Foaming production line for water storage tank of water heater

By designing power conveying lines and lifting components, combined with fully enclosed and semi-enclosed box structures, the automatic conveying and heating and baking of the water heater storage tank foaming production line are realized, solving the problems of low automation and space utilization efficiency in the existing technology. , improving production efficiency and accuracy.

WO2024221698A1PCT designated stage expired Publication Date: 2024-10-31ANHUI KINGPOWER EQUIP & MOLD MFR
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/118270
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-23
Filing Date
2023-09-12
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

The existing water heater storage tank foaming production line has a low degree of automation, high labor intensity, and low production efficiency. The production line occupies a large space, making it difficult to arrange and complete all aspects of production in a limited space.

Method used

A water heater storage tank foaming production line including upper and lower power conveying lines is designed. It adopts fully enclosed and semi-enclosed box structures, combines mold loading and unloading manipulators, and realizes mold clamping components through power conveying lines and lifting components. The automatic conveying and heating baking improve the automation level and space utilization efficiency of the production line.

Benefits of technology

It realizes efficient automated production of water heater storage tanks, reduces the labor intensity of operators, improves production efficiency, and completes all aspects of production in a limited space, improving the automation and accuracy of the production line.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023118270_31102024_PF_FP_ABST
    Figure CN2023118270_31102024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of production of water storage tanks of water heaters, and relates to a foaming production line for a water storage tank of a water heater. A powered conveying line (1) comprises an upper-layer powered conveying line (2) and a lower-layer powered conveying line (3); the front half part of the powered conveying line (2) is provided with a fully-closed box body (5); a heating and baking component for the front half part is provided in the fully-closed box body (5); the other part of the powered conveying line (1) is provided with a semi-closed box body (6); a heating and baking component for a lower conveying layer on the rear half part is provided in the semi-closed box body (6); a mold discharging manipulator (9) is arranged at the position of the powered conveying line (1) where the semi-closed box body (6) is arranged; and each mold fixture component (4) is supported on driving wheel assemblies (11) on the two sides of the powered conveying line (1). The foaming production line for a water storage tank of a water heater of the present invention has a simple structure, can conveniently and reliably achieve foaming manufacturing of the water storage tank, and can achieve arrangement of the production line and completion of operations in all links of production in a limited space.
Need to check novelty before this filing date? Find Prior Art

Description

A water heater water tank foaming production line Technical Field

[0001] The invention belongs to the technical field of water heater water tank production, and more specifically, relates to a water heater water tank foaming production line. Background Art

[0002] The water tank of a water heater consists of an inner tank and an outer shell. During the production process, the mold for the water heater water tank needs to be filled with polyurethane foam to form the water tank, and then the water tank needs to be baked to form the water tank product. For this reason, the production of water heater water tanks requires a production line. However, the existing production line has a low degree of automation during the movement of the foaming mold along the line. The mold needs to be manually loaded and moved, and the mold needs to be manually clamped on the mold clamping components and manually unloaded and moved. This results in low production efficiency and high labor intensity. In addition, the baking process of the water tank needs to continue for a certain period of time, so the length of the production line needs to be increased to meet the baking time and control the baking quality. This results in the production line occupying a large space and inconvenient layout.

[0003] In the prior art, there is a technology named "A solar water heater water tank foaming production line" and publication number "202862490U". The production line of this technology includes an inflation device, which includes multiple gas tanks, a main air pipe, multiple bronchial pipes and multiple one-way safety valves. The bronchial pipes and the one-way safety valves correspond to each other. The gas tanks are installed on a work vehicle, and the gas tanks flow together with the foaming production line. Each gas tank is connected in series through the main air pipe. Multiple bronchial pipes are provided on the main air pipe. The bronchial pipes are connected to the water tank through their respective one-way safety valves. The bronchial pipes are used to inflate the water tank, and the one-way safety valves control the inflation of the water tank.

[0004] However, this technology does not involve the technical problems and technical solutions of the present application.

[0005] Summary of the Invention

[0006] The technical problem to be solved by the present invention is: in view of the shortcomings of the existing technology, a water heater water tank foaming production line is provided, which has a simple structure, can conveniently and reliably realize the foaming manufacturing of the water tank, and can realize the production line layout and complete the operations of each production link in a limited space.

[0007] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is:

[0008] The present invention discloses a water heater storage tank foaming production line, comprising a power transmission line, which comprises an upper power transmission line and a lower power transmission line, which are stacked up and down, a fully enclosed box is provided at the front half of the power transmission line, a front half heating and baking component is provided inside the fully enclosed box, the fully enclosed box completely encloses the front half of the power transmission line, a semi-enclosed box is provided at the other part of the power transmission line, the semi-enclosed box encloses the lower position of the rear half of the power transmission line, a rear half lower heating and baking component is provided inside the semi-enclosed box, a mold loading robot is provided at the position of the power transmission line near the fully enclosed box, a mold loading conveyor line is provided on the ground near the position of the mold loading robot, a mold unloading robot is provided at the position of the power transmission line where the semi-enclosed box is provided, a mold unloading conveyor line is provided on the ground near the position of the mold unloading robot, and each mold clamping component is supported on the driving wheel assemblies on both sides of the power transmission line.

