Method and data processing system for operating and simulating a manufacturing system, and manufacturing system

The two-stage method for generating a production plan based on spatial and manufacturing capacities optimizes resource utilization and productivity in manufacturing systems with mixed automation levels, addressing inefficiencies in additive manufacturing by automating order assignment and planning.

WO2024217815A1PCT designated stage expired Publication Date: 2024-10-24SIEMENS AG
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
PCT/EP2024/057549
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-17
Filing Date
2024-03-21
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

Manufacturing systems, particularly in additive manufacturing, face inefficiencies due to varying levels of automation and unpredictable manual processes, leading to challenges in optimizing production planning and resource utilization.

Method used

A two-stage method for generating a production plan, where initial distribution options are determined based on spatial capacities of production stations, and then optimized based on manufacturing capacities, using a computing unit to automate the assignment of orders and creation of a production plan, thereby improving resource utilization and efficiency.

Benefits of technology

This approach optimizes resource utilization, enhances productivity, and improves adherence to deadlines by automating the planning process, even in systems with mixed automation levels and unpredictable manual processes, ensuring efficient operation and simulation of manufacturing systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure EP2024057549_24102024_PF_FP_ABST
    Figure EP2024057549_24102024_PF_FP_ABST
Patent Text Reader

Abstract

The aim of the invention is to operate a manufacturing system (1) having a plurality of first manufacturing stations (3), each of which is designed to automatically carry out a manufacturing job according to a first job class. This is achieved in that a plurality of jobs are specified, wherein each job specifies the manufacture of at least one product to be manufactured, and the process of manufacturing each product to be manufactured includes the process of carrying out a manufacturing job according to the first job class. A plurality of different distribution options (12) are determined, each distribution option being used to assign each product to be manufactured of a subset of the plurality of jobs to a first manufacturing station (3). A distribution option to be implemented is selected according to the manufacturing capacities of the first manufacturing stations (3) and a corresponding manufacturing plan (13) for a specified manufacturing time period is generated. The manufacturing system (1) is operated on the basis of the manufacturing plan (13).
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Description

[0002] Method and data processing system for operating and simulating a manufacturing plant and manufacturing plant

[0003] The present invention relates to a method for operating a production plant, a method for simulating an operation of a production plant, a data processing system for operating a production plant and / or for simulating an operation of the production plant, and a production plant with such a data processing system.

[0004] Manufacturing facilities can contain a mix of workstations with varying degrees of automation. In addition to fully automated processes, partially automated and / or manual work steps may be required. A typical example of this is additive manufacturing, for example, additive manufacturing with metallic materials. Other examples include chip factories in the semiconductor industry, foundries, or metalworking facilities.

[0005] Additive manufacturing systems feature production stations, also known as 3D printers, which, once properly prepared, operate automatically for extended periods without operator intervention. Such systems may also include saws for cutting the printed workpieces and / or heat treatment furnaces. These can be loaded and started, then independently run a predefined program until they are unloaded and prepared for the next job. However, there are also manual workstations where operators manually process the workpieces.

[0006] Individual production stations such as 3D printers are characterized by different characteristics and parameters, for example a production space, in the case of 3D printers also referred to as a build space. The production space corresponds to a spatial volume for accommodating workpieces or a volume in which workpieces can be manufactured, in particular printed. The larger the production space, the more and / or larger workpieces can be manufactured with the production station. The production space therefore corresponds to a spatial capacity of the production station. The same applies analogously to other production stations, such as furnaces or saws.

[0007] The spatial capacity alone does not say anything about the throughput of the production station, i.e. how many workpieces can be manufactured or processed in a certain period of time. This quantifies the production capacity of the production station. In addition to the spatial capacity, the production capacity depends in particular on a production speed, for example printing speed in the case of 3D printers, or a production time for a certain production task. The production capacity can, for example, be the product of the spatial capacity and the production speed or the quotient of the spatial capacity and the production time or the like. The production capacity can also be referred to as the production throughput of the production station.

[0008] Furthermore, depending on their specific design and their type and function, the production stations can be characterized by further characteristics and parameters, for example usable materials in the case of a 3D printer, temperature ranges in the case of an oven, energy consumption, wear rate and so on.

[0009] For example, operators are scheduled for multiple workstations and / or functions. Some of their activities can be interrupted, others cannot. The execution times for manual tasks can vary greatly, depending both on the characteristics of the workpieces being processed and on the operator's level of experience. This can result in difficult-to-predict irregularities or deviations in the workflow, for example, due to insufficient quality of a printed workpiece or errors in post-processing.

[0010] It is an object of the present invention to increase the efficiency of a manufacturing plant, in particular a manufacturing plant for additive manufacturing.

[0011] This problem is solved by the respective subject matter of the independent claims. Advantageous embodiments and preferred developments are the subject matter of the dependent claims.

[0012] The invention is based on the idea of ​​automatically generating a production plan for processing a large number of orders within a production period in a two-stage process. First, a large number of different distribution options are determined depending on the spatial capacities of the first production stations of the production plant, with each distribution option assigning each product to be manufactured to a first production station. Then, depending on the production capacities of the first production stations, a distribution option to be implemented is selected and the production plan is generated accordingly. Based on the production plan, the production plant can be operated or its operation can be simulated.

[0013] According to one aspect of the invention, a method for operating a manufacturing plant, in particular a manufacturing plant for additive manufacturing, is specified. The manufacturing plant has a plurality of first manufacturing stations, each of which is set up to automatically carry out a manufacturing task according to a first task class. Each first manufacturing station of the plurality of first manufacturing stations is characterized at least by a respective spatial capacity and a respective manufacturing capacity. A plurality of orders is specified, wherein each order of the plurality of orders specifies a manufacture of at least one product to be manufactured and wherein the manufacture of each product to be manufactured of each of the plurality of orders includes the execution of a manufacturing task according to the first task class, for example exactly one manufacturing task according to the first task class.

[0014] By means of at least one computing unit, in particular by means of an option generator module of the at least one computing unit, a plurality of different distribution options are automatically determined depending on the respective spatial capacities of the plurality of first production stations, wherein each distribution option of the plurality of different distribution options assigns each product to be manufactured from a part of the plurality of orders to one, for example exactly one, first production station of the plurality of first production stations.

[0015] By means of the at least one computing unit, a distribution option to be implemented from the plurality of different distribution options is automatically selected depending on the respective production capacities of the plurality of first production stations and, in particular by means of a time planning module of the at least one computing unit, a production plan for a predetermined production period is automatically generated in accordance with the distribution option to be implemented.

[0016] The production facility is operated according to the production plan. In particular, that portion of the numerous orders that corresponds to the distribution option to be implemented is processed based on the production plan.

