Integrated multi-AGV path planning and multi-line device layout optimization method

By integrating multi-AGV path planning and multi-row equipment layout methods, A* algorithm and genetic algorithm are used to optimize workshop equipment layout, which solves the problem of mixed-flow processing production line equipment layout reconstruction and poor production evaluation effect, improves production efficiency and reduces AGV costs. Risk of collision.

WO2024212472A1PCT designated stage expired Publication Date: 2024-10-17CHINA ELECTRONIC TECH GRP CORP NO 38 RES INST

Patent Information

Application Number
PCT/CN2023/126422
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-10
Filing Date
2023-10-25
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

The existing technology has poor results in equipment layout reconstruction and production evaluation in the workshop, especially in equipment layout reconstruction and production evaluation of mixed-flow processing production lines.

Method used

The integrated multi-AGV path planning and multi-row equipment layout method is used to build a multi-objective optimization model by collecting workshop operation data. The A* algorithm based on time windows and the ant colony algorithm combined with genetic algorithms are used to optimize the equipment layout and verify the accuracy of the model. .

Benefits of technology

The workshop equipment layout is optimized, production efficiency is improved, the risk of collision during AGV operation is reduced, the shortcomings of the ant colony algorithm and genetic algorithm in the convergence process are overcome, and more efficient production tasks are completed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023126422_17102024_PF_FP_ABST
    Figure CN2023126422_17102024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention provides an integrated multi-AGV path planning and multi-line device layout method and system. The method comprises: establishing a multi-line device layout multi-objective optimization model; solving a total processing time in the iteration: given a layout condition, solving a shortest time required by a workshop to complete an order by using a multi-AGV path planning method on the basis of a time window A* algorithm by combining information of a process route and a processing time of a product; solving a model by using an ant colony algorithm by combining a genetic algorithm; and verifying an accuracy of a solving scheme on the basis of dynamic simulation of a discrete event. The present invention solves the technical problem of device layout in a workshop, especially device layout reconstruction of the hybrid-flow processing production line, and poor production evaluation effect.
Need to check novelty before this filing date? Find Prior Art

Description

Integrated multi-AGV path planning and multi-row equipment layout optimization method Technical Field

[0001] The present invention belongs to the field of factory virtual simulation and optimization, and specifically relates to a method and system for integrating multi-AGV path planning and multi-row equipment layout. Background Art

[0002] With the continuous development of science and technology, manufacturing, as a basic industry, has increasingly demonstrated its importance in the national economy. In the design process of a production and manufacturing system, the determination of equipment layout is an indispensable and even very important part. For every production system, having a reasonable equipment layout can improve its production efficiency. AGV plays an important role in intelligent logistics systems. It is not only a major way for enterprises to achieve digital and automated production models, but also a major indicator of the degree of intelligence in manufacturing. Therefore, the quality of its path planning directly determines the production efficiency of an intelligent manufacturing system. For example, the existing invention patent application document "A Digital Workshop for Lithium Battery Materials," with publication number CN110442105A, includes: a digital production equipment layer, including intelligent production equipment, intelligent transmission equipment, intelligent inspection equipment, and public infrastructure intelligent equipment; a process control layer: building a lithium battery material production workshop network system based on industrial Ethernet, building a lithium battery material production process data acquisition and monitoring system based on an intelligent simulation system and a PLC-based underlying process control system, and enabling interconnection and information exchange among various intelligent devices; a production execution layer: establishing an intelligent manufacturing execution system for lithium battery material production workshops with the goal of intelligent optimization scheduling and quality control, realizing production progress management, material management, equipment management, quality management, and intelligent production scheduling. Furthermore, the method for "Modeling and Optimization Method for AGV Scheduling Management," with publication number CN105354648A, includes the following steps: Step 1: Modeling the AGV operation path network; Step 2: Storing the path network map; Step 3: Modeling the multi-AGV system using binary methods; and Step 4: Dynamic path optimization method using local search.

[0003] Comprehensive optimization of equipment layout and AGV paths can significantly reduce logistics costs during the production process. These two issues are also very typical in the field of industrial engineering, and there is a close connection between them. To further optimize factory logistics systems, it is necessary to explore the coupling relationship between AGV path planning and equipment layout to achieve matching of productivity levels.

