Maintenance assistance system

The maintenance support system addresses the inefficiency in handling multiple malfunctions by prioritizing maintenance tasks based on work unit accuracy, ensuring timely and effective maintenance across the component mounting system.

WO2024201879A1PCT designated stage expired Publication Date: 2024-10-03YAMAHA MOTOR CO LTD

Patent Information

Application Number
PCT/JP2023/013126
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing maintenance systems for component mounting systems lack efficiency and rationality when dealing with multiple malfunctions simultaneously, as they primarily focus on identifying malfunctioning parts rather than prioritizing and optimizing maintenance across multiple affected locations.

Method used

A maintenance support system that includes a display section, a display control section, a process for obtaining work accuracy parameter data, and an arithmetic processing unit to detect decreased work unit accuracy, prioritizing maintenance items for units with decreased accuracy and displaying them prominently for efficient maintenance.

Benefits of technology

Enables efficient and rational maintenance by quickly identifying and prioritizing maintenance tasks for work units with decreased accuracy, ensuring timely and effective maintenance across multiple locations within the component mounting system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023013126_03102024_PF_FP_ABST
    Figure JP2023013126_03102024_PF_FP_ABST
Patent Text Reader

Abstract

This maintenance assistance system assists maintenance in a component mounting system including a plurality of work units. The maintenance assistance system is provided with: a display unit that displays a maintenance item of a work unit that requires maintenance among the plurality of work units; a display control unit that controls the display unit; and a calculation processing unit that executes a process for acquiring, for each unit period, data of a parameter indicating work accuracy of the work unit, and a process for detecting, on the basis of the data, a work unit having reduced work accuracy as a maintenance target work unit. The display control unit controls a display method and / or display content of the maintenance item of the target work unit such that maintenance of the target work unit is prioritized over maintenance of other work units.
Need to check novelty before this filing date? Find Prior Art

Description

Maintenance Support System

[0001] The present invention relates to a maintenance support system that supports maintenance of various work sections of a component mounting system that is equipped with various work sections for producing component-mounted boards.

[0002] Component mounting apparatuses that mount electronic components (hereinafter simply referred to as components) on substrates to manufacture component-mounted substrates are well known. Component mounting apparatuses are comprised of working units such as a transport mechanism that transports and positions the substrates, a feeder that supplies components, a nozzle that sucks and holds the components, a mounting head equipped with the nozzle, and a head drive mechanism that moves the mounting head.

[0003] In component mounting devices, maintenance work is performed periodically or when a malfunction such as a pickup error occurs to ensure that these operating sections operate normally. For example, Patent Document 1 discloses a malfunction detection system that transmits data such as component pickup errors, supply errors, and pickup position deviation amounts from the component mounting device to a management computer, and identifies and notifies the user of the malfunctioning location (feeder, mounting head, nozzle) based on the data.

[0004] This malfunction detection system has the advantage of enabling the malfunction location to be quickly identified and maintenance to be performed. However, this malfunction detection system is a system for identifying the malfunction location, and does not incorporate any measures to enable efficient and rational maintenance when malfunctions occur in multiple locations at the same time. Therefore, there is room for improvement in this regard.

[0005] Japanese Patent Application Laid-Open No. 2019-62163

[0006] The present invention aims to provide a maintenance support system that enables efficient and rational maintenance in cases where malfunctions occur in multiple locations at the same time in a component mounting system equipped with a work unit for producing component-mounted boards.

[0007] A maintenance support system according to one aspect of the present invention is a maintenance support system for a component mounting system including a plurality of work units that perform work to produce component mounting boards, and includes a display unit that displays maintenance items for work units that require maintenance among the plurality of work units, a display control unit that controls the display unit, and an arithmetic processing unit that executes a process of obtaining parameter data that indicates the work accuracy of the work units for each unit period and a process of detecting work units whose work accuracy has declined based on the data as work units that are subject to maintenance, and the display control unit controls the display method and / or display content of the maintenance items for the target work units so that maintenance of the target work units is given priority over maintenance of other work units.

[0008] FIG. 1 is a block diagram of a component mounting system equipped with a maintenance support system according to the present invention. FIG. 2 is a plan view of a mounting device provided in the component mounting system. FIG. 3 is a front view showing a head unit of the mounting device. FIG. 4 is a block diagram showing the configuration of a management device. FIG. 5 is a flow diagram of maintenance support processing. FIG. 6 is a diagram showing an example of maintenance support information. FIG. 7 is a diagram showing an example of a condition setting screen for trend analysis processing. FIG. 8 is an explanatory diagram of trend analysis processing. FIG. 9 is an explanatory diagram of trend analysis processing. FIG. 10 is an explanatory diagram of trend analysis processing. FIG. 11 is a diagram showing an example of a condition setting screen for demand level determination processing. FIG. 12 is a diagram showing an example of updating of maintenance support information. FIG. 13 is a diagram showing another example of maintenance support information. FIG. 14 is a diagram showing another example of maintenance support information.

[0009] Preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings.

[0010] 1 is a block diagram showing a component mounting system 1 equipped with a maintenance support system according to the present invention. The component mounting system 1 includes a mounting device 2, an inspection device 3, and a management device 4 connected to the mounting device 2 and the inspection device 3 so as to enable data communication. The mounting device 2 is a device that mounts (loads) electronic components (hereinafter referred to as "components") on a substrate P such as a printed wiring board. The inspection device 3 is a device that inspects the mounting state of the components mounted on the substrate P by the mounting device 2.

[0011] 2 is a plan view showing the mounting device 2, and Fig. 3 is a front view showing a head unit 15 (described later) of the mounting device 2. The mounting device 2 includes a base 10, a conveyor 12, a component supply unit 14, a head unit 15, and an imaging unit 13.

[0012] The conveyor 12 is a transport line for the board P. The conveyor 12 carries the board P from outside the machine to a predetermined work position, and after the mounting work is completed, carries the board P from the work position to outside the machine. The position of the board P shown in Figure 2 is the work position.

