Training device, estimation device, training method, estimation method, and program

By incorporating temporal and spatial feature calculations based on periodicity into a neural network estimation model, the device enhances the prediction of simulation results, addressing the challenge of accurately modeling long-term spatio-temporal characteristics in complex simulation models.

WO2024214192A1PCT designated stage expired Publication Date: 2024-10-17NT T INC
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/014765
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-11
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

Existing surrogate models struggle to accurately imitate the spatio-temporal characteristics of simulation results over long periods, particularly in complex simulation models like general circulation models, leading to ineffective prediction of climate and meteorological phenomena.

Method used

A learning device and estimation device that analyze time-series simulation data to calculate and add temporal and spatial feature amounts based on periodicity, using these features to enhance a neural network estimation model for predicting future state variables, thereby improving the model's ability to capture and replicate the original simulation's characteristics.

Benefits of technology

The solution enables the construction of an estimation model that efficiently and accurately imitates temporal and spatial characteristics, allowing for precise long-term prediction of simulation results, thereby improving the reliability of climate and meteorological forecasts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023014765_17102024_PF_FP_ABST
    Figure JP2023014765_17102024_PF_FP_ABST
Patent Text Reader

Abstract

A training device (10) comprises: a first calculation unit for calculating a temporal feature amount of an object in simulation data, which is time-series data of a state variable related to the object; a second calculation unit for calculating a spatial feature amount of the object in the simulation data; an addition unit for adding, to the simulation data, the temporal feature amount and / or the spatial feature amount; an estimation unit (14) for inputting, to an estimation model (141) constructed by using a neural network, the simulation data to which the temporal feature amount and / or the spatial feature amount has been added, the simulation data being of the state variable at a first time, and estimating a predicted value of the time-series data of the state variable at a second time, which is a time later than the first time; and an updating unit (15) for updating a parameter of the estimation model (141) such that the predicted value of the state variable at the second time approaches the actual value of the state variable at the second time.
Need to check novelty before this filing date? Find Prior Art

Description

Learning device, estimation device, learning method, estimation method, and program

[0001] The present invention relates to a learning device, an estimation device, a learning method, an estimation method, and a program.

[0002] In the fields of science and engineering, various simulators have been developed to reproduce physical phenomena in the real world. However, as attempts to reproduce phenomena more precisely lead to simulators becoming more complex, the amount of calculation required to obtain simulation results, which are the output from the simulator, becomes enormous.

[0003] In such cases, a technique is known in which a model that acts as a simulator (hereinafter referred to as a surrogate model) is generated and simulation results are generated using the surrogate model, thereby reducing the amount of calculation required to obtain the results.

[0004] In general, many techniques have been proposed for constructing surrogate models using machine learning techniques. By learning the input-output relationship of state variables, which corresponds to the transition and development of state variables in a simulator, it becomes possible to predict the time changes of state variables.

[0005] Calculations using machine learning technology are often cheaper than expensive simulator calculations, so simulation results can be generated with a smaller amount of calculation, making it possible to shorten the time required for ensemble forecasts in the fields of climate and weather, and structural design in the field of engineering.

[0006] Traditionally, surrogate models based on conventional machine learning techniques such as linear regression, Random Forest, Gaussian process regression, etc. have been common. However, in recent years, simulation models have become more complex, the size of input and output state variables has grown, and research into machine learning techniques has progressed, leading to the widespread use of surrogate models based on deep learning models.

[0007] For example, as described in Non-Patent Documents 1 and 2, a technology is known in which a surrogate model is constructed that quickly predicts future atmospheric conditions using a deep learning model that is trained to predict the atmospheric conditions of the next day based on the atmospheric conditions of the previous day, using input / output data from a general circulation model (atmospheric general circulation model) used to simulate climate and weather phenomena.

[0008] Sebastian Scher and Gabriele Messori, “Weather and climate forecasting with neural networks: using general circulation models (GCMs) with different complexity as a study ground.”, Geoscientific Model Development, Vol.12, No. 7, pp. 2797-2809, 2019.Sebastian Scher, “Toward Data-Driven Weather and Climate Forecasting: Approximating a Simple General Circulation Model With Deep Learning,” Geophysical Research Letters, Vol. 45, No. 22, pp. 12,616-12,622, 2018.

[0009] However, the techniques described in Non-Patent Documents 1 and 2 have a problem in that when predicting simulation results over the long term, the results generated do not adequately mimic the spatiotemporal characteristics of the original simulation results.

[0010] For example, Figures 6 and 7 of Non-Patent Document 1 show that the seasonality of the physical phenomenon known as climate is not captured and that geographical characteristics cannot be reproduced, respectively. In the climate field, which is the subject of Non-Patent Document 1, it is necessary to analyze long-term simulation results, so it is difficult to reuse forecast results that do not capture the characteristics of the simulation results.

