Method for generating risk maps on localised or distributed infrastructure
The method addresses the challenge of climate change impacts on infrastructure by generating risk maps that combine geolocation and climate data to calculate a risk index, enabling proactive adaptation and reducing economic losses through optimized resource allocation and intervention planning.
Patent Information
- Application Number
- PCT/IB2024/053087
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-31
- Filing Date
- 2024-03-29
- Publication Date
- 2024-10-03
AI Technical Summary
Existing infrastructure maintenance plans do not adequately account for climate change impacts, leading to increased costs and service interruptions due to unforeseen damage from environmental events, necessitating a method to assess and mitigate climate change risks.
A computer-implemented method generates risk maps by combining geolocation, infrastructure characteristics, and projected climate data to calculate a risk index for each infrastructure, enabling proactive adaptation and resilience planning.
The method allows for optimized resource allocation and prioritization of interventions, reducing the economic impact of climate-related damage and improving infrastructure resilience by identifying high-risk areas and components, thus minimizing service disruptions and maintenance costs.
Smart Images

Figure IB2024053087_03102024_PF_FP_ABST
Abstract
Description
[0001] METHOD FOR GENERATING RISK MAPS ON LOCALISED OR DISTRIBUTED INFRASTRUCTURE
[0002] TECHNICAL FIELD
[0003] This disclosure concerns methods for determining a climate change risk index associated with localised infrastructures (e.g. plants) and spatially distributed infrastructures (e.g. distribution networks) exposed to atmospheric events (e.g. heat waves, extreme precipitation, ...) and induced phenomena (e.g. fires, ...). This index represents a support for the quantification of the possible economic impact of the future effects of these environmental events on each infrastructure and the consequent identification of a set of possible adaptation actions to maximise their resilience. In other words, the method, calibrated through a cost-benefit analysis and an analysis of the timing of the implementation of adaptive measures, allows to:
[0004] 1. Increasing the resilience of existing infrastructure,
[0005] 2. Developing new infrastructure in a resilient manner,
[0006] 3. Increasing responsiveness to adverse events.
[0007] BACKGROUND
[0008] The infrastructures referred to in this disclosure are those located on the territory and are exposed to atmospheric events as well as their indirect impacts. Variations in environmental factors, such as wind, precipitation, fire, temperature variations, to name but a few, have an impact on the functionality of the infrastructures installed on the territory as well as their efficiency. In particular, adverse atmospheric events can cause damage that can compromise the functionality of the installation or limit its efficiency, leading to maintenance interventions, either to prevent a long interruption of service or, if prevention does not take place in time, to repair the damage that has occurred.
[0009] Standard procedures provide for infrastructure maintenance and upgrade plans that preserve the expected average useful life of the infrastructure. However, these ordinary or extraordinary maintenance operations are costly and therefore need to be carried out only when indispensable, to contain costs and to limit service interruptions due to maintenance. Typically, maintenance or replacement interventions are decided on the basis of a schedule of interventions established by the manufacturer, on the observation of the present state of the equipment and the experience of the individual operators, which do not always contemplate the impacts of climate change.
[0010] In general, unplanned maintenance interventions after a damaging event reduce productivity and also increase maintenance costs, as the expenses for planned maintenance are generally much lower than the expenses for carrying out emergency maintenance and restoration, as well as not causing an emerging economic damage. Therefore, methods are desirable that provide useful elements to measure one or more indices of risk associated with each installation exposed to environmental events and induced effects, in order to be able to plan intervention in time before the damaging event; all this to improve resilience, to reduce the risk of impacts such as damage and service interruptions, and to the ability to manage adverse events to safeguard assets and people. SUMMARY
[0011] To meet this need, the present disclosure provides a computer-implemented method for generating risk maps of installations in areas to be monitored. Such risk maps are produced from the combination of several suitably combined input maps, such as:
[0012] 1- Map showing the geolocation of infrastructures exposed to environmental and induced events in the area to be monitored, and optionally also the characteristics of the infrastructures;
[0013] 2- Map with information on the conformation and territorial characteristics of the area to be monitored (e.g. forest coverage or hydrogeology of the territory);
[0014] 3- Map showing the estimated change in frequency and intensity in future years (projected future behaviour) of atmospheric agents (temperature, rain, wind, etc.) in order to take into account the effects of climate change on their behaviour.
