The control device dynamically allocates computational resources based on processing load analysis, addressing the inefficiency in NFV and end-user computing by optimizing resource utilization in communication networks, ensuring efficient and timely resource allocation.

WO2024224507A1PCT designated stage expired Publication Date: 2024-10-31NIPPON TELEGRAPH & TELEPHONE CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/016443
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-26
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

In communication networks, the inefficient use of computational resources occurs due to the separate management of resources for Network Functions Virtualization (NFV) and end-user computing, leading to suboptimal allocation based on physical server units rather than dynamic processing load requirements.

Method used

A control device and method that acquires and analyzes processing load information to dynamically allocate computational resources to virtualized network functions and applications, ensuring efficient resource utilization by determining the appropriate allocation based on measured loads and transmitting this information to relevant computers.

Benefits of technology

This approach enables efficient use of computational resources, reduces the time required for resource allocation, and optimizes resource deployment by allocating resources according to actual processing loads, thereby handling burst traffic with fewer resources and minimizing delays.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023016443_31102024_PF_FP_ABST
    Figure JP2023016443_31102024_PF_FP_ABST
Patent Text Reader

Abstract

Provided is a control device which is a controller that allocates computing resources for virtualized network functions and applications, the control device comprising: an acquisition unit that acquires information having an effect on the processing load of the computing resources; an allocation determination unit that determines the amount of computing resources to be allocated for each of the network functions and applications on the basis of the information, acquired by the acquisition unit, having an effect on the processing load of the computing resources; and a communication unit that transmits information about the amount of computing resources determined by the allocation determination unit to one or more computers to be allocated with the computing resources. 
Need to check novelty before this filing date? Find Prior Art

Description

Control device and resource allocation method

[0001] The present invention relates to a control device and a resource allocation method.

[0002] Conventionally, network function virtualization (NFV) technology has been used in communication networks. Network function virtualization makes it possible to provide network functions using general-purpose computers, which are less expensive than dedicated devices specialized for communication. Non-Patent Document 1 states that, since the control plane (C-Plane) and the data plane (D-Plane) require different amounts of processing, separation of the control plane and the data plane (CUPS: Control and User Plane Separation) can be performed, thereby enabling the number of servers for the C-Plane and the servers for the D-Plane to be increased almost independently.

[0003] Non-Patent Document 2 describes multi-access edge computing (MEC), which processes data at the facilities of a telecommunications carrier. Generally, edge computing ensures low latency by performing processing that requires low latency, which would not be possible if data were transferred from a terminal device to a data center far away before processing, on a computer located at the telecommunications carrier's base.

[0004] Therefore, as the use of MEC and NFV develops, it is conceivable that computers that provide NFV for network use within telecommunications carriers will be used in conjunction with computers that provide computing resources to end users, such as in edge computing.

[0005] “An Efficient Virtual Network Function (VNF) Architecture for Next-Generation Communications Infrastructure,” Intel, White Paper, [Retrieved April 14, 2023], Internet, <URL:https: / / www.intel.com / content / dam / support / jp / ja / programmable / support-resources / bulk-container / pdfs / literature / wp / wp-01273-finding-an-efficient-virtual-network-function-architecture-j.pdf > "Edge Computing Evolves into 'MEC' with 5G: What Will Change?", Nikkei CrossTech (xTECH), [Retrieved April 14, 2023], Internet,<URL:https: / / xtech.nikkei.com / atcl / nxt / column / 18 / 01515 / 122300011 / >

[0006] However, in the past, computational resources for NFV use and computational resources provided to end users were managed separately, which meant that if the usage of either deviated from the unit of physical computational resource amount (for example, the number of CPU cores as the amount of computational resources per physical server), the computational resources could not be used efficiently.

[0007] In view of the above circumstances, an object of the present invention is to provide a technology that enables efficient use of computational resources.

[0008] One aspect of the present invention is a control device that allocates computing resources to virtualized network functions and applications, and includes an acquisition unit that acquires information that affects the processing load of the computing resources, an allocation determination unit that determines the amount of computing resources to allocate to each of the network functions and the applications based on the information that affects the processing load of the computing resources acquired by the acquisition unit, and a communication unit that transmits information about the amount of computing resources determined by the allocation determination unit to one or more computers to which the resources are to be allocated.

[0009] One aspect of the present invention is a resource allocation method performed by a control device that allocates computing resources to virtualized network functions and applications, which resource allocation method acquires information that affects the processing load of the computing resources, determines the amount of computing resources to be allocated to each of the network functions and the applications based on the acquired information that affects the processing load of the computing resources, and transmits information on the determined amount of computing resources to one or more computers to which the resources are to be allocated.

[0010] The present invention allows for efficient use of computational resources.

[0011] 1 is a diagram illustrating an example of a configuration of a communication system in an embodiment. FIG. 2 is a diagram illustrating an example of a profile table in an embodiment. FIG. 3 is a flowchart illustrating a processing flow of a controller in an embodiment. FIG. 4 is a diagram illustrating an example of a configuration of a communication system in an embodiment. FIG. 5 is a flowchart illustrating a processing flow of a controller in an embodiment. FIG. 6 is a diagram illustrating a configuration in which a communication system in an embodiment is applied to a mobile system. FIG. 7 is a diagram illustrating a configuration (part 1) in which some devices of a communication system in an embodiment are accommodated in a rack. FIG. 8 is a diagram illustrating a configuration (part 2) in which some devices of a communication system in an embodiment are accommodated in a rack. FIG. 9 is a diagram illustrating a configuration in which a communication system in an embodiment is applied to a PON system. FIG. 10 is a diagram illustrating an example of another profile table.

