Work planning method, work planning system, and program
The work planning method and system optimize forklift and AGV operations in warehouses by restricting forklift movement and allocating tasks to minimize human intervention, addressing safety concerns and improving efficiency in product transportation.
Patent Information
- Application Number
- PCT/JP2023/013676
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-03
AI Technical Summary
In commercial warehouses, existing technologies do not effectively limit the work area of forklifts to prevent collisions with workers, and existing work planning systems do not optimize forklift operations, leading to safety concerns and inefficiencies in product transportation.
A work planning method and system that creates a picking work plan based on shipping information, allocating forklifts and AGVs to minimize human intervention and restrict forklift movement, allowing AGVs to transport products while forklifts focus on lifting and unloading, thus reducing the risk of collisions and optimizing warehouse operations.
This approach limits forklift movement to safe areas, reducing the risk of collisions and enhancing operational safety and efficiency by allowing AGVs to handle product transportation, thereby improving the overall safety and productivity of warehouse operations.
Smart Images

Figure JP2023013676_03102024_PF_FP_ABST
Abstract
Description
Work planning method, work planning system, and program
[0001] The present invention relates to a technique that is effective in supporting the transport of goods in commercial warehouses and the like.
[0002] In commercial warehouses, forklifts are used for the loading and unloading of goods. Forklifts are particularly used for storing pallets on shelves installed in the warehouse and for removing and transporting goods to shipping locations. When using forklifts, it is necessary to prevent accidents between the vehicle and workers from the perspective of work safety. For example, Patent Document 1 describes a moving object detection system that improves the reliability of warnings by selectively detecting the approach of workers or forklifts based on their relative positions. This technology only issues warnings based on the relative positions of the workers or forklifts, but does not change the movement path of the forklift. Meanwhile, Patent Document 2 discloses a work planning system that optimizes overall work according to shipping orders, including the allocation of work to a wide variety of resources.
[0003] Republished Patent Publication No. 2018 / 042607 JP 2021-033873 A
[0004] In consideration of worker safety, transporting goods using AGVs can be considered. However, loading and unloading goods onto storage shelves requires the use of forklifts. The technology in Patent Document 2 optimizes the warehouse's overall work plan, but does not mention forklift work plans.
[0005] The present invention aims to provide a work planning method, work planning system, and program that limit the working area of a forklift and realize operations that minimize human intervention in the lifting and unloading of goods from storage shelves and the transportation of said goods.
[0006] The present invention provides a work planning method for creating a picking work plan based on shipping information, comprising the steps of: determining the products to be loaded onto an AGV and creating a product list; identifying storage shelves corresponding to the products on the product list; allocating forklifts to the products based on information on the identified storage shelves; and creating a work plan for each forklift and AGV, including product information, work times, and work locations.
[0007] According to the present invention, since the forklift lifts and lowers the products and the AGV transports the products, picking work can be performed without the need for transporting the products by the forklift. This limits the area in which the forklift can move, and reduces unsafe situations where workers come into contact with the forklift.
[0008] Although the present invention is in the category of a method, the same functions and effects specific to the category can be achieved even when it is applied to a system or a program.
[0009] According to the present invention, the working area of the forklift can be limited, and operations can be realized that minimize human intervention when picking and transporting products from storage shelves.
[0010] 1A and 1B are diagrams for explaining an overview of the work planning system 1, where (1a) is a schematic diagram of the entire system and (1b) is a diagram showing a computer in isolation. FIG. 1B is a diagram showing the instruction configuration of the work planning system 1. FIG. 1C is a diagram showing a flowchart of a plan instruction process executed by the work planning system 1. FIG. 1D is a diagram showing a flowchart of a picking work plan executed by the work planning system 1. FIG. 1E is a diagram showing examples of inventory information and resource information stored in the WMS and the work planning system. FIG. 1F is a conceptual diagram explaining a work location in a warehouse in an embodiment of the present invention. FIG. 1F is a diagram explaining picking work in an embodiment of the present invention. FIG. 1C is a diagram showing a schematic diagram of work instructions given to each resource in an embodiment of the present invention. FIG. 1D is an example of a picking work plan in a second embodiment of the present invention, showing a schematic diagram of work instructions given to each resource. FIG. 1F is a diagram showing a flowchart of a picking work plan in another embodiment of the present invention. FIG. 1D is an example of a picking work plan in a third embodiment of the present invention, showing a schematic diagram of work instructions given to each resource. FIG. 1F is a conceptual diagram explaining a work location in a warehouse in the third embodiment of the present invention.