[0009] A lifting component is set near the front of the power transmission line, and another lifting component is set near the rear of the power transmission line. The lifting component includes a component frame, a moving plate is set inside the component frame, and support wheels are set on each side of the moving plate. The moving plate is connected to the top of the component frame through a lifting cylinder.

[0010] The power transmission line is configured to drive each mold clamping component to move forward in sequence from the upper power transmission line close to the mold loading robot position, and pass through the upper power transmission line in the fully enclosed box, the lifting component in front of the power transmission line, the lower power transmission line in the fully enclosed box, the lower power transmission line in the semi-enclosed box, and the lifting component at the rear of the power transmission line, and then move to the structure of the mold unloading conveyor line position on the upper power transmission line close to the side position of the mold unloading robot.

[0011] A slide rail is provided on the device base of the mold clamping component, and the mold supporting plate is movably provided on the slide rail. A rear clamping assembly, a first side clamping assembly, and a second side clamping assembly are also provided on the device base. The mold supporting plate is connected to the device base through a horizontal telescopic component, and a top closing assembly is provided on the upper part of the rear clamping assembly.

[0012] One side of the rear clamping assembly of the mold clamping component is connected to the first side clamping assembly through the first telescopic component, and the other side of the rear clamping assembly is connected to the second side clamping assembly through the second telescopic component; the top closing assembly is connected to the rear clamping assembly through the third telescopic component.

[0013] The mold loading robot includes a loading robot frame, the loading robot frame includes a loading robot beam, the power transmission line is located below the loading robot beam, the first loading mobile platform is movably arranged on the first loading slide rail on the loading robot beam, the first loading motor is arranged on the loading robot beam, and the first loading motor is connected to the loading conveyor belt.

[0014] The first loading mobile platform is connected to the loading conveyor belt, the second loading motor is arranged on the first loading mobile platform, the second loading slide rail arranged on the first loading mobile platform is movably connected to the second loading mobile platform, the loading rack part is arranged on the second loading mobile platform, the loading gear set of the second loading motor is engaged with the loading rack part, and a loading suction cup is arranged near the bottom of the second loading mobile platform.

[0015] The mold blanking robot includes a blanking robot frame, the blanking robot frame includes a robot beam, the power transmission line is located below the blanking robot beam, the first blanking sliding rail on the blanking robot beam is movably provided with a first mobile blanking platform, the blanking robot beam is provided with a first blanking motor, the first blanking motor is connected to the blanking conveyor belt, the first mobile blanking platform is connected to the blanking conveyor belt, the first mobile blanking platform is provided with a second blanking motor, the second blanking sliding rail provided on the first mobile blanking platform is movably connected to the second mobile blanking platform, the second mobile blanking platform is provided with a blanking rack part, the blanking gear set of the second blanking motor is engaged with the blanking rack part, and a blanking suction cup is provided near the bottom of the second mobile blanking platform.

[0016] A foaming material injection manipulator is further provided at a position between the mold feeding manipulator and the fully enclosed box, and an injection gun is provided on the foaming material injection manipulator.

[0017] The mold loading robot is configured to be a structure capable of grabbing and moving the foaming mold from the mold loading conveyor line to the mold clamping component on the upper power conveyor line of the power conveyor line; the mold unloading robot is configured to be a structure capable of grabbing and moving the foaming mold from the mold clamping component on the upper power conveyor line of the power conveyor line to the mold unloading conveyor line.

[0018] A loading manipulator climbing ladder is provided on the outside of the mold loading manipulator, and a blanking manipulator climbing ladder is provided on the outside of the mold blanking manipulator.

[0019] The technical solution of the present invention is adopted, and the working principle and beneficial effects are as follows:

