Method for controlling a production process of a production plant, computer program, and electronically readable data storage medium
The method employs a control agent algorithm in a control unit to select optimal process parameters from multiple trained models, addressing the challenge of fluctuating sheet properties and process changes, thereby reducing downtime and ensuring consistent quality in press shops.
Patent Information
- Application Number
- PCT/EP2024/056143
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-28
- Filing Date
- 2024-03-08
- Publication Date
- 2024-10-03
AI Technical Summary
In press shops, adjusting process parameters to maintain component quality is often done based on experience, leading to significant downtime and costs due to fluctuations in sheet properties like thickness, lubricant amount, and material properties, as conventional methods require manual retraining of models and are not adaptable to changes in the production process.
A method using a control unit with a control agent algorithm that selects the most suitable set of process parameters from multiple trained models based on current production system and semi-finished product conditions, allowing for continuous monitoring and adaptation, utilizing machine learning to determine optimal parameters.
This approach reduces downtime and costs by providing self-monitoring and adapting process parameters, ensuring consistent component quality and minimizing the impact of changes in the production process, such as tool wear or supplier variations, through continuous evaluation and retraining of models.
Smart Images

Figure EP2024056143_03102024_PF_FP_ABST
Abstract
Description
[0001] Method for controlling a production process of a production plant, computer program and electronically readable data carrier
[0002] The invention relates to a method for controlling a production process of a production plant according to patent claim 1. Furthermore, the invention relates to a computer program and an electronically readable data carrier according to patent claims 10 and 11.
[0003] A production plant can, for example, be used in series production in vehicle production. For example, a production plant can be designed as a press shop for body components. The manufacture of body components in press shops is divided into several process steps, or a production process can comprise several of these process steps. For example, blanks can first be cut from a coil on a coil line. This can produce traceable stacks of blanks, which are normally stored temporarily before processing in the press line. The press line usually involves deep drawing a flat sheet or the cut blank, which is then further processed in further process steps such as trimming and / or post-forming.
[0004] The thin sheets and semi-finished products processed in press shops can exhibit fluctuations in their properties. For example, sheet thickness, lubricant quantity, roughness, and elastoplastic material properties can fluctuate. Depending on the extent of such fluctuations, it may be necessary to adjust process parameters in order to ensure the required quality of the produced components.
[0005] In most press shops, process parameters are typically adjusted by a plant operator based on experience, which, however, involves plant downtime. Depending on how long it takes to find a favorable combination of process parameters, considerable costs can arise due to the production process downtime. A process parameter that affects a press in the press shop can be referred to as a press parameter and can describe or characterize, for example, forces or kinematics of a ram movement, the positioning of the blank holder, and / or the application of additional lubricant.
[0006] Other process parameters can be tool parameters, such as a drawing aid, gas filling of gas springs, and / or the determination of a guide position. Process parameters configured as tool parameters typically represent adjustment options within the tool. Furthermore, the setting of a straightening device on the coiling system can also be configured via process parameters.
[0007] In order to at least minimize or reduce the downtimes mentioned when finding process parameters to solve problems, it is the object of the invention to provide a method, a computer program and a data carrier by means of which process parameters for a production process of a production plant can be advantageously provided.
[0008] This object is achieved according to the invention by the subject matter of the independent patent claims. Advantageous embodiments and further developments of the invention are specified in the dependent patent claims as well as in the description and the drawings.
[0009] A first aspect of the invention relates to a method for controlling a production process of a production plant by a control unit, which for this purpose in particular uses a control agent algorithm and specifies a set of process parameters or process parameter combinations by means of which the production plant is operated during the production process to produce at least one component, wherein at least two trained models each determine or at least suggest their own set of process parameters for the production process on the basis of status data, for example a status of the production plant and / or semi-finished product properties, and a control unit makes a selection, in particular in the form of evaluations of the forecasts proposed by the model, of one of the at least two models for the production process, wherein this is done on the basis of a respective expected value.Thus, one of the at least two models is selected by the control unit. The production plant can, for example, be a plant that includes a press for deep-drawing blanks. The production process can thus be deep-drawing, so that a formed part is produced as the component from a blank or a semi-finished product during the production process. The control unit can, in particular, be designed to execute an algorithm, in particular the control agent algorithm, and in particular can comprise an electronic computing device, which can, in particular, have components for machine learning. The process parameters can, for example, be divided into pressing parameters characterizing the forming press and tool parameters. The status data describes a status of the production plant and / or, for example, semi-finished product properties, such as blank thickness, lubricant quantity, etc.The fact that the models are trained means that the respective model is trained using machine learning methods, particularly on the basis of training data, to be able to output or specify process parameters.