[0011] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a detailed description of embodiments of the present invention will be given with reference to the accompanying drawings. In the following drawings, the same elements are designated by the same numbers or symbols throughout the description of the embodiments.
[0012] [Overview of Work Planning System 1] FIG. 1a is a block diagram illustrating an overview of the work planning system 1, and FIG. 1b is a diagram illustrating a computer 10. FIG. 2 is a diagram illustrating an overview of the work planning system 1. FIG. 6 is a conceptual diagram illustrating a warehouse work area, and FIG. 7 is a diagram illustrating warehouse operations. The components of the work planning system 1 will be described with reference to FIGS. 1, 2, and 6. The work planning system 1 is a system that plans work such as picking according to shipping information and includes a computer 10. The computer 10 includes, for example, a processor 11, a reception unit 12 that accepts data in cooperation with a communication unit 14 via data communication, an output unit 13 that outputs signals, data, etc., the communication unit 14, and a recording unit 15 that stores resource information, etc. The system may be implemented by a single computer or by multiple computers, such as a cloud computer. Note that the cloud computer in this specification may refer to either a system that uses any computer in a scalable manner to perform a specific function, or a system that includes multiple functional modules to realize a system and uses the functions in any combination.
[0013] This computer 10 executes each process executed by the work planning system 1. The computer 10 includes a recording unit 15 such as a hard disk, semiconductor memory, recording medium, memory card, or other data storage unit. The computer 10 includes a processor 11 such as various devices that execute various processes. The computer 10 is connected to a WMS (Warehouse Management System) 2 and resource control devices (4, 5, 7) via a network 8.
[0014] The WMS2 is a system having functions such as general warehouse entry / exit management and inventory management.
[0015] The resources are a forklift 41, an AGV (Automatic Guided Vehicle) 51, and a worker 6. The work planning system 1 may also be connected to other resources. The other resources include, for example, loading equipment such as a vanning / devanning system, sorting equipment such as an arm robot, a conveyor, or a sorter, storage equipment such as an automated warehouse, a digital picking system, and shipping equipment such as an automatic box former. In this embodiment, the work planning system 1 particularly controls the forklift 4, the AGV 5, and the worker 6 (worker terminal 7).
[0016] The forklift 41 is responsible for storing products on the storage shelves C or retrieving products from the storage shelves C. The forklift 41 may be either a manned forklift or an unmanned forklift. In the case of an unmanned forklift, it may be an autonomously controlled type, a remotely controlled type, or any other type of control.
[0017] The AGV 5 is an automated guided vehicle that transports goods taken out from the storage shelf C. The AGV 5 is an automated guided vehicle that transports goods taken out from the storage shelf by the forklift 41 to a predetermined location (berth U), for example.
[0018] There may be a plurality of forklifts 4 and AGVs 5, and there is no limit to the number of each.
[0019] The worker terminal 7 is a terminal device such as a mobile phone, smartphone, or tablet terminal carried by the worker 6 performing the picking work.
[0020] Based on instructions for the reloading work from the computer 10 described below, the worker 6 picks a predetermined number of products removed by the forklift 4 and places them on the AGV 5, and also affixes identification code labels output from the worker terminal to the products.
[0021] 1, the work planning system 1 is a system that plans product picking work based on shipping information of a shipping order, and is connected to at least the WMS 2, forklift controller 4, AGV controller, and worker terminal 7 via a network 8 such as a public line network or an intranet so that data communication is possible. Note that the components of the work planning system 1 are merely examples, and the number, types, and functions of terminals, devices, and other unmanned transport vehicles not shown can be changed as appropriate.
