Hot-stamping shaped article and manufacturing method therefor

The hot stamp molded product design with tailored steel materials and processes allows for adjustable mechanical properties, addressing the challenges of conventional techniques by achieving cost-effective and flexible mechanical property adjustments in automotive components.

WO2024190832A1PCT designated stage expired Publication Date: 2024-09-19NIPPON STEEL CORPORATION
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/009816
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-15
Filing Date
2024-03-13
Publication Date
2024-09-19

AI Technical Summary

Technical Problem

Conventional hot stamp molding techniques face challenges in separately adjusting the mechanical properties of burring parts and other parts in automotive components, leading to increased material costs and difficulty in meeting varying mechanical property requirements for different automobile parts.

Method used

A hot stamp molded product design featuring a first steel material with a burring part and a second steel material, where the Vickers hardness of the burring part is greater than or equal to that of the first plate-like part, and the second plate-like part, with specific welding and quenching processes to achieve tailored mechanical properties, allowing for a high degree of design freedom.

Benefits of technology

This approach enables the production of hot stamp molded products with adjustable mechanical properties, reducing material costs while ensuring the required strength and wear resistance for automotive parts, thereby enhancing the manufacturing process's flexibility and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024009816_19092024_PF_FP_ABST
    Figure JP2024009816_19092024_PF_FP_ABST
Patent Text Reader

Abstract

A hot-stamping shaped article 10 comprises: a first steel material 12 having a first plate-shaped section 24 and a burr section 26 extending upward from the first plate-shaped section 24; a second steel material 14 having a second plate-shaped section 44 provided so as to be lined up with the first plate-shaped section 24 in a direction orthogonal to the thickness direction of the first plate-shaped section 24; and a weld line 16 that bonds together an edge of the first plate-shaped section 24 and an edge of the second plate-shaped section 44.
Need to check novelty before this filing date? Find Prior Art

Description

Hot stamped product and its manufacturing method

[0001] The present invention relates to a hot stamped product and a method for producing the same.

[0002] To achieve both weight reduction and crashworthiness in automobiles, there is a demand for higher strength materials used in automobiles. For this reason, hot-stamped steel up to 1.8 GPa has been put into practical use in car bodies in recent years. Furthermore, if chassis parts also require high strength similar to that of car bodies, it will be necessary to consider using hot-stamped steel in the future.

[0003] In the automotive parts described above, burring may be performed in order to assemble the parts together, etc. For example, Patent Document 1 discloses a method for manufacturing a hot-pressed product having a burred portion.

[0004] The manufacturing method disclosed in Patent Document 1 includes a heating step of heating a plate material and a forming step of forming the heated plate material. In the forming step, the plate material is quenched and burred in addition to being formed.

[0005] Japanese Patent Application Laid-Open No. 2019-58916

[0006] The inventors of the present invention conducted a detailed study of burred portions formed by hot stamping (hot press forming) and found that the mechanical properties of the burred portions may differ from those of other portions. Meanwhile, the mechanical properties required for automotive parts generally vary depending on the application of the automotive part. Therefore, when using a hot stamped product as an automotive part, it is necessary to select a material that satisfies the required mechanical properties for both the burred portions and the portions other than the burred portions. This increases material costs.

[0007] Furthermore, depending on the automobile part, the mechanical properties required for the burred portion may differ from those required for the portion other than the burred portion. However, with the conventional hot stamp forming as described above, it is difficult to separately change the mechanical properties of the burred portion and the mechanical properties of the portion other than the burred portion according to requirements.

[0008] Therefore, an object of the present invention is to provide a hot stamped product with a high degree of design freedom and a method for manufacturing the same.

[0009] The present invention relates to the following hot stamped product and a method for producing the same.

[0010] (1) A hot stamped product comprising: a first steel material having a first plate-shaped portion and a burring portion rising from the first plate-shaped portion; a second steel material having a second plate-shaped portion arranged to be aligned with the first plate-shaped portion in a direction perpendicular to the thickness direction of the first plate-shaped portion; and a weld line joining an edge of the first plate-shaped portion and an edge of the second plate-shaped portion.

[0011] (2) The hot stamped product according to (1) above, wherein the Vickers hardness of the tip end of the burring portion and the Vickers hardness of the first plate-shaped portion are equal to or higher than the Vickers hardness of the second plate-shaped portion.

[0012] (3) The hot stamped product according to (1) or (2) above, wherein the Vickers hardness of the tip of the burring portion is equal to or higher than the Vickers hardness of the first plate-shaped portion.

[0013] (4) A first test piece and a second test piece are cut out from the second plate-shaped portion, and the Vickers hardness HV of the first test piece is measured after applying strain to the first test piece and then quenching the first test piece. 1 and the Vickers hardness HV of the second test piece when the second test piece was quenched without applying strain to the second test piece. 2 and satisfy the following formula (i): 1 <HV 2 ...(i)

[0014] (5) A third test piece and a fourth test piece are cut out from the first plate-shaped portion, and the Vickers hardness HV of the third test piece is measured after applying strain to the third test piece and then quenching the third test piece. 3 and the Vickers hardness HV of the fourth test piece when the fourth test piece was quenched without applying strain to the fourth test piece. 4and satisfy the following formula (ii): 3 ≧HV 4 ... (ii)

[0015] (6) The hot stamped product according to (2) or (3) above, wherein the thickness of the tip of the burring portion is smaller than the thickness of the first plate-shaped portion, and a difference D1 between the thickness of the tip of the burring portion and the thickness of the first plate-shaped portion and a difference D2 between the thickness of the first plate-shaped portion and the thickness of the second plate-shaped portion satisfy the following formula (iii): D1>D2 (iii)

[0016] (7) The hot stamped product according to (1) or (2) above, wherein the Vickers hardness of the tip of the burring portion is lower than the Vickers hardness of the first plate-shaped portion.

[0017] (8) A method for producing the hot stamped product according to any one of (1) to (7) above, comprising: a step of obtaining a tailored blank by welding a first steel plate and a second steel plate together; a step of heating the tailored blank; a step of press-forming the tailored blank; a step of burring the first steel plate of the heated tailored blank; and a step of quenching the heated tailored blank.

[0018] (9) The method for producing a hot stamped product according to (8) above, wherein in the step of obtaining the tailored blank, a plated steel sheet is used for at least one of the first steel sheet and the second steel sheet.

[0019] According to the present invention, a hot stamped product with a high degree of freedom in design can be obtained.

[0020] Fig. 1 is a schematic diagram showing a hot stamped product according to a first embodiment of the present invention, and Fig. 2 is a schematic diagram showing a test piece.

[0021] Hereinafter, a hot stamped product and a method for manufacturing the same according to an embodiment of the present invention will be described with reference to the drawings.