[0012] An embodiment of the present invention will be described below with reference to the drawings. Fig. 1 is a diagram showing an example of the configuration of a communication system 100 according to the embodiment. The communication system 100 includes a base station 10, one or more servers 30, and a controller 50. In Fig. 1, one server 30 is shown as one or more servers 30. Note that the number of base stations 10 and servers 30 is not particularly limited.

[0013] The base station 10 and the server 30, the base station 10 and the controller 50, and the server 30 and the controller 50 are connected by wire. One or more terminal devices (not shown) are connected wirelessly to the base station 10. An upper NW 40 is located above the server 30.

[0014] The base station 10 performs wireless communication with one or more terminal devices. The base station 10 is, for example, a gNB in ​​5G or a distributed unit (DU) or central unit (CU) in the case of functional division. The base station 10 includes a radio scheduler 11 and a main signal processing unit 12.

[0015] The wireless scheduler 11 acquires information that affects the processing load of the computational resources in communication with the terminal devices. The information that affects the processing load of the computational resources is information about data transmitted by the terminal devices, such as information about traffic volume and the number of terminal devices 60 connected to the server 30 (hereinafter referred to as the "number of connected terminal devices"). In the following explanation, an example will be given in which the information that affects the processing load of the computational resources is traffic volume. The wireless scheduler 11 notifies the controller 50 of the acquired traffic volume.

[0016] The main signal processing unit 12 processes the main signal transmitted from the terminal device. Specifically, the main signal processing unit 12 transfers the main signal transmitted from the terminal device to the server 30, which is the destination.

[0017] The server 30 processes the main signal transmitted from the terminal device in accordance with the resources allocated by the controller 50. The server 30 includes a processing load profile measurement unit 31, resources 32, a communication function 33, and an application 34.

[0018] The processing load profile measurement unit 31 measures the processing load according to the input traffic volume for each function used by the server 30. The functions used by the server 30 are, for example, the communication function 33 and the application 34. That is, the processing load profile measurement unit 31 measures the processing load for each input traffic volume for each of the communication function 33 and the application 34. The processing load profile measurement unit 31 creates a profile table that summarizes the measurement results. The processing load profile measurement unit 31 transmits the created profile table to the controller 50. The values ​​registered in the profile table differ for each server 30.

[0019] The processing load profile measurement unit 31 may measure the processing load during operation, or may measure the processing load when the server 30 is installed so as not to affect the service during operation, or may measure the processing load in advance before installation and store only the result in the controller 50. Note that if the processing load is measured in advance before the server 30 is installed, the processing load profile measurement unit 31 does not need to be provided in the server 30 during actual operation.

[0020] FIG. 2 is a diagram showing an example of a profile table in an embodiment. (A) in FIG. 2 shows measurement results of the processing load for each traffic volume in the communication function 33, and (B) in FIG. 2 shows measurement results for each traffic volume in the application 34. FIG. 2 shows measurement results when the server 30 can use three cores as resources. The measurement results registered in the profile table will be described. As an example, if the traffic volume input to the communication function 33 is 10 kB (kilobytes) per 1 ms, the processing load is shown to be 10% when one core is used as a resource, 10% when two cores are used, and 10% when three cores are used. If the traffic volume input to the application 34 is 10 kB per 1 ms, the processing load is shown to be 20% when one core is used as a resource, 20% when two cores are used, and 17% when three cores are used.

[0021] 1 , the description will be continued. The resource 32 is hardware (including circuitry) such as one or more processors such as a CPU or an FPGA (Field Programmable Gate Array). The resource 32 processes the main signal using computational resources in accordance with instructions from the controller 50.

[0022] The communication function 33 is a communication device realized on a virtual machine by virtualization technology using the resource 32. The communication function 33 performs a transfer process for transferring a main signal to a destination, etc. The communication function 33 is, for example, a UPF (User Plane Function).

[0023] The application 34 is software executed by the resource 32. The application 34 is, for example, an image processing application. The processing load of both the communication function 33 and the application 34 varies depending on the amount of input traffic.

[0024] The controller 50 controls each device included in the communication system 100. The controller 50 includes a communication unit 51, a storage unit 52, and a control unit 53. The controller 50 is one aspect of a control device.

[0025] The communication unit 51 communicates with other devices. The communication unit 51 receives, for example, information on traffic volume from the base station 10. The communication unit 51 receives, for example, a profile table transmitted from each server 30. The communication unit 51 transmits, for example, resource allocation information to each server 30. The resource allocation information is information that indicates the amount of computational resources used in the server 30. For example, the resource allocation information is information that indicates how many cores are used for which function.

[0026] The storage unit 52 stores the profile tables 521 transmitted from each server 30. Therefore, if the communication system 100 includes a plurality of servers 30, a plurality of profile tables 521 are stored in the storage unit 52. The storage unit 52 is configured using a storage device such as a magnetic storage device or a semiconductor storage device.

[0027] The control unit 53 is configured using one or more processors such as a CPU and a memory. The control unit 53 realizes the functions of an acquisition unit 531 and an allocation determination unit 532 by executing a program.

[0028] Some or all of the acquisition unit 531 and the allocation determination unit 532 may be realized by hardware (including circuitry) such as an ASIC (Application Specific Integrated Circuit), a PLD (Programmable Logic Device), or an FPGA, or may be realized by a combination of software and hardware. The program may be recorded on a computer-readable recording medium. Examples of computer-readable recording media include portable media such as flexible disks, magneto-optical disks, ROMs, and CD-ROMs, and non-transitory storage media such as storage devices built into a computer system, such as hard disks. The program may be transmitted via a telecommunications line.