[0010] In other words, a set of process parameters is determined by at least two models depending on the situation—that is, the current state of the production plant and the component to be produced and the semi-finished product used for this purpose. The models differ from each other, for example, in the training data set and can therefore deliver different results. The control unit then selects the supposedly better model and visualizes or outputs the resulting set of process parameters, for example, to a plant operator for implementation. Furthermore, the set of process parameters can be transferred directly to the production plant's control system.For example, the model or the control agent algorithm can generate suggestions for a suitable choice of process parameters depending on the semi-finished product properties of the board to be processed, a state of the board, such as temperature, a state of the tools, such as surface temperature, and / or other variables, such as the age of the material.
[0011] The invention is based on the finding that algorithms from the field of machine learning can already be used to implement process control. When operating such trained models, particular consideration must be given to the fact that changes to production processes may occur. For example, in a drawing stage, depending on the wear on the drawbeads, local welding and re-milling may occur in order to restore the original geometry of the drawbead. Other examples of changes could be a change of supplier of the semi-finished products or a revision of the production line for the semi-finished product. Additionally or alternatively, a tool may need to be revised, for example, due to a tool breakage.Such changes can lead to a model no longer being able to be used to recommend process parameters because it is based on the properties of the production process of a state that no longer exists, for example the original one.
[0012] To train the model, one could use only training data resulting from a last completed production order. This would allow the current state of the production process to be taken into account in some way. However, such a model cannot advantageously represent the variation in semi-finished product properties, since only the variation of these properties from a few orders is taken into account. In order to optimally account for the variation in the properties of semi-finished products in a model for recommending production parameters or process parameters, it would be advantageous to consider data from many production orders. However, this approach cannot take into account changes to the manufacturing process or production process, especially when changes are made to the machine and not to the semi-finished product.
[0013] Therefore, a decision should be made regarding the number of orders whose corresponding data can be used to train a model for recommending process parameters. This decision is not trivial and can depend on several factors. For example, the number of production orders considered for model training should be kept relatively low for a production process that is currently in its start-up phase, as frequent changes to the state of the production process are expected. For a process that has been in operation for a long time, for example, several years, changes to the state of the production process generally occur rarely or are not expected.
[0014] In principle, however, unforeseeable changes to the production process can occur at any time, such as those caused by a tool breakage. A statically selected number of production processes for providing a training data set can be problematic. Under these conditions, a decision can involve a correspondingly high level of manual analysis effort. If, during operation with such a machine learning model, it becomes apparent that its forecasting quality is unsatisfactory and the amount of data considered or the orders from which the data is generated needs to be adjusted, the model must be retrained.Such retraining, which is usually done manually, also leads to the unavailability of the model to recommend process parameters for one or, in the worst case, for several production orders, each of which characterizes a certain number of production processes for a specific type of component.
[0015] These disadvantages can be circumvented by the method according to the invention. Thus, the method according to the invention presents a modified model for recommending process parameters. This involves introducing several models trained with different data, evaluating the predictions of these models, deriving a recommendation, and continuously and independently monitoring recommended process parameters. The entirety of these method components can be summarized in an algorithm, the control agent algorithm. This algorithm recommends process parameters or a set of process parameters determined by the one of the at least two models most suitable for the current situation or the current production process.
[0016] The method according to the invention thus makes it possible to provide a self-monitoring and self-adapting algorithm for controlling production processes, by means of which the production plant can be operated particularly advantageously.
[0017] In an advantageous embodiment of the invention, the at least one component is produced using the set of process parameters determined by the selected model. In other words, the manufacture of the at least one component of the production process takes place based on the selection made by the control unit, on the basis of which the selected model specifies its specific set of process parameters. For example, the model containing the training data set advantageous for the current state in the production plant can advantageously be selected, so that the component can be produced particularly advantageously using the method. In a further advantageous embodiment, each of the at least two models is trained using machine learning with its own training data set, which differs from the other training data sets of the other of the at least two models.In other words, each model is unique, meaning no two are alike, with the differences arising from the individually selected training data. For example, a first of the at least two models can include training data from the most recent production order performed in the production facility, whereas the second training data set of the at least two models for the second model can include data from the last ten production orders, for example. This offers the advantage of maintaining advantageous models for various situations in subsequent production processes.
