Data conversion device and data conversion method
The data conversion device addresses the lack of compatibility in existing systems by generating a station/arrival/departure time structure graph and integrating information, enabling effective conversion of operation plan data for mobile objects across diverse operation management systems.
Patent Information
- Application Number
- PCT/JP2024/000017
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-25
- Filing Date
- 2024-01-04
- Publication Date
- 2024-10-31
AI Technical Summary
Current data conversion devices are not versatile enough to handle operation plan data for mobile objects and are not compatible with various operation management systems, limiting their ability to effectively convert data between different systems.
A data conversion device that extracts moving object information, including station and arrival/departure times, to generate a station/arrival/departure time structure graph, and integrates or duplicates information according to specific rules, allowing for the conversion of operation plan data between different systems.
Enables the conversion of operation plan data for mobile objects across various operation management systems, ensuring compatibility and versatility in data transfer.
Smart Images

Figure JP2024000017_31102024_PF_FP_ABST
Abstract
Description
Data conversion device and data conversion method Incorporation by Reference
[0001] This application claims priority from Japanese Patent Application No. 2023-071415, filed on April 25, 2023, the contents of which are incorporated herein by reference.
[0002] The present invention relates to a data conversion device and a data conversion method.
[0003] For example, operation plan data for mobile bodies that travel on fixed routes, such as trains and route buses, is managed by an operation management system adopted by an operating company such as a railway company. When converting the operation management system adopted by an operating company to another operation management system, for example, it is necessary to convert the operation plan data that was suitable for the original operation management system into operation plan data that is suitable for the destination operation management system.
[0004] Conventionally, to convert operation plan data, it was necessary to analyze the source and destination operation management systems and design and develop a data conversion device each time.
[0005] Regarding data conversion, for example, Patent Document 1 (JP 2018-072958 A) describes a data providing device that provides on-site data to a service device that provides a service using one or more pieces of on-site data collected at one or more sites, comprising: a storage unit that stores pre-registered explanatory information for each piece of on-site data, including specifications of the on-site data; explanatory information for the service, including the on-site data required by the service and the specifications of the on-site data; and a conversion rule for converting the specifications of the on-site data into specifications required by the service that uses the on-site data; and a field data conversion execution unit that, in response to a request to transfer the on-site data from the service device, refers to the explanatory information for the on-site data, the explanatory information for the service, and the conversion rule, converts all of the on-site data used by the service provided by the service device into data with the specifications required by the service, and transmits the data to the service device.
[0006] The data providing device described in Patent Document 1 can absorb the difference in granularity between source data and destination data. However, when converting operation plan data of a mobile object, simply absorbing the granularity is insufficient, and currently there is no data conversion device that can convert operation plan data of a mobile object while supporting various source and destination operation management systems.
[0007] The present invention has been made in consideration of the above points, and aims to provide a data conversion device, a data conversion method, and a data conversion system that have the versatility to accommodate various operation management systems that can convert operation plan data for mobile bodies.
[0008] The present application includes a number of means for solving at least part of the above-mentioned problems, examples of which are as follows.
[0009] In order to solve the above-mentioned problems, a data conversion device according to one aspect of the present invention is a data conversion device that converts source system operation plan data into destination system operation plan data, and includes one or more arithmetic units, one or more memory resources, and one or more storage devices, wherein the source system operation plan data is operation plan data for mobile objects that travel on a predetermined route and has a data structure suitable for the source system, and the destination system operation plan data is operation plan data for mobile objects that travel on a predetermined route and has a data structure suitable for the destination system, and the arithmetic unit extracts mobile object three-element information consisting of information on mobile objects, stations, and arrival and departure times from the source system operation plan data based on a source system mobile object three-element correspondence table and source system data structure information, and extracts station information from the source system operation plan data based on the mobile object three-element information, and extracts station information from the destination system operation plan data based on the mobile object three-element correspondence table and source system data structure ... the station / arrival / departure time structure graph generation unit that generates a station / arrival / departure time structure graph consisting of a station node table representing arrival and departure times and an inter-station element table; an inter-station element integration / duplication unit that integrates and duplicates information of each item in the inter-station element table that constitutes the station / arrival / departure time structure graph in accordance with an integration / duplication rule; a mobile unit combination / division unit that identifies a station at which the mobile unit switches based on source system before and after operation information and the source system operation plan data, and combines and divides the inter-station element table that constitutes the station / arrival / departure time structure graph into units of the mobile unit; and a destination system operation plan data creation unit that generates the destination system operation plan data based on the source system operation plan data, the station / arrival / departure time structure graph, and destination system data structure information.
[0010] According to the present invention, operation plan data of a mobile object can be converted with versatility that can be adapted to various operation management systems as source and destination of the conversion.
[0011] Problems, configurations, and effects other than those described above will become apparent from the following description of the embodiments.
[0012] FIG. 1 is a diagram illustrating an overview of the present invention. FIG. 2 is a diagram illustrating an example of the configuration of a data conversion system according to an embodiment of the present invention. FIG. 3 is a diagram illustrating an example of the configuration of a computer that realizes a data conversion device. FIG. 4 is a diagram illustrating an example of operation plan data for each system sample. FIG. 5 is a diagram illustrating an example of the data structure of pre- and post-operation information for each system sample. FIG. 6 is a diagram illustrating an example of the data structure of each system mobile object three-element correspondence table. FIG. 7 is a diagram illustrating an example of the data structure of each system data structure information. FIG. 8 is a flowchart illustrating an example of data conversion processing. FIG. 9A is a flowchart illustrating an example of mobile object switching information extraction processing. FIG. 9B is a diagram illustrating an example of mobile object switching information. FIG. 10A is a flowchart illustrating an example of station / arrival / departure time structure graph generation processing. FIG. 10B is a diagram illustrating an example of mobile object three-element information. FIG. 11 is a diagram illustrating an example of a station node table. FIG. 12 is a diagram illustrating an example of an inter-station element table. FIG. 13 is a diagram illustrating an image of a station / arrival / departure time structure graph. FIG. 14 is a flowchart illustrating an example of variation information extraction processing. FIG. 15 is a diagram illustrating the processing of steps S302 and S303. FIG. 16 is a diagram showing the processing of steps S304 to S310. FIG. 17 is a diagram showing an example of a display of a data conversion setting information list screen. FIG. 18 is a flowchart showing an example of inter-station element integration and duplication processing. FIG. 19 is a diagram showing the processing of step S503. FIG. 20 is a diagram showing the processing of steps S504 and S505. FIG. 21 is a flowchart showing an example of moving body combination and division processing. FIG. 22 is a diagram showing the processing of steps S602 and S603. FIG. 23 is a diagram showing the processing of steps S606 to S608. FIG. 24 is a diagram showing an example of converted system operation plan data.
