Scheduling method and apparatus for cargo unit
By calculating the usage rate of the cache space in the storage area and determining the target cargo unit, the dynamic adjustment of the cache space is realized, the problem of unreasonable cache space occupation is solved, the storage and handling efficiency of the cargo unit is improved, and the handling cost is reduced.
Patent Information
- Application Number
- PCT/CN2024/087237
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-21
- Filing Date
- 2024-04-11
- Publication Date
- 2024-10-24
AI Technical Summary
In the warehousing operation scenario, the number of cache spaces on the shelves is limited, resulting in unreasonable cache space occupation, affecting the robot's handling efficiency, and the number of available cache spaces gradually decreases, affecting the storage and handling efficiency of cargo units.
By obtaining the number of cache bits and the number of occupied cache bits in the storage area, the cache bit usage rate is calculated. When the preset threshold is reached, the target cargo unit is determined and a handling instruction is sent to the handling equipment to move it to the free storage spot. Dynamically adjust the cache bit occupancy, improve the cache bit reuse rate, and reduce the handling and cost of handling equipment.
It effectively solves the problem of unreasonable cache space occupation, improves the storage and handling efficiency of cargo units, reduces handling costs, and improves the overall efficiency of warehousing operations.
Smart Images

Figure CN2024087237_24102024_PF_FP_ABST
Abstract
Description
Cargo unit dispatching method and device
[0001] This application claims priority to Chinese patent application No. 202310440134.4 filed on April 21, 2023, and priority to Chinese patent application No. 202310434449.8 filed on April 21, 2023, the entire contents of which are incorporated by reference into this application. Technical Field
[0002] The present disclosure relates to the field of warehousing technology, and in particular to a method and device for dispatching cargo units. Background Art
[0003] In warehouse operations, robots can move through the aisles between shelves to perform handling tasks. Shelves are pre-configured with a certain number of storage locations and buffer locations. Storage locations are used to store goods, while buffer locations are used to temporarily store cartons. However, due to the limited number of buffer locations on shelves, as the warehouse area operates, the number of available buffer locations for caching cartons gradually decreases, affecting the robot's handling efficiency.
[0004] Summary of the Invention
[0005] Embodiments of the present disclosure provide a method and device for dispatching cargo units.
[0006] According to a first aspect of an embodiment of the present disclosure, a method for scheduling cargo units is provided, which is applied to a control device and includes: first, obtaining a first number of cache locations in a first storage area of a warehousing system and a second number of occupied cache locations in the first storage area; wherein the first storage area includes at least one storage rack, and each storage rack is pre-installed with multiple cache locations and multiple storage locations. Secondly, based on the first number and the second number, determining the cache location utilization rate of the first storage area. Then, when the cache location utilization rate reaches a preset utilization rate threshold, determining a target cargo unit among the cargo units cached in the occupied cache locations. Finally, sending a cargo unit handling instruction to a first handling device in the first storage area to control the first handling device to transport the target cargo unit to a target free storage location in the first storage area.
[0007] According to a second aspect of an embodiment of the present disclosure, a scheduling device for cargo units is provided, comprising an acquisition module, a first determination module, a second determination module, and a control module. The acquisition module is configured to acquire a first number of cache locations in a first storage area of a warehousing system and a second number of occupied cache locations in the first storage area; the first storage area comprises at least one storage rack, and each storage rack is pre-installed with a plurality of cache locations and a plurality of storage locations. The first determination module is configured to determine a cache location utilization rate of the first storage area based on the first number and the second number. The second determination module is configured to determine a target cargo unit in the cargo location unit cached in the occupied cache location when the cache location utilization rate reaches a preset utilization rate threshold. The control module is configured to send a cargo unit handling instruction to a first handling device in the first storage area to control the first handling device to transport the target cargo unit to a target free storage location.
[0008] According to a third aspect of an embodiment of the present disclosure, a computing device is provided, comprising a memory, a processor, and computer instructions stored in the memory and executable on the processor, wherein when the processor executes the computer instructions, the steps of the cargo unit scheduling method described in the first aspect are implemented.
[0009] According to a fourth aspect of an embodiment of the present disclosure, a computer-readable storage medium is provided, which stores computer instructions. When the computer instructions are executed by a processor, the steps of the method for scheduling cargo units described in the first aspect are implemented.
[0010] A fifth aspect of an embodiment of the present disclosure provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium, and the computer program includes program instructions. When the program instructions are executed by a computer, the computer executes the steps of the cargo unit scheduling method described in the first aspect.
[0011] A sixth aspect of the embodiments of the present disclosure provides a computer program, which, when executed by a processor, can implement the steps of the method for scheduling cargo units described in the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] FIG1A is a schematic diagram of a cargo unit scheduling scenario provided by some embodiments of the present disclosure;
[0013] FIG1B is a schematic diagram of a storage rack provided in some embodiments of the present disclosure;
[0014] FIG1C is a schematic diagram of another cargo unit dispatching scenario provided by some embodiments of the present disclosure;
[0015] FIG1D is a schematic diagram of another storage rack provided by some embodiments of the present disclosure;
[0016] FIG2 is a schematic diagram of a method for dispatching cargo units provided in some embodiments of the present disclosure;
[0017] FIG3 is a schematic diagram of another method for dispatching cargo units provided in some embodiments of the present disclosure;
[0018] FIG4A is a schematic diagram of another cargo unit dispatching scenario provided by some embodiments of the present disclosure;
[0019] FIG4B is a schematic diagram of a storage scenario of a cargo unit provided by some embodiments of the present disclosure;
[0020] FIG4C is a schematic diagram of another storage scenario of cargo units provided by some embodiments of the present disclosure;
[0021] FIG4D is a schematic diagram of another storage scenario of cargo units provided by some embodiments of the present disclosure;
[0022] FIG5 is a schematic diagram of another method for dispatching cargo units provided in some embodiments of the present disclosure;
[0023] FIG6 is a schematic diagram of a storage scenario of a single-side workstation provided in some embodiments of the present disclosure;
[0024] FIG7 is a schematic diagram of a storage scenario of a double-sided workstation provided by some embodiments of the present disclosure;
[0025] FIG8 is a schematic diagram of another storage scenario of a double-sided workstation provided by some embodiments of the present disclosure;
[0026] FIG9 is a schematic diagram of yet another method for dispatching cargo units provided in some embodiments of the present disclosure;
[0027] FIG10 is a schematic diagram of a dispatching device for cargo units provided by some embodiments of the present disclosure;
[0028] FIG11 is a schematic diagram of a computing device provided by some embodiments of the present disclosure. DETAILED DESCRIPTION
[0029] The following description sets forth many specific details to facilitate a full understanding of the present disclosure. However, the present disclosure can be implemented in many other ways than those described herein, and those skilled in the art can make similar generalizations without violating the scope of the present disclosure. Therefore, the present disclosure is not limited to the specific implementations disclosed below.
[0030] The terms used in one or more embodiments of the present disclosure are for the purpose of describing specific embodiments only and are not intended to limit one or more embodiments of the present disclosure. The singular forms "a", "the", and "the" used in one or more embodiments of the present disclosure and the appended claims are also intended to include plural forms unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used in one or more embodiments of the present disclosure refers to and includes any or all possible combinations of one or more associated listed items.
[0031] It should be understood that although the terms first, second, etc. may be used to describe various information in one or more embodiments of the present disclosure, such information should not be limited to these terms. These terms are only used to distinguish information of the same type from each other. For example, without departing from the scope of one or more embodiments of the present disclosure, the first may also be referred to as the second, and similarly, the second may also be referred to as the first. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".
[0032] First, the terms used in the following embodiments of the present disclosure are explained.
[0033] SKU: Stock Keeping Unit (SKU), the basic unit of measurement for inventory in and out, can be in units of pieces, boxes, pallets, etc. It is also referred to as the abbreviation for product identification number. Each product has a unique SKU number.
[0034] In some examples, robots can operate in the aisles of shelves in a storage area. The shelves in the storage area are pre-installed with a certain number of storage locations and a certain number of cache locations. The storage locations are located above the cache locations, and are used to store containers, while the cache locations are used to temporarily store containers. Containers can include cargo boxes, material boxes, and original boxes. The following embodiments use cargo boxes as an example. For example, a first robot can move a cargo box to a cache location on the bottom shelf for temporary storage, and then a second robot can move the cargo box temporarily stored in the cache location to a storage location above for storage.
[0035] In some cases, buffer slots are located on the bottom shelf and are limited in number. After a robot moves a box to a buffer slot for temporary storage, if the box is not promptly moved to a storage location, the number of unused buffer slots will gradually increase, and the number of available buffer slots will gradually decrease, affecting the robot's handling efficiency. Therefore, it is necessary to adjust the number of buffer slots in a timely manner according to the operation of the storage area to ensure the smooth progress of storage operations.
[0036] FIG1A is a schematic diagram of a cargo unit dispatching scenario provided by some embodiments of the present disclosure. As shown in FIG1A , a first storage area 100 is provided with a plurality of storage racks 120 , and a first handling device 110 operates in a lane formed by two storage racks.
[0037] In some examples, the first storage area 100 includes multiple storage racks 120, with lanes disposed between adjacent rows of storage racks 120. Multiple lanes may be provided in the first storage area. The first handling device 110 can move within any lane of the first storage area 100 to transport cargo boxes placed on the storage racks 120 on either side of the lane. For example, the first handling device 110 can transport cargo boxes placed in a buffering position on a storage rack 120 to an upper storage position, or alternatively, transport cargo boxes placed in an upper storage position to a buffering position on a lower level.
[0038] Figure 1B is a schematic diagram of a storage rack provided in some embodiments of the present disclosure. As shown in Figure 1B, the storage rack 120 is provided with a plurality of storage locations and a plurality of cache locations.
[0039] In some examples, the cache position can be set at the bottom layer of the storage rack 120, and the storage position can be set above the cache position; or, the storage position can also be set to the left or right of the cache position. The embodiments of the present disclosure do not limit the positional relationship between the cache position and the storage position. The following embodiments are illustrative using the example of the storage position being set above the cache position.
[0040] Figure 1C is a schematic diagram of another cargo unit dispatching scenario provided by some embodiments of the present disclosure. As shown in Figure 1C , a first handling device 110 retrieves or stores a cargo unit from a storage rack 120. For example, in an aisle formed by two storage racks 120, the first handling device 110 identifies a target cargo unit from among the cargo units (e.g., cargo boxes) cached in a lower cache location and transports the identified target cargo unit to an upper storage location.
[0041] Figure 1D is a schematic diagram of another storage rack provided in some embodiments of the present disclosure. As shown in Figure 1D, a plurality of cache locations are provided on the bottom layer of the storage rack, and a plurality of storage locations are provided above the cache locations.
[0042] The embodiment of the present disclosure provides a method for dispatching cargo units, which obtains the total number of cache locations in the first storage area and the number of occupied cache locations (cache locations of cached cargo units), calculates the cache location utilization rate of the first storage area according to the number of occupied cache locations and the total number of cache locations in the first storage area, and then determines whether the cache location utilization rate reaches a preset utilization rate threshold. In the case where the cache location utilization rate reaches the preset utilization rate threshold, a target cargo unit cached in a target cache location that needs to be transported to an idle storage location is determined from the occupied cache locations. At this time, the control device sends a cargo unit transport instruction to the first transport device, so that the first transport device transports the target cargo unit to the idle storage location. The embodiment of the present disclosure solves the problem of invalid occupation of cache locations by dynamically adjusting the number of occupied cache locations, improves the reuse rate of cargo units on cache locations, and thereby reduces the transport actions of the first transport device, reduces transport costs, and improves transport efficiency.
[0043] The dispatching method of cargo units provided by the embodiment of the present disclosure is described in detail below with reference to FIG. 2 .
[0044] FIG2 is a schematic diagram of a method for dispatching cargo units provided in some embodiments of the present disclosure. As shown in FIG2 , the method includes the following steps:
[0045] Step 202: Obtain a first number of cache bits in a first storage area and a second number of occupied cache bits in the first storage area.
[0046] The first storage area includes at least one storage rack, and each storage rack is pre-installed with a plurality of cache locations and a plurality of storage locations.
[0047] In some examples, a certain number of buffer slots can be provided on the storage rack 120 to temporarily store boxes removed from storage but not yet moved to the workstation. Alternatively, they can be used to store boxes that the robot has moved from the workstation to the inventory area. As warehouse operations continue, boxes gradually accumulate in the buffer slots, resulting in a decreasing number of buffer slots. This can result in a lack of free buffer slots for storing boxes, impacting the robot's handling efficiency. Therefore, the number of buffer slots needs to be dynamically adjusted.
[0048] In some examples, the cargo unit scheduling method provided in the embodiments of the present disclosure can be applied to a control device, which can be a server or terminal device, or a device deployed with a Robot Management System (RMS). The terminal device can include at least one of a personal computer, a laptop computer, a smartphone, a tablet computer, and a portable wearable device; the server can include an independent server or a server cluster consisting of multiple servers, which is not limited in the embodiments of the present disclosure. For example, the control device in the embodiments of the present disclosure can be a device deployed with an RMS.
[0049] In some examples, the first handling device may be a handling device used to perform handling tasks within the first storage area. For example, the first handling device may be an intelligent mobile robot or other intelligent mobile device capable of storing and retrieving goods. For example, the first handling device may be a container robot that handles goods and / or containers.