[0020] The water heater tank foaming production line of the present invention is configured such that, when water heater tank production is required, a foaming mold is transported from a foaming mold storage location to a location near a mold loading robot. The mold loading robot grips the mold or uses a suction cup to hold the mold, lifting the mold and moving it to a corresponding mold clamping component on the upper power transmission line of the power transmission line. The clamping assembly of the mold clamping component then actuates to seal the foaming mold from the outside, achieving sealing of the foaming mold. The power transmission line is then used to move the mold clamping component along the upper power transmission line. The mold clamping component drives the foaming mold to a position below the foaming material injection robot between the mold loading robot and a fully enclosed housing. The power transmission line is then paused, the foaming mold is aligned with a foaming gun, and the injection gun of the foaming material injection robot injects foaming material into the foaming mold. The power transmission line then continues to drive the mold clamping component to move, entering the upper power transmission line within the fully enclosed housing. A heating and baking component in the front half of the fully enclosed housing bakes the foaming material within the mold. Then, after each mold clamping component moves to the front end position of the power transmission line, the moving plate of the front lifting component is in an ascending state, and the moving plate is flush with the upper power transmission line. The mold clamping component will move to the moving plate of the front lifting component and rely on the support wheels for support, while the moving plate of the front lifting component drops so that the moving component is flush with the lower power transmission line. The driving motor of the lifting component is started to drive the support wheels to rotate, thereby transporting the mold clamping component on the moving plate to the lower power transmission line. The mold clamping component continues to be transported on the lower power transmission line in the fully enclosed box in the opposite direction of the upper power transmission line. After the mold clamping component leaves the fully enclosed box, it will enter the semi-enclosed box, and the rear half will transport the lower heating and baking component to continue baking the foaming material in the mold until it moves along the lower power transmission line to the other end of the power transmission line. The rear setting The lifting component works. At this time, the moving plate of the lifting component at the rear is in a descending state. The moving plate is flush with the lower power transmission line. The mold clamping component will move to the moving plate of the lifting component at the rear, and rely on the support wheels for support. The moving plate of the lifting component at the rear rises so that the moving component is flush with the upper power transmission line. The driving motor of the lifting component at the rear is started, driving the support wheels to rotate, thereby conveying the mold clamping component on the moving plate to the upper power transmission line and moving it to the position below the mold unloading robot. The mold clamping component opens to expose the foaming mold. The mold unloading robot clamps the mold or absorbs the mold through a suction cup and moves the foaming mold to the mold unloading conveyor line. The mold unloading conveyor line moves the mold to the water tank product storage area and takes away the water tank product. The mold can be transported to the mold loading conveyor line for reuse, and the finished water tank product can be transferred and transported.In this way, the online production of water heater storage tanks can be completed conveniently and quickly. The entire production process has a high degree of automation and high precision, low labor intensity for operators, and high production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The following is a brief description of the contents and symbols in the drawings of this specification:

[0022] FIG1 is a schematic diagram of the main structure of the water heater tank foaming production line according to the present invention;

[0023] FIG2 is an axial structural schematic diagram of the water heater tank foaming production line according to the present invention;

[0024] FIG3 is a partial enlarged structural diagram of the power transmission line of the water heater tank foaming production line according to the present invention;

[0025] FIG4 is a schematic axial structural diagram of a mold clamping component of a water heater tank foaming production line according to the present invention;

[0026] FIG5 is a schematic diagram of the axial structure of the mold loading manipulator of the water heater tank foaming production line according to the present invention;

[0027] FIG6 is a partially enlarged structural diagram of a mold loading robot of a water heater tank foaming production line according to the present invention;

[0028] FIG7 is a schematic structural diagram of the lifting components of the water heater tank foaming production line according to the present invention;

[0029] The markings in the attached figure are: 1. Power transmission line; 2. Upper power transmission line; 3. Lower power transmission line; 4. Mold clamping component; 5. Fully enclosed box; 6. Semi-enclosed box; 7. Mold loading robot; 8. Mold loading conveyor line; 9. Mold unloading robot; 10. Mold unloading conveyor line; 11. Driving wheel assembly; 12. Loading robot climbing ladder; 13. Unloading robot climbing ladder; 14. Foaming material injection robot; 15. Lifting component; 16. Component frame; 17. Moving plate; 18. Support wheel; 19. Driving motor; 20. Lifting cylinder. DETAILED DESCRIPTION

[0030] The following describes the embodiments with reference to the accompanying drawings to further explain in detail the specific embodiments of the present invention, such as the shapes, structures, mutual positions and connection relationships between the various components involved, the functions and working principles of the various components.

