Production management device, substrate processing device, production management method, and program

The production control device addresses the inefficiencies in substrate processing by detecting and prioritizing deterioration handling processes, ensuring rapid resolution of issues in substrate processing equipment, thus improving operational efficiency.

WO2024228279A1PCT designated stage expired Publication Date: 2024-11-07PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2023/046909
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-01
Filing Date
2023-12-27
Publication Date
2024-11-07

AI Technical Summary

Technical Problem

Existing substrate processing technologies face challenges in quickly resolving issues that arise during operations, leading to prolonged downtime and inefficiencies due to the repetitive execution of countermeasures without optimizing the priority and effectiveness of deterioration handling processes.

Method used

A production control device that detects device quality deterioration, prioritizes and executes high-priority deterioration handling processes, and verifies the effectiveness of these processes to rapidly address and solve problems in substrate processing equipment.

Benefits of technology

This approach significantly reduces the time required to resolve issues in substrate processing devices by prioritizing and effectively executing countermeasures, thereby enhancing operational efficiency and productivity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2023046909_07112024_PF_FP_ABST
    Figure JP2023046909_07112024_PF_FP_ABST
Patent Text Reader

Abstract

This production management device (2) comprises: a condition monitoring unit (12) that, on the basis of information representing the result of mounting-related work acquired from a substrate processing device (1) that executes the mounting-related work upon a substrate, detects a deterioration in device quality; a manufacturing instruction unit (15) that causes the substrate processing device (1) to start execution from a deterioration handling process, among a plurality of different deterioration handling processes extracted as deterioration handling processes for handling the deterioration in the device quality, which has the highest priority; and an effect verification unit (16) that confirms whether the result of the mounting-related work by the substrate processing device (1) that executed the deterioration handling process improved. If a plurality of deterioration handling processes having the same priority are included in the plurality of different deterioration handling processes, the manufacturing instruction unit (15) selects one deterioration handling process from among the plurality of deterioration handling processes having the same priority on the basis of an effect verification time period including at least the time period needed for effect verification processing, and causes the substrate processing device (1) to execute said deterioration handling process.
Need to check novelty before this filing date? Find Prior Art

Description

Production management device, substrate processing apparatus, production management method and program

[0001] The present disclosure relates to a production management device that manages a substrate processing apparatus that performs mounting-related work on a substrate.

[0002] Patent Document 1 describes a technology in which, when information indicating multiple different abnormalities is acquired, priorities are determined for multiple different processing tasks for the multiple different abnormalities based on the types of abnormalities stored in advance, and the priority execution order of the multiple processing tasks is determined according to the determined priorities.

[0003] JP 2012-145997 A

[0004] When a problem occurs, it is required to solve the problem quickly. In the technology described in the above-mentioned Patent Document 1, when a problem occurs in a substrate processing apparatus, measures with a high priority (e.g., measures with a high effect) are implemented, and each time a measure is implemented, it is confirmed whether the problem has been solved, and this process is repeated until the problem is solved. There is a demand for shortening the time required for such a series of processes to solve a problem that has occurred in a substrate processing apparatus.

[0005] Therefore, the present disclosure provides a production management device and the like that can increase the possibility of solving problems that occur in substrate processing apparatuses in a short period of time.

[0006] The production management device according to the present disclosure comprises: a status monitoring unit that detects deterioration in equipment quality based on information indicating the results of mounting-related work obtained from a substrate processing apparatus that has an execution unit that performs the work on a substrate; a manufacturing instruction unit that causes the substrate processing apparatus to execute a deterioration response process with a higher priority from among a plurality of different deterioration response processes extracted as deterioration response processes to address deterioration in equipment quality; and an effect verification unit that performs an effect verification process after the substrate processing apparatus has executed the deterioration response process to confirm whether the results of the mounting-related work performed by the substrate processing apparatus that executed the deterioration response process have improved, and when the plurality of different deterioration response processes include a plurality of deterioration response processes of the same priority, the manufacturing instruction unit selects one deterioration response process from the plurality of deterioration response processes of the same priority based on an effect verification time that includes at least the time required for the effect verification process and causes the substrate processing apparatus to execute it.

[0007] These comprehensive or specific aspects may be realized by a system, an apparatus, a method, a recording medium, or a computer program, or may be realized by any combination of a system, an apparatus, a method, a recording medium, and a computer program.