[0013] An embodiment of the present invention will be described below with reference to the drawings. In all drawings used to describe the embodiment, identical components are generally designated by the same reference numerals, and repeated description thereof will be omitted. Furthermore, in the following embodiments, the components (including element steps, etc.) are not necessarily essential unless otherwise specified, or unless clearly considered essential in principle. Furthermore, when the terms "consisting of A," "composed of A," "having A," or "including A" are used, other elements are not excluded unless otherwise specified, or unless otherwise clearly considered to be only that element. Similarly, in the following embodiments, when referring to the shape, positional relationship, etc. of components, etc., the term includes those that are substantially similar or similar to the shape, etc., unless otherwise specified, or unless clearly considered otherwise in principle.
[0014] <Outline of the Present Invention> FIG. 1 is a diagram showing an outline of the present invention.
[0015] The present invention is used, for example, when converting an operation management system adopted by an operating company into another operation management system, to convert operation plan data that was suitable for the original operation management system (original system operation plan data) into operation plan data that is suitable for the destination operation management system (destination system operation plan data).
[0016] In addition to the examples described above, the present invention can also be applied to cases such as when trains of one railway company run on the lines of another railway company, when an operation control system used in Japan is exported to a foreign country, or when operation plan data managed by an operation control system is shared with other service systems (such as passenger information systems).
[0017] Specifically, the source system operation plan data is separated into three mobile object elements (mobile object, station, and arrival / departure time) and other attributes, with stations where mobile objects depart and arrive as nodes and routes between stations as edges, and a station / arrival / departure time structure graph is generated from the three mobile object elements. Furthermore, mobile object switching information and variation information are generated from each of the source system operation plan data and the destination system operation plan data. The source system operation plan data is then converted into destination system operation plan data based on the station / arrival / departure time structure graph, mobile object switching information, and variation information.
[0018] The mobile unit switching information is information that records the switching method (number change rules) associated with the mobile unit switching conditions at a station, specifically, the operation type (turnaround, splitting, merging, destination change, relay (track number change, destination change, etc.)) when the number (train number) representing a mobile unit that is physically connected at a station is changed.
[0019] Variation information is information that indicates the description format of the operation date and vehicle composition of a moving object.
[0020] In the following embodiments, a railroad train will be used as an example of a moving body. A train refers to a vehicle configuration consisting of one or more connected cars. However, the moving body is not limited to a railroad train, and includes buses, trams, monorails, and the like that run on a set route.
[0021] <Configuration Example of Data Conversion System 10 According to One Embodiment of the Present Invention> FIG. 2 shows a configuration example of a data conversion system 10 according to one embodiment of the present invention.
[0022] The data conversion system 10 includes a data conversion device 20, a source transportation service system 50 connected to the data conversion device 20 via a network 11, and a destination transportation service system 60.
[0023] The network 11 is a two-way communication network such as a LAN (Local Area Network), a WAN (Wide Area Network), or the Internet.
[0024] The source transportation service system 50 is, for example, a planning system that creates train operation plans. The destination transportation service system 60 is, for example, a traffic management system that manages train operations, or a passenger information system that manages travel information services using trains. The source transportation service system 50 and the destination transportation service system 60 can be one or more systems.
[0025] When multiple systems are installed in the destination transportation service system 60, in addition to being able to synchronize data between the source transportation service system 50 and the destination transportation service system 60, data can also be synchronized between the multiple systems installed in the destination transportation service system 60.
[0026] In addition, the source transportation service system 50 and the destination transportation service system 60 may be a planning system, an operation management system, a travel guidance system, or, for example, a timetable evaluation system, a delay prediction system, a traffic flow simulation system, etc.
[0027] In the following description, each system refers to the source transportation service system 50 and the destination transportation service system 60. The source transportation service system 50 may also be referred to as the source system, and the destination transportation service system 60 may also be referred to as the destination system.
[0028] The data conversion device 20 is realized by a general computer 100 (FIG. 3) such as a server computer or a personal computer.
[0029] 3 shows an example of the configuration of a general computer 100 that realizes the data conversion device 20. The computer 100 includes a processor 101 such as a CPU (Central Processing Unit), a memory 102 such as a DRAM (Dynamic Random Access Memory), a storage 103 such as a HDD (Hard Disk Drive) or an SSD (Solid State Drive), an input device 104 such as a keyboard, a mouse, or a media drive, an output device 105 such as a display, and a communication module 106 such as an Ethernet (registered trademark) card or a Wi-Fi (trademark) adapter.
[0030] The data conversion device 20 (computer 100) realizes the functional blocks of a data acquisition unit 21, a station / arrival / departure time structure graph generation unit 22, a setting information generation unit 23, and a data conversion unit 24 by having a processor 101 execute a program 107 stored in a memory 102.
[0031] The program 107 executed by the processor 101 may be stored in advance in the memory 102, or may be downloaded from a removable medium (CD-ROM, flash memory, etc.) or a predetermined server via the network 11, stored in the storage 103, which is a non-transitory storage medium, and read out from the storage 103 when needed. For this reason, the data conversion device 20 (computer 100) should preferably have an interface for reading data from removable media.
