Information processing device, information processing method, and program

The smart agricultural system automates the recording and prediction of agricultural tasks by processing sensor data from farmers, addressing the inefficiency of manual recording and prediction in current systems.

WO2024225077A1PCT designated stage expired Publication Date: 2024-10-31OMRON CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/014811
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-24
Filing Date
2024-04-12
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

Current agricultural information processing systems require farmers to manually record work progress and predict future tasks, which is burdensome and inefficient.

Method used

An information processing device that acquires agricultural worker behavior data using sensors and estimates work progress, automating the recording and prediction of agricultural tasks through a smart agricultural system, including a server that processes and analyzes data from various sensors to provide work history and future task determination.

Benefits of technology

Automates the recording of agricultural work history and predicts future tasks, reducing farmer burden and improving efficiency by using sensor data to estimate and manage agricultural work processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024014811_31102024_PF_FP_ABST
    Figure JP2024014811_31102024_PF_FP_ABST
Patent Text Reader

Abstract

The purpose of the present invention is to provide an information processing device, an information processing method, and a program which make it possible to more easily record a history of agricultural work from action information pertaining to a person involved in agriculture. Provided is an information processing device comprising: an acquisition unit that acquires action information which pertains to an agricultural worker and which has been obtained via a sensor; an estimation unit that estimates information relating to agricultural work on the basis of the action information; and a management unit that records the information relating to the agricultural work which has been estimated by the estimation unit.
Need to check novelty before this filing date? Find Prior Art

Description

Information processing device, information processing method, and program

[0001] The present invention relates to an information processing device, an information processing method, and a program.

[0002] To facilitate the input of agricultural information during farm work, technology has been proposed that provides a voice input interface. For example, Patent Literature 1 discloses an information processing system that includes a terminal with a dialogue control unit that asks a farmer for the type of work to be done by voice and performs voice recognition on the farmer's response, and a server that stores the work indicated by the farmer's voice-recognized response in association with farmland.

[0003] Japanese Patent Application Laid-Open No. 2022-052569

[0004] In the system described in Patent Document 1, the terminal needs to confirm the work with the farmer by voice and receive a response. However, from the perspective of further reducing the burden on the farmer, it is desirable to automatically record the progress of the farm work process and predict the timing and content of the next farm work process based on the record.

[0005] The present invention has been made in consideration of the above-mentioned problems, and aims to provide an information processing device, information processing method, and program that can more easily record agricultural work history from agricultural worker behavior information.

[0006] An information processing device according to one aspect of the present invention has an acquisition unit that acquires behavioral information of agricultural workers obtained by a sensor, an estimation unit that estimates information related to agricultural work based on the behavioral information, and a management unit that records the information related to the agricultural work estimated by the estimation unit.

[0007] According to the present invention, it is possible to provide an information processing device, an information processing method, and a program that can more easily record the history of farm work from the behavioral information of farmers.

[0008] It is a conceptual diagram of a smart agriculture system. It is a diagram showing an example of the configuration of a server of this embodiment. It is a diagram showing an example of work history data. It is a diagram showing an example of basic farm work data. It is a diagram showing an example of a display screen based on basic farm work data 252. It is a schematic diagram showing one aspect of a screen whose display is controlled by a display control unit. It is a diagram showing a processing sequence.

[0009] Hereinafter, an embodiment of the present invention (hereinafter referred to as "the present embodiment") will be described in detail with reference to the drawings as necessary. However, the present invention is not limited to this embodiment, and various modifications are possible without departing from the spirit of the present invention. In the drawings, the same elements are given the same reference numerals, and redundant explanations will be omitted. Furthermore, positional relationships such as up, down, left, and right are based on the positional relationships shown in the drawings unless otherwise specified. Furthermore, the dimensional ratios of the drawings are not limited to those shown in the drawings.

[0010] 1. System Figure 1 is a schematic diagram showing a smart agriculture system of this embodiment. As shown in Figure 1, in one example of the smart agriculture system of this embodiment, various sensors such as fixed sensors 310, wearable devices 320, self-propelled sensors 330, and flying sensors 340 are used to acquire behavioral information of agricultural workers, and an information processing device (server 200) may estimate information about the agricultural work, such as the type of agricultural work and the details of the identified type of agricultural work, based on the behavioral information, and store this information as, for example, a work history.

[0011] This allows agricultural workers to accumulate work history without having to record the work history on paper media such as a notebook, or by operating the input interface of a terminal such as a personal computer.

[0012] In the system of this embodiment, each process such as collecting various types of data, recording the collected data, analyzing the collected data, and providing the analysis results may be realized by a measuring device or a server installed in the field, or a combination of these, as shown in Figure 1.