[0029] Some of the functions of the acquisition unit 531 and the allocation determination unit 532 do not need to be pre-installed in the controller 50 , and may be realized by installing an additional application program in the controller 50 .

[0030] The acquisition unit 531 acquires various information received by the communication unit 51. When the communication unit 51 receives a profile table, the acquisition unit 531 stores the received profile table in the storage unit 52 in association with the identification information of the server 30. The acquisition unit 531 acquires information on the traffic volume received by the communication unit 51. The acquisition unit 531 outputs the acquired traffic volume information to the allocation determination unit 532.

[0031] The allocation determination unit 532 acquires information on the processing load of each of the communication functions 33 and the applications 34 of the server 30 based on the traffic volume information output from the acquisition unit 531 and the profile table 521. The allocation determination unit 532 determines the amount of computational resources to be allocated to the communication functions 33 and the applications 34 based on the acquired information on the processing load of each function.

[0032] 3 is a flowchart showing the flow of processing by the controller 50 in this embodiment. Note that the description will be given assuming that the profile table 521 shown in FIG. 2 is stored in the storage unit 52 of the controller 50 at the time of the processing in FIG.

[0033] The communication unit 51 receives traffic volume information transmitted from the base station 10. The communication unit 51 outputs the received traffic volume information to the control unit 53. The acquisition unit 531 of the control unit 53 acquires the traffic volume information output from the communication unit 51 (step S101). The acquisition unit 531 outputs the acquired traffic volume information to the allocation determination unit 532.

[0034] The allocation determination unit 532 acquires information on the processing load of each of the communication functions 33 and the applications 34 of the server 30 based on the traffic volume information output from the acquisition unit 531 and the profile table 521 (step S102). Specifically, the allocation determination unit 532 first reads out the profile table 521 stored in the control unit 53. Next, the allocation determination unit 532 refers to the read profile table 521 to acquire information on the processing load of each of the communication functions 33 and the applications 34 of the server 30. For example, if the traffic volume is 40 KB per 1 ms and three cores are available in the server 30, the allocation determination unit 532 acquires 12% as information on the processing load of the communication functions 33 and 19% as information on the processing load of the applications 34.

[0035] The allocation determination unit 532 determines whether or not resource allocation to each function is possible based on the acquired information on the processing loads of the communication function 33 and the application 34 (step S103). The allocation determination unit 532 determines that resource allocation to each function is possible when the sum of the processing loads of the communication function 33 and the application 34 is less than 100%. On the other hand, the allocation determination unit 532 determines that resource allocation to each function is impossible when the sum of the processing loads of the communication function 33 and the application 34 exceeds 100%.

[0036] If the allocation determination unit 532 determines that resource allocation to each function is not possible (step S103—NO), the controller 50 concludes that computational resources cannot be allocated and terminates the process. On the other hand, if the allocation determination unit 532 determines that resource allocation to each function is possible (step S103—YES), the controller 50 allocates computational resources to each function of the server 30 (step S104). In the above example, the processing load of the communication function 33 is 12%, and the processing load of the application 34 is 19%, so the total processing load is less than 100%. Therefore, in the server 30, processing of the communication function 33 can be performed approximately simultaneously with processing of the application 34. Therefore, the allocation determination unit 532 determines that processing is possible even if computational resources are allocated within the same server 30.

[0037] In this case, the allocation determination unit 532 generates resource allocation information indicating that three cores are to be allocated as computational resources to each of the communication function 33 and the application 34. The allocation determination unit 532 transmits the generated resource allocation information to the server 30 via the communication unit 51. As a result, the server 30 allocates three cores as computational resources to the communication function 33 and the application 34 based on the resource allocation information transmitted from the controller 50.

[0038] 1, the communication system 100 is configured to include one server 30, and therefore may not be able to process the main signal transmitted from the terminal device if the processing load exceeds the capacity of the server 30. Therefore, the communication system 100 may be configured to include multiple servers 30 as shown in FIG.

[0039] Fig. 4 is a diagram showing an example of the configuration of a communication system 100a according to an embodiment. The communication system 100a includes a base station 10, a switching device 20, a plurality of servers 30, and a controller 50. In Fig. 4, two servers 30-1 and 30-2 are shown as the plurality of servers 30. Note that the number of base stations 10 and servers 30 is not particularly limited.

[0040] In the following description, when there is no need to distinguish between the servers 30-1 and 30-2, they will be referred to as the server 30. The base station 10 and the switching device 20, the switching device 20 and each server 30, the base station 10 and the controller 50, the switching device 20 and the controller 50, and the server 30 and the controller 50 are connected by wire. One or more terminal devices (not shown) are connected to the base station 10 by wireless. An upper NW 40 is located above the server 30. In the following description, it is assumed that the base station 10 is connected to the server 30-1 via the switching device 20.

[0041] The communication system 100a differs from the communication system 100 in that a switching device 20 is provided between the base station 10 and a plurality of servers 30, and in that a controller 50 instructs path switching. The following description will focus on the differences.

[0042] The switching device 20 switches the transfer path of the main signal transmitted from the base station 10 in response to an instruction from the controller 50. The switching device 20 may be, for example, an L2 switch or an optical switch.