[0015] For each infrastructure, a respective risk index is calculated over a future time interval of interest according to the three levels of information just described. An output file is then generated, storable on a storage medium or viewable on screen or printable, e.g. in graphical or text form (but not limited to), containing the risk map of the assets present in the area to be monitored, showing each infrastructure accompanied by at least one graphical or numerical element representative of the respective risk index.
[0016] More precisely, an output file containing a risk map of infrastructure in an area to be monitored is generated by means of a computer through the following operations:
[0017] Providing to the computer an input file containing an input map showing the geolocation of infrastructures exposed to environmental events, in which each infrastructure is associated, in the input map, with respective information of vulnerability and resilience to environmental events assigned at a current date, in which this information is potentially updated over time to take into account the decay of the infrastructure; information is provided to the computer on various climate projections of environmental events in a future time interval, preferably taking into account for each analysed infrastructure only environmental events relevant to that infrastructure; providing the computer with information on the conformation and territorial characteristics of the area to be monitored; for each infrastructure, vulnerability and resilience information is calculated for the infrastructure in the future time interval as a function of the vulnerability and resilience information assigned at the current date, optionally also as a function of information on different climate projections of environmental events in a future time interval and information on the conformation and territorial characteristics of the area to be monitored and a respective risk index is calculated, in the future time interval, as a function of the respective vulnerability and resilience information in the future time interval for each of the climate projections of environmental events in the area to be monitored, conformation information and territorial characteristics; the computer generates the output file containing the risk map of the infrastructures in the area to be monitored, accompanying each infrastructure with at least one graphic or numerical element representative of the respective risk index.
[0018] Optionally, the risk map can be generated with each infrastructure accompanied by a risk index for each infrastructure component.
[0019] Further embodiments are defined in the annexed claims.
[0020] BRIEF DESCRIPTION OF THE DESIGNS
[0021] Figure 1 shows a map of fire risk increase over the Italian territory in the RCP 2.6 climate scenario (RCP - Representative Concentration Pathways) obtained by reprocessing regional public climate data.
[0022] Figure 2 shows a map of the NDVI (Normalised Difference Vegetation Index) obtained by reprocessing NASA satellite data. Figure 3 shows an illustrative map of the average number of days per year characterised by excessively high temperatures (heat waves) on Italian territory recorded in the period from 1990 to 2020.
[0023] Figure 4 shows an illustrative map of the estimated increase in the number of days per year characterised by excessively high temperatures (heat waves) over the Italian territory in the RCP 2.6 scenario compared to the historical average shown in Figure 3.
[0024] Figure 5 shows a risk map of infrastructures on Italian territory accompanied by graphical elements representing the relative risk index calculated using the method of this disclosure over a 20-year time interval.
[0025] DESCRIPTION OF ILLUSTRATIVE EMBODIMENTS
[0026] The assessment of the vulnerability of the Italian network, after the intense snowfalls of the last few years (e.g. 2011-2018), prompted the Ministry of Economic Development (MiSE) and ARERA (the National Energy Authority) to develop an ad hoc framework capable of stimulating Distribution System Operators (DSOs) to propose specific measures in their intervention plans. In 2017, the stakeholder discussion led to the definition of the current Resilience Plan, a specific three-year additional plan that each DSO must publish by 30 June each year. This plan includes a list of interventions specifically addressing three different climate threats: ice on cables, heat waves and falling trees caused by windstorms. All interventions are prioritised according to the return time of the events and the potential benefits of implementing resilient solutions.
[0027] The method of the present disclosure is of particular use in this context, as it allows for the fully automated generation of a risk map that is useful for planning interventions to adapt facilities to the effects of climate change. The risk map shows the infrastructures at risk in the area to be monitored, each accompanied by at least one graphic or numerical element representative of the respective risk index. These risk maps, and their tabular declinations, then form the basis on which intervention / maintenance decisions are made to maximise the resilience of these infrastructures to the effects of climate change. Decisions regarding the choice of interventions can be derived by knowing the available budget and the cost of each individual intervention, but such decisions can only be made after a risk map has been created in order to allocate resources in an optimised manner.