[0017] For a given distribution option among the plurality of different distribution options, the products of a specific portion of the orders are distributed among the first production stations. This portion is different for different distribution options. In some cases, the portion may also correspond to all orders in the plurality of orders. In general, however, the portion corresponding to the distribution option being implemented does not include all of the products to be manufactured for all of the orders in the plurality of orders, so that not all of the orders in the plurality of orders are processed even according to the production plan.

[0018] Rather, it is only once the production plan has been created that it is determined which orders will be fully or partially processed. The remaining orders can then, for example, be taken into account when the process is repeated and a further production plan is created for a subsequent production period. The priority of the remaining orders can then also be increased.

[0019] In particular, one or more different manufacturing tasks required to manufacture the products can be assigned to the first task class. Likewise, one or more different manufacturing tasks can be assigned to a second task class. In particular, a manufacturing task assigned to the first task class is not assigned to the second task class, and vice versa. In other words, the manufacturing tasks required to manufacture the products are divided into the first task class and the second task class. This division is, in particular, predefined.

[0020] The production tasks of the first task class and the second task class can be divided accordingly based on different specifications, for example depending on the time required to carry out the respective production task and / or depending on the degree of automation with which the respective production task can be carried out and / or on the interruptibility of the respective production task and so on.

[0021] For example, the manufacturing tasks in the first task class may involve long-running and easily plannable processes that may be particularly critical for the overall performance of the production facility. Due to these characteristics, they are suitable, for example, for precise planning using powerful optimization algorithms. This may not be the case for manufacturing tasks in the second task class, for example, due to fluctuating processing times and / or other imponderables. The manufacturing tasks in the second task class may, for example, be interruptible.

[0022] In the case of additive manufacturing, the first manufacturing stations of the plurality of first manufacturing stations for performing the manufacturing tasks according to the first task class can, for example, include manufacturing stations for the additive manufacturing of workpieces, which are also referred to below as 3D printers. Accordingly, the manufacturing tasks according to the first task class can include those manufacturing tasks required to process the plurality of orders that can be performed using a 3D printer, i.e., in particular, the 3D printing of a workpiece.

[0023] The first manufacturing stations of the plurality of first manufacturing stations for carrying out the manufacturing tasks according to the first task class can, for example in the case of additive manufacturing, only include 3D printers or can also include one or more ovens and / or one or more saws and / or one or more depowdering machines.

[0024] In this case, different first production stations of the plurality of first production stations can be designed to carry out the same production task. These different first production stations can be nominally identical or differ in one or more properties, for example in the spatial capacity, in the case of a 3D printer, i.e. the available build space, and / or the production speed, in particular the printing speed, and / or the production capacity, i.e. in particular the build space and the printing speed in combination, and so on.

[0025] Likewise, different first production stations of the plurality of first production stations can be designed to perform different production tasks. These different production tasks can differ, for example, through the use of different materials, particularly in 3D printing, and so on. In the case of additive manufacturing, as mentioned above, the plurality of first production stations can include, in addition to 3D printers, ovens, saws, and / or depowdering machines, so that the basic tasks of the individual first production stations can also differ from one another.

[0026] The fact that the first production stations of the plurality of first production stations are each configured to automatically execute the production task according to the first task class can be understood in particular to mean that the production task can be executed automatically and without operator intervention. However, this does not preclude manual steps for preparing the first production station, post-processing the first production station, starting the execution of the production task, and / or troubleshooting, and so on.

[0027] The manufacturing tasks according to the second task class, for example, cannot be performed using the first manufacturing stations of the plurality of first manufacturing stations. These may, for example, involve manual activities, partially manual activities, or automatic processes for post-processing or post-treatment, particularly of the workpieces printed using the 3D printer. In the case of additive manufacturing, these manufacturing tasks according to the second task class may include, for example, the removal of support structures, steps for manually re-drilling printed holes, grinding treatments, and so on.

[0028] As mentioned above, the manufacturing tasks according to the second task class can, depending on the division of the manufacturing tasks into the first and the second task class, also include the separation of the printed workpieces from one another or from connecting base parts or the like, for example by sawing processes, and / or heat treatments in a furnace.

[0029] Each first production station of the multitude of first production stations is characterized by predetermined properties which include the respective spatial capacity, for example printer installation space, and the respective production capacity and may include, for example, usable materials, energy consumption, and so on. Furthermore, the multitude of orders and thus, for example, the type and number of products to be manufactured, the materials required for this, completion dates, and so on are also predetermined. In particular, all of the products of a given order can be identical, or products of a given order can be different from one another. Products of different orders can likewise be identical or different from one another.

[0030] From the properties of the first production stations of the plurality of first production stations and the plurality of orders, a basic set of all theoretically feasible distribution options can be determined. Each feasible distribution option corresponds to an assignment of all products of all orders of the plurality of orders to exactly one first production station of the plurality of first production stations, by means of which the respective product can be manufactured or partially manufactured. All feasible distribution options of the basic set differ from one another. All products of a given order can be assigned to one and the same first production station, or the order can be split up so that the products of the respective order can be manufactured or partially manufactured at different first production stations of the plurality of first production stations.

[0031] The multitude of different distribution options, which is automatically determined by means of the at least one computing unit, is a subset of the said basic set of all realizable distribution options, in particular a true subset, i.e. a subset that is not identical to the basic set. A distribution option can, for example, be understood as an allocation variant that defines how a certain part of the products to be manufactured - if necessary, this can also be all products from all orders - are to be distributed among the available first production stations according to the spatial capacities. This can be done in different ways. For example, the products to be manufactured can be individually assigned directly to the first production stations. Alternatively, the products to be manufactured can be assigned to production units, also known as lots, charges or batches, which each contain several products.Each production unit can then be assigned to a first production station.

[0032] According to a given distribution option, multiple occupancy of a given first production station can also be provided. In other words, the given first production station can be assigned to a set of products to be manufactured. In this case, for example, the first set of products to be manufactured is provided for together. In the case of a 3D printer, this would be a first print job, for example. Furthermore, the same first production station can be assigned to a second set of products to be manufactured. In this case, for example, the second set of products to be manufactured is provided for together, but separately from the first set of products, i.e. before or after. In the case of a 3D printer, this would be a second print job, for example. This can also be extended to more than two sets of products to be manufactured.

[0033] The basic set of feasible distribution options, which can also be referred to as the basic set of all theoretically possible distribution options, may be very large in realistic applications, so that the optimal creation of a production plan directly based on the basic set would be extremely computationally intensive and therefore potentially time-consuming. According to the invention, by determining the large number of different distribution options depending on the respective spatial capacities of the large number of initial production stations, a pre-selection is made or, for example, a pre-optimization is carried out in order to be able to carry out the subsequent selection of the distribution option to be implemented and the creation of the production plan as efficiently as possible.