[0011] The present invention has been made in consideration of the above, and aims to provide a learning device, an estimation device, a learning method, an estimation method, and a program that can efficiently and accurately imitate the temporal and / or spatial characteristics of data and predict simulation results over the long term.

[0012] In order to solve the above-mentioned problems and achieve the object, a learning device according to the present invention includes: a first calculation unit that calculates temporal features of an object for simulation data, which is time-series data of state variables related to an object having a shape that has periodicity in a predetermined direction; a second calculation unit that calculates spatial features of the simulation data based on the periodicity of the shape of the object in the predetermined direction; an addition unit that adds the temporal features and / or the spatial features to the simulation data; an estimation unit that inputs the simulation data of the state variables at a first time point, to which the temporal features and / or the spatial features have been added, into an estimation model formed by a neural network, and estimates a predicted value of the time-series data of the state variables at a second time point that is later than the first time point; and an update unit that updates parameters of the estimation model so that the predicted value of the state variable at the second time point estimated by the estimation unit approaches an actual value of the state variable at the second time point in the simulation data.

[0013] An estimation device according to the present invention is characterized in that it comprises: a first calculation unit that calculates temporal features of an object, for input data that is time-series data of state variables related to an object having a shape that has periodicity in a predetermined direction; a second calculation unit that calculates spatial features of the input data based on the periodicity of the shape of the object in the predetermined direction; an addition unit that adds the temporal features and / or the spatial features to the input data; and an estimation unit that inputs input data of state variables at a third time, to which the temporal features and / or the spatial features have been added, to the estimation model, the estimation model being trained to estimate a predicted value of the time-series data of the state variables at a second time that is later than the first time, when simulation data of the state variables at a first time to which the temporal features of the object and / or the spatial features based on the periodicity of the shape of the object in the predetermined direction have been added, and estimates a predicted value of the time-series data of the state variables at a fourth time that is later than the third time.

[0014] According to the present invention, it is possible to construct an estimation model that can efficiently and accurately mimic the temporal and / or spatial characteristics of data and predict simulation results over the long term.

[0015] Fig. 1 is a diagram showing an example of the configuration of a learning device according to an embodiment. Fig. 2 is a diagram showing an example of the configuration of a feature amount calculation unit shown in Fig. 1. Fig. 3 is a diagram showing an example of the configuration of an estimation device according to an embodiment. Fig. 4 is a flowchart showing the processing procedure of a processing according to an embodiment. Fig. 5 is a flowchart showing the processing procedure of a feature amount calculation process shown in Fig. 4. Fig. 6 is a flowchart showing the processing procedure of a learning process according to an embodiment. Fig. 7 is a flowchart showing the processing procedure of an estimation process according to an embodiment. Fig. 8 is a diagram showing an example of a computer on which a learning device and an estimation device are realized by executing a program.

[0016] Hereinafter, embodiments of a learning device, an estimation device, a learning method, an estimation method, and a program according to the present application will be described in detail with reference to the accompanying drawings. However, the present invention is not limited to the embodiments described below.

[0017] [Embodiment] This embodiment relates to the field of surrogate modeling, which is a technology for reducing the amount of calculation by replacing a simulation that requires a huge amount of calculation with a machine learning model that operates more inexpensively.

[0018] In the embodiment, a case will be described in which the machine learning model is made to learn the input / output relationship of the state variables, which corresponds to the transition and development of the state variables in a simulator, and the time change of the state variables is predicted.

[0019] Here, in the embodiment, in order to make it easier for a machine learning model (e.g., a deep learning model) to capture the temporal and / or spatial characteristics of the original simulation results, auxiliary features that can be used both during learning and estimation are generated from the data and added to the data.

[0020] For example, in this embodiment, a feature quantity related to periodicity is generated as a temporal characteristic. For example, periodicity in the field of climate includes diurnal and annual (seasonal) cycles. These can be calculated from calendar information representing the initial state both during learning and estimation. Therefore, in this embodiment, a temporal feature quantity related to periodicity is generated from data and added to the data.

[0021] Furthermore, as spatial characteristics, feature quantities related to geographical characteristics derived from a sphere are generated. For example, in the field of climate, since the Earth is a sphere, there are spatial characteristics based on the latitude and longitude on the Earth, such as the amount of thermal energy incident from the sun varying depending on the location on the Earth. For this reason, in the embodiment, spatial feature quantities based on characteristics such as periodicity in the longitude direction, symmetry in the latitude direction, and narrowing distance intervals in the longitude direction are generated and added to the data.