[0013] The component supply units 14 are areas for supplying components, and are provided on both sides of the conveyor 12. Each component supply unit 14 is provided with a plurality of feeders 14a, and components are supplied by each feeder 14a. In this example, each component supply unit 14 is provided with a tape feeder that supplies components by unwinding a tape containing components at regular intervals. Various feeders other than tape feeders may also be provided in the component supply unit 14.

[0014] The head unit 15 performs a component mounting process by picking up components from the feeders 14a in the component supply unit 14, moving to a working position, and mounting the components on the board P. As shown in Fig. 3, the head unit 15 has a plurality of mounting heads 16, each equipped with a nozzle 16a at its tip (lower end). The nozzles 16a are members that pick up components supplied by the feeders 14a.

[0015] The nozzles 16a can be connected to either a negative pressure generator, a positive pressure generator, or the atmosphere via an electric selector valve. Supplying negative pressure to the nozzles 16a enables the nozzles 16a to suck and hold a component, and then supplying positive pressure releases the component from the suction hold. A suction level sensor (not shown) is provided in the passage between the nozzles 16a of each mounting head 16 and the electric selector valve. The suction level sensor detects the component suction level, specifically the negative pressure level in the passage.

[0016] The mounting head 16 is capable of moving up and down (raising and lowering) and rotating around an axis (moving in the R direction), and is driven by a motor not shown. When picking up a component from the feeder 14a, the mounting head 16 descends to a predetermined component pick-up position, picks up and holds the component with the nozzle 16a, and then rises. When mounting a component on the board P, the mounting head 16 descends above the board P to the component mounting position and releases the component from its suction hold, thereby releasing the component onto the board P. This allows the component to be mounted at the target mounting position set on the board P.

[0017] The head unit 15 can be moved horizontally in the space above the component supply unit 14 and the substrate P at the work position by operation of the head unit drive mechanism 17. As shown in Figures 2 and 3, the head unit drive mechanism 17 includes fixed rails 18 each fixed to a pair of elevated frames installed on the base 10, a beam member 19 that moves in the Y direction along the fixed rails 18, and a unit support portion (not shown) that moves in the X direction along the beam member 19. The head unit 15 is attached to this unit support portion. The beam member 19 and the unit support member each move due to the driving force of a motor. The movement of the beam member 19 and the unit support member moves the head unit 15 in the X and Y directions.

[0018] The imaging unit 13 includes a first imaging unit 13a and a second imaging unit 13b. The first imaging unit 13a and the second imaging unit 13b are both imaging cameras equipped with imaging elements.

[0019] The first imaging unit 13a is installed on the base 10 between the component supply unit 14 and the conveyor 12. After the nozzle 16a of each mounting head 16 has sucked and held a component, the first imaging unit 13a captures an image of the component sucked and held by the nozzle 16a from below when the head unit 15 moves from the component supply unit 14 to above the board P at the work position. The image thus obtained is an image that can be used to check the processing status of the component suction process, such as whether the nozzle 16a has failed to pick up the component, the attitude of the component picked up by the nozzle 16a, and the amount of deviation in the pickup position of the component relative to the nozzle 16a. A component suction failure refers to a processing status in which the nozzle 16a fails to pick up and hold a component supplied by the feeder 14a, or whether the component was once picked up and held but then dropped.

[0020] The second imaging unit 13b is disposed in the head unit 25. When each mounting head 16 performs the component mounting process, the second imaging unit 13b images the marks from above in order to recognize the various marks affixed to the upper surface of the substrate P placed at the work position. The second imaging unit 13b recognizes the marks on the substrate P, thereby detecting the amount of positional deviation from the origin coordinates of the substrate P. The second imaging unit 13b also images the component supply position of the feeder 14a before the nozzle 16a of each mounting head 16 sucks and holds the component. The image obtained in this manner is an image that allows confirmation of component supply errors and the amount of deviation in the supply position as the processing status of the component supply process.

[0021] The mounting device 2 is equipped with a mounting control unit 20 that comprehensively controls the operation of each unit, such as the conveyor 12, the feeder 14a, the head unit 15 (head unit drive mechanism 17), and the mounting head 16. The mounting control unit 20 controls each unit, such as the head unit 15, to perform a component mounting process for mounting components on the substrate P, and also to perform various calculation processes required for this component mounting process.

[0022] Furthermore, the mounting control unit 20 transmits mounting history data D1 (see FIG. 1 ) to the management device 4 periodically or based on a request signal input from the management device 4. This mounting history data D1 includes production board data D11, setup data D12, pickup position deviation amount data D13, pickup level data D14, pickup state data D15, component supply state data D16, maintenance data D17, etc.

[0023] The production board data D11 is data relating to the type and number of boards produced. The setup data D12 is data relating to the nozzle 16a, mounting head 16, and feeder 14a used in production. The pickup position deviation amount data D13 is data indicating the deviation amount of the pickup position of a component relative to the nozzle 16a. The pickup level data D14 is data indicating the pickup level (negative pressure level) when the nozzle 16a picks up a component. The pickup status data D15 is data indicating pickup errors and pickup posture by the nozzle 16a. The component supply status data D16 is data indicating component supply errors and deviation amount of the supply position by the feeder 14a. The maintenance data D17 is data relating to the history of maintenance that has been performed.

[0024] In addition to the above-mentioned data D11 to D17, the mounting history data D1 includes various data acquired by the mounting device 2 and useful in the maintenance support process executed by the management device 4 (described later).

[0025] The inspection device 3 includes a conveyor, an inspection head, and a head drive mechanism (details are omitted). The conveyor carries the board P, which has completed component mounting processing by the mounting device 2, into a predetermined work position, and after inspection processing is completed, carries the board P out of the machine from the work position.

[0026] The inspection head is equipped with an imaging unit consisting of, for example, an imaging camera, and can be moved horizontally in the space above the substrate P at the work position by operating a head drive mechanism. The inspection head images each component mounting position while moving above the substrate P. The images obtained in this way are images that can be used to check for component mounting errors as well as, for example, the posture of the mounted components and the amount of deviation in their mounting positions.

[0027] The inspection device 3 is equipped with an inspection control unit 30 that controls the overall operation of the inspection device 3. The inspection control unit 30 detects the above-mentioned component mounting errors, the attitude of the mounted components, the amount of deviation in the mounting position, etc., based on images acquired by the inspection head (imaging unit).