[0022] (Basic Structure of Hot-Stamped Product) Figure 1 is a schematic diagram showing a hot-stamped product according to one embodiment of the present invention, where (a) is a plan view, (b) is a cross-sectional view of portion b-b in (a), and (c) is a cross-sectional view of portion c-c in (a). As shown in Figure 1, a hot-stamped product 10 (hereinafter abbreviated as product 10) has a first steel material 12, a second steel material 14, and a weld line 16 joining an edge of the first steel material 12 and an edge of the second steel material 14. The thicknesses of the first steel material 12 and the second steel material 14 are, for example, 1.2 to 4.0 mm.

[0023] The material of the first steel material 12 and the second steel material 14 may contain, for example, in mass %, C: 0.10 to 0.50%, Si: 0.01 to 1.30%, Mn: 0.10 to 3.00%, P: 0.050% or less, S: 0.020% or less, N: 0.020% or less, Al: 0.10% or less, Nb: 0 to 0.20%, Ti: 0 to 0.20%, Cr: 0.010 to 1.00%, Mo: : 0 to 1.00%, B: 0 to 0.010%, Co: 0 to 4.0%, Ni: 0 to 2.0%, Cu: 0 to 1.0%, V: 0 to 1.0%, W: 0 to 1.0%, Ca: 0 to 0.010%, Mg: 0 to 0.010%, REM: 0 to 0.010%, Sb: 0 to 0.10%, Zr: 0 to 0.10%, and the balance being Fe and impurities.

[0024] The term "impurities" refers to components that are mixed in due to raw materials such as ores and scraps or other factors when steel is industrially produced, and are acceptable within a range that does not adversely affect the steel according to the present invention.

[0025] The first steel material 12 has a pair of first vertical wall portions 20, 22, a first plate-shaped portion 24 connecting the first vertical wall portion 20 and the first vertical wall portion 22, and a burring portion 26 rising from the first plate-shaped portion 24. The height L of the burring portion 26 (the length in the thickness direction of the first plate-shaped portion 24) is, for example, 3 to 30 mm, and the diameter of a circle inscribed in the tip of the burring portion 26 when viewed from the thickness direction of the first plate-shaped portion 24 is, for example, 15 to 100 mm.

[0026] The second steel material 14 has a pair of second vertical wall portions 40, 42 and a second plate-shaped portion 44 connecting the second vertical wall portion 40 and the second vertical wall portion 42. In the present embodiment, the first vertical wall portion 20 and the second vertical wall portion 40 are joined by weld lines 16, the first vertical wall portion 22 and the second vertical wall portion 42 are joined by weld lines 16, and the first plate-shaped portion 24 and the second plate-shaped portion 44 are joined by weld lines 16. The first plate-shaped portion 24 and the second plate-shaped portion 44 are arranged side by side in a direction perpendicular to the thickness direction of the first plate-shaped portion 24.

[0027] 1, the burring portion 26 is formed to rise perpendicularly to the first plate-shaped portion 24, but the burring portion 26 may rise at an angle relative to the first plate-shaped portion 24. For example, the burring portion 26 may be formed so that the diameter becomes smaller toward the tip end (the further away from the first plate-shaped portion 24 in the thickness direction of the first plate-shaped portion 24).

[0028] 1 , the burring portion 26, the first vertical wall portion 20, the first vertical wall portion 22, the second vertical wall portion 40, and the second vertical wall portion 42 are formed to rise on one side of the first plate-shaped portion 24 in the thickness direction of the first plate-shaped portion 24. However, the rising direction of the burring portion and the vertical wall portions is not limited to the above example. For example, the burring portion 26 may be formed to rise in the opposite direction to the first vertical wall portions 20, 22 and the second vertical wall portions 40, 42 in the thickness direction of the first plate-shaped portion 24. Furthermore, the first vertical wall portion 20 and the second vertical wall portion 40 may be formed to rise in the opposite direction to the first vertical wall portion 22 and the second vertical wall portion 42 in the thickness direction of the first plate-shaped portion 24.

[0029] In addition, in Figure 1, when viewed from the thickness direction of the first plate-shaped portion 24, the first vertical wall portions 20, 22, the first plate-shaped portion 24, the second vertical wall portions 40, 42, and the second plate-shaped portion 44 are formed to extend in a straight line, but when viewed from the thickness direction of the first plate-shaped portion 24, the first vertical wall portions 20, 22, the first plate-shaped portion 24, the second vertical wall portions 40, 42, and the second plate-shaped portion 44 may be curved.

[0030] 1, the first plate-shaped portion 24 and the second plate-shaped portion 44 each have a flat plate shape, but the shapes of the first plate-shaped portion 24 and the second plate-shaped portion 44 are not limited to flat plate shapes. For example, the first plate-shaped portion 24 and the second plate-shaped portion 44 may be curved when viewed from a direction perpendicular to the thickness direction of the first plate-shaped portion 24, or the first plate-shaped portion 24 and the second plate-shaped portion 44 may have unevenness formed thereon.

[0031] Although the burring portion 26 in FIG. 1 has a cylindrical shape, the burring portion 26 may be formed in any other cylindrical shape, such as a rectangular tube. A notch may be formed in a portion of the burring portion 26. For example, the burring portion 26 may not be completely cylindrical, but may have a C-shape in a cross section perpendicular to the cylindrical axis direction. In this specification, the burring portion refers to a cylindrical or approximately cylindrical portion in which molding strain is imparted, particularly to the tip end, by molding the tip end in such a manner that the tip end is expanded. However, the present invention can be suitably used in molded products having a burring portion with at least a partial circular cross section (cross section perpendicular to the cylindrical axis direction).

[0032] 1 is merely an example, and the present invention can be applied to hot-stamped products of various shapes, including a first steel material having a burred portion extending from a first plate-shaped portion, a second steel material having a second plate-shaped portion aligned with the first plate-shaped portion, and a weld line joining the first and second plate-shaped portions. Therefore, for example, the hot-stamped product 10 may further include a reinforcing steel material (e.g., a patch member welded to the first steel material or the second steel material) in addition to the first and second steel materials. While detailed description is omitted, the hot-stamped product according to the present invention is used, for example, as an automobile chassis part (e.g., a cross member, a lower arm, a torsion beam, etc.).

[0033] (Outline of Manufacturing Method of Hot Stamped Product) The manufacturing method of a hot stamped product according to this embodiment includes a first step of obtaining a tailored blank, a second step of heating the tailored blank, a third step of press-forming the tailored blank, a fourth step of burring the first steel plate, and a fifth step of quenching the heated tailored blank. Hereinafter, the manufacturing method of a hot stamped product according to this embodiment will be described using the case of manufacturing a hot stamped product 10 as an example.

[0034] In the first step, a first steel plate (not shown) that will become the first steel material 12 in the formed product 10 and a second steel plate (not shown) that will become the second steel material 14 in the formed product 10 are butt-welded. The first steel plate and the second steel plate are joined using a known welding method such as laser welding or plasma arc welding, similar to a known tailor welded blank (TWB). Furthermore, although a detailed description will be omitted, a pilot hole for forming a burring portion 26 is formed in the first steel plate.