[0022] [Learning Device] Next, a learning device according to an embodiment will be described. In the embodiment, a case where a simulator that performs a global-scale simulation is the target will be described as an example. Target simulators include, for example, general circulation models (atmospheric general circulation models, ocean general circulation models) that simulate climate phenomena on a global scale (see Non-Patent Documents 1 and 2), land process models, and integrated assessment models (IAMs) that simulate social and economic activities on a global scale.

[0023] In these simulators, the Earth is discretized into several representative points (such as countries), grids, graphs, etc., and simulations are performed according to the Earth's calendar. An example of discretized data is vector data R, which can be handled by general deep learning models. n and 2D and 3D grid data (R n×m , R n×m×l ), graph data G = (V, E), etc., which are output at time intervals based on the Earth's calendar, such as every hour or every day.

[0024] When dealing with planets other than Earth, simulations may be performed according to the planet's calendar, in which case the technology developed can be applied by converting the time data to match the Earth's calendar. Furthermore, geographic information such as latitude and longitude exists for each feature dimension in vector data, each grid in grid data, and each vertex in graph data.

[0025] The simulator numerically calculates the governing equation of the simulator from the simulation parameter θ and the initial state value u0 of the state variable, and obtains the time series data u of the state variable, which is represented by the grid data mentioned above, at every fixed time interval Δt. {t×Δt} (t = 1, 2, 3, 4, ..., T) is output. This is combined with the initial state value u0 to generate the simulation data u {t×Δt} (t = 0, 1, 2, ..., T).

[0026] For simplicity of explanation, the simulation parameter θ is assumed to be fixed in this example. However, even when the simulation parameter changes, the embodiment can be applied by adding the simulation parameter as an input to the learning data or estimation model.

[0027] 1 is a diagram showing an example of the configuration of a learning device according to an embodiment. The learning device 10 according to the first embodiment is realized by, for example, loading a predetermined program into a computer or the like including a ROM (Read Only Memory), a RAM (Random Access Memory), a CPU (Central Processing Unit), etc., and having the CPU execute the predetermined program. The learning device 10 also has a communication interface for transmitting and receiving various information to and from other devices connected via a network, etc.

[0028] The learning device 10 has a processing unit 11, an estimation unit 14, and a parameter update unit 15 (update unit). The learning device 10 receives simulation data as input and performs learning on an estimation model 141 (e.g., a deep learning model) held by the estimation unit 14, for example, using machine learning. As described above, the simulation data is time-series data of state variables related to an object having a shape with periodicity in a predetermined direction (latitudinal and / or longitudinal directions). The object is, for example, the Earth, and a calendar exists.

[0029] The processing unit 11 uses the simulation data u {t×Δt} (t=0, 1, 2, ..., T) to generate training data to be input to the estimation model. {t×Δt} Accepts input and each u {t×Δt} The processing unit 11 adds the calculated feature values ​​to the state variables of the simulation data, and then processes the data into training data (batch processing). The processing unit 11 has a feature value calculation unit 12 and a training data processing unit 13.

[0030] The feature calculation unit 12 calculates the simulation data u {t×Δt} (t = 0, 1, 2, ..., T) and {t×Δt}For the data, feature quantities based on temporal and / or spatial characteristics are calculated, and the calculated feature quantities are added to the state variables to generate data to be input to the estimation model 141.

[0031] Fig. 2 is a diagram showing an example of the configuration of the feature amount calculation unit 12 shown in Fig. 1. As shown in Fig. 2, the feature amount calculation unit 12 has a first calculation unit 121, a second calculation unit 122, and an addition unit 123.

[0032] The first calculation unit 121 calculates the input simulation data u {t×Δt} , for example, based on the Earth's calendar, a temporal feature is calculated.

[0033] Temporal features will now be described. In this embodiment, we focus on periodicity, which is generally treated as a temporal feature. For example, meteorological phenomena, which are the subject of general circulation models, have periodicity such as seasonality over a one-year period. Similarly, socio-economic phenomena, which are the subject of integrated assessment models, have periodicity, such as one week or one year, that is derived from human socio-economic activities.

[0034] In the embodiment, the temporal feature based on the calendar information included in the state variable data output from the simulator is calculated and introduced as a feature, thereby enabling the estimation model 141 to learn the periodicity of the object described above.

[0035] Time series data u of state variables output from the simulator {t×Δt} In this case, the details of the calendar information included in t and the time interval Δt corresponding to one simulation step are defined as follows:

[0036] First, for t, which corresponds to the number of simulation steps, we set Y t Year M t Moon D t day h t time m t minutes t Let Δt be the time interval expressed in units of years, months, days, hours, minutes, and seconds included in the above format.