[0043] The servers 30-1 and 30-2 have the same configuration. In the following description, the sub-numbers "-1" and "-2" are added to distinguish between the functional units of the servers 30-1 and 30-2. For example, when describing the functional units of the server 30-1, they will be described as a processing load profile measurement unit 31-1, a resource 32-1, a communication function 33-1, and an application 34-1. The resource 32 of the server 30-2 has a larger capacity than the resource 32 of the server 30-1.

[0044] The controller 50 controls each device included in the communication system 100 a. The controller 50 includes a communication unit 51, a storage unit 52, and a control unit 53.

[0045] The communication unit 51 performs the same processing as the communication unit 51 shown in Fig. 1 . Furthermore, the communication unit 51 transmits a switching instruction to the switching device 20. The switching instruction is an instruction to switch the connection destination of the base station 10. Here, the information that can uniquely identify the server 30 is, for example, the MAC address of the server 30. Note that the information that can uniquely identify the server 30 is not limited to the MAC address of the server 30, and may be other information that can uniquely identify the server 30.

[0046] The storage unit 52 stores profile tables 521 transmitted from each server 30. The storage unit 52 shown in Fig. 4 stores at least a profile table in which measurement results of the processing load of each function of server 30-1 are registered, and a profile table in which measurement results of the processing load of each function of server 30-2 are registered. The storage unit 52 is configured using a storage device such as a magnetic storage device or a semiconductor storage device.

[0047] The control unit 53 is configured using one or more processors such as a CPU and a memory. The control unit 53 executes a program to realize the functions of an acquisition unit 531, an allocation determination unit 532, and a switching instruction unit 533.

[0048] Some or all of the acquisition unit 531, allocation determination unit 532, and switching instruction unit 533 may be realized by hardware (including circuitry) such as an ASIC, PLD, or FPGA, or may be realized by a combination of software and hardware. The program may be recorded on a computer-readable recording medium. Examples of computer-readable recording media include portable media such as flexible disks, magneto-optical disks, ROMs, and CD-ROMs, and non-transitory storage media such as storage devices built into a computer system, such as hard disks. The program may be transmitted via a telecommunications line.

[0049] Some of the functions of the acquisition unit 531, the allocation determination unit 532, and the switching instruction unit 533 do not need to be pre-installed in the controller 50, and may be realized by installing additional application programs in the controller 50.

[0050] The allocation determination unit 532 acquires information on the processing load of each of the communication functions 33 and the applications 34 of the server 30 based on the traffic volume information output from the acquisition unit 531 and the profile table 521. The allocation determination unit 532 determines the amount of computational resources to be allocated to the communication functions 33 and the applications 34 based on the acquired information on the processing load of each function.

[0051] The switching instruction unit 533 transmits a switching instruction to the switching device 20 via the communication unit 51 so that the main signal transmitted from the terminal device is transmitted to the switching destination server 30. For example, the switching instruction unit 533 generates a switching instruction including information that can uniquely identify the switching destination server 30. The switching instruction unit 533 transmits the switching instruction to the switching device 20 via the communication unit 51.

[0052] 5 is a flowchart showing the flow of processing by the controller 50 in this embodiment. Note that the following description will be given assuming that, at the time of the processing in FIG. 5, the profile table 521 of each server 30 is stored in the storage unit 52 of the controller 50. In FIG. 5, the same processes as those in FIG. 3 are denoted by the same reference numerals as those in FIG. 3, and descriptions thereof will be omitted.

[0053] After the processing of step S102 is performed, the allocation determination unit 532 determines whether switching is necessary based on the acquired information on the processing loads of the communication function 33 and the application 34 (step S201). For example, the allocation determination unit 532 determines that switching is not necessary when the sum of the processing loads of the communication function 33 and the application 34 is less than 100%. On the other hand, the allocation determination unit 532 determines that switching is necessary when the sum of the processing loads of the communication function 33 and the application 34 exceeds 100%.

[0054] If the allocation determination unit 532 determines that switching is not necessary (step S201-NO), the allocation determination unit 532 allocates computational resources to each function of the server 30-1 (step S202). For example, the allocation determination unit 532 generates resource allocation information indicating that three cores are to be allocated as computational resources to each of the communication function 33 and the application 34. The allocation determination unit 532 transmits the generated resource allocation information to the server 30-1 via the communication unit 51. As a result, the server 30-1 allocates three cores as computational resources to the communication function 33 and the application 34 based on the resource allocation information transmitted from the controller 50.

[0055] On the other hand, if the allocation determination unit 532 determines that switching is necessary (step S201—YES), the switching instruction unit 533 identifies a server 30 that can process the traffic indicated by the traffic volume information acquired in the processing of step S101. For example, it is assumed that server 30-2 can process the traffic indicated by the traffic volume information. In this case, the switching instruction unit 533 generates a switching instruction that includes information for identifying server 30-2. The switching instruction unit 533 transmits the generated switching instruction to the switching device 20 via the communication unit 51. As a result, the switching instruction unit 533 instructs switching of the path (step S203).

[0056] The allocation determination unit 532 allocates computational resources to each function of the server 30-2 (step S204). For example, the allocation determination unit 532 generates resource allocation information indicating that three cores are to be allocated as computational resources to each of the communication function 33 and the application 34. The allocation determination unit 532 transmits the generated resource allocation information to the server 30-2 via the communication unit 51. As a result, the server 30-2 allocates three cores as computational resources to the communication function 33 and the application 34 based on the resource allocation information transmitted from the controller 50. Note that the processing of step S203 and the processing of step S204 may be performed in the reverse order.

