Control device, control method, and work machine

The control device for a working machine improves usability and productivity by determining and executing automatic operations based on work implement information, addressing space constraints and operator complexity in automated loading and excavation processes.

WO2024202983A1PCT designated stage expired Publication Date: 2024-10-03KOMATSU LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/008066
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2024-03-04
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

The increasing number of automated driving operations in loading machines necessitates more switches, leading to space constraints and poor usability due to the complexity of operations, reducing productivity.

Method used

A control device and method for a working machine with a revolving body that determines and executes executable automatic operations based on information about the work implement, reducing the need for multiple switches and improving usability by automating movements between loading and excavation positions.

Benefits of technology

The solution enhances usability and productivity by reducing the number of operation switches required, effectively utilizing space and minimizing operator errors in automated turning control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024008066_03102024_PF_FP_ABST
    Figure JP2024008066_03102024_PF_FP_ABST
Patent Text Reader

Abstract

Provided is a control device for a work machine, the working machine comprising a turning body that turns around a turning center, and a work implement that has a work tool and is attached to the turning body. In response to input of an instruction signal related to automatic operation including the work implement output from an operation unit, the control device determines an executable automatic operation among a plurality of automatic operations on the basis of information on the work tool, and executes the automatic operation determined to be executable.
Need to check novelty before this filing date? Find Prior Art

Description

Control device, control method and work machine

[0001] This application claims priority to Japanese Patent Application No. 2023-056911, filed on March 31, 2023, the contents of which are incorporated herein by reference.

[0002] Patent Document 1 describes a control device for a loading machine having a rotating body and a work implement, which is capable of automating the movement of the work implement between a loading position and an excavation position.

[0003] Japanese Patent Application Publication No. 2020-41352

[0004] In a control device that can automate the movement of a work machine between a loading position and an excavation position, the automatic operation is performed based on a signal from a switch operated by an operator. When the number of automatic operation operations increases, switches corresponding to the automatic operations must be installed, which makes it difficult to secure the installation space. Furthermore, when the number of switches increases, the operator must operate the switches with precision, which makes the system difficult to use and leads to reduced productivity.

[0005] The present disclosure has been made in consideration of the above circumstances, and has an object to provide a control device, a control method, and a work machine that can improve usability.

[0006] One aspect of the present disclosure is a control device for a work machine that includes a rotating body that rotates around a rotation center and a work implement that has a work tool and is attached to the rotating body, and when an instruction signal related to an automatic operation including the work implement is input from an operating unit, the control device determines which of a plurality of automatic operations is executable based on information related to the work tool, and executes the automatic operation determined to be executable.

[0007] One aspect of the present disclosure is a control method for a work machine that includes a rotating body that rotates around a rotation center and a work machine that has a work implement and is attached to the rotating body, and when an instruction signal related to an automatic operation including the work implement is input from an operating unit, the control method includes a step of determining which of a plurality of automatic operations is executable based on information related to the work implement, and executing the automatic operation determined to be executable.

[0008] One aspect of the present disclosure is a work machine comprising a rotating body that rotates around a rotation center, a work machine having a work implement attached to the rotating body, and a control device that controls the rotating body and the work implement, wherein when an instruction signal related to an automatic operation including the work implement output from an operating unit is input, the control device determines which of a plurality of automatic operations is executable based on information related to the work implement, and executes the automatic operation determined to be executable.

[0009] The control device, control method, and work machine disclosed herein can improve usability.

[0010] FIG. 1 is a schematic diagram illustrating a configuration of a work machine according to an embodiment of the present disclosure. FIG. 2 is a diagram illustrating a configuration of the interior of a cab according to an embodiment of the present disclosure. FIG. 3 is a block diagram illustrating an example configuration of a control system according to an embodiment of the present disclosure. FIG. 4 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 5 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 6 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 7 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 8 is a flowchart illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 9 is a schematic diagram illustrating an example operation of a control device according to an embodiment of the present disclosure. FIG. 1 is a schematic diagram for explaining an example operation of a control device according to an embodiment of the present disclosure. FIG. 2 is a flowchart showing an example operation of a control device according to an embodiment of the present disclosure. FIG. 3 is a schematic diagram for explaining an example operation of a control device according to an embodiment of the present disclosure. FIG. 4 is a flowchart showing an example operation of a control device according to an embodiment of the present disclosure. FIG. 5 is a flowchart showing an example operation of a control device according to an embodiment of the present disclosure.

[0011] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. Note that the same or corresponding components in each drawing will be designated by the same reference numerals, and descriptions thereof will be omitted as appropriate. FIG. 1 is a schematic diagram showing the configuration of a work machine according to an embodiment of the present disclosure. FIG. 2 is a diagram showing the internal configuration of a cab according to an embodiment of the present disclosure. FIG. 3 is a block diagram showing an example configuration of a control system according to an embodiment of the present disclosure. FIGS. 4 to 11 are schematic diagrams for explaining an example operation of a control device according to an embodiment of the present disclosure. FIGS. 12, 15, 18, 20, 22, and 24 to 27 are flowcharts showing an example operation of a control device according to an embodiment of the present disclosure. FIGS. 13, 14, 16, 17, 19, 21, and 23 are schematic diagrams for explaining an example operation of a control device according to an embodiment of the present disclosure.

[0012] (Configuration of work machine 100) FIG. 1 shows the configuration of a work machine 100 according to an embodiment of the present disclosure. The work machine 100 operates at a construction site and works on a construction target such as earth and sand. The work machine 100 according to an embodiment of the present disclosure is, for example, a hydraulic excavator. However, the work machine according to the present disclosure is not limited to a work machine that is equipped with a rotating body and a work implement, which are actuators, and may be other work machines such as a face shovel or a rope shovel. Furthermore, the work machine according to the present disclosure may be a work machine that has an actuator that is not limited to being hydraulic, but is instead electrically operated. The work machine 100 includes a traveling body 110, a rotating body 120, a work implement 130, and a cab 140.

[0013] The running body 110 supports the work machine 100 so that it can travel. The running body 110 is equipped with two tracks 111 provided on the left and right, and two travel motors 112 for driving each track 111. The rotating body 120 is supported on the running body 110 so that it can rotate about a rotation center.

[0014] The work implement 130 is hydraulically driven. The work implement 130 is supported on the front part of the revolving unit 120 so that it can be driven in the vertical direction. The cab 140 is a space where an operator sits and operates the work machine 100. The cab 140 is provided on the left front part of the revolving unit 120. In this embodiment, as shown in FIG. 1 , the up-down direction (Z direction), left-right direction (Y direction), and front-to-back direction (X direction) are defined with the revolving unit 120 as the reference. In this embodiment, this coordinate system is called the excavator coordinate system. Furthermore, the part of the revolving unit 120 to which the work implement 130 is attached is called the front part. Furthermore, with respect to the revolving unit 120, the opposite part from the front part is called the rear part, the left part is called the left part, and the right part is called the right part.

[0015] (Configuration of the Swing Unit 120) The swing unit 120 includes an engine 121, a hydraulic pump 122, an EPC (Electromagnetic Proportional Control) valve 123-1, a main valve 123-2, a swing motor 124, and a fuel injection device 125. The engine 121 is a prime mover that drives the hydraulic pump 122. The engine 121 is an example of a power source. A starter 1211 is provided on the engine 121. The engine 121 is started by rotation of the starter 1211. The EPC valve 123-1 controls the hydraulic oil flowing to the main valve 123-2 based on an operation command signal output by the control device 61.