[0037] Then, convert the calendar information included in t into the unit of Δt as the elapsed time from 00:00:00 on January 1, Year 1 of the Gregorian calendar, and use this value as d t In this case, units smaller than the unit of Δt are ignored when performing the conversion.

[0038] For example, if the unit of Δt is days, we use the commonly known Zeller formula to calculate the number of days that have passed since January 1, 1 AD, and use that value as d t Also, if the unit of Δt is minutes, multiply the value of the number of elapsed days by 1440 (24 hours x 60 minutes) and h t , m t Using d as the number of minutes elapsed since January 1, 1st year of the Gregorian calendar t In the embodiment, the obtained d t Based on the value of (a), a time feature based on periodicity is introduced. According to the concept of Zeller's formula, the date M of year Y, date D, when counted from January 1, year 1, is expressed as formula (1). However, when M is 1 or 2, the calculation is performed assuming the 13th or 14th month of the previous year.

[0039]

[0040] Let us assume that there is a known periodicity, such as the seasonality mentioned above, and that it is expressed in units of years, months, days, hours, minutes, and seconds, as above. Here, as in the previous procedure, d t The value converted to match the unit of is defined as the period P. In this case, the period P incorporates the feature quantity shown in formula (2). Note that % in formula (2) indicates a remainder.

[0041]

[0042] Also, multiple periods P1,...,P n are considered, all of these are incorporated as feature quantities as in equation (3).

[0043]

[0044] We will introduce specific examples of feature quantities using a general circulation model simulation on an hourly basis. The general circulation model simulates the climate system. The climate system is primarily driven by the amount of heat incident from the sun, and this heat quantity generates periodicities on a 24-hour and 12-month basis due to the Earth's rotation and revolution. Therefore, in order to incorporate this periodicity due to the Earth's celestial motion, we introduce the feature quantity of equation (4).

[0045]

[0046] In equation (4), the first three variables are used to capture the diurnal cycle due to the rotation, and the latter three variables are used to capture the annual cycle due to the revolution. {t×Δt} For the above, the feature amount of Equation (4) is calculated as a temporal feature amount.

[0047] The second calculation unit 122 calculates the simulation data u {t×Δt} For example, the second calculation unit 122 calculates a spatial feature quantity based on the periodicity of the shape of the Earth in a predetermined direction for each u {t×Δt} For the above, spatial features are calculated based on periodicity in the latitudinal and / or longitudinal directions of the Earth.

[0048] For example, when dealing with a simulator that targets the Earth, spatial characteristics and patterns arise in state variables depending on the latitude and longitude on the Earth, due to the Earth's spherical shape. Take the climate phenomenon that a general circulation model targets as an example. In this case, the amount of heat energy incident from the sun differs depending on the location on Earth, resulting in characteristics such as low latitudes being relatively hot and high latitudes being relatively cold.

[0049] Therefore, in the embodiment, spatial feature quantities based on the fact that the Earth is a sphere are calculated, and simulation data u {t×Δt} By adding the above, the estimation model 141 (described later) can learn the characteristics resulting from the sphere.

[0050] In the case of the Earth, the time series data of the output state variables is u {t×Δt}For each point (vertex) in the vector data, grid data, and graph data, the corresponding latitude value on Earth is lat and the longitude value is lon.

[0051] For latitude lat, the value expressed in degrees, with north latitude being positive and south latitude being negative, is divided by 90 and normalized to the range of [-1,1]. For longitude lon, the value expressed in degrees from 0 to 360, going west from the prime meridian, is divided by 360 and normalized to the range of [0,1]. For example, 135° east longitude, through which the Japan Standard Time Meridian passes, is converted to 225° longitude.

[0052] The second calculation unit 122 calculates the feature quantity shown in Equation (5) based on the features related to the sphere based on the values ​​of lat and lon for each u {t×Δt} is calculated as a spatial feature.

[0053]

[0054] For example, cos(2π lon) and sin(2π lon) have similar values ​​at longitude 0°, which corresponds to the prime meridian, and at the nearby longitude of 350°, making them features based on periodicity in the longitudinal direction. On the other hand, cos(π lat) and sin(π lat) have features based on contrasting characteristics between the Southern and Northern Hemispheres, such as seasonality in climate, and the proximity of longitude in the high latitudes.

[0055] Furthermore, in some cases, such as in an ocean general circulation model targeting ocean currents, depth-wise geographical information may be present for state variables. In such cases, the depth-wise geographical information may also be used. In this case, the second calculation unit 122 similarly normalizes the depth-wise value h as an additional feature and introduces it.

[0056] The adding unit 123 adds the temporal feature calculated by the first calculating unit 121 and / or the spatial feature calculated by the second calculating unit 122 to the simulation data based on the shape of the input state variables.