[0008] According to the production management device and the like according to the present disclosure, it is possible to increase the possibility of quickly resolving problems that occur in substrate processing apparatuses.

[0009] 1 is a diagram showing a mounting line to which a production management device according to an embodiment is applied; FIG. 2 is a configuration diagram showing an example of a production management device according to an embodiment; FIG. 3 is a configuration diagram showing an example of a substrate processing apparatus according to an embodiment; FIG. 4 is a sequence diagram showing an example of an operation of a production management device according to an embodiment; FIG. 5 is a diagram showing an example of a reference effect verification time and a success rate for each deterioration response process; FIG. 6 is a diagram showing an example of a reference effect verification time, a reference work time, and a success rate for each deterioration response process; FIG. 7 is a diagram showing an example of an actual effect verification time and a success rate for each deterioration response process; FIG. 8 is a diagram showing an example of an actual effect verification time, an actual work time, and a success rate for each deterioration response process; FIG. 9 is a diagram showing another example of a reference effect verification time, a reference work time, and a success rate for each deterioration response process; FIG. 10 is a diagram showing an example of an effect verification time and an actual work time when successful, an effect verification time and an actual work time when unsuccessful, and a success rate for each deterioration response process;

[0010] The embodiments described below are all comprehensive or specific examples, and the numerical values, shapes, materials, components, the arrangement and connection of the components, steps, and the order of steps shown in the following embodiments are merely examples and are not intended to limit the present disclosure.

[0011] (Embodiment) Hereinafter, a production management device and a substrate processing apparatus according to an embodiment will be described with reference to Figs.

[0012] FIG. 1 is a diagram showing a mounting line 40 to which a production management device according to an embodiment of the present invention is applied.

[0013] The mounting line 40 is equipped with a plurality of substrate processing apparatuses each having an execution unit that executes mounting-related work on a substrate. The mounting line 40 has the function of producing a mounted substrate by mounting components (electronic components) on a substrate, and also has the function of supplying, delivering, and collecting the substrates to be mounted.

[0014] For example, in the mounting line 40, a board supply device M1, a board transfer device M2, a printing device M3, mounting devices M4 and M5, a reflow device M6, a board removal device M7, and an inspection device M8 are connected in series in this order. Each device from the board supply device M1 to the inspection device M8 is connected to the line management device 50 via the communication network 30.

[0015] For example, printing device M3, mounting devices M4 and M5, and inspection device M8 are an example of board processing apparatus 1 (see FIG. 3) that includes an execution unit that executes mounting-related work on boards transported along mounting line 40. The mounting-related work performed by printing device M3 is solder printing work, the mounting-related work performed by mounting devices M4 and M5 is component mounting work, and the mounting-related work performed by inspection device M8 is board inspection work.

[0016] The boards supplied by the board supply device M1 are carried into the printing device M3 via the board transfer device M2. The printing device M3 performs a solder printing operation on the carried-in board by screen-printing solder for joining components.

[0017] The solder-printed boards are then delivered to mounting devices M4 and M5, which perform component mounting work to mount components on the solder-printed boards.

[0018] Mounting devices M4 and M5 each include a base, a board transport unit, a component supply device, and a mounting head. A board is placed on the base. The board transport unit can transport boards delivered from an upstream device to a downstream device. The component supply device can supply components to the mounting head. The component supply device is provided with multiple tape feeders for supplying components to the mounting head. The mounting head can pick up and remove components from the tape feeders, move above the board, and place the components in the mounting position on the board. The mounting head is equipped with suction nozzles that pick up and hold components and can be raised and lowered individually. Component mounting work is performed by mounting devices M4 and M5 like this.

[0019] After the components are mounted, the board is loaded into the reflow device M6 and heated according to a predetermined heating profile. This melts and solidifies the solder printed on the heated board to join the components. The components are solder-joined to the board in this way, completing the mounted board with the components mounted on the board. The completed mounted board is then collected by the board collection device M7.

[0020] The inspection device M8 performs a board inspection of the board on which components are mounted. For example, the inspection device M8 performs a visual inspection of the board, specifically, inspecting for the presence of solder bridges and the presence of dust on the board using a camera or the like. Furthermore, for example, the inspection device M8 may also perform a continuity test on the board.

[0021] Next, the configuration of the production management device 2 will be described with reference to FIG.