[0016] The hydraulic pump 122 is a variable displacement pump driven by the engine 121. The hydraulic pump 122 supplies hydraulic oil to each actuator via a main valve 123-2. Each actuator includes a boom cylinder 131C, an arm cylinder 132C, a bucket cylinder 133C, a travel motor 112, and a swing motor 124. The main valve 123-2 controls the flow rate of hydraulic oil supplied from the hydraulic pump 122.

[0017] The swing motor 124 is driven by hydraulic oil supplied from the hydraulic pump 122 via a main valve 123-2, and causes the swing body 120 to swing around a swing axis 120C (center of swing). The fuel injection device 125 injects fuel into the engine 121.

[0018] (Configuration of Work Machine 130) The work machine 130 includes a boom 131, an arm 132, a bucket 133, a boom cylinder 131C, an arm cylinder 132C, and a bucket cylinder 133C. The boom cylinder 131C, the arm cylinder 132C, and the bucket cylinder 133C are included in the cylinder 130C shown in FIG. 3 . In this embodiment, the bucket 133 is one example of a configuration of the "work tool" in this disclosure. In addition to a bucket, a tiltrotator, a quick coupler, a grapple, a magnet, a breaker, and the like may be attached as the work tool, which is an attachment. These are also examples of the "work tool" in this disclosure.

[0019] The base end of the boom 131 is attached to the revolving unit 120 via a boom pin. The arm 132 connects the boom 131 and the bucket 133. The base end of the arm 132 is attached to the tip of the boom 131 via an arm pin. The bucket 133 includes a blade for excavating earth and sand and a storage section for storing the excavated earth. The base end of the bucket 133 is attached to the tip of the arm 132 via a bucket pin 133P.

[0020] The boom cylinder 131C is a hydraulic cylinder for operating the boom 131. A base end of the boom cylinder 131C is attached to the revolving unit 120. A tip end of the boom cylinder 131C is attached to the boom 131. The arm cylinder 132C is a hydraulic cylinder for driving the arm 132. A base end of the arm cylinder 132C is attached to the boom 131. A tip end of the arm cylinder 132C is attached to the arm 132. The bucket cylinder 133C is a hydraulic cylinder for driving the bucket 133. A base end of the bucket cylinder 133C is attached to the arm 132. A tip end of the bucket cylinder 133C is attached to a link member connected to the bucket 133.

[0021] 2 shows the internal configuration of the driver's cab 140 according to the embodiment of the present disclosure. Inside the driver's cab 140, a driver's seat 142, an operating device 143, and the like are provided.

[0022] The operating device 143 is a device that the operator manually operates to drive the traveling body 110, the revolving body 120, and the work machine 130, set and change various settings, and provide information to the operator. The operating device 143 is composed of, for example, levers, switches, and pedals. The operating device 143 includes a left operating lever 143LO, a right operating lever 143RO, a left foot pedal 143LF, a right foot pedal 143RF, a left travel lever 143LT, a right travel lever 143RT, and a display / input device 143D. In this embodiment, the switches are components that generate or change predetermined signals when operated by the operator. In this embodiment, the switches are one example of the "operating unit" in this disclosure. Various switches, such as pushbutton switches, rocker switches, and toggle switches, may be used as the switches. Furthermore, the switches may be located within a range that the operator can operate them. The switches are located near the driver's seat in the cab 140 or a remote control room. For example, the switch may be provided on a console to the side of the driver's seat 142, a transmitter that outputs an operation command to the work machine 100 from outside the work machine 100, or the like.

[0023] The left operating lever 143LO is provided on the left side of the driver's seat 142. The right operating lever 143RO is provided on the right side of the driver's seat 142.

[0024] The left operation lever 143LO is an operation mechanism for performing the swing operation of the revolving unit 120 and the excavation / dump operation of the arm 132. Specifically, when the operator of the work machine 100 tilts the left operation lever 143LO forward, the arm 132 performs a dump operation. When the operator of the work machine 100 tilts the left operation lever 143LO rearward, the arm 132 performs an excavation operation. When the operator of the work machine 100 tilts the left operation lever 143LO to the right, the revolving unit 120 swings to the right. When the operator of the work machine 100 tilts the left operation lever 143LO to the left, the revolving unit 120 swings to the left. Note that in other embodiments, the revolving unit 120 may swing to the right or left when the left operation lever 143LO is tilted forward or backward, and the arm 132 may perform an excavation or dump operation when the left operation lever 143LO is tilted left or right. The left operation lever 143LO is provided with, for example, an operation switch 1433. The operation switch 1433 is provided on the top or side of the left operation lever 143LO. When the operation switch 1433 is turned on, for example, a horn may sound.

[0025] The right operating lever 143RO is an operating mechanism for performing the excavation / dumping operation of the bucket 133 and the raising / lowering operation of the boom 131. Specifically, when the operator of the work machine 100 tilts the right operating lever 143RO forward, the boom 131 is lowered. When the operator of the work machine 100 tilts the right operating lever 143RO rearward, the boom 131 is raised. When the operator of the work machine 100 tilts the right operating lever 143RO to the right, the bucket 133 is dumped. When the operator of the work machine 100 tilts the right operating lever 143RO to the left, the bucket 133 is excavated. Note that in other embodiments, when the right operating lever 143RO is tilted forward or backward, the bucket 133 may be dumped or excavated, and when the right operating lever 143RO is tilted left or right, the boom 131 may be raised or lowered. The right operation lever 143RO is provided with, for example, operation switches 1431 and 1432. In this embodiment, the operation switch 1431 is set to function as a teaching switch, and the operation switch 1432 is set to function as an automatic start switch (hereinafter, each switch will be referred to as the teaching switch 1431 and the automatic start switch 1432 (or simply as the "switch")). The operation switches 1431 and 1432 are provided on the top or side of the right operation lever 143RO. Note that the teaching switch and the automatic start switch are examples of switches for automatic control. For example, when the automatic start switch 1432 is turned ON, the automatic start switch 1432 outputs an instruction signal to the control device 61 to start an automatic operation, including the work implement 130. The switch is not limited to a switch for starting an automatic operation, and may output any signal related to the automatic operation, such as a signal to stop the automatic operation. Furthermore, for example, the switch functions are not limited to automatic control of loading swing and return swing, but may also be assigned automatic controls such as automatic earth removal, which automatically performs earth removal operation using the bucket 133, and automatic excavation, which automatically performs excavation operation. For example, the automatic operations of automatic excavation, loading swing, return swing, and automatic earth removal may be assigned to two or more switches, respectively.In addition, multiple switches may be provided on one operating lever, and automatic operation may be assigned to each of the multiple switches, or one or more switches may be provided separately for multiple operating levers.

[0026] The left foot pedal 143LF is located on the left side of the floor in front of the driver's seat 142. The right foot pedal 143RF is located on the right side of the floor in front of the driver's seat 142. The left travel lever 143LT is pivotally supported by the left foot pedal 143LF, and is configured so that tilting the left travel lever 143LT and pushing down the left foot pedal 143LF are linked. The right travel lever 143RT is pivotally supported by the right foot pedal 143RF, and is configured so that tilting the right travel lever 143RT and pushing down the right foot pedal 143RF are linked.

[0027] The left foot pedal 143LF and left travel lever 143LT correspond to the rotational drive of the left crawler belt of the running body 110. Specifically, when the operator of the work machine 100 pushes the left foot pedal 143LF or the left travel lever 143LT forward, the left crawler belt rotates in the forward direction. Conversely, when the operator of the work machine 100 pushes the left foot pedal 143LF or the left travel lever 143LT backward, the left crawler belt rotates in the reverse direction.