[0035] The heating conditions in the second step are not particularly limited. In this embodiment, for example, the tailored blank (the first steel plate and the second steel plate) is 3 The upper limit of the heating temperature of the tailored blank is not particularly limited, and may be set appropriately depending on the material used. 3 The points are calculated by the following formula (a): 3 = 850 + 10 (C + N) Mn + 350 Nb + 250 Ti + 40 B + 10 Cr + 100 Mo (a) In the formula, each element symbol represents the content (mass%) of the element contained in the steel sheet, and if the element is not contained, it is set to zero.

[0036] In the third step, the heated tailored blank is press-formed to form the first vertical wall portions 20, 22, the first plate-shaped portion 24, the second vertical wall portions 40, 42, and the second plate-shaped portion 44. In the fourth step, the first steel plate of the heated tailored blank is burred to form the burred portion 26. It is preferable that the press-forming in the third step and the burring in the fourth step be initiated at a temperature of 600°C or higher. In the fifth step, the tailored blank (the first steel plate and the second steel plate) is quenched by rapidly cooling to a temperature below the Mf point. In the quenching step, the tailored blank (the first steel plate and the second steel plate) is held in a mold and cooled to a temperature below the Mf point by extracting heat from the mold. The cooling rate in the fifth step is set to, for example, 20°C / s or higher. The tailored blank cooled to a temperature below the Mf point is then allowed to cool to room temperature. The Mf point is calculated by the following formula (b): Mf=410.5-407.3C-7.3Si-37.8Mn-20.5Cu-19.5Ni-19.8Cr-4.5Mo (b) where each element symbol represents the content (mass%) of the element contained in the steel sheet, and is set to zero if the element is not contained.

[0037] In this embodiment, the third, fourth, and fifth steps are performed as a series of steps. For example, after heating the tailored blank in the second step, press forming (the third step) and burring (the fourth step) may be performed simultaneously, and then quenching (the fifth step) may be performed without demolding. Alternatively, for example, after heating the tailored blank in the second step, press forming (the third step) and burring (the fourth step) may be performed consecutively without demolding, and then quenching (the fifth step) may be performed without demolding.

[0038] It should be noted that the press forming (step 3) and the burring (step 4) may be performed as separate steps. For example, the forming (step 3) and quenching (step 5) of the first vertical wall portions 20, 22, the first plate-shaped portion 24, the second vertical wall portions 40, 42, and the second plate-shaped portion 44 may be performed as a series of steps, and then the burring (step 4) and quenching (step 5) may be performed as a series of steps. In this case, the second step (heating) is performed before the third step and before the fourth step. That is, the second step and the fifth step are each performed twice. Also, for example, after cold press forming (step 3), the tailored blank may be heated (step 2), and then the burring (step 4) and quenching (step 5) may be performed as a series of steps. That is, the third step may be performed after the first step and before the second step. It should be noted that known methods can be used for the press forming and burring.

[0039] In this embodiment, as described above, hot stamping (hot press forming) is performed in the third step. To ensure proper quenching during this process, the carbon equivalent (Ceq) of the first steel material 12 (first steel plate) and the second steel material 14 (second steel plate) as defined by the following formula (c) is preferably 0.35 or greater: Ceq = C + Si / 24 + Mn / 6 + Ni / 40 + Cr / 5 + Mo / 4 + V / 14 (c) where the element symbols in the formula represent the content (mass%) of each element contained in the steel material (steel plate), and are set to zero if the element is not contained.

[0040] (Combination of First Steel Material and Second Steel Material) The inventors have discovered that by appropriately selecting the material of the first steel material (first steel plate) or the second steel material (second steel plate), it is possible to impart functions to a hot-stamped product that could not be achieved with conventional hot-stamped products. Combinations of the first steel material and the second steel material and their effects are described below. In this embodiment, the Vickers hardness (HV1) of the tip of the burring portion, the Vickers hardness (HV1) of the first plate-shaped portion, and the Vickers hardness (HV1) of the second plate-shaped portion are preferably 280 or more, 360 or more, 450 or more, 540 or more, 580 or more, or 650 or more. Furthermore, the Vickers hardness (HV1) of the tip of the burring portion, the Vickers hardness (HV1) of the first plate-shaped portion, and the Vickers hardness (HV1) of the second plate-shaped portion are each, for example, 760 or less. Note that "HV1" refers to the "hardness symbol" when a Vickers hardness test is performed with a test force of 9.8 N (1 kgf) (see JIS Z 2244-1:2020). When simply referring to Vickers hardness in this specification, it means Vickers hardness (HV1).

[0041] (Example 1) The materials of the first steel material and the second steel material are selected so that the Vickers hardness of the tip of the burring portion and the Vickers hardness of the first plate-shaped portion are equal to or greater than the Vickers hardness of the second plate-shaped portion.

[0042] When the molded product 10 is used as an automobile part, it is conceivable that other components will be attached to the burred portion 26. In this case, excellent strength is required for the tip of the burred portion 26 and the periphery thereof. Furthermore, wear resistance may also be required for the tip of the burred portion 26 and the periphery thereof. In such a case, the materials for the first steel material 12 and the second steel material 14 are selected so that the Vickers hardness of the tip of the burred portion 26 and the Vickers hardness of the first plate-shaped portion 24 are equal to or greater than the Vickers hardness of the second plate-shaped portion 44. In other words, a steel that can be hardened to a hardness equal to or greater than that of the second steel material 14 is used as the material for the first steel material 12. This reduces the manufacturing cost of the molded product compared to when the entire molded product is made of a high-strength material, while ensuring the strength required of the molded product. Furthermore, wear resistance of the tip of the burred portion 26 and the periphery thereof can also be ensured.

[0043] The Vickers hardness of the tip of the burring portion 26 is measured along the height direction of the burring portion 26 on a cut surface of the burring portion 26 that passes through the axis of the burring portion 26 and is parallel to the axis (in this embodiment, the cut surface when the burring portion 26 is cut in half), with the measurement center set at a position 5 mm from the tip of the burring portion 26 toward the first plate-shaped portion 24. Specifically, measurements are made at five positions at a depth of T / 4 (T is the thickness of the tip of the burring portion 26 at the Vickers hardness measurement position) from the outer peripheral surface 26a of the burring portion 26, with a test force (measurement load) of 9.8 N (1 kgf) and 0.5 mm pitch, with the center set at a position 5 mm from the tip of the burring portion 26 toward the first plate-shaped portion 24. The average of the measured values ​​is taken as the Vickers hardness of the tip of the burring portion 26. The thickness of the burred portion 26 is measured as the distance between the outer peripheral surface 26a and the inner peripheral surface 26b, measured in a direction perpendicular to the outer peripheral surface 26a, with the outer peripheral surface 26a as the reference.