[0028] The inspection control unit 30 transmits inspection data D2 (see FIG. 1) of each board P to the management device 4 periodically or upon input of a request signal from the management device 4. This inspection data D2 includes not only mounting position deviation amount data D21 and mounting state data D22 such as mounting errors, but also various data acquired by the inspection device 3 and useful in the maintenance support process executed by the management device 4, which will be described later.

[0029] The management device 4 is configured by, for example, a personal computer connected to the mounting device 2 and the inspection device 3 so as to be able to communicate data with them. The management device 4 has the function of comprehensively managing the component mounting system 1, and mainly supports the maintenance of the mounting device 2 and the inspection device 3. In other words, the management device 4 functions as a maintenance support system of the present invention.

[0030] 4 is a block diagram showing the configuration of the management device. As shown in the figure, the management device 4 includes a management control unit 40, a communication unit 41, a display unit 42, an operation unit 43, and a storage unit 44. The communication unit 41 is an interface for performing data communication with the mounting device 2 and the inspection device 3. The communication unit 41 acquires mounting history data D1 input from the mounting device 2 and inspection data D2 input from the inspection device 3.

[0031] The storage unit 44 stores the mounting history data D1 and inspection data D2 acquired by the communication unit 41 as management data DM. The management data DM also includes production plan information DM1 for component-mounted boards and mounted component information DM2. The production plan information DM1 is information such as the type and number of component-mounted boards to be produced, and the type and number of components to be mounted on those component-mounted boards. The mounted component information DM2 is various information about the components used in the production of component-mounted boards, such as their type (name), size, unit price, and usage history.

[0032] The mounting history data D1 stored as the management data DM includes the maintenance data D17. Therefore, in this example, the storage unit 44 corresponds to the "history information storage unit" of the present invention.

[0033] The display unit 42 is configured by, for example, a liquid crystal display. The display unit 42 displays management information of the component mounting system 1. This management information includes maintenance support information (described later) for supporting maintenance. The display operation of the display unit 42 is controlled by the management control unit 40.

[0034] The operation unit 43 (corresponding to the "operation input unit" of the present invention) is configured with a keyboard, a mouse, a touch panel provided on the display unit 42, etc. The operation unit 43 accepts input operations of various commands and settings to the management control unit 40.

[0035] The management control unit 40 executes various processes related to the management of the component mounting system 1 in response to commands input to the operation unit 43. The management control unit 40 is composed of a CPU, ROM, RAM, etc., and includes an arithmetic processing unit 51, a display control unit 52, and a communication control unit 53 as functional components for executing the maintenance support process described above.

[0036] The communication control unit 53 controls the communication unit to control data communication between the mounting device 2 and the inspection device 3. The arithmetic processing unit 51 executes maintenance support processing based on the mounting history data D1 input from the mounting device 2, the inspection data D2 input from the inspection device, and the management data DM, and also executes various arithmetic processing associated with the maintenance support processing. The display control unit 52 controls the display unit 42 to display various information according to the processing results of the arithmetic processing unit 51.

[0037] [Maintenance Support Processing] The component mounting system 1 (mounting device 2 and inspection device 3) includes multiple "working units" for producing component-mounted boards. For the mounting device 2, the conveyor 12, feeder 14a, head unit 15 (head unit drive mechanism 17), mounting head 16, and nozzle 16a correspond to the working units. For the inspection device 3, the conveyor and inspection head (head drive mechanism) correspond to the working units. If a malfunction occurs in these working units and the work accuracy declines, the component mounting accuracy of the mounting device 2 and the inspection accuracy of the inspection device 3 decline. The maintenance support processing detects (identifies) a working unit with declining work accuracy based on the mounting history data D1, inspection data D2, and management data DM, and displays information (maintenance support information) on the display unit 42 to support the priority of maintenance of the working unit, i.e., to prioritize maintenance over regularly scheduled regular maintenance. In the following description, the conveyor 12, feeder 14a, etc. may be referred to as the working unit (working unit Wp) as described above.

[0038] 5 is a flow diagram showing the flow of the maintenance support process. The maintenance support process proceeds along the steps of (1) data acquisition process, (2) trend analysis process, (3) working unit detection process, (4) importance determination process, and (5) display process. Then, maintenance support information 100 as shown in FIG. 6 is displayed on the display unit 42.

[0039] The maintenance support information 100 is information in a list format in which maintenance items M for the work unit Wp that require maintenance are displayed one above the other, with the maintenance items M of higher importance displayed at the top. The worker performs maintenance by accessing this maintenance support information 100. This maintenance support information 100 will be described in detail later in "4. Display Processing."

[0040] "1. Data Acquisition Process" The data acquisition process is executed by the communication control unit 53. The communication control unit 53 controls the communication unit 41 to acquire mounting history data D1 from the mounting device 2 and inspection data D2 from the inspection device 3, and cumulatively stores the data D1 and D2 in the storage unit 44. The data D1 and D2 are acquired, for example, for each set number of sheets or for each set period.

[0041] "2. Trend Analysis Processing" The trend analysis processing is executed by the calculation processing unit 51. Immediately after a preset unit period U has elapsed, the calculation processing unit 51 refers to the mounting history data D1 and the inspection data D2 stored in the storage unit 44, and determines predetermined analysis parameters for the unit period U based on the data D1 and D2.

[0042] The analysis parameters are parameters for evaluating the work accuracy of the working unit Wp. Parameters that can be used to evaluate work accuracy include "number of inspection failures," "inspection defect rate," "number of component pickup errors," "component pickup rate," "number of component placement errors," "component placement rate," "component pickup accuracy," "component placement accuracy," and "negative pressure level." Note that "placement" is synonymous with "mounting." These are included in the analysis parameters.

[0043] The unit period U is defined by the number of operating hours (days) or the number of sheets produced. The unit period U may also be defined by the number of operations performed by each work unit Wp. For example, when a "pickup rate" is calculated as an analysis parameter, the unit period U can be defined by the number of component pick-up operations. Similarly, when a "placement rate" is calculated as an analysis parameter, the unit period U can be defined by the number of component placement operations. In the following explanation, unless otherwise specified, the unit period U will be described as "1 day (24 hours)."