[0057] For example, if the simulation data is vector data, the adding unit 123 adds the temporal feature and / or spatial feature directly as a feature dimension. If the simulation data is grid data, the adding unit 123 adds the temporal feature and / or spatial feature as a channel dimension. If the simulation data is graph data, the adding unit 123 adds the temporal feature and / or spatial feature as a feature for a node.

[0058] The adding unit 123 adds each u {t×Δt} In contrast, both the temporal feature quantity and the spatial feature quantity may be added to the state variables of the simulation data, or either the temporal feature quantity or the spatial feature quantity may be added to the state variables of the simulation data.

[0059] The adding unit 123 can also combine additional information with the simulation data. For example, the adding unit 123 can combine a simulation parameter θ to accommodate various simulation settings.

[0060] The learning data processing unit 13 processes the simulation data u {t×Δt} (t=0, 1, 2, ..., T) is input, and learning data is generated for learning a model that obtains a predicted value of the state variable at time t+Δt. {t×Δt} and u{(t+1)×Δt} (t = , ..., T-1), and randomly rearrange them to generate B (Equation (6)), which is used as training data.

[0061]

[0062] The estimation unit 14 inputs simulation data of the state variables at a first time, to which temporal features and / or spatial features have been added, into an estimation model 141 configured by a neural network (NN), and estimates a predicted value of the time-series data of the state variables at a second time, which is a time after the first time. The estimation model 141 is, for example, a machine learning model such as a deep learning model.

[0063] During learning, the estimation unit 14 first inputs the learning data processed by the processing unit 11 to the estimation model 141, which has been set with appropriate initial values ​​in advance. The learning data is simulation data u {t×Δt} and u{(t+1)×Δt} (t = , ..., T-1).

[0064] The estimation unit 14 acquires and outputs a predicted value of the state variable at time (t+Δt), which is the output of the estimation model 141. The estimation model 141 used here can adopt various formats, such as a multilayer perceptron (MLP) when handling vector data, a convolution neural network (CNN) when handling grid data, or a graph neural network (GNN) when handling graph data.

[0065] The parameter update unit 15 updates the parameters of the estimation model 141 so that the predicted value of the state variable at the second time estimated by the estimation unit 14 approaches the actual value of the state variable at the second time in the simulation data.

[0066] The parameter update unit 15 updates the parameters of the estimation model 141 through supervised learning using the predicted values ​​of the state variables at time (t+Δt) output from the estimation unit 14 and the actual values ​​of the state variables at time (t+Δt) included in the set of learning data. The parameter update unit 15 updates the parameters of the estimation model 141 by, for example, applying a general stochastic gradient descent method using the mean square error between the predicted values ​​and the actual values ​​of the state variables.

[0067] The learning device 10 repeats the estimation process by the estimation unit 14 and the parameter update process by the parameter update unit 15 until a predetermined termination condition is met. The termination condition may be, for example, that the comparison result between the predicted value of the state variable and the actual value of the state variable is equal to or less than a predetermined value, or that the number of repetitions has reached a predetermined number.

[0068] [Estimation Device] Next, an estimation device according to an embodiment will be described. Fig. 3 is a diagram showing an example of the configuration of the estimation device according to an embodiment.

[0069] The estimation device 20 according to the embodiment is realized, for example, by loading a predetermined program into a computer or the like including a ROM, a RAM, a CPU, etc., and causing the CPU to execute the predetermined program. The estimation device 20 also has a communication interface for transmitting and receiving various information to and from other devices connected via a network, etc. The estimation device 20 has a feature calculation unit 22 and an estimation unit 24.

[0070] The feature calculation unit 22 has the same configuration as the feature calculation unit 12 shown in FIG. 1 and executes the same processing as the feature calculation unit 12. The feature calculation unit 22 calculates temporal feature amounts of the Earth for input data that is, for example, time-series data of state variables related to the Earth. The feature calculation unit 22 calculates spatial feature amounts for the input data based on the periodicity of the Earth's shape in a predetermined direction. The feature calculation unit 22 adds the temporal feature amounts and / or spatial feature amounts to the input data and outputs the input data to the estimation unit 24.

[0071] The estimation unit 24 has an estimation model 241 configured by a neural network. The estimation model 241 is set with model parameters of the estimation model 141 updated by the learning device 10. In other words, the estimation model 241 is a model that has been trained to estimate a predicted value of time-series data of state variables at a second time that is later than the first time when simulation data of state variables at a first time to which temporal features of the Earth and / or spatial features based on the periodicity of the Earth's shape in a predetermined direction are added.

