Design device, design method, and program
The design device optimizes network resources to meet user demands for high-definition video transmission in 6G networks by aligning user movement plans with current resource utilization, achieving optimal communication quality for drones and other mobile objects despite limited resources.
Patent Information
- Application Number
- PCT/JP2023/015644
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-19
- Publication Date
- 2024-10-24
AI Technical Summary
Current network design technologies face challenges in achieving optimal communication quality for remote operation of high-speed drones, particularly in 6G networks with limited resources, where it is difficult to identify and manage congested areas and allocate sufficient network resources for high-definition video transmission.
A design device that optimizes network resources by combining user movement plans with current network resource utilization, using an optimization unit to minimize differences between planned and actual resource usage, and a control unit to manage network settings such as beamforming and frequency allocation across base stations.
This approach enables optimal communication quality according to user requests even with limited network resources, ensuring high-definition video transmission for drones and other mobile objects by dynamically adjusting network settings and resource allocation.
Smart Images

Figure JP2023015644_24102024_PF_FP_ABST
Abstract
Description
Design device, design method, and program
[0001] The present disclosure relates to designing a network according to a plan for the movement of a mobile object.
[0002] In recent years, efforts have been underway to realize cargo transportation by drones. Remote control (piloting) of logistics drones assumes an environment in which the drone (device) and operator are physically separated (connected via an internet line, etc.). High-definition (mainly in terms of improving user quality of experience (QoE)) and low-latency video transmission are desirable to withstand remote control of drones traveling at speeds of up to 140 km / h. Network resources for wireless or wired networks (core networks) required for real-time transmission of uncompressed 4K or 8K video are required. Transmission speeds of 12-18 Gbps are required for uncompressed 4K, and 24-160 Gbps for uncompressed 8K.
[0003] Therefore, unlike people or traffic flow, it is difficult to identify congested areas and systematically design network resources that can satisfy the required user quality of experience.
[0004] In contrast, there are wireless network control technologies that grasp and predict the radio wave environment based on environmental information such as the radio wave environment (communication) quality, congestion, usage status of each terminal, or interference status, and information about surrounding buildings, and control the parameters of network resources in a wireless network (see non-patent documents 1 and 2).
[0005] Sasaki et al., "Multi-wireless proactive control technology - Creating a natural communication environment without being aware of the wireless network," NTT Technical Journal, April 20, 2021.<https: / / journal.ntt.co.jp / article / 13100> Kawamura et al., "Wireless Technology for Extreme NaaS - Multi-Wireless Proactive Control Technology," NTT Technical Journal, August 1, 2021.<https: / / journal.ntt.co.jp / article / 14898 >
[0006] However, in the era of 6G (sixth generation mobile networks), there is a possibility that a cell-free architecture in which many base stations are distributed will be adopted, rather than the current cellular base station configuration that manages mobile devices in large area units. When the ratio of devices to base stations is 1:n, it is not known which devices and base stations will carry out high-capacity or low-latency transmissions, and there is a high possibility that there will be places or time periods where wireless communication network resources are not abundant in absolute terms, making it difficult to operate with surplus in mind compared to wired communication network resources.
[0007] Furthermore, even in the case of wired networks, when 6G (sixth generation mobile networks) is first introduced (until around 2030), there will be limitations on optical paths that support high-capacity or low-latency transmission, making it difficult to simultaneously allocate a sufficient number of optical paths to all base stations.
[0008] The present invention has been made in view of the above points, and has as its object to realize optimal communication quality according to user requests using limited network resources.
[0009] In order to achieve the above object, the invention of claim 1 is a design device for performing network design using network resources, which has an optimization unit that attempts to optimize the network design so that the difference between a plan for the movement of a mobile object (a user's plan) and the current use of the network resources is equal to or less than a predetermined value, and a control unit that, if the optimization is possible, controls the network resources for the network design.
[0010] As described above, the present disclosure provides an advantage in that it is possible to achieve optimal communication quality according to user demands with limited network resources.