[0034] The determination of the multitude of different distribution options, depending on the respective spatial capacities of the plurality of initial production stations, can be carried out according to various selection criteria or pre-optimization criteria. These can include, for example, that the total unused spatial capacity of the initial production stations is as small as possible, i.e., in particular, less than or equal to a correspondingly specified limit. This ensures that as little available installation space as possible remains unused, i.e., is wasted.

[0035] The selection criteria or pre-optimization criteria can also be designed to maximize the total number of products distributed to the initial production stations using the corresponding distribution option. Instead of the actual total number, an effective total quantity of products can also be used, whereby products of different types, sizes, volumes, weights, and / or products with different economic values ​​are weighted differently and thus contribute differently to the total quantity.

[0036] The determination of the multitude of different distribution options depending on the respective spatial capacities of the multitude of first production stations is carried out, in particular, independently of the production capacities of the first production stations. This means that the production capacities are not explicitly used, although, as mentioned above, the production capacities may depend on the spatial capacities. The determination of the multitude of different distribution options can therefore, for example, be described as time-independent in the sense that it does not involve any scheduling or sequence of the production of the products, in particular of the production units.

[0037] Such temporal planning or sequence planning can also be referred to as scheduling. In the method according to the invention, this takes place depending on the production capacities of the first production stations only in the second step, in which the distribution option to be implemented is selected and the production plan is generated. This second step can in particular be carried out as optimization. By splitting the process according to the invention into two parts, the complexity involved in selecting the distribution option to be implemented and in generating the production plan can be reduced, which ultimately improves the quality of the optimization and / or reduces the time required and the computing resources required to generate the production plan.

[0038] The described method according to the invention enables optimal use of the available resources of the production plant.

[0039] A computing unit can be understood, in particular, as a data processing device that contains a processing circuit. The computing unit can therefore, in particular, process data to perform computing operations. This may also include operations for performing indexed access to a data structure, for example, a look-up table (LUT).

[0040] The computing unit can in particular contain one or more computers, one or more microcontrollers and / or one or more integrated circuits, for example one or more application-specific integrated circuits (ASICs), one or more field-programmable gate arrays (FPGAs), and / or one or more single-chip systems (SoCs). The computing unit can also contain one or more processors, for example one or more microprocessors, one or more central processing units (CPUs), one or more graphics processing units (GPUs), and / or one or more signal processors, in particular one or more digital signal processors (DSPs). The computing unit can also contain a physical or virtual network of computers or other of the aforementioned units.

[0041] In various embodiments, the computing unit includes one or more hardware and / or software interfaces and / or one or more memory units.

[0042] A memory unit can be a volatile data memory, for example a dynamic random access memory (DRAM) or a static random access memory (SRAM), or a non-volatile data memory, for example a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a flash memory or flash EEPROM, a ferroelectric random access memory (FRAM), a magnetoresistive random access memory (MRM), or a memory with a random access frequency of up to 128 MB. Access,MRAM (magnetoresistive random access memory) or as phase-change random access memory, PCRAM (phase-change random access memory).

[0043] According to at least one embodiment of the method for operating the production plant, a prioritized list of activities for at least one operator of the production plant is generated by means of the at least one computing unit, in particular by means of an operator instruction module of the at least one computing unit, depending on the production plan.

[0044] The prioritized list can be displayed, for example, using at least one electronic device, for example at least one mobile electronic device belonging to the operator. In this case, all entries in the prioritized list can be displayed to all operators or on all of the electronic devices, or certain entries in the prioritized list can be assigned to specific operators or groups of operators and accordingly displayed only on one or more specific electronic devices.

[0045] In order to process the large number of orders, the prioritized list can be processed accordingly by the operators, which in particular includes starting the production tasks according to the first task class, necessary activities after their completion, and / or starting or manually carrying out the production tasks according to the second task class.

[0046] According to at least one embodiment, an input of the at least one operator concerning a status change of one of the activities of the prioritized list of activities is recorded and the prioritized list of activities is updated depending on the input, in particular by means of the at least one computing unit.

[0047] As a result, an operator can inform the at least one computing unit by inputting information that the status of the corresponding activity has changed, for example because the operator has taken over the corresponding activity, started it, aborted it, successfully completed it, that an error has occurred, or the like. The at least one computing unit, in particular the operator instruction module, can then adapt the prioritized list in accordance with the respective status change and, if necessary, display it again or in an updated form using the at least one electronic device.

[0048] The updated prioritized list can differ from the previous prioritized list in various ways depending on the status change and, where applicable, depending on the activity affected by the status change. If the status change corresponds, for example, to an operator taking over the activity or successfully completing it, the activity can be deleted or marked accordingly in the updated prioritized list so that another operator can no longer take over the activity. If the activity is aborted or in the event of an error, the updated prioritized list can also specify an updated sequence, i.e. updated prioritization, of the activities, change the planned times or periods for carrying out the activities, and so on. The changes are in particular in line with the production plan so that the production plan can still be fulfilled.

[0049] Otherwise, i.e., in the event of serious deviations, it may be necessary to abort processing, create a new production plan, for example by repeating the method according to the invention, and then continue processing the remaining orders. The input is captured, for example, by an input interface of one of the at least one electronic device or of another electronic device, for example by a keyboard, a touch-sensitive display, a voice input interface, or the like.

[0050] According to at least one embodiment, a machine status is obtained from one of the first production stations by means of the at least one computing unit and the prioritized list of activities is updated depending on the machine status.

[0051] This allows at least one computing unit to react to deviations in the machine status from normal operation, for example in the event of a fault or if maintenance work or other operator intervention is required, by adjusting the prioritized list. The at least one computing unit, in particular the operator instruction module, can then adjust the prioritized list according to the respective machine status and, if necessary, display it again or in an updated form using the at least one electronic device.

[0052] The updated prioritized list may differ from the previous prioritized list in various ways depending on the machine status and, where applicable, on the type of the corresponding first production station to which the machine status relates.

[0053] In the event of serious errors or the like, it may be necessary to abort processing, create a new production plan, for example by repeating the process according to the invention, and then continue processing the remaining orders.

[0054] According to at least one embodiment, wherein the plurality of different distribution options is a proper subset of the basic set of all distribution options realizable by means of the plurality of production plants, a preselection from the basic set is carried out using at least one predetermined selection criterion to determine the plurality of different distribution options.

[0055] According to at least one embodiment, wherein the plurality of different distribution options is a proper subset of the basic set of all distribution options realizable by means of the plurality of production plants, an optimization method is carried out to determine the plurality of different distribution options, in particular a numerical optimization method, wherein the plurality of realizable distribution options of the basic set are used as variables of the optimization, i.e. as variables in the optimization method.