[0050] In some examples, the inventory area may be divided into multiple storage areas, and the first storage area may be any one of the multiple storage areas. The first storage area may include at least one storage rack, each of which is pre-set with multiple cache locations and multiple storage locations.
[0051] For example, among the plurality of cache locations in the first storage area, the cache locations that have already cached cargo units are referred to as occupied cache locations, and the cache locations that have not yet cached cargo units are referred to as vacant cache locations. Among the plurality of storage locations in the first storage area, the storage locations that have already stored cargo units are referred to as occupied storage locations, and the storage locations that have not yet stored cargo units are referred to as vacant storage locations.
[0052] In some examples, the cargo unit may include a container, which may be an ordinary cargo box (also called a material box) or a cargo packaging (also called an original box), which is not limited in the present embodiment. The present embodiment is schematically described using the cargo unit being a cargo box as an example.
[0053] In some examples, the first number is the total number of cache bits pre-set in the first storage area; the second number is the number of occupied cache bits in the first storage area.
[0054] The cargo unit scheduling method provided by the embodiment of the present disclosure, after determining the first storage area that needs to be scheduled for cargo units in the inventory area, further obtains the number of cache bits in the first storage area and the number of occupied cache bits, so that the cache bit utilization rate of the first storage area can be determined based on the total number of cache bits and the number of occupied cache bits, and then the use of cache bits can be adjusted to achieve reasonable use of cache bits.
[0055] Step 204: Determine the cache bit usage rate of the first storage area according to the first quantity and the second quantity.
[0056] In some examples, the cache bit usage rate in the first storage area can be calculated based on the total number of cache bits in the first storage area and the number of occupied cache bits. For example, the cache bit usage rate can be the ratio of the number of occupied cache bits to the total number of cache bits, i.e., cache bit usage rate = second number / first number.
[0057] For example, there are 100 cache bits in the first storage area, of which 60 cache bits are occupied, that is, the number of occupied cache bits is 60, and the total number of cache bits is 100, then the cache bit usage rate of the first storage area is 0.6.
[0058] The cargo unit scheduling method provided in the embodiment of the present disclosure calculates the cache bit usage rate of the first storage area based on the number of occupied cache bits and the total number of cache bits in the first storage area, providing a basis for subsequent reasonable adjustment of the cache bit usage.
[0059] Step 206: When the cache usage rate reaches a preset usage rate threshold, a target cargo unit is determined from the cargo units in the occupied cache locations.
[0060] For example, after determining the usage rate of the cache bits in the first storage area, the occupied cache bits may be adjusted according to the usage rate of the cache bits and a preset usage rate threshold to improve the reuse rate of the cache bits.
[0061] In some examples, the cargo unit is a cargo box stored or cached in the first storage area, and the target cargo unit refers to a cargo unit cached in a cache position and needs to be moved to an empty storage position. The cache position where the target cargo unit is located can be referred to as the target cache position.
[0062] In some examples, a preset usage rate threshold can be set for the usage rate of the cache bits in the first storage area, and whether the number of occupied cache bits needs to be adjusted is determined based on the cache bit usage rate threshold. For example, when the usage rate of the cache bits in the first storage area exceeds the preset usage rate threshold, the number of occupied cache bits in the first storage area needs to be adjusted; when the usage rate of the cache bits in the first storage area does not exceed the preset usage rate threshold, the number of occupied cache bits in the first storage area does not need to be adjusted.
[0063] In some examples, the preset usage threshold can be set as a data value or as a data interval. It should be noted that the preset usage threshold can be set as needed and is not limited in this embodiment of the present disclosure. For example, the preset usage threshold can be set to 0.7, or it can be set to a data interval of [0.7, 0.95].
[0064] For example, taking the preset usage threshold of 0.7 as an example, when the cache bit usage rate of the first storage area is 0.8, since the cache bit usage rate of the first storage area 0.8 is greater than the preset usage threshold of 0.7, the target cargo unit is determined from the cargo units cached in the occupied cache bits.
[0065] The cargo unit scheduling method provided by the embodiment of the present disclosure adjusts the number of occupied cache locations so that the number of free cache locations is increased during the transportation of the cargo units, thereby avoiding insufficient cache locations, resulting in a lack of corresponding locations for storing cargo units, and thus causing congestion in the transportation equipment.
[0066] In some examples, a cache location is used to temporarily store cargo units. Whether the cargo units are removed from a storage rack and need to be transported to a workstation and temporarily stored in the cache location, or the cargo units are removed from a storage rack and need to be transported to a storage location after use, the cache location can be temporarily stored. When a cargo unit stored in a cache location is a cargo unit removed from a storage rack and needs to be transported to a workstation, since the cargo unit has been hit by an order and needs to be transported to a workstation for picking, the cargo unit cannot be transported to an empty storage location. Therefore, it is necessary to determine the cargo units that need to be transported to an empty storage location from the cargo units that have been cached in the occupied cache location but have not been hit by an order.
[0067] In some embodiments, determining the target cargo unit among the cargo units cached in the occupied cache slots may include: determining at least one first cargo unit that is not hit by the order among the cargo units cached in the occupied cache slots; and determining the target cargo unit from the at least one first cargo unit.
[0068] In some examples, the cargo units that have been cached in the occupied cache locations may include cargo units that have been hit by the order, and / or cargo units that have not been hit by the order. The cargo units that have been hit by the order may be cargo units that have been hit by the first order and need to be transported to the workstation for picking tasks. The first order may be a group of orders within a preset time, or it may be the current order, and the embodiments of the present disclosure are not limited to this. The cargo units that have not been hit by the order may be cargo units that have not been hit by the first order. When a cargo unit is not hit by an order, it indicates that the cargo unit does not need to be transported to the workstation for picking, and therefore, the target cargo unit can be determined from the cargo units that have not been hit by the order (i.e., the first cargo unit).
[0069] For example, the first cargo unit is a cargo unit cached in an occupied cache location and not matched by an order, i.e., a cargo unit that is not matched by the first order. The target cargo unit is a cargo unit among the first cargo units cached in the occupied cache location that is determined to be moved to an unoccupied storage location. The number of first cargo units can be one or more. When there is only one first cargo unit, the first cargo unit can be determined as the target cargo unit. When there are multiple first cargo units, the target cargo location unit can be further determined from the multiple first cargo units.
[0070] That is to say, the cargo units that have occupied the cache positions can be determined first, and then it can be determined which cargo units among the cargo units that have occupied the cache positions are cargo units hit by the order and which are cargo units that have not been hit by the order. From the cargo units that have not been hit by the order, the target cargo units that need to be moved to the vacant storage positions can be determined.
[0071] In some embodiments, determining the target cargo unit from at least one first cargo unit includes: determining score information of each first cargo unit; and determining the target cargo unit from first cargo units whose score information is less than a score threshold.
[0072] In some embodiments, determining the score information of each first cargo unit includes: determining at least one of the handling weight of each first cargo unit, the handling distance between each first cargo unit and the first handling equipment, and the heat information of each first cargo unit; determining the score information of each first cargo unit based on at least one of the handling weight of each first cargo unit, the handling distance between each first cargo unit and the first handling equipment, and the heat information of each first cargo unit.
[0073] For example, each cargo unit may be scored based on at least one of its handling weight, the handling distance between each first cargo unit and the first handling equipment, and the heat information of each first cargo unit. Target cargo units may be determined based on the scores of each cargo unit. For example, cargo units with scores less than a threshold may be determined as target cargo units.
[0074] For example, the popularity information of each first cargo unit can be determined based on the number of times the first cargo unit is hit by orders within a preset time period. For example, the more times a first cargo unit is hit by orders within the preset time period, the greater its popularity information. It should be noted that the popularity information of the first cargo unit can also be determined using other methods, which are not limited in the present embodiment.
[0075] In some examples, determining the target cargo unit among the first cargo units whose score information is less than a score threshold includes determining the target cargo unit among the first cargo units whose heat information is less than a heat threshold.
[0076] For example, when there are multiple first cargo units whose heat information is less than the heat threshold, one of the first cargo units can be randomly determined as the target cargo unit, or the first cargo unit with the smallest heat information can be determined as the target cargo unit, or the target cargo unit can be further determined based on the handling weight of each cargo unit and / or the handling distance between each first cargo unit and the first handling equipment.
[0077] The following describes the process of determining the target cargo unit according to the transport weight of each cargo unit and the transport distance between each first cargo unit and the first transport equipment.
[0078] In some embodiments, determining the target cargo unit from at least one first cargo unit includes: obtaining a handling weight of each first cargo unit; and determining the target cargo unit from the first cargo units having a handling weight less than a preset weight threshold.
[0079] In some examples, the handling weight is used to indicate the probability that the first unit of goods will be selected by the second order. For example, the second order may be an order for a period of time in the future. In other words, the handling weight may indicate the probability that the first unit of goods will be selected by the second order within the period of time in the future.
[0080] In other examples, the handling weight of the first cargo unit may also be determined based on the category of the cargo stored in the first cargo unit and / or the order hit status. For example, each cargo unit may be assigned an initial handling weight, and based on the different categories of the cargo stored and the different order hit status, the initial handling weights may be accumulated on the basis of the initial handling weights. It should be noted that the handling weight used to determine the target cargo unit may be the accumulated handling weight.
[0081] For example, the first cargo unit S1 stores cargo 1, cargo 2, and cargo 3. The cargo grades corresponding to cargo 1, cargo 2, and cargo 3 are A, B, and C, respectively, and the first cargo unit S1 is matched by an order. The handling weights corresponding to the storage of Class A cargo, Class B cargo, and Class C cargo decrease in descending order. For example, if Class A cargo is stored, the handling weight of the first cargo unit increases by 3; if Class B cargo is stored, the handling weight of the first cargo unit increases by 2; if Class C cargo is stored, the handling weight of the first cargo unit increases by 1; and if an order is matched, the handling weight of the first cargo unit increases by 1. If the initial handling weight of the first cargo unit S1 is 0, then the handling weight of the first cargo unit S1 can be 7 (i.e., 3+2+1+1=7).
[0082] In some examples, the preset weight threshold is used to measure whether the first cargo unit needs to be moved to an empty storage location. The preset weight threshold can be set according to needs and is not limited in the embodiments of the present disclosure.
[0083] In some examples, cargo units temporarily stored in a cache location may have different probabilities of being repeatedly hit due to the different cargo stored. Cargo units with a higher probability of being hit will also be removed from the storage rack more frequently, thereby increasing the handling operations of the first handling device, increasing the workload of the first handling device, and increasing handling costs. Therefore, when determining the target cargo unit from the first cargo units, it is necessary to consider the usage frequency of the first cargo units. The target cargo unit is determined based on the usage frequency of the first cargo units, so that first cargo units with lower usage frequencies are moved to vacant storage locations.
[0084] For example, when there are multiple first cargo units with transport weights less than a preset weight threshold, the target cargo unit may be determined randomly, or the first cargo unit with the smallest transport weight may be determined as the target cargo unit.
[0085] For example, taking a preset weight threshold of 10 as an example, based on the aforementioned calculation logic for determining the same handling weight for the first cargo unit S1, the handling weight for the first cargo unit S1 is determined to be 7, the handling weight for the first cargo unit S2 is determined to be 5, the handling weight for the first cargo unit S3 is determined to be 8, and the handling weight for the first cargo unit S4 is determined to be 12, and the preset weight threshold is 10. By comparing the handling weights of the first cargo units S1, S2, S3, and S4 with the preset weight threshold, it can be determined that the first cargo units S1, S2, and S3 are smaller than the preset weight threshold, and the target cargo unit is determined among the first cargo units S1, S2, and S3.
[0086] For example, a first cargo unit may be randomly selected from S1, S2, and S3 as the target cargo unit. Therefore, the first cargo unit S1 may be determined as the target cargo unit, or the first cargo unit S2 may be determined as the target cargo unit, or the first cargo unit S3 may be determined as the target cargo unit.
[0087] For example, in order to further reduce the handling workload of the first handling equipment and improve handling efficiency, the first cargo unit S2 with the lowest handling weight among the first cargo units whose handling weight is less than a preset weight threshold may be determined as the target cargo unit.
[0088] The cargo unit scheduling method provided by the embodiment of the present disclosure obtains the handling weight of each first cargo unit and determines the target cargo unit among the first cargo units whose handling weight is less than the preset weight threshold according to a preset weight threshold, thereby reducing the handling workload of the first handling equipment and improving the handling efficiency.
[0089] In some embodiments, determining the target cargo unit from the first cargo units includes: calculating the transport distance between each first cargo unit and the first transport equipment; and determining the target cargo unit from the first cargo units whose transport distance is less than a preset transport distance threshold.
[0090] In some examples, if the target cargo unit is far from the first handling device, the first handling device may need to move to the target cargo unit to perform the handling operation, which may take a long time and reduce the working efficiency of the first handling device. Therefore, the target cargo unit may also be determined based on the distance between the first cargo unit and the first handling device.
[0091] For example, the transport distance refers to the actual travel distance that the first transport device travels to the first cargo unit, and the preset transport distance threshold refers to the travelable distance that the first transport device travels to the first cargo unit.
[0092] In some examples, the transport distance between each first cargo unit and the first transport equipment is calculated respectively, and based on a preset transport distance threshold, the target cargo unit is determined among the first cargo units whose transport distance is less than the preset transport distance threshold.