[0004] As part of the smart workshop, the operating efficiency of AGV is closely related to the production efficiency of the workshop. As for the problem of facility layout, the scheduling of AGV when the order is confirmed will greatly affect the evaluation index of the layout. Therefore, we need to optimize the scheduling of AGV so that it can be used as an evaluation index of equipment layout.

[0005] Equipment layout is the process of determining the spatial location of some production units such as processing equipment in a certain production workshop. For multi-row equipment layout, compared with single-row equipment layout and ring equipment layout, the row breaking problem in the equipment layout process also needs to be considered.

[0006] In summary, the existing technology has technical problems such as poor equipment layout reconstruction in the workshop, especially the equipment layout of the mixed-flow processing production line, and poor production evaluation effect.

[0007] Summary of the Invention

[0008] The technical problem to be solved by the present invention is how to solve the technical problem of poor production evaluation effect of equipment layout in a workshop, especially equipment layout reconstruction of a mixed-flow processing production line.

[0009] The present invention solves the above technical problems by adopting the following technical solutions: The integrated multi-AGV path planning and multi-row equipment layout method includes:

[0010] S1. Collect workshop operation data, solve and obtain no less than two clustering indicators, linearly weight the clustering indicators to obtain the model objective function, and establish a multi-objective optimization model for multi-row equipment layout based on the model objective function and preset model constraints;

[0011] S2. Based on the preset layout, the A* algorithm is used to plan the multi-AGV path based on the time window. Combined with the workshop operation data, the total processing time in the iteration is solved.

[0012] S3, using the ant colony algorithm combined with the genetic algorithm to solve the final layout according to the total processing time in the iteration;

[0013] S4. Perform dynamic simulation based on preset discrete events to verify the accuracy of the multi-objective optimization model for multi-row equipment layout according to the final layout situation.

[0014] This method integrates multi-AGV path planning and multi-row equipment layout. By constructing a model using clustering metrics and model constraints, the A* algorithm is used to solve the total processing time, and the final layout is obtained using an ant colony algorithm combined with a genetic algorithm. Dynamic simulations are then used to verify the constructed model. This method optimizes equipment layout in the workshop and evaluates production, enabling more efficient completion of corresponding production tasks and guiding workshop production optimization. This method is suitable for equipment layout reconstruction in mixed-flow production lines and offers valuable insights for similar workshop layouts.

[0015] In a more specific technical solution, step S1 further includes the following specific steps:

[0016] Step S11: Determine the model objective function using the following logic: min Z = μ1T + μ2C + μ3K (1)

[0017] Where T is the time to complete the order, C is the transportation cost, K is the clustering index between devices, μ1, μ2, and μ3 represent the weights of the order completion time, transportation cost, and clustering index between devices, respectively;

[0018] Step S12: Define the clustering index K between devices using the following logic:

[0019] Among them, d ij is the distance between devices i and j, S t is the set of equipment that processes the same process, and m is the number of processing steps;

[0020] S13. Determine the weights between the three objectives and determine the weights of the clustering indicators according to the entropy weight method;

[0021] S14. Determine preset model constraints based on the spatial constraints between devices.

[0022] In a more specific technical solution, step S13 includes:

[0023] Step S13 further includes:

[0024] S131. Using the following logic, use the minimum and maximum normalization method to obtain preprocessed data:

[0025] Among them, X ij is the data of sample i before the jth indicator is standardized, X i is the data in sample i, Y ij is the standardized data of the jth indicator of sample i.

[0026] S132, calculate the pre-processed data to obtain the proportion P of the clustering index ij :

[0027] S133. According to the proportion of cluster indicators, the information entropy E of the indicators is solved using the following logic: j :

[0028] S134. Process the information entropy using the following logic to determine the weight of the clustering indicator:

[0029] Among them E j The information entropy of indicator j, k is the number of indicators, w j is the weight of the calculated clustering index.