[0028] The risk index is calculated by combining different layers of information, which will be described later, and is associated with specific areas to be monitored for the presence of strategic assets, productive activities, etc., providing useful indications for defining the urgency and extent of adaptation actions needed to increase their resilience to the weather conditions to which they might be exposed under different future climate scenarios.
[0029] The risk maps are obtained by a computer from an input map showing the geolocation of the infrastructures installed in the area to be monitored and exposed to environmental events, wherein in the input map each infrastructure is associated with respective information of vulnerability and resilience to environmental events, where this vulnerability and resilience information is potentially updated over time to take into account the decay of the infrastructure. Information is then provided to the computer on the conformation and territorial characteristics of the area to be monitored, as well as information on future estimates of environmental events that are expected to occur in a future time interval at the same site. In addition, the vulnerability and resilience information in the future time interval is determined as a function of the vulnerability and resilience information of the infrastructure at the current date and, optionally, also as a function of future estimates of environmental events that are expected to occur in the future time interval.
[0030] A respective risk index is then calculated for each infrastructure in function of the respective information of vulnerability and resilience, of the climatic projections in the area to be monitored and of the conformation of the territory finally generating an output file containing the risk map showing each structure present in the area to be monitored accompanied by at least one graphic or numerical element representative of the respective risk index. The risk map is then generated by combining the input map and reporting the assets accompanied by appropriate graphic elements, such as a colour chosen from a chromatic scale applied on the map in correspondence with the area to be monitored, in which the various shades of the chromatic scale represent different values of the risk index. Alternatively or additionally, the risk map could represent each infrastructure associated with the numerical value of the risk index.
[0031] If there are several components within an infrastructure, according to one aspect a risk index can be calculated for each component of the infrastructure. In order to do this, it is necessary to have information on the vulnerability and resilience to environmental events of all the components that make up each infrastructure. With this information, a risk index relative to each component is calculated, in a future time interval, as a function of the respective vulnerability and resilience information for each of the climate projections of adverse environmental events in the area to be monitored, conformation information and territorial characteristics. The risk map contained in the output file will represent the infrastructure present in the area to be monitored accompanied by at least one graphic or numerical element representative of the risk index relative to at least one component of the infrastructure. The output file containing the risk map may conveniently be stored on a mass storage medium, or it may be displayed on a screen or printed so that an operator can see the risk map in graphical form, text form, etc..
[0032] Basically, risk indices are obtained by combining different levels of information, which are described below:
[0033] Geolocation map and asset characterisation: this layer contains information on the geolocation of assets and their characteristics (including the technology on the basis of which the incidence of various phenomena, economic value, vulnerability status, resilience characteristics, etc., is weighted);
[0034] Climatological projection map: this layer contains projection information (e.g. in the different RCP - Representative Concentration Pathway - climate risk scenarios) of a range of acute (short-lived but particularly intense phenomena such as floods, hurricanes, etc. with potential impacts on infrastructures) and chronic (related to structural changes in the climate, such as temperature increase trends, sea level rise, etc. that may lead to a constant variation in plant production and a change in electricity consumption profiles) climate phenomena identified as relevant following an assessment activity on historical data related to environmental factors related to the climate which may determine, for example, a constant variation in plant production and a change in electricity consumption profiles) identified as relevant following an assessment activity on historical data of damaging events linked to environmental factors related to the asset / activity (which in the example shown are obtained from georeferenced daily raw data from public climate models with worldwide coverage on a square mesh that goes up to a resolution of approximately 12Km x 12Km). An example, at low resolution, of this level of information is represented by the map of the Italian territory in Figure 1, which shows the distribution of fire risk increases over the Italian territory in the RCP 2.6 scenario. Another example of this level of information is provided by Figures 3 and 4, which respectively show the average number of days per year characterised by excessively high temperatures (heat waves) on the Italian territory recorded in the period from 1990 to 2020 and an estimate of the increase in the number of days per year characterised by excessively high temperatures on the Italian territory in the RCP 2.6 scenario compared to the historical average represented in Figure 3;
[0035] Territorial characterisation map: this layer of information concerns the conformation and characteristics of the territory useful for characterising the actual territory-specific risk linked to each climatic phenomenon analysed. An example of this layer of information is represented by the map of the Italian territory in Figure 2, which shows the distribution of the ND VI ('Normalized Difference Vegetation Index') obtained from the reprocessing of NASA satellite data.