[0032] Furthermore, the data conversion device 20 may be a computer system configured on a single physical computer, or on multiple logically or physically configured computers, and may operate on a virtual computer constructed on multiple physical computer resources. For example, multiple programs that realize the functions of the data conversion device 20 may each operate on separate physical or logical computers, or multiple programs may be combined to operate on a single physical or logical computer.
[0033] The data conversion device 20 (computer 100 ) also stores integration and duplication rules 30 , an input DB (database) 31 , and an output DB 41 in the storage 103 .
[0034] The integration / duplication rules 30 record the integration / duplication processes to be executed and their priorities (the smaller the value, the higher the priority) in association with combinations of the variation types of the source transportation service system 50 and the destination transportation service system 60 (see FIG. 19). The priorities are set according to the variation type of the destination transportation service system 60, with the highest priority being set when the variation type is "value type" and the lowest priority being set when the variation type is "none."
[0035] The input DB 31 stores each system sample operation plan data 32, each system sample pre- and post-operation information 33, each system mobile body three-element correspondence table 34, each system data structure information 35, source system operation plan data 36, source system pre- and post-operation information 37, and destination system data structure information 38.
[0036] The output DB 41 stores a sample station / arrival / departure time structure graph 42 for each system, mobile object switching information for each system 43, system variation information 44, operation plan data for the converted system 45, and a station / arrival / departure time structure graph 46.
[0037] The data acquisition unit 21 acquires sample operation plan data, before-and-after operation information, a mobile body three-element correspondence table, and data structure information from each system, and stores them in the input DB 31 as each-system sample operation plan data 32, each-system sample before-and-after operation information 33, each-system mobile body three-element correspondence table 34, and each system data structure information 35. The data acquisition unit 21 also acquires source operation plan data, before-and-after operation information, and data structure information from the source transportation service system 50, and stores them in the input DB 31 as source system operation plan data 36, source system before-and-after operation information 37, and destination system data structure information 38.
[0038] The station / arrival / departure time structure graph generating unit 22 executes a sample station / arrival / departure time structure graph generating process (step S2 in FIG. 8) and a station / arrival / departure time structure graph generating process (step S4 in FIG. 8) which will be described later.
[0039] The setting information generation unit 23 is subdivided into a moving object switching information extraction unit 231 and a variation information extraction unit 232. The moving object switching information extraction unit 231 executes a moving object switching information extraction process (step S1 in FIG. 8 ) described later. The variation information extraction unit 232 executes a variation information extraction process (step S3 in FIG. 8 ) described later.
[0040] The data conversion unit 24 is subdivided into an inter-station element integration and duplication unit 241, a mobile unit combination and division unit 242, and a converted system operation plan data generation unit 243. The inter-station element integration and duplication unit 241 executes an inter-station element integration and duplication process (step S5 in FIG. 8 ) described later. The mobile unit combination and division unit 242 executes a mobile unit combination and division process (step S6 in FIG. 8 ) described later. The converted system operation plan data generation unit 243 executes a converted system operation plan data generation process (step S7 in FIG. 8 ) described later.
[0041] Next, Fig. 4 shows an example of the data structure of source system operation plan data 36, which is an example of each system sample operation plan data 32. Note that this figure is only an example of operation plan data, and the data structure differs depending on the system.
[0042] The source system operation plan data 36 consists of a train table, a station table, and an arrival / departure time table. The train table records information on each item, such as the station IDs of one or more stations where the train stops and the operation date, in association with a train number for identifying a single train. The station table records information on each item, such as the station code, time ID, running order (the order in which the train stops), and track number, in association with each station ID recorded in the train table. The arrival / departure time table records information on each item, such as the arrival time and departure time, in association with each time ID recorded in the station table.
[0043] In the example shown in the figure, for example, a train with train number "Tr-A" stops at stations with station IDs "St-A-A" and "St-A-B" in that order, and the train operates on Mondays. The station with station ID "St-A-A" has a station code of "St-A," a time ID of "Tm-A-A," is first in the running order (the order in which the train stops), and stops at platform "Pf-3." Furthermore, the time ID "Tm-A-A" in the arrival / departure time table indicates that the arrival time is "08:00:10" and the departure time is "08:02:20."
[0044] Next, FIG. 5 shows an example of the data structure of the pre- and post-operation information 33 for each system sample.
[0045] The previous and next operation information represents the relationship between the train number at the time of arrival of a train arriving at each station where turnaround, splitting, merging, destination change, relay, etc. occurs, and the train number at the time of departure of the train.Information on each item of the previous train number (train number at the time of arrival), the next train number (train number at the time of departure), and operation type (turnaround, splitting, merging, destination change, relay, etc.) is recorded in correspondence with the station code of the station where turnaround, splitting, merging, destination change, relay, etc. occurs.
[0046] In the case of the same figure, for example, when a train turns back at a station with station code "St-D," the train number of that train changes from "Tr-A" to "Tr-C." Also, when a train splits at a station with station code "St-C," the train number of that train is carried over from "Tr-A" without change.
[0047] Next, FIG. 6 shows, as an example of the system mobile object three-element correspondence table 34, a mobile object three-element correspondence table corresponding to the source system operation plan data 36 (FIG. 4).
[0048] The mobile object three-element correspondence table records information on each item of name and attribute name in association with each of the three elements (mobile object, station, arrival / departure time). Note that although the mobile object three elements are common to each system, the name and attribute names may differ depending on the system.
[0049] In the same figure, the name of "mobile object," one of the three elements, is "train," the attribute name is "train number," the name of "station," one of the three elements, is "station," the attribute name is "station code," the name of "arrival / departure time," one of the three elements, is "arrival / departure time," and the attribute names are "arrival time" and "departure time."
[0050] Next, FIG. 7 shows, as an example of each system data structure information 35, data structure information corresponding to the source system operation plan data 36 (FIG. 4).