[0030] In a more specific technical solution, step S2 further includes:

[0031] S21. Construct a grid map so that each device is located at a point in the grid;

[0032] S22, minimizing the processing time of the workshop according to the preset AGV scheduling rules;

[0033] S23, using the time window-based A* algorithm to plan the path of the dispatched transport task AGV in the grid map;

[0034] S24, for node conflicts and opposite conflicts, adjust the AGV path by constructing the AGV occupation time windows of different nodes;

[0035] S25. Repeat steps S23 to S24 until all products are processed, so as to calculate the total processing time in the iteration.

[0036] When the AGV performs path planning, the present invention uses the A* algorithm based on the time window to obtain the time window of the node, detects whether a conflict will occur through the time window, and adopts a waiting measure to wait at the node before the conflicting node, thereby reducing the collision risk in the operation process of each AGV.

[0037] In a more specific technical solution, in step S23, the time window-based A* algorithm further includes:

[0038] S231, obtaining the previous task paths of the remaining AGV paths except the current AGV path;

[0039] S232: Set the non-loading and unloading points on the previous task path as obstacles;

[0040] S233: Based on the starting and ending points of the previous task and the obstacles, call the A* algorithm to obtain a suitable path;

[0041] S234. Obtain the time window of the node through which the current task passes according to the applicable path;

[0042] S235: Compare the current time window with the total time window to determine whether there is a node conflict;

[0043] S236: If yes, wait for time t and shift the time window;

[0044] S237, obtain a new AGV path;

[0045] S238: If not, add the current time window of the AGV path to the total time window.

[0046] In a more specific technical solution, in step S23, a turning penalty term P is introduced into the evaluation function of the time window-based A* algorithm:

[0047] In the formula, (x f ,y f ) is the coordinate of the parent node of point S, C is a constant, (x s ,y s ) is the coordinate of the current node S.

[0048] The present invention takes into account that in actual work, AGV needs to change speed when changing direction, and introduces a turning penalty term P into the evaluation function of the A* algorithm, which reduces energy consumption and improves transportation efficiency.

[0049] In a more specific technical solution, step S3 includes:

[0050] S31: Initialize the population and update the pheromone concentration. Execute step S2 to solve the total processing time and processing and transportation costs in the iteration. Based on the spatial characteristics of the initial layout, calculate the clustering index between the devices and update the pheromone concentration accordingly.

[0051] S32, calculating the ant state transition probability according to the pheromone concentration, and obtaining the intermediate population according to the model objective function;

[0052] S33, using a genetic algorithm to perform crossover mutation based on the intermediate population to obtain a final offspring according to a preset fitness parameter;

[0053] S34: Update the pheromone concentration on the path through the offspring, and iterate steps S32 to S34 to obtain the final layout.

[0054] The present invention adopts an ant colony algorithm solution model combined with a genetic algorithm. This method updates the pheromone concentration according to the clustering index, obtains the intermediate population through objective function processing, and realizes the iterative update of the offspring through differential mutation. It can overcome the shortcomings of the ant colony algorithm in the convergence process, that is, the speed is not fast enough, and the genetic algorithm is prone to fall into the local optimal solution during the convergence process.

[0055] In a more specific technical solution, in step S4, the path of the dispatched transport task AGV in the grid map is planned using the A* algorithm based on the time window.

[0056] In a more specific technical solution, in step S4, a simulation model is run to obtain the processing and transportation equipment conditions of the production line, which are compared with the final layout conditions to obtain the accuracy verification results of the multi-objective optimization model for the multi-row equipment layout.

[0057] In a more specific technical solution, the integrated multi-AGV path planning and multi-row equipment layout system includes:

[0058] The model building module is used to collect workshop operation data, solve for no less than two clustering indicators, linearly weight the clustering indicators to obtain the model objective function, and establish a multi-objective optimization model for multi-row equipment layout based on the model objective function and preset model constraints;

[0059] The total time processing module is used to perform multi-AGV path planning based on the preset layout and the A* algorithm based on the time window. It combines the workshop operation data to solve the total processing time in the iteration.

[0060] A layout solving module is used to solve the final layout according to the total processing time in iteration by using an ant colony algorithm combined with a genetic algorithm. The layout solving module is connected to the total time processing module.