[0057] In this way, when one server 30 cannot process the traffic, the controller 50 instructs switching of the path so that the traffic is transferred to another server 30. As a result, even when traffic that exceeds the allowable amount arrives, the functions of the communication function 33 and the application 34 can be provided without significantly increasing delays.

[0058] According to the communication system 100 configured as described above, the controller 50 includes an acquisition unit 531 that acquires information that affects the processing load of the computational resources, an allocation determination unit 532 that determines the amount of computational resources to be allocated to each of the communication functions 33 and the applications 34 included in the server 30 based on the information that affects the processing load of the computational resources acquired by the acquisition unit 531, and a communication unit 51 that transmits information on the amount of computational resources determined by the allocation determination unit 532 to the server 30 that is the allocation destination. This allows appropriate allocation of computational resources depending on the processing load status, thereby enabling efficient use of computational resources.

[0059] Furthermore, the allocation determination unit 532 determines the amount of computational resources to be allocated to each of the communication functions 33 and the application 34 based on the profile table 521. In this way, the processing load can be easily obtained by using the profile table 521, which shows the results of pre-measurement of the processing load of the communication functions 33 and the application 34 according to the input traffic volume. As a result, the time required for allocating computational resources can be reduced.

[0060] The controller 50 allocates the total load to one server 30 based on the processing load of each of the communication functions 33 and the applications 34, if the total load is less than the load of one server 30. This allows burst traffic to be handled with fewer computing resources, which in turn reduces the computing resources to be deployed (number of CPU cores, number of machines, FPGA circuit capacity, network bandwidth).

[0061] The achieved allocation determination unit 532 shown in FIGS. 1 and 4 may perform the following processing. When the communication function 33 processes data in fixed amounts, such as block coding, or when the application 34 performs image processing, processing may begin after all image data for one image has arrived at the application 34. In this case, the application 34 processes data after the communication function 33 completes processing, so it is possible that resources may not be used simultaneously. Therefore, the processing load profile measurement unit 31 applies a load in advance via a fixed amount of traffic via the communication function 33 and the application 34, and measures the difference in the time at which the load increases at the communication function 33 and the application 34 as the arrival time difference, and stores this information for each server 30. In other words, the arrival time difference is the time difference between when traffic is input to the communication function 33 and when traffic is input to the application 34. Each server 30 notifies the controller 50 of this arrival time difference information along with a profile table. The controller 50 stores the arrival time difference information in the storage unit 52.

[0062] If the arrival time difference is within a predetermined time, the allocation determination unit 532 adds up the processing load of the communication function 33 and the processing load of the application 34 obtained from the profile table 521. The allocation determination unit 532 determines whether resource allocation is possible based on the result of adding the processing loads. If the allocation determination unit 532 determines that resource allocation is possible, it allocates computational resources to each function of the server 30. That is, the allocation determination unit 532 determines the amount of computational resources to be allocated to each of the communication function 33 and the application 34. In this way, if the arrival time difference is within a predetermined time, there is a possibility that the communication function 33 and the application 34 will be used approximately simultaneously. This may result in an increase in processing load. Therefore, by allocating traffic processing to different servers 30 (which do not share computational resources), it is possible to avoid increased delays due to the depletion of computational resources.

[0063] On the other hand, if the arrival time difference is greater than or equal to a predetermined time, the allocation determination unit 532 adds the processing load of the communication function 33 and the processing load of the application 34 obtained from the profile table 521, shifting them in the time direction by the arrival time difference. The allocation determination unit 532 determines whether resource allocation is possible based on the result of adding the processing loads. If the allocation determination unit 532 determines that resource allocation is possible, it allocates computational resources to each function of the server 30. That is, the allocation determination unit 532 determines the amount of computational resources to be allocated to each of the communication function 33 and the application 34. In this way, if the arrival time difference is greater than or equal to a predetermined time, there is little chance that the communication function 33 and the application 34 will be used approximately simultaneously. Therefore, consolidating traffic processing within the same server 30 enables efficient computational resource allocation.

[0064] The following describes in detail a system configuration to which the processing of the above-described embodiment is applied. (Application Example 1) Fig. 6 is a diagram showing a configuration in which the communication system 100 of the embodiment is applied to a mobile system. The mobile system includes an RU 61, a DU 62, one or more servers 30, and a controller 50. The DU 62 is a functional unit obtained by dividing the functions of the base station 10 shown in Fig. 1.

[0065] The RU 61 performs wireless communication with the terminal device 60. The DU 62 performs signal processing on the main signal received by the RU 61. Furthermore, the DU 62 acquires information on the traffic volume and notifies the controller 50 of the acquired traffic volume information.

[0066] The communication function 33 of the server 30 may include not only the UPF but also a virtual CU as long as the processing load does not exceed 100%. The specific processing of the mobile system shown in Figure 6 is the same as the processing shown in Figure 1, so a description thereof will be omitted.

[0067] (Application Example 2) Fig. 7 is a diagram showing a configuration (part 1) in which some of the devices of the communication system 100 according to the embodiment are housed in a rack. The communication system shown in Fig. 7 includes a plurality of servers 30, a controller 50, a plurality of DUs 62, a plurality of switches 63, a main signal switch 67, and a control switch 68. In Fig. 7, four servers 30-1, 30-2, 30-3, and 30-4 are shown as the plurality of servers 30, two DUs 62-1 and 62-2 are shown as the plurality of DUs 62, and four switches 63-1, 63-2, 63-3, and 63-4 are shown as the plurality of switches 63. Note that the number of servers 30, DUs 62, and switches 63 is not particularly limited.