[0093] For example, the transport distance between the first cargo unit and the first transport device can be identified by a laser radar installed at the bottom of the first transport device, or the transport distance can be calculated by a control device and fed back to the first transport device. The embodiment of the present disclosure does not limit the method for determining the transport distance between the first cargo unit and the first transport device.
[0094] For example, when there are multiple first cargo units whose transport distance is less than the preset transport distance threshold, the target cargo unit may be determined randomly, or the first cargo unit with the shortest transport distance may be determined as the target cargo unit.
[0095] In some examples, assuming a preset handling distance threshold of 10 meters, it is determined that the handling distance between the first cargo unit S5 and the first handling equipment is 7 meters, the handling distance between the first cargo unit S6 and the first handling equipment is 3 meters, the handling distance between the first cargo unit S7 and the first handling equipment is 6 meters, and the handling distance between the first cargo unit S8 and the first handling equipment is 11 meters, and the preset handling distance threshold is 10 meters. By comparing the handling distances between the first cargo units S5, S6, S7, and S8 and the first handling equipment with the preset handling distance threshold, it is determined that the first cargo units S5, S6, and S7 are smaller than the preset handling distance threshold, and the target cargo unit is determined among the first cargo units S5, S6, and S7.
[0096] For example, a first cargo unit may be randomly selected as the target cargo unit from among S5, S6, and S7, such as determining the first cargo unit S5 as the target cargo unit, or determining the first cargo unit S6 as the target cargo unit, or determining the first cargo unit S7 as the target cargo unit.
[0097] For another example, in order to further reduce the operation time of the first handling equipment and improve handling efficiency, the first cargo unit S6 with the shortest handling distance among the first cargo units whose handling distance is less than the preset handling distance threshold can be directly determined as the target cargo unit.
[0098] It should be noted that, in addition to the above implementation, the target cargo unit can also be determined by comprehensively considering the transport weight and transport distance of the first cargo unit. The method for determining the target cargo unit can be selected and determined according to the actual business application scenario, and this disclosure does not limit it here.
[0099] For example, the transport weight and transport distance of a first cargo unit may be determined. Among the first cargo units whose transport distance is less than a preset transport distance threshold, the first cargo unit with the lowest transport weight is selected as the target cargo unit. If, within the preset transport distance threshold, no first cargo unit with a transport weight less than the preset weight threshold exists, the target cargo unit is randomly determined among the first cargo units whose transport distance is less than the preset transport distance threshold, or the first cargo unit with the shortest transport distance is determined as the target cargo unit. Alternatively, among the first cargo units whose transport weight is less than the preset weight threshold, the first cargo unit with the shortest transport distance is selected as the target cargo unit.
[0100] The scheduling method for cargo units provided in the embodiments of the present disclosure determines the target cargo unit in the first cargo unit based on the heat information of the first cargo unit, the handling weight of the first cargo unit and / or the handling distance between the first cargo unit and the first handling equipment. This can reduce the handling actions of the first handling equipment, shorten the operating time of the first handling equipment, and thus improve the working efficiency of the first handling equipment.
[0101] Step 208: Sending a cargo unit transport instruction to the first transport device in the first storage area to control the first transport device to transport the target cargo unit to the target vacant storage location.
[0102] The cargo unit scheduling method provided by the embodiment of the present disclosure is applied to a control device. Regardless of whether the control device is placed in the first handling equipment or is independently set outside the first handling equipment, after determining the target cargo unit, it is necessary to send a cargo unit handling instruction to the first handling equipment to drive the first handling equipment to transport the target cargo unit to an empty storage position.
[0103] In some embodiments, step 208 includes: determining a target free storage location in at least one free storage location in the first storage area; generating a cargo unit handling instruction based on the location information of the target free storage location; and sending the cargo unit handling instruction to the first handling device so that the first handling device handles the target cargo unit to the target free storage location.
[0104] In some examples, the cargo unit transport instruction is an instruction to drive the first transport device to transport the target cargo unit to a target vacant storage location, wherein the vacant storage location is a storage location that does not store cargo units, and the target vacant storage location is an vacant storage location for placing the target cargo unit.
[0105] In some embodiments, determining a target free storage location among at least one free storage location in the first storage area includes: randomly determining a target free storage location among at least one free storage location; or determining a target free storage location based on a distance between each free storage location and the first handling device.
[0106] In some examples, before controlling the first handling device to transport the target cargo unit to the target vacant storage location, it is necessary to first determine a target vacant storage location among the vacant storage locations in the first storage area so that the first handling device can transport the target cargo unit to the target vacant storage location. The target vacant storage location refers to an vacant storage location determined among the vacant storage locations for storing the target cargo unit.
[0107] For example, a target free storage location for storing the target cargo unit may be randomly determined from at least one free storage location in the first storage area, or the target free storage location for storing the target cargo unit may be determined based on the distance between each free storage location and the first handling device. After the target free storage location is determined, the location information of the target free storage location is included in the cargo unit transfer instruction, and the cargo unit transfer instruction is sent to the first handling device, so that the first handling device can transfer the target cargo unit to the target free storage location.
[0108] In some examples, randomly determining the target free storage location among the free storage locations may be selecting any free storage location among the free storage locations as the target free storage location. By randomly determining the target free storage location, computing resources and computing time for determining the target free storage location can be saved.
[0109] In some examples, to further improve the handling efficiency of the first handling device, a target vacant storage location can be determined based on the distance between each vacant storage location and the first handling device. For example, the distance between each vacant storage location and the first handling device can be calculated, and the target vacant storage location can be determined from the vacant storage locations that are closest to the first handling device. For example, the vacant storage location closest to the first handling device can be determined as the target vacant storage location.
[0110] In some embodiments, the above-mentioned determination of the target free storage position in the at least one free storage position in the first storage area may also include: if there is a free storage position in the at least one free storage position in the first storage area that is located in the same column as the target cache position where the target cargo unit is located, then the target free storage position is determined in the free storage positions in the same column as the target cache position; if there is no free storage position in the at least one free storage position in the first storage area that is located in the same column as the target cache position, then based on the position information of the target cache position, the target free storage position is determined in the at least one free storage position in the first storage area.
[0111] In some examples, there may or may not be a free storage bit in the storage bits in the same column as the target cache bit, wherein the storage bits in the same column as the target cache bit may be located on the same storage shelf as the target cache bit.
[0112] Exemplarily, when there is at least one free storage bit in the storage bits located in the same column as the target cache bit, the target free storage bit may be determined from the at least one free storage bit.
[0113] In some examples, when there is a free storage bit in the storage bits located in the same column as the target cache bit, the free storage bit can be determined as the target free storage bit; when there are multiple free storage bits in the storage bits located in the same column as the target cache bit, the target free storage bit can be randomly determined from the multiple free storage bits, or the free storage bit closest to the target cache bit can be determined as the target free storage bit. The embodiments of the present disclosure do not limit the method for determining the target free storage bit.
[0114] In some embodiments, when there are no free storage bits in the storage bits located in the same column as the target cache bit, the horizontal distance between each free storage bit and the target cache bit can be determined based on the position information of the target cache bit; and the target free storage bit can be determined based on the free storage bit in at least one free storage bit that is closest to the target cache bit in the horizontal direction.
[0115] In some examples, the distance between each free storage bit and the target cache bit is determined, such as the distance in the horizontal direction, and the free storage bit closest to the target cache bit in the horizontal direction is determined as the target free storage bit.
[0116] In some examples, when there is only one free cache bit closest to the target cache bit in the horizontal direction, that free cache bit may be determined as the target free storage bit. When there are multiple free cache bits closest to the target cache bit in the horizontal direction, the free storage bit closest to the target cache bit in the horizontal direction and closest to the target cache bit in the vertical direction among the multiple free storage bits may be determined as the target free storage bit. In other words, the free storage bit closest to the target cache bit in both the horizontal and vertical directions may be determined as the target free storage bit.
[0117] In some embodiments, a cargo unit handling instruction is sent to a first handling device in a first storage area, including: determining a first target idle storage position among the idle storage positions above the target cache position; carrying the position information of the first target idle storage position into the cargo unit handling instruction, and sending the cargo unit handling instruction to the first handling device, so that the first handling device handles the target cargo unit to the first target idle storage position.
[0118] In some examples, a target free storage location can be determined among free storage locations above the target cache location and designated as the first target free storage location. After the first target free storage location is determined, the location information of the first target free storage location is included in a cargo unit transfer instruction, and the cargo unit transfer instruction is sent to the first transfer device, causing the first transfer device to transfer the target cargo unit to the first target free storage location.
[0119] For example, if there are two free storage positions above the target cache position, any one of the two free storage positions can be selected as the target storage position, or the target free storage position can be determined according to the type of goods stored in the target cargo unit to be stored (if the cargo type is Class A cargo, the target cargo unit can be stored in the lower storage position of the two free storage positions; if the cargo type is Class B or Class C cargo, the target cargo unit can be stored in the upper storage position of the two free storage positions); or the free storage position closest to the first handling equipment can be directly determined as the target free storage position.
[0120] The scheduling method for cargo units provided by the embodiment of the present disclosure can save the handling time of the first handling equipment, shorten the processing cycle of the first handling equipment, and improve the handling efficiency of the first handling equipment by determining the first target idle storage position in the idle storage position above the target cache position.
[0121] When there is no free storage location above the target cache location, it is necessary to further determine a target free storage location for the target cargo unit.
[0122] In some embodiments, the method further includes: in the absence of a first target free storage position, determining a second target free storage position based on the target cache position and the position information of the first handling device; carrying the position information of the second target free storage position into the cargo unit handling instruction, and sending the cargo unit handling instruction to the first handling device, so that the first handling device transports the target cargo unit to the second target free storage position.
[0123] Exemplarily, the second target free storage location refers to a free storage location to the left or right of an occupied storage location located above the target cache location. If there is no free storage location above the target cache location, a second target free storage location can be determined among the free storage locations based on the location information of the target cache location and the location information of the first handling device. After determining the second target free storage location, the location information of the second target free storage location is included in the cargo unit handling instruction, and the cargo unit handling instruction is sent to the first handling device, so that the first handling device can handle the target cargo unit to the second target free storage location.
[0124] In some examples, when there is no free storage position above the target cache position, the free storage position closest to the target cache position can be determined based on the position information of the target cache position, and then the second target free storage position can be determined among the free storage positions based on the position information of the first handling device.
[0125] For example, if there is no free storage space above the target buffer location, but there is a free storage space in the storage rack to the right of the target buffer location, then the second target free storage space can be determined from the free storage spaces to the right of the target buffer location. To further improve the handling efficiency of the first handling device, the lowest free storage space among the free storage spaces to the right of the target buffer location can be determined as the second target free storage space.
[0126] For example, if there are free storage locations on both sides of the target cache location, the free storage location can be determined on which side of the target cache location to determine based on the position information of the first handling device. For example, if there are no free storage locations above the target cache location, but there are free storage locations in the storage racks on both sides of the target cache location, if the first handling device is located to the left of the target cache location, the second target free storage location can be determined in the free storage locations to the left of the target cache location. Determining the free storage location based on the position information of the first handling device can save the time of the first handling device moving to the second target free storage location, thereby shortening the processing cycle of the first handling device.
[0127] The cargo unit scheduling method provided by the disclosed embodiments determines a target free storage location based on the location information of the target cache location and / or the location information of the first handling device. After determining the location information of the target free storage location, the location information of the free storage location is included in the cargo handling instruction, thereby driving the first handling device to transport the target cargo unit to the target free storage location. This saves the time it takes the first handling device to move the cargo unit to the target free storage location, shortens the processing cycle of the first handling device, and improves the working efficiency of the first handling device.
[0128] In some embodiments, the above-mentioned determining of the target free storage location in at least one free storage location in the first storage area also includes: determining the storage weight of each free storage location based on the position information of each free storage location in the at least one free storage location; and determining the target free storage location in at least one free storage location based on the heat information of the target cargo unit and the storage weight of each free storage location.
[0129] In some examples, the storage weight of each idle storage position can also be determined based on the location information of each idle storage position. For example, based on the location information of each idle storage position and the location information of each workstation in the warehousing system, the target distance between each idle storage position and each workstation can be determined, and based on the target distance between each idle storage position and each workstation, the storage weight of each idle storage position can be determined. Among them, the storage weight of the idle storage position is used to indicate the priority of the idle storage position for storing cargo units. It should be noted that the implementation method of determining the storage weight of each idle storage position based on the location information of each idle storage position can refer to the relevant content of determining the storage weight of each storage position based on the location information of each storage position in the following implementation.
[0130] After determining the storage weight of each free storage location, a target free storage location can be further determined from at least one free storage location based on the heat information of the target cargo unit and the storage weight of each free storage location. For example, when the heat of the target cargo unit is higher, the target cargo unit is moved more frequently, and therefore the target cargo unit with higher heat can be placed on a free storage location with a larger storage weight, that is, the free storage location with a larger storage weight is determined as the target free storage location. For another example, when the heat of the target cargo unit is lower, the target cargo unit is moved less frequently, and therefore the target cargo unit with lower heat can be placed on a free storage location with a smaller storage weight, that is, the free storage location with a smaller storage weight is determined as the target free storage location.