[0044] The Vickers hardness of the first plate-shaped portion 24 is measured in a cross section parallel to the thickness direction of the first plate-shaped portion 24 at a position sufficiently distant from the weld line 16 and the burring portion 26, from the surface of the first plate-shaped portion 24 (the surface on which the burring portion 26 is formed) to t 1 / 4(t1 The depth position of the first plate-shaped portion 24 (where x is the thickness at the Vickers hardness measurement position) is measured at five locations at 0.5 mm intervals with the above test force. The average of the measured values ​​is taken as the Vickers hardness of the first plate-shaped portion 24. Note that a position sufficiently distant from the weld line 16 refers to a position 3 mm or more away from the boundary between the weld line 16 and the first steel material 12 when the first steel material 12 and the second steel material 14 are welded by laser welding, and refers to a position 10 mm or more away from the boundary when the first steel material 12 and the second steel material 14 are welded by arc welding. Furthermore, a position sufficiently distant from the burring portion 26 refers to a position 10 mm or more away from the rising position of the burring portion 26.

[0045] Similarly, the Vickers hardness of the second plate-shaped portion 44 is measured in a cross section parallel to the thickness direction of the second plate-shaped portion 44 at a position sufficiently distant from the weld line 16, from the surface of the second plate-shaped portion 44 (a surface continuous with the surface on the side where the burring portion 26 of the first plate-shaped portion 24 is formed; in FIG. 1( c ), this is the underside of the second plate-shaped portion 44). 2 / 4(t 2 The depth position of the second plate-shaped portion 44 (where x is the thickness at the Vickers hardness measurement position) is measured at five locations at 0.5 mm intervals with the above test force. The average of the measured values ​​is taken as the Vickers hardness of the second plate-shaped portion 44. Note that a position sufficiently distant from the weld line 16 refers to a position 3 mm or more away from the boundary between the weld line 16 and the second steel material 14 when the first steel material 12 and the second steel material 14 are welded by laser welding, and refers to a position 10 mm or more away from the boundary when the first steel material 12 and the second steel material 14 are welded by arc welding.

[0046] (Example 1a) In (Example 1), for example, the materials of the first steel material 12 and the second steel material 14 may be selected so that the carbon content of the first steel material 12 is higher than the carbon content of the second steel material 14. Specifically, for example, Steel A described below may be used as the material of the first steel material 12, and Steel B described below may be used as the material of the second steel material 14.

[0047] (Steel A) In mass%, C: over 0.35% and 0.50% or less, Si: 0.01 to 1.30%, Mn: 0.10 to 3.00%, P: 0.050% or less, S: 0.020% or less, N: 0.020% or less, Al: 0.10% or less, Nb: 0 to 0.20%, Ti: 0 to 0.20%, Cr: 0.010 to 1.00%, Mo: 0 to 1.0 0%, B: 0-0.010%, Co: 0-4.0%, Ni: 0-2.0%, Cu: 0-1.0%, V: 0-1.0%, W: 0-1.0%, Ca: 0-0.010%, Mg: 0-0.010%, REM: 0-0.010%, Sb: 0-0.10%, Zr: 0-0.10%, and the balance being Fe and impurities.

[0048] (Steel B) In mass%, C: 0.10 to 0.35%, Si: 0.01 to 1.30%, Mn: 0.10 to 3.00%, P: 0.050% or less, S: 0.020% or less, N: 0.020% or less, Al: 0.10% or less, Nb: 0 to 0.20%, Ti: 0 to 0.20%, Cr: 0.010 to 1.00%, Mo: 0 to 1.00 %, B: 0-0.010%, Co: 0-4.0%, Ni: 0-2.0%, Cu: 0-1.0%, V: 0-1.0%, W: 0-1.0%, Ca: 0-0.010%, Mg: 0-0.010%, REM: 0-0.010%, Sb: 0-0.10%, Zr: 0-0.10%, and the balance being Fe and impurities.

[0049] The term "impurities" refers to components that are mixed in due to raw materials such as ores and scraps or other factors when steel is industrially produced, and are acceptable within a range that does not adversely affect the steel according to the present invention.

[0050] As described above, when the carbon content of the first steel material 12 is made higher than the carbon content of the second steel material 14, the proportion of the second steel material 14 in the formed product 10 can be increased to ensure the strength and wear resistance required for the burring portion 26 while improving the hydrogen embrittlement resistance of the formed product 10. Furthermore, by increasing the proportion of the second steel material 14, the ductility and toughness of the formed product 10 as a whole can be ensured. This improves the deformability of the formed product 10. The deformability of the formed product 10 refers to the ability to suppress fracture due to deformation (fracture resistance). In addition, in this specification, the content of each element in the first steel material 12 and the second steel material 14 refers to the content of each element in the steel from which the surface layer has been removed by polishing or the like when scale, a decarburized layer, a plating solid solution layer, or the like is formed on the surface layer of the steel.

[0051] Alternatively, the first steel material 12 may be made of a steel having a higher carbon content and lower hardenability than the second steel material 14, and the second steel material 14 may be made of a steel having a higher hardenability. In this case, for example, the formed product 10 may be manufactured so that the Vickers hardness of the tip of the burring portion 26 and the Vickers hardness of the first plate-shaped portion 24 are equivalent to the Vickers hardness of the second plate-shaped portion 44. This results in a highly homogeneous formed product 10. In this specification, "steel with low hardenability" refers to a steel having a carbon equivalent (Ceq) of less than 0.65 as defined by the above formula (c), and "steel with high hardenability" refers to a steel having a Ceq of 0.65 or more. Therefore, for example, the first steel material 12 may be made of a steel that satisfies the above-mentioned conditions for Steel A and has a Ceq of less than 0.65, and the second steel material 14 may be made of a steel that satisfies the above-mentioned conditions for Steel B and has a Ceq of 0.65 or more.

[0052] Even when using steel with low hardenability, it is preferable to properly harden the steel in hot stamping, which does not impart large strain. That is, even if the processed portion, which is subjected to large strain such as burring, is not properly hardened, it is preferable to properly harden the other portions. For this reason, even when using steel with low hardenability, it is preferable that Ceq is 0.35 or more.

[0053] (Example 1b) In (Example 1), both the first steel material 12 and the second steel material 14 may satisfy the above-mentioned conditions for Steel A, or both the first steel material 12 and the second steel material 14 may satisfy the above-mentioned conditions for Steel B. In these cases, for example, the carbon contents of the first steel material 12 and the second steel material 14 may be the same, and a steel with high hardenability may be used as the material for the first steel material 12, while a steel with low hardenability may be used as the material for the second steel material 14. Specifically, for example, a steel having a Ceq of 0.65 or more as defined by the above formula (a) may be used as the material for the first steel material 12, and a steel having a Ceq of less than 0.65 may be used as the material for the second steel material 14. In this case, for example, the Vickers hardness of the tip of the burring portion 26 and the Vickers hardness of the first plate-shaped portion 24 may be set to values ​​equivalent to the Vickers hardness of the second plate-shaped portion 44. This results in a highly homogeneous molded product 10. Furthermore, by using a steel with high hardenability as the material for the first steel material 12, the burring portion 26 can be properly quenched without increasing the cooling rate of the mold. This eliminates the need to increase the cooling rate of the entire mold or to partially increase the cooling rate of the portion of the mold that comes into contact with the burring portion 26, facilitating the production of the formed product 10. Furthermore, by using a steel with low hardenability as the material for the second steel material 14, the toughness and deformability of the portion other than the burring portion 26 can be improved.

