System, battery charge management unit and methods in underground environment

The method and system optimize battery charging in underground mining by determining a drive plan based on operational and spatial factors, addressing the challenges of high costs and space limitations, thereby enhancing operational efficiency and productivity.

WO2024205460A1PCT designated stage expired Publication Date: 2024-10-03EPIROC ROCK DRILLS AB
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/SE2023/050291
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

In underground mining environments, managing the charging of electrically powered machines is challenging due to high investment costs for charging infrastructure and limited space, which can lead to queuing and reduced operational efficiency.

Method used

A method and system that determine a drive plan for battery-operated machines based on operational plans, spatial arrangements, and machine characteristics to optimize charging times and routes, avoiding queuing and minimizing waiting times by prioritizing charging and adapting routes to available chargers.

Benefits of technology

This approach improves operational efficiency and productivity by efficiently managing battery charging, reducing waiting times, and allowing continuous operations in confined underground environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SE2023050291_03102024_PF_FP_ABST
    Figure SE2023050291_03102024_PF_FP_ABST
Patent Text Reader

Abstract

A method for managing charging of one or more battery operated machines operating in an underground environment is provided. Each battery operated machines comprises at least one battery providing electrical power to the battery operated machine. An operation plan indicating at least one time and / or order for when each respective battery operated machine (21a-d) is expected to perform at least one respective action is obtained (202). The operation plan further indicates an expected position of each respective battery operated machine during a time period of the operation plan. Respective characteristics of the one or more battery operated machines are obtained (204). The respective characteristics indicates one or more out of: Dimensions of the respective battery operated machine, battery capacity of the respective battery operated machine, and expected power consumption of the respective battery operated machine. Based on the operation plan, the one or more characteristics, and a spatial arrangement of the underground environment (1), a drive plan is determined (205). The drive plan indicates at least one time and / or order for when the respective battery operated machines is to charge via the one or more battery chargers.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] SYSTEM, BATTERY CHARGE MANAGEMENT UNIT AND METHODS IN UNDERGROUND ENVIRONMENT.

[0002] TECHNICAL FIELD

[0003] Embodiments herein relate to a method, system and an arrangement for handling operations in an underground mining environment.

[0004] BACKGROUND

[0005] In mining and tunneling, there is a constant ongoing process of improving efficiency, productivity and safety. Examples of changes and / or improvements that are carried out to an increasing extent, especially in mining, is the automation, fully or partly, of various processes occurring in mining. Methods for localization, mapping, control and motion planning have enabled development and deployment of fully or partly autonomous vehicles and / or mobile machines, hereinafter denoted as machines. Further, a transition to electrically powered machines is ongoing. This is an important step to reduce emissions of e.g., carbon dioxide. Further, with electrically powered machines, exhaust fumes decrease in the mines and tunnels. This may lead to an improved work environment and lower ventilation requirements.

[0006] Electrically powered machines introduce new requirements for charging infrastructure and electrical capacity, especially in underground environments. Further, tunnels have limitations, such as dimensions. It may be difficult, sometimes even impossible, for machines to pass each other.

[0007] Consequently, there is a need for improvements in handling the charging of electrically powered machines in an underground environment.

[0008] SUMMARY

[0009] As part of developing embodiments herein a problem has been identified and will first be discussed.

[0010] A problem in underground environments relates to managing the charging of electrically powered machines. More specifically, managing charging of energy sources, such as batteries, comprised in the electrically powered machines. To able to charge electrically powered machines in an underground, or underground-like, environment, investments in charging infrastructure as well as electrical transmission capacity is needed, which may incur high costs. Further, machines operating in an underground environment are generally large machines, and the space is limited by e.g., tunnel dimensions. It may be impossible for two machines pass each other, which may stop a machine from traveling to a charging station or create queues along the paths. One solution would e.g., be to increase, at least at some locations, the dimensions of the paths to allow two machines to pass each other. Another would be to increase the number of charging stations and electrical transmission capacity. However, this would incur high investments costs, and further it does not solve the problem of allowing electrically powered machines to charge its batteries while not affecting the operational efficiency and productivity in the underground environment.

[0011] An object of embodiments herein is to provide a mechanism that improves the charging management of battery operated machines and increases the operational efficiency in a delimited environment, such as an underground environment. The object is achieved by the independent claims.

[0012] According to a first aspect, a method performed by a system for managing charging of one or more battery operated machines operating in an underground environment is provided. Each battery operated machines comprises at least one battery providing electrical power to the battery operated machine.

[0013] An operation plan is obtained. The operational plan indicates at least one time and / or order for when each respective battery operated machine is expected to perform at least one respective action. The operation plan further indicating an expected position of each respective battery operated machine during a time period of the operation plan.