[0028] The right foot pedal 143RF and the right travel lever 143RT correspond to the rotational drive of the right crawler of the running body 110. Specifically, when the operator of the work machine 100 pushes the right foot pedal 143RF or the right travel lever 143RT forward, the right crawler rotates in the forward direction. Conversely, when the operator of the work machine 100 pushes the right foot pedal 143RF or the right travel lever 143RT backward, the right crawler rotates in the reverse direction.

[0029] The display / input device 143D is a device that combines a display device with a sensor that detects touch operations on the display screen. For example, an operator can use the display / input device 143D to set or change various setting values, etc. In the display / input device 143D, the display device having a display unit and the input unit consisting of switches and the like for inputting operator instructions may be separate units.

[0030] (Sensors, etc.) As shown in Fig. 3, the control system 60 of the work machine 100 includes a control device 61, an operation device 143, etc., and various sensors. Note that in Fig. 3, the hydraulic system circuit is indicated by a thick line. In the example shown in Fig. 3, the control system 60 includes an attitude angle sensor 151, a GNSS (Global Navigation Satellite System) sensor 152, and an IMU (Inertial Measurement Unit) 153.

[0031] The attitude angle sensor 151 includes a boom attitude angle sensor, an arm attitude angle sensor, and a bucket attitude angle sensor. The boom attitude angle sensor measures the attitude angle of the boom cylinder 131C. The arm attitude angle sensor measures the attitude angle of the arm cylinder 132C. The bucket attitude angle sensor measures the attitude angle of the bucket cylinder 133C.

[0032] The GNSS sensor 152 calculates the position of the revolving unit 120 and the azimuth in which the revolving unit 120 faces. The GNSS sensor 152 includes two receivers 161 and 162 (see FIG. 1 ) that receive positioning signals from artificial satellites that make up the GNSS. The two receivers 161 and 162 are installed at different positions on the revolving unit 120. The GNSS sensor 152 detects the position of a representative point of the revolving unit 120 in the site coordinate system (the origin of the excavator coordinate system) based on the positioning signals received by the receivers 161 and 162. The GNSS sensor 152 uses the positioning signals received by the two receivers 161 and 162 to calculate the azimuth in which the revolving unit 120 faces as the relationship between the installation position of one receiver and the installation position of the other receiver. The azimuth angle (also called the vehicle azimuth angle) of the rotating body 120 is the front direction (X direction) of the rotating body 120 and is equal to the horizontal component of the extension direction of the straight line extending from the boom 131 of the work implement 130 to the bucket 133.

[0033] The IMU 153 measures the acceleration and angular velocity of the rotating unit 120, and detects the attitude (for example, roll angle and pitch angle) of the rotating unit 120 based on the measurement results. The IMU 153 is installed on the underside of the rotating unit 120, for example.

[0034] Examples of other sensors that the work machine 100 is equipped with include a stereo camera, a LiDAR (Light Detection and Ranging) device, and a laser scanner. These sensors are installed, for example, so that their detection direction faces forward of the cab 140 of the work machine 100. These sensors identify the three-dimensional position of an object in a coordinate system based on the position of each sensor. These sensors may be installed on either the left or right side of the work machine 100, or on both sides, so that they face to the side of the work machine 100.

[0035] The work machine 100 is also equipped with, for example, a short-range communication device for performing vehicle-to-vehicle communication with other nearby vehicles, a mobile communication device for connecting to a remote server, and the like.

[0036] (Basic Operation of the Control Device) First, with reference to FIGS. 4 to 11 , the basic operation of the control device 61 according to an embodiment of the present disclosure will be described. In this embodiment, the swing operation of automatically raising the boom 131 from a state in which the bucket 133 is positioned outside the loading target due to excavation of the excavation target to a direction facing the loading target and moving the bucket to a discharge point is referred to as a "loading swing." Furthermore, the operation of automatically lowering the boom 131 from a state in which the bucket 133 is positioned above the loading target due to loading and moving the bucket 133 to a predetermined direction and moving the bucket to an excavation start point is referred to as a "return swing." The "loading swing" and "return swing" are operations that automatically change the working implement 130 and the rotating unit 120, and are examples of "automatic operations including the working implement" in the present disclosure. Note that examples of automatic operations may include automatic operations of either the working implement 130 or the rotating unit 120. The unloading point is a target point for loading, etc., and is set, for example, at the loading port of a dump truck, a land improvement machine, a hopper, or the like, which is a transport vehicle. However, the unloading point is not limited to these, and for example, a destination for moving excavated soil, etc., to another surface can also be set as the unloading point. In the present disclosure, the unloading point is an example of a first target point (hereinafter also referred to as a loading swing target point TLP) corresponding to the target position for unloading the bucket 133, etc. Furthermore, the excavation start point is a target point for automatic return operation after unloading is completed, and is set, for example, to the point where excavation starts. In the present disclosure, the excavation start point is an example of a second target point (hereinafter also referred to as a return swing target point TRP) corresponding to the target position for loading the bucket 133, etc. Note that in this embodiment, the unloading point (loading swing target point TLP), the excavation start point (return swing target point TRP), and the interference avoidance point described later are collectively referred to as reference points. Furthermore, in this embodiment, the portion of the work machine 100 that corresponds to the reference point is the bucket pin 133P. The control device 61 sets the position of each reference point as a target value and controls the position of the bucket pin 133P. Furthermore, the loading swing target point TLP and the return swing target point TRP are collectively referred to as the target point.

[0037] FIG. 4 schematically shows a series of steps in manual excavation, loading swing, manual earth removal, and return swing. First, as shown in the upper left of FIG. 4 , the operator manually excavates the work machine 100 and loads earth and sand or other cargo into the bucket 133. Then, when the operator operates the automatic start switch 1432, as shown in the upper right of FIG. 4 , loading swing is initiated, and the bucket 133 (bucket pin 133P) automatically swings to the loading swing target point TLP by combined operation of the work implement 130 and the rotating unit 120. At the loading swing target point TLP, the operator manually discharges earth and sand or other cargo from the bucket 133 (lower right of FIG. 4 ). After earth removal is complete, when the operator operates the automatic start switch 1432, return swing is initiated, and the bucket 133 (bucket pin 133P) automatically swings to the return swing target point TRP by combined operation of the work implement 130 and the rotating unit 120, as shown in the lower left of FIG. 4 .

[0038] In the example shown in Figures 2 and 3, one automatic start switch 1432 is used in common for loading swing and return swing, but two or more switches may be used. For example, two independent automatic start switches may be provided, with the automatic start switch for loading swing being the automatic start switch 1432 shown in Figure 2 (hereinafter also referred to as the loading swing automatic start switch 1432) and the automatic start switch for return swing being the automatic start switch 1433 shown in Figure 2 (hereinafter also referred to as the return swing automatic start switch 1433). The switches may be provided in a manner that allows the operator to freely set them. Note that the operation switch 1433 may be used for the horn, and a third operation switch may be provided on either the left or right operation lever 143LO or 143RO as the automatic start switch for return swing.