[0044] The calculation processing unit 51 executes a process of analyzing the trend (transition) of each analysis parameter from the obtained analysis parameter data and past analysis parameter data. Specifically, it analyzes whether the value of the analysis parameter is tending to deteriorate.

[0045] The trend analysis process is performed based on preset trend analysis conditions, which can be set by the operator using an analysis condition setting screen such as that shown in FIG.

[0046] 7 is a diagram showing an example of an analysis condition setting screen for trend analysis processing. The operator operates the operation unit 43 to input the number of days (i.e., the number of unit periods U) and other information for each setting item field displayed on the analysis condition setting screen 200. This sets the trend analysis conditions. In this way, the ability to arbitrarily set trend analysis conditions increases the degree of freedom in trend analysis.

[0047] The analysis condition setting screen 200 displays, as setting item columns, for example, a continuous deterioration analysis setting column 201, a post-maintenance analysis setting column 202, a noted component setting column 203, and a trend analysis setting column 204.

[0048] The conditions for trend analysis based on the above-described analysis parameters are set in a trend analysis setting field 204. The trend analysis setting field 204 is a field for setting reference values ​​for trend analysis of analysis parameters. In the trend analysis setting field 204, values ​​for "threshold," "significant difference," "number of consecutive days of deterioration," and "predicted date" are set for each analysis parameter (defect rate, suction rate, suction accuracy, attachment accuracy, and negative pressure level).

[0049] 7, for example, for the "defective rate," the "threshold" is set to 10 ppm, the "significant difference" is set to 5%, the "number of consecutive days of deterioration" is set to 5 days, and the "predicted date" is set to 5 days. For the other analysis parameters, specific values ​​are set as shown in the figure for the "threshold," "significant difference," "number of consecutive days of deterioration," and "predicted date." With these settings, the calculation processing unit 51 analyzes the trends of the analysis parameters, for example, as follows.

[0050] 8 is an explanatory diagram of the trend analysis process, which shows a graph of the daily (unit period U) change in an analysis parameter (e.g., "adsorption rate"), where the lower the value, the lower the evaluation of the work accuracy.

[0051] The calculation processing unit 51 analyzes the trends in the analysis parameters over a predetermined analysis period. The analysis period is defined by the number of days (the number of unit periods U). In the illustrated example, the analysis period is five days. At the end of the fifth day, the calculation processing unit 51 calculates the analysis parameters for that fifth day and analyzes their trends based on the data of the past analysis parameters for the five days including that fifth day. Specifically, it determines whether the analysis parameters are on a worsening trend based on the trends in the data of the analysis parameters from the first day (first period) to the fifth day (fifth period).

[0052] Here, if the value of the latest (fifth day) analysis parameter has deteriorated beyond the "threshold" set in the trend analysis setting field 204, the calculation processing unit 51 determines that the analysis parameter is on a worsening trend.

[0053] Furthermore, if the value of the analysis parameter deteriorates for the "number of consecutive days of deterioration" set in the trend analysis setting field 204, the calculation processing unit 51 determines that the analysis parameter is on a worsening trend. For example, if the analysis parameter in FIG. 8 is assumed to be "defective rate," the figure shows that the "defective rate" deteriorates for five consecutive days, from the first day to the fifth day. Since the set value for the "number of consecutive days of deterioration" for the "defective rate" is five days, in this case the calculation processing unit 51 determines that the "defective rate" is on a worsening trend.

[0054] In this case, the calculation processing unit 51 may set a regression line L for the values ​​of the analysis parameter for those five days as shown in Fig. 8 and determine the trend of the analysis parameter based on the regression line L. In other words, it may determine that the analysis parameter is linearly deteriorating.

[0055] Furthermore, even if the value of the analysis parameter on the fifth day does not reach the "threshold" and the value of the analysis parameter does not worsen for the "number of consecutive worsening days," if it is estimated that the value of the analysis parameter will reach the "threshold" by the "prediction date" set in the trend analysis setting field 204, i.e., by the number of days set in the "prediction date" from the present, the calculation processing unit 51 determines that the analysis parameter is on a worsening trend. For example, as shown in FIG. 9 , if the "threshold" has not been reached currently (the eighth day / eighth period) but is estimated to reach the "threshold" by the "prediction date" seven days from now, i.e., by the fifteenth day (the fifteenth period), the calculation processing unit 51 determines that the analysis parameter is on a worsening trend. In this case, the calculation processing unit 51 can set the regression line L as shown in FIG. 9 and estimate the value of the analysis parameter on the "prediction date" based on the regression line L.

[0056] Furthermore, even if the current value of the analysis parameter (for example, the fifth day in FIG. 8 ) has not reached the “threshold value,” if the current value of the analysis parameter has deteriorated by more than a preset value from the value of the analysis parameter on the previous day (the fourth day), the calculation processing unit 51 will determine that the analysis parameter is on a worsening trend.

[0057] 8, when the sixth day ends, the calculation processing unit 51 calculates the analysis parameters for the sixth day and analyzes their trends based on the data of the analysis parameters from the past five days including the sixth day. Specifically, it analyzes whether the analysis parameters are on a worsening trend based on the trends in the analysis parameter data from the second day to the sixth day. Thereafter, in the same manner, the calculation processing unit 51 calculates the analysis parameters for the next five consecutive days with each passing day and analyzes whether the analysis parameters are on a worsening trend based on the trends in the analysis parameters.

[0058] Returning to Fig. 5, the continuous deterioration analysis setting field 201 is a field for setting conditions for detecting whether a maintenance item M of a specific working unit Wp appears multiple times at the top of the maintenance support information 100 (see Fig. 6). In the continuous deterioration analysis setting field 201, the number of days for which continuous deterioration analysis is to be performed and a threshold value for the continuous deterioration period (number of days) can be set. In the example of Fig. 7, the period for which continuous deterioration analysis is to be performed is set to "5 days," and the threshold value is set to "3 days."