[0061] The dynamic simulation verification module is used to perform dynamic simulation based on preset discrete events and verify the accuracy of the multi-objective optimization model of the multi-row equipment layout according to the final layout situation. The dynamic simulation verification module is connected to the layout solution module and the model construction module.

[0062] This invention offers the following advantages over existing technologies: The method for integrated multi-AGV path planning and multi-row equipment layout implemented in this invention utilizes clustering metrics and model constraints to construct a model, uses the A* algorithm to solve the total processing time, and utilizes an ant colony algorithm combined with a genetic algorithm to determine the final layout. Dynamic simulation and verification of the constructed model allows for optimization of equipment layout in the workshop and production evaluation, enabling more efficient completion of corresponding production tasks and guiding workshop production optimization. This method is suitable for equipment layout reconstruction in mixed-flow processing production lines and offers valuable insights for similar workshop layouts.

[0063] When the AGV performs path planning, the present invention uses the A* algorithm based on the time window to obtain the time window of the node, detects whether a conflict will occur through the time window, and adopts a waiting measure to wait at the node before the conflicting node, thereby reducing the collision risk in the operation process of each AGV.

[0064] The present invention takes into account that in actual work, AGV needs to change speed when changing direction, and introduces a turning penalty term P into the evaluation function of the A* algorithm, which reduces energy consumption and improves transportation efficiency.

[0065] The present invention adopts an ant colony algorithm solution model combined with a genetic algorithm. This method updates the pheromone concentration according to the clustering index, obtains the intermediate population through objective function processing, and realizes the iterative update of the offspring through differential mutation. It can overcome the shortcomings of the ant colony algorithm in the convergence process, that is, the speed is not fast enough, and the genetic algorithm is prone to fall into the local optimal solution during the convergence process.

[0066] The present invention solves the technical problems existing in the prior art of equipment layout in a workshop, especially equipment layout reconstruction of a mixed-flow processing production line, and poor production evaluation effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] FIG1 is a schematic diagram of the basic steps of a method for integrated multi-AGV path planning and multi-row equipment layout according to Example 1 of the present invention;

[0068] FIG2 is a flow chart of the A* algorithm based on a time window according to Example 1 of the present invention;

[0069] FIG3 is a schematic diagram of specific steps for constructing a multi-objective optimization model for multi-row equipment layout according to Example 1 of the present invention;

[0070] FIG4 is a schematic diagram of specific steps for solving the total processing time in Example 1 of the present invention;

[0071] FIG5 is a schematic diagram of specific steps for solving the model in Example 1 of the present invention;

[0072] FIG6 is a schematic diagram of an ant colony algorithm process combined with a genetic algorithm according to Example 1 of the present invention;

[0073] FIG7 is a schematic diagram of specific steps for verifying the accuracy of the solution of Example 1 of the present invention;

[0074] FIG8 is a schematic diagram of data flow processing of the integrated multi-AGV path planning and multi-row equipment layout system according to Example 2 of the present invention. DETAILED DESCRIPTION

[0075] To make the objectives, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative efforts shall fall within the scope of protection of the present invention.

[0076] Example 1

[0077] As shown in FIG1 , the method for integrating multi-AGV path planning and multi-row equipment layout provided by the present invention includes the following basic steps:

[0078] Step S1, establishing a multi-objective optimization model for multi-row equipment layout;

[0079] In this embodiment, for a given workpiece processing route and the processing time on each piece of equipment, three objectives are solved for a given order: total processing time, total transportation cost, and clustering index between equipment under a certain layout. The linear weighted result of these three objectives is used as the objective function of the model, and the model constraints are the spatial constraints between the various equipment.

