining period T11 and the other period T12, a value obtained by subtracting the power procurement cost and the power wheeling cost for the other period T12 from the second power sales amount for the amount of power sent from the grid power system 7 and used in the electric water heater 20. The determination unit 162 calculates, as the second target profit, the sum of the values ​​calculated for each of the remaining period T11 and the other period T12. The determination unit 162 calculates the sum of the calculated first target profit and second target profit. Here, if the load 6 (electric water heater 20) is operated in the predetermined period T1, a profit can be obtained by selling surplus electricity in the other period T12. However, by operating the load 6 (electric water heater 20) in the other period T12, the profit from selling surplus electricity is replaced with the first target profit. Therefore, the determination unit 162 calculates the final profit (target profit) in the other period T12 by subtracting the profit from selling surplus electricity from the sum of the first target profit and the second target profit. The determination unit 162 calculates the target profit for each of the multiple allocation periods while changing the period (allocation period) to be allocated as the other period T12 within the daytime T2.

[0065] The determination unit 162 determines, as the operation period, another period T12 corresponding to a target profit greater than the reference profit from among the multiple target profits calculated for each of the multiple allocation periods. If there are multiple target profits greater than the reference profit, the determination unit 162 determines, as the operation period, another period T12 corresponding to the target with the largest difference from the reference profit. At this time, the determination unit 162 also determines the remaining period T11 as the operation period. As described above, the sum of the first profit and the second profit depends on the first electricity sales amount, surplus electricity sales amount, second electricity sales amount, electricity procurement cost, and electricity wheeling cost during the period in which the electric water heater 20 is operated. Therefore, by maximizing the profit obtained by operating the electric water heater 20, the sum of the first profit and the second profit is maximized.

[0066] The determination unit 162 stores information including the determined operating periods and scheduled operating dates as schedule information in the storage unit 11. Here, the determination unit 162 determines the other period T12 and the remaining period T11 as operating periods, and stores the schedule information including the operating periods and scheduled operating dates in the storage unit 11.

[0067] The load control unit 163 controls the electric water heater 20, which is the load 6 provided in the facility 5, by communication via the first communication unit 12. The load control unit 163 controls the electric water heater 20, which is the load 6, so that it operates during the operation period determined by the determination unit 162.

[0068] Specifically, at a predetermined time (e.g., midnight), the load control unit 163 determines whether schedule information including a scheduled operation date that is the same as the current day is stored in the storage unit 11. If it is determined that schedule information including a scheduled operation date that is the same as the current day is stored in the storage unit 11, the load control unit 163 acquires the schedule information including the scheduled operation date. The load control unit 163 starts controlling the electric water heater 20 based on the operation period included in the acquired schedule information. The load control unit 163 operates the electric water heater 20 at the start time of the operation period (e.g., the start time of the remaining period T11, the start time of another period T12). The load control unit 163 stops the electric water heater 20 at the end time of the operation period (e.g., the end time of the remaining period T11, the end time of another period T12). At this time, when using power from the power generation system 30, the grid-connection device 40 outputs power transmitted from the PCS 32 to the distribution board 70. When using power from the grid power system 7, the grid interconnection device 40 outputs the power transmitted from the grid power system 7 to the distribution board 70.

[0069] If it is determined that the memory unit 11 does not store schedule information including the same scheduled operation date as the current day, the load control unit 163 controls the electric water heater 20 to operate at night, for example, for a predetermined period T1 shown in Figure 3.

[0070] (3) Operation (3.1) Decision process Here, the operation of the determination process in which the control device 10 determines the operation period of the electric water heater 20 will be described with reference to FIG.

[0071] The acquisition unit 160 acquires weather forecast information including forecast weather on the scheduled operation date of the electric water heater 20 from the information providing device 700 (step S1).

[0072] The determination unit 161 determines whether power generation by the power generation system 30 is possible on the scheduled operation day (step S2). If the weather forecast information acquired by the acquisition unit 160 indicates that the weather on the scheduled operation day included in the weather forecast information is other than sunny, the determination unit 161 determines that power generation by the power generation system 30 is impossible on the scheduled operation day. If the weather forecast information acquired by the acquisition unit 160 indicates that the weather on the scheduled operation day included in the weather forecast information is sunny, the determination unit 161 determines that power generation by the power generation system 30 is possible on the scheduled operation day.