[0068] As shown in FIG. 7 , a plurality of servers 30, a controller 50, a plurality of DUs 62, and a plurality of switches 63 are housed in a plurality of racks R. Rack R1 houses a switch 63-1 and DUs 62-1 and 62-2. Rack R2 houses a switch 63-2 and servers 30-1 and 30-2. Rack R3 houses a switch 63-3 and servers 30-3 and 30-4. Rack R10 houses a switch 63-4 and a controller 50. Racks R1, R2, and R3 are housed in a single housing. Each of the racks R1, R2, R3, and R10 is connected via a main signal switch 67 or a control switch 68.

[0069] The switch 63 is a ToR (Top of Rack) switch. The switch 63 outputs an input signal to another path. The switch 63-1 is connected to the DUs 62-1 and 62-2. The switch 63-1 is further connected to a main signal switch 67 and a control switch 68. The switch 63-2 is connected to the servers 30-1 and 30-2. The switch 63-2 is further connected to the main signal switch 67 and the control switch 68. The switch 63-3 is connected to the servers 30-3 and 30-4. The switch 63-3 is further connected to the main signal switch 67 and the control switch 68. The switch 63-4 is connected to the controller 50. The switch 63-4 is further connected to the main signal switch 67 and the control switch 68.

[0070] The main signal switch 67 transfers the main signal to the switch 63. The control switch 68 transfers a control signal such as a switching instruction to the switch 63.

[0071] The processing flow of application example 2 will now be described. Assume that the profile table 521 shown in FIG. 2 has been measured in advance by the processing load profile measurement unit 31, and that the server 30-1 is currently operating with two cores because only traffic volumes up to 40 KB are input. In this case, for inputs of 40 KB or less, the communication function 33-1 of the server 30-1 has a 15% processing load and the application 34-1 has a 26% processing load, so the total does not exceed 100%, making it possible for the server 30-1 to process the inputs. If a burst of large-volume traffic flows in and a notification is received indicating that 480 KB of traffic will arrive per 1 ms, the communication function 33-1 of the server 30-1 is expected to have a 65% processing load, and the application 34-1 is expected to have an 80% processing load. As a result, the total processing load of the communication function 33-1 and the application 34-1 of the server 30-1 exceeds 100%. Therefore, if the same server 30-1 continues to accommodate these inputs, increased delays are expected.

[0072] Therefore, in application example 2, when a notification is received that an input will cause the total processing load to exceed 100%, the switching instruction unit 533 of the controller 50 issues a switching instruction so that the traffic in question is distributed to another server 30. Specifically, when the input traffic volume is 40 KB or less, the server 30-1 accommodates the communication function 33-1 and the application 34-1, whereas when a notification is received that 480 KB of traffic will be input, the server 30-1 processes up to the communication function 33-1, and the server 30-3 processes the application 34. When the total load, including the load of the other communication functions 33-1 accommodated within the server 30-1, exceeds 100%, a switching instruction is issued to the main signal switch 67 so that the server 30-2 performs UPF processing for the 480 KB burst input.

[0073] In this way, the communication function 33 and the application 34 can be provided without causing significant delays for large inputs, while efficiently utilizing computational resources according to the amount of input.

[0074] If the processing load does not exceed the allowable capacity, the switching instruction unit 533 instructs switching of the path so that the main signal is transferred along the following path: DU 62-2 → switch 63-1 → main signal switch 67 → switch 63-2 → server 30-1 (communication function 33-1) → switch 63-2 → main signal switch 67 → switch 63-3 → server 30-3 (application 34-3) → switch 63-3 → main signal switch 67 → to upper NW 40

[0075] If the processing load exceeds the capacity, the switching instruction unit 533 instructs switching of the path so that the main signal is transferred along the following path: DU 62-2 → switch 63-1 → main signal switch 67 → switch 63-2 → server 30-2 (communication function 33-2) → switch 63-2 → main signal switch 67 → switch 63-3 → server 30-4 (application 34-4) → switch 63-3 → main signal switch 67 → to upper NW 40

[0076] 8 is a diagram showing a configuration (part 2) in which some of the devices of the communication system 100 according to the embodiment are housed in a rack. The communication system shown in FIG. 8 includes a plurality of servers 30, a controller 50, a plurality of switches 63, a plurality of main signal switches 67, a control switch 68, and a plurality of optical switches 70.

[0077] 8 shows eight servers 30-1, 30-2, 30-3, 30-4, 30-5, 30-6, 30-7, and 30-8 as the multiple servers 30, seven switches 63-1, 63-2, 63-3, 63-4, 63-5, 63-6, and 63-7 as the multiple switches 63, four main signal switches 67-1, 67-2, 67-3, and 67-4 as the multiple main signal switches 67, and four optical switches 70-1, 70-2, 70-3, and 70-4 as the multiple optical switches 70. Note that the numbers of servers 30, switches 63, and optical switches 70 are not particularly limited.

[0078] 8, the multiple servers 30, the controller 50, the multiple switches 63, the multiple main signal switches 67, and the multiple optical switches 70 are housed in multiple racks R. Rack R1 houses the switch 63-1 and the optical switches 70-1 and 70-2. Rack R2 houses the switch 63-2, the servers 30-1 and 30-2, and the main signal switch 67-1. Rack R3 houses the switch 63-3, the servers 30-3 and 30-4, and the main signal switch 67-2.