[0014] Respective characteristics of the one or more battery operated machines is obtained. The respective characteristics indicates one or more out of: Dimensions of the respective battery operated machine, battery capacity of the respective battery operated machine, and expected power consumption of the respective battery operated machine.

[0015] Based on the operation plan, the one or more characteristics, and a spatial arrangement of the underground environment, a drive plan is determined. The drive plan indicates at least one time and / or order for when the respective battery operated machines is to charge via the one or more battery chargers. According to an exemplary embodiment, the expected power consumption may comprise the expected power consumption during a predetermined cycle of operation. As explained further in the description, the predetermined cycle of operation may e.g., comprise the cycle of operation a respective battery operated mining machine is currently performing, or is about to start. This may allow a more accurate drive plan to be determined, e.g., since the expected power consumption during the cycle of operation may be taken into account during the determination.

[0016] According to an exemplary embodiment, obtaining the expected power consumption may comprise estimating the expected power consumption. The expected power consumption may be estimated based on a respective actual power consumption of one or more previously performed predetermined cycles of operation. This may allow a more accurate drive plan to be determined, e.g., since the expected power consumption may be more accurately estimated when based on historical data.

[0017] According to an exemplary embodiment, determining the drive plan may comprise generating a respective charge model for the one or more battery operated machines. The respective charge model may schedule a battery charger, a charging power and a charging time for the respective one or more battery operated machines. As explained further in the description, the time for charging may e.g., comprise a time instant the charging is to be performed. Alternatively, or additionally, the for charging may e.g., how long the charging is to be performed, i.e. , the length of time the charging is to be performed. By this, the operational efficiency may be increased, since the charging of the one or more battery operated machines is efficiently managed by using a charge model that schedules charging of the one or more battery operated machines.

[0018] According to an exemplary embodiment, determining the drive plan may further comprise adapting a route of a predetermined cycle of operation based on the respective charge model for the one or more battery operated machines. This may allow an increased operational efficiency, e.g., since an adapted route may allow a battery operated machine to reach an available charger or bypass an occupied charger, and thus avoid queueing and minimize the waiting time.

[0019] According to an exemplary embodiment, determining the drive plan may comprise prioritizing the charging of the one or more battery operated machines. As explained further in the description, the prioritization may e.g., be based on current charged level, battery capacity, type of battery operated machine and / or cycle of operation currently performed. By this, the drive plan may be more optimally determined to efficiently manage charging of the one or more battery operated machines. E.g., a battery operated machine performing a cycle of operation that comprise leaving the underground environment may be assigned a lower priority than a battery operated machine that does not leave the underground environment. This since it may be possible to charge outside the underground environment where it may be easier to deploy several more battery chargers and where the spatial limitations of the underground, or delimited, environment does not apply.

[0020] According to an exemplary embodiment, the spatial arrangement of the underground environment may indicate the location of one or more charging stations and / or dimensions of passages in the underground environment. As explained further in the description, the dimensions of passage in underground environment and / or the location of the one or more battery chargers may be taken into account when determining the drive plan, which may result in an increased operational efficiency since the charging may be efficiently managed.

[0021] According to an exemplary embodiment, the method may further comprise providing the determined drive plan to the one or more battery operated machines. By this, the one or more battery operated machines may be made aware, and operated according to, the determined drive plan.

[0022] According to an exemplary embodiment, obtaining the operation plan may further comprise obtaining a current location and charge level of the one or more battery operated machines. According to some examples, the method may further comprise update the operation plan based on the obtained current location of the one or more battery operated mining machines. The drive plan may further be determined based on the current charge level of the one or more battery operated mining machines. By updating the operation plan based on the current location, a more accurate operation plan is achieved since the current location is used. Further, by taking a current charge level of the one or more battery, and in some examples the updated drive plan, into account when determining the drive plan, an increased operational efficiency may be achieved since a more accurate drive plan may be determined.

[0023] According to an exemplary embodiment, charging the one or more battery operated machines may comprise charging the at least one battery comprised in the one or more battery operated machines. The charging may be performed according to the determined drive plan.

[0024] According to a second aspect, a system for charge management of one or more battery operated machines adapted to operate in an underground environment is provided. Each battery operated machines is adapted to comprise at least one battery providing electrical power to the battery operated machine. The system comprises the one or more battery operated machines, at least one a battery charge management unit configured to determine a drive plan to manage charging of the one or more battery operated machines, and one or more battery chargers arranged to charge the one or more battery operated machines.