[0073] If it is determined that power generation by the power generation system 30 is not possible on the scheduled operation date ("No" in step S2), the process ends.

[0074] When the determination unit 161 determines that the power generation system 30 can generate power on the scheduled operation date ("Yes" in step S2), the determination unit 162 determines an operation period for the electric water heater 20 on the scheduled operation date (step S3). The determination unit 162 determines an operation period that maximizes the sum of the first profit from the sale of power transmitted from the power generation system 30 and the second profit from the sale of power transmitted from the grid power system 7.

[0075] The determination unit 162 performs a storage process to store the operating periods determined in step S3 (step S4). Specifically, the determination unit 162 stores information including the determined operating periods and scheduled operating dates as schedule information in the storage unit 11. As an example, the determination unit 162 determines the other period T12 and the remaining period T11 as operating periods, and stores schedule information including the operating periods and scheduled operating dates in the storage unit 11.

[0076] (3.2) Control processing Here, the operation of the control process performed by the control device 10 on the electric water heater 20 will be described with reference to FIG.

[0077] At a predetermined time (for example, midnight), the load control unit 163 determines whether or not schedule information including the same scheduled operation date as the current day is stored in the storage unit 11 (step S11).

[0078] If it is determined that schedule information including the same scheduled operation date as the current day is stored in the memory unit 11 ("Yes" in step S11), the load control unit 163 acquires the schedule information including the scheduled operation date (step S12).

[0079] The load control unit 163 performs a first control process based on the acquired schedule information (step S13). The load control unit 163 starts controlling the electric water heater 20 based on the operating period included in the acquired schedule information. The load control unit 163 operates the electric water heater 20 at the start time of the operating period (e.g., the start time of the remaining period T11, the start time of another period T12). The load control unit 163 stops the electric water heater 20 at the end time of the operating period (e.g., the end time of the remaining period T11, the end time of another period T12).

[0080] If it is determined that the storage unit 11 does not store schedule information including the same scheduled operation date as the current day ("No" in step S11), the load control unit 163 performs a second control process (step S14). The load control unit 163 controls the electric water heater 20 to operate at night, for example, for a predetermined period T1 shown in FIG.

[0081] (4) Advantages As described above, the control system 1 (control device 10) of the embodiment includes the load control unit 163 and the determination unit 162. The load control unit 163 controls the load 6 (for example, the electric water heater 20) provided in the facility 5. The determination unit 162 determines an operation period for the load 6. The determination unit 162 determines an operation period that maximizes the sum of a first profit from the sale of power transmitted from the power generation system 30 provided in the facility 5 and a second profit from the sale of power transmitted from the grid power system 7. The load control unit 163 controls the load 6 to operate within the operation period determined by the determination unit 162.

[0082] According to this configuration, the control system 1 controls the load 6 (electric water heater 20) in an operating period in which the sum of the first profit and the second profit is maximized. That is, by controlling the load 6, it is possible to obtain a large profit by selling power through the power generation system 30 and the grid power system 7. More specifically, it is possible to obtain a large profit by selling power through the power generation system 30 and the grid power system 7 while having users of the facility 5 use the power of the power generation system 30.

[0083] (5) Variations Modifications are listed below. The modifications described below can be applied in appropriate combination with the above-described embodiment.

[0084] (5.1) Variation 1 The operation period of the electric water heater 20 may be determined by the server 3. In this case, the control system 1 is configured to include the control device 10 and the server 3.

[0085] Furthermore, the determination of the operation period of the electric water heater 20 and the control of the electric water heater 20 during the determined operation period may be performed by the server 3. In this case, the control device 10 functions as a relay. That is, the server 3 controls the electric water heater 20 via the control device 10. When the determination of the operation period and the control of the electric water heater 20 during the operation period are performed by the server 3, the control system 1 is configured to include at least the server 3 out of the control device 10 and the server 3.

[0086] (5.2) Variation 2 The control device 10 may transmit each power value acquired from the PCS 32 and the measuring device 60 to the server 3 via the network NT1. The server 3 calculates the amount to be paid by the user of the facility 5 based on each power value received from the control device 10 and notifies the user. Alternatively, the server 3 notifies the user of information related to the amount of power used in the facility 5 (for example, information indicating the change in the amount of power used in a day) based on each power value received from the control device 10.