[0039] Next, the interference avoidance point EVP will be described with reference to FIG. 5 . FIG. 5 schematically shows the positional relationship between the work machine 100 and a dump truck 200, which is the loading target for loading earth and sand, etc. The dump truck 200 is equipped with a cab 201, a loading platform 202, and a tailgate 203. In the example shown in FIG. 5 , the work machine 100 performs a loading swing to move the bucket 133 (133a), which is at the automatic swing start point (SP) when the automatic start switch 1432 is operated, to the loading swing target point (TLP) via the interference avoidance point (EVP). The posture of the bucket 133 (133b) when it reaches the loading swing target point (TLP) is the hoisting posture (also referred to as the loading posture in this embodiment). Here, the operator sets the posture of the bucket 133 to the dump posture (also referred to as the unloading posture in this embodiment) (bucket 133 (133c)) and performs earth removal work. Here, the interference avoidance point (EVP) is a point (position information) that represents the boundary of an area set to prevent the bucket 133 from colliding with the bed 202 of the dump truck 200 during loading (loading swing). In this embodiment, only the swing operation of the swing unit 120 is performed on the side of the unloading point (the loading swing target point TLP side) of this boundary. The interference avoidance point (EVP) can be set, for example, based on teaching, in which the operator actually operates the work implement 130 to set its position and attitude. In this case, as shown in FIG. 5 , for example, the interference avoidance point (EVP) is set with a certain margin in the vertical and horizontal directions relative to the interference avoidance point (teaching position) registered by the operator. The automatic swing start point (SP) is the position of the bucket pin 133P at the start of loading swing or return swing, and is the position when the operator operates the automatic start switch 1432. In the following, the automatic swing start point (SP) is also referred to as the start point. The automatic turning start point (SP) may be a specific position of the work implement 130 at the start of the loading turn or return turn, such as the left or right end of the bucket 133 or the cutting edge.

[0040] Figure 6 shows an example of changes in the swing angle and the height of the bucket pin 133P during loading swing. The horizontal axis represents the swing angle, and the vertical axis represents the bucket pin height. In Figure 6, the swing angle of the automatic swing start point (SP) is shown as the start angle, the swing angle of the interference avoidance point (EVP) as the interference avoidance point angle, and the swing angle of the loading swing target point (TLP) as the target angle. Also, the height of the automatic swing start point (SP) is shown as the start height, the height of the interference avoidance point (EVP) as the interference avoidance point height, and the height of the loading swing target point (TLP) as the target height. The interference area between the bucket 133 and the dump truck 200 is shown shaded. In the example shown in FIG. 6 , until the bucket pin 133P reaches the interference avoidance point (EVP) from the automatic swing start point (SP), the control of the swing unit 120 and the control of the work implement 130 are executed in parallel, so that the height of the bucket pin 133P reaches the interference start point height before the swing angle reaches the interference avoidance point angle. After the bucket pin 133P reaches the interference avoidance point (EVP), the swing angle reaches the target angle through independent control of the swing unit 120. The loading swing operation includes a swing region in which the swing unit 120 and the boom 131 operate simultaneously. The operation of the boom 131 during loading swing may be boom-up or boom-down. For example, if the height of the automatic swing start point (SP) is higher than the height of the interference avoidance point (EVP), the operation of the boom 131 during loading swing may be boom-down.

[0041] 7 and 8 show examples of changes in the swing angle and the height of the bucket pin 133P during a return swing. FIG. 7 shows an example in which the height of the automatic swing start point (SP) is equal to the height of the interference avoidance point (EVP), while FIG. 8 shows an example in which the height of the automatic swing start point (SP) is lower than the height of the interference avoidance point (EVP). In the example shown in FIG. 7 , the height of the bucket pin 133P is maintained at the start height until the bucket pin 133P reaches the interference avoidance point (EVP), and the swing angle is changed from the start angle to the interference avoidance point angle by independent control of the swing unit 120. After the bucket pin 133P reaches the interference avoidance point (EVP), both the height and the swing angle of the bucket pin 133P are changed to the target height and target angle by control of the swing unit 120 and control of the work implement 130 being executed in parallel. 8 , the height of the bucket pin 133P is first changed by independent control of the work implement 130 until the height of the bucket pin 133P reaches the interference avoidance point height. After the height of the bucket pin 133P reaches the interference avoidance point height, the height of the bucket pin 133P is maintained at the start height until the bucket pin 133P reaches the interference avoidance point (EVP), and the swing angle is changed from the start angle to the interference avoidance point angle by independent control of the rotating unit 120. After the bucket pin 133P reaches the interference avoidance point (EVP), both the height and the swing angle of the bucket pin 133P are changed to the target height and target angle by controlling the rotating unit 120 and the work implement 130 in parallel. Note that in this embodiment, during the return swing, the attitude of the work implement 130 (attitude of the bucket 133) is controlled to be the target attitude by the time the target angle and target height are reached. The return rotation operation includes a rotation region in which the rotating bed 120 and the boom 131 are simultaneously operated. The operation of the boom 131 in the return rotation may be a boom-down operation or a boom-up operation. For example, if the target height is higher than the height of the collision avoidance point (EVP), the operation of the boom 131 in the return rotation may be a boom-up operation.

[0042] Fig. 9 is a perspective view showing an example of operation during loading swing. In addition to a gate 203, the dump truck 200 is equipped with a covolane (scattering prevention device) 204 and a hinge 205. The covolane 204 and the hinge 205 are examples of obstructions. In the example shown in Fig. 9, the trajectory of the bucket pin 133P extends from the automatic swing start point (SP) to the interference avoidance point (EVP) by the operation of both the work implement 130 and the swing unit 120 (hereinafter referred to as combined operation), and continues from the interference avoidance point (EVP) to the loading swing target point (TLP) by the independent operation of the swing unit 120.

[0043] FIG. 10 is a perspective view showing an example of operation during a return turn. In the example shown in FIG. 10, the height of the automatic turn start point (SP) is higher than the height of the interference avoidance point (EVP). Furthermore, the positions of the automatic turn start point (SP) and the interference avoidance point (EVP) are different. In this case, in this embodiment, interference avoidance with an interfering object is ensured based on a vertical plane (interference avoidance vertical plane (VS)) that includes the rotation axis 120C of the rotating unit 120 and the interference avoidance point (EVP). Note that in this embodiment, the interference avoidance vertical plane (VS) and the interference avoidance plane (HS), which will be described later, are collectively referred to as the interference avoidance plane. In this example, the trajectory of the bucket pin 133P extends by the independent movement of the rotating body 120 from the automatic rotation starting point (SP) until the bucket pin 133P passes through the interference avoidance vertical plane (VS), and after passing through the interference avoidance vertical plane (VS), the trajectory continues to the return rotation target point (TRP) by the combined movement of the work machine 130 and the rotating body 120.

[0044] FIG. 11 is a perspective view illustrating an example of operation during a return swing. In the example illustrated in FIG. 11 , the height of the automatic swing start point (SP) is lower than the height of the interference avoidance point (EVP). Furthermore, the positions of the automatic swing start point (SP) and the interference avoidance point (EVP) are different. In this case, in this embodiment, the work implement 130 is controlled based on a horizontal plane (interference avoidance plane (HS)) that includes the interference avoidance point (EVP) until the height of the bucket pin 133P becomes equal to or higher than the interference avoidance plane (HS). Thereafter, similar to the example illustrated in FIG. 10 , interference with an obstructing object is ensured based on the interference avoidance vertical plane (VS). In this example, the trajectory of the bucket pin 133P rises from the automatic rotation starting point (SP) until it reaches the interference avoidance plane (HS), and then extends by the independent movement of the rotating body 120 until it passes through the interference avoidance vertical plane (VS), and after passing through the interference avoidance vertical plane (VS), it continues to the return rotation target point (TRP) by the combined movement of the work machine 130 and the rotating body 120.

[0045] 3 , the control device 61 can be configured using a computer such as a microcontroller, and includes an automatic swing control unit 62, a memory unit 63, and an operation command switching unit 64 as a functional configuration formed by a combination of hardware such as a computer, computer peripheral devices and peripheral circuits, and software such as a program executed by the computer. The automatic swing control unit 62 also includes an information input / output unit 621, a reference point setting unit 622, a swing direction setting unit 623, a start instruction receiving unit 624, an operation command switching control unit 625, and an operation command signal generating unit 626. The memory unit 63 also stores information 631 indicating the target work implement attitude and vehicle body azimuth angle (earth removal target point, interference avoidance point, excavation start point), etc.