[0054] (Example 2) A steel having a Vickers hardness of the tip of the burring portion equal to or greater than the Vickers hardness of the first plate-shaped portion is used as the material for the first steel material. In this example, the Vickers hardness of the tip of the burring portion is preferably 471 or more, 475 or more, 477 or more, 609 or more, 616 or more, 632 or more, 682 or more, or 684 or more. Furthermore, the Vickers hardness of the first plate-shaped portion is preferably 463 or more, 465 or more, 468 or more, 602 or more, 603 or more, 625 or more, 676 or more, or 680 or more.

[0055] When manufacturing the molded product 10 according to this embodiment, burring and quenching are performed as a series of steps. Here, the burring portion 26 is formed by expanding a pilot hole. As a result, large strain is imparted to the burring portion 26. As a result of research by the present inventors, it has been found that the large strain imparted to the burring portion 26 can reduce the hardenability of the burring portion 26. As a result, quenching, which is performed immediately after the burring, may not be able to increase the hardness of the burring portion 26 to the desired hardness.

[0056] Therefore, in this example, a steel that, when quenched, will have a Vickers hardness of the tip of the burring portion 26 that is equal to or greater than the Vickers hardness of the first plate-shaped portion 24 is used as the material for the first steel material 12. This makes it possible to ensure sufficient hardness for the burring portion 26. Note that, in this example, the requirements of (Example 1) above may be satisfied, or may not be satisfied. Specifically, when the requirements of (Example 1) are satisfied, the materials for the first steel material 12 and the second steel material 14 are selected so that the Vickers hardness of the tip of the burring portion 26 and the Vickers hardness of the first plate-shaped portion 24 are equal to or greater than the Vickers hardness of the second plate-shaped portion 44, and the Vickers hardness of the tip of the burring portion 26 is equal to or greater than the Vickers hardness of the first plate-shaped portion 24. Furthermore, when the requirements of (Example 1) are not satisfied, for example, the materials of the first steel material 12 and the second steel material 14 are selected so that the Vickers hardness of the tip of the burring portion 26 and the Vickers hardness of the first plate-shaped portion 24 are less than the Vickers hardness of the second plate-shaped portion 44, and the Vickers hardness of the tip of the burring portion 26 is equal to or greater than the Vickers hardness of the first plate-shaped portion 24. Furthermore, when the requirements of (Example 1) are not satisfied, for example, the materials of the first steel material 12 and the second steel material 14 are selected so that the Vickers hardness of the tip of the burring portion 26 is equal to or greater than the Vickers hardness of the second plate-shaped portion 44, and the Vickers hardness of the first plate-shaped portion 24 is less than the Vickers hardness of the second plate-shaped portion 44.

[0057] (Example 3) In the above (Example 1) or (Example 2), a steel whose hardenability is reduced by large strain can be used as the material for the second steel material. Specifically, a steel whose second plate-shaped portion satisfies the following formula (i) can be used as the material for the second steel material. HV 1 <HV 2 ...(i) In the above formula (i), HV 1 indicates the Vickers hardness of the first test specimen when the first test specimen cut out from the second plate-shaped portion was subjected to quenching after applying a strain to the first test specimen, and HV 2 indicates the Vickers hardness of the second test specimen when the second test specimen cut out from the second plate-shaped portion was quenched without applying strain. A method for quenching the first test specimen and the second test specimen will be described later. In this example, the Vickers hardness of the second plate-shaped portion is preferably 418 or more, 425 or more, 435 or more, 453 or more, 460 or more, 462 or more, 463 or more, 464 or more, 468 or more, 485 or more, 555 or more, 588 or more, 605 or more, 624 or more, 660 or more, or 661 or more.

[0058] In the formed product 10 according to this embodiment, the second steel material 14 does not have a burred portion 26 formed therein, and therefore large strain is not imparted to the second steel material 14. Therefore, even if a steel that satisfies the above formula (i), i.e., a steel whose hardenability is reduced by large strain, is used as the material for the second steel material 14, the formed product 10 will not be affected by the reduction in hardenability of the second steel material 14. On the other hand, by selecting the material for the first steel material 12 as described above in (Example 1) or (Example 2), it is possible to ensure sufficient hardness of the burred portion 26.

[0059] The first test piece and the second test piece were cut out at a position sufficiently distant from the weld line 16. A position sufficiently distant from the weld line 16 means a position 3 mm or more away from the boundary between the weld line 16 and the second steel material 14 when the first steel material 12 and the second steel material 14 are welded by laser welding, and a position 10 mm or more away from the boundary when the first steel material 12 and the second steel material 14 are welded by arc welding.

[0060] Hereinafter, a method for hardening the first test specimen and the second test specimen will be described. In this embodiment, the first test specimen is subjected to hardening immediately after being subjected to strain in a hot state. Specifically, the first test specimen is first hardened at 900°C (where Ac 3 For steel materials with a temperature exceeding 900°C, 3 +50°C) and held at that temperature for 60 seconds. Thereafter, the first test piece was cooled to 700°C (the working temperature) at a cooling rate of 25°C / s, and immediately subjected to compression working. Thereafter, the first test piece was immediately cooled to a temperature equal to or lower than the Mf point at a cooling rate of 50°C / s. Thereafter, the first test piece was allowed to cool to room temperature.

[0061] More specifically, in this embodiment, an odd number of disk-shaped first test pieces each having a diameter of 8 mm are cut out from the second plate-shaped portion 44, and a cylindrical test body is fabricated using the plurality of cut-out first test pieces. Fig. 2 is a schematic diagram showing a cylindrical test body fabricated using the first test pieces.

[0062] As shown in FIG. 2 , the test specimen 100 includes a main body 50 consisting of an odd number (three in FIG. 2 ) of first test pieces 52, and a pair of steel dummy members 60 sandwiching the main body 50. The main body 50 is configured of the minimum number (an odd number) of first test pieces 52 that results in a thickness Ts of 3.0 mm or more. For example, when the thickness of the second plate-shaped portion 44 (first test pieces 52) is 1.2 mm or more and less than 3.0 mm, the main body 50 is configured of three first test pieces 52. Furthermore, when the thickness of the second plate-shaped portion 44 (first test pieces 52) is 3.0 mm or more, the main body 50 is configured of one first test piece 52. Note that when scale, a decarburized layer, a plating solid solution layer, etc. are formed on the surface layer of the second plate-shaped portion 44 (first test pieces 52), the main body 50 is configured of a first test piece 52 from which the surface layer has been removed by polishing or the like.