[0031] As shown in Figures 1 to 7, the present invention is a water heater tank foaming production line, comprising a power transmission line 1, which comprises an upper power transmission line 2 and a lower power transmission line 3. The upper power transmission line 2 and the lower power transmission line 3 are stacked up and down. A fully enclosed box 5 is provided in the front half of the power transmission line 2. The front half of the heating and baking components are arranged inside the fully enclosed box 5. The fully enclosed box 5 completely encloses the front half of the power transmission line 1. A semi-enclosed box 6 is provided in the other part of the power transmission line 1. The semi-enclosed box 6 encloses the back half. The lower part of the power transmission line 1 is arranged in the semi-enclosed box 6, and the rear half of the lower layer heating and baking components is arranged inside the semi-enclosed box 6. A mold loading robot 7 is arranged near the power transmission line 1 of the fully enclosed box 5, and a mold loading conveyor line 8 is arranged on the ground near the position of the mold loading robot 7. A mold unloading robot 9 is arranged at the power transmission line 1 of the semi-enclosed box 6, and a mold unloading conveyor line 10 is arranged on the ground near the position of the mold unloading robot 9. Each mold clamping component 4 is supported on the driving wheel assembly 11 on both sides of the power transmission line 1. The driving wheel assemblies are respectively arranged on both sides of the power transmission line, and the driving wheel assemblies on both sides are arranged in parallel. The driving wheel motor is connected to the active driving wheel through a chain, and the active driving wheel is connected to the driven driving wheel through a chain to realize the automatic transportation of the mold clamping components. The above structure proposes an improved technical solution to the shortcomings of the existing technology. When it is necessary to produce a water heater storage tank, the foaming mold is transported through the mold loading conveyor line 8 from the foaming mold storage position to a position near the mold loading robot 7. The mold loading robot 7 clamps the mold or absorbs the mold through a suction cup, lifts the foaming mold and moves it to a corresponding mold clamping component 4 on the upper power transmission line 2 of the power transmission line 1, and then the clamping component of the mold clamping component 4 is actuated to seal the foaming mold from the outside, and the foaming mold is sealed. The movement of the power transmission line 1 realizes the movement and transportation of the mold clamping component 4 on the upper power transmission line. The mold clamping component 4 drives the foaming mold to move to the position below the foaming material injection robot 14 between the mold loading robot 7 and the fully enclosed box 5. The power transmission line 1 is paused, the foaming mold is aligned with the foaming gun, and the injection gun of the foaming material injection robot 14 injects the foaming material into the foaming mold. Then, the power transmission line 1 continues to drive the mold clamping component 4 to move and enter the upper power transmission line in the fully enclosed box 5. The front half of the fully enclosed box 5 heats and bakes the foaming material in the mold.Then, after each mold clamping component 4 moves to the front end position of the power transmission line 1, the moving plate of the front lifting component is in an ascending state, and the moving plate 17 is flush with the upper power transmission line 2. The mold clamping component 4 will move to the moving plate 17 of the front lifting component and rely on the support wheel 18 for support. The moving plate of the front lifting component descends, making the moving component flush with the lower power transmission line 3, and the driving motor of the lifting component is started, driving the supporting wheel to rotate, thereby conveying the mold clamping component 4 on the moving plate to the lower power transmission line, and the mold clamping component 4 continues to be conveyed on the lower power transmission line 3 in the fully enclosed box 5 in the opposite direction of the upper power transmission line. After the mold clamping component 4 leaves the fully enclosed box, it will enter the semi-enclosed box, and the rear half will convey the lower heating and baking component to continue to bake the foaming material in the mold until it moves along the lower power transmission line 3 to the other end of the power transmission line 1. The lifting component 15 set at the rear comes into play. At this time, the moving plate of the rear lifting component is in a descending state, and the moving plate is flush with the lower power transmission line 3. The mold clamping component 4 Part 4 will move to the moving plate 17 of the rear lifting component and be supported by the support wheel 18. The moving plate of the rear lifting component rises so that the moving component is flush with the upper power transmission line 2. The driving motor of the rear lifting component is started, driving the support wheel to rotate, thereby conveying the mold clamping component 4 on the moving plate to the upper power transmission line and moving it to the position below the mold unloading robot 9. The mold clamping component 4 opens to expose the foaming mold. The mold unloading robot 9 clamps the mold or absorbs the mold through a suction cup and moves the foaming mold to the mold unloading conveyor line 10. The mold unloading conveyor line 10 moves the mold to the water tank product storage area and takes away the water tank product. The mold can be transported to the mold loading conveyor line 8 for reuse, and the finished water tank product can be transferred and transported. In this way, the online production of water heater water tanks can be completed conveniently and quickly. The entire production process has a high degree of automation and high precision, low labor intensity for operators, and high production efficiency. The water heater water tank foaming production line of the present invention has a simple structure, can conveniently and reliably realize the foaming manufacturing of the water tank, and can realize the production line layout and complete the operations of each production link in a limited space.

[0032] A lifting component 15 is provided at the front of the power transmission line 1 near the power transmission line 1, and another lifting component 15 is provided at the rear of the power transmission line 1 near the power transmission line 1. The lifting component 15 includes a component frame 16, a moving plate 17 is provided inside the component frame 16, and support wheels 18 are provided on each side of the moving plate 17. The moving plate 17 is connected to the top of the component frame 16 through a lifting cylinder. In the above structure, the front and rear lifting components serve the purpose of switching the mold clamping component between the upper power transmission line and the lower power transmission line. When the structure is set, some of the support wheels are connected to the motor through chains or belts, so that some of the support wheels become driving wheels, thereby reliably realizing the movement of the mold clamping component on the moving plate. This allows the mold clamping component to be transported away from the moving plate and into the power transmission line when needed.

[0033] The power transmission line 1 is configured to drive each mold clamping component 4 to move forward in sequence from the upper power transmission line 2 near the mold loading manipulator 7, passing through the upper power transmission line 2 in the fully enclosed box 5, the lifting component 15 at the front of the power transmission line 1, the lower power transmission line 3 in the fully enclosed box 5, the lower power transmission line 3 in the semi-enclosed box 6, and the lifting component 15 at the rear of the power transmission line 1, and then moving in sequence to the mold unloading conveyor line 10 on the upper power transmission line 2 near the side of the mold unloading manipulator 9. In the above structure, the various components of the entire production line cooperate with each other to complete the water tank production, so that the mold starts at the mold loading conveyor line 8 and ends at the mold unloading conveyor line 10.