[0087] Alternatively, the server 3 may further transmit each power value received from the control device 10 to another server. The other server may calculate the amount to be paid by the user of the facility 5 based on each power value received from the server 3 and notify the user. Alternatively, the server 3 may notify the user of information regarding the amount of power used in the facility 5 (for example, information indicating the change in the amount of power used in a day) based on each power value received from the server 3. Here, the other server may be, for example, a server of the PPA provider or a server of the electricity retailer. Alternatively, the other server may be a server of another company in the corporate group to which the PPA provider and the electricity retailer belong.

[0088] (5.3) Variation 3 Although the solar power generation facility 31 has been described as an example of the power generation system 30, the power generation system 30 is not limited to a configuration including the solar power generation facility 31.

[0089] The power generation system 30 may include a hydroelectric power generation facility or a wind power generation facility.

[0090] Alternatively, the power generation system 30 may be configured to include two or more facilities selected from the group consisting of a solar power generation facility 31, a hydroelectric power generation facility, and a wind power generation facility. That is, the power generation system 30 is configured to include at least one facility selected from the group consisting of a solar power generation facility 31, a hydroelectric power generation facility, and a wind power generation facility.

[0091] (5.4) Variation 4 The predetermined period T1 is not limited to nighttime, but may be daytime.

[0092] Furthermore, when the power generation system 30 includes at least one of a hydroelectric power generation facility and a wind power generation facility, the other period T12 may be nighttime.

[0093] (5.5) Variation 5 Although the electric water heater 20 has been described as an example of the load 6 whose operation period is determined by the control system 1 and controlled during the determined operation period, the load 6 whose operation period is determined by the control system 1 and controlled during the determined operation period is not limited to the electric water heater 20. The load 6 whose operation period is determined by the control system 1 and controlled during the determined operation period may be, for example, a power storage device or an electric vehicle (EV).

[0094] (Other variations) The above embodiment is merely one of various embodiments of the present disclosure, and various modifications can be made to the above embodiment depending on the design and the like as long as the object of the present disclosure can be achieved.

[0095] Furthermore, functions similar to those of the control system 1 may be embodied as a control method, a computer program, or a non-transitory recording medium on which a program is recorded. A control method according to one embodiment includes a load control step and a determination step. The load control step controls a load 6 (e.g., an electric water heater 20) provided in the facility 5. The determination step determines an operation period of the load 6. The determination step determines an operation period that maximizes the sum of a first profit from the sale of power transmitted from the power generation system 30 provided in the facility 5 and a second profit from the sale of power transmitted from the grid power system 7. The load control step controls the load 6 to operate within the operation period determined in the determination step. A program according to one embodiment is a program for causing a computer system to execute the above-described control method.

[0096] The control system 1 in the present disclosure includes a computer system. The computer system is primarily composed of a processor and memory as hardware. The processor executes a program stored in the memory of the computer system to realize the functions of the control system 1 in the present disclosure. The program may be pre-stored in the memory of the computer system, provided via a telecommunications line, or provided in a non-transitory recording medium such as a memory card, optical disk, or hard disk drive that is readable by the computer system. The processor of the computer system is composed of one or more electronic circuits, including a semiconductor integrated circuit (IC) or a large-scale integrated circuit (LSI). The integrated circuits, such as ICs and LSIs, are referred to by different names depending on the degree of integration, and include integrated circuits called system LSIs, very large-scale integrations (VLSIs), and ultra-large-scale integrations (ULSIs). Furthermore, field-programmable gate arrays (FPGAs), which are programmed after the LSI is manufactured, or logic devices that allow the reconfiguration of internal connections or circuit partitions within the LSI can also be used as processors. Multiple electronic circuits may be integrated on a single chip or distributed across multiple chips. The multiple chips may be integrated into one device or distributed across multiple devices. The computer system referred to here includes a microcontroller having one or more processors and one or more memories. Therefore, the microcontroller also comprises one or more electronic circuits, including semiconductor integrated circuits or large-scale integrated circuits.