[0011] 1 is a schematic diagram of a communication system according to an embodiment; FIG. 2 is an electrical hardware configuration diagram of a user terminal, a design device, and a communication control server; FIG. 3 is a functional configuration diagram of the design device; FIG. 4 is a conceptual diagram showing a movement plan; FIG. 5 is a conceptual diagram showing a realistic network resource utilization plan; FIG. 6 is a diagram showing beamforming settings for each time at each base station in wireless communication; FIG. 7 is a diagram showing frequencies preferentially allocated for each time at a predetermined base station in wireless communication; FIG. 8 is a diagram showing wired communication paths allocated for each time to each base station; FIG. 9 is a diagram showing wireless communication coverage obtained by cooperative control; FIG. 10 is a flowchart showing processing by which a design device executes network design processing; FIG. 11 is a flowchart showing processing by which a design device executes network design processing;
[0012] [Overview of Overall Configuration] Fig. 1 is a schematic diagram of a communication system according to an embodiment. Fig. 1 shows, as an example, a communication system 10 according to this embodiment in which a user remotely controls an aircraft. The communication system 10 is constructed by a user terminal 30, a design device 50, an aircraft 70, base stations A, B, and C, and a communication control server 90. Note that although three types of base stations A, B, and C are described here, any number of types may be used.
[0013] The user terminal 30 is a communication terminal for transmitting plan information indicating a plan related to movement, such as a movement (flight) plan for the air vehicle 70, to the design device. The user terminal 30 is also a communication terminal for remotely controlling the air vehicle 70. Note that the air vehicle 70 may be remotely controlled by a terminal other than the user terminal 30, but the following describes the case where the air vehicle 70 is remotely controlled by the user terminal 30.
[0014] The design device 50 is a device that controls the design of the network, such as controlling the beamforming settings of each of the base stations A, B, and C, in accordance with planning information from the user terminal 30.
[0015] The flying object 70 is a drone or the like, and flies by remote control by a user. The flying object 70 transmits video data obtained by capturing images of the surroundings of the device (flying object 70) to the user terminal 30. The video data is transmitted with a data capacity of 4K, 8K, or the like. Note that the flying object 70 is an example of a mobile object, and mobile objects also include vehicles such as remotely operated robots.
[0016] Base stations A, B, and C are base stations for a wireless (communication) network 100. In addition, base stations A, B, and C are connected to a wired (communication) network 200 using optical fiber or the like. The wireless network 100 is a 5G network (fifth generation mobile network), a 6G network (sixth generation mobile network), or the like.
[0017] The communication control server 90 is a server that controls communications between the user terminal 30 or other user terminals and the flying object 70. The communication control server 90 performs streaming control (control of video codec, resolution, frame rate, or bit rate) to ensure communication quality. The communication control server 90 is managed by a telecommunications carrier.
[0018] [Hardware Configuration] Next, the electrical hardware configuration of the design device 50 will be described with reference to Fig. 2. Note that the user terminal 30 and the communication control server have the same hardware configuration as the design device 50, and therefore descriptions thereof will be omitted.
[0019] As shown in FIG. 2 , the design device 50 is a computer that includes a CPU (Central Processing Unit) 501, a ROM (Read Only Memory) 502, a RAM (Random Access Memory) 503, an SSD (Solid State Drive) 504, an external device connection I / F (Interface) 505, a network I / F 506, a display 507, an operation unit 508, a media I / F 509, and a bus line 510.
[0020] Of these, the CPU 501 controls the overall operation of the design apparatus 50. The ROM 502 stores programs such as IPL used to drive the CPU 501. The RAM 503 is used as a work area for the CPU 501.
[0021] The SSD 504 reads or writes various data under the control of the CPU 501. Note that instead of the SSD 504, a hard disk drive (HDD) may be used.
[0022] The external device connection I / F 505 is an interface for connecting various external devices, such as a display, a speaker, a keyboard, a mouse, a USB memory, and a printer.
[0023] The network I / F 506 is an interface for performing data communication via a network such as the Internet.
[0024] The display 507 is a type of display means such as a liquid crystal display or organic electroluminescence (EL) display that displays various images.
[0025] The operation unit 508 is a keyboard, a pointing device, or the like, and is an example of an input unit for accepting input operations such as characters, numbers, and various instructions.
[0026] The media I / F 509 controls reading and writing (storing) of data from and to a recording medium 509m such as a flash memory, etc. The recording medium 509m includes DVDs and Blu-ray Discs (registered trademarks).