[0025] An operation plan adapted to indicate at least one time and / or order for when each respective battery operated machine is expected to perform at least one respective action is obtained. The operation plan is further adapted to indicate an expected position of each respective battery operated machine during a time period of the operation plan.

[0026] Respective characteristics of the one or more battery operated machines is obtained. The respective characteristics are adapted to indicate one or more out of: Dimensions of the respective battery operated machine, battery capacity of the respective battery operated machine, and expected power consumption of the respective battery operated machine.

[0027] Based on the operation plan, the one or more characteristics, and a spatial arrangement of the underground environment, drive plan is determined. The drive plan is adapted to indicate at least one time and / or order for when the one or more battery operated machines is to charge via the one or more battery chargers.

[0028] According to a third aspect a battery charge management unit configured to manage charging of one or more battery operated machines adapted to operate in an underground environment is provided. Each battery operated machine is adapted to comprise at least one battery providing electrical power to the battery operated machine.

[0029] The battery charge management unit obtains an operation plan adapted to indicate at least one time and / or order for when each respective battery operated machine is expected to perform at least one respective action. The operation plan is further adapted to indicate an expected position of each respective battery operated machine during a time period of the operation plan.

[0030] The battery charge management unit obtains respective characteristics of the one or more battery operated machines. The respective characteristics are adapted to indicate one or more out of: Dimensions of the respective battery operated machine, battery capacity of the respective battery operated machine, and expected power consumption of the respective battery operated machine.

[0031] Based on the operation plan, the one or more characteristics, and a spatial arrangement of the underground environment, the battery charge management unit determines a drive plan adapted to indicate at least one time and / or order for when the one or more battery operated machines is to charge via the one or more battery chargers.

[0032] According to a fourth aspect, it is furthermore provided herein a computer program comprising instructions, which, when executed on at least one processor, cause the at least one processor to carry out the method above.

[0033] According to a fifth aspect, the battery operated machines may operate in a delimited environment using methods and systems described herein for an underground environment. These described methods may be used for machines operating in a delimited environment as well.

[0034] Embodiments herein may bring the advantage of improved charging management of battery operated machines operating in an underground, or delimited, environment. This may be achieved by, as mentioned above, determine a drive plan that indicates at least one time and / or order for when the battery operated machines is to charge. The drive plan may e.g., be determined based on an operational plan, a spatial arrangement of the underground, or delimited, environment and respective characteristics of the battery operated machines. This leads to an improved charging management of the battery operated machines, since by determining the drive plan, it is possible efficiently manage the charging of the battery operated machines. This is achieved by basing the drive plan on the operational plan, the spatial arrangement and the respective characteristics of the battery operated machines.

[0035] Further, embodiments herein may bring the advantage of an improved operational efficiency in the underground, or delimited, environment. This since by determining the drive plan, it is possible to minimize waiting time for the one or more battery operated machines, e.g., by avoiding queuing at battery chargers.

[0036] BRIEF DESCRIPTIONS OF DRAWINGS

[0037] Examples of embodiments herein are described in more detail with reference to attached drawings in which:

[0038] Figures 1a shows a system according to embodiments herein.

[0039] Figures 1b to 1d disclose examples of an underground environment according to embodiments herein.

[0040] Figure 2 shows a flowchart depicting embodiments of a method according to embodiments herein. Figures 3a to 3b shows schematic block diagrams illustrating embodiments of a central unit.

[0041] DETAILED DESCRIPTION

[0042] An object of embodiments herein is to provide mechanisms that increase the operational efficiency and productivity in a delimited environment, such as an underground environment, e.g., by an improved mechanism for charging management of battery operated machines.

[0043] Embodiments herein may bring the advantage of an increased operational efficiency in the underground environment. This may be achieved determining a drive plan that e.g., indicates at least one time and / or order for when the respective battery operated machines is to charge via the one or more battery chargers. Further, embodiments herein may bring the advantage of increased operational efficiency in the underground environment by e.g., route adaptation, charging prioritization and / or avoiding queuing at battery chargers, thus allowing continuous operations in the underground environment where impact of charging the one or more battery operated machines is minimized.

[0044] Fig. 1a shows a schematic illustration of a system 100 comprising one or more battery operated machines 21a-d and one or more battery chargers 102a-d. The system may further comprise a battery charge management unit 101. Methods according to embodiments herein may be performed by the system 100 and / or the battery charge management unit 101.