[0022] 2 is a configuration diagram showing an example of a production management device 2 according to an embodiment. In addition to the production management device 2, Fig. 2 also shows a line management device 50, a substrate processing apparatus 1, a sensor 6, an input device 7, a peripheral device 8, and a data creation device 5.

[0023] The production management device 2 manages the status of the substrate processing apparatus 1 and other equipment. The production floor to which the production management device 2 is applied includes, for example, a mounting line 40, an inventory warehouse, a preparation area, and a maintenance area. As described above, the mounting line 40 is equipped with substrate processing apparatuses 1, such as mounting apparatuses M4 and M5, printing apparatus M3, and inspection apparatus M8. The inventory warehouse stores materials such as components (reel components, cassettes for storing tape components, bulk cases, stick cases, etc.), solder, and screen masks. In the preparation area, preparation of operational units such as carts, feeders, nozzles, and mounting heads is carried out. In the maintenance area, maintenance of the operational units and jigs is carried out. The jigs referred to here are used to adjust feeders, nozzles, mounting heads, etc. Note that jigs may also be used to adjust the mounting head movement mechanism and substrate transport unit of the equipment. Workers perform production, preparation, and maintenance tasks in each area of ​​the production floor, and transport components and operational units between areas. For example, the production management device 2 is a computer located on the production floor. For example, the functions of the production management device 2 may be provided in the line management device 50. The production management device 2 may be a computer installed in one housing, or may be divided into two or more housings and implemented by two or more computers. The production management device 2 does not have to be located on the production floor, but may be a computer such as a server installed outside the production floor. The workers are not limited to people, and may include robots, working mechanisms, and automated guided vehicles that perform the above-mentioned tasks.

[0024] The production management device 2 outputs work instructions to workers on the production floor or to the substrate processing apparatus 1, etc., depending on the status of the substrate processing apparatus 1, etc. The production management device 2 includes an acquisition unit 11, a status monitoring unit 12, a countermeasure determination unit 13, an arbitration unit 14, a manufacturing instruction unit 15, an effect verification unit 16, and a storage unit 3. The production management device 2 is realized by a computer including a processor, a memory, etc. The memory is a ROM (Read Only Memory) or a RAM (Random Access Memory), etc., and can store programs executed by the processor. The acquisition unit 11, the status monitoring unit 12, the countermeasure determination unit 13, the arbitration unit 14, the manufacturing instruction unit 15, and the effect verification unit 16 are realized by the processor operating in accordance with the programs stored in the memory. Note that the storage unit 3 does not necessarily have to be included in the production management device 2.

[0025] The monitoring information, the priority countermeasure list, and the time for verifying the effectiveness of each countermeasure are stored in the storage unit 3. The monitoring information is acquired from the substrate processing apparatus 1.

[0026] The acquisition unit 11 acquires information used to monitor the status of the substrate processing apparatus 1 and the like. For example, the acquisition unit 11 acquires monitoring information of the substrate processing apparatus 1 (specifically, productivity, quality, presence or absence of defects, etc.) and stores it in the storage unit 3. For example, the acquisition unit 11 acquires monitoring information from the substrate processing apparatus 1 via the line management device 50. The monitoring information is an example of information indicating the results of mounting-related work acquired from the substrate processing apparatus 1, which has an execution unit that executes mounting-related work on substrates. The monitoring information may be a sensing history record obtained by the sensor 6, or may be data input to the input device 7. The sensor 6 is a sensor that monitors the status of an operation unit provided in the substrate processing apparatus 1. The input device 7 is an input interface such as a keyboard, a mouse, a display, or a touch panel display.

[0027] The status monitoring unit 12 detects deterioration of the device quality based on the monitoring information. The operation of the status monitoring unit 12 will be described in detail later.

[0028] The countermeasure determining unit 13 estimates the cause of the deterioration of the equipment quality detected by the status monitoring unit 12 and extracts a process (countermeasure) for dealing with the deterioration of the equipment quality. The operation of the countermeasure determining unit 13 will be described in detail later.

[0029] When two or more measures can be taken simultaneously on the mounting line 40, if the resources (task units) required for each measure overlap, it is difficult to execute the two or more measures simultaneously, so the arbitration unit 14 arbitrates between the two or more measures. For example, while one of the two or more measures is being executed using a certain resource, the arbitration unit 14 locks the resource so that other measures using the resource are not executed.