[0022] The computer 10 includes a processor 11 such as a CPU (Central Processing Unit), a GPU (Graphics Processing Unit), a RAM (Random Access Memory), and a ROM (Read Only Memory), and includes a communication unit 14 such as a device that enables communication with other terminals and devices, and an output unit that outputs work instructions.
[0023] The worker terminal 7 is a terminal device such as a mobile phone, smartphone, or tablet terminal carried by the worker 6 who performs the product transshipment work. The worker terminal 7 includes a CPU, GPU, RAM, ROM, etc. as a terminal control unit, a device for enabling communication with other terminals and devices, etc. as a communication unit, and a device for inputting and outputting various data, etc. Note that the types, functions, etc. of the worker terminal 7 are not limited to the examples described above.
[0024] As shown in Figure 6, storage area S has multiple rows of storage shelves C, and each storage shelf C stores products to be shipped. Each storage shelf C is assigned unique location information within storage area S, and is also given unique information regarding its frontage. In the inventory information held by WMS 2, each product is linked to the identification code and frontage information of the storage shelf C, and when an instruction to ship a given product is received, the location information of the storage shelf is automatically determined.
[0025] When the WMS 2 receives a shipping order, it picks a specified product G1 from a storage area S based on shipping information (e.g., product information, delivery address, delivery date (time), and tracking number). One or more forklifts 41a, 41b, etc. are located in the storage area S. The forklifts 41a, 41b, etc. are resources solely responsible for lifting and lowering products in the storage area S and may be manned or unmanned. In the case of an unmanned forklift, it may be program-controlled, autonomously controlled, remotely controlled, or any other type. In the present invention, when an unmanned forklift is used, a worker guided from another work area performs the picking work. When a manned forklift is used, a forklift operator may be responsible for the picking work. The forklifts 41a, 41b, etc. remove pallets loaded with products from a storage shelf C where the specified products are stored.
[0026] FIG. 7 is a diagram illustrating the picking operation according to this embodiment. In FIG. 7(a1), the first forklift 41a unloads the first product G1. The unloading completion time is planned in advance, and the AGV 51a arrives at that time. The operator 6a, who is the driver of the first forklift 41a, follows instructions displayed on his / her own terminal to pick a predetermined number of first products G1 from the group of products removed by the first forklift and place them on the loading platform of the AGV 51a. Furthermore, the operator 6a outputs labels from a mobile terminal (not shown), affixes them to the products G1, and presses a work completion button (not shown) on the terminal screen. This completes the picking operation for the first product G1. After picking the first product G1, the AGV 51a begins moving to the storage shelf C for the next product to be picked. At approximately the same time, as shown in Figure 7(a2), the second forklift 41b removes the second product G2 from storage shelf C2 for the second product G2. Meanwhile, as shown in Figure 7(b1), the first forklift 41a stores the pallet of products it just removed back on storage shelf C1.
[0027] The AGV 51a moves to the storage shelf C2 for the second product to be picked next. As shown in FIG. 7(b2), the AGV 51a arrives at the time when the second forklift 41b is scheduled to pick up the products and pallets. The operator 6b, who is the driver of the second forklift 41b, picks and places the second product G2 on the loading platform of the arriving AGV 51a. After loading a predetermined number of products onto the AGV 51a in accordance with the work instructions, the operator prints labels from a mobile terminal (not shown) and affixes them to the products G2, as described above, and presses a work completion button (not shown) on the terminal screen. This completes the picking work for the second product G2. Thereafter, similar work and operations are performed until the picking work for which the AGV 51a is responsible for collection is completed.
[0028] When the AGV 51a has completed picking all of the scheduled products, it transports the picked products from the storage area S to the next area, for example, a shipping berth U (see FIG. 6).