[0072] The estimation unit 24 inputs input data of the state variables at a third time, to which temporal features and / or spatial features have been added, into the estimation model 241, and estimates a predicted value of the time series data of the state variables at a fourth time, which is a time after the third time.

[0073] The estimation device 20 performs autoregressive prediction using the trained estimation model 241 to obtain a predicted value u' regarding the time change of the state variable to be obtained. {t×Δt} (t = T+1, T+2, ..., T') is obtained.

[0074] First, the estimation device 20 calculates the state variable u {T×Δt} to the feature calculation unit 22 to obtain data to which the same feature values ​​as those used during learning have been added. The estimation device 20 inputs the input data to which the feature values ​​have been added to the trained estimation model 241. As a result, the estimation device 20 obtains a predicted value u'{(T+1)×Δt} of the state variable after Δt time has elapsed.

[0075] Next, the estimation device 20 again inputs the acquired u'{(T+1)×Δt} into the feature calculation unit 22, and then inputs the data with the feature added to the estimation model 241, thereby acquiring the next step, that is, the predicted value u{(T+2)×Δt} of the state variable after 2×Δt time has elapsed. The estimation device 20 repeats the calculation of the feature and the estimation process for the predicted value of the state variable, thereby making it possible to predict the simulation result over the long term.

[0076] [Processing] FIG. 4 is a flowchart showing the processing procedure of the processing in the embodiment.

[0077] In the learning device 10, the processing unit 11 accepts input of simulation data (step S11). The feature calculation unit 12 calculates temporal and / or spatial features and performs feature calculation processing to add them to state variables of the simulation data (step S12). The learning data processing unit 13 processes the simulation data with the added features into learning data to be input to the estimation model 141 (step S13).

[0078] [Feature Calculation Processing] FIG. 5 is a flowchart showing the processing procedure of the feature calculation processing (step S12) shown in FIG.

[0079] The feature calculation unit 12 calculates the temporal feature of the Earth for the input simulation data (step S21). The second calculation unit 122 calculates the spatial feature of the input simulation data based on the periodicity of the Earth's shape in a predetermined direction (step S22).

[0080] The adding unit 123 performs an adding process of adding the temporal feature calculated in step S21 and / or the spatial feature calculated in step S22 to the simulation data (step S23). Note that steps S21 and S22 may be executed in parallel or in series. Alternatively, only one of steps S21 and S22 may be executed.

[0081] [Learning Process] FIG. 6 is a flowchart showing the processing procedure of the learning process according to the embodiment.

[0082] In the learning device 10, when the estimation unit 14 receives input of the learning data generated by the processing unit 11 (step S31), the estimation unit 14 inputs the learning data to the estimation model 141 and performs an estimation process to estimate predicted values ​​of the state variables (step S32). The estimation unit 14 inputs simulation data of the state variables at a first time point, to which temporal features and / or spatial features have been added, to the estimation model 141, and estimates predicted values ​​of the time-series data of the state variables at a second time point that is later than the first time point.

[0083] The parameter update unit 25 updates the parameters of the estimation model 141 so that the predicted value of the state variable at the second time estimated by the estimation unit 14 approaches the actual value of the state variable at the second time in the simulation data (step S33).

[0084] If the predetermined termination condition is not satisfied (step S34: No), the learning device 10 returns to step S32 and executes steps S32 and S33. If the predetermined termination condition is satisfied (step S34: Yes), the learning device 10 terminates the learning process.

[0085] [Estimation Process] FIG. 7 is a flowchart showing the processing procedure of the estimation process according to the embodiment.

[0086] In the estimation device 20, when input of data is received (step S41), the feature calculation unit 22 performs a feature calculation process in which temporal feature values ​​and / or spatial feature values ​​are calculated and added to the state variables of the input data (step S42). The feature calculation process is the same as the processing procedure shown in FIG.

[0087] The estimation unit 24 inputs the input data to which the temporal feature and / or spatial feature has been added to the estimation model 241, and performs estimation processing to estimate predicted values ​​of the state variables (step S43). The estimation unit 24 estimates predicted values ​​of the time-series data of the state variables at the third time s to which the temporal feature and / or spatial feature has been added.

[0088] If the estimation is not to be terminated (step S44: No), the estimation device 20 proceeds to step S42. That is, the estimation device 20 performs feature calculation processing and estimation processing on the predicted values ​​of the time series data of the state variables at the fourth time estimated by the estimation unit 24. The feature calculation processing and estimation processing are repeated based on the predicted values ​​of the time series data of the state variables estimated by the estimation unit 24, thereby predicting the simulation results over the long term. If the estimation is to be terminated (step S44: Yes), the estimation device 20 outputs the estimation results (long-term prediction results of the simulation results) (step S45).