[0027] The bus line 510 is an address bus, a data bus, etc. for electrically connecting the components such as the CPU 501 shown in FIG.
[0028] [Functional Configuration of Design Apparatus] Next, the functional configuration of the design apparatus 50 will be described with reference to Fig. 3. Fig. 3 is a functional configuration diagram of the design apparatus.
[0029] <Network Resource DB> The design device 50 also has a network resource DB 41. The network resource DB 41 is constructed in the SSD 504. The network resource DB 41 manages network resource information indicating the location and antenna type of each base station A, B, and C, the number of optical fibers connected to each base station A, B, and C, and the like.
[0030] <Functional Configuration> The design device 50 has an acquisition unit 51, a design unit 53, a control unit 55, a notification unit 57, and an optimization unit 59. Each of these units is a function that the CPU 501 causes the design device 50 to realize using one or more programs installed in the design device 50.
[0031] The acquisition unit 51 acquires from the user terminal 30 plan information indicating at least one of three plans for the movement of the user's aircraft 70 (movement plan, realistic network resource utilization plan, and ideal network resource utilization plan).
[0032] The "movement plan" indicates a plan of the predicted locations (positions) and predicted times of passage of the flying object 70. An example of the movement plan will be described below with reference to FIG. 4. FIG. 4 is a conceptual diagram showing the movement plan. In this embodiment, a plan relating to a race of the flying object 70 will be described.
[0033] As shown in Figure 4, on the day of the race, the aircraft 70 is scheduled to fly over the area near the base stations A1, A2, A3, B1, B2, B3, and C1, C2, C3. Note that base stations A1, A2, and A3 are examples of base station A. Base stations B1, B2, and B3 are examples of base station B. Base stations C1, C2, and C3 are examples of base station C.
[0034] In this case, the "movement plan" indicates the estimated times of passage from the start to the first checkpoint, the second checkpoint, the third checkpoint, and the finish line.
[0035] A "realistic network resource utilization plan" refers to a utilization plan for currently available network resources, such as a plan to use a base station at the foot of a mountain because no base station is installed at the top of the mountain. The realistic network resource utilization plan is determined by the user based on a mobility plan and information about currently available network resources. The information about currently available network resources may be information previously acquired by the user from a network operator, information acquired by the user performing an information transmission trial, or information based on a predetermined network quality prediction method. An information transmission trial may, for example, involve the user visiting a site and measuring the uplink or downlink communication speed. The predetermined network quality prediction method is also described in the aforementioned Non-Patent Documents 1 and 2. Here, an example of a realistic network resource utilization plan will be described using FIG. 5. FIG. 5 is a conceptual diagram illustrating a realistic network resource utilization plan.
[0036] As shown in Figure 5, the "realistic network resource utilization plan" shows the times at which the aircraft 70 will utilize each wireless network 100A provided by base stations A1, A2, and A3, each wireless network 100B provided by base stations B1, B2, and B3, and each wireless network 100C provided by base stations C1, C2, and C3 on the day of the race.
[0037] The "ideal network resource utilization plan" indicates a network resource utilization plan that cannot be fully realized with the current network resources but that reflects the user's ideals (desires), for example, an ideal plan in which a base station is desired to be used at the mountaintop even though no base station is installed at the mountaintop. As in Figure 5, the "ideal network resource utilization plan" indicates the times on the day of the race when the aircraft 70 will use each wireless network 100A formed by base stations A1, A2, and A3, each wireless network 100B formed by base stations B1, B2, and B3, and each wireless network 100C formed by base stations C1, C2, and C3.
[0038] The design unit 53 references the network resource DB 41 and attempts to design a network that satisfies the user's plan for the movement of the aircraft 70 using the current network resources. For example, the design unit 53 attempts network design such as changing the antenna angle of a base station during a predetermined time period for wireless communication, preferentially allocating frequencies during a predetermined time period for wireless communication, and allocating wired communication paths during a predetermined time period. If the network design is possible, the design unit 53 sends control information indicating the control content to the control unit 55 and also sends notification information to the notification unit 57 indicating that the network can be set up using the current network resources. On the other hand, if the network design is not possible, the design unit 53 sends an optimization instruction to the optimization unit 59. In this case, the optimization instruction includes the plan information acquired from the acquisition unit 51.