[0056] For optimization, a given objective function is used, which represents one or more given optimization criteria. In addition, correspondingly given constraints can be used.

[0057] The optimization criteria can, for example, relate to capacity utilization, i.e. the highest possible capacity utilization, of the individual first production stations, a total throughput of manufactured products, preferred or prescribed periods within the production period in which certain production tasks are carried out, a respective priority of the orders, the avoidance of retooling of the first production stations during the production period, in particular the avoidance of corresponding material changes, the joint processing of all products of an order in a single one of the first production stations, the energy consumption of the production plant, the material consumption of the production plant, and so on. This applies analogously in corresponding embodiments to the at least one selection criterion.The optimization or preselection is carried out in such a way that not just a single distribution option of the basic set is obtained as a result of the optimization or preselection, but a multitude of different distribution options. This can be achieved in different ways. For example, the objective function can be chosen such that its optimization, i.e. minimization or maximization, has multiple solutions, i.e. multiple distribution options. Alternatively or additionally, a termination criterion for the optimization can be chosen such that multiple solutions are possible. The objective function can then, for example, be optimized multiple times, for example with different starting conditions, in order to obtain multiple optimal solutions.

[0058] According to at least one embodiment, the optimization method is carried out as a mixed integer linear optimization, i.e. as a method for mixed integer linear optimization.

[0059] According to at least one embodiment, a further optimization method is carried out to select the distribution option to be implemented, wherein the plurality of different distribution options is used as variables of the further optimization, i.e. as variables in the further optimization method.

[0060] For further optimization, a predefined objective function is used, which represents one or more predefined optimization criteria. In addition, appropriately predefined constraints may be used.

[0061] The respective production capacities of the first production plants can be taken into account in the further optimization in the form of further constraints and / or further optimization criteria.The further optimization criteria can, for example, relate to a utilization, i.e. the highest possible capacity, of the individual first production stations of the plurality of first production stations, of the operators and / or second production stations for carrying out the production tasks according to the second task class, a total throughput of manufactured products, preferred or prescribed periods within the production period in which certain production tasks are carried out, a respective priority of the orders, the avoidance of retooling of the first production stations during the production period, in particular the avoidance of corresponding material changes, the joint processing of all products of an order in a single one of the first production stations, an energy consumption of the production plant, a material consumption of the production plant, and so on.

[0062] The further optimization process can be carried out in one or more steps. In a first step, a subset of potentially implementable distribution options can be determined from the multitude of different distribution options. This subset of potentially implementable distribution options can be reduced step by step until, after a final step, only the one actually implementable distribution option remains, according to which the production plan is created.

[0063] According to at least one embodiment, the further optimization method is carried out as a mixed integer linear optimization, i.e. as a method for mixed integer linear optimization.

[0064] According to at least one embodiment, the production of each product to be manufactured includes the execution of a production task according to the second task class.

[0065] According to at least one embodiment, the

[0066] Distribution option determined depending on the capacity to perform the production tasks according to the second task class.

[0067] The capacity to carry out the manufacturing tasks according to the second task class can be taken into account in the further optimization in the form of further constraints and / or further optimization criteria.

[0068] The capacity to carry out the manufacturing tasks according to the second task class can, for example, be a total capacity with several partial capacities. A partial capacity can, for example, be the capacity of the manufacturing plant to carry out manufacturing tasks of the second task class, for which the resources available in each case and the resources required to process the orders are specifically defined. Depending on the division of the manufacturing tasks, this can apply in the case of additive manufacturing, for example, to the above-mentioned steps for heat treatment in furnaces or for separating the printed workpieces. A further partial capacity can, for example, be the capacity of the operators scheduled to process the orders, for example for the preparation and / or follow-up of the first production stations or the second production stations of the manufacturing plant and / or for the above-mentioned manual activities.This additional partial capacity can be estimated, for example, in the form of the total available working time of the operators, the number of pieces that can be achieved by the operators, and so on.

[0069] According to at least one embodiment, the at least one manufacturing task according to the second task class, in particular for each product to be manufactured from all orders in the plurality of orders or at least for each product to be manufactured from a part of the plurality of orders, is a post-treatment or finishing operation by means of a second manufacturing station of the manufacturing system and / or a manual post-treatment or finishing operation. The second manufacturing station can, in particular in the case of an additive manufacturing system and depending on the distribution of the manufacturing tasks between the first and second task classes, be, for example, a sawing station for separating several printed workpieces from one another or a furnace station with a furnace for heat-treating printed workpieces.

[0070] Post-processing or post-processing may also involve the removal of support structures that are necessary or advantageous for additive manufacturing but are not included in the finished product. This can be done manually and / or automatically and / or partially automatically at the second manufacturing station.

[0071] Post-processing or finishing may, for example, also include grinding the printed workpieces and / or re-drilling holes in the printed workpieces, etc. This may be done manually and / or automatically and / or partially automatically at the second production station.

[0072] According to at least one embodiment, at least a part of the plurality of first production stations is each configured to carry out the corresponding production task according to the first task class simultaneously for a plurality of products.

[0073] The products can originate from different orders. This can occur particularly in additive manufacturing applications, where 3D printers can print several identical or similar products in parallel.

[0074] In such embodiments, the invention is particularly advantageous due to the complexity of the planning options. For applications or application situations that may arise during the method and that are not explicitly described here, it can be provided that, according to the method, an error message and / or a request for user feedback is output and / or a default setting and / or a predetermined initial state is set.

[0075] According to a further aspect of the invention, a method is specified for simulating the operation of a production plant, in particular the operation of the production plant according to a method according to the invention for operating a production plant, which is also referred to below as a simulation method. The production plant has a plurality of first production stations, each of which is set up to automatically carry out a production task according to a predefined first task class. Each first production station is characterized at least by a respective spatial capacity and a respective production capacity. A plurality of orders are specified, each order specifying the production of at least one product to be manufactured and the production of each product to be manufactured comprising the execution of a production task according to the first task class.

[0076] By means of at least one computing unit, a plurality of different distribution options are automatically determined depending on the respective spatial capacities of the plurality of first production stations, wherein each distribution option assigns each product to be manufactured to exactly one first production station. By means of the at least one computing unit, a distribution option to be implemented from the plurality of different distribution options is selected depending on the respective production capacities, and a production plan for a predetermined production period is automatically generated in accordance with the distribution option to be implemented. The operation of the production plant according to the production plan is simulated. According to at least one embodiment of the simulation method, a prioritized list of activities for at least one operator of the production plant is generated by means of the at least one computing unit depending on the production plan.

[0077] In particular, the prioritized list is generated according to the steps described above and used for the simulation.