[0059] With this setting, the calculation processing unit 51 analyzes a period of five consecutive days, and if a maintenance item M for a specific work unit Wp appears at the top of the maintenance support information 100 for three or more days, it determines that the work accuracy of the work unit Wp is continuously deteriorating.

[0060] The post-maintenance analysis setting field 202 is a field for setting conditions for detecting whether a working unit Wp that has undergone maintenance appears again at the top of the maintenance support information 100 as a maintenance target. In the post-maintenance analysis setting field 202, the number of days can be set as the detection period. In the example of FIG. 7, this is set to "5 days." As a result, if, after maintenance has been performed on a working unit Wp, the same working unit Wp appears again at the top of the maintenance support information 100 as a maintenance target within five days, the calculation processing unit 51 determines that the work accuracy of the working unit Wp has deteriorated.

[0061] An example is shown in Figure 10. In the illustrated example, errors occur in the working unit Wp from the first day (first period) to the second day (second period). Maintenance is performed at the end of the third day (third period), but after the maintenance, errors occur again on the fourth day (fourth period) and the fifth day (fifth period). Therefore, if the working unit Wp appears again at the top of the maintenance support information 100 as a maintenance target within five days, the calculation processing unit 51 determines that the work accuracy of the working unit Wp has deteriorated.

[0062] The noted component setting field 203 is a field for setting a noted component, and this setting field is configured with, for example, check boxes. Pre-registered components and new components that have not been used in the past are included in the noted components. If a component is not a work unit Wp but a noted component is set in the noted component setting field 203, the arithmetic processing unit 51 determines that the quality of the shape, etc. of the noted component has deteriorated if the data of the analysis parameters related to the set noted component is deteriorating.

[0063] In the following description, a part set in the attention part setting field 203, such as a pre-registered part or a new part that has not been used in the past, will be simply referred to as a "attention part."

[0064] "3. Working Unit Detection Process" When an analysis parameter that is on a worsening trend is found in the trend analysis process (trend analysis based on analysis parameters) described above, the calculation processing unit 51 executes working unit detection process to identify a working unit Wp that requires maintenance (hereinafter referred to as a target working unit Wp). This working unit detection process is executed based on calculation processing in accordance with a predetermined statistically determined judgment algorithm, which is based on the analysis parameter that is on a worsening trend and other analysis parameters related to that analysis parameter, as well as the mounting history data D1 and inspection data D2 stored in the storage unit 44.

[0065] In the work unit detection process, the calculation processing unit 51 detects, as the target work unit Wp, a work unit Wp whose work accuracy has been determined to be continuously deteriorating by trend analysis based on the conditions set in the continuous deterioration analysis setting field 201, i.e., a work unit Wp that appears multiple times in the top rankings of the maintenance support information 100. The calculation processing unit 51 also detects, as the target work unit Wp, a work unit Wp whose work accuracy has been determined to be declining by trend analysis based on the conditions set in the post-maintenance analysis setting field 202, i.e., a work unit Wp that is being subject to maintenance again after maintenance.

[0066] Furthermore, for a component of interest set in the component of interest setting field 203, if the data of the analysis parameters related to that component of interest are tending to deteriorate, the calculation processing unit 51 detects that component of interest itself as a maintenance target. In other words, the calculation processing unit 51 regards the component of interest itself as a target work part Wp and detects it as a maintenance target. This makes it possible to confirm, if the cause of the deterioration of the analysis parameter data lies on the component side.

[0067] "4. Importance Determination Process" The calculation processing unit 51 further executes an importance determination process to determine the "importance" of the maintenance of the target work unit Wp. The importance is information that serves as an index for determining the priority level of the maintenance of the target work unit Wp. The calculation processing unit 51 executes this importance determination process based on preset importance determination conditions.

[0068] 11 shows an example of an importance setting screen for setting importance determination conditions. The operator operates the operation unit 43 to input the number of days (the number of unit periods U) and specific numerical values ​​into the setting item fields displayed on the importance setting screen 300. In this way, the importance determination conditions are set.

[0069] The importance setting screen 300 displays five setting item fields, for example, a continuous deterioration analysis setting field 301, a post-maintenance analysis setting field 302, a component of interest setting field 303, a loss cost setting field 304, and a trend analysis setting field 305. These setting fields 301 to 305 correspond to the setting fields 201 to 204 of the analysis condition setting screen 200 described above, except for the loss cost setting field 304.

[0070] Each setting item field can be set to one of three levels, "A," "B," and "C," in descending order of importance. The number of levels that can be set may be two, four, or more.

[0071] The continuous deterioration analysis setting field 301 is a field for setting the importance level according to the number of days that the target work Wp has been displayed in the top positions of the maintenance support information 100 when the target work Wp has been displayed multiple times. In the example of FIG. 11 , four or more days is set to "A," and three or more days is set to "B." The setting for "C" is "none," which indicates that no setting has been made. In other words, if the target work Wp has been displayed in the top positions of the maintenance support information 100 for four or more days, the importance level of the maintenance of the target work Wp is set to "A," and if it has been displayed for three or more days (three days), the importance level of the maintenance of the target work Wp is set to "B." Since the importance level "C" has not been set, no importance level "C" is set.

[0072] The post-maintenance analysis setting field 302 is a field for setting the importance level when the target working unit Wp is detected as a maintenance target again after maintenance. The importance level is set based on how many days ago the maintenance was performed before the target working unit Wp was detected as a maintenance target again. In the example of FIG. 11 , the importance level "A" is set to one day before the detection date. In other words, if the target working unit Wp is detected as a maintenance target again the day after maintenance, the importance level of the maintenance of the target working unit Wp is set to "A."

[0073] The attention component setting field 303 is a field for setting the importance of a component of interest set in the attention component setting field 203 on the analysis condition setting screen 200 when the component is detected as a target for confirmation (maintenance). The setting is performed by selecting the level of importance for each component from "A" to "C." In the example of FIG. 11, the importance of both components that have been registered in advance as attention components and new components is set to "A." In other words, when a component of interest is considered to be a target operation part Wp and detected as a target for confirmation, the importance is set to "A."