[0131] FIG3 is a schematic diagram of another method for dispatching cargo units provided in some embodiments of the present disclosure. The following, in conjunction with FIG3 , further illustrates the method for dispatching cargo units provided by the present disclosure using the application of the method in a container handling scenario as an example. As shown in FIG3 , the method includes the following steps:
[0132] Step 302: Obtain a first number of preset cache locations in the first storage area and a second number of occupied cache locations in the first storage area.
[0133] Step 304: Determine the cache bit usage rate of the first storage area according to the first quantity and the second quantity.
[0134] Step 306: When the cache usage rate reaches a preset usage rate threshold, a first cargo box where the order is not hit is determined in the cargo boxes that have occupied the cache positions, and a target cargo box is determined from the first cargo boxes.
[0135] Step 308: Determine a target free storage location based on the distance between each free storage location and the transport robot.
[0136] Step 310: Carry the location information of the target free storage location into the cargo box transport instruction, and send the cargo box transport instruction to the transport robot so that the transport robot transports the target cargo box to the target free storage location.
[0137] The scheduling method for cargo units provided in the embodiment of the present disclosure solves the problem of invalid cache position occupation by adjusting the number of occupied cache positions, thereby improving the reuse rate of cargo units on cache positions, thereby reducing the handling actions of the first handling equipment, reducing handling costs, and improving handling efficiency.
[0138] In some examples, as handling equipment dispatches cargo units to storage areas, new orders may be assigned to various storage areas as the warehouse operates. However, due to the varying number of tasks assigned to each storage area, the handling equipment in each area may not be able to accept all assigned orders. To ensure efficient operation of different storage areas, it is necessary to identify the different order tasks and determine whether to assign them to the handling equipment in that area.
[0139] In some embodiments, the scheduling method of the above-mentioned cargo units also includes: in response to the task assignment request corresponding to the first storage area, determining the second cargo unit corresponding to the task assignment request in the first storage area; determining the number of tasks to be completed in the first storage area based on the number of second cargo units; if the number of tasks to be completed in the first storage area does not reach the first preset task threshold, assigning the tasks to be assigned carried in the task assignment request to the first handling equipment.
[0140] The task assignment request is used to assign an order task to each storage area. The second cargo unit is the cargo unit in the first storage area that is targeted by the order corresponding to the task assignment request. The second cargo unit can be a cargo unit stored in an occupied storage location in the first storage area, or a cargo unit cached in an occupied cache location in the first storage area.
[0141] In some examples, the number of pending tasks is the number of uncompleted tasks in the first storage area. The first preset task threshold is the upper limit of the number of uncompleted tasks in the first storage area. Unassigned tasks are tasks that have not yet been assigned to a storage area and are included in the task assignment request.
[0142] In some examples, after receiving a task assignment request for a first storage area, the control device, in response to the task assignment request, determines the second cargo units within the first storage area that are hit by the order, and determines the number of pending tasks within the first storage area based on the number of second cargo units. Furthermore, based on a first preset task threshold, the control device determines whether the pending tasks within the first storage area have reached an upper limit for the number of uncompleted tasks. If the number of pending tasks within the first storage area has not reached the upper limit, the pending tasks contained in the task assignment request are assigned to the first handling equipment within the first storage area.
[0143] For example, it is determined that the number of tasks to be completed in the first storage area is 50 and the first preset task threshold is 70. Since the number of tasks to be completed in the first storage area does not reach the first preset task threshold, the task to be assigned can be assigned to the first handling equipment.
[0144] In some embodiments, when the number of pending tasks in the first storage area reaches a first preset task threshold, the cargo identification carried in the task assignment request is determined; based on the cargo identification, the pending tasks carried in the task assignment request are assigned to the second handling equipment in the second storage area, and the second handling equipment is controlled to perform the pending tasks in the second storage area.
[0145] For example, the second storage area is a storage area for the goods corresponding to the goods identification. The goods identification can be the actual SKU (Stock Keeping Unit) corresponding to the goods, or the goods serial number set for different goods. Each item has its own unique goods identification, which can be used to accurately identify the corresponding goods.
[0146] In some examples, if the number of pending tasks in a first storage area reaches a first preset task threshold, it indicates that the number of pending tasks in the first storage area has reached the upper limit of uncompleted tasks in the first storage area. Assigning new tasks to it may cause task congestion in the first storage area, making it impossible for the first handling equipment to handle all tasks. Based on this, the pending tasks can be assigned to handling equipment in other storage areas for completion, thereby achieving task balance within different storage areas and at the same time achieving task balance for handling equipment in different storage areas.
[0147] In some examples, the second storage area is another storage area other than the first storage area that stores the cargo identifier in the to-be-assigned task, and the to-be-completed tasks in the second storage area have not reached the first preset task threshold. The second handling equipment refers to the handling equipment located in the second storage area that performs the task. For example, when the number of to-be-completed tasks in the first storage area reaches the first preset task threshold, the cargo identifier in the task assignment request is determined, and based on the determined cargo identifier, the to-be-assigned task carried in the task assignment request is assigned to the second handling equipment in the second storage area that stores the cargo identifier, and the second handling equipment performs the to-be-assigned task in the second storage area.
[0148] For example, if the number of pending tasks in the first storage area is 72 and the first preset task threshold is 70, it can be determined that the number of pending tasks in the first storage area has reached the first preset task threshold, and then the cargo identification in the task assignment request is determined. If the cargo identification is determined to be SKU1, based on the cargo identification SKU1, in the storage areas other than the first storage area where the number of pending tasks has not reached the first preset task threshold, a second storage area with the cargo identification SKU1 is determined, and the pending tasks carried in the task assignment request are assigned to the second handling equipment in the second storage area.
[0149] The scheduling method for cargo units provided in the embodiment of the present disclosure sets an upper limit for tasks to be completed for storage areas. When the number of tasks to be completed in a first storage area reaches a first preset task threshold, the tasks to be assigned are assigned to a second handling device in a second storage area, thereby realizing task scheduling in different storage areas and further achieving task balance in different storage areas.
[0150] In some embodiments, after determining the cargo identification carried in the task assignment request, the method further includes: assigning the target task corresponding to the target cargo identification to the first handling equipment when the target cargo identification is determined, wherein the target cargo identification matches the first storage area.
[0151] The target cargo identifier refers to the cargo identifier that matches the first storage area, and the target cargo corresponding to the target cargo identifier is only stored in the first storage area.
[0152] In some examples, there may be a situation where all cargo units corresponding to a certain cargo identification are stored in the same storage area. In this case, regardless of whether the number of tasks to be completed in the first storage area reaches the first preset task threshold, the to-be-assigned tasks corresponding to the cargo identification in the task assignment request need to be assigned to the first handling equipment in the first storage area.
[0153] Exemplarily, after determining the cargo identification in the task assignment request, it is determined that the cargo identification in the task assignment request includes a target cargo identification, and the target cargo corresponding to the target cargo identification is only stored in the first storage area. Therefore, regardless of whether the number of tasks to be completed in the first storage area reaches the first preset task threshold, the target task corresponding to the target cargo identification needs to be assigned to the first handling equipment in the first storage area.
[0154] For example, when it is determined that the cargo identifier in the task assignment request includes SKU2, and the cargo corresponding to SKU2 is only stored in the first storage area, the to-be-assigned task corresponding to SKU2 is assigned to the first handling equipment in the first storage area.
[0155] The cargo unit scheduling method provided by the disclosed embodiments determines the cargo identifier in a task assignment request, then determines the storage area where the cargo corresponding to the cargo identifier is stored. Based on the number of pending tasks in different storage areas, the method ultimately determines the handling equipment within the storage area to which the pending tasks carried in the task assignment request should be assigned. This achieves task balancing within different storage areas.
[0156] In some examples, there are often too many tasks assigned to a storage area, resulting in task congestion. Task congestion will cause the handling equipment in the storage area to be busy, while the handling equipment in the storage area with fewer tasks will be idle, resulting in an imbalance in the tasks of the handling equipment.
[0157] In some embodiments, the method further includes: when the first storage area is in task congestion, allocating tasks to be completed in the first storage area.
[0158] For example, if it is determined that the first storage area is in task congestion, the tasks to be completed in the first storage area can be allocated to the handling equipment in other storage areas, thereby reducing the number of tasks to be completed in the first storage area and alleviating the task workload of the first handling equipment.
[0159] In some examples, task congestion is often caused by an excessive number of tasks to be completed in a storage area. Therefore, tasks can be allocated to handling equipment in other storage areas based on the number of tasks to be completed in the storage area.
[0160] In some embodiments, when the number of tasks to be completed in the first storage area is greater than the second preset task threshold, the tasks to be assigned are determined among the tasks to be completed based on the number of tasks to be completed and the second preset task threshold; the tasks to be assigned are assigned to the third handling equipment in the third storage area, and the third handling equipment is controlled to perform the tasks to be assigned in the first storage area; wherein the third storage area is an adjacent storage area to the first storage area.
[0161] The second preset task threshold may be the upper limit of the number of pending tasks corresponding to the first storage area being in a non-task congestion state. A pending task refers to a task among pending tasks that needs to be assigned to another storage area. A third storage area refers to any storage area in a non-task congestion state, for example, a third storage area that is relatively close (e.g., the closest) to the first storage area. A third handling device refers to a handling device located in the third storage area that performs tasks.
[0162] In some examples, before allocating the pending tasks in the first storage area, it is necessary to first determine the pending tasks in the first storage area. When the number of pending tasks is greater than the second preset task threshold, the pending tasks that need to be allocated to the third handling equipment in the third storage area are determined among the pending tasks based on the number of pending tasks and the second preset task threshold, and the pending tasks are allocated to the third handling equipment in the third storage area.
[0163] For example, if the number of pending tasks in the first storage area is determined to be 100 and the second preset task threshold is 70, it can be determined that the pending tasks in the first storage area need to be assigned to the third handling equipment in the third storage area that is in a non-task congested state. Based on the number of pending tasks in the first storage area being 100 and the second preset task threshold being 70, the number of pending tasks is determined to be 100-70=30. Therefore, the 30 pending tasks in the first storage area are determined to be pending tasks, and these 30 pending tasks are assigned to the third handling equipment in the third storage area. For example, the third handling equipment can be moved to the first storage area to perform these 30 pending tasks.
[0164] In some examples, when two handling robots are performing handling tasks in the same lane in a storage area (such as the first storage area), the lane can be split. For example, the lane can be divided into two areas (such as the first area and the second area); wherein one handling robot is located in the first area to perform handling tasks, and the other handling robot is located in the second area to perform handling tasks, thereby preventing collisions between the two handling robots in the lane.
[0165] The scheduling method for cargo units provided by the embodiment of the present disclosure determines the tasks to be assigned in the first storage area based on the tasks to be completed in the first storage area and the second preset task threshold when the first storage area is in task congestion, and assigns the tasks to be assigned to the third handling equipment. This can achieve balanced task distribution between storage areas and balanced task distribution between handling equipment.
[0166] In addition to the task congestion caused by too many tasks to be completed in the storage area, task congestion in the storage area can also occur when there is no handling equipment to perform tasks in the storage area.
[0167] In some embodiments, when the time when the first handling device leaves the first storage area reaches a preset time threshold, the to-be-completed tasks in the first storage area are assigned to the third handling device in the third storage area, and the third handling device is controlled to perform the to-be-completed tasks in the first storage area; wherein the third storage area is an adjacent storage area to the first storage area.
[0168] In some examples, the preset time threshold refers to the upper limit of the time that the transport device must leave its corresponding storage area. The preset time threshold can be determined based on actual application circumstances. For example, the preset time threshold can be set to 30 minutes, 40 minutes, 60 minutes, etc., which is not limited in the present embodiment. The circumstances under which the first transport device leaves the first storage area include, but are not limited to, being charged or damaged.
[0169] In some examples, when it is determined that the time for the first handling equipment to leave the first storage area reaches a preset time threshold, it can be determined that the first storage area is in a task congestion state. In order to ensure that the tasks in the first storage area can be executed normally and to ensure execution efficiency, the tasks to be completed in the first storage area are assigned to the handling equipment in the storage area adjacent to the first storage area for execution.
[0170] For example, when the first handling device leaves the first storage area for 30 minutes, 40 minutes, or 60 minutes, the task to be completed in the first storage area can be assigned to a third handling device in a neighboring third storage area for execution. For example, the third handling device can move into the first storage area to execute the task to be completed.
[0171] In some embodiments, the cargo unit scheduling method further includes: when the first handling device returns to the first storage area, allocating the to-be-completed tasks in the first storage area to the first handling device.
[0172] In some examples, after the first transport device leaves the first storage area and returns to the first storage area after a period of time, the first transport device is in an idle state and can continue to perform tasks. In order not to interfere with the normal operation of other storage areas, the pending tasks of the first storage area can be assigned to the first transport device. It should be noted that the first transport device may return to the first storage area after completing charging or after completing damage repairs, and this is not limited in the present embodiment.
[0173] The cargo unit scheduling method provided by the embodiment of the present disclosure achieves task balance between storage areas and task balance between handling equipment by assigning and allocating tasks between different storage areas.
[0174] The cargo unit scheduling method provided by the embodiment of the present disclosure determines whether to assign a task to the first handling equipment in the first storage area based on a first preset task threshold and the number of tasks to be completed in the first storage area, thereby achieving task balance between storage areas; based on a second preset task threshold and the number of tasks to be completed in the first storage area, when the first storage area is in task congestion, task scheduling is implemented for the first handling equipment in the first storage area, thereby solving the problems of task congestion in the first storage area and unbalanced tasks of the first handling equipment.