[0046] The automatic swing control unit 62 generates an operation command signal (automatic) and outputs it to the EPC valve 123-1 via the operation command switching unit 64, thereby driving the swing body 120 and the work implement 130. The actuators that automatically operate in response to the operation command signal generated by the control device 61 without operator operation are actuators that correspond to automatic operations assigned to instruction signals output by operation of an operation switch. In this embodiment, instruction signals related to automatic operations including the work implement 130 are input to the automatic swing control unit 62, output from an operation unit such as the automatic start switch 1432. If the automatic operation assigned to the input instruction signal is identical to an executable automatic operation based on information indicating the position, posture, and surrounding conditions of the bucket 133 (an example of "information related to the work implement" in this disclosure), the automatic swing control unit 62 executes the automatic operation of the input instruction signal. In this case, the automatic swing control unit 62 may execute the automatic operation of the instruction signal if the automatic operation assigned to the instruction signal is identical to an executable automatic operation based on information related to the bucket 133. Alternatively, the automatic swing control unit 62 may not execute the automatic action of the instruction signal when the automatic action assigned to the instruction signal is the same as the automatic action that cannot be executed based on the information about the bucket 133. Note that the automatic swing control unit 62 does not execute the automatic action of the instruction signal when the automatic action assigned to the instruction signal is not the same as the automatic action that can be executed based on the information about the bucket 133.

[0047] The information input / output unit 621 receives input of predetermined information output by the operation device 143, the attitude angle sensor 151, the GNSS sensor 152, the IMU 153, etc. The information input / output unit 621 outputs predetermined display information to the display input device 143D. The information input / output unit 621 receives input of, for example, an instruction signal output from the automatic start switch 1432 (operation unit) relating to an automatic operation including the work machine 130 equipped with a work implement such as the boom 131, the arm 132, or the bucket 133.

[0048] The reference point setting unit 622 sets a loading swing target point TLP (earth unloading point), a return swing target point TRP (excavation start point), and an interference avoidance point (EVP). In this embodiment, these reference points can be set by the operator teaching, or by creating a three-dimensional map or the like as described in Patent Document 1 and setting the reference points based on the created three-dimensional map. The setting method can be, for example, freely selected by the operator. Here, an example in which the reference points are set by the operator teaching will be described. The reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the excavation start point. The operator operates the operation device 143 to move the bucket 133 to the excavation start point and inputs a completion of movement to the excavation start point into the display input device 143D. Next, the reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the interference avoidance point. The operator operates the operation device 143 to move the bucket 133 to the interference avoidance point and inputs into the display input device 143D the completion of movement to the interference avoidance point. Next, the reference point setting unit 622 causes the display input device 143D to display an instruction to move the bucket 133 to the discharge point. The operator operates the operation device 143 to move the bucket 133 to the discharge point and inputs into the display input device 143D the completion of movement to the discharge point.

[0049] The reference point setting unit 622 displays an instruction to move to the reference point on the display input device 143D. Furthermore, the reference point setting unit 622 stores, as information 631 in the storage unit 63, information on the position and attitude of the work implement 130 acquired based on the excavator coordinate system at each reference point, the swing angle of the swing unit 120, and the like, based on the operator's input operation on the display input device 143D and the information input to the information input / output unit 621. The reference point setting unit 622 can change the setting of the reference point at any timing. That is, for example, the reference point setting unit 622 can set the loading swing target point TLP (earth unloading point), the return swing target point TRP (excavation start point), and the interference avoidance point EVP once before executing automatic swing, and then change the loading swing target point TLP, the return swing target point TRP, and the interference avoidance point EVP at any timing (e.g., during work). In this case, for example, fine adjustments can be made as appropriate to the loading swing target point TLP (earth unloading point) and the return swing target point TRP (digging start point).

[0050] The swing direction setting unit 623 sets the swing direction of the work machine 130 (the swing unit 120). The swing direction setting unit 623 sets the swing direction in the loading swing control (first swing control) and the return swing control (second swing control) in accordance with the swing direction of the swing unit 120 in which interference with an interfering object may occur in the loading swing control (first swing control) and the return swing control (second swing control).

[0051] The swing direction setting unit 623 sets the swing direction, for example, in a direction that leads the bucket 133 across the interference avoidance point (EVP) to a loading swing target point TLP (first target point) corresponding to the unloading position (target position for unloading) or a return swing target point TRP (second target point) corresponding to the excavation start position (target position for loading). FIG. 12 shows an example of the operation of the swing direction setting unit 623 in this case. The process shown in FIG. 12 is started when the automatic start switch 1432 is operated. When the process shown in FIG. 12 is started, the swing direction setting unit 623 first acquires the target angle described with reference to FIG. 6 or FIG. 7 (step S101). Next, the swing direction setting unit 623 acquires the interference avoidance point angle (step S102). Next, the swing direction setting unit 623 determines whether the target angle is reached across the interference avoidance point angle when the work machine 130 (the rotating unit 120) turns left (step S103). If the target angle is reached across the interference avoidance point angle when the work machine 130 (the rotating unit 120) turns left (step S103: YES), the swing direction setting unit 623 sets the swing direction to a left swing (step S104) and ends the processing shown in Fig. 12. If the target angle is not reached across the interference avoidance point angle when the work machine 130 (the rotating unit 120) turns left (step S103: NO), the swing direction setting unit 623 sets the swing direction to a right swing (step S105) and ends the processing shown in Fig. 12. Fig. 13 shows an example in which the swing direction is set to a left swing. Fig. 14 shows an example in which the swing direction is set to a right swing. In this case, the loading turn or return turn will be made in the direction of the interference avoidance point that has been taught, so it is possible to prevent the situation where it becomes unclear in which direction the work machine 130 (swivel body 120) should be rotated when making a turn of nearly 180 degrees, for example.

[0052] Furthermore, for example, when the target of unloading (loading, earth removal, etc.) is the dump truck 200 and the interfering object is the cab 201 of the dump truck 200, the swing direction setting unit 623 sets the swing direction in a direction that will not cause interference between the work implement 130 and the cab 201 of the dump truck 200, based on the positional relationship between the swing center (swing axis 120C) and the dump truck 200. FIG. 15 shows an example of the operation of the swing direction setting unit 623 in this case. The processing shown in FIG. 15 is started when the automatic start switch 1432 is operated. When the processing shown in FIG. 15 is started, the swing direction setting unit 623 acquires position information of the earth removal target point P0 and the position coordinates of the four truck contour points P1 to P4 shown in FIG. 16 or 17 based on the excavator coordinate system (step S201). The position coordinates of the four track contour points P1 to P4 can be obtained, for example, through vehicle-to-vehicle communication or by using external sensors such as a LiDAR device, a radar scanner, or a camera provided on the work machine 100. Next, the turning direction setting unit 623 calculates a vector (vector a) connecting the origin (turning axis 120C) of the shovel coordinate system and the soil discharge target point P0 (step S202). Next, the turning direction setting unit 623 calculates a vector (vector b) of the X-axis of the truck coordinate system (step S203). The truck coordinate system is a coordinate system based on the position and orientation of the dump truck 200. Next, the turning direction setting unit 623 determines whether the angle formed by vector a and vector b is greater than 0 degrees (step S204). If the angle formed by vector a and vector b is greater than 0 degrees, the turning direction setting unit 623 sets the turning direction to a right turn (step S205), and the processing shown in FIG. 15 ends. If the angle between vector a and vector b is not greater than 0 degrees, the turning direction setting unit 623 sets the turning direction to a left turn (step S206), and ends the processing shown in Fig. 15. In the example shown in Fig. 16, the angle is greater than 0, so the turning direction is set to the right. In the example shown in Fig. 17, the angle is not greater than 0, so the turning direction is set to the left. In this case, the work implement 130 can approach from the rear side of the bed 202 of the dump truck 200, which is preferable compared to the case where the work implement 130 passes over the cab 201.When the angle between vector a and vector b is close to 0 degrees within a predetermined range from 0 degrees, the vehicle may automatically turn in a direction that results in the minimum turning angle.