[0051] The data structure information is associated with each table (train, station, arrival / departure time) of the operation plan data and records information on the attribute items of the table.
[0052] In the figure, the "Train" table has attributes such as train number and station ID, the "Station" table has attributes such as station code, time ID, running order, track number, etc., and the "Time" table has attributes such as time ID, arrival time, departure time, etc.
[0053] <Data Conversion Processing by Data Conversion Apparatus 20> Next, FIG. 8 is a flowchart showing an example of data conversion processing by the data conversion apparatus 20. In FIG.
[0054] As a premise for the data conversion process, the input DB 31 of the data conversion device 20 is assumed to store each system sample operation plan data 32, each system sample pre- and post-operation information 33, each system mobile body three-element correspondence table 34, each system data structure information 35, source system operation plan data 36, source system pre- and post-operation information 37, and destination system data structure information 38.
[0055] The data conversion process comprises steps S1 to S3 executed for the source system and the destination system, and steps S4 to S7 executed for the combination of the source system and the destination system.
[0056] The data conversion process is initiated, for example, in response to a predetermined operation by a user. First, each system is sequentially designated as a processing target, and the mobile object switching information extraction unit 231 executes a mobile object switching information extraction process by referring to each system sample pre- and post-operation information 33, thereby generating each system's mobile object switching information 43 and storing it in the output DB 41 (step S1).
[0057] <Details of the Mobile Object Switching Information Extraction Process (Step S1 in FIG. 8)> FIG. 9A is a flowchart showing an example of the mobile object switching information extraction process performed by the mobile object switching information extraction unit 231. As shown in FIG.
[0058] First, the mobile unit switching information extraction unit 231 acquires the pre- and post-operation information corresponding to the system to be processed from the system sample pre- and post-operation information 33 (step S101). Next, the mobile unit switching information extraction unit 231 classifies the pre- and post-operation information acquired in step S101 into operation types (turnaround, splitting, merging, destination change, relay, etc.) (step S102).
[0059] Next, the mobile unit switching information extraction unit 231 executes the processing of steps S103 to S105 for each operation type. First, the mobile unit switching information extraction unit 231 determines an operation type of interest and determines whether the train numbers of the preceding and succeeding trains will be changed at the station where the operation type of interest is performed (step S103). Here, if it is determined that the train numbers of the preceding and succeeding trains will be changed (YES in step S103), the mobile unit switching information extraction unit 231 proceeds to step S104.
[0060] Next, the mobile unit switching information extraction unit 231 checks the method (change rule) for switching the train numbers of the preceding and succeeding trains (step S104). Examples of methods for switching the train numbers of the preceding and succeeding trains include having the train number of the preceding train inherited by the succeeding train, increasing the train number of the preceding train (by incrementing the number by 1) and assigning it to the train number of the succeeding train, or assigning a train number to the succeeding train that has no regularity with the train number of the preceding train.
[0061] Next, the mobile unit switching information extraction unit 231 generates mobile unit switching information (Figure 9B) that records the train number switching method, corresponding to the operation type being considered, and registers it in each system mobile unit switching information 43 in the output DB 41 (step S105).
[0062] 9B shows an example of the mobile unit switching information generated in step S105. In this figure, for example, the operation type "return" is associated with the switching method "irregular," the operation type "split" is associated with the switching method "inherit," and the operation type "merge" is associated with the switching method "advance."
[0063] In step S103, if the mobile object switching information extraction unit 231 determines that the train numbers of the preceding and succeeding trains are not changed (NO in step S103), steps S104 and S105 are skipped. Then, when the processing of steps S103 to S105 for all operation types is completed, the mobile object switching information extraction processing is terminated.
[0064] Returning to Fig. 8 , next, the station / arrival / departure time structure graph generation unit 22 executes a sample station / arrival / departure time structure graph generation process with reference to each system sample operation plan data 32, each system mobile body three-element correspondence table 34, and each system data structure information 35, thereby generating each system sample station / arrival / departure time structure graph 42 and storing it in the output DB 41 (step S2).
[0065] <Details of Sample Station / Arrival / Departure Time Structure Graph Generation Processing (Step S2 in FIG. 8)> Next, FIG. 10A is a flowchart showing an example of sample station / arrival / departure time structure graph generation processing by the station / arrival / departure time structure graph generation unit 22.
[0066] First, the station / arrival / departure time structure graph generation unit 22 extracts the mobile object three-element information ( FIG. 10B ) from the operation plan data corresponding to the system to be processed, by referring to the sample operation plan data for each system 32, the system-mobile object three-element correspondence table 34, and the system data structure information 35. Furthermore, the station / arrival / departure time structure graph generation unit 22 adds a running order indicating the order in which trains stop at each station, based on the arrival and departure times of each mobile object (step S201).
[0067] 10B shows an example of the mobile object three-element information extracted in step S201. The mobile object three-element information records information on the mobile object, station, arrival and departure times, and running order of the three mobile object elements. In the example shown in FIG. 10B, for example, mobile object "Tr-A" departs from station "St-A" at "08:2:20," passes through stations "St-B" and "St-C," and arrives at station "St-D" at "08:38:25."
[0068] Next, the station / arrival / departure time structure graph generating unit 22 generates a station node table (FIG. 11) based on the combination of the station and arrival / departure time included in the extracted mobile object three-element information (step S202).
[0069] Fig. 11 shows an example of a station node table. In the station node table, station codes, arrival times, and departure times are recorded in association with station nodes. In the case of the same figure, for example, station node "B-1" is associated with station code "St-B", arrival time "08:06:45", and departure time "08:07:10". Note that even if the same station and arrival / departure times are the same, different moving bodies are assigned different station nodes.
[0070] Next, the station / arrival / departure time structure graph generating unit 22 generates an inter-station element table (FIG. 12) based on the information on the three moving object elements extracted in step S201 (step S203).