[0175] In some examples, the storage location of frequently used cargo units (such as cargo boxes) in a warehousing system can affect the handling efficiency of robots (or other intelligent mobile devices). For example, if cargo units are stored far from a workstation, the robot's travel distance increases, thereby reducing the robot's handling efficiency. For another example, if frequently used cargo units are stored in a relatively concentrated area, congestion may occur during the robot's travel, reducing the robot's handling efficiency.
[0176] The cargo unit scheduling method provided in the embodiments of the present disclosure can not only adjust the number of occupied cache slots when the cache slot usage rate is high to solve the problem of invalid cache slot occupation, but also determine the storage weight of each storage slot to determine the optimal storage slot for cargo units to be stored, thereby improving the handling efficiency of the robot. It should be noted that in actual application, there is no direct connection between the solution of adjusting the number of occupied cache slots in the above embodiment and the solution of determining the optimal storage slot for cargo units to be stored in the following embodiment. The two solutions can be used independently or in combination.
[0177] Figure 4A is a schematic diagram of another cargo unit scheduling scenario provided by some embodiments of the present disclosure. As shown in Figure 4A, the target inventory area is equipped with multiple workstations and multiple storage racks. Each storage rack has multiple storage locations, and the racks form lanes between them for handling equipment to operate. During the operation of handling equipment, improper distribution of cargo units often leads to low operating efficiency of the handling equipment. Therefore, the rational inventory distribution of goods has become a pressing issue to be addressed.
[0178] The cargo unit scheduling method provided by the embodiment of the present disclosure can calculate the storage weight of each storage location on the storage rack, and determine the corresponding storage location for each cargo unit in combination with the heat information of each cargo unit, thereby achieving a reasonable distribution of cargo units, thereby also improving the working efficiency of the handling equipment.
[0179] Figures 4B, 4C, and 4D are schematic diagrams of a storage scenario for cargo units according to an embodiment of the present disclosure, wherein the cargo units are divided into ultra-high-heat cargo units, high-heat cargo units, and low-heat cargo units according to their heat information.
[0180] FIG4B shows the distribution and storage of super-high-calorific cargo units based on the thermal information of the cargo units and the storage weights of the storage locations; FIG4C shows the distribution and storage of high-calorific cargo units based on the thermal information of the cargo units and the storage weights of the storage locations; and FIG4D shows the distribution and storage of low-calorific cargo units based on the thermal information of the cargo units and the storage weights of the storage locations.
[0181] FIG5 is a schematic diagram of another method for dispatching cargo units provided by some embodiments of the present disclosure. The following describes the process of determining the storage location corresponding to each cargo unit in a warehousing scenario in conjunction with FIG5. As shown in FIG5, the method further includes the following steps:
[0182] Step 502: Determine the heat information of each unit of goods to be stored in the warehousing system and the location information of each storage location in the target inventory area of the warehousing system.
[0183] Different inventory areas (or storage zones) within a warehousing system involve tasks such as handling, storing, and sorting cargo units (or cartons). To determine how to store cartons within an inventory area, it's necessary to plan the storage locations within the area in advance so that the cartons are stored in the appropriate locations.
[0184] In some examples, the distribution of cargo boxes can be rationally planned based on the heat information of cargo boxes to be stored (or to be warehoused) and the storage locations in the target inventory area, thereby improving the efficiency of handling equipment. A cargo unit refers to a cargo box to be stored; the heat information of a cargo unit can refer to the heat information of the cargo box; and the target inventory area refers to the inventory area where the cargo unit inventory distribution planning is performed.
[0185] For example, after determining that the target inventory area needs to distribute the inventory of cargo units, it is necessary to obtain the heat information of each cargo unit and the location information of each storage location in the target inventory area, so that in the subsequent process, the inventory distribution of each cargo unit at each storage location can be determined based on the heat information of each cargo unit and the location information of each storage location.
[0186] In some examples, a cargo box can store multiple SKUs (minimum stock keeping units) of goods. When the goods are shipped out, they are often shipped out in SKU units. In order to improve the accuracy of determining the heat information of the cargo unit, it can be determined based on the heat information of each cargo stored in each cargo unit (that is, the heat information of the goods in SKU units).
[0187] In some embodiments, determining the heat information of each cargo unit to be stored in the warehousing system includes: determining the cargo heat information of the cargo stored in each cargo unit; and determining the heat information of each cargo unit based on the cargo heat information of the cargo stored in each cargo unit.
[0188] The cargo heat information is used to indicate the cargo heat information of each cargo stored in the cargo unit. First, the cargo heat information of each cargo stored in each cargo unit is obtained, and then the heat information of each cargo unit is determined based on the cargo heat information of each cargo.
[0189] In some examples, after obtaining the cargo heat information of each cargo in the cargo unit, the cargo heat information of each cargo can be sorted from high to low, and the cargo with the highest heat information is determined as the heat information of the cargo unit; or, after obtaining the cargo heat information of each cargo in the cargo unit, a corresponding weight coefficient is set for each cargo based on the high or low cargo heat information, and a weighted calculation is performed based on the cargo heat information of each cargo and the weight coefficient corresponding to the heat information of each cargo, and the weighted cargo heat information is determined as the heat information of the cargo unit; or, after obtaining the cargo heat information of each cargo in the cargo unit, the average cargo heat information of the cargo heat information of each cargo is calculated, and the average heat information is determined as the heat information of the cargo unit; or, after obtaining the cargo heat information of each cargo in the cargo unit, the cargo heat information of each cargo is summed, and the summed cargo heat information is determined as the heat information of the cargo unit.
[0190] It should be noted that the heat information of each cargo unit may be determined based on any of the above methods, and the embodiment of the present disclosure does not limit the method for determining the heat information of each cargo unit.
[0191] In some examples, when the goods stored in a goods unit only include goods of one SKU, the goods heat information of the goods of the SKU can be directly determined as the heat information of the goods unit.
[0192] In some examples, the popularity of a product can be determined based on the order data corresponding to the product. This order data can include orders currently being shipped or historical order data. For example, for products that have no order data within a preset time period (e.g., an adjacent time period), an estimate can be made based on the product's historical order data, and the popularity of the product can be determined based on the estimated result.
[0193] The scheduling method for cargo units provided by the embodiments of the present disclosure can further determine the heat information of the cargo units based on the heat information of the cargo stored in the cargo units, so that in the subsequent process, the storage locations corresponding to different cargo units can be determined based on the heat information of the cargo units.
[0194] Step 504: Determine the storage weight of each storage bit based on the location information of each storage bit.
[0195] In some examples, the storage weight of each storage location can be determined based on the location information of each storage location in the target inventory area. Furthermore, the storage location corresponding to each unit of goods can be matched based on the storage weight of each storage location, thereby achieving inventory distribution of the units of goods. The storage weight of each storage location indicates the storage priority of each storage location for storing units of goods and serves as the basis for determining the storage location corresponding to each unit of goods.
[0196] For example, the location information of each storage location can be the specific location of each storage location in the target inventory area, such as the storage location on the nth row of shelf and the nth layer. Alternatively, it can be the coordinate location information corresponding to each storage location. For example, the coordinate location information can be rectangular coordinate information in a rectangular coordinate system or coordinate information in a world coordinate system. It should be noted that the representation of the location information of each storage location can be determined according to actual conditions and is not limited in this embodiment of the present disclosure.
[0197] In some embodiments, the above step 504 includes: obtaining the location information of each workstation in the warehousing system; determining the target distance between the target storage location and each workstation based on the location information of the target storage location and the location information of each workstation; and determining the storage weight of the target storage location based on the target distance between the target storage location and each workstation.
[0198] In some embodiments, the storage weight of the target storage location is determined based on the target distance between the target storage location and each workstation, including: determining the sum of the target distances based on the target distances between the target storage location and each workstation; and determining the storage weight of the target storage location based on the sum of the target distances.
[0199] The target storage location is any storage location in the target inventory area.
[0200] In some examples, the purpose of matching cargo units and storage locations in a target inventory area is to improve the operating efficiency of handling equipment (such as robots or intelligent handling equipment, and the following embodiments use robots as an example for illustrative purposes) performing warehousing operations in the target inventory area. The handling equipment can transport cargo units from a workstation to a storage location in the target inventory area for warehousing, or transport cargo units from a storage location in the target inventory area to a workstation for picking operations. Therefore, the distance between the storage location of a cargo unit and the workstation can affect the handling efficiency of the robot, and the storage weight of each storage location can be determined based on the distance between each storage location (such as the target storage location) and each workstation.
[0201] In some embodiments, based on the location information of each storage location, the storage weight of each storage location is determined, including: obtaining the location information of each workstation; based on the location information of the target storage location and the location information of each workstation, respectively determining the actual distance between the target storage location and each workstation; and according to the actual distance between the target storage location and each workstation, determining the storage weight of the target storage location.
[0202] That is to say, the above-mentioned determination of the target distance between the target storage location and each workstation based on the location information of the target storage location and the location information of each workstation includes: determining the first distance between the target storage location and each workstation based on the location information of the target storage location and the location information of each workstation; wherein, the target distance includes the first distance.
[0203] For example, the first distance between the target storage location and each workstation may be referred to as the actual distance between the target storage location and each workstation.
[0204] In some examples, the workstation's location information can be the workstation's specific location within the target inventory area, or can be coordinate information corresponding to the workstation. The coordinate information can be rectangular coordinate information in a rectangular coordinate system or coordinate information in a world coordinate system. The representation of the workstation's location information can be determined based on actual circumstances and is not limited in the presently disclosed embodiments.
[0205] For example, after obtaining the location information of each storage location, the location information of each workstation can be obtained, and based on the location information of any one of the storage locations and the location information of each workstation, the actual distance (i.e., the first distance) between the storage location and each workstation can be calculated respectively, and then the storage weight of the storage location can be determined based on the actual distance between the storage location and each workstation.
[0206] Exemplarily, the actual distances between the target storage location and each workstation are summed up and the summed result is determined as the storage weight of the target storage location.
[0207] For example, let's take the position information of each workstation and the target storage location as the rectangular coordinate information in a rectangular coordinate system as an example. In the target inventory area P, there are three workstations, namely workstation 1, workstation 2, and workstation 3, and all three workstations are located on the same side of the storage area. When a rectangular coordinate system is established with workstation 2 as the origin, the x-axis parallel to the rows where workstations 1, 2, and 3 are located, and the y-axis perpendicular to the rows where workstations 1, 2, and 3 are located, the position information of workstation 2 can be (0, 0), the position information of the target storage location can be (5, 3), the position information of workstation 1 can be (-10, 0), and the position information of workstation 3 can be (10, 0). Therefore, based on the position information of workstations 1, 2, and 3, as well as the position information of the target storage location, the distance between the target storage location and workstation 1 can be calculated as 18, the distance between the target storage location and workstation 2 can be 8, and the distance between the target storage location and workstation 3 can be calculated as 8 using the distance formula.
[0208] Therefore, when it is determined that the distances between the target storage position and workstation 1, workstation 2, and workstation 3 are 18, 8, and 8 respectively, it can be determined that the sum of the distances between the target storage position and workstation 1, workstation 2, and workstation 3 is 18+8+8=34, and the storage weight of the target storage position is determined to be 34.
[0209] In some examples, due to different inventory areas, different operating methods of robots operating in the inventory areas, or different actual business needs, the emphasis on storage needs of each storage location is different. Therefore, determining the storage weight corresponding to each storage location based only on the actual distance between the storage location and each workstation may make the storage weight of each storage location inaccurate. Therefore, it is necessary to further determine the storage weight of each storage location based on the actual business situation.
[0210] In some embodiments, based on the location information of each storage location, the storage weight of each storage location is determined, including: obtaining the location information of each workstation; based on the location information of the target storage location and the location information of each workstation, respectively determining the location parameter group of the target storage location relative to each workstation, wherein the location parameter group includes multiple location parameters; according to the business needs of the target inventory area, determining the weight parameters corresponding to different location parameters; based on the location parameters in each location parameter group and the corresponding weight parameters, determining the target distance information of the target storage location; and according to the target distance information of the target storage location, determining the storage weight of the target storage location.
[0211] That is to say, the above-mentioned determination of the target distance between the target storage location and each workstation based on the location information of the target storage location and the location information of each workstation also includes: determining the location parameter group of the target storage location and each workstation based on the location information of the target storage location and the location information of each workstation; determining the weight parameter corresponding to each position parameter in the multiple position parameters in the location parameter group according to the business needs of the target inventory area; determining the second distance of the target storage location based on each position parameter in the location parameter group and the weight parameter corresponding to each position parameter; wherein the target distance includes the second distance.
[0212] For example, the second distance between the target storage location and each workstation may be referred to as target distance information between the target storage location and each workstation.
[0213] Exemplarily, a position parameter group includes a plurality of position parameters, that is, each position parameter group is a combination of position parameters of a target storage location relative to each workstation.
[0214] In some examples, the position parameter group includes first-direction relative position information, second-direction relative position information, and layer position information of the storage location. The first-direction relative position information may include difference information about the relative position of the target storage location relative to each workstation in one direction; the second-direction relative position information may include difference information about the relative position of the target storage location relative to each workstation in another direction; and the layer position information may include layer position information corresponding to the storage shelf where the target storage location is located.