[0080] Step S2, solving the total processing time in iteration;

[0081] In this embodiment, for a given layout, a multi-AGV path planning method based on the time window A* algorithm is used to combine the product's process route and processing time information to solve the shortest time required for the workshop to complete the order;

[0082] As shown in FIG2 , in this embodiment, the time window-based A* algorithm further includes the following specific steps:

[0083] S21, obtain the last task path of other AGVs;

[0084] S22: Set non-loading and unloading points on the path as obstacles;

[0085] S23, calling the A* algorithm to obtain a path based on the task starting point, end point and obstacles;

[0086] S24. Obtain the time window of the node through which the current task passes according to the path;

[0087] S25. Compare the current time window with the total time window to determine whether there is a node conflict;

[0088] S26. If yes, calculate the waiting time t and shift the time window;

[0089] S27, obtain a new path;

[0090] S28. If not, add the current time window to the total time window.

[0091] Step S3, using an ant colony algorithm combined with a genetic algorithm to solve the model;

[0092] Step S4: Verify the accuracy of the solution based on dynamic simulation of discrete events.

[0093] As shown in FIG3 , in this embodiment, step S1 further includes the following specific steps:

[0094] Step S11: Determine the expression of the objective function, which is defined as follows: min Z = μ1T + μ2C + μ3K (1)

[0095] Where T is the time to complete the order, C is the transportation cost, K is the clustering index between devices, μ1, μ2, and μ3 represent the weights of the order completion time, transportation cost, and clustering index between devices, respectively;

[0096] Step S12: defining clustering indicators between devices;

[0097] In this embodiment, the clustering index is used to characterize the equipment that processes the same process. The equipment needs to be centrally located to meet the needs of production personnel for observation, maintenance, and centralized management. The clustering index is defined as follows:

[0098] Among them, d ij is the distance between devices i and j, S t is a collection of equipment that processes the same process, and m is the number of processing steps.

[0099] Step S13: Determine the weights between the three objectives. Use the entropy weight method to determine the weights of the three indicators. Use the minimum and maximum normalization method to preprocess the data. Then calculate the variation of the indicators, that is, the proportion of the indicators. Finally, solve the information entropy of the indicators and determine the weights based on the information entropy:

[0100] Among them, X ij is the data of sample i before the jth indicator is standardized, X i is the data in sample i, Y ij is the data after standardization of the jth indicator of sample i, E j The information entropy of indicator j, k is the number of indicators, w j is the weight of the calculated clustering index.

[0101] Step S14: determining model constraints. For the equipment layout model, the constraints are spatial constraints.

[0102] In this embodiment, the spatial constraints include, but are not limited to, equipment shape constraints (aspect ratio), safety distance constraints between equipment, spatial non-overlap constraints on equipment, and equipment layout constraints within the scope of the workshop.

[0103] As shown in FIG4 , in this embodiment, step S2 further includes the following specific steps:

[0104] Step S21: construct a grid map, where each device is located at a point in the grid;

[0105] Step S22: Determine the AGV scheduling rule as FIFS to minimize the processing time of the workshop;

[0106] Step S23: For the AGV assigned with the transport task, the path of the AGV in the grid map is planned using the A* algorithm.

[0107] In this embodiment, considering that the AGV needs to change speed when changing direction in actual work, in order to minimize energy consumption and improve transportation efficiency, a turning penalty term P is introduced into the evaluation function of the A* algorithm:

[0108] Among them, (x f ,y f ) is the coordinate of the parent node of point S, C is a constant, (x s ,y s ) is the coordinate of the current node S. This is to achieve the purpose of reducing the number of AGV turns.

[0109] Step S24: There is a risk of collision during the operation of multiple AGVs. For node conflicts and opposite-direction conflicts, the paths of the AGVs are adjusted by constructing the AGV occupation time windows at different nodes.

[0110] In this embodiment, the implementation method for adjusting the AGV path can be, for example: obtaining a time window for passing through a node when the AGV is planning the path, detecting whether a conflict will occur through the time window, and taking a waiting measure to wait at the node before the conflicting node to avoid a collision.

[0111] Step S25: Repeat steps S23 to S24 until all products are processed and calculate the final processing time.

[0112] As shown in FIG5 , in this embodiment, step S3 includes the following specific steps:

[0113] Step S31: Initialize the population and update the pheromone concentration. That is, the initial layout of the equipment is randomly generated. Then, the total processing time and transportation cost during the processing are solved using the method in step S2. The clustering index between the equipment is calculated based on the spatial characteristics of the initial layout, which serves as the basis for updating the pheromone concentration.