[0053] The turning direction setting unit 623 may set the turning direction manually, for example, based on an input operation by an operator via the display input device 143D. Furthermore, the turning direction setting unit 623 may set the turning direction in a direction that results in the minimum turning angle, for example, in the case of unloading soil into a hopper or the ground where no obstructions exist. The setting method may be selected by the operator's discretion, for example, by touching the input screen.

[0054] When the automatic start switch 1432 is a single operation switch, and the automatic start switch 1432 (a specified operation unit) is operated, the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start loading swing control (first swing control that moves the bucket to a first target point corresponding to the target position for unloading) or as an instruction to start return swing control (second swing control that moves the bucket to a second target point corresponding to the target position for loading). With this configuration, a command to start swing control can be given using a single operation switch.

[0055] Furthermore, in the case where the automatic start switch 1432 is a single operation switch, the start instruction receiving unit 624 may perform the following processing when the automatic start switch 1432 is operated. That is, for example, as shown in FIG. 19 , when the automatic start switch 1432 is operated, if the bucket 133 is above the bed 202 or the vessel 206 of the dump truck 200 (if the bucket is within a predetermined range from the first target point), the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start return swing control (second swing control). When the automatic start switch 1432 is operated, if the bucket 133 is not above the bed 202 or the vessel 206 of the dump truck 200 (hereinafter simply referred to as the vessel 206) (if the bucket is not within a predetermined range from the first target point), the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start loading swing control (first swing control). In FIG. 19 , positions P5 and P6 are positions at the ends of the operator's cab 201. FIG. 18 shows an example of the operation of the start instruction receiving unit 624 in this case. The processing shown in FIG. 18 is started when the automatic start switch 1432 is operated. When the processing shown in FIG. 18 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S301). Next, the start instruction receiving unit 624 acquires position information of the bucket 133 (step S302). For example, the position of the bucket 133 is the position of the bucket pin 133P in the excavator coordinate system, and also includes the orientation in which the rotating bed 120 is facing. Next, the start instruction receiving unit 624 determines whether the bucket 133 is above the vessel 206 (step S303). If the bucket 133 is above the vessel 206 (step S303: YES), the start instruction receiving unit 624 sets the swing mode (type of swing control) to return swing (step S304), and ends the processing shown in Fig. 18. If the bucket 133 is not above the vessel 206 (step S303: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S305), and ends the processing shown in Fig. 18.

[0056] Furthermore, if the automatic start switch 1432 is a single operation switch, the start instruction receiving unit 624 may perform the following processing when the automatic start switch 1432 is operated. That is, for example, as shown in FIG. 21 , when the automatic start switch 1432 is operated and the bucket 133 is in the dump position (the bucket 133 is in a predetermined unloading position), the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start return swing control (second swing control). As shown in FIG. 23 , when the automatic start switch 1432 is operated and the bucket 133 is in the hoisting position (the bucket 133 is in a predetermined loading position), the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start loading swing control (first swing control). In this case, the swing mode can be set by the work machine 100 alone. An example of operation in this case is shown in FIGS. 20 and 22 . The dump position is a position in which a load in the bucket 133 is being discharged. The dump posture is a posture (dashed line DL in FIG. 21 ) in which the cutting edge 133T of the bucket 133 faces away from the work machine 100 rather than in a posture in which the cutting edge 133T of the bucket 133 points vertically, as shown, for example, in FIG. 21 . The hoarding posture is a posture in which a load is loaded into the bucket 133. The hoarding posture is a posture in which the cutting edge 133T of the bucket 133 faces closer to the work machine 100 rather than in a posture in which the cutting edge 133T of the bucket 133 points vertically, as shown, for example, in FIG. 23 . In this case, it is preferable that the cutting edge 133T points upward more than perpendicular to the vertical direction, as shown by dashed line DL in FIG. 23 . The posture of the bucket 133 may be corrected by the pitch angle of the work machine 100.

[0057] The process shown in Fig. 20 is started when the automatic start switch 1432 is operated. When the process shown in Fig. 20 is started, the start instruction receiving unit 624 acquires attitude information of the bucket 133 (step S401). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the dump attitude (step S402). If the bucket 133 is in the dump attitude (step S402: YES), the start instruction receiving unit 624 sets the swing mode to return swing (step S403) and ends the process shown in Fig. 20. If the bucket 133 is not in the dump attitude (step S402: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S404) and ends the process shown in Fig. 20.

[0058] The process shown in Fig. 22 is started when the automatic start switch 1432 is operated. When the process shown in Fig. 22 is started, the start instruction receiving unit 624 acquires posture information of the bucket 133 (step S501). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the hoisting posture (step S502). If the bucket 133 is in the hoisting posture (step S502: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S503) and ends the process shown in Fig. 22. If the bucket 133 is not in the hoisting posture (step S502: NO), the start instruction receiving unit 624 sets the swing mode to return swing (step S504) and ends the process shown in Fig. 22.

[0059] Furthermore, in the case where the automatic start switch 1432 is a single operation switch, the start instruction receiving unit 624 may perform the following processing when the automatic start switch 1432 is operated. That is, for example, as shown in FIG. 19 , when the automatic start switch 1432 is operated, the start instruction receiving unit 624 does not accept the operation of the automatic start switch 1432 if the bucket 133 is above the bed 202 or vessel 206 of the dump truck 200 (even if the bucket is within a predetermined range from the first target point) or if the bucket 133 is not in a dump position (if the bucket is not in a predetermined unloading position). When the automatic start switch 1432 is operated, the start instruction receiving unit 624 does not accept the operation of the automatic start switch 1432 if the bucket 133 is not above the bed 202 or vessel 206 of the dump truck 200 (even if the bucket is within a predetermined range from the first target point) or if the bucket 133 is not in a hoisting position (if the bucket is not in a predetermined loading position). An example of the operation in this case is shown in FIG. 24 .

[0060] The process shown in FIG. 24 is started when the automatic start switch 1432 is operated. When the process shown in FIG. 24 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S601) and acquires position and posture information of the bucket 133 (step S602). For example, the position of the bucket 133 is the position of the bucket pin 133P in the excavator coordinate system, and also includes the orientation of the swing unit 120. Next, the start instruction receiving unit 624 determines whether the bucket 133 is above the vessel 206 (step S603). If the bucket 133 is above the vessel 206 (step S603: YES), the start instruction receiving unit 624 determines whether the bucket 133 is in the dump position (step S604). If the bucket 133 is in the dump position (step S604: YES), the start instruction receiving unit 624 sets the swing mode to return swing (step S607) and ends the process shown in FIG. 24. If the bucket 133 is not in the dump posture (step S604: NO), the start instruction receiving unit 624 does not activate the automatic rotation (step S605), and notifies the display input device 143D that the position or posture of the bucket 133 is inappropriate by, for example, displaying a message or outputting a sound for a predetermined period of time (step S606), and ends the processing shown in Fig. 24. Note that step S601 does not necessarily have to be included.