[0036] The composition of these three macro-levels, i.e. information on future climate projections, information on territorial conformation and characteristics, and information on infrastructures, makes it possible to generate the risk map by calculating a composite index that makes it possible to identify infrastructures in the most dangerous areas on which to focus adaptation actions to increase resilience to climate change for each type of infrastructure or even each component of each localised or distributed infrastructure. An example of such a risk map is illustrated in Figure 5, which shows where infrastructures are located (circles) and what the risk index of the area in which they are installed is. Clearly, depending on the information provided, the values of the calculated risk indices will change and consequently the generated risk map will change. Thus, using information on projections of environmental events in the area to be monitored that are expected to occur in a future time interval, re-processed, for example, from data on RCP (Representative Concentration Pathway) scenarios, and based on the presence or absence of additional risk factors (such as forest cover or vegetation cover in the vicinity of infrastructures) makes it possible to have scientifically valid estimates of the risks to which the structures could be exposed.
[0037] The following will show a non-limiting practical example of how risk indices can be calculated by combining the various information. A way to characterise environmental events from historical data of similar past events will also be shown.
[0038] Acute environmental events, such as storms, floods, heat waves, cold waves, etc., are characterised by a specific intensity and frequency of occurrence that can produce impacts such as damage and interruptions of activities. To assess the potential impact of acute environmental events under different scenarios, as a first step, it is important to identify the correlation between failures and meteorological variables, in order to define the characteristics of acute events to be studied under long-term projections and under the main scenarios RCP 2.6, RCP 4.5 and RCP 8.5, for example.
[0039] Each RCP (Representative Concentration Pathway) scenario, e.g. the Intergovernmental Panel on Climate Change (IPCC) scenarios in IPCC AR5 (5th Assessment Report) 2014 and IPCC AR6 (6th Assessment Report) 2022, is associated with a certain trend in greenhouse gas emissions and, therefore, with a different level of increase in the earth's temperature by 2100, compared to the pre-industrial period (1850-1900). In particular, RCP 2.6 is compatible with a global warning interval of less than 2°C increase, while in RCP 8.5 the temperature increase is more than 4°C. Considering the conformation of the territory, climate projections, and information on the vulnerability and resilience to environmental events of each infrastructure, such as sections of the distribution network, as well as the costs associated with related maintenance and interruption / restoration of service, it is possible to estimate the potential economic risk associated with an increase or decrease in the frequency and / or intensity of a given environmental phenomenon.
[0040] Once the risk index was calculated to associate it with a potential economic impact relative to each phenomenon and geography, depending on the available information, several methodologies were adopted, following a common consistent framework:
[0041] Potential Economic Risk = (Climate Hazard x Vulnerability x Exposure) + Emerging Damage
[0042] In which are defined, respectively
[0043] Climate Hazard: is the theoretical frequency of an atmospheric event over a specific time frame: the return time. In other words, a catastrophic event that has, for example, a return time of 250 years implies that it has a 0.4% probability of occurring in one year. This information, necessary to assess the frequency level of the event, is then associated with its geographical distribution with respect to the different locations where the assets are present. The hazard associates a certain probability of occurrence with different levels of intensity of the phenomenon.
[0044] Vulnerability: in percentage terms, this indicates how much value is lost and / or damaged when a weather event occurs. In more specific terms, therefore, it can refer to damage to physical assets, the impact on the continuity of electricity production and / or distribution, or even the provision of electricity services to the end customer. Vulnerability associates with different levels of intensity of the hazard a probable impact that can be expressed as a share in the value of the asset.
[0045] Exposure: is the economic value of the asset, which may have non-negligible impacts in the presence of adverse weather events.
[0046] Emerging damage: economic loss, not related to the asset, understood as emerging damage and / or loss of profit that occurs as a direct result of a specific event (e.g. a disastrous event causing billing losses, etc.) and refers to direct and indirect losses and damages that would never have occurred if the specific event had not occurred.