[0114] Step S32: Calculate the ant state transition probability based on the pheromone concentration and select a path to calculate the travel cost, that is, the objective function in step S1 to obtain the intermediate population;

[0115] Step S33: Input the intermediate population in step S32 into the genetic algorithm to perform crossover mutation. Here, the crossover operator is the PMX crossover operator, and the mutation is the two-point exchange mutation. The final offspring is obtained according to the size of the fitness.

[0116] Step S34: Update the pheromone concentration on the path through the offspring, and repeat steps S32 to S34 until the iteration is terminated to obtain the final layout.

[0117] As shown in FIG6 , in this embodiment, the ant colony algorithm combined with the genetic algorithm further includes the following specific steps:

[0118] S31', initialization;

[0119] S32', update pheromone concentration table;

[0120] S33', determine whether the loop is finished; if so, end the loop;

[0121] S34', if not, set the current ant k=1;

[0122] S35', calculate the state transition probability and select the path, calculate the travel cost;

[0123] S36', k=k+1;

[0124] S37', determine whether k is greater than m; if not, jump to step S35';

[0125] S38', if yes, then the solution of the ant colony algorithm is used as the initial population input;

[0126] S39′, crossover mutation;

[0127] S310', calculate the new offspring fitness;

[0128] S311', update pheromones.

[0129] As shown in FIG7 , in this embodiment, step S4 includes the following specific steps:

[0130] Step S41: Establish a digital twin workshop model;

[0131] In this embodiment, the process route of the workshop's product processing, the data on the product's processing time on each machine, and the equipment layout obtained in step 3 are obtained, and parametric modeling is performed on the workshop's AGV system, processing equipment, material storage area, and the entire workshop.

[0132] Step S42: running the simulation model;

[0133] In this embodiment, the model is run to obtain statistics on the total processing time of the production line, logistics and transportation efficiency, and equipment utilization, which are then compared and analyzed with the results obtained by the algorithm.

[0134] Example 2

[0135] As shown in Figure 8, in this embodiment, the production line of a certain agricultural machinery production workshop is a mixed-flow processing production line. There are three products in total, denoted as A, B, and C. The three products have up to 14 processes respectively, and the processing equipment type and processing time of the corresponding process are given. Different products have different processes and the required processing time is also different. Materials between different equipment are transported by AGV. It is known that the distance between the equipment is equal and the moving speed of the AGV between the equipment is constant. For a certain type of order, it is necessary to optimize the layout of a total of 28 equipment including the raw material storage location.

[0136] The integrated multi-AGV path planning and multi-row equipment layout optimization method provided by the present invention is used to optimize and solve the workshop equipment layout.

[0137] In this embodiment, a multi-objective optimization model for multi-row equipment layout is established, 500 layouts are randomly generated, and their corresponding processing time, logistics transportation costs, and clustering indicators between equipment are solved. The initial data are input into the entropy weight method to determine the weights of the objective function, which are: 0.3219, 0.3370, and 0.3411, respectively.

[0138] In this embodiment, the relevant parameters of the ant colony algorithm and the genetic algorithm are set: the number of ants is set to the number of devices 27, the information heuristic factor is 0.8, the expected heuristic factor is 1.1, the number of iterations is 100 generations, the pheromone increase constant is 1, the pheromone volatility factor is 0.5, the crossover rate is 0.8, and the mutation rate is 0.2.

[0139] In this embodiment, the model is solved to obtain the optimal layout, and simulation software is used to verify the result.

[0140] In summary, the integrated multi-AGV path planning and multi-row equipment layout method implemented in this invention uses clustering indicators and model constraints to construct a model, uses the A* algorithm to solve the total processing time, and uses the ant colony algorithm combined with the genetic algorithm to obtain the final layout. Dynamic simulation verification of the constructed model can optimize the equipment layout in the workshop and evaluate production, thereby more efficiently completing corresponding production tasks and guiding production optimization in the workshop. This method is suitable for the equipment layout reconstruction of mixed-flow processing production lines and is also of reference value for similar workshop layouts.