[0079] Rack R4 houses a switch 63-5 and optical switches 70-3 and 70-4. Rack R5 houses a switch 63-6, servers 30-5 and 30-6, and a main signal switch 67-3. Rack R6 houses a switch 63-7, servers 30-7 and 30-8, and a main signal switch 67-4. Rack R10 houses a switch 63-4 and a controller 50. Racks R1, R2, and R3 are housed in a single housing. Racks R4, R5, and R6 are housed in a single housing. Each of the racks R1, R2, R3, R4, R5, R6, and R10 is connected via a control switch 68.

[0080] The switch 63 is a ToR switch. The switch 63 outputs an input signal to another path. The switch 63-1 is connected to optical switches 70-1 and 70-2. The switch 63-1 is further connected to a control switch 68. The switch 63-2 is connected to servers 30-1 and 30-2. The switch 63-2 is further connected to the control switch 68. The switch 63-3 is connected to servers 30-3 and 30-4. The switch 63-3 is further connected to the control switch 68. The switch 63-4 is connected to the controller 50. The switch 63-4 is further connected to the control switch 68.

[0081] The switch 63-5 is connected to the optical switches 70-3 and 70-4. Furthermore, the switch 63-5 is connected to the control switch 68. The switch 63-6 is connected to the servers 30-5 and 30-6. Furthermore, the switch 63-6 is connected to the control switch 68. The switch 63-7 is connected to the servers 30-7 and 30-8. Furthermore, the switch 63-7 is connected to the control switch 68.

[0082] The optical switch 70 outputs the input optical signal to another path. For example, the optical switch 70 is connected to the main signal switch 67 and outputs the input main signal light to the main signal switch 67. The example shown in Figure 8 shows a state in which the optical switch 70-2 is connected to the main signal switches 67-1 and 67-2 and the optical switch 70-4, and the optical switch 70-4 is connected to the main signal switches 67-3 and 67-4 and the optical switch 70-2.

[0083] When the main signal is processed in one of the servers 30-1, 30-2, 30-3, and 30-4 housed in racks R2 and R3, the optical switch 70-2 outputs the input main signal light to the main signal switch 67-1 or the main signal switch 67-2. When the main signal is processed in one of the servers 30-5, 30-6, 30-7, and 30-8 housed in racks R5 and R6, the optical switch 70-2 outputs the input main signal light to the optical switch 70-4. This allows the optical switch 70-4 to transfer the main signal light to one of the servers 30-5, 30-6, 30-7, and 30-8 that processes the main signal.

[0084] A switching instruction for the path of the optical switch 70 is transmitted from the switching instruction unit 533 of the controller 50. For example, when it is desired to switch the path of the optical switch 70-2, the switching instruction unit 533 of the controller 50 generates a switching instruction for switching the path of the optical switch 70-2. The switching instruction unit 533 outputs the generated switching instruction to the switch 63-4 via the communication unit 51. The switch 63-4 transfers the input switching instruction to the control switch 68. The control switch 68 transfers the switching instruction transferred from the switch 63-4 to the switch 63 in the rack R in which the destination device is housed. For example, the control switch 68 transfers the switching instruction transferred from the switch 63-4 to the switch 63-1 in the rack R1 in which the destination optical switch 70-2 is housed. The switch 63-1 transfers the switching instruction transferred from the control switch 68 to the destination optical switch 70-2. This allows the switching instruction to be transferred to the optical switch 70-2.

[0085] The main signal switch 67 includes a plurality of transceivers T. The main signal switch 67 converts the optical main signal transferred from the optical switch 70 into an electrical signal using the transceivers T and transfers the electrical signal to the server 30. The main signal switch 67 converts the electrical signal output from the server 30 into an optical signal using the transceivers T and transfers the optical signal to the optical switch 70.

[0086] In FIG. 8, the main signal and the control signal are shown separately to clearly separate them, but the switch 63 may also have the function of the main signal switch 67 .

[0087] Since the load can be calculated based on the total amount of traffic notified, the communication function 33 and the application 34 do not necessarily have to be accommodated in the same server 30 .

[0088] If the processing load exceeds the capacity, the switching instruction unit 533 instructs switching of the path so that the main signal is transferred along the following path: optical switch 70-2 → optical switch 70-4 → main signal switch 67-3 → server 30-5 (communication function 33-5) → main signal switch 67-3 → optical switch 70-4 → main signal switch 67-4 → server 30-7 → main signal switch 67-4 → optical switch 70-4 → to upper NW 40

[0089] 9 is a diagram showing a configuration in which the communication system 100 according to the embodiment is applied to a PON (Passive Optical Network) system. The PON system includes an ONU 80, an OLT 90, one or more servers 30, and a controller 50. The ONU 80 and the OLT 90 are connected via an optical transmission path such as an optical fiber.

[0090] The ONU 80 is an optical network unit that is installed in a user's home and terminates optical signals. One or more terminal devices 60 are connected to the ONU 80. The ONU 80 converts the main signal transmitted from the terminal device 60 into an optical signal and outputs it to the optical transmission path.

[0091] The OLT 90 is an optical line termination device provided on the electric utility side and terminates optical signals. The OLT 90 may accommodate multiple ONUs 80 via optical fibers and optical splitters. The OLT 90 receives optical signals transmitted from the ONUs 80. The OLT 90 converts the received optical signals into electrical signals and outputs them to the server 30. The OLT 90 notifies the controller 50 of traffic volume information. In this case, the traffic volume notified to the controller by the OLT 90 may be calculated based on the grant allocated to the ONU 80. The specific processing of the PON system shown in FIG. 9 is the same as the processing shown in FIG. 1, and therefore a description thereof will be omitted.