[0013] FIG. 1 is a conceptual diagram showing the relationship between terminals and sensors used in a farm field and a cloud server (hereinafter also simply referred to as "server") in the smart agriculture system of this embodiment. As shown in FIG. 1, the smart agriculture system 1 of this embodiment may include a server 200, a measurement device 300, and an operation device 400. The server 200, the measurement device 300, and the operation device 400 may be connected via a network N. Below, each component will be described in detail assuming that the information processing device of this embodiment is the server 200.

[0014] 1.1. Server In the smart agriculture system 1, the server 200 may be a cloud server or an edge server. The edge server may be installed in or near the field and perform data processing and analysis. This reduces communication delays because data is processed on the edge server side without being sent to a cloud server. The server 200 may also be a terminal with the same functions as an edge server.

[0015] 2A , the hardware configuration and functional configuration of the server 200 will be described. The server 200 includes, for example, a processor 210, a communication interface 220, an input / output interface 230, a memory 240, a storage 250, and one or more communication buses 260 for interconnecting these components.

[0016] The server 200 may be, for example, a desktop, a laptop, or other computer. The server 200 is a general-purpose computer and may be configured as a single computer or multiple computers distributed over a network N.

[0017] The processor 210 executes processes, functions, or methods implemented by code or instructions included in a program stored in the storage 250. The processor 210 may include, for example and without limitation, one or more central processing units (CPUs), microprocessing units (MPUs), graphics processing units (GPUs), microprocessors, processor cores, multiprocessors, application-specific integrated circuits (ASICs), field programmable gate arrays (FPGAs), etc., and may implement the processes, functions, or methods disclosed in each embodiment by logic circuits (hardware) formed in integrated circuits (IC (Integrated Circuit) chips, LSIs (Large Scale Integration)), etc., or dedicated circuits.

[0018] As shown in FIG. 2A , the processor 210 of this embodiment may be configured to function as a transceiver unit 211, an acquisition unit 212, an estimation unit 213, a management unit 214, a work determination unit 215, a work instruction unit 216, a display control unit 217, and a sensing device management unit 218.

[0019] The communication interface 220 transmits and receives various data to and from other devices via the network N. The communication may be performed either wired or wirelessly, and any communication protocol may be used as long as mutual communication is possible. For example, the communication interface 220 may be implemented as hardware such as a network adapter, various types of communication software, or a combination of these.

[0020] The network N may be, by way of example and not limitation, an ad hoc network, an intranet, an extranet, a virtual private network (VPN), a local area network (LAN), a wireless LAN (WLAN), a wide area network (WAN), a wireless WAN (WWAN), a metropolitan area network (MAN), a portion of the Internet, a portion of the public switched telephone network (PSTN), a cellular network, integrated service digital networks (ISDNs), wireless LANs, long term evolution (LTE), code division multiple access (CDMA), Bluetooth, satellite communications, or the like, or any combination thereof. A network may include one or more networks.

[0021] The input / output interface 230 includes an input device for inputting various operations to the server 200, and an output device for outputting processing results processed by the server 200. For example, the input / output interface 230 includes information input devices such as a keyboard, a mouse, and a touch panel, and information output devices such as a display. Note that the server 200 may receive a predetermined input or execute a predetermined output by connecting an external input / output interface 230.

[0022] The memory 240 temporarily stores programs loaded from the storage 250 and provides a working area for the processor 210. The memory 240 also temporarily stores various data generated while the processor 210 is executing the programs. The memory 240 may be, for example, a high-speed random access memory such as a DRAM, an SRAM, a DDR RAM, or another random access solid-state storage device, or a combination of these.

[0023] The storage 250 stores programs, each functional unit, and various data. The storage 250 may be, for example, one or more magnetic disk storage devices, optical disk storage devices, flash memory devices, or nonvolatile memories such as other nonvolatile solid-state storage devices, or a combination thereof. Another example of the storage 250 may be one or more storage devices installed remotely from the processor 210.

[0024] The storage 250 may store work history data 251, basic farm work data 252, and the like, as described below.

[0025] 1.1.1. Transmitter / Receiver The transmitter / receiver 211 may function as a transmitter that transmits various types of information to other devices such as the measurement device 300 via the communication interface 220 and the network N, or as a receiver that receives various types of information from other devices such as the measurement device 300.

[0026] For example, the transmitter / receiver unit 211 may transmit acquisition commands such as information on the behavior of agricultural workers in a field to the measuring device 300, and the acquisition unit 212 may acquire information on the behavior of agricultural workers from the measuring device 300 equipped with a sensor via the transmitter / receiver unit 211.

[0027] The acquisition unit 212 acquires behavioral information of farm workers obtained by the sensors. Specifically, the acquisition unit 212 may receive behavioral information of farm workers from one or more measurement devices 300 via the transmission / reception unit 211.

[0028] Alternatively, if various measurement data from within the farm field has been stored in advance in another database, the acquisition unit 212 may refer to the other database to acquire information on the behavior of farmworkers and other information. Note that the other database may be an external database in which weather data and the like are recorded, or may be any database within the smart agriculture system.