[0029] In this way, the operation of the forklift 41 is largely limited to lifting and lowering pallets, and lateral movement is limited to a short distance. Because the collected goods are transported by the AGV 51, the work area of the forklift 41 is limited to the storage area, reducing the chances of contact with workers and enabling safer warehouse operations. The AGV 51 is more agile and smooth in operation than a forklift and has a stronger emergency stop function. Therefore, by using the AGV to transport goods (lateral movement), the safety of warehouse operations can be significantly improved. Note that when the quantity of goods to be picked is greater than can be loaded onto a single AGV 51, not only AGV 51a but multiple AGVs 51 arrive at storage shelf C, and the picked goods are loaded onto each AGV 51. That is, at the planning stage of the work, the amount of goods that can fit on one AGV 51 is estimated, but when the goods are actually loaded, it may happen that one AGV cannot fit them all due to the packaging style or other reasons. In such cases, the worker issues instructions from the terminal, allocates an available AGV 51, and transports the goods using multiple AGVs 51. Of course, it is also possible to allocate multiple AGVs 51 from the beginning, and then use a relay method in which, when a situation arises where the first AGV 51a cannot fit all the goods, the second AGV 51 is guided to the required location.
[0030] An overview of the processing steps when the work planning system 1 manages the transshipment work of goods will be described with reference to Figures 2 and 3. The computer 10 acquires shipping information (shipping order) (step S0). The shipping information is information about goods to be shipped from the commercial warehouse, such as the product identifier (name, type, management ID, etc.), quantity, shipping date and time, storage location identifier (shelf management number, etc.), and destination store identifier (store code, store name, etc.) (see Figure 5). The computer 10 acquires this shipping information from the WMS 2.
[0031] The computer 10 creates a work plan schedule for resources (step S1). The resources are the forklift 41, the AGV 51, and the worker 6 (worker terminal 7).
[0032] The computer 10 outputs picking work instructions to the control devices (including the worker terminals) of each resource (step S2). The computer outputs the work plan schedule created in step S1 to the forklift (FL) control unit 4, the AGV control unit 5, and the worker control unit 7. The forklift (FL) control unit 4 outputs work instructions to the forklift 41. The AGV control unit 5 outputs work instructions to the AGV 51. The worker control unit 7 outputs work instructions to the worker terminal 71. After the work starts, the FL control unit 4, the AGV control unit 5, and the worker control unit 7 each acquire the results of each resource and send them to the work planning system 1 (step S3). That is, the FL control unit 4 acquires the results from each forklift 41, the AGV control unit 5 acquires the results from each AGV 51, and the worker control unit 7 acquires the results from each worker terminal 7, etc. The computer 10 receives data from each of the FL control unit 4, AGV control unit 5, and worker control unit 7 and acquires each result. If there is a deviation in the work progress, the plan for the subsequent work is revised and the work plan schedule is output again to the FL control unit 4, AGV control unit 5, and worker control unit 7. After acquiring all the actual results for the picking work plan scheduled for shipping on that day, the computer 10 terminates.
[0033] An outline of the processing steps when the work planning system 1 creates a picking work plan in step S1 will be described with reference to FIGS.
[0034] The computer 10 allocates products by shipping destination (delivery destination) (step S11). The computer 10 extracts shipping information from the shipping order and sets the order of picking products by calculating backward from the shipping time. If products are shipped to multiple destinations, the berth area U may be divided, so a product list of the picking order is created to aggregate products with the same shipping destination and enable simultaneous picking.
[0035] The computer 10 estimates the number of products to be loaded onto one AGV and determines the transport unit (step S12). Based on the product list in picking order, the computer 10 extracts products that can be loaded onto one AGV based on the resource information stored in memory and the product information stored in the WMS (product ID, storage unit (storage status such as case or loose), weight, volume data, arrival date, and shipper information), and creates a product list for each picking unit. The resource information includes forklift information, AGV information, and worker information (see FIG. 5). This determines the product list to be picked for each AGV.
[0036] The computer 10 identifies the storage shelf for the target product and creates a travel route for the AGV (step S13). The computer 10 creates the travel route for the AGV based on the storage shelf information (location information, entrance information, storage information, space entrance information, etc.) from the product data stored in the WMS, according to the product list for each picking unit. It is desirable for the picking route to follow the shortest route (distance), but it is also advisable to optimize it so as not to interfere with other resources.