[0074] The loss cost setting field 304 is a field for setting the importance of maintenance of the target working unit Wp based on the loss cost due to a decline in the work accuracy of the target working unit Wp. In the example of Fig. 11, the importance is set to "A" when the loss cost is 50,000 yen or more, and "B" when the loss cost is 5,000 yen or more but less than 50,000 yen. In other words, when the target working unit Wp is identified, for example, if the loss cost due to a decline in the work accuracy of the target working unit Wp, such as the cost of discarded parts, is 50,000 yen or more, the importance of maintenance of the target working unit Wp is set to "A."

[0075] The trend analysis setting field 305 is a field for setting the importance according to the deterioration tendency of the above-mentioned analysis parameters (failure rate, suction rate, suction accuracy, attachment accuracy, and negative pressure level). The importance can be set from three perspectives: "threshold," "significant difference," and "number of consecutive days of deterioration." The importance of each of "threshold," "significant difference," and "number of consecutive days of deterioration" can be set according to the specific value of the analysis parameter.

[0076] 11, for example, the importance level "A" of the "threshold" for the defect rate is set to 10 ppm or more, and the importance level "B" is set to 5 ppm or more. This means that if the defect rate tends to worsen to 10 ppm or more, the importance level is set to "A," and if the defect rate tends to worsen to a range of 5 ppm or more but less than 10 ppm, the importance level is set to "B."

[0077] Furthermore, the importance level "A" for a "significant difference" in the defect rate is set to 5% or more. This means that if there is a tendency for the significant difference to be 5% or more, the importance level is set to "A."

[0078] Furthermore, the importance of "continuous deterioration" in the defect rate is set to "A" for five days or more, and "B" for three days or more. This means that when the target working part Wp is detected, if the defect rate has been worsening for five days or more in a row, the importance is set to "A," and if the defect rate has been worsening for three days or more but less than five days in a row, the importance is set to "B."

[0079] Here, the importance setting for the "defective rate" of the analysis parameters has been explained, but the importance settings for the other analysis parameters (suction rate, suction accuracy, mounting accuracy, and negative pressure level) are similar, and the numerical values ​​are set as shown in the figure.

[0080] The calculation processing unit 51 executes the process of determining the importance of maintenance of the target work unit Wp based on the importance determination conditions set in accordance with the importance setting screen 300 .

[0081] In this case, the calculation processing unit 51, for example, evaluates the results of the trend analysis process based on the importance determination conditions already described, and tally up the numbers of "A," "B," and "C" respectively, and can determine the importance with the largest total number among these importance levels as the importance of maintenance for the target working unit Wp.

[0082] In addition, the calculation processing unit 51 may tally the numbers of "A," "B," and "C," and if the number of "A" is equal to or greater than a certain number, determine the importance of maintenance of the target working part Wp to be "A" regardless of the numbers of "B" and "C."

[0083] In addition, if the evaluation of any of the conditions set in the continuing deterioration analysis setting field 301, the post-maintenance analysis setting field 302, the target component setting field 303, and the loss cost setting field 304 is "A," the calculation processing unit 51 may determine the importance of maintenance of the target work part Wp to be "A," regardless of the evaluation of the other conditions.

[0084] "5. Display Processing" The display control unit 52 controls the display unit 42 to display the maintenance support information 100 described above. The maintenance support information 100 is in the form of a list in which various pieces of information (referred to as maintenance items M) relating to the maintenance of the target work unit Wp are arranged vertically. Figure 6 shows an example of the maintenance support information 100.

[0085] The maintenance support information 100 includes maintenance items M for work parts Wp that require maintenance, and in addition to maintenance items M for target work parts Wp (including parts of interest that are considered to be target work parts Wp) detected based on the trend analysis process described above, it also includes maintenance items M that are scheduled on a regular basis.

[0086] The display control unit 52 displays the maintenance support information 100 so that the maintenance items M for the target work unit Wp detected based on the trend analysis process are displayed higher than the regularly scheduled maintenance items M. Furthermore, the display control unit 52 displays the maintenance support information 100 so that the maintenance items M for the target work unit Wp detected based on the trend analysis process are displayed higher in importance based on the importance determined in the importance determination process described above.

[0087] In this way, the maintenance items M for the target working units Wp detected based on the trend analysis process, i.e., the target working units Wp whose work accuracy is deteriorating, are displayed higher than the regularly scheduled maintenance items M, thereby making the worker aware that maintenance of the target working units Wp whose work accuracy is deteriorating should be performed as a higher priority than regularly scheduled maintenance (corresponding to "maintenance of other working units" in this invention). By having the worker perform maintenance first in the order of the higher-ranking maintenance items M, maintenance can be efficiently performed starting with the target working units Wp whose work accuracy is deteriorating.

[0088] Furthermore, for the target work part Wp detected based on the trend analysis process, the maintenance items M with higher importance are displayed at the top, making it possible to make the worker aware of the need to prioritize maintenance of the most important maintenance items M. By having the worker prioritize maintenance of the most important maintenance items M, maintenance can be performed efficiently starting with the most important maintenance items M. Therefore, the maintenance support system described above makes it possible to efficiently and rationally carry out maintenance of the work part Wp.

[0089] In this example, each maintenance item M includes an item number 101 , part information 102 , analysis parameter information 103 , loss cost information 104 , analysis information 105 , instruction information 106 and importance information 107 .

[0090] The item number 101 is information corresponding to the priority of the maintenance item M, and is a sort of serial number. That is, consecutive numbers starting with "1" for the item number of the highest-ranking maintenance item M are displayed as the item numbers 101.

[0091] The part information 102 is information about the part that caused the work unit Wp to be detected as a maintenance target. The part information 102 displays, for example, the part name and the part identification number. By displaying this part information 102, the worker can recognize the relationship between the maintenance item M and the part.

[0092] The analysis parameter information 103 is information indicating the analysis parameters obtained in the trend analysis process described above. In the illustrated example, the values ​​of the analysis parameters, "defect rate," "pickup rate," and "mounting rate," are displayed as the analysis parameter information 103. By displaying the analysis parameter information 103, the operator can specifically grasp the status of the analysis parameters. Note that the analysis parameter information 103 may also display other information related to the analysis parameters.