[0141] When the AGV performs path planning, the present invention uses the A* algorithm based on the time window to obtain the time window of the node, detects whether a conflict will occur through the time window, and adopts a waiting measure to wait at the node before the conflicting node, thereby reducing the collision risk in the operation process of each AGV.

[0142] The present invention takes into account that in actual work, AGV needs to change speed when changing direction, and introduces a turning penalty term P into the evaluation function of the A* algorithm, which reduces energy consumption and improves transportation efficiency.

[0143] The present invention adopts an ant colony algorithm solution model combined with a genetic algorithm. This method updates the pheromone concentration according to the clustering index, obtains the intermediate population through objective function processing, and realizes the iterative update of the offspring through differential mutation. It can overcome the shortcomings of the ant colony algorithm in the convergence process, that is, the speed is not fast enough, and the genetic algorithm is prone to fall into the local optimal solution during the convergence process.

[0144] The present invention solves the technical problems existing in the prior art of equipment layout in a workshop, especially equipment layout reconstruction of a mixed-flow processing production line, and poor production evaluation effect.

[0145] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present invention.

Claims

1. Integrate multi-AGV path planning and multi-row equipment layout method, It is characterized in that The method comprises: S1. Collecting workshop operation data, solving to obtain no less than 2 clustering indicators, linearly weighting the clustering indicators to obtain a model objective function, and establishing a multi-row equipment layout multi-objective optimization model according to the model objective function and preset model constraints; S2. Based on the preset layout, the A* algorithm is used to perform multi-AGV path planning based on the time window, and the total processing time in the iteration is obtained by combining the workshop operation data; S3, using an ant colony algorithm combined with a genetic algorithm to solve the final layout according to the total processing time in the iteration; S4. Perform dynamic simulation based on preset discrete events to verify the accuracy of the multi-objective optimization model for the multi-row equipment layout according to the final layout situation.

2. The integrated multi-AGV path planning and multi-row equipment layout method according to claim 1, It is characterized in that The step S1 also includes the following specific steps: Step S11: Determine the model objective function using the following logic: min Z=μ 1 T+μ 2 C+μ 3 K (1) Where T is the time to complete the order, C is the transportation cost, K is the clustering index between devices, μ 1 , μ 2 , μ 3 They represent the weights of order completion time, transportation cost, and clustering indicators between devices respectively; Step S12: define the clustering index between the devices using the following logic: Among them, d ij is the distance between devices i and j, S t is the set of equipment that processes the same process, and m is the number of processing processes; S13, determining the weights between the three objectives, and determining the weights of the clustering indicators according to the entropy weight method; S14. Determine the preset model constraint according to the spatial condition constraint between the devices.

3. The integrated multi-AGV path planning and multi-row equipment layout method according to claim 2, It is characterized in that The step S13 comprises: Step S13 also includes: S131, using the following logic, using the minimum and maximum standardization method to obtain preprocessed data: Among them, X ij is the data of sample i before the jth index is standardized, X i is the data in sample i, Y ij is the standardized data of the jth indicator of sample i. S132, calculating the preprocessed data to obtain the proportion of the clustering index: S133. According to the weight of the clustering index, the information entropy of the index is solved by the following logic: S134. Process the information entropy using the following logic to determine the weight of the clustering index: Where E j The information entropy of indicator j, k is the number of indicators, w j is the weight of the calculated clustering index.

4. The integrated multi-AGV path planning and multi-row equipment layout method according to claim 1, It is characterized in that The step S2 further comprises: S21, constructing a grid map so that each device is located at a point in the grid; S22, minimizing the processing time of the workshop according to the preset AGV scheduling rules; S23, for the dispatched transport task AGV, using the time window-based A* algorithm to plan the path of the dispatched transport task AGV in the grid map; S24, adjusting the path of the AGV by constructing the AGV occupation time window of different nodes for node conflicts and opposite conflicts; S25. Repeat step S23 to step S24 until all products are processed, so as to calculate the total processing time in the iteration.