[0063] Each of the pair of dummy materials 60 has a disk shape with a diameter of 8 mm. The steel type (chemical composition) of the dummy material 60 may be the same as that of the first test piece 52, or may not be the same as that of the first test piece 52. However, if the steel type of the dummy material 60 is not the same as that of the first test piece 52, a steel having a C content of 0.1 to 0.5% and a total content of Cr, Mo, V, W, and Nb of less than 2.0% by mass is used as the material for the dummy material 60. The thicknesses of the pair of dummy materials 60 are approximately equal to each other. In this embodiment, the thicknesses of the pair of dummy materials 60 are adjusted so that the height of the test piece 100 is 12.0 mm. Using a Formaster processing tester, the test piece 100 is hot compressed so that the height of the test piece 100 is 7.2 mm (60% of the original height). The strain rate during compression is 5 s -1 Then, the test piece 100 is hardened. After hardening, the first test piece 52 arranged in the center of the main body 50 is cut in the thickness direction along the major axis. In the obtained cut surface, the thickness of the first test piece 52 is set to t 3 / 4(t 3 The Vickers hardness is measured at five locations at a depth of 1 / 4 of the diameter (longer diameter) from the outer periphery at a distance of 0.5 mm from the outer periphery, with a test force of 9.8 N (1 kgf), at 0.5 mm intervals. The average of the measured values ​​is calculated as HV in the above formula (i). 1 Let's say.

[0064] The second test specimens were subjected to quenching without applying strain. Specifically, similarly to the first test specimens, the second test specimens were quenched at 900°C (except for Ac 3 For steel materials with a temperature exceeding 900°C, 3 +50°C) and then hold that temperature for 60 seconds. Thereafter, the second test specimens are cooled at a cooling rate of 25°C / s down to 700°C, and then at a cooling rate of 50°C / s from 700°C to a temperature equal to or lower than the Mf point. Thereafter, similarly to the first test specimens, the second test specimens that had been cooled to a temperature equal to or lower than the Mf point are allowed to cool to room temperature.

[0065] In this embodiment, as in the case of the first test piece described above, an odd number of disk-shaped second test pieces with a diameter of 8 mm are cut out from the second plate-shaped portion 44, and a cylindrical test piece with a height of 12.0 mm is fabricated using the plurality of cut second test pieces. Then, using a Formaster test machine, heat treatment is performed without processing according to the thermal history described above. Thereafter, the second test piece placed in the center of the test piece (main body) is cut in the thickness direction so as to divide it into two equal parts. At the obtained cut surface, the distance from the top surface of the second test piece to the t 4 / 4(t 4 Vickers hardness is measured at five locations at a depth of 1 / 4 of the diameter from the outer periphery at a distance of 0.5 mm with a test force of 9.8 N (1 kgf) at a depth of 1 / 4 of the diameter of the second test piece at the Vickers hardness measurement position. The average of the measured values ​​is calculated as HV in the above formula (i). 2 Let's say.

[0066] (Example 4) In the above (Example 1) or (Example 2), a steel that can suppress the deterioration of hardenability due to large strain can be used as the material for the first steel material. Specifically, a steel that can satisfy the following formula (ii) for the first plate-shaped portion can be used as the material for the first steel material. HV 3 ≧HV 4 ... (ii) In the above formula (ii), HV 3 indicates the Vickers hardness of the third test specimen when the third test specimen, which was cut out from the first plate-shaped portion, was subjected to quenching after applying a strain to the third test specimen, and HV 4 indicates the Vickers hardness of the fourth test specimen when the fourth test specimen cut out from the first plate-shaped portion was quenched without applying strain to the fourth test specimen. In this example, the Vickers hardness of the tip end of the burred portion is preferably 471 or more, 475 or more, 477 or more, 609 or more, 616 or more, 632 or more, 682 or more, or 684 or more. In addition, the Vickers hardness of the first plate-shaped portion is preferably 463 or more, 465 or more, 468 or more, 602 or more, 603 or more, 625 or more, 676 or more, or 680 or more.

[0067] The third and fourth test pieces were cut out at positions sufficiently distant from the weld line 16 and the burred portion 26. A position sufficiently distant from the weld line 16 refers to a position 3 mm or more away from the boundary between the weld line 16 and the first steel material 12 when the first steel material 12 and the second steel material 14 are welded by laser welding, and refers to a position 10 mm or more away from the boundary when the first steel material 12 and the second steel material 14 are welded by arc welding. Furthermore, a position sufficiently distant from the burred portion 26 refers to a position 10 mm or more away from the rising position of the burred portion 26.

[0068] Moreover, in the present embodiment, similarly to the cases of the first and second Test Specimens, test specimens were fabricated using an odd number of third Test Specimens and an odd number of fourth Test Specimens, and the fabricated test specimens were subjected to quenching. The third Test Specimens were subjected to quenching after being subjected to strain in a hot state under the same conditions as those for the above-mentioned first Test Specimens. Furthermore, the fourth Test Specimens were subjected to quenching without being subjected to strain under the same conditions as those for the above-mentioned second Test Specimens. 3 and HV 4 is the HV of the above formula (i). 1 and HV 2 is measured in the same way.

[0069] (Example 5) In the above (Example 1) or (Example 2), the thickness of the tip of the burring portion may be smaller than the thickness of the first plate-shaped portion, and the molded product may satisfy the following formula (iii): D1 > D2 ... (iii) In the above formula (iii), D1 represents the difference (absolute value) between the thickness of the tip of the burring portion and the thickness of the first plate-shaped portion, and D2 represents the difference (absolute value) between the thickness of the first plate-shaped portion and the thickness of the second plate-shaped portion. In this example, the Vickers hardness of the tip of the burring portion, the Vickers hardness of the first plate-shaped portion, and the Vickers hardness of the second plate-shaped portion are each the same as those in the above (Examples 2) to (Example 4).

[0070] For the molded product 10 to satisfy the above formula (iii), it means that the difference in thickness between the burred portion 26 and the first plate-shaped portion 24 is greater than the difference in thickness between the first plate-shaped portion 24 and the second plate-shaped portion 44. In other words, it means that the thicknesses of the first plate-shaped portion 24 and the second plate-shaped portion 44 are equivalent. For example, a tailored blank may be formed using a first steel plate and a second steel plate having equivalent thicknesses, and the first steel plate of the tailored blank may be subjected to burring. In this case, the thickness of the tip of the burred portion 26 is smaller than the thickness of the first plate-shaped portion 24, but the thicknesses of the first plate-shaped portion 24 and the second plate-shaped portion 44 are equivalent, thereby satisfying the above formula (iii). Even when the thickness of the tip of the burred portion 26 is reduced in this way, the strength of the molded product 10 can be sufficiently ensured by satisfying the requirements of (Example 1) or (Example 2) above. The thickness of the tip of the burring portion 26 is measured at a position 5 mm from the tip of the burring portion 26 toward the first plate-shaped portion 24.