[0030] The manufacturing instruction unit 15 causes the substrate processing apparatus 1 to execute the deterioration countermeasure process with the highest priority among the multiple different deterioration countermeasure processes extracted as deterioration countermeasure processes for dealing with deterioration in equipment quality. In other words, when multiple countermeasures are extracted by the countermeasure decision unit 13, the manufacturing instruction unit 15 causes the substrate processing apparatus 1 to execute the countermeasure with the highest priority. Note that when only one deterioration countermeasure process for dealing with deterioration in equipment quality is extracted, the manufacturing instruction unit 15 causes the substrate processing apparatus 1 to execute that deterioration countermeasure process.

[0031] Furthermore, when a plurality of different deterioration countermeasure processes include a plurality of deterioration countermeasure processes of the same priority, the manufacturing instruction unit 15 selects one of the plurality of deterioration countermeasure processes of the same priority based on an effect verification time that includes at least the time required for the effect verification process, and causes the substrate processing apparatus 1 to execute the selected deterioration countermeasure process. Details of the operation of the manufacturing instruction unit 15 will be described later.

[0032] After the substrate processing apparatus 1 has performed the deterioration countermeasure processing, the effect verification unit 16 performs an effect verification process to confirm whether or not the results of the mounting-related work performed by the substrate processing apparatus 1 that has performed the deterioration countermeasure processing have improved. Details of the operation of the effect verification unit 16 will be described later.

[0033] The data creation device 5 creates resource data and control programs used by the substrate processing apparatus 1 to execute mounting-related tasks on substrates. The resource data includes board-related information related to components to be mounted on the substrate, and task unit-related information set for each of the multiple task units that make up the execution unit used for the mounting-related tasks of the components.

[0034] The peripheral devices 8 are devices provided in the inventory warehouse, preparation area, maintenance area, etc. on the production floor, and include maintenance devices, setup devices, transport robots, etc.

[0035] Next, the configuration of the substrate processing apparatus 1 will be described with reference to FIG.

[0036] Fig. 3 is a configuration diagram showing an example of a substrate processing apparatus 1 according to an embodiment. Fig. 3 shows a plurality of substrate processing apparatuses 1 (two substrate processing apparatuses 1 in this example) on a mounting line 40. Fig. 3 also shows a line management device 50. For example, the substrate processing apparatus 1 is either a printing device M3 that prints solder on lands on a substrate as a mounting-related task, or a mounting device M4 or M5 that mounts components at predetermined positions on the substrate on which solder has been printed as a mounting-related task.

[0037] The substrate processing apparatus 1 includes a main control unit 111, an operation control unit 112, an image processing unit 113, an execution unit 114, a display unit 115, and a notification unit 116. The substrate processing apparatus 1 is realized by a computer including a processor, a memory, etc. The memory is a ROM, a RAM, etc., and can store programs executed by the processor. The main control unit 111, the operation control unit 112, the image processing unit 113, the execution unit 114, the display unit 115, and the notification unit 116 are realized by the processor operating in accordance with the programs stored in the memory.

[0038] The main control unit 111 is a processing unit that controls the entire substrate processing apparatus 1 , and controls the operation control unit 112 , the image processing unit 113 , the display unit 115 and the notification unit 116 .

[0039] The execution unit 114 performs mounting-related work on the board. When the board processing apparatus 1 is the printing apparatus M3, the execution unit 114 is equipped with a squeegee unit, a stage, a mask recognition camera, a board recognition camera, etc. as multiple work units, and performs solder printing work as mounting-related work. When the board processing apparatus 1 is the mounting apparatus M4 or M5, the execution unit 114 is equipped with a board transport unit, a feeder, a horizontal movement mechanism, a mounting head, a board recognition camera, etc. as multiple work units, and performs component mounting work as mounting-related work.

[0040] The operation control unit 112 controls the operation of the execution unit 114. When the substrate processing apparatus 1 is the printing apparatus M3, the operation control unit 112 controls the operation of the squeegee unit, stage, etc. When the substrate processing apparatus 1 is the mounting apparatus M4 or M5, the operation control unit 112 controls the horizontal movement mechanism, the lift movement mechanism, etc.

[0041] The image processing unit 113 processes images captured by a camera provided in the substrate processing apparatus 1. When the substrate processing apparatus 1 is the printing apparatus M3, the image processing unit 113 processes images captured by a mask recognition camera, a substrate recognition camera, etc. When the substrate processing apparatus 1 is the mounting apparatus M4 or M5, the image processing unit 113 processes images captured by a substrate recognition camera, etc.