[0018] In a further advantageous embodiment of the invention, the respective training data set comprises results, i.e., data based on process parameters of manufactured components suggested by the model, in particular a specific number of previously executed production orders, and / or results of a number of produced components and / or a predefined time period in which components were produced, wherein the training data sets differ from one another, in particular in terms of number and / or time period. In other words, for the individual training data set, a specific number of production orders and the components produced by these production orders in the past are used. Additionally or alternatively, the training data set can be determined independently of a production order by the number of produced components.Additionally or alternatively, the results can be used for a specified period of time during which the production facility was operating and manufactured components. This offers the advantage of providing training data sets and thus trained models for any unforeseen events.
[0019] In a further advantageous embodiment of the invention, a chronological sequence of the results used is specified for the respective training data set. In other words, if, for example, a number of completed production orders or a number of produced components are used for the training data set, these are not randomly selected from different time periods, but rather the production orders and / or the produced components are in particular consecutive in series. The chronological sequence is advantageously based on the most recently completed orders and further back into the past. This results in the advantage that, in particular, only models can be retained whose training data set is relevant to the current production processes of the production plant.
[0020] In a further advantageous embodiment of the invention, the status data characterize semi-finished product properties of a semi-finished product from which the component is to be manufactured, and / or the status data characterize a status of the production facility. In other words, the status data describe properties of the semi-finished product from which the component is at least partially produced by the production process of the production facility. Additionally or alternatively, the status data describe a status of the production facility, whereby, for example, a repair of a drawbead can be described. Semi-finished product properties can be, for example, a blank thickness, an elastic modulus, and / or a quantity of lubricant on the blank.This results in the advantage that the state data can be used in a particularly advantageous manner to provide an input for the at least two trained models for determining the respective set of process parameters.
[0021] In a further advantageous embodiment of the invention, the respective expected value describes an expected quality, for example of the component geometry, of the at least one component to be manufactured for each set of the determined process parameters. In other words, the control unit, which can also be implemented as a separate algorithm, makes the selection based on the expected quality of the manufactured component. In this way, the quality for the first of the at least two models is determined, and thus it is recorded how high the quality of the set of process parameters specified by this model can be expected. This determination of the expected value is carried out based on the quality for each of the at least two trained models. Finally, the control unit selects the model with the best expected quality.This results in the advantage that the method can provide a particularly advantageous set of process parameters or a combination of process parameters particularly advantageous for the production plant.
[0022] In a further advantageous embodiment of the invention, the control unit's selection takes into account, in addition to the respective expected value, a change in the production process. In other words, the control unit is provided with the information determining the change in the production process via a suitable input, so that the control unit can consider the change in the production process and select the model whose training data set most closely reflects the change. This results in the advantage of being able to select a particularly advantageous set of process parameters.
[0023] In a further advantageous embodiment of the invention, in addition to the respective expected field, a comparison with components already produced using one of the models is taken into account during the selection. In other words, if a model has already been used to produce components in a previous production process and / or for a production order, the results obtained are used, for example, to determine their quality and are taken into account in the selection in addition to the particularly calculated expected value. This results in the advantage that particularly reliable data can be accessed during the selection, so that a particularly advantageous set of process parameters or process parameter combinations can be provided.
[0024] A second aspect of the invention comprises a computer program. The computer program can, for example, be loaded into a memory of an electronic computing device of a production plant and comprises program means for executing the steps of the method when the computer program is executed in the electronic computing device or a control device.
[0025] Advantages and advantageous embodiments of the first aspect of the invention are to be regarded as advantages and advantageous embodiments of the second aspect of the invention and vice versa.
[0026] A third aspect of the invention relates to an electronically readable data carrier. The electronically readable data carrier comprises electronically readable control information stored thereon, which comprises at least one computer program as just presented and is configured such that, when the data carrier is used in an electronic computing device, it can execute a method presented here according to the first aspect of the invention. Advantages and advantageous embodiments of the third aspect of the invention are to be regarded as advantages and advantageous embodiments of both the second and the first aspect of the invention, and vice versa.
[0027] Further features of the invention emerge from the claims, the figures, and the description of the figures. The features and combinations of features mentioned above in the description, as well as the features and combinations of features mentioned below in the description of the figures and / or shown alone in the figures, can be used not only in the respective specified combination, but also in other combinations or on their own.