[0029] Furthermore, the acquisition unit 212 may execute both a method of acquiring behavioral information from the measurement device 300 and a method of acquiring behavioral information and other information by referring to a database. For example, the acquisition unit 212 may acquire behavioral information from the measurement device 300, and refer to a database to acquire environmental information such as the weather and temperature at the time the behavioral information was acquired, and the management unit 214 (described later) may associate the information and record it in the work history data 251. The estimation unit 213 may estimate information about agricultural work by referring to the work history data 251 in which information acquired by various sensors, such as behavioral information and environmental information, is recorded. Furthermore, when the management unit 214 modifies information about agricultural work, the environmental information in the work history data 251 may be referenced.

[0030] 2B shows an example of the data structure of the work history data 251. As shown in FIG. 2B , the management unit 214, which will be described later, may record the behavior information acquired by the acquisition unit 212 in association with location information at which the behavior information was acquired, date and time information at which the behavior information was acquired, and the like.

[0031] For example, the progress of agricultural work can be managed for each section within a field, such that bud removal has been completed in section A, but not yet in section B. This allows the estimation unit 213 to estimate information about agricultural work based on the work history for each section within the field. Specifically, in the above example, the estimation unit 213 can estimate that the work performed by the farm worker in section A is pollination work, which follows bud removal, and that the work performed by the farm worker in section B is bud removal, even if the work is performed at the same time.

[0032] Furthermore, the work determination unit 215, which will be described later, can determine the type and content of the agricultural work that the farmer will subsequently perform, based on the work history for each section within the field. Specifically, as described above, it can determine that the next work for the farmer in section A will be pollination work, and that the next work for the farmer in section B will be bud removal work. In addition, for periodic farm work such as weeding and pest control (disease prevention), which occurs periodically, the work determination unit 215 can plan where and when the next work is needed by referring to information on when and where the work was last performed, based on the work history for each section within the field.

[0033] Measuring device 300 may be any device that acquires behavioral information of farmworkers using sensors, and may also have other functions such as measuring crops 520 in field 500 using similar sensors to acquire image information and other information about the crops. There are no particular limitations on measuring device 300, and it may be, for example, a device equipped with various sensors installed at any position in the field, a drone equipped with various sensors that flies within the field or an unmanned aerial vehicle that propels itself within the field, a smartphone equipped with various sensors, a handheld computing device, a wearable terminal, or other terminal operated by a person.

[0034] Here, the sensors for acquiring the behavioral information of the farmworker are not particularly limited, but examples thereof include an image sensor, a motion sensor, a vital sensor, etc. Other sensors included in the measuring device 300 include a component sensor and an environmental sensor.

[0035] The image sensor is not particularly limited as long as it is a sensor that can capture still or video images of the farmworker. For example, as shown in Fig. 1, the image sensor may be a sensor mounted on a drone, a fixed camera installed in the field, a camera on a terminal such as a wearable device, or a camera installed on a self-propelled measuring device 330. Here, the wearable device is not particularly limited, and examples thereof include a neck-mounted type, a glasses-type, a head-mounted type, and a wristwatch-type.

[0036] The motion sensor is not particularly limited as long as it is a sensor that can measure information about the movements of a farm worker. Examples of the motion sensor include an inertial sensor such as an acceleration sensor and a gyro sensor, and a geomagnetic sensor.

[0037] The vital sensor is not particularly limited as long as it is a sensor that can measure or estimate the vital signs of a farm worker. Examples of vital sensors include sensors that acquire vital signs such as respiratory rate, heart rate, blood pressure, and body temperature and measure them as measurement information. The vital sensor may be a sensor that is worn on the body to measure, such as a blood pressure monitor, or a non-contact sensor that measures heartbeat and heart rate.

[0038] The component sensor is not particularly limited, but examples thereof include sensors configured to be capable of performing predetermined analyses such as fluorescent analysis and spectroscopic analysis.

[0039] The environmental sensor is a sensor for measuring environmental information in the field of the crops 520. Examples of environmental sensors include, but are not limited to, weather sensors, soil sensors, and gas sensors. The soil sensor may be a sensor that acquires information about the soil, such as the amount of moisture, nutrients, acidity, and underground temperature. The weather sensor may be a sensor that acquires information about the weather, such as temperature, humidity, amount of sunlight, sunlight intensity, hours of sunlight, amount of rainfall, and weather. The environmental sensor is not limited to a soil sensor and a weather sensor, and any sensor that can measure various types of environmental information in the field may be used.

[0040] The estimation unit 213 estimates the type of agricultural work and the details of the identified type of agricultural work based on the behavioral information. For example, if a sensor acquires still image data or video data as behavioral information, the estimation unit 213 may use an image recognition model to output the type of agricultural work and the details of the identified type of agricultural work.

[0041] The image recognition model may be created using a library or the like used in image processing using a known method, through steps such as preparing training data, constructing an image recognition model using the training data, and evaluating the constructed image recognition model. Note that the training data may be data in which still image data or video data is associated with the type and content of agricultural work.