[0039] Here, the network design refers to performing at least one of, for example, setting beamforming for each time in each base station of wireless communication, setting a frequency to be preferentially assigned for each time in a predetermined base station of the wireless communication, and setting a wired communication path to each base station for each time. Here, an example of the network design will be described with reference to Figs. 6 to 8.
[0040] 6 is a diagram showing the beamforming setting contents for each time at each base station of wireless communication. As shown in FIG. 6, the design unit 53 designs the beamforming setting contents for each time at each base station of wireless communication. Here, the contents for changing the antenna angle of each base station are shown.
[0041] 7 is a diagram showing frequencies that are preferentially allocated at each time by a specific base station for wireless communication. In this example, since the estimated number of connections is high between 11:00 and 13:00, the design unit 53 sets a specific frequency (channel) for this time (time period) to be preferentially allocated to the connection of the flying object 70. Note that frequencies that are not allocated via wired communication are used for connections such as best effort and round robin.
[0042] 8 is a diagram showing wired communication paths to be allocated to each base station at each time. As shown in FIG. 8, the design unit 53 sets wired communication paths (optical paths, etc.) to be allocated to each base station at each time.
[0043] As a result, the control unit 55 can perform control to set the area coverage (coverage rate or completeness rate) of wireless communication by cooperative control of the base stations A, B, and C, as shown in Fig. 9. Fig. 8 is a diagram showing wired communication paths assigned to each base station at each time.
[0044] The control unit 55 acquires control information indicating the control of the network designed by the design unit 53, and performs control for network design on network resources (each base station A, B, C and priority communication paths in the wired network).
[0045] The notification unit 57 notifies the user terminal 30 of the results of the network design for the user's plan regarding the movement of the aircraft 70.
[0046] The optimization unit 59 attempts to optimize the current network resources in accordance with the user's plan for the movement of the aircraft 70. In this case, the optimization unit 59 attempts to optimize the network design so that the difference between the movement plan and the current network resource usage obtained from the network resource DB 41 is equal to or less than a predetermined value. If optimization is possible, the optimization unit 59 sends control information indicating the control content for optimization to the control unit 55, and also sends notification information to the notification unit 57 indicating that optimization is possible with the current network resources. On the other hand, if optimization is not possible, the optimization unit 59 sends notification information to the notification unit 57 indicating that optimization (or design) is not possible.
[0047] The optimization will now be described in detail.
[0048] For example, from the viewpoint of a telecommunications carrier, optimization would be to increase the concentration of network resources, i.e., if there are three available base stations, consolidating and using only one base station.
[0049] From the viewpoint of the carrier, optimization means using network resources so that the amount of change in the user's travel plan is within a certain range. In this case, the carrier asks the user to change the user's travel plan within the range of the currently available network resources.
[0050] On the other hand, optimization from the user's perspective means designing network resources to maximize the user's quality of experience. Specifically, if there are three available base stations, the network resources are distributed across all three base stations.
[0051] If the optimization unit 59 is unable to perform optimization, the communication carrier may consider future installation locations of base stations so that optimization can be performed.
[0052] [Processing or Operation of the Embodiment] Next, processing or operation of the embodiment will be described with reference to Fig. 10 and Fig. 11. Fig. 10 and Fig. 11 are flowcharts showing the process in which the design device executes the network design process.
[0053] S11: The acquisition unit 51 acquires, from the user terminal 30, plan information indicating at least one of three pieces of plan information (a movement plan, a realistic network resource utilization plan, and an ideal network resource utilization plan).
[0054] S12: The design unit 53 attempts to design a network that satisfies the movement plan with the current network resources, with reference to the network resource DB 41. For example, the design unit 53 attempts to design a network that changes the antenna angle of a base station during a predetermined time period for wireless communication, prioritizes frequency allocation during a predetermined time period for wireless communication, and allocates wired communication paths during a predetermined time period.
[0055] S13: The design unit 53 determines whether a network design that satisfies the movement plan is possible.
[0056] S14: If network design is possible in the process S13 (S13; YES), the control unit 55 controls the network design for each base station and preferred communication path.