[0092] (Modification) In the above-described configuration, a configuration is shown in which a profile table 521 created based on traffic volume is used. On the other hand, if the server 30 is equipped with a communication function 33 or an application 34 that performs processing that depends on the number of sessions or the number of terminal devices accommodated by the server 30 (such as c-plane processing) rather than processing that depends on traffic volume or reception volume (such as U-plane processing), the processing load profile measurement unit 31 may obtain the number of sessions or the number of terminal devices as parameters and create the profile table 521 based on the obtained parameters.

[0093] 10 is a diagram showing an example of another profile table 521. Fig. 10 shows an example of a profile table 521 in which the processing load of the communication function 33 depends on the number of connected terminal devices, and the processing load of the application 34 depends on the traffic volume. Therefore, (A) of Fig. 10 registers the measurement results of the processing load for each number of connected terminal devices in the communication function 33, and (B) of Fig. 10 registers the measurement results of the processing load for each traffic volume in the application 34. By using such a profile table 521, even if the frequency of changes in the number of connected terminal devices is low compared to the frequency of changes in the traffic volume, it is possible to add up the loads of both and select an accommodating server 30.

[0094] Some of the functions of the server 30 or the controller 50 in the above-described embodiments may be implemented by a computer. In this case, a program for implementing this function may be recorded on a computer-readable recording medium, and the program may be loaded into a computer system and executed. Note that the term "computer system" as used herein includes hardware such as an operating system (OS) and peripheral devices. Furthermore, the term "computer-readable recording medium" refers to portable media such as flexible disks, optical magnetic disks, read-only memories (ROMs), and CD-ROMs, as well as storage devices such as hard disks built into computer systems. Furthermore, the term "computer-readable recording medium" may also include devices that dynamically store programs for a short period of time, such as communication lines used when transmitting programs via networks such as the Internet or telephone lines, or devices that store programs for a fixed period of time, such as volatile memory within the computer system serving as the server or client. The program may be designed to implement some of the above-described functions, or may be capable of implementing the above-described functions in combination with a program already stored in the computer system, or may be implemented using a programmable logic device such as an FPGA.

[0095] Although an embodiment of the present invention has been described above in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and includes designs within the scope of the gist of the present invention.

[0096] The present invention is applicable to systems that provide computing resources for network functions and applications.

[0097] DESCRIPTION OF SYMBOLS 10... Base station, 11... Wireless scheduler, 12... Main signal processing unit, 20... Switching device, 30, 30-1, 30-2, 30-3, 30-4, 30-5, 30-6, 30-7, 30-8... Server, 31... Processing load profile measurement unit, 32... Resource, 33... Communication function, 34... Application, 40... Upper network, 50... Controller, 51... Communication unit, 52... Storage unit, 53... Control unit, 60... Terminal device, 61... RU, 62, 62-1, 62-2... DU, 63, 63-1, 63-2, 63-3, 63-4, 63-5, 63-6, 63-7... Switch, 67, 67-1, 67-2, 67-3, 67-4... Main signal switch, 68...control switch, 70, 70-1, 70-2, 70-3, 70-4...optical switches, 80...ONU, 90...OLT, 521...profile table, 531...acquisition unit, 532...allocation determination unit, 533...switching instruction unit

Claims

1. A control device that allocates computational resources to virtualized network functions and applications, comprising: an acquisition unit that acquires information that affects the processing load of the computational resources; an allocation determination unit that determines an amount of computational resources to be allocated to each of the network functions and the applications based on the information that affects the processing load of the computational resources acquired by the acquisition unit; and a communication unit that transmits information on the amount of computational resources determined by the allocation determination unit to one or more computers to which the computational resources are to be allocated.

2. The control device according to claim 1, wherein the allocation determination unit determines the amount of computational resources to be allocated to each of the network functions and the applications based on a profile table in which the processing load of each of the network functions and the applications for information affecting the processing load of the computational resources is registered.

3. The control device according to claim 2, wherein the allocation determination unit, when the arrival time difference between when traffic is input to the network function and when it is input to the application is within a predetermined time, adds up the processing loads of the network function and the application obtained in the profile table, and determines the amount of computing resources to be allocated to each of the network function and the application based on the result of the addition of the processing loads.

4. The control device described in claim 2, wherein, when the arrival time difference between when traffic is input to the network function and when it is input to the application is greater than a predetermined time, the allocation determination unit adds up the processing loads of the network function and the application obtained in the profile table, shifting them in the time direction by the arrival time difference, and determines the amount of computing resources to be allocated to each of the network function and the application based on the result of adding up the processing loads.

5. The control device according to claim 3 or 4, wherein the one or more computers are multiple computers, and further comprising a switching instruction unit that instructs switching to distribute the traffic to another computer when the sum of the processing loads results in traffic that exceeds the capacity of one computer.

6. A resource allocation method performed by a control device that allocates computing resources to virtualized network functions and applications, comprising the steps of: acquiring information affecting the processing load of the computing resources; determining an amount of computing resources to be allocated to each of the network functions and the applications based on the acquired information affecting the processing load of the computing resources; and transmitting information on the determined amount of computing resources to one or more computers to which the resources are to be allocated.

Citation Information

Patent Citations

  • Communication device, communication method, and communication program

    JP2018129775A

  • Methods, systems, and computer readable media for diameter load and overload information and virtualization

    WO2015041750A1

  • Methods, systems, and computer readable media for a cloud-based virtualization orchestrator

    WO2015116449A1