[0093] The loss cost information 104 is information that indicates the loss cost associated with the deterioration of the work accuracy of the working unit Wp. For example, the current loss cost is displayed. By displaying this loss cost information 104, the worker can specifically grasp the loss cost due to the deterioration of the work accuracy of the working unit Wp that is the target of maintenance. By specifically grasping the loss cost, it is possible to raise the worker's awareness of the necessity and urgency of maintenance of the working unit Wp.

[0094] The analysis information 105 is information that shows an overview of the trend analysis process described above. By displaying this analysis information 105, the worker can grasp the specific situation of the deterioration in the work accuracy of the working part Wp that is the maintenance target.

[0095] The instruction information 106 is information that indicates the work part Wp to be maintained and an outline of the maintenance content. By displaying this instruction information 106, the worker can quickly understand the maintenance target and the maintenance content, and can proceed with the maintenance work accurately and efficiently.

[0096] The importance information 107 is information indicating the importance determined by the importance determination process described above, and in the illustrated example, information indicating the above-mentioned three levels of importance ("A," "B," and "C") is displayed. By explicitly displaying the importance in this way, it is possible to make the worker aware of the maintenance item M that needs to be performed with priority, and it becomes less likely that the implementation of a highly important maintenance item M will be overlooked.

[0097] Regarding the display of the maintenance support information 100, only the target work part W of the target work part Wp detected based on the trend analysis process may be highlighted by coloring the background or by changing the thickness of the characters of the maintenance item M, thereby differentiating the display from the other maintenance items M. Furthermore, among the target work parts Wp detected based on the trend analysis process, only the maintenance items M with a high level of importance (for example, importance level "A") may be highlighted (displayed prominently) by background highlighting, thereby differentiating the display from the other maintenance items M. In this way, it is possible to make the worker aware of target work parts Wp with declining work accuracy or target work parts Wp with high importance, making it less likely that the implementation of high-priority maintenance items M will be overlooked.

[0098] The above-described information 101 to 107 included in each maintenance item M is an example, and the maintenance item M may further include other information related to the maintenance of the target work unit Wp.

[0099] The display control unit 52 updates the maintenance support information 100 every time the unit period U (one day) described above elapses. Specifically, a maintenance item M for the target work unit Wp newly detected by the calculation processing unit 51 is added to a position corresponding to its importance. In this case, the display control unit 52 updates the maintenance support information 100 so that a maintenance item M with a high importance is displayed higher than a maintenance item with a lower importance. Furthermore, when the importance of a maintenance item M waiting for maintenance increases, the maintenance item M is moved up to a position corresponding to its importance (see FIG. 12 ). In other words, the display control unit 52 changes the display content of the maintenance item M in the maintenance support information 100 so that a maintenance item M with a high importance is performed with priority over a maintenance item M with a lower importance. By updating the maintenance support information 100 in this way, the worker can always perform maintenance by prioritizing the maintenance item M with the highest importance.

[0100] The maintenance support information 100 shown in Fig. 6 is an example. For example, the maintenance support information 100 as shown in Fig. 13 may be displayed on the display unit 42. That is, after maintenance of the target work part Wp is performed based on the maintenance item M, the maintenance record information 108 may be displayed.

[0101] The maintenance record information 108 is historical information about the maintenance that has been performed. This maintenance record information 108 includes two pieces of information: a "work record" and a "status after work." The "work record" is, for example, the date the maintenance was performed, the worker, and the work content. The "status after work" is the latest (current) value of the analysis parameter. In the illustrated example, the values ​​of the "defect rate," "pickup rate," and "mounting rate" are displayed as the analysis parameters.

[0102] By displaying the maintenance item M including the maintenance record information 108, the worker can confirm the effect of the maintenance work. In this case, after the maintenance is completed, the worker operates the operation unit 43 to delete the maintenance item M from the maintenance support information 100, thereby causing the display to disappear. This allows the worker to delete the completed maintenance item M from the maintenance support information 100 after checking the maintenance record information 108.

[0103] 14 may also be displayed. That is, if the part displayed in the part information 102 is a target part set in the target part setting field 203 on the analysis condition setting screen 200, the display control unit 52 may display an icon 110 indicating this. Furthermore, the display control unit 52 may display an icon 112 indicating that the redisplay is based on the setting in the continuous deterioration analysis setting field 201 on the analysis condition setting screen 200 and an icon 113 indicating the number of redisplays, at the end of the maintenance item M.

[0104] Furthermore, if maintenance has been performed on the same maintenance item in the past, the display control unit 52 may display an icon 120 indicating this. In this case, when the worker selects the icon 120 using the operation unit 43, the display control unit 52 may display past maintenance history information 121 using a pop-up display or the like. With this configuration, the worker can check the past maintenance history and then perform maintenance on the target work part Wp that is being displayed. This allows for more accurate and efficient maintenance.

[0105] The above describes an embodiment of the component mounting system 1 to which the maintenance support system according to the present invention is applied, but this component mounting system 1 is one example of an embodiment of a component mounting system to which the maintenance support system according to the present invention is applied. In other words, the specific configurations of the component mounting system and the maintenance support system are not limited to the contents disclosed in the above embodiment, and can be modified as appropriate without departing from the gist of the present invention.

[0106] The present invention described above can be summarized as follows.

[0107] A maintenance support system according to one aspect of the present invention is a maintenance support system for a component mounting system including a plurality of work units that perform work to produce component mounting boards, and includes a display unit that displays maintenance items for work units that require maintenance among the plurality of work units, a display control unit that controls the display unit, and an arithmetic processing unit that executes a process of obtaining parameter data that indicates the work accuracy of the work units for each unit period and a process of detecting work units whose work accuracy has declined based on the data as work units that are subject to maintenance, and the display control unit controls the display method and / or display content of the maintenance items for the target work units so that maintenance of the target work units is given priority over maintenance of other work units.

[0108] According to this maintenance support system, parameter data indicating the work accuracy of each work unit is obtained for each unit time. If there is a work unit whose work accuracy has declined, that work unit is identified as a work unit that requires maintenance, and its maintenance items are displayed on the display unit. In this case, the display method and / or display content are displayed so that the maintenance items for the work unit whose work accuracy has declined are given priority over maintenance for other work units. This allows the worker to prioritize maintenance of the work unit whose work accuracy has declined, making it possible to proceed with maintenance efficiently and rationally.