[0061] If the bucket 133 is not above the vessel 206 (step S603: NO), the start instruction receiving unit 624 determines whether the bucket 133 is in the hoisting position (step S608). If the bucket 133 is in the hoisting position (step S608: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S609) and ends the processing shown in FIG. 24. If the bucket 133 is not in the hoisting position (step S608: NO), the start instruction receiving unit 624 does not activate automatic swing (step S610) and notifies the display input device 143D that the position or posture of the bucket 133 is inappropriate by, for example, displaying or outputting sound for a predetermined period of time (step S611), and ends the processing shown in FIG. 24. This configuration makes it possible to prevent automatic swing control from being executed when the position or posture of the bucket 133 is inappropriate. In the above example in which one operation switch is used as an automatic start switch, two automatic operations, loading swing control and return swing control, are executed. However, the operation switch may be used as an automatic start switch for two or more automatic operations. For example, the automatic operations may further include an excavation operation and an automatic earth-discharge operation. The type of automatic operation may be determined to be an excavation operation or an automatic earth-discharge operation based on the posture of the work implement 130, including the postures of the arm 132, boom 131, and other components of the work implement 130 other than the bucket 133, and the corresponding automatic operation may be started. Furthermore, the combination of automatic operations started by the switch is not limited to the above, and any combination of automatic operations, such as a combination of loading swing control and automatic earth-discharge, may be used.

[0062] Furthermore, when two switches are provided as the automatic start switches (for example, when a loading swing automatic start switch 1432 and a return swing automatic start switch 1433 are provided), the start instruction receiving unit 624 may be configured to receive operation of the loading swing automatic start switch 1432 or the return swing automatic start switch 1433 (the first operation unit or the second operation unit) as an instruction to start the loading swing control (first swing control) or the return swing control (second swing control) only when at least one of the position and attitude of the bucket 133 satisfies a predetermined condition (only when at least one of the position and attitude of the bucket satisfies a predetermined condition). For example, when one automatic start switch is provided on the left operation lever 143LO and the other automatic start switch is provided on the right operation lever 143RO, it is possible to prevent the automatic swing control from starting if the operator mistakenly operates the loading swing automatic start switch 1432 or the return swing automatic start switch 1433. Furthermore, when multiple automatic start switches are provided on one operating lever, it tends to be more difficult to operate the automatic driving switches, but even in this case, erroneous operation can be suppressed.

[0063] For example, when the return swing automatic start switch 1433 (second operation unit) is operated, the start instruction receiving unit 624 may accept the operation of the return swing automatic start switch 1433 as an instruction to start return swing control (second swing control) only when the bucket 133 is above the vessel 206 (only when the bucket is within a predetermined range from the first target point). When the loading swing automatic start switch 1432 (first operation unit) is operated, the start instruction receiving unit 624 may accept the operation of the loading swing automatic start switch 1432 as an instruction to start loading swing control (first swing control) only when the bucket 133 is not above the vessel 206 (only when the bucket is not within a predetermined range from the first target point). An example of operation in this case is shown in FIG. 25 .

[0064] The process shown in FIG. 25 is started when the loading swing automatic start switch 1432 is operated. When the process shown in FIG. 25 is started, the start instruction receiving unit 624 acquires position information of the vessel 206 (step S701) and acquires position information of the bucket 133 (step S702). For example, the position of the bucket 133 is the position of the bucket pin 133P in the excavator coordinate system, and also includes the orientation in which the swing unit 120 faces. Next, the start instruction receiving unit 624 determines whether the bucket 133 is above the vessel 206 (step S703). If the bucket 133 is above the vessel 206 (step S703: YES), the start instruction receiving unit 624 does not activate automatic swing (step S704) and notifies the display input device 143D that the position or attitude of the bucket 133 is inappropriate by, for example, displaying or outputting a sound for a predetermined period of time (step S705), and then ends the process shown in FIG. 25. If the bucket 133 is not above the vessel 206 (step S703: YES), the start instruction receiving unit 624 sets the swing mode to loading swing (step S706) and ends the processing shown in Fig. 25. Note that step S701 may not be included.

[0065] Furthermore, for example, when the loading swing automatic start switch 1432 (first operation unit) is operated, the start instruction receiving unit 624 may accept the operation of the loading swing automatic start switch 1432 as an instruction to start loading swing control (first swing control) only when the bucket 133 is in a hoarding position (the bucket is in a predetermined loading position). When the return swing automatic start switch 1433 (second operation unit) is operated, the start instruction receiving unit 624 may accept the operation of the return swing automatic start switch 1433 as an instruction to start return swing control (second swing control) only when the bucket 133 is in a dump position (the bucket is in a predetermined unloading position). An example of operation in this case is shown in FIG. 26 .

[0066] The process shown in FIG. 26 is started when the loading swing automatic start switch 1432 is operated. When the process shown in FIG. 26 is started, the start instruction receiving unit 624 acquires posture information of the bucket 133 (step S801). Next, the start instruction receiving unit 624 determines whether the bucket 133 is in the dump posture (step S802). If the bucket 133 is in the dump posture (step S802: YES), the start instruction receiving unit 624 does not activate automatic swing (step S803) and notifies the display input device 143D that the posture of the bucket 133 is inappropriate by, for example, displaying or outputting sound for a predetermined period of time (step S804), and then ends the process shown in FIG. 26. If the bucket 133 is not in the dump posture (step S802: NO), the start instruction receiving unit 624 sets the swing mode to loading swing (step S805), and ends the process shown in FIG. 26.

[0067] The manner in which the above-described plurality of start instruction receiving sections 624 operate may be selected arbitrarily by the operator, for example.

[0068] The operation command switching control unit 625 controls the operation command switching unit 64 to output from the operation command switching unit 64 either an operation command signal (manual) generated in response to an operation of the operator on the operation device 143 or an operation command signal (automatic) generated by the operation command signal generating unit 626. For example, when the operation command signal generating unit 626 generates and outputs an operation command signal (automatic), the operation command switching control unit 625 selects the operation command signal (automatic) and outputs it from the operation command switching unit 64.

[0069] The operation command signal generating unit 626 is one example configuration of a control unit according to the present disclosure. The operation command signal generating unit 626 (control unit) generates and outputs an operation command signal for performing loading swing control or return swing control in response to a predetermined instruction (for example, operation of the automatic start switch 1432). The operation command signal generating unit 626 controls the movement of the bucket 133 in the loading swing control and return swing control based on, for example, the interference avoidance point EVP.

[0070] In addition, the operation command signal generating unit 626 executes loading swing control when the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start loading swing control, and executes return swing control when the start instruction receiving unit 624 receives the operation of the automatic start switch 1432 as an instruction to start return swing control.

[0071] In addition, the operation command signal generating unit 626 executes loading turning control based on the loading turning target point TLP and the interference avoidance point EVP, and executes return turning control based on the return turning target point TRP and the interference avoidance vertical plane VS (interference avoidance plane) including the interference avoidance point EVP.

[0072] Furthermore, when the interference avoidance plane is an interference avoidance vertical plane VS that includes the rotation axis 120C that passes through the rotation center and the interference avoidance point EVP, the operation command signal generating unit 626 sets the height of the bucket pin 133P of the bucket 133 (the specified height of the bucket) to be equal to or greater than the height of the interference avoidance point EVP from the start of the return rotation control until the bucket pin 133P passes through the interference avoidance vertical plane VS.

[0073] In addition, the operation command signal generating unit 626 executes a combination of control of the attitude of the work implement 130 and control of the rotation of the rotating body 120 in one of the first and second areas bounded by the interference avoidance surface, and executes only control of the rotation of the rotating body 120 in the other area.