[0034] The mold clamping component 4 is provided with a slide rail 4-2 on the device base 4-1, and a mold bearing plate 4-3 is movably provided on the slide rail 4-2. The device base 4-1 is also provided with a rear clamping assembly 4-4, a first side clamping assembly 4-5, and a second side clamping assembly 4-6. The mold bearing plate 4-3 is connected to the device base 4-1 via a horizontal telescopic component. A top closing assembly 4-10 is provided on the top of the rear clamping assembly 4-4. The rear clamping assembly 4-4 of the mold clamping component 4 is connected to the first side clamping assembly 4-5 on one side via a first telescopic component 4-8, and connected to the second side clamping assembly 4-6 on the other side via a second telescopic component 4-9. The top closing assembly 4-10 is connected to the rear clamping assembly 4-4 via a third telescopic component 4-11. In the above structure, before the foaming mold is clamped, the top closing component 4-10 is in an open state relative to the rear clamping component 4-4 due to the force applied by the extension of the third telescopic component 4-11. The first side clamping component 4-5 is in an open state relative to the rear clamping component 4-4 under the action of the force applied by the extension of the first telescopic component 4-8. The second side clamping component 4-6 is in an open state relative to the rear clamping component 4-4 under the action of the force applied by the extension of the second telescopic component 4-9. The horizontal telescopic component is in an extended state, driving the mold supporting plate 4-3 to move along the slide rail 4-2 to the external position of the clamping device. The foaming mold is grabbed and placed on the mold supporting plate 4-3 by a manipulator, and the horizontal telescopic component is controlled to contract. The horizontal telescopic component drives the mold supporting plate 4-3 to move along the slide rail 4-2 to the internal position of the clamping device. At this time, the foaming mold placed on the mold supporting plate 4-3 moves to the internal position of the clamping device along with the mold supporting plate 4-3. The first telescopic member 4-8 is then controlled to retract, causing the first side clamping assembly 4-5 to close relative to the rear clamping assembly 4-4 under the force exerted by the contraction of the first telescopic member 4-8. The second telescopic member 4-9 is then controlled to retract, causing the second side clamping assembly 4-6 to close relative to the rear clamping assembly 4-4 under the force exerted by the contraction of the second telescopic member 4-9. The third telescopic member 4-11 is then controlled to retract, causing the top closure assembly 4-10 to close relative to the rear clamping assembly 4-4 due to the force exerted by the contraction of the third telescopic member 4-11. At this point, the clamping device secures the foaming mold. The top closure assembly 4-10 is provided with an opening for injecting material into the foaming mold, facilitating injection of material from the injection assembly mounted on the injection molding robot, thereby forming the water heater tank product in the foaming mold. After the water heater tank product is processed, when the foaming mold and the tank product need to be removed, the clamping mold is controlled to open according to the initial steps, allowing the foaming mold and product to be removed. The entire clamping component is easy to use in the production line process, has reliable performance, can be reused, and the production line is equipped with multiple clamping components.

[0035] The mold loading robot 7 includes a loading robot frame 7-1, the loading robot frame 7-1 includes a loading robot beam 7-2, the power transmission line 1 is located below the loading robot beam 7-2, the first loading slide rail 7-4 on the loading robot beam 7-2 is movably provided with a first loading mobile platform 7-5, the first loading motor 7-6 is provided on the loading robot beam 7-2, and the first loading motor 7-6 is connected to the loading conveyor belt 7-7. The first loading mobile platform 7-5 is connected to the loading conveyor belt 7-7, the second loading motor 7-8 is arranged on the first loading mobile platform 7-5, the second loading slide rail 7-9 arranged on the first loading mobile platform 7-5 is movably connected to the second loading mobile platform 7-10, the loading rack part 7-11 is arranged on the second loading mobile platform 7-10, the loading gear set 7-12 of the second loading motor 7-8 is engaged with the loading rack part 7-11, and the loading suction cup 7-13 is arranged near the lower part of the second loading mobile platform 7-10. In the above structure, the mold loading robot 7 is used to lift the foaming mold from the ground and move it to the power transmission line. The control unit controls the rotation of the first loading motor, which drives the conveyor belt to rotate. Because the first loading slide 7-4 on the loading robot crossbeam 7-2 is movably mounted on the first loading platform 7-5, which is connected to the conveyor belt 7-7, when the first loading motor rotates, it drives the first loading platform to move horizontally along the direction of the loading robot crossbeam. The second loading platform is connected to the first loading platform, and the second loading platform moves horizontally synchronously with the movement of the first loading platform. The loading suction cup is mounted on the second loading platform, enabling the loading suction cup to move horizontally. The second loading motor is fixedly mounted on the first loading platform. The control unit controls the rotation of the second loading motor, which transmits power to the loading rack through the loading gear set, driving the second loading platform to move up and down relative to the first loading platform. The loading suction cup is mounted on the second loading platform, enabling the loading suction cup to move up and down. In this way, convenient and flexible control of the left and right and up and down movements of the loading suction cup can be achieved. When the foaming mold is lifted from the ground and moved to the power transmission line, the first loading mobile platform is controlled to move horizontally to the side close to the loading robot beam, and then the second loading mobile platform is controlled to descend vertically to a position close to the bottom. At this time, the loading suction cup is attached to the foaming mold, and the loading suction cup is started, and the loading suction cup adsorbs the foaming mold. Then the second loading mobile platform is controlled to rise horizontally and vertically, and then the second loading mobile platform is controlled to move horizontally to a position above the power transmission line 1, and then the second loading mobile platform is controlled to descend until the foaming mold falls on the mold clamping component on the upper power transmission line 2 of the power transmission line 1, and then the loading suction cup cancels the adsorption force, and the loading suction cup is separated from the mold. Then the first loading mobile platform and the second loading mobile platform are controlled to move so that the loading suction cup is away from the mold, and the operation of lifting the foaming mold from the ground and moving it to the power transmission line is completed.In this way, the entire operation process is smooth, highly automated, and the suction cup is accurately positioned. By simply setting the program, the position where the suction cup needs to be moved close to the ground and the position above the power transmission line can be accurately set, thereby achieving automated control with high precision. The number and position of the robot structure can be selected according to the actual needs of the production line.