[0042] In addition, the estimation unit 213, using an image recognition model, may estimate information about agricultural work, such as the type of agricultural work and the details of the agricultural work whose type has been identified, by estimating the actions being performed by the agricultural worker from an image showing the agricultural worker.

[0043] Alternatively, the estimation unit 213 may use an image recognition model to estimate information about agricultural work by comparing images of the crop before the work with images of the crop after the work, and inferring the actions of the farmworker on the crop from changes in the crop. For example, the estimation unit 213 can infer bud or flower thinning if it detects that buds or flowers have been thinned out from the image, infer harvesting if it detects a decrease in fruit, infer disease control work if it detects that diseased leaves or fruit have been removed or that pesticides have been applied, and infer irrigation if it detects that water has been applied. In addition, the estimation unit 213 may use changes in the appearance of the crop due to agricultural work, such as removing leaves, thinning out leaves, removing branches, thinning out branches, or training branches, to estimate the agricultural work.

[0044] Here, the types of agricultural work are not particularly limited, but include, for example, bud removal, pruning, flower removal, fruit removal, pollination, weeding, pesticide spraying, fertilization, top dressing, watering, and the like, as well as general work necessary for growing agricultural crops, without being particularly limited to these.

[0045] Furthermore, the content of the agricultural work is not particularly limited, but examples include information that quantitatively evaluates the agricultural work, such as the time required for the agricultural work and the amount of fruit thinned, and information that qualitatively evaluates the agricultural work, such as effective methods of fertilization and pesticide spraying.

[0046] In addition, when motion data such as acceleration is acquired as behavioral information, the estimation unit 213 may use a motion recognition model to output the type of agricultural work and the details of the agricultural work whose type has been identified.

[0047] The motion recognition model may be created using a library or the like used for motion data in a known manner, through steps such as preparing training data, constructing a motion recognition model using the training data, and evaluating the constructed motion recognition model. Note that the training data may be data in which motion data is associated with the type of farm work and the content of the farm work.

[0048] The estimation unit 213 may estimate the type of agricultural work based on at least one of past work history, type of crop, agricultural work plan, crop growth state, time of agricultural work, and environmental data before the agricultural work. When a learning model such as an image recognition model or a motion recognition model is used, the model may be a model that receives as input behavioral information and at least one selected from the group consisting of past work history, type of crop, agricultural work plan, time of agricultural work, and environmental data before the agricultural work, and outputs the type of agricultural work and the details of the agricultural work for which the type has been identified.

[0049] This allows for more appropriate behavioral information to be estimated by reflecting the above information. For example, by taking past work history into consideration, the type of farm work to be performed next and the details of the identified type of farm work can be more appropriately estimated. In this case, the estimation unit 213 may refer to the work history data 251 to acquire information related to the past work history.

[0050] For example, the tasks of bud picking, flower picking, and fruit picking are not always easy to distinguish because the farmer's motions are similar and the work locations are the same on the branches that bear buds, flowers, and fruit. However, farm work is performed in the order of bud picking, flower picking, and fruit picking according to the growth of the crop. Therefore, if, for example, bud picking has been completed in the past work history, the estimation unit 213 can estimate that the farmer's current action is flower picking and not bud picking.

[0051] Furthermore, by taking into account the type of crop, the work plan for the crop, or the time of the work, it becomes easier to identify the work that corresponds to the type of crop or the work plan for the crop, and therefore the type of work and the details of the work for which the type has been identified can be more appropriately estimated. In this case, the estimation unit 213 may acquire information by referring to basic work data 252 that records basic work methods for each crop. Furthermore, the estimation unit 213 may acquire the information by referring to the work history data 251, assuming that the time when the work information was acquired is the time of the work. The time of the work may include the date and time.

[0052] 2C shows an example of the basic farming work data 252. In the basic farming work data 252, the "basic farming work ID" is an ID that uniquely identifies information on basic farming methods for each crop. The basic farming work data 252 may also include information such as the type of crop, an annual farming work schedule, and detailed information on each farming work. The basic farming work data 252 may also be information created in advance by the farmer.

[0053] 2D shows an example of a display screen based on the basic farm work data 252. In the example of screen D3 shown in FIG. 2D, the vertical axis O1 represents the farm work, the horizontal axis O2 represents the time, and the time when the farm work is to be performed is expressed as a Gantt chart. For example, if the current time is represented by a dashed line, it can be seen that the necessary farm work includes pruning and bud removal. It can also be seen that there is a sequence to these tasks, and that future work such as fruit thinning will occur.

[0054] Such an annual farm work schedule may record the farm work procedures for the entire year. This allows the farmer to understand the farm work that needs to be done now and the farm work that needs to be done later by referring to the date. The record of the farm work procedures for the entire year is also called a cultivation history. Furthermore, the annual farm work schedule included in such basic farm work data 252 may be the same every year, or may be set based on the farm work implementation status of the previous year.