[0045] Fig. 1b shows an illustration of an underground environment 1. One or more battery operated machines, such as the one or more battery operated machines 21a-d, may operate in the underground environment 1. The one or more battery operated machines 21a-d may be associated with one or more respective characteristics. The one or more characteristics describes certain aspects of the battery operated machine, such as e.g., dimensions, battery capacity and / or expected power consumption. In some examples herein the expected power consumption is related to a cycle of operation, e.g., a predetermined cycle of operation. The underground may further comprise one or more battery chargers, such as the one or more battery chargers 102a-d. The one or more battery chargers 102a-d, which may also be referred to as charging stations or battery charging stations, may be located throughout the underground environment 1 , allowing the one or more battery operated machines 21a-d to charge their respective battery 22a- d, or batteries, comprised onboard the one or more machines 21a-d. Fig. 1b further shows the battery charge management unit 101 , e.g., for managing charging of the one or more battery operated machines 21a-d. The battery charge management unit 101 may be located in the underground environment 1 , or it may be located outside of the underground environment 1 , e.g., in a server or a cloud device. In some examples, the underground environment 1 may comprise several, such as one or more, battery charge management units 101. Thus, the battery charge management unit 101 may in some examples be referred to as a distributed charge management unit 101 , comprising several battery charge management units 10T (not shown) operating together to manage charging of the one or more battery operated machines 21a-d. The battery charge management units 101 may be able to communicate with the one or more battery operated machines 21a-d, and other nodes, servers and / or units located in or outside the underground environment 1. To manage the operation of the one or more battery operated machines 21a-d, an operation plan may at some point have been generated. The operation plan may e.g., indicate at least one time and / or order for when each respective battery operated machine 21a-d is expected to perform at least one respective action. The operation plan may further indicate an expected position of each respective battery operated machine 21a-d during a time period of the operation plan. Thus, the battery charge management unit 101 may obtain the operation plan for use in managing the charging of the one or more battery operated machines 21a-d. The underground environment 1 depicted in Fig. 1 may be represented by a spatial arrangement of said underground environment 1. The spatial arrangement may e.g., indicate the location of the one or more battery chargers 102a-b, and / or dimensions of passages in the underground environment 1.

[0046] According to examples of embodiments herein, a drive plan may be determined. The drive plan may indicate at least a time and / or order for when the respective one or more battery operated machines 21a-d is to charge, e.g., via the one or more battery chargers 102a-b. The drive plan may e.g., be determined based on the operation plan, the spatial arrangement of the underground environment 1 and the respective characteristics of the one or more battery operated machines 21a-d.

[0047] Embodiments herein may bring the advantage of an increased operational efficiency in an underground environment. This may result in an increased productivity in the underground environment, since e.g., battery operated machines operating in the underground environment may be efficiently operated by managing the charging of the battery operating machines based on e.g., an operation plan, spatial arrangement of the underground environment and / or one or more respective characteristics of the battery operated machines.

[0048] Fig. 1c shows an example according to embodiments herein. As mentioned above, the drive plan may indicate a time and / or order for when to charge a battery operated machine. According to this example, the drive plan indicates the battery operated machine 21b to charge at the battery charger 102b. Since the battery operated machine 21a in this example and according to the drive plan is currently charging at the battery charger 102a, the drive plan in in this examples indicates to the battery operated machine 21b to use the battery charger 102b.

[0049] Fig. 1d shows another example according to embodiments herein. According to this example, the drive plan indicates the battery operated machine 21a to charge at the battery charger 102a and the battery operated machine 21b to charge at battery charger 102b. According to the spatial arrangement of the underground environment 1 , the battery operated machine 21b will not be able to drive past the battery operated machine 21a. Thus, the drive plan in this example indicates an adapted route for the battery operated machine 21b to reach the battery charger 102b.

[0050] Fig. 2 shows an example embodiment of a method performed by the system 100 for managing charging of one or more battery operated machines 21a-d. the one or more battery operated machines 21a-d operates in a delimited environment, such as the underground environment 1. Each battery operated machines 21a-d comprises at least one battery 22a-d provides electrical power to the respective one or more battery operated machine 21a-d. The actions described below may e.g., be performed by one or more battery charge management units 101 comprised in the system 100. As described above, the charge management unit 101 be a distributed charge management unit, comprising one or distributed charge management units 10T. The method comprises the following actions, which may be taken in any suitable order. Optional actions are referred to as dashed boxes in Fig. 2.

[0051] Action 201 In some embodiments, a respective actual power consumption for the one or more battery operated machines 21a-d is obtained for each performed cycle of operation. An actual power consumption when used herein, may e.g., mean the amount of power, e.g., electrical power, used by the respective one or more battery operated machines 21a-d. the actual power consumption may thus differ from an expected or estimated power consumption.