[0037] The computer 10 estimates the number of forklifts required for the forklift unloading operation (step S14). The computer 10 calculates the estimated time of arrival at the storage shelf based on the AGV's travel route, AGV travel speed, and worker information, estimates which work location the forklift will work at, and for how long, and calculates how many forklifts will be needed for the work.
[0038] The computer 10 creates a forklift allocation plan (step S15). The computer 10 calculates the optimal time for removing each item from the storage shelf for each item to be picked, and allocates a forklift that can remove the item at each time. In other words, the computer 10 allocates a forklift for each item (storage shelf) to be picked. At this time, it is best to plan the forklift so that the total travel distance of the forklift (the sum of the travel distances of all forklifts) is minimized.
[0039] The computer 10 calculates the start time of the unloading work using the forklift (step S16). Here, the computer 10 calculates the work start time so that the unloading work of the goods will be completed by the arrival time of the AGV.
[0040] The computer 10 stores the product list, picking time, and location information (step S17). The computer 10 stores the product list for each picking operation to be performed by one AGV, as planned in the above steps, and the picking time and location for each product.
[0041] The computer 10 allocates the AGVs and determines and creates a movement plan (step S18). The computer 10 allocates the AGVs that will perform each picking operation and instructs the movement plan.
[0042] Figure 8 is a diagram showing the status of work instructions given to each resource. In this figure, the horizontal axis represents time (hours). For example, the forklift 41a unloads goods at the estimated time t1 when the AGV 51a arrives at the storage shelf C1. The forklift operator, worker 6a, picks up the goods and places them on the AGV 51a in accordance with the work instructions received on his / her terminal (71a).
[0043] The AGV 51a then moves to storage shelf C2. The forklift 41b arrives at storage shelf C2 before time t2, when the AGV 51a arrives, and begins unloading. When unloading is completed at time t2 and the AGV 51a arrives, the operator of the forklift 41b, acting as worker 6b, picks the specified products and loads them onto the AGV 51a in accordance with the work instructions received on his or her own terminal. After picking is complete, the operator stores the remaining products on storage shelf C2.
[0044] Meanwhile, the AGV 51a moves to storage shelf C3. The forklift 41c begins unloading from storage shelf C3 before the arrival of the AGV 51a, and is ready for picking at time t3 when the AGV 51a arrives. The operator of the forklift 41c, acting as operator 6c, picks the specified products according to the work instructions received on the terminal he or she carries. When picking is complete, the AGV 51a transports the picked products to a berth. The forklift 41c stores the remaining products that were not picked in a storage shelf. When the AGV 51a arrives at berth U, a transport completion flag is automatically or manually raised, and the processor 11 acquires this flag. This completes all planning for the picking of shipped products and product transport. Here, the work of one AGV has been described, but similar work will be performed in parallel. The work planning system 1 plans the work of the forklift and AGV so that picking of all products is completed based on the shipping information.
[0045] The above is an overview of the work planning system 1. With this work planning system 1, the use range of a forklift in picking work can be limited to the storage area and it can be specialized for the function of lifting and lowering goods, and it is possible to distinguish between the work area and traffic area of people and the work area of the forklift.
[0046] FIG. 9 is a diagram illustrating an example of a work plan for using unmanned forklifts, and is a diagram schematically illustrating the status of work instructions given to each resource. In this diagram, the horizontal axis represents time (hours). Forklifts 41a, 41b, 41c, and 41d unload cargo from designated shelves at their assigned times. Forklift 41a is assigned to storage shelf C11, forklift 41b to storage shelf C23, and forklift 41c to storage shelf C32. Forklift 41d starts unloading cargo later than the other forklifts, and begins unloading cargo from storage shelf C33.