[0071] (Example 6) The materials of the first steel material and the second steel material are selected so that the Vickers hardness of the tip of the burring portion is lower than the Vickers hardness of the first plate-shaped portion. In this example, the Vickers hardness of the tip of the burring portion is preferably 382 or more, 433 or more, 442 or more, 455 or more, 479 or more, 534 or more, 536 or more, 542 or more, 571 or more, 578 or more, 582 or more, or 583 or more. Furthermore, the Vickers hardness of the first plate-shaped portion is preferably 458 or more, 460 or more, 465 or more, 485 or more, 557 or more, 595 or more, 609 or more, 610 or more, 625 or more, 660 or more, 662 or more, or 663 or more.

[0072] When the molded product 10 is used as an automobile part, it is conceivable that other parts will be attached to the burred portion 26. In this case, it is necessary to perform processing such as trimming and piercing on the burred portion 26. Therefore, a material for the first steel material 12 is selected so that the Vickers hardness of the tip of the burred portion 26 is lower than the Vickers hardness of the first plate-shaped portion 24. In other words, a steel that will result in a lower hardness at the tip of the burred portion 26 than the first plate-shaped portion 24 after quenching is used as the material for the first steel material 12. In this case, processing (trimming, piercing, etc.) on the burred portion 26 becomes easier. Note that in this example, the requirements of (Example 1) above may or may not be satisfied. When the requirements of (Example 1) are satisfied, the materials of the first steel material 12 and the second steel material 14 are selected so that the Vickers hardness of the tip portion of the burring portion 26 and the Vickers hardness of the first plate-shaped portion 24 are equal to or greater than the Vickers hardness of the second plate-shaped portion 44, and the Vickers hardness of the tip portion of the burring portion 26 is less than the Vickers hardness of the first plate-shaped portion 24. When the requirements of (Example 1) are not satisfied, the materials of the first steel material 12 and the second steel material 14 are selected so that the Vickers hardness of the tip portion of the burring portion 26 and the Vickers hardness of the first plate-shaped portion 24 are less than the Vickers hardness of the second plate-shaped portion 44, and the Vickers hardness of the tip portion of the burring portion 26 is less than the Vickers hardness of the first plate-shaped portion 24, for example. Furthermore, if the requirements of (Example 1) are not met, the materials of the first steel material 12 and the second steel material 14 are selected, for example, so that the Vickers hardness of the first plate-shaped portion 24 is equal to or greater than the Vickers hardness of the second plate-shaped portion 44, and the Vickers hardness of the tip of the burring portion 26 is less than the Vickers hardness of the second plate-shaped portion 44.

[0073] When the requirements of (Example 1) above are satisfied, for example, the materials of the first steel material 12 and the second steel material 14 can be selected so that the carbon content of the first steel material 12 is greater than the carbon content of the second steel material 14. Specifically, for example, the above-mentioned Steel A can be used as the material of the first steel material 12, and the above-mentioned Steel B can be used as the material of the second steel material 14. Furthermore, when the requirements of (Example 1) above are satisfied, for example, the steel described in (Example 3) above may be used as the material of the second steel material 14.

[0074] Furthermore, when the requirements of (Example 1) above are not satisfied, for example, the materials of the first steel material 12 and the second steel material 14 can be selected so that the carbon content of the first steel material 12 is less than the carbon content of the second steel material 14. Specifically, for example, the above-mentioned Steel B can be used as the material of the first steel material 12, and the above-mentioned Steel A can be used as the material of the second steel material 14. In this case, the strength and wear resistance of the formed product 10 can be ensured, while the hydrogen embrittlement resistance of the burred portion 26 can be improved.

[0075] Furthermore, when the requirements of (Example 1) above are not satisfied, for example, both the first steel material 12 and the second steel material 14 may satisfy the conditions of Steel A described above, or both the first steel material 12 and the second steel material 14 may satisfy the conditions of Steel B described above. In these cases, for example, the carbon contents of the materials for the first steel material 12 and the second steel material 14 may be the same, and a steel with low hardenability may be used as the material for the first steel material 12, and a steel with high hardenability may be used as the material for the second steel material 14. Specifically, a steel with a Ceq of less than 0.65 may be used as the material for the first steel material 12, and a steel with a Ceq of 0.65 or more may be used as the material for the second steel material 14.

[0076] Furthermore, when the requirements of (Example 1) above are not satisfied, for example, a steel having a higher carbon content and lower hardenability than the second steel material 14 may be used as the material for the first steel material 12, and a steel having high hardenability may be used as the material for the second steel material 14. Specifically, a steel having a Ceq of less than 0.65 may be used as the material for the first steel material 12, and a steel having a Ceq of 0.65 or more may be used as the material for the second steel material 14. In this case, the workability of the burred portion 26 can be improved, and the deformability and hydrogen embrittlement resistance of the portions other than the burred portion 26 can be improved.

[0077] (Example 7) The first and second steel plates are selected so that the thickness of the first plate-shaped portion is greater than the thickness of the second plate-shaped portion. In this example, the Vickers hardness of the tip of the burring portion, the Vickers hardness of the first plate-shaped portion, and the Vickers hardness of the second plate-shaped portion are the same as those in (Examples 2) to (Example 6) above.

[0078] In this example, a thick steel plate is used as the first steel plate that becomes the first steel material 12 in the formed product 10, and a thin steel plate is used as the second steel plate that becomes the second steel material 14 in the formed product 10. In this case, the corrosion resistance life and fatigue characteristics of the burred portion 26 and its surrounding area can be improved while suppressing an increase in the weight of the formed product 10 itself. Furthermore, by using a thick steel plate as the first steel plate, during the manufacturing of the formed product 10, a decrease in the temperature of the first steel material 12 (first steel plate) can be suppressed between the time the tailored blank is removed from the furnace (after the second process) and the time the burring process (the fourth process) is performed. This suppresses the appearance of a ferrite layer and the softening of the burred portion 26. Furthermore, when the burred portion 26 is cooled using a mold, an excessive cooling rate of the burred portion 26 can be suppressed. This prevents a decrease in the toughness of the burred portion 26.

[0079] (Example 8) The first and second steel plates are selected so that the thickness of the first plate-shaped portion is smaller than the thickness of the second plate-shaped portion. In this example, the Vickers hardness of the tip of the burring portion, the Vickers hardness of the first plate-shaped portion, and the Vickers hardness of the second plate-shaped portion are the same as those in (Examples 2) to (Example 7) above.

[0080] In this example, a thin steel plate is used as the first steel plate that becomes the first steel material 12 in the formed product 10, and a thick steel plate is used as the second steel plate that becomes the second steel material 14 in the formed product 10. In this case, by using a thin steel plate as the first steel plate, a sufficient cooling rate can be maintained when cooling the burred portion 26 using a mold. This makes it possible to suppress the appearance of a ferrite layer and to suppress softening of the burred portion 26. Furthermore, by increasing the thickness of the second plate-shaped portion 44, it is possible to improve the corrosion resistance and fatigue properties of the portion other than the burred portion 26.