[0052] Action 202

[0053] An operation plan indicating at least one time and / or order for when each respective battery operated machine 21a-d is expected to perform at least one respective action is obtained. The operation plan further indicates an expected position of each respective battery operated machine 21a-d during a time period of the operation plan. The operation plan allows efficient determination of the drive plan indicating at least one time and / or order for when the respective battery operated machines 21a-d is to charge via the one or more battery chargers 102a-b.

[0054] In some embodiments, obtaining the operation plan further comprises obtaining a current location and charge level of the one or more battery operated machines. The current location and charge level may e.g., be used for updating the operation plan and / or determining the drive plan.

[0055] Action 203

[0056] In some embodiments, the operation plan is updated based on the obtained current location of the one or more battery operated mining machines 21a-d. This may e.g., comprise updating the expected position based on the obtained current location of the one or more battery operated machines 21a-d. Updating the expected position may comprise estimating an updated expected position. Alternatively, or additionally, updating the operation plan may in some examples comprise estimating an updated time for when each respective battery operated machine 21a-d is expected to perform the at least one respective action. By updating the operation plan, the drive plan may be more accurately determined. Determining the drive plan is explained in more details below.

[0057] Action 204

[0058] Respective characteristics of the one or more battery operated machines (21a-d) is obtained. The respective indications indicates one or more out of:

[0059] - dimensions of the respective battery operated machine 21 a-d,

[0060] - battery capacity of the respective battery operated machine 21 a-d, and

[0061] - expected power consumption of the respective battery operated machine 21 a-d. Dimension of a battery operated mining machine may e.g., comprise length, height, width and / or weight of the battery operated mining machine. Battery capacity of a battery operated mining machine may e.g., refer to the storage capacity of the one or more batteries comprised in the battery operated mining machine. This may e.g., may measured in kilo watt hours (kWh). In some examples, the respective characteristics may further comprise a current charge level of the one or more battery operated mining machines 21a-d, such as the charge level of the one or more batteries 22a-d comprised in the one or more battery operated machines 21a-d. In other words, the characteristic of a battery operated machine, such as one of the battery operated machines 21a-d, may further comprise the current charge level of the one or more batteries comprised in the battery operated machine. The current charge level may e.g., be expressed as a percentage of the total battery capacity. Alternatively, or additionally, the current charge level may be expressed explicitly, e.g., by the amount of kWh currently in the one or more batteries.

[0062] In some embodiments, the expected power consumption comprises the expected power consumption during a predetermined cycle of operation. The predetermined cycle of operation may e.g., comprise the cycle of operation a respective battery operated mining machine is currently performing, or is about to start. A cycle of operation may comprise one or more sub steps, or sub parts. This may e.g., mean that the cycle of operation may be divided into one or more sub steps, or sub parts, that when combined describes the cycle of operations. In some examples, the expected power consumption may be based on the expected power consumption of the one or more sub steps. This may e.g., mean that the expected power consumption may comprise the expected power consumption of the one or more sub parts added together. This may allow for variations in the cycle of operation, such as when e.g., digging further into the rock, it may be necessary to drive a bit further with the excavated material. The further length of driving may be treated as a sub step of a cycle of operation. By dividing the cycle of operation into sub steps, the cycle will only have to be updated with a new sub step, such as the further length of driving due the further digging into the rock, when the cycle operation changes. This allows for an efficient and adaptable handling of operating cycles. The cycle of operation may comprise any number of suitable sub steps, such as e.g., driving up or down a ramp and tramming along path between intersections.

[0063] In some embodiments, obtaining the expected power consumption comprises estimating the expected power consumption based on a respective actual power consumption of one or more previously performed predetermined cycles of operation. The respective actual power consumption may e.g., be the actual power consumption obtained as described above in Action 201. In some examples, the expected power consumption is estimated based on the respective actual power consumption of the one or more sub steps, or sub parts, of the predetermined cycle of operation. This allows for a more flexible estimation of the expected power consumption. This since a cycle of operation may change, e.g., due to changes in the underground environment 1, and the cycle of operation may easily be updated by adding a further sub step, or sub part, instead of creating a new cycle of operation.

[0064] Action 205

[0065] Based on the operation plan, the one or more characteristics, and a spatial arrangement of the underground environment 1, a drive plan is determined. The drive plan indicates at least one time and / or order for when the respective battery operated machines 21a-d is to charge via the one or more battery chargers 102a-b. The time for charging may e.g., comprise a time instant the charging is to be performed, alternatively, or additionally, the for charging may e.g., how long the charging is to be performed, i.e. , the length of time the charging is to be performed.