[0215] In some examples, each position parameter in the position parameter group corresponds to a corresponding weight parameter. The weight parameter is a constraint coefficient that adjusts the different position parameters based on different business needs, and is used to indicate the degree to which the business needs affect the storage weight of the target storage location. For example, the weight parameters corresponding to the different position parameters can be the same or different.
[0216] In some examples, the second distance (ie, target distance information) refers to distance information between the target storage location and the workstation adjusted based on business needs.
[0217] Exemplarily, after obtaining the location information of the target storage location and the location information of each workstation, the location parameter group of the target storage location is determined based on the location information of the target storage location and the location information of each workstation. Furthermore, when the business needs for the target inventory area are obtained, the weight parameters corresponding to different location parameters are determined based on the business needs, and the target distance information of the target storage location is determined based on the location parameters in each location parameter group and the weight parameters corresponding to each location parameter.
[0218] In some examples, target distance information of a target storage location is determined based on position parameters in a position parameter group and weight parameters corresponding to each position parameter, including: determining a position parameter group of the target storage location relative to any workstation, determining the distance of the target storage location relative to the workstation based on the position parameters in the position parameter group and weight parameters corresponding to each position parameter, summing the distances of the target storage location relative to each workstation, and determining the summed result as the target distance information of the target storage location; or, setting corresponding weights for different distance information based on the size of the distance information of the target storage location relative to each workstation, performing weighted calculation based on this, and determining the weighted result as the target distance information of the target storage location.
[0219] In some examples, the calculation method of the stored weight of each storage bit can refer to the following formula (1) and formula (2): L i =aX+bY+cW*F Formula (2)
[0220] In formula (1), S is the storage weight of the target storage location, n is the number of workstations in the target inventory area, L i The target distance information (ie, the second distance) from the target storage position to the i-th workstation is stored.
[0221] In formula (2), X is the relative position information between the target storage location and the i-th workstation in the first direction, Y is the relative position information between the target storage location and the i-th workstation in the second direction, W is the location width of the target storage location, and F is the layer weight corresponding to the layer position information of the target storage location. Among them, a, b, and c are the weight parameters corresponding to X, Y, and W*F, respectively. a, b, and c are constants, and the sizes of a, b, and c can be set according to requirements.
[0222] Therefore, the second distance between the target storage location and each workstation can be determined by formula (2), and according to formula (1), the sum of the second distances between the target storage location and each workstation is determined as the storage weight of the target storage location.
[0223] In some examples, when three workstations are set in the target inventory area P, namely workstation 1, workstation 2 and workstation 3, a rectangular coordinate system is established with workstation 2 as the origin, and the position information of workstation 2 is (0, 0), if the position information of the target storage position is (400, 100), the position information of workstation 1 is (500, 0), and the position information of workstation 3 is (-500, 0) as an example, then the first direction relative position information X1 of the target storage position and workstation 1 can be the absolute value of the difference between the x coordinates of the target storage position and workstation 1, that is, X1=100; the first direction relative position information X2 of the target storage position and workstation 2 can be the absolute value of the difference between the x coordinates of the target storage position and workstation 2. The first relative position information X3 between the target storage location and workstation 3 can be the absolute value of the difference between the x-coordinates of the target storage location and workstation 3, i.e., X3 = 900. The second relative position information Y1 between the target storage location and workstation 1 can be the absolute value of the difference between the y-coordinates of the target storage location and workstation 1, i.e., Y1 = 100. The second relative position information Y2 between the target storage location and workstation 2 can be the absolute value of the difference between the y-coordinates of the target storage location and workstation 2, i.e., Y2 = 100. The second relative position information Y3 between the target storage location and workstation 3 can be the absolute value of the difference between the y-coordinates of the target storage location and workstation 3, i.e., Y3 = 100. If the width of the target storage location is 2 meters, i.e., W = 2.
[0224] In some examples, since the lower the shelf level of the storage location is, the easier it is for the handling equipment to carry it, the layer weight of the storage location can be set according to the level of the storage location. Suppose there are 10 layers of storage racks (such as shelves). The higher the layer level of the storage location is, the smaller the layer weight F corresponding to the storage location will be. For example, when the layers of the storage locations are 1-10, the corresponding layer weights are 10-1. For example, if the target storage location is on layer 1, the layer weight corresponding to the target storage location can be 10. That is, the position width W=2 and the layer weight F=10 in the layer position information of the target storage location.
[0225] For example, if a, b, and c are set to 1, 5, and 5 respectively based on the business needs of the target inventory area P, the target distance information from the target storage location to each workstation can be calculated according to the above formula (2): that is, the target distance information from the target storage location to workstation 1 is: L1 = 1*100 + 5*100 + 5*2*10 = 700; the target distance information from the target storage location to workstation 2 is: L2 = 1*400 + 5*100 + 5*2*10 = 1000; the target distance information from the target storage location to workstation 3 is: L3 = 1*900 + 5*100 + 5*2*10 = 1500. Therefore, according to the above formula (1), the storage weight of the target storage location can be calculated as: S = 700 + 1000 + 1500 = 3200, that is, the storage weight of the target storage location is 3200.
[0226] The cargo unit scheduling method provided by the embodiment of the present disclosure further calculates the storage weight corresponding to each storage location based on the target distance information between each storage location and each workstation, so as to determine the storage location corresponding to each cargo unit according to the storage weight of each storage location in the subsequent process, thereby realizing a reasonable distribution of storage of each cargo unit.
[0227] Figures 6 through 8 are schematic diagrams of three cargo unit storage scenarios provided in embodiments of the present disclosure. Figure 6 is a schematic diagram of a single-side workstation storage scenario provided in some embodiments of the present disclosure, Figure 7 is a schematic diagram of a double-side workstation storage scenario provided in some embodiments of the present disclosure, and Figure 8 is a schematic diagram of another double-side workstation storage scenario provided in some embodiments of the present disclosure. The following describes three different cargo unit storage scenarios in conjunction with Figures 6 through 8.
[0228] Figure 6 illustrates an application scenario involving single-sided workstations. As shown in Figure 6, multiple workstations are located on one side of a storage location within a target inventory area. Steps 502 through 504 above can determine the storage weight of each storage location within the target inventory area, and the area consisting of storage locations with higher storage weights is referred to as a high-heat storage area. A higher storage weight can include a storage weight greater than a first threshold.
[0229] Figure 7 illustrates a multi-sided workstation application scenario, where multiple workstations are located on either side of a storage location in the target inventory area. For this scenario, the aforementioned cargo unit scheduling method can be used to calculate the storage weights for the storage locations in a single row of workstations. The calculated storage weights for the two rows of workstations are then mapped and added together to create the ultra-high-heat storage area shown in Figure 7.
[0230] That is, according to steps 502 through 504 above, the target distances between each storage location and each workstation on each side can be calculated, and the storage weight of each storage location can be determined based on the sum of the target distances. As shown in Figure 7, the area consisting of the storage locations with the highest storage weights can be determined as the ultra-high heat inventory, and the area consisting of the storage locations with relatively high storage weights can be determined as the high heat inventory. The highest storage weight can include a storage weight greater than a second threshold.
[0231] Figure 8 illustrates another application scenario with multiple workstations located on opposite sides of a storage location in the target inventory area. For this scenario, the aforementioned cargo unit scheduling method can be used to calculate the storage weights for the storage locations in a single row of workstations. The calculated storage weights for the two rows of workstations can then be mapped and subtracted to create the low-heat storage area shown in Figure 8.
[0232] That is, according to steps 502 to 504 above, the target distances between each storage location and each workstation on each side can be calculated, and the storage weight of each storage location can be determined based on the sum of the target distances. As shown in Figure 8, the area consisting of storage locations with higher storage weights can be determined as high-heat inventory, and the area consisting of storage locations with lower storage weights can be determined as low-heat inventory. A low storage weight can include a storage weight that is less than or equal to a first threshold.
[0233] The scheduling method for cargo units provided in the embodiment of the present disclosure calculates the distance between the storage location and each workstation to determine the storage weight corresponding to the storage location, and then determines the corresponding storage location for each cargo unit based on the storage weight corresponding to the storage location, thereby improving the rationality of the storage of each cargo unit and improving the working efficiency of the handling equipment.
[0234] Step 506: Determine the storage location corresponding to each cargo unit based on the heat information of each cargo unit and the storage weight of each storage location, and send a transport instruction to the fourth transport device to control the fourth transport device to transport each cargo unit to the corresponding storage location.
[0235] The fourth handling device refers to a robot or other intelligent handling device operating in the target inventory area. The handling instruction is an instruction to drive the handling device to carry the cargo unit to the storage location corresponding to the cargo unit.
[0236] In some examples, after determining the storage weight of each storage location, the storage location corresponding to each cargo unit can be determined based on the storage weight of each storage location and the heat information of each cargo unit. Then, after determining the storage location corresponding to each cargo unit, a transport instruction can be sent to the fourth transport device to drive the fourth transport device to transport each cargo unit to the corresponding storage location.
[0237] In some embodiments, the storage location corresponding to each cargo unit is determined based on the heat information of each cargo unit and the storage weight of each storage location, including: sorting the storage weight of each storage location in descending order to obtain a storage location weight list; sorting the heat information of each cargo unit in descending order to obtain a cargo unit heat list; and determining the storage location corresponding to each cargo unit based on the storage location weight list and the cargo unit heat list.
[0238] Among them, the storage location weight list refers to a list composed of each storage location after arranging them from large to small according to the storage weight of each storage location; the cargo unit heat list refers to a list composed of each cargo unit after arranging them from large to small according to the heat information of each cargo unit.
[0239] For example, after determining the storage weight of each storage location and the popularity information of each cargo unit, the storage weights of each storage location are sorted from largest to smallest to obtain a storage location weight list, and the popularity information of each cargo unit is sorted from largest to smallest to obtain a cargo unit popularity list. Based on the storage location weight list and the cargo unit popularity list, the corresponding storage location is determined for each storage location.
[0240] In some embodiments, the storage location corresponding to each cargo unit is determined based on the storage location weight list and the cargo unit heat list, including: determining the number of target cargo units in the cargo unit heat list; based on the number of target cargo units, determining the storage locations corresponding to the number of target cargo units in the storage location weight list in descending order of storage weight.
[0241] In some examples, a target cargo unit refers to a cargo unit that stores the same cargo identifier. The same cargo identifier can be the same SKU. For example, if cargo boxes Q1, Q2, and Q3 all store cargo with SKU 1, then cargo boxes Q1, Q2, and Q3 are all target cargo units.
[0242] In other examples, the target cargo unit may also be a cargo unit with the same popularity information. For example, when cargo boxes Q1, Q2, and Q3 are cargo units with the same popularity information in the popularity list, the middle cargo boxes Q1, Q2, and Q3 may be determined as the target cargo unit.
[0243] It should be noted that, when the heat information of two cargo units in the heat list is the same, the cargo placed in the two cargo units may be the same or different, and the embodiment of the present disclosure does not limit this.
[0244] Exemplarily, the number of target cargo units is determined in the cargo unit heat list, and the same number of storage locations are determined based on the number of target cargo units in the storage location weight list in descending order of storage weight.
[0245] For example, if cargo boxes Q1, Q2, and Q3 all store goods of SKU1, the number of target cargo units is determined to be 3. In the storage location weight list, 3 storage locations are determined in descending order of storage weight. That is, the 3 determined storage locations are the storage locations corresponding to cargo boxes Q1, Q2, and Q3.
[0246] In order to improve the matching efficiency between each cargo unit and each storage location and avoid data matching confusion caused by the storage location where the corresponding cargo unit has been determined to be stored, the storage location where the corresponding cargo unit has been determined to be stored can be deleted.
[0247] In some embodiments, after determining the number of storage locations corresponding to the target cargo units, the method further includes: deleting the number of storage locations corresponding to the target cargo units from the storage location weight list.
[0248] In some examples, after matching some storage locations with some cargo units, the storage locations that have been matched can be deleted from the storage location weight list, so that the storage location weight list only contains unmatched storage locations, thereby preventing the storage locations that have been matched from causing data interference and improving the matching efficiency between storage locations and cargo units.
[0249] In some embodiments, determining the storage location corresponding to each cargo unit based on the storage location weight list and the cargo unit heat list also includes: classifying each cargo unit based on the cargo unit heat list to obtain a cargo unit heat classification result; classifying each storage location in the storage location weight list based on the cargo unit heat classification result to obtain a storage location weight classification result; determining the storage location corresponding to each cargo unit based on the cargo unit heat classification result and the storage location weight classification result.
[0250] In some examples, after obtaining the cargo unit heat list, each cargo unit in the cargo unit heat list can be categorized based on the cargo unit heat list. For example, the categorization can be based on the magnitude of the cargo heat information corresponding to each cargo unit, or based on the shipment quantity of each cargo unit during shipment. Based on the categorization of each cargo unit, a corresponding cargo unit heat classification result is obtained. The number of cargo units included in each category can be the same or different.
[0251] In some examples, each storage location in the storage location weight list is classified based on the cargo unit heat classification results. Each storage location can be classified using the same method used to classify each cargo unit to obtain a corresponding storage location weight classification result. Because the storage location weight classification results are based on the cargo unit heat classification results and are classified based on the cargo unit heat classification results, there is a classification correspondence between the cargo unit heat classification results and the storage location weight classification results. Therefore, based on the correspondence between the cargo unit heat classification results and the storage location weight classification results, the storage location corresponding to each cargo unit can be determined.