[0071] 12 shows an example of an inter-station element table. The inter-station element table contains information representing the departure and arrival stations of a moving object and their departure and arrival times, and records the moving object (train number), departure station node, arrival station node, departure station code, arrival station code, departure time, and arrival time in association with the inter-station element code. Inter-station element groups will be described later.
[0072] In the case of the same figure, for example, the inter-station element code "AB-1" is associated with the mobile unit (train number) [Tr-A], the departure station node "A-1", the arrival station node "B-1", the departure station code "St-A", the arrival station code "St-B", the departure time "08:02:00", and the arrival time "08:46:45".
[0073] Next, the station / arrival / departure time structure graph generation unit 22 classifies, among the inter-station elements in the inter-station element table generated in step S203, a plurality of inter-station elements that share the same origin station code, destination station code, departure time, and arrival time into the same inter-station element group, and classifies those that do not share the same code into different inter-station element groups (step S204). For example, in the case of Figure 12, the inter-station element code "AB-1" and the inter-station element code "AB-2" share the same origin station code, destination station code, departure time, and arrival time, and are therefore classified into the same inter-station element group "a."
[0074] Next, the station / arrival / departure time structure graph generation unit 22 stores the station node table generated in step S202 and the inter-station element tables classified into inter-station element groups in step S204 as a station / arrival / departure time structure graph corresponding to the system to be processed in the sample station / arrival / departure time structure graph 42 for each system in the output DB 41 (step S205). This completes the sample station / arrival / departure time structure graph generation process.
[0075] Fig. 13 shows an image of a station / arrival / departure time structure graph made up of the station node table shown in Fig. 11 and the inter-station element table shown in Fig. 12. The station / arrival / departure time structure graph represents the moving object (train number), the station node and station code of the station where the train stops, the arrival time and departure time at the station, and the inter-station element code to the next station where the train stops.
[0076] When generating a station / arrival / departure time structure graph corresponding to the source transportation service system 50, if there is a deficiency in the source system operation plan data, the station / arrival / departure time structure graph generation unit 22 interpolates the deficiency using information from the source system operation plan data that has the same station node or inter-station element to create a station / arrival / departure time structure graph.
[0077] Returning to Fig. 8, next, the variation information extraction unit 232 executes a variation information extraction process with reference to each system sample operation plan data 32, each system mobile object three-element correspondence table 34, and each system sample station / arrival / departure time structure graph 42, thereby generating each system variation information 44 and storing it in the output DB 41 (step S3).
[0078] <Details of Variation Information Extraction Process (Step S3 in FIG. 8)> FIG. 14 is a flowchart showing an example of the variation information extraction process performed by the variation information extraction section 232. As shown in FIG.
[0079] First, the variation information extraction unit 232 acquires a sample station / arrival / departure time structure graph corresponding to the system to be processed from each system sample station / arrival / departure time structure graph 42 (step S301).
[0080] Next, for each inter-station element group in the inter-station element table included in the sample station / arrival / departure time structure graph acquired in step S301, the variation information extraction unit 232 refers to the system mobile object three-element correspondence table 34 and identifies that the attribute name of the mobile object in the system to be processed is the train number. Then, from each system sample operation plan data 32, it acquires the inter-station elements belonging to the target inter-station element group, the mobile object (train number), and the vehicle composition, operation date, type, etc. corresponding to the mobile object information (train number) (step S302).
[0081] Figure 15 shows an example of information on inter-station elements belonging to the same inter-station element group a, moving bodies (train numbers), and vehicle composition, operation dates, type, etc. corresponding to the moving bodies (train numbers), obtained in step S302.
[0082] Next, the variation information extraction unit 232 refers to the information acquired in step S302 and detects attributes whose values vary depending on the inter-station element as candidates for variation attributes (step S303). For example, in the case of Figure 15, vehicle composition and operation date are detected as attributes whose values vary depending on the inter-station element.
[0083] Next, the variation information extraction unit 232 executes the processes of steps S304 to S310 for each attribute whose value varies depending on the inter-station element.
[0084] First, the variation information extraction unit 232 classifies non-target attributes, among the attributes whose values differ depending on the inter-station element, into the same value (step S304).
[0085] 16 shows the classification results of the example shown in FIG. 15. For example, when the operation date is the target attribute, if the vehicle composition, which is not the target attribute, is classified by the same value, the vehicle composition is classified into three types: "1, 2, 3," "4, 5, 6," and "1, 2, 3, 4, 5, 6." Also, for example, when the vehicle composition is the target attribute, if the operation date, which is not the target attribute, is classified by the same value, the vehicle composition is classified by day of the week, such as "Monday," "Tuesday," etc.
[0086] Next, the variation information extraction unit 232 refers to the classification result of step S304 and determines whether the attribute value of the target attribute in the all-station element group is singular (step S305). If it is determined that the attribute value is singular (YES in step S305), the variation information extraction unit 232 then determines whether the attribute values of the target attribute in the all-station element group are different (step S306). If it is determined that the attribute values of the target attribute in the all-station element group are different (YES in step S306), the variation information extraction unit 232 then designates the target attribute as a variation attribute, determines its type to be "value type," and records it in each system variation information 44 (step S307).
[0087] In step S306, if it is determined that the attribute values of the target attribute within the all-station element group are not different (identical) (NO in step S306), the target attribute is not designated as a variation attribute, and step S307 is skipped.
[0088] If it is determined in step S305 that the attribute value of the target attribute in the all-station element group is not singular (is plural) (NO in step S305), then the variation information extraction unit 232 determines whether or not there is an inclusion relationship between the attribute values of the target attributes (step S308).If it is determined that there is an inclusion relationship between the attribute values of the target attributes (YES in step S308), then the variation information extraction unit 232 designates the target attribute as a variation attribute, determines its type to be "subset type," and records this in each system variation information 44 (step S309).
[0089] If it is determined in step S308 that there is no inclusion relationship between the attribute values of the target attribute (NO in step S308), then the variation information extraction unit 232 designates the target attribute as a variation attribute, determines its type as "category type," and records this in each system variation information 44 (step S310). This completes the variation information extraction process.