5. The integrated multi-AGV path planning and multi-row equipment layout method according to claim 4, It is characterized in that In step S23, the time window-based A* algorithm further includes: S231, obtaining the previous task paths of the remaining AGV paths except the current AGV path; S232, setting the non-loading and unloading points on the previous task path as obstacles; S233, combining the starting point and end point of the previous task and the obstacles, calling the A* algorithm to obtain an applicable path; S234, obtaining a time window in which the current task passes through a node according to an applicable path; S235, comparing the current time window with the total time window to determine whether there is a node conflict; S236: If yes, wait for time t and shift the time window; S237, obtaining a new AGV path; S238: If not, add the time window of the current AGV path to the total time window.

6. The integrated multi-AGV path planning and multi-row equipment layout method according to claim 4, It is characterized in that In step S23, a turning penalty term P is introduced into the evaluation function of the time window-based A* algorithm: In the formula, (x f ,y f ) is the coordinate of the parent node of point S, C is a constant, (x s ,y s ) is the coordinate of the current node S.

7. The integrated multi-AGV path planning and multi-row equipment layout method according to claim 1, It is characterized in that The step S3 comprises: S31, initialize the population and update the pheromone concentration, execute the step S2, solve the total processing time and processing and transportation cost in the iteration, and according to the spatial characteristics of the initial layout, find the clustering index between the devices, and update the pheromone concentration accordingly; S32, calculating the ant state transition probability according to the pheromone concentration, and obtaining an intermediate population according to the model objective function; S33, using a genetic algorithm to perform crossover mutation based on the intermediate population to obtain a final offspring according to a preset fitness parameter; S34, updating the pheromone concentration on the path through the offspring, and iteratively executing the steps S32 to S34 to obtain the final layout.

8. The integrated multi-AGV path planning and multi-row equipment layout method according to claim 1, It is characterized in that In the step S4, the path of the dispatched transport task AGV in the grid map is planned using the time window-based A* algorithm.

9. The integrated multi-AGV path planning and multi-row equipment layout method according to claim 1, It is characterized in that In step S4, the simulation model is run to obtain the processing and transportation equipment conditions of the production line, which are compared with the final layout conditions to obtain the accuracy verification result of the multi-row equipment layout multi-objective optimization model.

10. Integrate multi-AGV path planning and multi-row equipment layout system, It is characterized in that The system comprises: The model building module is used to collect workshop operation data, solve and obtain no less than 2 clustering indicators, linearly weight the clustering indicators to obtain the model objective function, and build the model according to the model objective function and the preset model constraints. Establish a multi-objective optimization model for multi-row equipment layout; A total time processing module is used to perform multi-AGV path planning based on the A* algorithm of the time window according to the preset layout, and to solve the total processing time in the iteration in combination with the workshop operation data; A layout solving module, used for solving the final layout according to the total processing time in the iteration by using an ant colony algorithm combined with a genetic algorithm, wherein the layout solving module is connected to the total time processing module; A dynamic simulation verification module is used to perform dynamic simulation based on preset discrete events to verify the accuracy of the multi-row equipment layout multi-objective optimization model according to the final layout situation. The dynamic simulation verification module is connected to the layout solving module and the model building module.

Citation Information

Patent Citations

  • AGV obstacle avoidance scheduling method based on multi-population hybrid intelligent algorithm

    CN111007813A

  • Multi-AGV cooperative scheduling method and device in workshop environment

    CN113743747A

  • Workshop AGV path planning method based on improved ant colony algorithm and dynamic window

    CN114035586A

  • Method for optimizing vehicle path with road and time window based on ant colony algorithm

    CN115470651A

  • Integrated multi-AGV path planning and multi-row equipment layout optimization method

    CN116401951A

Cited By

  • Path planning method and system based on ant colony algorithm and dynamic window

    CN119204379A

  • Multi-algorithm combinatorial optimization 120 emergency center ambulance task allocation method

    CN119230070A

  • Multi-AGV path planning method and system, storage medium and product

    CN119272963A

  • Logistics and warehousing system optimization method based on multi-agent system

    CN119273122A

  • AGV-based intelligent material distribution management optimization method and system

    CN119476878A