[0097] Furthermore, it is not essential for the control system 1 that multiple functions in the control system 1 are concentrated in one housing, and the components of the control system 1 may be distributed across multiple housings. Furthermore, at least some of the functions of the control system 1 may be realized by the cloud (cloud computing) or the like.

[0098] (summary) As described above, the control system (1) of the first aspect includes a load control unit (163) and a determination unit (162). The load control unit (163) controls a load (6) (e.g., an electric water heater 20) provided in a facility (5). The determination unit (162) determines an operation period of the load (6). The determination unit (162) determines an operation period that maximizes the sum of a first profit from the sale of power transmitted from a power generation system (30) provided in the facility (5) and a second profit from the sale of power transmitted from the grid power system (7). The load control unit (163) controls the load (6) to operate within the operation period determined by the determination unit (162).

[0099] According to this embodiment, the control system 1 controls the load 6 in an operation period in which the sum of the first profit and the second profit is maximized. That is, by controlling the load 6, it is possible to obtain a large profit by selling power through the power generation system 30 and the grid power system 7. More specifically, it is possible to obtain a large profit by selling power through the power generation system 30 and the grid power system 7 while allowing users of the facility 5 to use the power of the power generation system 30.

[0100] In the control system (1) of the second aspect, in the first aspect, the first profit is the sum of a first power sales amount for the amount of power sent from the power generation system (30) and used in the facility (5) and a surplus power sales amount for the amount of power sent from the power generation system (30) to the grid power system (7). The second profit is a value obtained by subtracting a power procurement cost and a power wheeling cost when the power is sent from the grid power system (7) from a second power sales amount for the amount of power sent from the grid power system (7) and used in the facility (5).

[0101] According to this embodiment, it is possible to control the load (6) and obtain a large profit by selling the power through the power generation system (30) and the grid power system (7).

[0102] In the control system (1) of the third aspect, the power generation system (30) in the second aspect includes a solar power generation facility (31). The first power sales amount and the surplus power sales amount are sales amounts for the amount of power output from the solar power generation facility (31).

[0103] According to this embodiment, profits can be obtained based on the electricity generated by solar power.

[0104] The control system (1) of the fourth aspect is the control system (1) of any one of the first to third aspects, further including a determination unit (161). The determination unit (161) determines whether the power generation system (30) can generate power on the scheduled operation day based on the forecast of weather in an area including the facility (5) on the scheduled operation day of the load (6). The determination unit (162) determines an operation period on the scheduled operation day when the determination unit (161) determines that the power generation system (30) can generate power on the scheduled operation day.

[0105] According to this embodiment, the operation period on the scheduled operation date can be determined depending on whether the load (6) can generate power on the scheduled operation date.

[0106] In the control system (1) of the fifth aspect, in any of the first to fourth aspects, the determination unit (162) determines the other period (T12) as the operating period so that the profit (target profit) is greater than the reference profit. The reference profit is the profit obtained in the predetermined period (T1) when the load (6) is operated in the predetermined period (T1) using power from the grid power system (7). The target profit is the profit obtained in the other period (T12) when the load (6) is operated in the other period (T12) using power from at least the power generation system (30) of the power generation system (30) and the grid power system (7) instead of at least a part (T10) of the predetermined period (T1), and is the profit included in the sum of the first profit and the second profit.

[0107] According to this embodiment, the maximum value of the sum of the first profit and the second profit can be found based on the reference profit.

[0108] In the control system (1) of the sixth embodiment, in the fifth embodiment, the predetermined period (T1) is nighttime, and the other period (T12) is daytime.

[0109] According to this embodiment, it is possible to operate the load (6) during the daytime, while making a large profit by selling the power through the power generation system (30) and the grid power system (7).

[0110] In the control system (1) of the seventh aspect, in any one of the first to sixth aspects, the load (6) is an electric water heater (20).

[0111] According to this embodiment, by controlling the electric water heater (20) to operate during the operating period, it is possible to obtain a large profit from the sale of power through the power generation system (30) and the grid power system (7).

[0112] The control method of the eighth aspect includes a load control step and a determination step. The load control step controls a load (6) (e.g., an electric water heater 20) provided in a facility (5). The determination step determines an operation period of the load (6). The determination step determines an operation period that maximizes the sum of a first profit from the sale of power transmitted from a power generation system (30) provided in the facility (5) and a second profit from the sale of power transmitted from a grid power system (7). The load control step controls the load (6) to operate within the operation period determined in the determination step.