[0090] In the case of FIG. 16 , for example, the attribute values "Monday," "Tuesday," etc. of the target attribute "operation date" are singular, but the values are different, so the variation type is determined to be "value type." Also, for example, the attribute values "1, 2, 3," "4, 5, 6," "1, 2, 3, 4, 5, 6," etc. of the target attribute "car configuration" are not singular (they are plural), and "1, 2, 3, 4, 5, 6" encompasses "1, 2, 3" and "4, 5, 6," so the variation type is determined to be "subset type." Also, although not shown, for example, if the attribute values of the target attribute "operation date" are "Monday, Tuesday, Wednesday, Thursday, Friday," "Saturday, Sunday, holiday," etc., these are not singular (they are plural), and there is no inclusion relationship, so the variation type is determined to be "category type."
[0091] As described above, steps S1 to S3 are executed for each system as the processing target, and then, for example, in response to an operation by a user specifying a combination of a source system and a destination system, steps S4 to S7 are executed for the combination of the source system and the destination system as the processing target.
[0092] FIG. 17 shows an example of a data conversion setting information list screen 1000 displayed as a UI screen presented to the user when a combination of a conversion source system and a conversion destination system is specified.
[0093] The data conversion setting information list screen 1000 displays a mobile object three-element correspondence table, variation information, and mobile object switching information corresponding to the conversion source system and the conversion destination system, respectively.
[0094] The user can check the source and destination mobile body three-element correspondence table, variation information, and mobile body switching information on the data conversion setting information list screen 1000. Furthermore, if there is an error or missing information in the source and destination mobile body three-element correspondence table, variation information, or mobile body switching information, the user can correct the error or add the missing information.
[0095] Returning to Fig. 8, next, for example, a combination of a source system and a destination system designated by the user is set as a processing target, and the station / arrival / departure time structure graph generating unit 22 executes a source station / arrival / departure time structure graph generating process by referring to the each-system mobile object three-element correspondence table 34, each system data structure information 35, and the source system operation plan data 36, thereby generating a station / arrival / departure time structure graph 46 and storing it in the output DB 41 (step S4). Note that the source station / arrival / departure time structure graph generating process is similar to the sample station / arrival / departure time structure graph generating process (step S2), and therefore a description thereof will be omitted.
[0096] Next, the inter-station element integration / duplication unit 241 updates the station / arrival / departure time structure graph 46 by executing the inter-station element integration / duplication process with reference to the integration / duplication rules 30, the source system operation plan data 36, each system variation information 44, and the station / arrival / departure time structure graph 46 (step S5).
[0097] <Details of Inter-Station Element Integration and Replication Processing (Step S5 in FIG. 8)> FIG. 18 is a flowchart showing an example of inter-station element integration and replication processing performed by the inter-station element integration and replication unit 241.
[0098] First, the inter-station element integration / duplication unit 241 acquires the station / arrival / departure time structure graph 46 (generated in step S4) based on the source system operation plan data 36 from the output DB 41 (step S501). Next, the inter-station element integration / duplication unit 241 acquires variation information corresponding to the source system and the destination system from each system variation information 44 (step S502). Next, the inter-station element integration / duplication unit 241 refers to the integration / duplication rules 30 and determines the integration / duplication processes to be executed and the execution order thereof (step S503).
[0099] FIG. 19 is a diagram showing the processing of step S503. For example, as shown in FIG. 19, assume that the variation information in the source system has the variation attribute "Vehicle Composition" of type "subset type" and the variation attribute "Operation Date" of type "value type," and the variation information in the destination system has the variation attribute "Operation Date" of type "classification type." In this case, the variation type of the variation attribute "Vehicle Composition" in the source system is "subset type" and the variation type in the destination system is "none," so the process on line 9, "List and integrate elements of the union of values, priority 3," is determined to be executed. Furthermore, the variation type of the variation attribute "Operation Date" in the source system is "value type" and the variation type in the destination system is "classification type," so the process on line 1, "List and integrate values into defined groups, priority 2," is determined to be executed. Furthermore, the process for the variation attribute "Operation Date" has a higher priority than the process for the variation attribute "Vehicle Composition," so the process order for the variation attribute "Operation Date" is determined to be first, and the process order for the variation attribute "Vehicle Composition" is determined to be second. If the priorities are equal, the order of processing may be determined by any method.
[0100] Next, the inter-station element integration / duplication unit 241 refers to the inter-station element table that constitutes the station / arrival / departure time structure graph 46, designates each inter-station element group as a processing target, and executes the processes of steps S504 and S505. First, the inter-station element integration / duplication unit 241 refers to the source system operation plan data 36, and assigns attribute values of the variation information to the inter-station elements of the inter-station element group to be processed (step S504). Next, the inter-station element integration / duplication unit 241 executes the integration / duplication processes determined in step S503 in the execution order (step S505).
[0101] FIG. 20 is a diagram illustrating the processing of steps S504 and S505. For example, if the processing target is inter-station element group a, for example, the inter-station element "AB-1" belonging to inter-station element group a is assigned attribute values "1, 2, 3" for the variation attribute "vehicle composition" and attribute value "Mon" for the variation attribute "operation date." The same process is performed for other inter-station elements (step S504). Next, a process is performed to "list and integrate the values of 'operation date' into defined groups." As a result, the attribute values of the variation attribute "operation date" are listed as "Mon, Tue, Wed, Thu, Fri." Next, a process is performed to "list and integrate the elements of the union of the values of 'vehicle composition'." As a result, the attribute values of the variation attribute "vehicle composition" are listed as "1, 2, 3, 4, 5, 6." Note that in the integration and duplication process, inter-station elements, moving objects, departure station nodes, destination station nodes, etc. (not shown in FIG. 20) are also listed.