[0055] Furthermore, a model may be created in which the posture data of the farmworker is normalized / standardized based on learning data that associates the posture data of the farmworker in the previous year with the farmwork corresponding to that posture. Using such a model, the estimation unit 213 may estimate information about the farmwork from the behavioral information of the farmworker.

[0056] The detailed information for each agricultural task may include details of how to perform each agricultural task. Furthermore, in addition to the method of performing each agricultural task, information that is recommended to be obtained when performing that agricultural task may also be recorded.

[0057] Furthermore, by taking into account environmental data obtained before the agricultural work, it is possible to more appropriately estimate the type of agricultural work to be performed next and the details of the identified agricultural work. As described above, agricultural work is carried out based on a year-round agricultural work plan, but the details of the appropriate agricultural work may change depending on uncertainties such as the weather.

[0058] For example, if there was heavy rain the day before, it becomes easier to identify the agricultural work to be performed after the heavy rain. Therefore, by taking into account the environmental data before the agricultural work, the type of agricultural work and the details of the identified type of agricultural work can be more appropriately estimated. In this case, the estimation unit 213 may acquire the environmental data before the agricultural work by referring to a database in which environmental information is recorded.

[0059] Furthermore, for example, when high temperature and humidity conditions continue for a certain period of time, diseases are more likely to occur. In this case, the estimation unit 213 may estimate that the work to be performed by the farmworker is to spray pesticides as a preventative measure before diseases occur. Furthermore, when rain continues or the soil moisture level remains high, the rain can wash away nutrients in the soil or pesticides, making it necessary to improve the soil condition. In this case, the estimation unit 213 may estimate that the work to be performed by the farmworker is fertilization or pesticide spraying. In this way, the estimation unit 213 may estimate information related to farm work based on changes in weather and environmental data.

[0060] Note that agricultural work that is required after heavy rain or high temperatures and humidity is suddenly required depending on the weather, and is therefore often not scheduled in the basic agricultural work data 252. For agricultural work that is suddenly required in a specific environment, a data table of specific environments and corresponding agricultural work may be prepared in addition to the basic agricultural work data 252. In this way, the estimation unit 213 may estimate information about agricultural work that is suddenly required by taking into account the data table and environmental data.

[0061] The estimation unit 213 may also estimate at least one of the type of agricultural work and the details of the agricultural work based on at least one of information about the agricultural worker or the agricultural crops that are the subject of the agricultural work, captured by an image sensor.

[0062] For example, when there are multiple agricultural workers, each farm worker may have a different role in the farm work, such as someone who thins fruit and someone who applies fertilizer. Therefore, by considering the farm worker, the type of farm work and the details of the identified type of farm work can be more appropriately estimated. Considering the farm worker may include considering the farm worker's belongings, equipment, and the equipment they use. More specifically, the estimation unit 213 may estimate the farm work by further considering the equipment used by the farm worker, such as whether they have a pollination sprayer or whether they use a tractor.

[0063] Furthermore, since the type of agricultural work to be performed can be specified to some extent depending on the target crop, it is possible to more appropriately estimate the type of agricultural work and the details of the specified type of agricultural work. For example, in the case of tomatoes, unnecessary flowers, side shoots, and leaves are removed, and in the case of kiwi, fruit thinning, bud removal, and pollination are performed, so by specifying the crop, it is possible to narrow down the candidate work options.

[0064] As another example of how the agricultural work to be performed can be identified based on the crop being the target of the agricultural work, for example, if canker-infected leaves are found on the crop being the target of the agricultural work, removal work is required, and the estimation unit 213 may estimate removal work. Also, if flowers of the crop being the target of the agricultural work have bloomed, pollination work is required, and the estimation unit 213 may estimate pollination work. Alternatively, if information is acquired that the canker-infected leaves have disappeared, the estimation unit 213 may estimate that removal work has been completed, or if information is acquired that the flowers have fruited, the estimation unit 213 may estimate that pollination work has been properly performed. In this case, the estimation unit 213 may refer to the work history data 251 to acquire information about the farm worker associated with the behavior information, or may refer to the basic agricultural work data 252 to acquire information about the crop being the target of the agricultural work.

[0065] Furthermore, in addition to the basic farm work data 252, the work content can be estimated with high accuracy from a combination of data including estimated date and time information, environmental information obtained from weather sensors and weather databases, and information on the behavior of farm workers obtained from motion sensors and vital sensors.

[0066] For example, suppose that work is being performed in the morning in late April, the weather is clear, and a worker is detected moving through the field at a speed of about 5 meters per minute while raising and lowering his arm. In this case, based on the basic agricultural work data 252, one of the following work is assumed: pollination, crushing, or fertilization. Of these, pollination and crushing are work that is not performed in rainy weather, but on clear days. Furthermore, since the worker is moving through the field at a speed of about 5 meters per minute while raising and lowering his arm, pollination work can be identified.