[0074] In addition, when the start instruction receiving unit 624 receives the operation of the loading rotation automatic start switch 1432 as an instruction to start loading rotation control, the operation command signal generating unit 626 executes loading rotation control, and when the start instruction receiving unit 624 receives the operation of the return rotation automatic start switch 1433 as an instruction to start return rotation control, the operation command signal generating unit 626 executes return rotation control.

[0075] FIG. 27 shows an example of the operation of the operation command signal generation unit 626. The operation shown in FIG. 27 is started when the automatic start switch 1432 is operated and the swing direction and swing mode are set. When the processing shown in FIG. 27 is started, the operation command signal generation unit 626 determines whether the swing mode is set to loading swing (step S901). If the swing mode is set to loading swing (step S901: YES), the operation command signal generation unit 626 executes swing control and work implement control in parallel in the set swing direction until the bucket pin 133P reaches the interference avoidance point EVP (step S902). After the bucket pin 133P passes the interference avoidance point EVP, the operation command signal generation unit 626 executes swing control alone until the bucket pin 133P reaches the loading swing target point TLP (step S903), and then ends the processing shown in FIG. 27.

[0076] If the swing mode is not set to loading swing (step S901: NO), the operation command signal generation unit 626 determines whether the start height is equal to or greater than the interference avoidance point height (step S904). If the start height is not equal to or greater than the interference avoidance point height (step S904: NO), the operation command signal generation unit 626 independently executes work implement control until the height of the bucket pin 133P reaches the interference avoidance point height (step S907). After step 907, or if the start height is equal to or greater than the interference avoidance point height (step S904: YES), the operation command signal generation unit 626 independently executes swing control in the set swing direction until the bucket pin 133P reaches the interference avoidance vertical plane (VS) (step S905). After the bucket pin 133P passes the interference avoidance point EVP, the operation command signal generation unit 626 executes swing control and work implement control in parallel until the bucket pin 133P reaches the return swing target point TRP (return swing target posture) (step S906), and then ends the processing shown in FIG. 27 .

[0077] As described above, in this embodiment, the control device 61 is a control device for a work machine 100 that includes a revolving unit 120 that revolves around a revolving center and a work implement 130 that has a bucket 133 as a work implement and is attached to the revolving unit 120. When an instruction signal related to an automatic operation including the work implement 130 is input from a switch that is an operation unit, the control device 61 determines which of multiple automatic operations can be performed based on information about the bucket 133 (work implement), and executes the automatic operation determined to be executable. Note that the multiple automatic operations are, for example, automatic operations that include combined operations of the work implement 130 and the revolving unit 120. The combined operation is, for example, a loading swing or a return swing. Furthermore, the information related to the bucket 133 is, for example, information that represents the position or attitude of the bucket 133. Furthermore, determining which automatic operations can be performed is, for example, determining whether the bucket 133 is located above the vessel of the transport vehicle. Furthermore, the determination of the automatic operation that can be performed is, for example, a determination of whether the position of the bucket 133 is either the dump position or the hoarding position.

[0078] (Actions and Effects) There are limitations on the number of switches that can be arranged in a space that is used by an operator. However, according to this embodiment, the number of operation switches that output signals instructing the start of an automatic driving operation can be made smaller than the number of automatic driving operations. Therefore, according to this embodiment, space can be used effectively. Furthermore, during automatic turning control, erroneous operation of operation switches by the operator can be suppressed, improving usability.

[0079] Although the embodiments of the present invention have been described above with reference to the drawings, the specific configuration is not limited to the above-described embodiments and includes design modifications within the scope of the present invention. For example, a remote control system may be used in which the operating device 143 and part of the configuration of the control device 61 are installed in a remote location, and an operator at the remote location controls the work machine 130 and the revolving body 120 via wireless communication while viewing a monitor screen. Furthermore, part or all of the programs executed by the computer in the above-described embodiments may be distributed via a computer-readable recording medium or a communication line.

[0080] [Additional Notes] The control device 61 described in the embodiment can be understood as follows.

[0081] (1) A control device according to a first aspect of the present disclosure is a control device for a work machine that includes a rotating body that rotates around a rotation center and a work implement that has a work tool and is attached to the rotating body. When an instruction signal related to an automatic operation including the work implement is input from an operating unit, the control device determines which of multiple automatic operations is executable based on information related to the work tool, and executes the automatic operation that is determined to be executable.

[0082] (2) A control device according to a second aspect of the present disclosure is the control device of (1), in which the operation unit is one.

[0083] (3) A control device according to a third aspect of the present disclosure is the control device of (1) or (2), in which the operating unit is provided on an operating lever provided on the work machine.

[0084] (4) A control device according to a fourth aspect of the present disclosure is a control device according to (1) to (3), wherein the plurality of automatic operations are automatic operations including combined operations of the work machine and the rotating body.

[0085] (5) A control device according to a fifth aspect of the present disclosure is the control device of (1) to (4), wherein the combined operation is a loading swing or a return swing.

[0086] (6) A control device according to a sixth aspect of the present disclosure is the control device of (1) to (5), wherein the information about the work implement is information representing the position or posture of the work implement.

[0087] (7) A control device according to a seventh aspect of the present disclosure is a control device according to any one of (1) to (6), wherein the determination of the executable automatic operation is a determination of whether the work tool is located above a vessel of a transport vehicle.

[0088] (8) A control device according to a seventh aspect of the present disclosure is a control device according to any one of (1) to (6), in which the determination of the executable automatic operation is made by determining whether the posture of the implement is either a dump posture or a hoist posture.

[0089] The control device, control method, and work machine disclosed herein can improve usability.

[0090] 100...working machine, 110...traveling body, 120...swinging body, 130...working machine, 133...bucket, 140...operator's cab, 143D...display input device, 60...control system, 61...control device, 622...reference point setting unit, 623...swing direction setting unit, 624...start instruction receiving unit, 626...operation command signal generating unit (control unit)

Claims

1. A control device for a work machine having a rotating body that rotates around a rotation center and a work machine having a work implement attached to the rotating body, which, when an instruction signal related to an automatic operation including the work implement output from an operating unit is input, determines which of a plurality of automatic operations is executable based on information related to the work implement, and executes the automatic operation determined to be executable.

2. The control device according to claim 1, wherein the operation unit is one.

3. The control device according to claim 2, wherein the operating section is provided on an operating lever equipped on the work machine.

4. The control device according to claim 1, wherein the plurality of automatic operations include a combined operation of the work machine and the rotating body.

5. The control device according to claim 4, wherein the combined operation is a loading turn or a return turn.

6. The control device according to claim 1, wherein the information relating to the work implement is information representing a position or a posture of the work implement.

7. The control device according to any one of claims 1 to 6, wherein the determination of the executable automatic operation is a determination of whether or not the work tool is located above a vessel of a transport vehicle.

8. A control device as claimed in any one of claims 1 to 6, wherein said determination of the executable automatic operation is a determination of whether or not the posture of said implement is either a dump posture or a hoisting posture.

9. A control method for a work machine having a rotating body that rotates around a rotation center and a work machine having a work implement attached to the rotating body, the control method including the step of, when an instruction signal related to an automatic operation including the work implement output from an operating unit is input, determining which of a plurality of automatic operations is executable based on information related to the work implement, and executing the automatic operation determined to be executable.

10. A work machine comprising: a rotating body that rotates around a rotation center; a work machine having a work implement and attached to the rotating body; and a control device that controls the rotating body and the work implement, wherein when an instruction signal related to an automatic operation including the work implement output from an operating unit is input, the control device determines which of a plurality of automatic operations is executable based on information related to the work implement, and executes the automatic operation determined to be executable.

Citation Information

Patent Citations

  • Automatic control device for hydraulic shovel

    JP1997256407A

  • Control device and control method for loading machine

    JP2020041352A