[0078] According to at least one embodiment of the simulation method, a simulated input of the at least one operator relating to a status change of one of the activities of the prioritized list of activities is generated based on a predetermined operator model, and the prioritized list of activities is updated depending on the simulated input, in particular by means of the operator instruction module.

[0079] According to at least one embodiment of the simulation method, a simulated status of one of the first production stations is generated based on a predetermined machine model by means of the at least one computing unit, and the prioritized list of activities is updated depending on the simulated machine status.

[0080] Further embodiments of the simulation method according to the invention follow directly from the various configurations of the method according to the invention for operating a production plant and vice versa. In particular, individual features and corresponding explanations as well as advantages relating to the various embodiments of the method according to the invention for operating a production plant can be transferred analogously to corresponding embodiments of the simulation method according to the invention. For applications or application situations which may arise during the simulation method and which are not explicitly described here, it can be provided that, in accordance with the method, an error message and / or a request to enter user feedback is output and / or a standard setting and / or a predetermined initial state is set.

[0081] According to a further aspect of the invention, a data processing system for operating a manufacturing plant and / or for simulating operation of the manufacturing plant is specified. The manufacturing plant has a plurality of first manufacturing stations, each of which is set up to automatically carry out a manufacturing task according to a predefined first task class. Each first manufacturing station is characterized at least by a respective spatial capacity and a respective manufacturing capacity. The data processing system has at least one computing unit which is set up to receive a plurality of orders, each order specifying a manufacture of at least one product to be manufactured and the manufacture of each product to be manufactured comprising the execution of a manufacturing task according to the first task class.

[0082] The at least one computing unit is configured to automatically determine a plurality of different distribution options depending on the respective spatial capacities of the plurality of first production stations, wherein each distribution option assigns each product to be manufactured from a part of the plurality of orders to precisely one first production station, to select a distribution option to be implemented from the plurality of different distribution options depending on the respective production capacities of the plurality of first production stations, and to automatically generate a production plan for a predetermined production period in accordance with the distribution option to be implemented. The production plant can then be operated based on the production plan, or its operation can be simulated based on the production plan.

[0083] Further embodiments of the data processing system according to the invention follow directly from the various embodiments of the method according to the invention for operating a production plant and vice versa, or of the simulation method according to the invention and vice versa. In particular, individual features and corresponding explanations as well as advantages relating to the various embodiments of the method according to the invention for operating a production plant and of the simulation method according to the invention can be transferred analogously to corresponding embodiments of the data processing system according to the invention.

[0084] According to a further aspect of the invention, a manufacturing plant is provided which has a plurality of first manufacturing stations, each of which is configured to automatically carry out a manufacturing task according to a first task class, as well as a data processing system according to the invention.

[0085] According to at least one embodiment of the manufacturing plant according to the invention, the manufacturing plant is designed as a manufacturing plant for additive manufacturing and / or the first manufacturing stations are designed for the additive manufacturing of workpieces, in particular as 3D printers.

[0086] Further embodiments of the production plant according to the invention follow directly from the various embodiments of the method according to the invention for operating a production plant and vice versa, or of the simulation method according to the invention and vice versa. In particular, individual features and corresponding explanations as well as advantages relating to the various embodiments of the method according to the invention for operating a production plant and of the simulation method according to the invention can be transferred analogously to corresponding embodiments of the production plant according to the invention.

[0087] According to a further aspect of the invention, a computer program with instructions is provided. When the instructions are executed by a data processing system according to the invention, the instructions cause the data processing system to perform the corresponding steps of an inventive method for operating a production plant or a simulation method according to the invention.

[0088] The instructions can be provided, for example, as program code. The program code can be provided, for example, as binary code or assembly code and / or as source code of a programming language, for example C, and / or as a program script, for example Python.

[0089] According to a further aspect of the invention, a computer-readable storage medium is provided which stores a computer program according to the invention.

[0090] If, within the scope of the present disclosure, it is stated that a component of the production plant according to the invention, in particular the at least one computing unit of the production plant, is set up, designed, constructed or the like to carry out or implement a specific function, to achieve a specific effect or to serve a specific purpose, this can be understood to mean that the component, beyond the fundamental or theoretical usability or suitability of the component for this function, effect or purpose, is concretely and actually capable of carrying out or implementing the function, achieving the effect or serving the purpose through appropriate adaptation, programming, physical design and so on. Further features of the invention emerge from the claims, the figures and the description of the figures.The features and combinations of features mentioned above in the description as well as the features and combinations of features mentioned below in the description of the figures and / or shown in the figures can be encompassed by the invention not only in the respective combination specified, but also in other combinations. In particular, the invention can also encompass embodiments and combinations of features that do not have all the features of an originally formulated claim. Furthermore, the invention can encompass embodiments and combinations of features that go beyond the combinations of features set out in the backreferences to the claims or deviate from them.

[0091] The invention is explained in more detail below with reference to specific exemplary embodiments and associated schematic drawings. In the figures, identical or functionally equivalent elements may be provided with the same reference numerals. The description of identical or functionally equivalent elements may not necessarily be repeated for different figures.

[0092] The figures show

[0093] FIG 1 is a schematic representation of an exemplary embodiment of a manufacturing plant according to the invention;

[0094] FIG 2 shows a schematic flow diagram of an exemplary embodiment of a method according to the invention for operating a production plant; and

[0095] FIG 3 shows a schematic representation of an exemplary embodiment of a data processing system according to the invention for simulating the operation of a production plant. FIG 1 shows a schematic representation of an exemplary embodiment of a production plant 1 according to the invention. The production plant has an exemplary embodiment of a data processing system 2 according to the invention for operating a production plant and a plurality of first production stations 3, each of which is set up to automatically carry out a production task according to a first task class. Each first production station 3 is characterized at least by a respective spatial capacity and a respective production capacity.

[0096] A method according to the invention for operating a production plant can be carried out using the production plant 1. A flow diagram of an exemplary embodiment of such a method is shown schematically in FIG. 2.

[0097] For example, production facility 1 is designed for additive manufacturing, and the first production stations 3 are 3D printers. The production tasks of the first task class then correspond, for example, to the respective 3D printing of one or more workpieces. The spatial capacity corresponds to a build volume of the respective 3D printer, and the production capacity, for example, to a combination of build volume and print speed. The workpieces correspond to the products to be manufactured, or the products to be manufactured are manufactured from the printed workpieces, for example by post-processing and / or post-treatment. The following explanations can be applied analogously to other use cases.

[0098] First, in step 200, a plurality of orders are specified, wherein each order specifies the production of at least one product to be manufactured, and wherein the production of each product to be manufactured includes the execution of a production task according to the first task class and, for example, the execution of at least one production task according to a second task class, for example, post-processing and / or post-treatment. Furthermore, a capacity for performing the production tasks according to the second task class can be determined or specified.