[0067] In this way, the estimation unit 213 may estimate information about agricultural work that satisfies those conditions, specifically the type and content of the agricultural work, based on date and time information, environmental information, behavioral information, etc.

[0068] Furthermore, the estimation unit 213 may estimate information about agricultural work, such as the type and content of the agricultural work, by referring to the work history data 251. For example, information about the type and content of the next agricultural work to be performed may be estimated based on information about the most recent work performance in the work history data 251. More specifically, the estimation unit 213 may estimate information about agricultural work, such as whether the agricultural worker will continue the same work or move on to the next work, depending on the progress of the work that the agricultural worker performed most recently. Furthermore, when a farmer works in a certain plot, the estimation unit 213 may estimate information about the agricultural work based on whether the farmer will perform the same work in the adjacent plot, based on the work that the farmer performed in the adjacent plot.

[0069] The estimation unit 213 may estimate the type of agricultural work and at least some of the content of the agricultural work based on at least one of information obtained from a position sensor worn by the agricultural worker and information obtained from an acceleration sensor worn by the agricultural worker.

[0070] For example, information obtained from the position sensor may include not only the location of the farmworker, but also information such as the time spent at that location, the farmworker's movement speed, and the farmworker's movement route. This information can be used for quantitative and / or qualitative evaluation of the farm work. For example, the estimation unit 213 may consider the time spent at a location or the farmworker's movement speed as information for quantitatively evaluating the farm work, such as the farm work speed or the amount of farm work processed. Furthermore, the estimation unit 213 may consider the farmworker's movement route as information for qualitatively evaluating the farm work, such as more effective methods of fertilizing or spraying pesticides.

[0071] The estimation unit 213 may estimate at least one of the type of agricultural work, the details of the agricultural work, and information related to the agricultural worker's vital signs based at least on information obtained from a vital sensor worn by the agricultural worker. The workload of agricultural work varies depending on the type and amount of work. Vital information such as respiratory rate and heart rate changes depending on the workload. Because the vital sensor contains information related to the agricultural worker's vital signs such as respiratory rate, heart rate, blood pressure, and body temperature, it can be used to estimate the workload of the agricultural work, and therefore the agricultural work corresponding to the workload and the details of that agricultural work.

[0072] More specifically, a model for estimating farm work from vital sign information may be created and used based on learning data that associates information about vital signs with the farm work performed at the time the vital sign information was obtained. Furthermore, the estimation unit 213 may estimate information about farm work based on information about the behavior of the farmworker and information about the farmworker's vital signs. In this way, the estimation unit 213 may estimate the farm work based on the work load estimated from the vital sign information and the motion data that imparts that work load.

[0073] As an example of agricultural work recognition, if a behavioral pattern of a farmer frequently raising and lowering their arms is observed from the nine-axis sensor of the wearable device, the estimation unit 213 may estimate bud picking, flower picking, pollination, fruit picking, harvesting, etc. Furthermore, the work may be further classified and determined as bud picking, flower picking, pollination, fruit picking, and harvesting based on the cycle, speed, angle information, etc. of raising and lowering the arms, which can be obtained by the nine-axis sensor of the wearable device.

[0074] As an example of estimating the workload of agricultural workers, the workload level may be estimated from the amount of exercise such as the worker's heart rate fluctuations (heart rate sensor), number of steps (9-axis sensor), and amount of movement (GPS), or the environmental load level such as the risk of heat stroke may be estimated from weather data and surface temperature (temperature sensor). This allows the management unit 214, which will be described later, to manage labor tasks taking the agricultural workers into consideration.

[0075] Furthermore, the information obtained from vital sensors varies depending on the working environment and physical condition of the worker. For example, when working in the hot sun of midsummer, a worker is more likely to become fatigued than usual, and such changes in physical condition can be evaluated using vital information. Alternatively, the information obtained from vital sensors also changes if the worker feels unwell from the morning. Information about a farmworker's vital signs can be said to be the worker's current health condition. The estimation unit 213 may estimate the worker's level of fatigue and health condition based at least on information obtained from the vital sensors worn by the farmworker, and record and manage this information in association with the farmworker.

[0076] The estimation unit 213 may estimate at least one of the type of farm work and the details of the farm work based at least on information about the farm worker.

[0077] Furthermore, the speed and quality of farm work varies depending on the farmer. The information about the farm worker may include a qualitative or quantitative evaluation of the farm work that the farm worker has performed in the past. This allows the estimation unit 213 to estimate the type and content of the farm work based at least on the information about the farm worker.

[0078] The management unit 214 records the type and content of the agricultural work estimated by the estimation unit as work history. The management unit 214 may also record the behavioral information and other information acquired by the acquisition unit 212 in the work history data 251.