[0042] The display unit 115 displays the current status of the substrate processing apparatus 1 or instructions to an operator who performs work on the substrate processing apparatus 1 .

[0043] The notification unit 116 notifies an external device (e.g., the production management device 2) of information relating to the quality of the mounting-related work of each of the multiple task units constituting the execution unit 114, and receives instructions for the deterioration response processing selected in the production management device 2. The operation control unit 112 executes the deterioration response processing indicated by the received instruction.

[0044] Next, the operation of the production management device 2 will be described in detail with reference to FIG.

[0045] 4 is a sequence diagram showing an example of the operation of the production management device 2 according to the embodiment. Note that, hereinafter, the deterioration handling process is also referred to as a "measure."

[0046] For example, a deterioration in the quality of the substrate processing apparatus 1 occurs (step S11), and a mounting log (monitoring information) indicating the deterioration in the quality of the substrate processing apparatus 1 is transmitted from the line management device 50 to the production management device 2.

[0047] The status monitoring unit 12 detects a problem based on the monitoring information (step S12). That is, the status monitoring unit 12 detects a deterioration in the quality of the equipment. For example, the status monitoring unit 12 detects whether there is a deterioration in the quality of the equipment for each of the multiple operation units (e.g., equipment stage, equipment table, feeder cart, nozzle, specific component, mounting head (spindle), feeder, etc.) that constitute the execution unit 114 of the substrate processing apparatus 1.

[0048] For example, the deterioration of equipment quality may include an increase in the defect rate (worsening of work) based on the quality of the mounting-related tasks of each of the multiple operation units constituting the execution unit 114 of the substrate processing apparatus 1, an increase in downtime during which the substrate processing apparatus 1 stops production due to an error in an operation unit of the substrate processing apparatus 1 (in other words, a decrease in the operating rate), or a deterioration in the defect rate obtained from an inspection unit (e.g., inspection device M8) that inspects the solder printing state or component mounting state (e.g., the defect rate of the printing state calculated based on the inspection results of the position on the board of the solder printed by printing device M3, and the defect rate of the mounting state calculated based on the inspection results of the position on the board of the components mounted by mounting devices M4 and M5). Furthermore, for example, the deterioration of equipment quality may also include tact loss (e.g., an increase in cycle time or throughput).

[0049] For example, the status monitoring unit 12 may detect a deterioration in device quality based on whether the defect rate (mounting defect rate, printing defect rate, etc.) of each of the multiple task units indicated by the monitoring information exceeds a predetermined threshold for the defect rate of each of the multiple task units. The defect rate can be calculated, for example, by dividing the number of pickup errors by the total number of pickups, the number of mounting errors by the total number of pickups, or the total number of errors by the total number of pickups. Furthermore, for example, the status monitoring unit 12 may detect a deterioration in device quality based on whether the defect rate based on the inspection results of the inspection device M8 indicated by the monitoring information exceeds a predetermined threshold for the defect rate.

[0050] Next, the countermeasure determination unit 13 formulates countermeasures for the detected trouble (step S13). That is, the countermeasure determination unit 13 extracts countermeasures for dealing with the detected deterioration in equipment quality. For example, the countermeasure determination unit 13 compares the detected deterioration in equipment quality with the priority countermeasure list to extract countermeasures for dealing with the detected deterioration in equipment quality.

[0051] For example, the priority measure list associates one or more measures with each factor of deterioration in equipment quality. When multiple measures are associated with one factor, priorities are assigned to the multiple measures. Specifically, in the priority measure list, a measure of changing the component rank is associated with the deterioration of defective work related to a specific component. Furthermore, a measure of calibrating the sensor (i.e., appropriately setting a reference value for detecting events in which the sensor measurement value falls outside the normal range) is associated with the deterioration of defective work related to a specific operation unit determined to be normal by a state prediction based on values ​​measured by a sensor provided in the substrate processing apparatus 1. Examples of sensors include a flow rate sensor and a load sensor provided in the mounting head, and a linear scale provided in the horizontal movement mechanism. Furthermore, a measure of changing the movement speed and acceleration of the mounting head (i.e., setting an appropriate movement speed and movement acceleration) is associated with the deterioration of defective work related to a large-sized component. Furthermore, a measure of changing the temperature profile of the reflow furnace (substrate processing apparatus 1) (i.e., setting an appropriate temperature) is associated with the deterioration of defective work related to a component mounted on a double-sided board having a front and back surface, when the defect rate based on the inspection results of the component mounted on the double-sided board exceeds a threshold.