[0047] The AGVs 51a, 51b, and 51c each move to a predetermined location and pick up products. In this embodiment, the workers 6a, 6b, and 6c are assigned picking tasks and are not forklift operators. That is, storage shelf location information, time information, and product information (product ID, storage unit, quantity, etc.) are output to the worker terminals carried by the workers 6a, 6b, and 6c. The workers 6a, 6b, and 6c pick a predetermined number of products from the group of products unloaded by the forklift according to the assigned task and load them onto the loading platform of the corresponding AGV 51a, 51b, or 51c. The workers also output identification labels from their worker terminals, affix them to the picked products, and press a work completion button on their worker terminals. In this embodiment, the storage shelves assigned to each worker are generally close to each other. Specifically, worker 6a is in charge of the upper area in storage area S on the drawing, and performs picking work from storage shelves C11, C12, and C13 in that order. The unmanned forklift that unloads goods is 41a, but the AGVs that load the goods are all different, alternating in the order AGV 51a → AGV 51c → AGV 51b. In this way, the amount of movement of worker 6a can be minimized, but the present invention is not limited to this.
[0048] When each of the AGVs 51a, 51b, and 51c has picked up all the products, it follows the instructions to transport the products to berth U. When the AGVs 51a, 51b, and 51c arrive at berth U, a transport end flag is automatically or manually raised, and all plans for picking and product transport are completed.
[0049] As described above, even when using unmanned forklifts, by assigning workers according to the picking start time, it is possible to create a work plan that allows the forklift, AGV, and worker to start picking in good coordination.
[0050] 10 to 12 are diagrams illustrating further different examples of work plans. In this embodiment, an example of an unmanned forklift is described, but a manned forklift may also be used. In this embodiment, as shown in FIG. 12, an area for picking work is provided in a section of the storage area S. The work area P is where the picking work is performed and is an area different from the berth.
[0051] FIG. 10 is a flowchart of a picking operation plan executed by the operation planning system 1. The computer 10 allocates products to each shipping destination (step S31). The number of products to be loaded onto one AGV is estimated, and the unit of product (picking operation unit) that the AGV will transport in one trip (step S32) is determined. The order in which the products will be picked is determined, and the allocation order for storage shelves C is determined (step S33). The forklifts 41 that will unload the products are assigned to the storage shelves C (products) (step S34). The time it takes for the forklifts 41 to unload the products and move to the picking operation location P is calculated (step S35). The start time of the forklifts 41's unloading operation is calculated, taking into account the time it takes for the AGVs 51 to complete picking and transport the products to the berth S (step S36). A work plan for picking all products is determined and created, and a product list and picking time and location information are stored (step S37). The AGVs 51 are assigned, and a movement plan is created (step S38).
[0052] FIG. 11 is a diagram showing a schematic diagram of the status of work instructions given to each resource. In this diagram, the horizontal axis represents time (hours). For forklifts 41a-41d, the time required for unloading and moving to the work area is taken into account as a pre-process of the picking work, and the time required for moving from the work area to the original storage shelf C and storing the product is taken into account as a post-process of the picking work. After that, the forklifts move to the next storage shelf, retrieve the specified product, and then move back to the work area. Since the AGV to be used for the work is different for each product, a waiting area is precisely set for each AGV, and the forklift transports the product to the corresponding AGV. For example, in this example, forklift 41a, the target AGVs are all different AGVs 51a, 51b, and 51c.
[0053] In this example, two workers 6a and 6b, who are separate from the forklift operator, handle the picking work, but if the forklift is manned, the operator may also perform the work. Within the work area P, the forklift 41 transports the cargo, lowers the lift, and when it is stopped in a state where work can be performed, the worker removes a predetermined number of target products from the pallet held by the forklift and places them on the loading platform of the AGV 51. The picking work is completed when predetermined operations, such as printing labels from the worker terminal and affixing them to the products, are completed.
[0054] The above-described means and functions are realized by a computer (including a CPU, an information processing device, and various terminals) reading and executing a predetermined program. The program may be provided, for example, from a computer via a network (Software as a Service (SaaS)) or as a cloud service. The program may also be provided in a form recorded on a computer-readable recording medium. In this case, the computer reads the program from the recording medium, transfers it to an internal or external recording device, records it, and executes it. The program may also be pre-recorded on a recording device (recording medium) and provided to the computer from the recording device via a communication line.
[0055] Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments. Furthermore, the effects described in the embodiments of the present invention are merely a list of the most preferable effects resulting from the present invention, and the effects of the present invention are not limited to those described in the embodiments of the present invention.