[0102] After executing the processes of steps S504 and S505 for all inter-station element groups, the inter-station element integration / duplication unit 241 then updates the inter-station element tables that make up the station / arrival / departure time structure graph 46 to those after the integration / duplication process (step S506). This completes the inter-station element integration / duplication process.
[0103] Returning to Fig. 8 , next, the moving entity combining / splitting unit 242 refers to the source system operation plan data 36, the source system before and after operation information 37, the respective system moving entity switching information 43, and the respective system variation information 44, and executes a moving entity combining / splitting process to update the station / arrival / departure time structure graph 46 (step S6).
[0104] <Details of Moving Body Combining and Dividing Process (Step S6 in FIG. 8)> FIG. 21 is a flowchart showing an example of the moving body combining and dividing process performed by the moving body combining and dividing unit 242. As shown in FIG.
[0105] First, the moving object combining / dividing unit 242 acquires the station / arrival / departure time structure graph 46 (updated through step S3) based on the source system operation plan data 36 from the output DB 41 (step S601).
[0106] Next, the mobile entity combining / splitting unit 242 refers to the inter-station element table that constitutes the station / arrival / departure time structure graph 46, and executes the processes of steps S602 and S603 for the combination of adjacent inter-station element groups across the same station node list. The combination of adjacent inter-station element groups across the same station node list refers to the combination of inter-station element groups whose arrival station node and departure station node match.
[0107] First, the moving entity combining / splitting unit 242 determines whether the attributes "vehicle composition" and "operation date" of the combination of inter-station element groups have the same attribute values (step S602). If it is determined that the attributes have the same attribute values (YES in step S602), the moving entity combining / splitting unit 242 then assigns the same moving entity number to the combination of inter-station element groups (step S603). Note that if it is determined that the attributes "vehicle composition" and "operation date" of the combination of inter-station element groups do not have the same attribute values (NO in step S602), the processing of step S603 is skipped.
[0108] 22 is a diagram showing the processing of steps S602 and S603. In the case of the figure, for example, the destination station node of inter-station element group a in the first row matches the departure station node of inter-station element group b in the third row, so the inter-station element groups a and b are a combination of adjacent inter-station element groups across the same station node list. Furthermore, since the attribute values of the attributes "vehicle composition" and "operation day" of this combination of inter-station element groups are the same ("1, 2, 3, 4, 5, 6") and "Monday, Tuesday, Wednesday, Thursday, Friday," the same mobile unit number "Tr-XXX" is assigned to the inter-station element groups a and b.
[0109] Next, the mobile entity combining / splitting unit 242 refers to the respective system mobile entity switching information 43 and acquires the mobile entity switching information of the source transportation service system 50 and the destination transportation service system 60 (step S604). Next, the mobile entity combining / splitting unit 242 acquires the source system before and after operation information 37 (step S605).
[0110] Next, the mobile unit combining / dividing unit 242 compares the mobile unit switching information of the source transportation service system 50 with the mobile unit switching information of the destination transportation service system 60, and identifies an operation type that does not exist in the mobile unit switching information of the source transportation service system 50 but does exist in the mobile unit switching information of the destination transportation service system 60. Furthermore, the mobile unit combining / dividing unit 242 identifies stations where previous and next operations of the identified operation type occur (stations where a change in train number occurs) based on the source system previous and next operation information 37 (step S606).
[0111] Next, the mobile entity combining / splitting unit 242 sequentially focuses on the stations identified in step S606, and executes the processes of steps S607 and S608. First, the mobile entity combining / splitting unit 242 refers to the inter-station element table of the station / arrival / departure time structure graph 46, and acquires inter-station elements before and after the focused station (inter-station elements with the focused station as the arrival station node and inter-station elements with the focused station as the departure station node) that have the same mobile entity number assigned (step S607).
[0112] Next, the mobile unit combining / splitting unit 242 changes the same mobile unit numbers assigned to the inter-station elements before and after the station of interest obtained in step S607 according to a switching method corresponding to the operation type occurring at the station of interest (step S608).
[0113] FIG. 23 is a diagram illustrating the processing of steps S606 to S608. For example, as shown in FIG. 23, if the original mobile unit switching information only records "return" as the operation type, and the new mobile unit switching information records "return," "relay," "merge," and "split" as the operation types, in step S606, stations where the operation types "relay," "merge," and "split" occur are identified. Then, for example, if it is identified that "relay" occurs at station D, in step S607, of the inter-station elements d and e before and after station D, those that have the same mobile unit number "Tr-ZZZ" are acquired. Then, the mobile unit number of inter-station element d is changed to "Tr-ZZZ1," and the mobile unit number of inter-station element e is changed to "Tr-ZZZ2." This completes the mobile unit combining / splitting processing.
[0114] Returning to Fig. 8, next, the converted system operation plan data generation unit 243 executes a converted system operation plan data generation process by referring to the source system operation plan data 36, the converted system data structure information 38, and the station / arrival / departure time structure graph 46, and stores the converted system operation plan data 45 obtained as a result in the output DB 41 (step S7).
[0115] 24 shows an example of the converted system operation plan data 45. The converted system operation plan data 45 records information such as StatinCode, Arr, Dep, OperationDay, VehicleComposition, and TrainClass in association with TrainCode.
[0116] As is clear from a comparison between the destination system operation plan data 45 and the source system operation plan data 36 (FIG. 4), the destination system operation plan data 45 and the source system operation plan data 36 (FIG. 4) contain essentially the same information content, but differ in data structure such as the names and order of each item. In other words, the data conversion device 20 can convert the source system operation plan data 36 (FIG. 4) into destination system operation plan data 45, which has a different data structure.
[0117] The present invention is not limited to the above-described embodiments and various modifications are possible. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to those including all of the described configurations. Furthermore, it is possible to replace part of the configuration of one embodiment with or add to the configuration of another embodiment.