[0036] The first loading motor 7-6 is installed near one side of the first loading mobile platform 7-5, and the loading conveyor belt receiving seat 7-18 is installed near the other side of the first loading mobile platform 7-5. One end of the loading conveyor belt 7-7 is mounted on the first driving wheel of the first loading motor 7-6, and the other end of the loading conveyor belt 7-7 passes around the loading conveyor belt receiving seat 7-18. In the above structure, when the first loading motor rotates, it drives the loading conveyor belt to rotate, and the first loading mobile platform is fixedly connected to the loading conveyor belt, so that the first loading mobile platform moves along the direction of the first loading slide rail. The loading manipulator crossbeam 7-2 is set to a horizontally arranged structure, the first loading mobile platform 5 is set to a horizontally arranged structure, and the second loading mobile platform 7-1 is set to a vertically arranged structure. The second loading mobile platform 7-10 passes through the opening 7-23 on the first loading mobile platform 7-5. In the above structure, the second loading motor is fixed to the first loading platform, and the second loading platform is limited and movably connected by the second loading slide rail provided on the first loading platform, thereby enabling the second loading platform to move up and down relative to the first loading platform. In this way, the lifting and lowering movement drives the loading suction cup to move up and down.

[0037] The mold blanking robot 9 includes a blanking robot frame, the blanking robot frame includes a robot beam, the power transmission line is located below the blanking robot beam, the first blanking slide rail on the blanking robot beam is movably provided with a first mobile platform for blanking, the blanking robot beam is provided with a first motor for blanking, the first motor for blanking is connected to the blanking conveyor belt, the first mobile platform for blanking is connected to the blanking conveyor belt, the second motor for blanking is provided on the first mobile platform for blanking, the second slide rail provided on the first mobile platform for blanking is movably connected to the second mobile platform for blanking, a blanking rack part is provided on the second mobile platform for blanking, the blanking gear set of the second motor for blanking is engaged with the blanking rack part, and a blanking suction cup is provided near the bottom of the second mobile platform for blanking. With the above structure, when the foaming mold is lowered from the power transmission line to the ground, the first and second mobile platforms for unloading are first controlled to move close to the foaming mold. Then, the unloading suction cups absorb the foaming mold. The second mobile platform for unloading is then controlled to rise. The first mobile platform for unloading is then controlled to move horizontally to the side close to the crossbeam of the unloading robot. The second mobile platform for unloading is then controlled to descend vertically to a position close to the bottom. At this point, the mold falls to the ground and the unloading suction cups are separated from the mold, completing the operation of the foaming mold being lowered from the power transmission line to the ground. The entire operation process is smooth, highly automated, and the suction cups are accurately positioned. By simply setting the program, the suction cups can be accurately set to the position close to the ground and the position above the power transmission line, achieving automated control with high precision, and the number and position of the robot structures can be selected.

[0038] A foaming material injection robot 14 is also provided between the mold loading robot 7 and the fully enclosed housing 5, and an injection gun is provided on the foaming material injection robot 14. With the above structure, the mold clamping component 4 drives the foaming mold to a position below the foaming material injection robot between the mold loading robot 7 and the fully enclosed housing 5. The power transmission line is paused, the foaming mold is aligned with the foaming gun, and the injection gun injects foaming material into the foaming mold, and then continues to transport the foaming material.

[0039] The mold loading robot 7 is configured to be capable of grabbing and moving the foaming mold from the mold loading conveyor line 8 to the mold clamping component 4 on the upper power conveyor line 2 of the power conveyor line 1; the mold unloading robot 10 is configured to be capable of grabbing and moving the foaming mold from the mold clamping component 4 on the upper power conveyor line 2 of the power conveyor line 1 to the mold unloading conveyor line 10. A loading robot climbing ladder 12 is provided on the outside of the mold loading robot 7, and a unloading robot climbing ladder 13 is provided on the outside of the mold unloading robot 9.