[0052] For example, when a deterioration in the quality of a specific component (component rank 1) is observed, the countermeasure determination unit 13 extracts a countermeasure of changing the component to a higher component rank (component rank 2, which is higher than component rank 1). When a temporal change in the value detected by the sensor (a sign of deviation from the normal range) is observed, the countermeasure determination unit 13 extracts a countermeasure of calibrating the sensor. When a deterioration in the quality of a component is observed even though the value detected by the sensor is normal, the countermeasure determination unit 13 may extract a countermeasure of calibrating the sensor. When the movement speed (or movement acceleration) of the mounting head when mounting large-sized components and small-sized components detected by the sensor are the same and a deterioration in the quality of the large-sized component is observed, the countermeasure determination unit 13 extracts a countermeasure of lowering the movement speed (or movement acceleration) of the mounting head when mounting the large-sized component. When the NG rate in the inspection results of components mounted on the front side of a double-sided board exceeds a threshold, the countermeasure determination unit 13 extracts a countermeasure of lowering the reflow temperature on the back side.

[0053] Next, when a plurality of different measures are extracted, the manufacturing instruction unit 15 determines whether the plurality of different measures includes a plurality of measures with the same priority (step S14).

[0054] If the manufacturing instruction unit 15 determines that the multiple different measures do not include multiple measures of the same priority (branch of step S14: "one"), it instructs the line management device 50 to select one measure of high priority (step S17) and has the substrate processing device 1 execute it.

[0055] If the manufacturing instruction unit 15 determines that the multiple different measures include multiple measures of the same priority ("multiple" at the branch in step S14), it determines the effectiveness verification time for each of the multiple measures of the same priority (step S15).

[0056] For example, a predetermined verification time may be assigned to the effectiveness verification process, and the manufacturing instruction unit 15 may determine the predetermined verification time as the effectiveness verification time. This will be described with reference to FIG. 5 .

[0057] 5 is a diagram showing an example of the standard effect verification time and success rate for each countermeasure. The standard effect verification time is a predetermined verification time allocated to the process of verifying the effect of the countermeasure. The success rate is the probability that the device quality will improve by implementing the countermeasure.

[0058] For example, if measures A and B shown in Figure 5 are extracted as multiple measures of the same priority, the manufacturing instruction unit 15 determines the effect verification time for measure A to be 10 minutes, which is the standard effect verification time assigned to the effect verification process of measure A, and determines the effect verification time for measure B to be 20 minutes, which is the standard effect verification time assigned to the effect verification process of measure B.

[0059] Next, the manufacturing instruction unit 15 selects one measure from among the multiple measures with the same priority (step S16). For example, the manufacturing instruction unit 15 selects one measure with a short effectiveness verification time from among the multiple measures with the same priority. For example, the manufacturing instruction unit 15 selects measure A, which has a short standard effectiveness verification time, from measures A and B shown in FIG. 5. Note that if measure B is selected taking only the success rate into consideration, the effectiveness verification time will be long, and it may ultimately take a long time to solve the problem.

[0060] The effectiveness verification time may further include the work time required for the work to be carried out as a countermeasure, which will be described with reference to FIG.

[0061] 6 is a diagram showing an example of the standard effect verification time, standard work time, and success rate for each countermeasure. The standard work time is a predetermined work time assigned to the work of the countermeasure as the time required for the work to be performed as the countermeasure.

[0062] 6 are extracted as multiple measures of the same priority, the manufacturing instruction unit 15 determines the effect verification time for measure A to be 12 minutes, which is the sum of 10 minutes, which is the standard effect verification time allocated to the effect verification process of measure A, and 2 minutes, which is the standard work time allocated to the work of measure A, and determines the effect verification time for measure B to be 30 minutes, which is the sum of 20 minutes, which is the standard effect verification time allocated to the effect verification process of measure B, and 10 minutes, which is the standard work time allocated to the work of measure B. Then, from among measures A and B shown in FIG. 6, the manufacturing instruction unit 15 selects measure A, which has the shortest sum of the standard effect verification time and the standard work time.