[0099] The data processing system 2 contains at least one computing unit, which is represented in FIG. 1 by way of example by an option generator module 5, a scheduler module 6, and an operator instruction module 7. These can each be software modules and / or hardware modules. In alternative embodiments, the steps performed by the individual modules can also be performed otherwise by the at least one computing unit.

[0100] In step 220 of the method, a plurality of different distribution options 12 are automatically determined by means of the option generator module 5 depending on the respective spatial capacities of the plurality of first production stations 3, wherein each distribution option assigns each product to be manufactured to exactly one part of the plurality of orders corresponding to the respective distribution option of one of the first production stations 3.

[0101] In step 240, by means of the time planning module 6, a distribution option to be implemented from the plurality of different distribution options 12 is automatically selected depending on the respective production capacities of the first production stations 3, and if necessary additionally depending on the capacity for carrying out the production tasks according to the second task class, and a production plan 13 for processing the corresponding orders within a predetermined production period, for example one week, is automatically generated in accordance with the distribution option to be implemented. The production plant 1 is operated according to the production plan 13. For this purpose, in particular the orders corresponding to the distribution option to be implemented are processed based on the production plan 13, for example by operator 4 of the production plant 1, also referred to as worker.For example, a prioritized list 14 of activities for the operators 4 is generated by means of the operator instruction module 7 depending on the production plan 13 and is displayed, for example, by means of at least one electronic device 8 of the data processing system 2.

[0102] In step 260, the operator instruction module 7 can, for example, detect an input 15 from an operator 4 concerning a status change of one of the activities of the prioritized list 14 and / or receive a machine status 16 of the first production station 3 from one of the production stations 3. The operator instruction module 7 can update the prioritized list 14 depending on the input 15 and / or the machine status 16.

[0103] In the case of additive manufacturing, particularly with metallic materials, the production facility 1 may contain, in addition to the 3D printers as the first production stations 3, saws for separating the printed parts and / or furnaces for heat treatment. These are loaded and started, and then independently run a predefined program until they are unloaded and prepared for the next job. In addition, there may also be manual workstations 4 where the operators 4 process the workpieces by hand.

[0104] In principle, the operators 4 in additive manufacturing can be scheduled for several workstations and functions. Some of their activities can be interrupted, for example, while others cannot. The execution times for a manual task can vary greatly, depending not only on the characteristics of the products being processed, but also on the experience of the respective operator 4. In addition, there may be problems in the workflow that are difficult to predict, such as insufficient quality of a printed workpiece or errors in post-processing due to complex product geometries. This complex interaction between human and machine, which can only be determined in advance with limited determinism, can be planned by the present invention in such a way that an efficient process results despite the aforementioned imponderables.

[0105] This can present several challenges. Firstly, if there is a large number of orders, each of which may require the production of several products, there can be an overwhelming number of options for dividing products between 3D printing jobs and 3D printers. As described, the manual processes of additive manufacturing are sometimes subject to fluctuations that are difficult to plan, which makes complete planning of all required processes in detail seem pointless, since the operators have to make their own decisions to a certain extent depending on the situation. One challenge therefore lies in keeping this necessary design flexibility free through an automated planning and control solution and nevertheless ensuring a high level of efficiency in the overall process by using powerful optimization methods.In particular, the scope for action mentioned above should be limited in such a way that no decisions are made that are detrimental to productivity.

[0106] With the procedure according to the invention, a high degree of automation can be achieved in which different systems, in particular the option generator module 5, the scheduler module 6 and the operator instruction module 7, are combined in order to optimize the efficiency of the production plant 1.

[0107] To create the production plan 13, precise automatic optimization methods can be used to best plan critical resources, in particular 3D printers and operators 4 for their preparation, under various optimization criteria, such as throughput, productivity, adherence to deadlines for orders with delivery dates, costs, and so on, within a specific planning horizon defined by the production period. The long-running 3D printing processes themselves generally require no human supervision but can run continuously, meaning that the operation of the 3D printers can deliberately be scheduled outside of work shifts as part of optimized planning to optimize productivity. In some embodiments, this can also be done for furnaces or other machines.

[0108] On the other hand, there are a number of processes for post-processing the products that are not or only partially automated and which can, for example, be started and interrupted flexibly depending on the current situation. In this regard, exact optimization of the planning may not be advisable due to strong fluctuations in processing times and / or due to different levels of experience of the operators 4 and numerous differences in product geometry for these processes. This applies in particular to the removal of support structures on the printed workpieces, especially when predominantly small series and / or individual pieces are manufactured. However, they can be planned on the basis of entire shifts or days in such a way that the required processing capacity is secured by the operators 4. Fluctuations in the processing time of individual processes are averaged out to a considerable extent with this coarser capacity planning.

[0109] Planning takes place logically in two consecutive steps. Since, for reasons of efficiency, the products to be printed are not printed individually, for example, but several products of the same material are produced together in a print job, the distribution options 12, also referred to as print job options, are first generated. These options, on the one hand, efficiently utilize the available build space of the 3D printers and, on the other hand, create the best possible conditions for subsequent scheduling in order to be able to use the available resources optimally over time. This option calculation can, for example, be treated as a complex combinatorial optimization problem, which can be solved in particular using a mathematical optimization model, for example a mixed integer linear optimization method.

[0110] Then, from the multitude of distribution options 12, a distribution option to be implemented, i.e., in particular, a suitable quantity of print jobs actually to be printed, is determined, scheduled, and capacity-wise compared with the resources available over time. This step, too, corresponds to a complex combinatorial optimization problem, which can also be solved, for example, using mixed integer linear optimization. As described above, the manual processes following the printing process and, if applicable, the subsequent heat treatment are also taken into account in terms of capacity.

[0111] The operator instruction module 7 can be based on the production plan 13 automatically transmitted to it, which on the one hand contains precisely scheduled processes, especially the 3D prints and their preparation and / or post-processing, and on the other hand contains a shift-related rough plan of the interruptible post-processing processes. For the latter processes, the operator instruction module 7 can, on the one hand, ensure compliance with boundary conditions regarding the sequence of operations and their earliest start, but on the other hand, allow the operators 4 the freedom necessary to act appropriately to the situation, for example, to select those post-processing activities that can be processed most efficiently given the experience background of the operator 4 currently deployed, or to avoid unnecessary setup processes, if there are several post-processing activities that can be started.