[0040] The water heater water tank foaming production line described in the present invention is configured to transport the foaming mold through the mold loading conveyor line 8 when it is necessary to produce the water heater water tank. The foaming mold is transported from the foaming mold storage position to a position near the mold loading robot 7. The mold loading robot 7 clamps the mold or absorbs the mold through a suction cup, lifts the foaming mold and moves it to a corresponding mold clamping component 4 on the upper power transmission line 2 of the power transmission line 1. Then, the clamping assembly of the mold clamping component 4 is actuated to seal the foaming mold from the outside, thereby achieving closure of the foaming mold. The movement of the power transmission line 1 enables the mold clamping component 4 to be moved and transported on the upper power transmission line. The mold clamping component 4 drives the foaming mold to move to a position below the foaming material injection robot 14 between the mold loading robot 7 and the fully enclosed box 5. The power transmission line 1 is paused, the foaming mold is aligned with the foaming gun, and the injection gun of the foaming material injection robot 14 injects the foaming material into the foaming mold. Then, the power transmission line 1 continues to drive the mold clamping component 4 to move and enter the upper power transmission line in the fully enclosed box 5. The front half of the fully enclosed box 5 heats and bakes the foaming material in the mold.After that, each mold clamping component 4 moves to the front end position of the power transmission line 1, at this time, the moving plate of the front lifting component is in an ascending state, and the moving plate 17 is flush with the upper power transmission line 2. The mold clamping component 4 will move to the moving plate 17 of the front lifting component, relying on the support wheel 18 for support, and the moving plate of the front lifting component will drop so that the moving component is flush with the lower power transmission line 3. The driving motor of the lifting component is started to drive the support wheel to rotate, thereby transporting the mold clamping component 4 on the moving plate to the lower power transmission line. The mold clamping component 4 continues to be transported on the lower power transmission line 3 in the fully enclosed box 5 in the opposite direction of the upper power transmission line. After the mold clamping component 4 leaves the fully enclosed box, it will enter the semi-enclosed box, and the rear half will transport the lower heating and baking component to continue baking the foaming material in the mold until it moves along the lower power transmission line 3 to the other end of the power transmission line 1. The rear setting The lifting component 15 works. At this time, the movable plate of the lifting component at the rear is in a descending state. The movable plate is flush with the lower power transmission line 3. The mold clamping component 4 will move to the movable plate 17 of the lifting component at the rear, and rely on the support wheel 18 for support. The movable plate of the lifting component at the rear rises, so that the movable component is flush with the upper power transmission line 2. The driving motor of the lifting component at the rear is started, driving the support wheel to rotate, thereby conveying the mold clamping component 4 on the movable plate to the upper power transmission line and moving it to the position below the mold unloading manipulator 9. The mold clamping component 4 opens to expose the foaming mold. The mold unloading manipulator 9 clamps the mold or absorbs the mold through a suction cup and moves the foaming mold to the mold unloading conveyor line 10. The mold unloading conveyor line 10 moves the mold to the water tank product storage area and takes away the water tank product. The mold can be transported to the mold loading conveyor line 8 for reuse, and the finished water tank product can be transferred and transported. In this way, the online production of water heater storage tanks can be completed conveniently and quickly. The entire production process has a high degree of automation and high precision, low labor intensity for operators, and high production efficiency.

[0041] The present invention is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the present invention is not limited to the above-mentioned method. As long as various improvements are made using the method concept and technical solution of the present invention, or the concept and technical solution of the present invention are directly applied to other occasions without improvement, they are all within the scope of protection of the present invention.

Claims

1. A water heater tank foaming production line, Features: The invention comprises a power transmission line (1), wherein the power transmission line (1) comprises an upper power transmission line (2) and a lower power transmission line (3), wherein the upper power transmission line (2) and the lower power transmission line (3) are stacked up and down, wherein a fully enclosed box (5) is arranged at the front half of the power transmission line (2), wherein a front half heating and baking component is arranged inside the fully enclosed box (5), wherein the fully enclosed box (5) completely encloses the front half of the power transmission line (1), wherein a semi-enclosed box (6) is arranged at the other half of the power transmission line (1), wherein the semi-enclosed box (6) encloses the lower part of the rear half of the power transmission line (1), wherein the semi-enclosed box (6) is arranged at the lower part of the rear half of the power transmission line (1), wherein the semi-enclosed box (6) is arranged at the lower part of the rear half of the power transmission line (1), wherein the semi-enclosed box (6) is arranged at the lower part of the rear half of the power transmission line (1), wherein the semi-enclosed box (6) is arranged at the lower part of the rear half of the power transmission line (1), wherein the semi-enclosed box (6) is arranged at the front ... A rear half conveying lower layer heating and baking component is arranged inside the closed box (6); a mold loading manipulator (7) is arranged near the power transmission line (1) of the fully closed box (5); a mold loading conveyor line (8) is arranged on the ground near the position of the mold loading manipulator (7); a mold unloading manipulator (9) is arranged at the power transmission line (1) of the semi-closed box (6); a mold unloading conveyor line (10) is arranged on the ground near the position of the mold unloading manipulator (9); and each mold clamping component (4) is supported on driving wheel assemblies (11) on both sides of the power transmission line (1).