[0028] The invention will now be explained in more detail using a preferred embodiment and with reference to the drawings. It shows:
[0029] Fig. 1 is a schematic view of a production plant with a
[0030] Control unit through which a method for controlling a production process of the production plant can be specified.
[0031] Fig. 1 shows a schematic view of a production plant 10, which is controlled by a control unit 12 by means of a method for controlling a production process of the production plant 10.
[0032] In the method, a set of process parameters 14 is specified, by means of which the production plant 10 is operated during the production process to produce at least one component 16, wherein at least two trained models 18 each determine their own set of process parameters 14 based on status data for the production process and a control unit 20 makes a selection 22 of one of the at least two models 18 for the production process, wherein this is done based on a respective expected value for the respective one of the at least two models 18.
[0033] By means of the method, at least one component 16 is advantageously manufactured or produced in a production process based on the set of process parameters determined by the selected model 18.
[0034] Each of the at least two models 18 is trained by machine learning with a respective training data set, which differs from the respective other training data set of the other of the at least two models. Advantageously, the respective training data set includes results from a specific number of previously completed production orders and / or a result from a number of previously produced components and / or results for the components 16 produced within a predetermined time period. The training data sets differ, in particular, in number and / or time period, thus, in particular, each training data set is individual for each of the at least two models 18.
[0035] The presented method can counteract the problem that arises, for example, during the conventional use of a model for a production plant 10, which may in particular represent a forming press of a press shop, when adapting to a changed production process, for example due to tool damage or changes to the production plant 10. Thus, the conventional use of a trained model would require retraining the model, which involves time and thus a downtime of the production plant 10, thus causing high costs.
[0036] By the presented method, whose control unit 12 comprises, in particular, a control agent algorithm, wherein this algorithm comprises both the at least two trained models 18, each embodied in particular as a self-learning algorithm and / or neural network. Furthermore, the control agent algorithm can comprise the control unit 20, wherein, in particular, a continuous evaluation of the forecast of the at least two models 18, which are trained with different data, can be carried out, and a derivation of a recommendation as well as, in particular, continuous and independent monitoring of recommended process parameters can be carried out. These units are summarized below for the method as the algorithm and the control agent algorithm, respectively.
[0037] In other words, the algorithm recommends process parameters. The trained models 18, which are in particular machine learning models, form part of this control agent algorithm. The problem of selecting the correct training dataset for a model 18 and the associated data for model training can be addressed by the presented method, since at least two models are trained in parallel using individual training datasets. For example, a first model 18 is trained with data or results from N jobs, and a second model 18 with K jobs. Here, K is less than N. This approach therefore provides at least two models 18 with different amounts of training data.The first model is generally better suited to recommending process parameters if, for example, the production process has recently been changed, meaning that only results that already incorporate the change in the production process are advantageously used. In contrast, a second of the at least two models 18 is suitable for predicting process parameters if no changes have been made to the production process in the past, thus advantageously providing more data.
[0038] Using the presented method, any number of trained models 18 can be trained with different amounts of data or results. Advantageously, all models 18 incorporate data from current orders, whereby the difference between the models 18 or the data can lie in the number of past production orders taken into account when determining the training data.
[0039] After M completed production orders, all models 18, for example, the first and second models 18, can be retrained. In other words, regular retraining of the models 18 can be carried out at specific intervals, particularly automatically. It is conceivable to continue to make the previously used models 18 available for validation purposes; this means that with each retraining of the existing models 18, the same number of models 18 is added, since the old models 18 are retained or can be used for verification.
[0040] Before the selection by the control unit 20 or a recommendation of the new model 18 is followed, a comparison of the forecasts of the previous models 18 with the new one can be carried out. A number of production orders can be used as a reference for the training data. Additionally or alternatively, a different reference can be selected; for example, training data could also be advantageously selected for the method by defining a time period and / or a produced quantity of components 16. For example, a corresponding selection of training data can be made based on the number of produced components 16 and the production orders, which can be subject to considerable fluctuations depending on the production order and thus the produced component 16.Determining the training data over a period of time can be particularly useful if similar quantities of each component 16 are produced on a production line 10.
[0041] If a recommendation or selection of the process parameters 14 is to be made, all trained models 18 are advantageously first evaluated, in particular by the control unit 20. Each model 18 provides a quantity or set of process parameters 14, which can also be referred to as process parameter combinations. Subsequently, a forecast of a model 18 is selected, which can, for example, be an average of the forecasts of several models 18, wherein this can, for example, be weighted, and / or a derivation of the process parameters 14 that is recommended by a majority of the models 18. The algorithm or the control unit 12 can then finally provide a process parameter combination to a plant operator and / or a press.