[0047] Below is an example of the calculation of the risk and possible economic impact of heatwaves on underground network cables in Italy.
[0048] For the production of the risk maps, for example, climate projections can be used to describe the evolution of the heat wave phenomenon in the long-term scenario (2030- 2050) according to different climate projections (RCP 2.6, 4.5, 8.5). In the example illustrated in Figure 3, for each territorial area in Italy, the heatwave (HW) phenomenon was first characterised using the meteorological data observed for each year in the period 1991-2020 correlated with the historical damage register. A specific historical analysis of the temporal evolution of faults (in English Faults - F) was then carried out, in order to identify a typical year on the basis of which to dimension the number of expected faults according to heatwaves.
[0049] Based on the previous analysis, heat waves are defined as a specific combination of extreme temperatures and the absence of precipitation for extended periods of time. By applying this definition to meteorological data observed in the past, an accurate number of heatwaves in the chosen model year may be identified. Thanks to this analysis, a map like the one shown in Figure 3 may be obtained.
[0050] Then, on the basis of the heat wave map defined in the previous step, the number of annual heat wave events that exceeded the levels of the chosen type year on the observed data over the period 1991-2020 were searched for in future projections from climate scenario data.
[0051] For each region, the percentage increase in the number of heat waves (AHW%) compared to the typical year was calculated, which is similar to the example map shown in Figure 4 (where the absolute values of the increase in the number of days are shown). The same procedure was done with the number of faults, i.e. the percentage increase / decrease in the number of faults (ΔF%) compared to the typical year was calculated. The ratio thus expresses the average number of additional faults in relation to the increase in heat waves compared to a typical year. This value will generally depend on the available information of vulnerability and resilience of the infrastructure to environmental events and on the conformation of the territory.
[0052] This parameter, obtained for each region, was then aggregated at the national level through a weighted average, whose weights are linked to the extension of the infrastructure. For example, in the case where the infrastructure whose risk index is to be calculated consists of underground cables, the weights of the weighted average are linked to the kilometres of extension of the underground cables (wR) :
[0053] The parameter calculated in this way provides an index of risk related to that infrastructure in the future time interval, depending on the respective vulnerability and resilience information, for the considered climate projection.
[0054] Having assessed the expected number of breakdowns, both at regional and national level, it is also possible to estimate the incremental costs of service interruption and line restoration, so as to highlight the interventions that need to be prioritised at both regional and national level, or other subsets of interest.
[0055] In general, the cost of underground faults in terms of CAPEX (CAPital Expenditure) and OPEX (OPerating Expenditure) was calculated as the average of the last 10 years and appropriately revalued. For the calculation of the Average Unitary Cost (AUC) for the failure of an underground cable, the revalued total cost was divided by the total number of annual failures.
[0056] Thus, future CapEx and OpEx are estimated as: wherein Ffuturerepresents an estimate of the number of failures that could take place in a future interval, understood as the number of episodes of heat waves comparable with those of the type year previously identified that are expected to take place in that future interval.
[0057] Therefore, the total cost projections for the heat wave (HW) emergency, under the different scenarios, can be estimated as follows: i.e. the summation over the years found to be critical in future projections based on the definition of a critical year extrapolated from historical AUC OpEx and CapEx data for taste restoration.
[0058] The operations performed in the example just described can be summarised as follows:
[0059] - Identification of heat wave thresholds: the correlation between historical faults on the underground cable and meteorological data (temperature and precipitation) was used to identify climate thresholds on the historical dataset;
[0060] - Identification of the reference period / event: the analysis on the number of faults on the underground network over the last decade highlighted the most critical period / event, which was considered as a reference for the climate projections;
[0061] - Estimation, in future CPR scenarios, of identified climate thresholds;
[0062] - Impact estimation: the impact on assets (CAPEX and OPEX costs for underground cables) was identified from the reference period / event. The extra costs compared to the historical average costs for the emergency were estimated.
[0063] Any variations or additions may be made by the experts in the technical field to the embodiments described and illustrated herein, while remaining within the scope of the following claims. In particular, further embodiments may comprise the technical features of any of the following claims with the addition of one or more technical features described in the text or illustrated in the figures, taken individually or in any combination thereof.