[0066] In some embodiments, determining the drive plan comprises generating a respective charge model for the one or more battery operated machines 21a-d. The respective charge model schedules a battery charger 102a-b, a charging power and a charging time for the respective one or more battery operated machines 21a-d. The charging power may e.g., indicate in kW. The charging time may, e.g., comprise how long time the battery operated machine should be charged and / or a time instant the charging is scheduled. In other words, the charge model indicates which battery charger 102a-b to use, the charging power the charge with, and at least one of how long time to charge and when to charge the battery operated machine.

[0067] In some embodiments, wherein determining the drive plan further comprises adapting a route of a predetermined cycle of operation based on the respective charge model for the one or more battery operated machines 21a-d. In some example, adapting a route may comprise changing the route, e.g., to reach a battery charger 102a-b. The battery charger 102a-b may e.g., be the battery charger 102a-b scheduled in the charged model. Alternatively, or additionally, adapting the charge model may comprise changing the route to bypass a battery charger 102a-b. This may be for minimizing waiting time e.g., when another battery operated machine 21a-d is scheduled to use the battery charger 102a-b that is to be bypassed, and driving past the charging other battery operated machine 21a-d is not possible due to e.g., spatial restrictions in the underground environment 1.

[0068] In some situations, it may be preferrable to prioritize charging of certain battery operated machines operating in the underground environment 1. Therefore, determining the drive plan may comprise prioritizing the charging of the one or more battery operated machines 21a-d. The prioritization may e.g., be based on current charged level, battery capacity, type of battery operated machine and / or cycle of operation currently performed. As an example, a battery operated machine 21a-d performing a cycle of operation that comprise leaving the underground environment 1 may be assigned a lower priority than a battery operated machine 21a-b that does not leave the underground environment 1. This may e.g., be since for the battery operated machine 21a-d that will leave the underground environment 1 , it may be possible to charge outside the underground environment 1 where it may be easier to deploy several more battery chargers and where the spatial limitations of the underground environment 1 does not apply.

[0069] The spatial arrangement of the underground environment 1 may indicate the location of one or more battery chargers 102a-b and dimensions of passages in the underground environment 1. Thus, when determining the drive plan, the dimensions of passage in underground environment 1 and the location of the one or more battery chargers 102a-b may be taken into account. In some examples the spatial arrangement may comprise a map, e.g., indicating the location of one or more charging stations and dimensions of passages in the underground environment 1.

[0070] In some embodiments, the drive plan is further determined based on the current charge level of the one or more battery operated mining machines 21a-d. This may mean that the current charge level is taken into account when the drive plan is determined. E.g., the current charge level of a battery operated machine may impact the time and / or order for when the battery operated machine is to charge. As mentioned above, the respective characteristics may comprise the current charge level of the one or more battery operated mining machines 21a-d, such as the charge level of the one or more batteries 22a-d comprised in the one or more battery operated machines 21a-d. In some examples, the current charge level is not comprised in the respective characteristics, but is instead obtained separately from the respective characteristics. The current charge level may e.g., be obtained, such as received, directly from the one or more battery operated machines 21a-d.

[0071] Action 206 In some embodiments, the determined drive plan is provided to the one or more battery operated machines 21a-d. This may e.g., comprise sending the drive plan to the one or more battery operated machines 21a-d. The drive plan may be sent, or provided, to the one or more battery operated machines 21a-d using wireless communication, such as e.g., WiFi, Bluetooth, cellular communication, e.g., GSM, WCDMA, LTE, 5G, or any other suitable wireless communication technology. The one or more battery operated machines 21a-d obtaining, or receiving, the drive plan may operate according to the drive plan. This may e.g., mean charge the battery operated machine according the time and / or order comprised in the drive plan.

[0072] In some embodiments, charging the one or more battery operated machines 21a-d comprises charging the at least one battery comprised in the one or more battery operated machines 21a-d, e.g., according to the determined drive plan.

[0073] Fig. 3a disclose an example configuration of the battery charge management unit 101 configured to manage charging of the one or more battery operated machines 21a-d adapted to operate in an underground environment 1. Each battery operated machine 21a-d is adapted to comprise at least one battery 22a-d providing electrical power to the battery operated machine 21a-d. The battery charge management unit 101 may be located in the underground environment 1. Alternatively, it may be located outside the underground environment 30, e.g., in a cloud service.

[0074] The battery charge management unit 101 may comprise an input and output interface 300 configured to communicate with, e.g., the one or more battery operated machines 21a-b and other nodes, servers and / or units located in or outside the underground environment 1.

[0075] Fig. 3b also discloses an example configuration of processing circuitry for a battery charge management unit, e.g., the processing circuitry 350 disclosed in Fig. 3a. The processing circuitry may comprise a obtaining unit 310, a determining unit 320, an updating unit 330 and a providing unit 330 configured to perform the methods above.