[0089] [Effects of the embodiment] As described above, in the embodiment, temporal features and / or spatial features are calculated from data and added to the data both during learning and estimation, making it easier for the estimation models 141 and 241 to capture the temporal and spatial characteristics of the original simulation results.

[0090] Therefore, in the embodiment, by adding the temporal and / or spatial features to the data, it becomes possible to efficiently learn the temporal and spatial characteristics related to the transition and development of the state variables from the data, and to imitate the characteristics of the original simulation results with high accuracy. As a result, according to the embodiment, it becomes possible to predict the simulation results over the long term.

[0091] The embodiment can be applied to IAMs that simulate social and economic activities on a global scale, such as models that predict future CO2 emissions, models that predict Gross Domestic Product (GDP) by country, and models that simulate agricultural production on a global scale.

[0092] Furthermore, the embodiments are not limited to the Earth, and can also be applied to simulators for other planets, such as general circulation models for other spherical celestial bodies, such as Mars and Venus. Furthermore, the embodiments are not limited to spheres, as long as the object incorporates periodic features in both the latitudinal and longitudinal directions. For example, the embodiments can be applied to other shapes, such as ellipsoids and tori, that have periodicity in the latitudinal and longitudinal directions. Shapes such as ellipsoids and tori often appear in simulations of the universe and galaxies. Therefore, the embodiments can be applied to galaxies with ellipsoids (elliptical galaxies) and gas regions distributed on a torus (molecular torus) inside large-scale black holes.

[0093] [System Configuration of the Embodiment] The components of the learning device 10 and the estimation device 20 shown above are conceptual functional components and do not necessarily need to be physically configured as shown in the drawings. In other words, the specific forms of distribution and integration of the functions of the learning device 10 and the estimation device 20 are not limited to those shown in the drawings, and all or part of them can be functionally or physically distributed or integrated in any unit depending on various loads, usage conditions, etc.

[0094] Furthermore, all or any part of the processes performed by the learning device 10 and the estimation device 20 may be realized by a CPU and a program analyzed and executed by the CPU. Furthermore, each process performed by the learning device 10 may be realized as hardware using wired logic.

[0095] Furthermore, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually. Alternatively, all or part of the processes described as being performed manually can be performed automatically using a known method. In addition, the process procedures, control procedures, specific names, and information including various data and parameters described above and illustrated can be changed as appropriate unless otherwise specified.

[0096] 8 is a diagram showing an example of a computer in which the learning device 10 and the estimation device 20 are realized by executing a program. The computer 1000 includes, for example, a memory 1010 and a CPU 1020. The computer 1000 also includes a hard disk drive interface 1030, a disk drive interface 1040, a serial port interface 1050, a video adapter 1060, and a network interface 1070. These components are connected by a bus 1080.

[0097] The memory 1010 includes a ROM 1011 and a RAM 1012. The ROM 1011 stores a boot program such as a BIOS (Basic Input Output System). The hard disk drive interface 1030 is connected to a hard disk drive 1090. The disk drive interface 1040 is connected to a disk drive 1100. A removable storage medium such as a magnetic disk or optical disk is inserted into the disk drive 1100. The serial port interface 1050 is connected to a mouse 1110 and a keyboard 1120, for example. The video adapter 1060 is connected to a display 1130, for example.

[0098] The hard disk drive 1090 stores, for example, an OS (Operating System) 1091, an application program 1092, a program module 1093, and program data 1094. That is, the program that defines each process of the learning device 10 is implemented as a program module 1093 in which code executable by the computer 1000 is written. The program module 1093 is stored, for example, on the hard disk drive 1090. For example, a program module 1093 for executing processes similar to those of the functional configuration of the learning device 10 is stored on the hard disk drive 1090. Note that the hard disk drive 1090 may be replaced by an SSD (Solid State Drive).

[0099] Furthermore, setting data used in the processing of the above-described embodiment is stored as program data 1094, for example, in memory 1010 or hard disk drive 1090. Then, CPU 1020 reads out program module 1093 or program data 1094 stored in memory 1010 or hard disk drive 1090 into RAM 1012 as necessary and executes them.

[0100] The program module 1093 and program data 1094 may not necessarily be stored in the hard disk drive 1090, but may also be stored in, for example, a removable storage medium and read by the CPU 1020 via the disk drive 1100 or the like. Alternatively, the program module 1093 and program data 1094 may be stored in another computer connected via a network (such as a local area network (LAN) or a wide area network (WAN)). The program module 1093 and program data 1094 may then be read by the CPU 1020 from the other computer via the network interface 1070.