Claims
CLAIMS1. A computer-implemented method for generating a risk map of infrastructures in an area to be monitored, said method comprising the following operations: providing said computer with an input file containing an input map showing a geolocation of the infrastructures exposed to environmental events, wherein each infrastructure is associated, in the input map, with respective vulnerability and resilience information to environmental events, wherein said vulnerability and resilience information are assigned at a current date; providing said computer with information relating to different climatic projections of RCP scenarios of environmental events in a future time interval, wherein said future time interval is after said current date; supplying said computer with information on conformation and territorial characteristics of the area to be monitored; for each infrastructure of said infrastructures and for each climatic projection of the climatic projections of RCP scenarios of environmental events in the area to be monitored, calculating, with said computer, respective vulnerability and resilience information of the infrastructure in said future time interval in function of said vulnerability and resilience information assigned at the current date, and calculating a respective risk index, in said future time interval, according to all the following information: said respective vulnerability and resilience information of the infrastructure in said future time interval, the information on conformation and the territorial characteristics in the area to be monitored; generating, with said computer, said risk map, referred to a respective RCP scenario of said climatic projection, which illustrates the infrastructures in the area to be monitored and in which the infrastructures are located, wherein each illustrated infrastructure in the risk map is accompanied by at least one graphic or numerical element representative of the respective risk index.
2. A computer-implemented method of creating and displaying a risk map of infrastructures in an area to be monitored, comprising the following steps:performing the method of ciaim 1 to generate the risk map of the infrastructures present in the area to be monitored showing each infrastructure accompanied by at least one graphical or numerical element representative of the respective risk index for each RCP scenario; displaying on a screen or printing with a printer, optionally in graphic or text form, the risk map.
3. A computer-implemented method for producing a storage medium containing a file of a risk map of infrastructures present in an area to be monitored, comprising the following operations: performing the method of claim 1 to generate, for each RCP scenario, the risk map of the infrastructures in the area to be monitored showing each infrastructure accompanied by at least one graphical or numerical element representative of the respective risk index; writing an output file, which represents said risk map, to the storage medium.
4. The method according to one of the preceding claims, wherein each infrastructure of said infrastructures comprises a plurality of components, and the method further comprises the following steps: providing said computer with respective vulnerability and resilience information to environmental events of the plurality of components which constitute each infrastructure of said infrastructures; for each component of an infrastructure of said infrastructures, calculating, with said computer, a risk index relating to said component, in said future time interval, according to the respective vulnerability and resilience information, for each of the climatic projections of the environmental adverse events in the area to be monitored, and to the information on the conformation and territorial characteristics; generating, with said computer, the risk map of the infrastructures present in the area to be monitored showing each infrastructure accompanied by at least one graphic or numeric element representative of said risk index relating to a component of said infrastructure.
5. The method according to one of the preceding claims, wherein: said information relating to future projections of adverse environmental eventsinclude risk information from climatic events and related destructive events (e.g, fires, floods, landslides) in the area to be monitored for a future time interval; said information on the conformation and territorial characteristics of the area to be monitored includes information such as for example a forest coverage or hydrogeological information of the area to be monitored.
6. The method according to one of the preceding claims, wherein the projections of said environmental events in the area to be monitored are selected from the set consisting of RCP projections relating to rainfall, snowfall, winds, atmospheric temperature, fires, level and temperature of sea and of waterways.
7. The method according to one of the preceding claims, comprising the operation of generating said information relating to projections of adverse environmental events in said area to be monitored in said future time interval by means of climate model projections based on RCP scenarios of the Intergovernmental Panel on Climate Change (IPCC) AR5 (5th Assessment Report) 2014 and AR6 (6th Assessment Report) 2022.
8. The method according to one of the preceding claims, comprising the operation of generating said risk map containing only the infrastructures present in the area to be monitored whose risk index calculated by the computer exceeds a maximum threshold.
9. A computer program loadable into a memory of a computer, comprising a software code configured to perform the operations of the method according to one of the preceding claims when executed by the computer.
Citation Information
Patent Citations
Systems and methods for forecasting and assessing hazard-resultant effects
US11200788B1
Systems and methods for dynamic risk analysis
US20210216928A1
Climate-based risk rating
US20220327447A1