[0076] The embodiments herein may be implemented through the processing circuitry 350 in the battery charge management unit 101 depicted in Figure 3a, together with respective computer program code for performing the functions and actions of the embodiments herein. The processing circuitry 350 may comprise one or more processors and one or more memory units. The memory units may be the memory 360. The program code mentioned above may also be provided as a computer program product, for instance in the form of a data carrier carrying computer program code for performing the embodiments herein when being loaded into the battery charge management unit 101. One such carrier may be in the form of a CD ROM disc, a USB flash drive, and / or an Over-the-Air (OTA) carrier. It is however feasible with other data carriers such as a memory stick. The computer program code may furthermore be provided as pure program code on a server and downloaded to the battery charge management unit 101.

[0077] The memory 360 of the battery charge management unit 101 may further comprise one or more memory units. The memory 360 is configured to store instructions executable by the processing circuitry 350. The memory 360 is arranged to be used to store e.g. information, messages, indications, configurations, thresholds, drive plans, charge models, characteristics, locations, positions, spatial arrangements, operation plans, and applications to perform the methods herein when being executed in executed in the battery charge management unit 101.

[0078] The battery charge management unit 101 is configured to manage charging of one or more battery operated machines 21a-d adapted to operate in an underground environment I .Each battery operated machine 21a-d is adapted to comprise at least one battery 22a-d providing electrical power to the battery operated machine 21a-d. The battery charge management unit further being configured to obtain an operation plan adapted to indicate at least one time and / or order for when each respective battery operated machine 21a-d is expected to perform at least one respective action. The operation plan is further adapted to indicate an expected position of each respective battery operated machine 21a-d during a time period of the operation plan.

[0079] The battery charge management unit 101 obtains respective characteristics of the one or more battery operated machines 21a-d. The respective characteristics are adapted to indicate one or more out of: dimensions of the respective battery operated machine 21 a-d, battery capacity of the respective battery operated machine 21a-d, and expected power consumption of the respective battery operated machine 21 a-d.

[0080] Based on the operation plan, the one or more characteristics, and a spatial arrangement of the underground environment 1, the battery charge management unit 101 determines a drive plan adapted to indicate at least one time and / or order for when the one or more battery operated machines 21 a-d is to charge via the one or more battery chargers 102a-b.

[0081] In some embodiments, a computer program 370 comprises instructions, which when executed by the processing circuitry 350, e.g., of the respective at least one processor of the processing circuitry 350, cause the processing circuitry 350 of the battery charge management unit 101 to perform the actions above.

[0082] In some embodiments, a respective carrier 380 comprises the respective computer program 370, wherein the carrier 380 is one of an electronic signal, an optical signal, an electromagnetic signal, a magnetic signal, an electric signal, a radio signal, a microwave signal, or a computer-readable storage medium.

[0083] Those skilled in the art will appreciate that the units in the battery charge management unit 101 described above may refer to a combination of analogue and digital circuits, and / or one or more processors configured with software and / or firmware, e.g., stored in the battery charge management unit 101, that when executed by the respective one or more processors such as the processors described above. One or more of these processors, as well as the other digital hardware, may be included in a single Application- Specific Integrated Circuitry (ASIC), or several processors and various digital hardware may be distributed among several separate components, whether individually packaged or assembled into a system-on-a-chip (SoC).

[0084] It will be appreciated that the foregoing description and the accompanying drawings represent non-limiting examples of the methods and apparatus taught herein. As such, the apparatus and techniques taught herein are not limited by the foregoing description and accompanying drawings. Instead, the embodiments herein are limited only by the following claims and their legal equivalents.

Claims

CLAIMS1 . A method performed by a system (100) for managing charging of one or more battery operated machines (21a-d) operating in an underground environment (1), wherein each battery operated machines (21a-d) comprises at least one battery (22a-d) providing electrical power to the battery operated machine (21a-d), the method comprising: obtaining (202) an operation plan indicating at least one time and / or order for when each respective battery operated machine (21a-d) is expected to perform at least one respective action, the operation plan further indicating an expected position of each respective battery operated machine (21a-d) during a time period of the operation plan, obtaining (204) respective characteristics of the one or more battery operated machines (21a-d) indicating one or more out of:- dimensions of the respective battery operated machine (21 a-d),- battery capacity of the respective battery operated machine (21 a-d), and- expected power consumption of the respective battery operated machine (21a- d), based on the operation plan, the one or more characteristics, and a spatial arrangement of the underground environment (1), determining (205) a drive plan indicating at least one time and / or order for when the respective battery operated machines (21 a-d) is to charge via the one or more battery chargers (102a-b).