[0101] Although the present invention has been described above as an embodiment, the present invention is not limited to the descriptions and drawings that form part of the disclosure of the present invention. In other words, other embodiments, examples, and operational techniques that are made by those skilled in the art based on the present invention are all included in the scope of the present invention.

[0102] REFERENCE SIGNS LIST 10 Learning device 11 Processing unit 12, 22 Feature amount calculation unit 13 Learning data processing unit 14, 24 Estimation unit 15 Parameter update unit 20 Estimation device 121 First calculation unit 122 Second calculation unit 123 Addition unit 141, 241 Estimation model

Claims

1. A learning device comprising: a first calculation unit that calculates temporal features of an object for simulation data which is time-series data of state variables relating to an object having a shape with periodicity in a predetermined direction; a second calculation unit that calculates spatial features of the simulation data based on the periodicity of the shape of the object in the predetermined direction; an addition unit that adds the temporal features and / or the spatial features to the simulation data; an estimation unit that inputs the simulation data of the state variables at a first time to which the temporal features and / or the spatial features have been added, into an estimation model formed by a neural network, and estimates a predicted value of the time-series data of the state variables at a second time which is later than the first time; and an update unit that updates parameters of the estimation model so that the predicted value of the state variable at the second time estimated by the estimation unit approaches an actual value of the state variable at the second time of the simulation data.

2. The learning device according to claim 1, characterized in that the first calculation unit calculates the temporal feature amount based on a calendar of the object.

3. The learning device described in claim 1, characterized in that the object has a shape that has periodicity in the latitudinal and / or longitudinal directions, and the second calculation unit calculates the spatial feature amount based on the periodicity of the object in the latitudinal and / or longitudinal directions.

4. The learning device described in claim 1, characterized in that the simulation data is data obtained by discretizing the object into a plurality of representative points, grids, or graphs, and running a simulation of the state variables at each discretized point according to the calendar of the object, and the addition unit adds the temporal features and / or the spatial features as feature dimensions if the simulation data is vector data, adds them as channel dimensions if the simulation data is grid data, and adds them as features for nodes if the simulation data is graph data.

5. An estimation device comprising: a first calculation unit that calculates a temporal feature of an object for input data which is time series data of state variables related to an object having a shape with periodicity in a predetermined direction; a second calculation unit that calculates a spatial feature of the input data based on the periodicity of the shape of the object in the predetermined direction; an addition unit that adds the temporal feature and / or the spatial feature to the input data; and an estimation unit that inputs input data of state variables at a third time to which the temporal feature and / or the spatial feature has been added, to the estimation model which is constructed using a neural network and has been trained to estimate a predicted value of the time series data of the state variables at a second time which is later than the first time when simulation data of the state variables at a first time to which the temporal feature and / or the spatial feature based on the periodicity of the shape of the object in the predetermined direction has been added, and estimates a predicted value of the time series data of the state variables at a fourth time which is later than the third time.

6. A learning method executed by a learning device, comprising: a first calculation step of calculating a temporal feature of an object for simulation data which is time-series data of state variables relating to an object having a shape with periodicity in a predetermined direction; a second calculation step of calculating a spatial feature of the simulation data based on the periodicity of the shape of the object in the predetermined direction; an addition step of adding the temporal feature and / or the spatial feature to the simulation data; an estimation step of inputting the simulation data of the state variables at a first time to which the temporal feature and / or the spatial feature has been added, into an estimation model formed by a neural network, and estimating a predicted value of the time-series data of the state variables at a second time which is later than the first time; and an update step of updating parameters of the estimation model so that the predicted value of the state variable at the second time estimated in the estimation step approaches an actual value of the state variable at the second time of the simulation data.

7. An estimation method executed by an estimation device, comprising: a first calculation step of calculating a temporal feature of an object for input data which is time series data of state variables related to an object having a shape with periodicity in a predetermined direction; a second calculation step of calculating a spatial feature of the input data based on the periodicity of the shape of the object in the predetermined direction; an addition step of adding the temporal feature and / or the spatial feature to the input data; and an estimation step of inputting input data of state variables at a third time to which the temporal feature and / or the spatial feature has been added to an estimation model configured by a neural network, the estimation model being trained to estimate a predicted value of the time series data of the state variables at a second time that is later than the first time when simulation data of the state variables at a first time to which the temporal feature and / or the spatial feature based on the periodicity of the shape of the object in the predetermined direction has been added, and estimating a predicted value of the time series data of the state variables at a fourth time that is later than the third time.

8. A program for causing a computer to function as the learning device according to claim 1, 2, 3 or 4, or the estimation device according to claim 5.

Citation Information

Patent Citations

  • Trajectory prediction method and device

    JP2022016419A

  • Weather prediction device

    JP2022124878A