[0057] S15: The notification unit 57 notifies the user terminal 30 of the results of the network design for the movement plan (that the network can be set up using the current network resources).
[0058] S16: On the other hand, if network design is not possible in the above process S13 (S13; NO), the optimization unit 39 attempts to optimize the current network resources in accordance with the movement plan.
[0059] S17: The optimization unit 39 determines whether optimization is possible. If optimization is possible (S17; YES), the process proceeds to step S14, where the control unit 55 controls the optimized network design. Then, the process proceeds to step S15, where the notification unit 57 notifies the user terminal 30 of the results of the network design for the mobility plan (that optimization is possible with the current network resources or that the mobility plan can be accommodated as much as possible).
[0060] On the other hand, if optimization is not possible in the above process S17 (S17; NO), the notification unit 57 notifies the user terminal 30 of the results of the network design for the movement plan (that optimization (or design) is not possible, or that it does not correspond to the movement plan).
[0061] This concludes the description of the processing or operation.
[0062] [Major Effects of the Embodiment] As described above, according to the present embodiment, it is possible to achieve an optimum communication quality according to the user's request with limited network resources.
[0063] Furthermore, unlike vehicles, devices that move in three-dimensional space, such as drones and other flying objects 70, do not have the same range of movement restrictions as roads, making it difficult to predict their movement from their current location. Furthermore, unlike large manned aircraft that take off and land from a limited number of specific locations (e.g., airports), drones and other flying objects 70 are expected to take off and land from a variety of locations, and demand is also expected to fluctuate significantly. This makes it difficult to identify congested areas and times and control the configuration (deployment) of network resources. (For example, even if deliveries are initially made by drone, as the volume increases, it is conceivable that they will be switched to vehicles and the drones will no longer fly, and vice versa.) In contrast, this embodiment achieves the effect of optimizing network resources in response to user requests, thereby achieving optimal communication quality in line with user requests.
[0064] [Supplementary Note] The present invention is not limited to the above-described embodiment, and may have the following configurations or processes (operations).
[0065] The user terminal 30, the design device 50, and the communication control server 90 can be realized by a computer and a program, and this program can be recorded on a recording medium or provided via a network such as the Internet.
[0066] The CPU 501 as a processor may be a single processor or a plurality of processors.
[0067] 10 Communication system 30 User terminal 41 Network resource DB (an example of a network resource management unit) 50 Design device 51 Acquisition unit 53 Design unit 55 Control unit 57 Notification unit 59 Optimization unit 70 Air vehicle 90 Communication control server
Claims
1. A design device for performing network design utilizing network resources, comprising: an optimization unit that attempts to optimize the network design so that a difference between a plan for the movement of a mobile object and current utilization of the network resources is within a predetermined level; and a control unit that, when the optimization is possible, performs control over the network resources for the network design.
2. The design device according to claim 1, wherein the plan regarding the movement of the mobile object is at least one of a movement plan of the mobile object, a realistic utilization plan of the network resources, and an ideal utilization plan of the network resources.
3. The design device according to claim 2, wherein the plan regarding the movement of the moving object indicates a plan of a predicted pass position and a predicted pass time of the moving object.
4. The design device according to claim 2, wherein the realistic network resource utilization plan indicates a current utilization plan of the available network resources.
5. The design device according to claim 2, wherein the ideal network resource utilization plan indicates a network resource utilization plan that cannot be fully realized with the current network resources but represents a user's ideal.
6. A design device according to any one of claims 1 to 5, wherein the network design is at least one of a beamforming setting for each time at each base station of wireless communication, a setting for preferentially allocating frequencies for each time at a predetermined base station of the wireless communication, and a setting for allocating wired communication paths to each base station for each time.
7. A design method performed by a design device that performs network design utilizing network resources, wherein the design device executes an optimization process that attempts to optimize the network design so that a difference between a plan for the movement of a mobile object and the current utilization of the network resources is equal to or less than a predetermined value, and a control process that performs control on the network resources for the network design when the optimization is possible.
8. A program for causing a computer to execute the method according to claim 7.
Citation Information
Patent Citations
Management device, flight management system, and flight management method and program
JP2019059258A
Information processing device and information processing method
JP7231773B1