[0079] The management unit 214 may associate the acquired behavioral information with environmental information such as the weather and temperature at that time, and record the information in the work history data 251. Examples of environmental information include temperature, weather, and soil temperature. The environmental information may include past actual measurements, or may include future predicted values, such as a weather forecast.

[0080] The management unit 214 may record the acquired behavioral information in the work history data 251 in association with the type and content of the farm work estimated by the estimation unit 213 based on the behavioral information.

[0081] The management unit 214 may associate the acquired behavioral information with information about the farmworker who performed the behavioral information and record the information in the work history data 251. The information about the farmworker is not particularly limited, but may include, for example, an ID for uniquely identifying the farmworker, the farmworker's name, age, gender, etc.

[0082] The management unit 214 may accept a correction to the recorded work history. At this time, the estimation unit 213 may accumulate data related to the accepted correction to the work history, and further estimate the type and content of the farm work based on the accumulated data.

[0083] 1.1.5 Work Determination Unit The work determination unit 215 determines the type and content of the farm work that the farmworker will perform next, based on the work history. At this time, the work determination unit 215 may determine the content of the farm work to be performed next by referring to the type and content of the farm work estimated by the estimation unit 213 and the basic farm work data 252. For example, the estimation unit 213 may estimate the amount of fertilizer to be applied based on behavioral information, and the work determination unit 215 may determine the content of the farm work to be performed next by taking into account the amount of fertilizer and other details.

[0084] For example, based on the amount of fertilizer to be applied, the tasks before and after the timing of using the target amount of fertilizer may be determined, such as preparing the fertilizer, transporting it to the application location, registering data on the fertilizer used, and placing an additional order. For pollination work, the tasks of preparing and arranging pollen needed for pollination may also be determined based on the amount of work. For harvesting work, the next agricultural task to be performed may be determined, such as preparing a cart or arranging a truck.

[0085] 1.1.6 Work instruction unit The work instruction unit 216 transmits information regarding the determined content of agricultural work to the working device 400. The working device 400 is not particularly limited, but may be any device having a mechanism capable of performing agricultural work such as pruning, flower thinning, fruit thinning, pesticide spraying, and pollen spraying. The working device 400 may be the same device as the measurement device 300, or may be a different device.

[0086] 1.1.7. Display Control Unit The display control unit 217 may control the display of at least one of the behavioral information and other information acquired by the acquisition unit 212 and the information estimated by the estimation unit 213 on the input / output interface 230, such as a display.

[0087] Furthermore, after the management unit 214 accepts a request to correct the work history, the display control unit 217 may present alternative candidates for the type of farming work and the content of the farming work in response to the request. This makes the correction work easier. At this time, the management unit 214 may refer to the basic farming work data 252 to extract alternative candidates for the type of farming work and the content of the farming work, and the display control unit 217 may control the display of the alternative candidates.

[0088] 3 is a schematic diagram showing one aspect of a screen whose display is controlled by the display control unit 217. Screen D1 is a screen for accepting correction requests. For example, on screen D1, the display control unit 217 may control the display of an object such as an "Edit" button for accepting a correction request for the date, time, work, etc. for a work history indicating that sowing work was performed from 13:00 to 14:00 on April 13, 2023.

[0089] When the user presses the "Edit" button for "Task" on the correction request screen D1, the display control unit 217 may transition to an editing screen D2. On the editing screen D2, the display control unit 217 may control the display of one or more editing methods for "Task," such as "Candidates," "List," and "Input." Here, "Candidates" may display candidate tasks in a ranking format, in descending order of the scores (degrees of agreement) among the tasks estimated by the estimation unit 213. Figure 3 illustrates an example in which the closer the "score" is to 100, the higher the degree of agreement. Furthermore, "List" may display a list of predefined tasks. Furthermore, "Input" is a form for inputting characters, and the user may be able to freely input the name of a task.

[0090] When the corrected work is selected or input on the editing screen D2, the type and content of the estimated farm work in the work history data 251 are updated.

[0091] 1.1.8 Sensing Device Management Unit The sensing device management unit 218 manages the status of the measuring device 300 so that data can be collected normally, and may perform corrections, calibrations, etc. as necessary. For example, the sensing device management unit 218 may manage whether sensing devices such as the measuring device 300 are operating normally, or manage the operating time of the measuring device 300, etc. At this time, if an abnormality is detected, such as a communication error or a device alarm, the sensing device management unit 218 may indicate that an abnormality has occurred on the display unit of the input / output interface 230.

[0092] 1.2 Operational Processing Next, the operation of the smart agriculture system will be described. Fig. 4 is a sequence diagram showing an example of processing performed by the smart agriculture system of this embodiment.

[0093] In step A01, the acquisition unit 212 of the server 200 may transmit an instruction to acquire behavioral information to the measurement device 300 via the transmission / reception unit 211. Then, in step A02, the transmission / reception unit 211 of the server 200 may receive the behavioral information from the measurement device 300 in the field.