[0081] (Example 9) When manufacturing a tailored blank, a plated steel sheet is used for at least one of the first steel sheet (first steel material) and the second steel sheet (second steel material). In this example, the Vickers hardness of the tip of the burring portion, the Vickers hardness of the first plate-shaped portion, and the Vickers hardness of the second plate-shaped portion are the same as those in (Example 2) to (Example 8) above.

[0082] According to this example, it is possible to improve the corrosion resistance of necessary portions of the molded product 10. For example, a steel sheet having a Zn-based plating layer can be used as the second steel sheet. In this case, the first steel sheet may not have a plating layer, or may have an Al-Si-based plating layer. Also, for example, a steel sheet having an Al-Si-based plating layer can be used as the second steel sheet. In this case, the first steel sheet may not have a plating layer, or may have a Zn-based plating layer.

[0083] The present invention will be explained in more detail below with reference to examples, but the present invention is not limited to these examples.

[0084] First and second steel plates having the thicknesses shown in Table 2 were prepared using steels having the chemical compositions of steel types a to s shown in Table 1. Tailored blanks were prepared by laser welding the obtained first and second steel plates (first step). As shown in Table 2, the surfaces of the first steel plates of test numbers 1 and 2 and the second steel plates of test numbers 12 and 20 were galvannealed before laser welding. In this example, square steel plates measuring 140 mm x 140 mm were used as the first and second steel plates, respectively, to prepare tailored blanks measuring 140 mm x 280 mm. A pilot hole with a diameter of 20 mm was drilled in the center of the first steel plate before laser welding to perform the burring process described below.

[0085]

[0086]

[0087] The resulting tailored blank was heated (step 2), press-formed (step 3), burred (step 4), and quenched (step 5) to obtain a molded product having a shape similar to that of the molded product 10 shown in FIG. 1 . In this example, the heating of the tailored blank in step 2 was performed using a heating furnace (gas furnace). The furnace temperature was set to 900-930°C, and the furnace time was set to 4-7 minutes depending on the plate thickness. In this example, steps 3 and 4 were started simultaneously, followed by step 5. Table 3 shows the heating temperature (steel plate surface temperature) in step 2, the surface temperature of the tailored blank at the start of processing in steps 3 and 4, the average cooling rate (surface temperature of the molded product) in step 5 after processing in steps 3 and 4, and the surface temperature of the molded product at the time of demolding. In this example, a burred portion with an inner diameter of 50 mm and a height of 16-23 mm was formed by the burring processing in step 4.

[0088]

[0089] The Vickers hardness and thickness of each portion of the molded products of Test Nos. 1 to 22 obtained as described above were measured. The method for measuring the Vickers hardness and thickness of each portion was as described above. Furthermore, the Vickers hardness was also measured for the first test specimen (strain-applied quenching), the second test specimen (strain-free quenching), the third test specimen (strain-applied quenching), and the fourth test specimen (strain-free quenching). Table 4 shows the measurement results. The Vickers hardness of the first test specimen, the second test specimen, the third test specimen, and the fourth test specimen were measured according to the method described above using a Formaster processing tester. Table 4 also shows the correspondence between the molded products of Test Nos. 1 to 22 and the above-mentioned (Example 1) to (Example 9).

[0090]

[0091] As shown in Table 4, it was possible to produce formed products corresponding to all of the above-mentioned (Example 1) to (Example 9). From these results, it was found that according to the present invention, it is possible to obtain hot stamped products with a high degree of freedom in design, in which the mechanical properties of each part can be adjusted according to requirements.

[0092] According to the present invention, a hot stamped product with a high degree of freedom in design can be obtained.

[0093] REFERENCE SIGNS LIST 10 Hot stamped product 12 First steel material 14 Second steel material 16 Weld line 20, 22 First vertical wall portion 24 First plate-shaped portion 26 Burring portion 40, 42 Second vertical wall portion 44 Second plate-shaped portion

Claims

1. A hot stamped product comprising: a first steel material having a first plate-shaped portion and a burred portion rising from the first plate-shaped portion; a second steel material having a second plate-shaped portion arranged to be aligned with the first plate-shaped portion in a direction perpendicular to the thickness direction of the first plate-shaped portion; and a weld line joining an edge of the first plate-shaped portion and an edge of the second plate-shaped portion.

2. A hot stamped product as described in claim 1, wherein the Vickers hardness of the tip of the burring portion and the Vickers hardness of the first plate-shaped portion are equal to or higher than the Vickers hardness of the second plate-shaped portion.

3. A hot stamped product according to claim 2, wherein the Vickers hardness of the tip of the burring portion is equal to or greater than the Vickers hardness of the first plate-shaped portion.

4. A first test piece and a second test piece are cut out from the second plate-shaped portion, and the Vickers hardness HV of the first test piece is measured after applying a strain to the first test piece and then quenching the first test piece. 1 and the Vickers hardness HV of the second test piece when the second test piece is quenched without applying strain to the second test piece. 2 and satisfy the following formula (i). 1 <HV 2 ...(i) 5. A third test piece and a fourth test piece are cut out from the first plate-shaped portion, and the Vickers hardness HV of the third test piece is measured after applying a strain to the third test piece and then quenching the third test piece. 3 and the Vickers hardness HV of the fourth test piece when the fourth test piece was quenched without applying strain to the fourth test piece. 4 and satisfy the following formula (ii): 3 ≧HV 4 ... (ii) 6. The hot stamp formed product according to claim 2 or 3, wherein the thickness of the tip of the burring portion is smaller than the thickness of the first plate-shaped portion, and the difference D1 between the thickness of the tip of the burring portion and the thickness of the first plate-shaped portion and the difference D2 between the thickness of the first plate-shaped portion and the thickness of the second plate-shaped portion satisfy the following formula (iii): D1>D2 (iii) 7. A hot stamped product according to claim 1 or 2, wherein the Vickers hardness of the tip of the burring portion is lower than the Vickers hardness of the first plate-shaped portion.

8. A method for producing a hot stamped product as described in claim 1, comprising the steps of: obtaining a tailored blank by welding a first steel plate and a second steel plate; heating the tailored blank; performing press forming on the tailored blank; performing burring on the first steel plate of the heated tailored blank; and quenching the heated tailored blank.

9. The method for producing a hot stamped product according to claim 8, wherein in the step of obtaining the tailored blank, a plated steel sheet is used for at least one of the first steel sheet and the second steel sheet.

Citation Information

Patent Citations

  • Method for manufacturing tailored blank press formed parts

    JP2006021216A

  • Ring-like component and method for manufacturing the same

    JP2016047544A

  • Plating steel plate for hot press and method for producing the same, and hot press molding member and method for producing the same

    JP2019014936A

  • Manufacturing method of hot press product

    JP2019058916A

  • Progressive press working method

    JP2021126695A