[0063] The manufacturing instruction unit 15 may also collect information on the time required for the effectiveness verification process for each of the multiple measures that have been implemented, and determine the effectiveness verification time for each of the multiple measures based on the collected information. This will be described with reference to FIG. 7.

[0064] 7 is a diagram showing an example of the actual effect verification time and success rate for each countermeasure. The actual effect verification time is the verification time actually required for the process of verifying the effect of the countermeasure in the environment in which the production management device 2 is applied.

[0065] 7 are extracted as multiple measures of the same priority, the manufacturing instruction unit 15 determines the effect verification time for measure A to be 6 minutes, which is the actual effect verification time actually required for the effect verification process of measure A, and determines the effect verification time for measure B to be 10 minutes, which is the actual effect verification time actually required for the effect verification process of measure B. Then, the manufacturing instruction unit 15 selects measure A, which has the shortest actual effect verification time, from among measures A and B shown in FIG.

[0066] 6, the effect verification time may include the work time required for the work to be carried out as a countermeasure in addition to the actual effect verification time. This will be described with reference to FIG.

[0067] 8 is a diagram showing an example of the actual effect verification time, actual work time, and success rate for each countermeasure. The actual work time is the time actually required for the work executed as a countermeasure in the environment where the production management device 2 is applied.

[0068] 8 are extracted as multiple measures of the same priority, the manufacturing instruction unit 15 determines the effect verification time for measure A to be 9 minutes, which is the sum of 6 minutes, which is the actual effect verification time actually required for the effect verification process of measure A, and 3 minutes, which is the actual work time actually required for the work performed as measure A, and determines the effect verification time for measure B to be 19 minutes, which is the sum of 10 minutes, which is the actual effect verification time actually required for the effect verification process of measure B, and 9 minutes, which is the actual work time actually required for the work performed as measure B. Then, the manufacturing instruction unit 15 selects measure A, which has the shortest sum of the actual effect verification time and the actual work time, from among measures A and B shown in FIG.

[0069] Note that even a measure with a short effect verification time may have a low success rate, and if such a measure is selected, other measures may also end up being implemented, which may lengthen the time required to resolve the problem occurring in the substrate processing apparatus 1. Therefore, the manufacturing instruction unit 15 may select one measure from multiple measures of the same priority based on the effect verification time and the frequency with which the results of mounting-related work by the substrate processing apparatus 1 that implemented the measure improved (in other words, the success rate of the measure). This will be described with reference to FIG. 9.

[0070] 9 is a diagram showing another example of the standard effect verification time, standard work time, and success rate for each measure. Note that, although an example in which the effect verification time is the sum of the standard effect verification time and the standard work time is described here, the effect verification time may be the standard effect verification time, the actual effect verification time, or the sum of the actual effect verification time and the actual work time, as described above.

[0071] For example, if measures C and D shown in Figure 9 are extracted as multiple measures of the same priority, the manufacturing instruction unit 15 determines the effect verification time for measure C to be 12 minutes, which is the sum of 10 minutes, the standard effect verification time allocated to the effect verification process of measure C, and 2 minutes, the standard work time allocated to the work of measure C, and determines the effect verification time for measure D to be 30 minutes, which is the sum of 20 minutes, the standard effect verification time allocated to the effect verification process of measure D, and 10 minutes, the standard work time allocated to the work of measure D.

[0072] Here, if measure C, which has a short effect verification time, is selected, the success rate of measure C is low at 5%, and even if measure C is executed, the results of the mounting-related work will not improve, and measure D will eventually be executed as well, which is likely to increase the time required to resolve the problem occurring in the substrate processing apparatus 1. Therefore, the manufacturing instruction unit 15 may select a measure by taking into consideration not only the effect verification time but also the success rate. In this case, the manufacturing instruction unit 15 may collect information for each of multiple measures of the same priority regarding the frequency with which the results of the mounting-related work by the substrate processing apparatus 1 that executed the measure improved (in other words, the success rate of the measure), and may determine the execution order of multiple measures of the same priority based on the information and the effect verification time, and cause the substrate processing apparatus 1 to execute the measures according to the determined execution order.

[0073] For example, the manufacturing instruction unit 15 may calculate, for each of multiple countermeasures of the same priority, an expected value of the time it will take for the results of the mounting-related work by the substrate processing apparatus 1 to improve if that countermeasure is selected, based on the effectiveness verification time and the frequency with which the results of the mounting-related work by the substrate processing apparatus 1 that has implemented the countermeasure have improved, and select the countermeasure with the shortest calculated expected value.