[0252] For example, based on the heat information of each cargo unit, each cargo unit is divided into three categories: A, B, and C. Among them, the cargo unit of category A has 1000 cargo units, the cargo unit of category B has 800 cargo units, and the cargo unit of category C has 700 cargo units. In the storage location weight list, each storage location is classified. For example, the first 1000 storage locations in the storage location weight list are classified as category A storage locations, the storage locations from 1001 to 1800 are classified as category B storage locations, and the storage locations from 1801 to 2500 are classified as category C storage locations. The first 1000 category A storage locations are determined as the storage locations corresponding to 1000 category A cargo units, the storage locations from 1001 to 1800 category B storage locations are determined as the storage locations corresponding to 800 category B cargo units, and the storage locations from 1801 to 2500 category C storage locations are determined as the storage locations corresponding to 700 category C cargo units.
[0253] In order to further avoid robot congestion caused by the concentrated distribution of cargo units with higher heat information, the cargo units in the determined storage locations can be further allocated based on the storage locations corresponding to each cargo unit determined based on the cargo unit heat classification results and the storage location weight classification results.
[0254] In some examples, allocation can be made based on the number of lanes in the storage area to which the storage locations belong. For example, if the first 1,000 Class A storage locations are determined to be the storage locations corresponding to 1,000 Class A cargo units, and if there are 10 lanes within the storage area to which these 1,000 storage locations belong, allocation can be made based on each lane storing 100 Class A cargo units.
[0255] The cargo unit scheduling method provided by the embodiment of the present disclosure can, after determining the storage weight of each storage location and the popularity information of each cargo unit, associate and match each storage location with each cargo unit based on the storage weight of each storage location and the popularity information of each cargo unit, so as to determine the storage location corresponding to each cargo unit.
[0256] FIG9 is a schematic diagram of another method for dispatching cargo units provided by some embodiments of the present disclosure. The following, in conjunction with FIG9 , uses the method for dispatching cargo units provided by the present disclosure in a cargo inventory distribution scenario as an example to further illustrate the method for dispatching cargo units. As shown in FIG9 , the method includes the following steps:
[0257] Step 902: Obtain the heat information of each cargo unit and the location information of each storage location in the target inventory area.
[0258] Step 904: Obtain the location information of each workstation.
[0259] Step 906: Based on the position information of the target storage location and the position information of each workstation, determine a position parameter group of the target storage location relative to each workstation, wherein the position parameter group includes a plurality of position parameters.
[0260] Step 908: Determine weight parameters corresponding to different location parameters based on business requirements for the target inventory area.
[0261] Step 910 : Determine target distance information of a target storage location based on the position parameters and corresponding weight parameters in each position parameter group.
[0262] Step 912: Determine the storage weight of the target storage location according to the target distance information of the target storage location.
[0263] Step 914: Sort the stored weights of each storage bit in descending order to obtain a storage bit weight list.
[0264] Step 916: Sort the popularity information of each cargo unit in descending order to obtain a cargo unit popularity list.
[0265] Step 918: Determine the number of target cargo units in the cargo unit heat list.
[0266] Step 920: Based on the number of target cargo units, determine the storage locations corresponding to the number of target cargo units in the storage location weight list in descending order of storage weight, and delete the storage locations from the storage location weight list.
[0267] Some embodiments provided by the present disclosure realize determining the storage weight of each storage location based on the location information of each storage location and the location information of each workstation, and then determining the storage location corresponding to each cargo unit based on the heat information of each cargo unit and the storage weight of each storage location, thereby realizing the combination of the heat information of the cargo unit and the storage weight of the storage location, and realizing the reasonable distribution of the cargo units in the target inventory area. From the aspect of the inventory distribution of the cargo units, the transportation time of the transportation equipment is shortened, the congestion rate of the transportation equipment is reduced, and the working efficiency of the transportation equipment is improved.
[0268] Corresponding to the above-mentioned method embodiments, embodiments of the present disclosure also provide a cargo unit scheduling device. Figure 10 is a schematic diagram of a cargo unit scheduling device provided by some embodiments of the present disclosure. As shown in Figure 10, the device includes: an acquisition module 1002, a first determination module 1004, a second determination module 1006, and a control module 1008. Among them:
[0269] The acquisition module 1002 is configured to obtain a first number of pre-set cache locations in a first storage area of the storage system and a second number of occupied cache locations in the first storage area; wherein the first storage area includes at least one storage rack, and each storage rack is pre-set with multiple cache locations and multiple storage locations.
[0270] The first determining module 1004 is configured to determine a cache bit usage rate of the first storage area according to the first quantity and the second quantity.
[0271] The second determining module 1006 is configured to determine a target cargo unit from cargo units cached in the occupied cache locations when the cache location usage rate reaches a preset usage rate threshold.
[0272] The control module 1008 is configured to send a cargo unit transport instruction to the first transport device in the first storage area to control the first transport device to transport the target cargo unit to the target vacant storage location.
[0273] In some embodiments, the second determination module 1006 is configured to: determine at least one first cargo unit that is not hit by the first order among the cargo units cached in the occupied cache locations; and determine a target cargo unit among the at least one first cargo unit.
[0274] In some embodiments, the second determining module 1006 is configured to: determine score information of each first cargo unit; and determine a target cargo unit among the first cargo units whose score information is less than a score threshold.
[0275] In some embodiments, the second determination module 1006 is configured to: determine at least one of the handling weight of each first cargo unit, the handling distance between each first cargo unit and the first handling equipment, and the popularity information of each first cargo unit; wherein the handling weight of the first cargo unit is used to indicate the probability of the first cargo unit being hit by the second order; based on at least one of the handling weight of each first cargo unit, the handling distance between each first cargo unit and the first handling equipment, and the popularity information of each first cargo unit, determine the score information of each first cargo unit.
[0276] In some embodiments, the control module 1008 is configured to: determine a target free storage location in at least one free storage location in the first storage area; generate a cargo unit handling instruction based on the location information of the target free storage location; and send the cargo unit handling instruction to the first handling device so that the first handling device handles the target cargo unit to the target free storage location.
[0277] In some embodiments, the control module 1008 is configured to: randomly determine a target free storage location from the at least one free storage location; or determine a target free storage location based on a distance between each free storage location and the first handling device.
[0278] In some embodiments, the control module 1008 is configured as follows: if there is a free storage location in the first storage area that is located in the same column as the target cache location where the target cargo unit is located, then the target free storage location is determined among the free storage locations in the same column as the target cache location; if there is no free storage location in the first storage area that is located in the same column as the target cache location, then based on the location information of the target cache location, the target free storage location is determined among the at least one free storage location in the first storage area.
[0279] In some embodiments, the control module 1008 is configured to: determine the horizontal distance between each free storage bit and the target cache bit based on the position information of the target cache bit; and determine the target free storage bit based on the free storage bit in at least one free storage bit that is closest to the target cache bit in the horizontal direction.
[0280] In some embodiments, the control module 1008 is configured to: determine the storage weight of each idle storage location based on the location information of each idle storage location in at least one idle storage location; and determine the target idle storage location in at least one idle storage location based on the heat information of the target cargo unit and the storage weight of each idle storage location.
[0281] In some embodiments, the apparatus 1000 further includes a third determination module and an allocation module; wherein the third determination module is configured to: in response to a task assignment request corresponding to the first storage area, determine the second cargo unit corresponding to the task assignment request in the first storage area; and determine the number of pending tasks in the first storage area based on the number of the second cargo units. The allocation module is configured to: if the number of pending tasks in the first storage area does not reach a first preset task threshold, assign the pending tasks contained in the task assignment request to the first handling device.
[0282] In some embodiments, the third determination module is further configured to: determine the cargo identification included in the task assignment request when the number of pending tasks in the first storage area reaches a first preset task threshold. The allocation module is configured to: assign the pending task included in the task assignment request to the second handling device in the second storage area based on the cargo identification. The control module 1008 is configured to: control the second handling device to execute the pending task in the second storage area; wherein the second storage area stores cargo units corresponding to the cargo identification.
[0283] In some embodiments, the third determination module is further configured to: determine the cargo identifier carried in the task assignment request when the number of pending tasks in the first storage area reaches a first preset task threshold. The allocation module is configured to: upon determining the target cargo identifier, assign the target task corresponding to the target cargo identifier to the first handling device, wherein the target cargo identifier matches the first storage area.
[0284] In some embodiments, the apparatus 1000 further includes a fourth determination module, configured to, if the number of pending tasks in the first storage area is greater than a second preset task threshold, determine a pending task from the pending tasks based on the number of pending tasks and the second preset task threshold. The allocation module is configured to allocate the pending task to a third handling device in a third storage area. The control module 1008 is configured to control the third handling device to execute the pending task in the first storage area, where the third storage area is adjacent to the first storage area.
[0285] In some embodiments, the allocation module is configured to allocate pending tasks in the first storage area to a third handling device in a third storage area if the first handling device leaves the first storage area for a predetermined time threshold. The control module 1008 is configured to control the third handling device to execute the pending tasks in the first storage area, where the third storage area is adjacent to the first storage area.
[0286] In some embodiments, the allocation module is further configured to: allocate the to-be-completed tasks in the first storage area to the first transport device when the first transport device returns to the first storage area.
[0287] In some embodiments, the apparatus 1000 further includes a fifth determination module configured to: determine the heat information of each cargo unit to be stored in the warehousing system, and the location information of each storage location in the target inventory area of the warehousing system; determine the storage weight of each storage location based on the location information of each storage location; and determine the storage location corresponding to each cargo unit based on the heat information of each cargo unit and the storage weight of each storage location. The control module 1008 is configured to: send a transport instruction to the fourth transport device to control the fourth transport device to transport each cargo unit to the corresponding storage location.
[0288] In some embodiments, the fifth determining module is configured to: determine cargo heat information of the cargo stored in each cargo unit; and determine heat information of each cargo unit based on the cargo heat information of the cargo stored in each cargo unit.
[0289] In some embodiments, the fifth determination module is configured to: obtain location information of each workstation in the warehousing system; determine a target distance between the target storage location and each workstation based on the location information of the target storage location and the location information of each workstation; wherein the target storage location is any storage location in the target inventory area; and determine a storage weight of the target storage location based on the target distance between the target storage location and each workstation.
[0290] In some embodiments, the fifth determination module is configured to: determine a first distance between the target storage location and each workstation based on the location information of the target storage location and the location information of each workstation; wherein the target distance includes the first distance.
[0291] In some embodiments, the fifth determination module is configured to: determine the location parameter group of the target storage location and each workstation based on the location information of the target storage location and the location information of each workstation; wherein the location parameter group includes multiple location parameters; determine the weight parameter corresponding to each location parameter in the multiple location parameters according to the business needs of the target inventory area; determine the second distance of the target storage location based on each location parameter in the location parameter group and the weight parameter corresponding to each location parameter; wherein the target distance includes the second distance.
[0292] In some embodiments, the fifth determination module is configured to: determine the sum of the target distances based on the target distances between the target storage location and each workstation; and determine the storage weight of the target storage location based on the sum of the target distances.
[0293] In some embodiments, the fifth determination module is configured to: sort the storage weight of each storage location in descending order to obtain a storage location weight list; sort the heat information of each cargo unit in descending order to obtain a cargo unit heat list; determine the storage location corresponding to each cargo unit based on the storage location weight list and the cargo unit heat list.
[0294] In some embodiments, the fifth determination module is configured to: determine the number of target cargo units in the cargo unit heat list; based on the number of target cargo units, determine the storage locations corresponding to the number of target cargo units in the storage location weight list in order of storage weight from large to small.
[0295] In some embodiments, the apparatus 1000 further includes a deletion module, which is configured to delete a corresponding number of storage locations of the target cargo units from the storage location weight list.
[0296] In some embodiments, the fifth determination module is configured to: classify each cargo unit based on the cargo unit heat list to obtain a cargo unit heat classification result; classify each storage location in the storage location weight list based on the cargo unit heat classification result to obtain a storage location weight classification result; determine the storage location corresponding to each cargo unit according to the cargo unit heat classification result and the storage location weight classification result.
[0297] It should be noted that the technical solution of the scheduling device of a cargo unit in the embodiment of the present disclosure and the technical solution of the scheduling method of the cargo unit mentioned above belong to the same concept. For details not described in detail in the technical solution of the scheduling device of the cargo unit, please refer to the description of the technical solution of the scheduling method of the cargo unit mentioned above.
[0298] Figure 11 is a schematic diagram of a computing device 1100 provided in some embodiments of the present disclosure. Components of the computing device 1100 include, but are not limited to, a memory 1110 and a processor 1120. The processor 1120 is connected to the memory 1110 via a bus 1130, and a database 1150 is used to store data.
[0299] The computing device 1100 also includes an access device 1140 that enables the computing device 1100 to communicate via one or more networks 1160. Examples of such networks include a public switched telephone network (PSTN), a local area network (LAN), a wide area network (WAN), a personal area network (PAN), or a combination of communication networks such as the Internet. The access device 1140 may include one or more of any type of network interface (e.g., a network interface controller (NIC)) whether wired or wireless, such as an IEEE 802.11 wireless local area network (WLAN) wireless interface, a Worldwide Interoperability for Microwave Access (Wi-MAX) interface, an Ethernet interface, a universal serial bus (USB) interface, a cellular network interface, a Bluetooth interface, a near field communication (NFC) interface, and the like.