[0094] In step A03, the management unit 214 of the server 200 may record the acquired behavioral information in the work history data 251. Furthermore, in step A04, the estimation unit 213 of the server 200 may estimate the type of agricultural work and the details of the agricultural work whose type has been identified based on the behavioral information, and in step A05, the management unit 214 of the server 200 may record the estimated type of agricultural work and the details of the agricultural work in the work history data 251 as work history.

[0095] Then, in step A06, the work determination unit 215 of the server 200 determines the work content by referring to the work history data 251, and in step A07, the work instruction unit 216 of the server 200 transmits information regarding the determined content of the agricultural work to the work device 400.

[0096] 2. Information Processing Method In the information processing method of this embodiment, an information processing device executes the following steps: acquiring behavioral information of farm workers; estimating information related to farm work based on the behavioral information; and recording the estimated information related to farm work.

[0097] Note that the specific aspects of the method of this embodiment have been described above in the operational processing, so detailed description thereof will be omitted here.

[0098] 3. Program The program of this embodiment causes an information processing device to execute the steps of acquiring behavioral information of farmworkers, estimating information related to farm work based on the behavioral information, and recording the estimated information related to farm work.

[0099] The program may be recorded on a readable recording medium. Note that the specific aspects of the processing executed by the program of this embodiment have been described above in the operational processing, and therefore detailed description thereof will be omitted here.

[0100] The present invention has industrial applicability as a component technology that can be used in smart agriculture systems.

[0101] 1...Smart agriculture system, 200...Server, 210...Processor, 211...Transmitter / receiver unit, 212...Acquisition unit, 213...Estimation unit, 214...Management unit, 215...Work determination unit, 216...Work instruction unit, 217...Display control unit, 218...Sensing equipment management unit, 220...Communication interface, 230...Input / output interface, 240...Memory, 250...Storage, 251...Work history data, 252...Basic agricultural work data, 260...Communication bus, 300...Measuring device, 310...Fixed sensor, 320...Wearable device, 330...Self-propelled sensor, 340...Flying sensor, 400...Work device, 500...Field, 520...Crops.

Claims

1. An information processing device having an acquisition unit that acquires behavioral information of agricultural workers obtained by a sensor; an estimation unit that estimates information about agricultural work based on the behavioral information; and a management unit that records the information about the agricultural work estimated by the estimation unit.

2. An information processing device according to claim 1, further comprising an acquisition unit that acquires position information of the farm worker in the farm field, and the management unit that records information relating to the farm work in association with the position information.

3. The information processing device according to claim 1, wherein the estimation unit estimates the type of agricultural work as information relating to the agricultural work based on at least one of past work history, the type of agricultural crop, the work plan for the agricultural crop, the growth state of the agricultural crop, the time of the agricultural work, and environmental data prior to the agricultural work.

4. The information processing device according to claim 1, wherein the estimation unit estimates information relating to the agricultural work based on at least one of information relating to the agricultural worker or the agricultural crop that is the subject of the agricultural work, captured by an image sensor.

5. The information processing device according to claim 1, wherein the estimation unit estimates information relating to the agricultural work based on at least one of information obtained from a position sensor worn by the agricultural worker and information obtained from an acceleration sensor worn by the agricultural worker.

6. The information processing device according to claim 1, wherein the estimation unit estimates at least one of information relating to the farm work and information relating to the vital signs of the farm worker based on information obtained from a vital sensor worn by the farm worker.

7. The information processing device according to claim 1, wherein the estimation unit estimates the information relating to the farm work based on information relating to the farm worker.

8. The information processing device according to claim 1, wherein the management unit accepts corrections to the recorded information relating to the farm work.

9. The information processing device according to claim 1, further comprising a display control unit that accepts an application for correction of the information relating to the farm work, and presents alternative candidates for the information relating to the farm work in response to the correction application.

10. The information processing device according to claim 8, wherein the estimation unit accumulates data relating to received corrections to the information relating to the farm work, and estimates the information relating to the farm work based on the accumulated data.

11. The information processing device according to claim 1, further comprising a task determination unit that determines information regarding the farm task that the farmer will subsequently be performing based on the information regarding the farm task.

12. The information processing device according to claim 1, wherein the information relating to the farm work includes at least one of the type of farm work and the details of the farm work.

13. An information processing method, comprising: an information processing device executing the steps of: acquiring behavioral information of farm workers; estimating information about farm work based on the behavioral information; and recording the estimated information about the farm work.

14. A program that causes an information processing device to execute the steps of: acquiring behavioral information of farm workers; estimating information about farm work based on the behavioral information; and recording the estimated information about farm work.

Citation Information

Patent Citations

  • Device, method and program for managing history of agricultural work

    JP2005092595A

  • Work recording device, work recording system, and work recording program

    JP2010161991A

  • Work support system and work support method

    JP2021114700A

  • Information processing device, information processing method, and program

    JP2022075366A

  • Information processing device and information processing method

    WO2015178065A1