[0042] The selection of one of the trained models 18 can, for example, depend on various events. If the algorithm or control unit 12 becomes aware that a change in the production process has occurred, the control unit 20 can select the prediction of a model 18 that only considers the data from a few production processes. However, it should be considered that the respective change actually affects the quality or grade of the produced component 16. If this cannot be clarified, the selection of model 18 can be rejected.
[0043] In other words, it is advantageous that, in addition to the respective expected value, a change made to the production process is taken into account during the selection. Additionally or alternatively, the respective expected value describes, in particular, an expected quality, for example, of a component geometry and thus a component quality of the at least one component 16 to be manufactured per set of the determined process parameters 14.
[0044] Should the change in the production process affect the quality of the produced components 16, the control unit 12 will check whether the forecast quality of the process parameters 14 meets the requirements and only change the model 18 if necessary. In this context, models 18 that contain more data or training data can generally be preferred, and a different model can only be switched to if a need is identified. To evaluate the forecast quality, the quality of the produced components 16 can be assessed and compared with the quality achieved in previous production processes. Only components that were produced in the past based on a recommendation from the control unit 12 or the monitoring unit 20 are considered.The quality can, for example, be a geometry of the produced component 16, but indirect quality indicators, such as material flow, can also be taken into account.
[0045] In the event that a change in the production process is not detected and thus corresponding information is not provided to the control unit 12, an assessment of the component quality and a comparison with previously produced components 16 can be carried out in the same way, as already explained. If a decrease in quality is detected, a switch can be made from, for example, the second to the first model 18. Should the quality decrease, a switch can be made back to the second model 18. In general, it is possible to switch between any number of models 18.
[0046] If the process parameters 14 are determined from several models 18, instead of switching between the models 18, the weights for averaging the process parameter combinations can be changed.
[0047] The method shown makes it particularly advantageous to provide automatic management of models 18 for the prediction of process parameters 14. This allows recommendations for process parameters 14 to be provided for many different production processes without significant additional effort.
[0048] Reference symbol list Production plant Control unit Process parameters Component Trained model Control unit Selection
Claims
Patent claims 1. Method for controlling a production process of a production plant (10) by means of a control unit (12) which specifies a set of process parameters (14) by means of which the production plant (10) is operated during the production process to produce at least one component (16), wherein at least two trained models (18) each determine their own set of process parameters (14) on the basis of status data for the production process and a control unit (20) selects one of the at least two models (18) for the production process, wherein this is done on the basis of a respective expected value.
2. Method according to claim 1, characterized in that the at least one component (16) is produced with the set of process parameters (14) determined by the selected model (18).
3. Method according to claim 1 or 2, characterized in that each of the at least two models (18) is trained by means of machine learning with a respective own training data set which differs from the respective other training data sets of the other of the at least two models (18).
4. Method according to claim 3, characterized in that the respective training data set comprises results of a certain number of previously carried out production orders and / or number of produced components (16) and / or a predetermined time period, wherein the training data sets differ in particular in the number and / or time period.
5. Method according to claim 4, characterized in that a chronological sequence of the results used is specified for the respective training data set.
6. Method according to one of the preceding claims, characterized in that the status data characterize semi-finished product properties of a semi-finished product from which the component (16) is to be produced and / or that the status data characterize a status of the production plant (10).
7. Method according to one of the preceding claims, characterized in that the respective expected value describes an expected quality of the at least one component to be manufactured per set of the determined process parameters (14).
8. Method according to one of the preceding claims, characterized in that in addition to the respective expected value, a change made to the production process is taken into account during the selection.
9. Method according to one of the preceding claims, characterized in that in the selection, in addition to the respective expected value, a comparison with components (16) already produced on the basis of one of the models (18) is taken into account.
10. A computer program which can be loaded directly into a memory of an electronic computing device of a production plant (10), with program means for carrying out the steps of the method according to one of claims 1 to 9 when the computer program is executed.
11. Electronically readable data carrier with electronically readable control information stored thereon, which comprises at least one computer program according to claim 10 and is designed such that, when the data carrier is used in an electronic computing device of a production plant (10), it carries out a method according to one of claims 1 to 9.
Citation Information
Patent Citations
System and method for learning and / or optimizing manufacturing processes
US20150161520A1