[0112] The operator instruction module 7 can, for example, issue recommendations regarding the prioritization of activities, for example according to the latest completion date of the associated order. In addition, it can, for example, divide processes into smaller steps that may not be important for optimized planning but can provide valuable guidance to the operator 4. For example, a task "preparing the workplace" could be divided into the subtasks "cleaning the system", "checking the machines", "reconfiguring the system", and "loading the system". These tasks and / or subtasks can then be displayed to the operators 4 and in particular to the correspondingly assigned operator 4 via the electronic devices 8, for example mobile devices.The operator 4 can then acknowledge the start and end of the activity on the electronic device 8, for example, so that the tasks are only distributed once, but also so that the operator 4 can be provided with new tasks after the activity has been completed. Completed activities can be reported back to the operator instruction module 7 by the automated first production stations 3 and / or the operator 4.

[0113] In addition, the operator instruction module 7 can be connected to the first production stations 3, for example via a standardized software interface, so that the first production stations 3 can also forward information about their status to the operator instruction module 7 in the form of the machine status 16. This can relate, on the one hand, to error cases, so that the operators 4 can be informed about errors, the error handling of which is also stored if necessary, but it can also transmit current statuses such as progress times or completion so that the operators 4 and the operator instruction module 7 can plan when certain activities are pending and must or can be scheduled.The operator instruction module 7 can also, for example, record the times of manual steps and, based on historical and / or product-specific data, take into account improved estimates of processing times over time, for example through the use of machine learning methods. A significant achievable advantage can be seen in the novel way of dealing with the combination of efficiency-critical processes that are also amenable to exact optimization and activities that cannot be planned precisely, in particular manual ones, as is characteristic, among other things, of additive manufacturing. Methods of exact optimization can be combined with an intelligent heuristic of the operator instruction module 7. This coordinated combination can, on the one hand, make it possible to exploit optimization potential that could not be realized by human planners with a complex order mix.On the other hand, operators 4 can be given the freedom to optimally design the post-processing process, which cannot be planned exactly in detail, within the given boundary conditions and taking into account important criteria such as order priority.

[0114] The result is higher productivity, better adherence to deadlines, and optimized resource utilization. Transparency regarding the production plan and its predicted and / or actual adherence can be ensured. These benefits are particularly evident in production facilities with a mix of manual, semi-automated, and fully automated production resources.

[0115] FIG 3 shows a schematic block diagram for an exemplary embodiment of a data processing system 2 according to the invention for simulating operation of the production plant 1. For this purpose, the data processing system 2 carries out in particular a method according to the invention for simulating the operation of the production plant 1. The data processing system 2 is based, for example, on the data processing system 2 discussed with reference to FIG 1, and therefore has, for example, the option generator module 5, the time planner module 6 and the operator instruction module 7 with the functions described. The processing of the corresponding orders can be simulated based on the production plan 13, for example using a simulator module 9 of the at least one computing unit, which contains, for example, a machine model 3' relating to the first production stations 3 and an operator model 4' relating to the operators 4.The operator instruction module 7 can acquire a simulated input 15' from an operator 4 concerning a status change of one of the activities of the prioritized list 14 from the operator model 4, for example via an operator interface 11. Alternatively or additionally, the operator instruction module 7 can acquire a simulated machine status 16' from the machine model 3, for example via a machine interface 10.

[0116] The simulator module 9 can be understood as a virtual or digital twin of the production plant 1, which can be used to evaluate the production plan 13 generated as described and / or to put it into operation virtually before its implementation.

[0117] The simulator module 9 maps both the material flow in the production plant 1, in particular through the machine model 3', and thus also the behavior of the operators 4, in particular through the operator model 4'. In contrast to a classic virtual commissioning, the communication between the simulator module 9, in particular the operator model 4', and the operator instruction module 7 does not take place via standardized automation protocols, for example, but rather via the prioritized list 14 of activities for the operators 4. Furthermore, the model can be set up in such a way that it is not the material flow of the product that controls the production processes, but rather the control of the workers that advances them.

[0118] Since, for example, there is no automated interface for controlling the operators because they receive their instructions via HMIs of the electronic devices 8 and can also acknowledge them via the electronic devices 8, parallel communication between the operator instruction module 7 and the simulator module 9 can be set up via the interface 11. This can be done, for example, via a network protocol for machine-to-machine communication, such as MQTT, or another standardized software interface, such as OPC. The prioritized list 14 of activities for the operators 4 can be transferred to the simulator module 9 via the interface 11 and the simulated status changes 15 can be reported back from the simulator module 9 to the operator instruction module 7.

[0119] The machine model 3 ', which can, for example, route one or more products according to their production steps through the production plant 1, is in particular extended by the operator model 4 ', wherein the individual action sequences can be triggered by the operator instruction module 7, and their start, end, etc. can be acknowledged by corresponding signals.

[0120] The instructions from the prioritized list 14 can in turn be mapped in the simulator module 9 by subsequences in order to, among other things, take into account the travel times of the operators 4. For example, an instruction "Load machine" can be mapped by the subsequences "Go to warehouse," "Take a workpiece," "Go to machine," and "Load machine." Furthermore, the operators 4, their qualifications, and / or the shift systems can also be mapped.

[0121] Since the process times can be specific to the respective orders, products and / or first production stations 3, these can be derived from the production plan 13 by the operator instruction module 7 and transferred to the simulator module 9 together with the order. Fluctuations in the processing times of operators 4 and production stations can be stored in the simulator module 9 so that the simulation times can be stochastically disrupted in order to simulate deviations from specifications and, if necessary, initiate corresponding rescheduling. These stochastic models can differ according to the qualification of the operators 4 or can also simulate typical human behavior, such as an increased error rate in monotonous activities, tiredness after a lunch break, stress before the end of the shift and so on.

[0122] The simulation can be used for the virtual commissioning of the production plant 1 and for its control in order to reduce the effort required for troubleshooting. On the other hand, the simulation allows the comparison of modified versions of the models with regard to the quality of the resulting production process. It can also be checked whether a calculated plan can be fulfilled within the planned time under realistic conditions. If, for example, it is determined that the production plan 13 is unrealistic, buffer times and / or time specifications can be adjusted or evaluated differently and then replanning can be initiated, for example manually.

[0123] The operator model 4 ' can also take into account various decision strategies according to which operators 4 can make their selection of work steps, for example according to priority, according to the first in - first out principle, preference for repeated activities, chance or combinations thereof.

[0124] It is also possible to simulate failures of the first production stations 3, for example, taking into account the mean time between failures (MTBF). Likewise, a certain scrap rate, which can be obtained from empirical data, can be taken into account. These errors can be reported by the operator model 4 to the operator instruction module 7 and / or by the machine model 3, depending on whether the first production stations 3 in the actual production plant 1 have a corresponding connection to the operator instruction module 7, so that the operator instruction module 7 can provide for rescheduling or can withdraw operators 4 who are qualified for maintenance activities to carry out repairs.