2. The water heater tank foaming production line according to claim 1, Features: A lifting component (15) is arranged near the front of the power transmission line (1), and another lifting component (15) is arranged near the rear of the power transmission line (1). The lifting component (15) comprises a component frame (16), a moving plate (17) is arranged inside the component frame (16), and support wheels (18) are arranged on each side of the moving plate (17). The moving plate (17) is connected to the top of the component frame (16) through a lifting cylinder (20).

3. The water heater tank foaming production line according to claim 2, Features: The power transmission line (1) is configured to be able to drive each mold clamping component (4) to move forward in sequence from the upper power transmission line (2) close to the mold loading manipulator (7), pass through the upper power transmission line (2) in the fully enclosed box (5), the lifting component (15) at the front of the power transmission line (1), the lower power transmission line (3) in the fully enclosed box (5), the lower power transmission line (3) in the semi-enclosed box (6), and the lifting component (15) at the rear of the power transmission line (1), and then move in sequence to the mold unloading transmission line (10) position on the upper power transmission line (2) close to the side position of the mold unloading manipulator (9).

4. The water heater tank foaming production line according to claim 1 or 2, Features: A slide rail (4-2) is arranged on the device base (4-1) of the mold clamping component (4); a mold bearing plate (4-3) is movably arranged on the slide rail (4-2); a rear clamping assembly (4-4), a first side clamping assembly (4-5), and a second side clamping assembly (4-6) are also arranged on the device base (4-1); the mold bearing plate (4-3) is connected to the device base (4-1) via a horizontal telescopic component; and a top closing assembly (4-10) is arranged on the upper part of the rear clamping assembly (4-4).

5. The water heater tank foaming production line according to claim 4, Features: The mold feeding robot (7) comprises a feeding robot frame (7-1), the feeding robot frame (7-1) comprises a feeding robot crossbeam (7-2), a power transmission line (1) is located below the feeding robot crossbeam (7-2), a first feeding moving platform (7-5) is movably arranged on a first feeding slide rail (7-4) on the feeding robot crossbeam (7-2), a first feeding motor (7-6) is arranged on the feeding robot crossbeam (7-2), and the first feeding motor (7-6) is connected to a feeding conveyor belt (7-7).

6. The water heater tank foaming production line according to claim 1 or 2, Features: The first loading mobile platform (7-5) is connected to the loading conveyor belt (7-7), a second loading motor (7-8) is arranged on the first loading mobile platform (7-5), a second loading slide rail (7-9) arranged on the first loading mobile platform (7-5) is movably connected to the second loading mobile platform (7-10), a loading rack part (7-11) is arranged on the second loading mobile platform (7-10), a loading gear set (7-12) of the second loading motor (7-8) is engaged with the loading rack part (7-11), and a loading suction cup (7-13) is arranged near the lower part of the second loading mobile platform (7-10).

7. The water heater tank foaming production line according to claim 1 or 2, Features: The mold unloading robot (9) includes a unloading robot frame, the unloading robot frame includes a robot beam, the power transmission line is located below the unloading robot beam, a first unloading mobile platform is movably arranged on the first unloading slide rail on the unloading robot beam, a first unloading motor is arranged on the unloading robot beam, the first unloading motor is connected to the unloading conveyor belt, the first unloading mobile platform is connected to the unloading conveyor belt, a second unloading motor is arranged on the first unloading mobile platform, the second unloading slide rail arranged on the first unloading mobile platform is movably connected to the second unloading mobile platform, an unloading rack part is arranged on the second unloading mobile platform, the unloading gear set of the second unloading motor is meshed with the unloading rack part, and an unloading suction cup is arranged near the lower part of the second unloading mobile platform.

8. The water heater tank foaming production line according to claim 1 or 2, Features: A foaming material injection manipulator (14) is also arranged between the mold loading manipulator (7) and the fully enclosed box (5), and an injection gun is arranged on the foaming material injection manipulator (14).

9. The water heater tank foaming production line according to claim 1 or 2, Features: The mold loading robot (7) is configured to be a structure capable of grabbing and moving the foaming mold from the mold loading conveyor line (8) to the mold clamping component (4) on the upper power conveyor line (2) of the power conveyor line (1); the mold unloading robot (10) is configured to be a structure capable of grabbing and moving the foaming mold from the mold clamping component (4) on the upper power conveyor line (2) of the power conveyor line (1) to the mold unloading conveyor line (10).

10. The water heater tank foaming production line according to claim 1 or 2, Features: A loading manipulator climbing ladder (12) is arranged outside the mold loading manipulator (7), and a unloading manipulator climbing ladder (13) is arranged outside the mold unloading manipulator (9).

Citation Information

Patent Citations

  • Automatic refrigerator body foaming production line

    CN109080066A

  • Tunnel drying oven

    CN115962640A

  • Foaming production line for water storage tank of water heater

    CN116476299A

  • Foamed ceramic production system and production process thereof

    WO2021031773A1