[0056] According to the present invention, the forklift can be used in a way that specializes in the function of lifting and lowering goods, allowing picked goods to be quickly transported to the shipping area (berth).
[0057] Embodiments of the present invention are briefly described below: (1) A work planning method for creating a picking work plan based on shipping information, comprising the steps of: determining products to be loaded onto an AGV and creating a product list; identifying storage shelves corresponding to the products on the product list; allocating forklifts to the products based on information on the identified storage shelves; and creating a work plan including product information, work times, and work locations for each of the forklifts and the AGV.
[0058] (2) The work planning method according to (1), wherein the work location is near a storage shelf where the target product is stored, further comprising a step of calculating an estimated time for the AGV to arrive at each storage shelf, and creating a forklift work plan based on the estimated arrival time.
[0059] (3) The work planning method described in (1) further includes the steps of: creating a movement plan for the AGV to move to the identified storage shelf; and transmitting the movement plan to an AGV control unit.
[0060] (4) The work planning method according to (1), further comprising a step of assigning a worker to pick up the products removed by the forklift onto the AGV.
[0061] (5) A work planning system comprising: a reception unit that receives shipping information; a processor that creates, based on the shipping information, a work plan for forklift unloading in a storage area of a warehouse; an AGV movement plan that causes the AGV to arrive when the forklift work is completed; and a work plan for loading target goods onto the AGV; and an output unit that transmits at least one of the unloading work plan, the movement plan, and the loading work plan to all or at least one of a forklift control unit, an AGV control unit, and a worker terminal.
[0062] (6) A computer-readable program for causing a computer that creates a picking work plan to execute the following steps: determining the products to be loaded onto an AGV and creating a product list; identifying storage shelves on the product list and creating a driving route for the AGV; assigning a forklift to each storage shelf; and creating a work plan for each forklift and AGV, including product information, work time, and work location.
[0063] REFERENCE SIGNS LIST 1 work planning system 10 computer 11 processor 12 reception unit 13 output unit 14 communication unit 15 recording unit 2 WMS 4 forklift control unit 41 forklift 5 AGV control unit 51 AGV 6 worker 7 worker control unit 71 worker terminal 8 network S storage area U berth (shipping location) C storage shelf P aisle G1, G2 product
Claims
1. A work planning method for creating a picking work plan based on shipping information, comprising the steps of: determining which products to load onto an AGV and creating a product list; identifying storage shelves corresponding to the products on the product list; allocating a forklift to the products based on information on the identified storage shelves; and creating a work plan including product information, work times, and work locations for each of the forklifts and the AGV.
2. The work planning method according to claim 1, wherein the work location is near a storage shelf where the target goods are stored, and further comprising a step of calculating an estimated time for the AGV to arrive at each storage shelf, and creating a forklift work plan based on the estimated arrival time.
3. The work planning method according to claim 1, further comprising the steps of: creating a movement plan for moving the AGV to the identified storage shelf; and transmitting the movement plan to an AGV control unit.
4. The work planning method according to claim 1, further comprising the step of assigning a worker to pick the items removed by the forklift to the AGV.
5. A work planning system comprising: a reception unit that receives shipping information; a processor that creates, based on the shipping information, a work plan for forklift unloading in a storage area of a warehouse; an AGV movement plan for the AGV to arrive when the forklift operation is completed; and a work plan for loading target goods onto the AGV; and an output unit that transmits at least one of the unloading work plan, the movement plan, and the loading work plan to all or at least one of a forklift control unit, an AGV control unit, and a worker terminal.
6. A computer-readable program for causing a computer that creates a picking work plan to execute the following steps: determining the products to be loaded onto an AGV and creating a product list; identifying storage shelves on the product list and creating a driving route for the AGV; assigning a forklift to each storage shelf; and creating a work plan including product information, work times, and work locations for each forklift and AGV.
Citation Information
Patent Citations
Article carrier system, carrier device and article carrier method
JP2019131403A
Picking support system and support method
JP2020033154A
Management device, picking system, and management method
JP2020172347A
Goods transport system using autonomous traveling forklift and automated guided vehicle
JP2021062964A
Warehouse operation system and method
JP2022527879A