[0118] Furthermore, some or all of the aforementioned configurations, functions, processing units, processing means, etc. may be implemented in hardware, for example, by designing them as integrated circuits. Furthermore, the aforementioned configurations, functions, etc. may be implemented in software by a processor interpreting and executing a program that implements each function. Information such as programs, tables, and files that implement each function may be stored in memory, a recording device such as a hard disk or SSD (Solid State Drive), or a recording medium such as an IC card, SD card, or DVD. Furthermore, the control lines and information lines shown are those considered necessary for explanation, and do not necessarily represent all control lines and information lines in the product. In reality, it can be assumed that almost all components are interconnected.
Claims
1. A data conversion device for converting source system operation plan data into destination system operation plan data, comprising one or more arithmetic devices, one or more memory resources, and one or more storage devices, wherein the source system operation plan data is operation plan data for a mobile object traveling on a set route, and has a data structure suitable for the source system, and the destination system operation plan data is operation plan data for a mobile object traveling on a set route, and has a data structure suitable for the destination system, wherein the arithmetic device extracts mobile object three-element information consisting of information on a mobile object, a station, and arrival and departure times from the source system operation plan data based on a source system mobile object three-element correspondence table and source system data structure information, and generates a station and arrival time structure graph consisting of a station node table representing stations and arrival and departure times traveled by a mobile object and an inter-station element table based on the mobile object three-element information, and wherein the arithmetic device integrates and replicates information of each item in the inter-station element table that constitutes the station and arrival and departure time structure graph according to an integration and replication rule, a mobile unit combining / splitting unit that identifies a station where the mobile unit is to be switched based on a source system before and after operation information and the source system operation plan data, and combines / splits the inter-station element table that constitutes the station / arrival / departure time structure graph into units of the mobile unit; and a destination system operation plan data creation unit that generates the destination system operation plan data based on the source system operation plan data, the station / arrival / departure time structure graph, and the destination system data structure information.
2. A data conversion device as described in claim 1, wherein the inter-station element integration / duplication unit sets inter-station element groups having the same arrival / departure times at the same station in the inter-station element table that constitutes the station / arrival / departure time structure graph, and integrates and duplicates information of each item in the inter-station element table for each inter-station element group.
3. A data conversion device as described in claim 1, wherein the calculation device has a mobile unit switching information extraction unit which extracts, from the sample pre- and post-sample operation information for each of the source system and the destination system, an operation type in which switching of identification numbers for physically connected mobile units occurs and a method of switching the identification numbers as mobile unit switching information, and the mobile unit combining / splitting unit combines and splits the inter-station element table constituting the station / arrival time structure graph into units of the mobile unit based on the difference in the mobile unit switching information between the source system and the destination system.
4. A data conversion device as described in claim 3, wherein the inter-station element integration / duplication unit sets inter-station element groups having the same arrival / departure times at the same station in the inter-station element table that constitutes the station / arrival / departure time structure graph, and the mobile unit combination / division unit assigns a common provisional mobile unit number to adjacent inter-station element groups in the inter-station element table that have the same attribute values related to mobile units, and then changes the provisional mobile unit numbers based on the difference in the mobile unit switching information between the source system and the destination system.
5. A data conversion device as described in claim 1, wherein the calculation device has a variation information extraction unit that extracts, for each of the source system and the destination system, variation information that indicates conditions under which variations occur in the moving object from sample operation plan data, a sample station / arrival / departure time structure graph based on the sample operation plan data, and a moving object three-element correspondence table based on the sample station / arrival / departure time structure graph, and the inter-station element integration / duplication unit determines an integration / duplication process to be executed from among a plurality of integration / duplication processes defined by the integration / duplication rules based on the difference in the variation information between the source system and the destination system.
6. A data conversion device as described in claim 5, characterized in that the variation information extraction unit sets at least one of the vehicle composition and operation days of the moving body as variation attributes, and generates the variation information by classifying the description method of the attribute value of the variation attribute into a variation type.
7. A data conversion device as described in claim 6, characterized in that the inter-station element integration / duplication unit determines, for each variation attribute, an integration / duplication process to be executed from among a plurality of integration / duplication processes defined by the integration / duplication rules based on the combination of the variation types of the source system and the destination system.
8. A data conversion device as described in claim 6, characterized in that the inter-station element integration / duplication unit determines the execution order of the integration / duplication process in accordance with the priority set in the integration / duplication rules based on the variation type of the conversion destination system.
9. A data conversion device as described in claim 1, characterized in that, when there is a deficiency in the source system operation plan data, the station / arrival / departure time structure graph generation unit interpolates the deficiency using information of the same station node or inter-station element in the source system operation plan data.
10. A data conversion method by a data conversion device in which a computer converts source system operation plan data into destination system operation plan data, the source system operation plan data being operation plan data for a moving object traveling on a predetermined route and having a data structure suitable for the source system, the destination system operation plan data being operation plan data for a moving object traveling on a predetermined route and having a data structure suitable for the destination system, the computer having one or more arithmetic units, one or more memory resources, and one or more storage devices, the arithmetic unit extracting mobile object three-element information consisting of information on a moving object, a station, and arrival and departure times from the source system operation plan data based on a source system mobile object three-element correspondence table and source system data structure information, and generating a station / arrival and departure time structure graph consisting of a station node table showing stations and arrival and departure times through which a moving object moves, and an inter-station element table based on the mobile object three-element information; a station-to-station element integrating / duplicating step in which the arithmetic device integrates and duplicates information of each item in the station-to-station element table that constitutes the station / arrival / departure time structure graph in accordance with an integration / duplicating rule; a moving body combining / splitting step in which the arithmetic device identifies a station at which the moving body is to be switched based on a source system before and after operation information and the source system operation plan data, and combines and splits the station-to-station element table that constitutes the station / arrival / departure time structure graph into units of the moving body; and a destination system operation plan data creating step in which the arithmetic device generates the destination system operation plan data based on the source system operation plan data, the station / arrival / departure time structure graph, and the destination system data structure information.
Citation Information
Patent Citations
Data integration device and data integration method
JP2018060430A
Data providing device and data providing method
JP2018072958A