2. The method according to claim 1 , wherein the expected power consumption comprises the expected power consumption during a predetermined cycle of operation.

3. The method according to any of claim 1-2, wherein obtaining the expected power consumption comprises estimating the expected power consumption based on a respective actual power consumption of one or more previously performed predetermined cycles of operation.

4. The method according to any of claims 1-3, wherein the method further comprises: for each performed cycle of operation, obtaining (201) a respective actual power consumption for the one or more battery operated machines (21 a-d).

5. The method according to any of claims 1-4, wherein determining the drive plan comprises generating a respective charge model for the one or more battery operated machines (21 a-d), which respective charge model schedules a battery charger (102a-b), acharging power and a charging time for the respective one or more battery operated machines (21a-d).

6. The method according to claim 5, wherein determining the drive plan further comprises adapting a route of a predetermined cycle of operation based on the respective charge model for the one or more battery operated machines (21a-d).

7. The method according to any of claims 1-6, wherein determining the drive plan comprises prioritizing the charging of the one or more battery operated machines (21a-d).

8. The method according to any one of claims 1-7, wherein the spatial arrangement of the underground environment (1) indicates the location of one or more charging stations and dimensions of passages in the underground environment (1).

9. The method according to any one of claims 1-8, wherein the method further comprises: providing (206) the determined drive plan to the one or more battery operated machines (21a-d).

10. The method according to any one of claims 1-9, wherein obtaining (202) the operation plan further comprises obtaining a current location and charge level of the one or more battery operated machines (21a-d), and wherein the method further comprises: updating (203) the operation plan based on the obtained current location of the one or more battery operated mining machines (21a-d), and wherein the drive plan is further determined (205) based on the current charge level of the one or more battery operated mining machines (21a-d).

11. The method according to any one of claims 1-10, wherein charging the one or more battery operated machines (21a-d) comprises charging the at least one battery comprised in the one or more battery operated machines (21a-d).

12. A system (100) for charge management of one or more battery operated machines (21a-d) adapted to operate in an underground environment (1), wherein each battery operated machines (21a-d) is adapted to comprise at least one battery (22a-d) providing electrical power to the battery operated machine (21a-d), the system comprising the oneor more battery operated machines (21a-d), at least one a battery charge management unit (101) configured to determine a drive plan to manage charging of the one or more battery operated machines (21a-d), and one or more battery chargers (102a-b) arranged to charge the one or more battery operated machines (21a-d), wherein the system is arranged to: obtain an operation plan adapted to indicate at least one time and / or order for when each respective battery operated machine (21a-d) is expected to perform at least one respective action, wherein the operation plan is further adapted to indicate an expected position of each respective battery operated machine (21a-d) during a time period of the operation plan, obtain respective characteristics of the one or more battery operated machines (21a-d) adapted to indicate one or more out of:- dimensions of the respective battery operated machine (21 a-d),- battery capacity of the respective battery operated machine (21 a-d), and- expected power consumption of the respective battery operated machine (21a- d), based on the operation plan, the one or more characteristics, and a spatial arrangement of the underground environment (1), determine a drive plan adapted to indicate at least one time and / or order for when the one or more battery operated machines (21 a-d) is to charge via the one or more battery chargers (102a-b).

13. The system according to claim 12, wherein the system is further configured to perform the method according to any of claims 2-10.

14. A battery charge management unit (101) configured to manage charging of one or more battery operated machines (21 a-d) adapted to operate in an underground environment (1), wherein each battery operated machine (21a-d) is adapted to comprise at least one battery (22a-d) providing electrical power to the battery operated machine (21 a-d), the battery charge management unit further being configured to: obtain an operation plan adapted to indicate at least one time and / or order for when each respective battery operated machine (21 a-d) is expected to perform at least one respective action, wherein the operation plan is further adapted to indicate an expected position of each respective battery operated machine (21 a-d) during a time period of the operation plan,obtain respective characteristics of the one or more battery operated machines (21a-d) adapted to indicate one or more out of:- dimensions of the respective battery operated machine (21 a-d),- battery capacity of the respective battery operated machine (21 a-d), and - expected power consumption of the respective battery operated machine (21a- d), based on the operation plan, the one or more characteristics, and a spatial arrangement of the underground environment (1), determine a drive plan adapted to indicate at least one time and / or order for when the one or more battery operated machines (21 a-d) is to charge via the one or more battery chargers (102a-b).

Citation Information

Patent Citations

  • Battery charge management of mining machines

    CA3103214A1

  • System and method for controlling and powering a vehicle

    US20120316717A1

  • System and method for charging machines

    US20210008997A1