[0109] In the maintenance support system, the calculation processing unit may detect the target work unit based on a trend of the data for each unit period along a time series.

[0110] According to this configuration, it is possible to more quickly detect a working unit whose working accuracy is declining based on the trend of the data.

[0111] In this case, the calculation processing unit may detect as the target work unit a work unit in which the value of the data has deteriorated beyond a predetermined threshold, or a work unit in which the difference between the value of the data in the preceding unit period and the value of the data in the following unit period has deteriorated beyond a set value.

[0112] This configuration makes it possible to more reliably detect work areas where work accuracy has declined, and also makes it possible to detect work areas where work accuracy has suddenly declined as target work areas.

[0113] In the above maintenance support system, the calculation processing unit may determine the importance of the maintenance item for the target work unit, and the display control unit may control the display of the maintenance item by the display unit based on the importance.

[0114] According to this configuration, the maintenance items for the target work unit are displayed so that the maintenance items with higher importance are given priority, which enables the worker to quickly start the maintenance items with higher importance.

[0115] In this case, the display control unit may control the display unit so that information indicating the importance level is also displayed.

[0116] According to this configuration, by explicitly displaying the importance, it is possible to make the worker more aware of the maintenance items that need to be performed with priority, which makes it less likely that a maintenance item with a high degree of importance will be overlooked.

[0117] In the maintenance support system, the display control unit may control the display unit so that maintenance items for the target work unit are displayed higher than maintenance items for other work.

[0118] According to this configuration, maintenance items for the target work unit where work accuracy has declined are displayed at the top, making it possible to make the worker aware that they should prioritize these maintenance items.

[0119] In the maintenance support system, the display control unit may control the display unit so that the maintenance item for the target work unit stands out more than the maintenance items for other work units.

[0120] With this configuration, the maintenance items for the target work unit where work accuracy has declined stand out more than the maintenance items for other work units, making it possible to make the worker aware that they should prioritize those maintenance items.

[0121] In this case, for example, if the component mounting board is a board on which a predetermined specific component is mounted, the arithmetic processing unit may regard the component of interest as the working part based on the data related to the component of interest, and detect the component of interest as a target for maintenance.

[0122] According to this configuration, when a mounting defect or the like occurs due to a component of interest, it becomes possible to check the component of interest as a maintenance target.

[0123] In the maintenance support system, the unit period may be defined by the number of operations performed by the operation unit.

[0124] With this configuration, it is possible to detect the target work unit from the tendency of the data based on the number of times the work unit has performed.

[0125] In the maintenance support system, the unit period may be defined by an operating time of the work unit.

[0126] With this configuration, it is possible to detect the target work unit from the trend of the data based on the operating time of the work unit.

[0127] The above-mentioned maintenance support system may include a history information storage unit that stores history information of maintenance performed based on the maintenance items, and an operation input unit that gives a command to change the display of the display unit to the display control unit, and the display control unit may control the display unit so that an icon that can be selected by operating the operation input unit is displayed together with the maintenance item, and when the icon is selected, the history information is displayed.

[0128] According to this configuration, the worker can check the history information of past maintenance as needed, and can use it as a reference for the current maintenance of the target work part.

Claims

1. A maintenance support system in a component mounting system including a plurality of working units which perform work for producing component mounting boards, comprising: a display unit which displays maintenance items for those working units which require maintenance among the plurality of working units; a display control unit which controls the display unit; and an arithmetic processing unit which executes a process of obtaining parameter data which indicates the work accuracy of the working units for each unit period and a process of detecting working units whose work accuracy has decreased based on the data as working units which require maintenance, wherein the display control unit controls the method and / or content of display of the maintenance items for the target working units so that maintenance of the target working units is given priority over maintenance of other working units.

2. A maintenance support system as claimed in claim 1, characterized in that the calculation processing unit detects the target work part based on the trend of the data for each unit period along a time series.

3. A maintenance support system as claimed in claim 1 or 2, characterized in that the calculation processing unit detects as the target work unit a work unit in which the value of the data has deteriorated beyond a predetermined threshold, or a work unit in which the difference between the value of the data in the preceding unit period and the value of the data in the following unit period has deteriorated beyond a set value.

4. A maintenance support system as claimed in any one of claims 1 to 3, characterized in that: the calculation processing unit determines the importance of the maintenance items for the target work unit; and the display control unit controls the display of the maintenance items by the display unit based on the importance.

5. A maintenance support system as claimed in claim 4, characterized in that the display control unit controls the display unit so that information indicating the importance is also displayed.

6. A maintenance support system as claimed in any one of claims 1 to 5, characterized in that the display control unit controls the display unit so that maintenance items for the target work unit are displayed higher than maintenance items for other work.

7. A maintenance support system as claimed in any one of claims 1 to 6, characterized in that the display control unit controls the display unit so that maintenance items for the target work unit stand out more than maintenance items for other work units.

8. A maintenance support system as claimed in any one of claims 1 to 7, characterized in that the component mounting board is a board on which a predetermined target component is mounted, and the calculation processing unit further detects the target component as the working part and as a maintenance target based on the data related to the target component.

9. A maintenance support system according to any one of claims 1 to 8, characterized in that the unit period is defined by the number of operations performed by the work unit.

10. A maintenance support system according to any one of claims 1 to 8, characterized in that the unit period is defined by the operating time of the work unit.

11. A maintenance support system as described in any one of claims 1 to 10, comprising: a history information storage unit which stores history information of maintenance performed based on the maintenance item; and an operation input unit which gives a command to change the display of the display unit to the display control unit, wherein the display control unit controls the display unit so that an icon which can be selected by operating the operation input unit is displayed together with the maintenance item, and when the icon is selected, the history information is displayed.

Citation Information

Patent Citations

  • Mounting board production system

    JP1995007262A

  • Maintenance work support system

    JP2017017174A

  • Maintenance system

    JP2019201124A

  • Facility abnormality treatment timing determination system, facility abnormality treatment timing determination method, and computer program