[0300] In some embodiments, the aforementioned components of the computing device 1100 and other components not shown in FIG11 may also be connected to each other, for example, via a bus. It should be noted that the block diagram of the computing device structure shown in FIG11 is for illustrative purposes only and does not limit the scope of the present disclosure. Those skilled in the art may add or replace other components as needed.
[0301] Computing device 1100 may be any type of stationary or mobile computing device, including a mobile computer or mobile computing device (e.g., a tablet computer, personal digital assistant, laptop computer, notebook computer, netbook computer, etc.), a mobile phone (e.g., a smartphone), a wearable computing device (e.g., a smartwatch, smart glasses, etc.), or other types of mobile devices, or a stationary computing device such as a desktop computer or personal computer (PC). Computing device 1100 may also be a mobile or stationary server.
[0302] When the processor 1120 executes the computer instructions, the steps of the cargo unit scheduling method are implemented.
[0303] The above is a schematic diagram of a computing device according to this embodiment. It should be noted that the technical solution of this computing device and the technical solution of the cargo unit scheduling method described above are based on the same concept. For details not described in detail in the technical solution of the computing device, please refer to the description of the technical solution of the cargo unit scheduling method described above.
[0304] Some embodiments of the present disclosure further provide a computer-readable storage medium storing computer instructions, which, when executed by a processor, implement the steps of the method for dispatching cargo units as described above.
[0305] The above is a schematic diagram of a computer-readable storage medium according to this embodiment. It should be noted that the technical solution of this storage medium and the technical solution of the cargo unit scheduling method described above share the same concept. For details not described in detail in the technical solution of the storage medium, please refer to the description of the technical solution of the cargo unit scheduling method described above.
[0306] The foregoing description describes specific embodiments of the present disclosure. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recited in the claims can be performed in an order different from that described in the embodiments and still achieve the desired results. Furthermore, the processes depicted in the accompanying drawings do not necessarily require the specific order shown or the sequential order to achieve the desired results. In certain embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0307] The computer instructions include computer program code, which may be in source code form, object code form, executable file, or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal, and software distribution medium, etc. It should be noted that the content contained in the computer-readable medium may be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0308] It should be noted that for the aforementioned method embodiments, for ease of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present disclosure is not limited by the order of the actions described, because according to the present disclosure, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present disclosure.
[0309] In the above embodiments, the description of each embodiment has its own focus. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0310] The preferred embodiments of the present disclosure disclosed above are intended only to help illustrate the present disclosure. The optional embodiments do not describe all details in detail, nor do they limit the invention to the specific embodiments described. Obviously, many modifications and variations can be made based on the content of the present disclosure. The present disclosure selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present disclosure, so that those skilled in the art can better understand and utilize the present disclosure. The present disclosure is limited only by the claims and their full scope and equivalents.
Claims
1. A method for dispatching cargo units, applied to a control device, the method comprising: Obtaining a first number of cache locations in a first storage area of a storage system and a second number of occupied cache locations in the first storage area; wherein the first storage area includes at least one storage rack, each of which is pre-installed with a plurality of cache locations and a plurality of storage locations; Determining a cache bit usage rate of the first storage area according to the first number and the second number; When the cache location usage rate reaches a preset usage rate threshold, determining a target cargo unit from the cargo units cached in the occupied cache locations; A cargo unit transport instruction is sent to a first transport device in the first storage area to control the first transport device to transport the target cargo unit to a target vacant storage location in the first storage area.
2. The method according to claim 1, wherein: The step of determining a target cargo unit from cargo units cached in the occupied cache locations comprises: Determine at least one first cargo unit that is not hit by the first order among the cargo units cached in the occupied cache locations; The target cargo unit is determined among the at least one first cargo unit.
3. The method according to claim 2, wherein: The determining the target cargo unit among the at least one first cargo unit comprises: Determining score information of each of the first cargo units; The target cargo unit is determined among the first cargo units whose score information is less than the score threshold.
4. The method according to claim 3, wherein: The determining of the score information of each of the first cargo units includes: Determine at least one of a handling weight of each of the first cargo units, a handling distance between each of the first cargo units and the first handling equipment, and heat information of each of the first cargo units; wherein the handling weight of the first cargo unit is used to indicate a probability that the first cargo unit is hit by the second order; The score information of each of the first cargo units is determined based on at least one of a transport weight of each of the first cargo units, a transport distance between each of the first cargo units and the first transport equipment, and heat information of each of the first cargo units.
5. The method according to claim 1, wherein: Sending a cargo unit transport instruction to a first transport device in the first storage area to control the first transport device to transport the target cargo unit to a target free storage location includes: Determining the target free storage location in at least one free storage location in the first storage area; generating the cargo unit handling instruction according to the location information of the target free storage location; The cargo unit transport instruction is sent to the first transport device, so that the first transport device transports the target cargo unit to the target vacant storage location.
6. The method according to claim 5, wherein: The step of determining the target free storage location in at least one free storage location in the first storage area comprises: randomly determining the target free storage location in the at least one free storage location; or, The target idle storage location is determined based on the distance between each idle storage location and the first handling device.
7. The method according to claim 5, wherein: The step of determining the target free storage location in at least one free storage location in the first storage area comprises: If there is an idle storage location in the same column as the target cache location where the target cargo unit is located among at least one idle storage location in the first storage area, determining the target idle storage location among the idle storage locations in the same column as the target cache location; If there is no free storage bit in the first storage area that is located in the same column as the target cache bit, the target free storage bit is determined in the at least one free storage bit in the first storage area based on the location information of the target cache bit.
8. The method according to claim 7, wherein: The step of determining the target free storage location in at least one free storage location in the first storage area based on the location information of the target cache location comprises: Based on the position information of the target cache bit, determining the distance between each of the free storage bits and the target cache bit in the horizontal direction; The target free storage bit is determined based on a free storage bit in the at least one free storage bit that is closest to the target cache bit in a horizontal direction.
9. The method according to claim 5, wherein: The step of determining the target free storage location in at least one free storage location in the first storage area comprises: Determining a storage weight of each free storage bit according to the position information of each free storage bit in the at least one free storage bit; The target free storage location is determined from the at least one free storage location according to the heat information of the target cargo unit and the stored weights of the free storage locations.
10. The method according to any one of claims 1 to 9, further comprising: In response to a task assignment request corresponding to the first storage area, determining a second cargo unit corresponding to the task assignment request in the first storage area; determining the number of tasks to be completed in the first storage area based on the number of the second cargo units; When the number of tasks to be completed in the first storage area does not reach a first preset task threshold, the tasks to be assigned carried in the task assignment request are assigned to the first transport device.
11. The method according to claim 10, further comprising: When the number of tasks to be completed in the first storage area reaches the first preset task threshold, determining the cargo identifier carried in the task assignment request; Based on the cargo identification, the task to be assigned carried in the task assignment request is assigned to a second handling device in a second storage area, and the second handling device is controlled to perform the task to be assigned in the second storage area; wherein the second storage area stores cargo units corresponding to the cargo identification.
12. The method according to claim 10, further comprising: When the number of tasks to be completed reaches the first preset task threshold, determining the cargo identification carried in the task assignment request; When the target cargo identification is determined, the target task corresponding to the target cargo identification is assigned to the first handling device, wherein the target cargo identification matches the first storage area.
13. The method according to any one of claims 1 to 9, further comprising: When the number of tasks to be completed in the first storage area is greater than a second preset task threshold, determining a task to be assigned from the tasks to be completed based on the number of tasks to be completed and the second preset task threshold; The task to be assigned is assigned to a third handling device in a third storage area, and the third handling device is controlled to perform the task to be assigned in the first storage area; wherein the third storage area is an adjacent storage area to the first storage area.
14. The method according to any one of claims 1 to 9, wherein: The method further comprises: When the time when the first transporting device leaves the first storage area reaches a preset time threshold, the to-be-completed tasks in the first storage area are assigned to the third transporting device in the third storage area, and the third transporting device is controlled to perform the to-be-completed tasks in the first storage area; wherein the third storage area is an adjacent storage area to the first storage area.
15. The method according to claim 14, characterized in that The method further comprises: When the first transporting device returns to the first storage area, the to-be-completed tasks in the first storage area are assigned to the first transporting device.
16. The method according to claim 1, further comprising: Determining the thermal information of each unit of goods to be stored in the warehousing system and the location information of each storage location in a target inventory area in the warehousing system; Determining the storage weight of each storage location based on the location information of each storage location; According to the heat information of each cargo unit and the storage weight of each storage location, the storage location corresponding to each cargo unit is determined, and a transport instruction is sent to the fourth transport device to control the fourth transport device to transport each cargo unit to the corresponding storage location.
17. The method according to claim 16, wherein: The determining of the thermal information of each cargo unit to be stored in the storage system includes: Determining cargo heat information of the cargo stored in each cargo unit; Based on the cargo temperature information of the cargo stored in the cargo units, the temperature information of the cargo units is determined.
18. The method according to claim 16, wherein: The step of determining the stored weight of each storage location based on the location information of each storage location includes: Obtaining location information of each workstation in the storage system; Based on the location information of the target storage location and the location information of each workstation, determine the target distance between the target storage location and each workstation; wherein the target storage location is any storage location in the target inventory area; The storage weight of the target storage location is determined according to the target distance between the target storage location and each workstation.
19. The method according to claim 18, wherein: The step of determining a target distance between the target storage location and each of the workstations based on the location information of the target storage location and the location information of each of the workstations includes: Based on the position information of the target storage location and the position information of each workstation, a first distance between the target storage location and each workstation is determined; wherein the target distance includes the first distance.
20. The method according to claim 18, wherein: The determining of the target distance between the target storage location and each workstation based on the location information of the target storage location among the storage locations and the location information of each workstation includes: Based on the location information of the target storage location and the location information of each workstation, determining a location parameter group of the target storage location and each workstation; wherein the location parameter group includes a plurality of location parameters; Determining a weight parameter corresponding to each of the plurality of location parameters according to the business requirements of the target inventory area; Based on each position parameter in the position parameter group and a weight parameter corresponding to each position parameter, a second distance of the target storage location is determined; wherein the target distance includes the second distance.
21. The method according to claim 18, wherein: The step of determining the storage weight of the target storage location according to the target distance between the target storage location and each workstation includes: Determining the sum of the target distances according to the target distances between the target storage location and each of the workstations; The storage weight of the target storage location is determined according to the sum of the target distances.
22. The method according to any one of claims 16 to 21, wherein: The determining the storage location corresponding to each cargo unit according to the heat information of each cargo unit and the storage weight of each storage location includes: Sorting the stored weights of the storage locations in descending order to obtain a storage location weight list; Sort the heat information of each cargo unit in descending order to obtain a cargo unit heat list; The storage location corresponding to each cargo unit is determined according to the storage location weight list and the cargo unit heat list.
23. The method according to claim 22, wherein: The determining, according to the storage location weight list and the cargo unit heat list, the storage location corresponding to each cargo unit comprises: Determining the number of target cargo units in the cargo unit heat list; Based on the number of the target cargo units, storage locations corresponding to the number of the target cargo units are determined in the storage location weight list in descending order of storage weights.
24. The method according to claim 23, after determining the number of storage locations corresponding to the target cargo units, the method further comprises: The storage locations corresponding to the number of target cargo units are deleted from the storage location weight list.
25. The method according to claim 22, wherein: The determining, according to the storage location weight list and the cargo unit heat list, the storage location corresponding to each cargo unit comprises: Based on the cargo unit heat list, classify each cargo unit to obtain a cargo unit heat classification result; Based on the cargo unit heat classification result, classify each storage location in the storage location weight list to obtain a storage location weight classification result; The storage location corresponding to each cargo unit is determined according to the cargo unit heat classification result and the storage location weight classification result.
26. A dispatching device for cargo units, comprising: An acquisition module is configured to acquire a first number of cache locations in a first storage area of a storage system and a second number of occupied cache locations in the first storage area; wherein the first storage area includes at least one storage rack, each of which is pre-installed with a plurality of cache locations and a plurality of storage locations; A first determining module is configured to determine a cache bit usage rate of the first storage area according to the first number and the second number; A second determination module is configured to determine a target cargo unit from cargo location units cached in the occupied cache locations when the cache location usage rate reaches a preset usage rate threshold; The control module is configured to send a cargo unit transport instruction to a first transport device in the first storage area to control the first transport device to transport the target cargo unit to a target vacant storage location.
27. A computing device, comprising a memory, a processor, and computer instructions stored in the memory and executable on the processor, wherein the processor implements the steps of the method according to any one of claims 1 to 25 when executing the computer instructions.
28. A computer-readable storage medium storing computer instructions, which implement the steps of the method according to any one of claims 1 to 25 when executed by a processor.
29. A computer program product, comprising a computer program, which, when executed by a processor, implements the steps of the method according to any one of claims 1 to 25.
Citation Information
Patent Citations
Cargo unit storage method and device
CN118811322A
Cargo unit scheduling method and device
CN118811342A
Cargo warehousing method and system
CN106966100A
Storage device and system and control method
CN111361908A
Warehouse-in and warehouse-out control method, device and equipment and readable storage medium
CN111453275A
Cited By
Dynamic resource priority intelligent allocation method based on equipment scheduling system
CN121073033A