[0125] This method can now be used to assess whether a production plan is fundamentally feasible, and / or, for example, using Monte Carlo simulations, it can be analyzed to what extent time windows for operators 4 and the first production stations 3 can be adhered to, and how many of the planned activities can probably be processed if random deviations occur, and so on. This information can then be fed back into the planning process.

[0126] Through appropriate embodiments of the simulation model according to the invention, the simulation can no longer be solely product- and machine-oriented, but can also be operator-oriented. Thus, a user-optimized simulation model can be realized instead of a product- and machine-oriented simulation model.

[0127] Regardless of the grammatical gender of a particular term, in particular the term "operator", persons with male, female or other gender identity are included.

Claims

Patent claims 1. A method for operating a production plant (1), the production plant (1) comprising a plurality of first production stations (3), each of which is configured to automatically carry out a production task according to a predefined first task class, wherein each first production station (3) is characterized at least by a respective spatial capacity and a respective production capacity, and wherein - a plurality of orders are specified, each order specifying a production of at least one product to be manufactured and the production of each product to be manufactured including the execution of a production task according to the first task class; - a plurality of different distribution options (12) are automatically determined by means of at least one computing unit depending on the respective spatial capacities of the plurality of first production stations (3), wherein each distribution option assigns each product to be manufactured from a part of the plurality of orders to a first production station (3); - by means of the at least one computing unit, a distribution option to be implemented from the plurality of different distribution options (12) is automatically selected depending on the respective production capacities of the plurality of first production stations (3), and a production plan (13) for a predetermined production period is automatically generated in accordance with the distribution option to be implemented; and - the production plant (1) is operated in accordance with the production plan (13).

2. Method according to claim 1, wherein the manufacturing plant (1) is designed as a manufacturing plant (1) for additive manufacturing.

3. Method according to one of the preceding claims, wherein by means of the at least one computing unit depending on the Production plan (13) a prioritized list (14) of activities for at least one operator (4) of the production plant (1) is generated.

4. The method according to claim 3, wherein - an input (15) of the at least one operator (4) concerning a status change of one of the activities of the prioritized list (14) of activities is recorded; and - the prioritized list (14) of activities is updated depending on the input (15).

5. The method according to any one of claims 3 or 4, wherein - by means of the at least one computing unit, a machine status (16) is obtained from one of the first production stations (3); and - the prioritized list (14) of activities is updated depending on the machine status (16).

6. Method according to one of the preceding claims, wherein the plurality of different distribution options (12) is a real subset of a basic set of all distribution options (12) that can be realized by means of the plurality of first production stations (3) and for determining the plurality of different distribution options (12) - an optimization procedure is carried out, whereby the plurality of feasible distribution options of the basic set are used as variables in the optimization procedure; or - a pre-selection is carried out from the basic set using at least one predetermined selection criterion.

7. Method according to one of the preceding claims, wherein a further optimization method is carried out to select the distribution option to be implemented, wherein the plurality of different distribution options (12) are used as variables in the further optimization method.

8. The method according to one of claims 6 or 7, wherein the optimization method is carried out as a method for mixed integer linear optimization and / or the further optimization method is carried out as a method for mixed integer linear optimization.

9. Method according to one of the preceding claims, wherein the manufacture of each product to be manufactured includes the execution of a manufacturing task according to a predefined second task class, and - the distribution option to be implemented is determined depending on the capacity to carry out the production tasks according to the second task class; and / or - the at least one manufacturing task according to the second task class includes a post-treatment or post-processing by means of a second manufacturing station (3) of the manufacturing plant (1) and / or a manual post-treatment or post-processing.

10. Method according to one of the preceding claims, wherein at least some of the plurality of first production stations (3) are each configured to carry out the corresponding production task according to the first task class simultaneously for a plurality of products.

11. Method for simulating an operation of a production plant (1), the production plant (1) comprising a plurality of first production stations (3), each of which is set up to automatically carry out a production task according to a predefined first task class, wherein each first production station (3) is characterized at least by a respective spatial capacity and a respective production capacity, and wherein - a plurality of orders are specified, each order specifying a production of at least one product to be manufactured and the production of each product to be manufactured including the execution of a production task according to the first task class; - a plurality of different distribution options (12) are automatically determined by means of at least one computing unit depending on the respective spatial capacities of the plurality of first production stations (3), wherein each distribution option assigns each product to be manufactured from a part of the plurality of orders to a first production station (3); - by means of the at least one computing unit, a distribution option to be implemented from the plurality of different distribution options (12) is selected depending on the respective production capacities of the plurality of first production stations (3), and a production plan (13) for a predetermined production period is automatically generated in accordance with the distribution option to be implemented; and - the operation of the production plant (1) is simulated according to the production plan (13).

12. The method according to claim 11, wherein a prioritized list (14) of activities for at least one operator (4) of the production plant (1) is generated by means of the at least one computing unit depending on the production plan (13), - a simulated input (15') of the at least one operator (4) relating to a status change of one of the activities of the prioritized list (14) of activities is generated based on a predetermined operator model (4'), and the prioritized list (14) of activities is updated depending on the simulated input (15'); and / or - by means of the at least one computing unit, a simulated machine status (16') of one of the first production stations (3) is generated based on a given machine model (3' ) and the prioritized list (14) of activities is updated depending on the simulated machine status (16' ).

13. Data processing system (2) for operating a production plant (1) and / or for simulating an operation of the production plant (1), the production plant (1) comprising a plurality of first production stations (3), each are set up to automatically carry out a production task according to a predefined first task class, wherein each first production station (3) is characterized at least by a respective spatial capacity and a respective production capacity, and wherein the data processing system (2) has at least one computing unit which is set up to - to receive a plurality of orders, each order specifying a production of at least one product to be manufactured and the production of each product to be manufactured involving the performance of a production task according to the first task class; - to automatically determine a plurality of different distribution options (12) depending on the respective spatial capacities of the plurality of first production stations (3), wherein each distribution option assigns each product to be manufactured from a part of the plurality of orders to a first production station (3); - depending on the respective production capacities of the plurality of first production stations (3), to select a distribution option to be implemented from the plurality of different distribution options (12) and to automatically generate a production plan (13) for a predetermined production period in accordance with the distribution option to be implemented.

14. A manufacturing plant (1) comprising a plurality of first manufacturing stations (3), each of which is configured to automatically carry out a manufacturing task according to a first task class, and a data processing system (2) according to claim 13.

15. Manufacturing plant (1) according to claim 14, wherein the manufacturing plant (1) is designed as a manufacturing plant (1) for additive manufacturing and / or wherein the first manufacturing stations (3) are designed for the additive manufacturing of workpieces.