[0113] According to this embodiment, it is possible to obtain a large profit by selling the electric power through the power generation system (30) and the grid electric power system (7).

[0114] A program according to a ninth aspect is a program for causing a computer system to execute the control method according to the eighth aspect.

[0115] According to this embodiment, it is possible to obtain a large profit by selling the electric power through the power generation system (30) and the grid electric power system (7).

[0116] The interconnection system (2) of the tenth aspect includes the control system (1) of any one of the first to seventh aspects and a power generation system (30).

[0117] According to this embodiment, it is possible to obtain a large profit by selling the electric power through the power generation system (30) and the grid electric power system (7). [Explanation of symbols]

[0118] 1. Control System 2. Grid-connected system 6 Load 7-grid power system 10 Control device 20 Electric water heater 30 Power Generation System 31 Solar power generation facilities 161 Judgment Department 162 Decision Section 163 Load control section T1 specified period T12 Other periods

Claims

1. a load control unit that controls a load installed in the facility; a determination unit that determines an operation period of the load, the determination unit is provided in the facility and determines an operation period that maximizes the sum of a first profit of the PPA company in selling electricity transmitted from a power generation system owned by the PPA company that provides the Power Purchase Agreement service and a second profit of the electricity retail company in selling electricity transmitted from a grid power system used by the electricity retail company when supplying electricity; the load control unit controls the load so that the load operates during the operation period determined by the determination unit; the first profit is a sum of a first power sales amount for the amount of power sent from the power generation system and used in the facility and a surplus power sales amount for the amount of power sent from the power generation system to the grid power system, the second profit is a value obtained by subtracting a power procurement cost and a power wheeling cost when the power is sent from the grid power system from a second power sales amount for the amount of power sent from the grid power system and used in the facility; Control system.

2. The power generation system includes a solar power generation facility, The first electricity sales amount and the surplus electricity sales amount are sales amounts for the amount of electricity output from the solar power generation facility. The control system of claim 1 .

3. A determination unit is further provided which determines whether or not power can be generated by the power generation system on the scheduled operation date based on a forecast of weather in an area including the facility on the scheduled operation date of the load, the determination unit determines the operation period on the scheduled operation date when the determination unit determines that power generation by the power generation system is possible on the scheduled operation date. The control system of claim 1 .

4. The determination unit: determining the other period as the operation period so that a profit that is obtained in the other period when the load is operated with electric power from at least the power generation system of the power generation system and the grid power system in place of at least a part of the predetermined period, and that is included in the sum of the first profit and the second profit, is larger than a base profit that is obtained in the predetermined period when the load is operated with electric power from the grid power system in the predetermined period; The control system of claim 1 .

5. The predetermined period is nighttime, The other period is a daytime period. The control system of claim 4.

6. The load is an electric water heater. The control system of claim 1 .

7. A load control step for controlling a load installed in a facility; determining an operating period of the load; In the determination step, an operation period is determined that maximizes the sum of a first profit of the PPA company in the sale of electricity transmitted from a power generation system installed in the facility and owned by the PPA company that provides the Power Purchase Agreement service, and a second profit of the electricity retail company in the sale of electricity transmitted from a grid power system used by the electricity retail company when supplying electricity; In the load control step, the load is controlled so as to operate within the operation period determined in the determination step; the first profit is a sum of a first power sales amount for the amount of power sent from the power generation system and used in the facility and a surplus power sales amount for the amount of power sent from the power generation system to the grid power system, the second profit is a value obtained by subtracting a power procurement cost and a power wheeling cost when the power is sent from the grid power system from a second power sales amount for the amount of power sent from the grid power system and used in the facility; Control method.

8. A program for causing a computer system to execute the control method described in claim 7.

9. A control system according to any one of claims 1 to 6, The power generation system, Interconnected system.

Citation Information

Patent Citations

  • Apparatus and system for controlling household electrical appliance

    JP2011142753A

  • Method, system and computer program product for scheduling demand events

    JP2013042652A

  • Load controller, program and load control system

    JP2013110951A

  • Apparatus control system

    JP2013219848A

  • Contract support apparatus, contract support system, contract support method

    JP2016192184A