[0074] For each of measures A and B shown in FIG. 6, the expected values ​​calculated when measure A is selected and the expected values ​​calculated when measure B is selected are as follows.

[0075] If measure A is selected (i.e., measures A, B are executed in this order), the time required until the results of the implementation-related work improve will be 12 minutes, which is the time required to verify the effects of measure A alone, with a 75% probability, and 42 minutes, which is the sum of the time required to verify the effects of measure A and measure B, with a 25% probability that measure A will fail and measure B will also be executed. Therefore, the expected value calculated when measure A is selected is 12 minutes x 75% + 42 minutes x 25% = 19.5 minutes.

[0076] If measure B is selected (i.e., if the measures are executed in the order of measure B, then measure A), the time required until the results of the implementation-related work improve will be 30 minutes, which is the time required to verify the effects of measure B alone, with a 100% probability, and 42 minutes, which is the sum of the time required to verify the effects of measure B and the time required to verify the effects of measure A, with a 0% probability that measure B will fail and measure A will also be executed. Therefore, the expected value calculated when measure B is selected is 30 minutes x 100% + 42 minutes x 0% = 30 minutes.

[0077] Therefore, the manufacturing instruction unit 15 selects Measure A, which has a shorter expected time required for the results of the mounting-related work to improve, from Measures A and B shown in Fig. 6. Since the success rate of Measure A shown in Fig. 6 is relatively high, the result is the same as when only the effect verification time is considered without considering the success rate.

[0078] Next, for each of measures C and D shown in Figure 9, the expected value calculated when measure C is selected and the expected value calculated when measure D is selected are as follows.

[0079] If measure C is selected (i.e., if the measures are executed in the order of measure C, then measure D), the time required until the results of the implementation-related work improve will be 12 minutes, which is the time required to verify the effects of measure C alone, with a 5% probability, and 42 minutes, which is the sum of the time required to verify the effects of measure C and measure D, with a 95% probability that measure C will fail and measure D will also be executed. Therefore, the expected value calculated when measure C is selected is 12 minutes x 5% + 42 minutes x 95% = 40.5 minutes.

[0080] If measure D is selected (i.e., if the measures are executed in the order of measure D, then measure C), the time required until the results of the implementation-related work improve will be 30 minutes, which is the time required to verify the effects of measure D alone, with a 100% probability, and 42 minutes, which is the sum of the time required to verify the effects of measure D and the time required to verify the effects of measure C, with a 0% probability that measure D will fail and measure C will also be executed. Therefore, the expected value calculated when measure D is selected is 30 minutes x 100% + 42 minutes x 0% = 30 minutes.

[0081] 9, the manufacturing instruction unit 15 selects measure D, which has a shorter expected time required for the results of the mounting-related work to improve. Because the success rate of measure C shown in FIG. 9 is low, the result differs from the result obtained when only the effect verification time is considered without considering the success rate.

[0082] In this way, by taking into account the success rate in addition to the effectiveness verification time, measures with a low success rate are less likely to be selected, and measures can be selected that shorten the expected time it takes for the results of implementation-related work to improve, further increasing the possibility of resolving problems that occur in the substrate processing apparatus 1 in a short period of time.

[0083] Furthermore, if it is confirmed that the results of the mounting-related work have improved in a time shorter than the predetermined verification time, the manufacturing instruction unit 15 may determine the effect verification time to be shorter than the predetermined verification time. This will be described with reference to FIG.

[0084] FIG. 10 is a diagram showing an example of the effect verification time and actual work time when each measure is successful, the effect verification time and actual work time when each measure is unsuccessful, and the success rate.

[0085] For example, if the countermeasure is successful, the effect verification time (the time required for the effect verification process) may be shorter than the predetermined verification time. This is because if the countermeasure is successful, the effect is often obtained in a short time, and the effect verification time is likely to be short. On the other hand, if the countermeasure fails, the effect is not apparent even after the predetermined verification time has elapsed, and the effect verification time is likely to be the predetermined verification time. Note that if the countermeasure fails, it may become clear in a short time that the effect is clearly not apparent, and the effect verification time may be shortened. Therefore, by determining the effect verification time to be shorter than the predetermined verification time when it is confirmed whether the results of the mounting-related work have improved in a time shorter than the predetermined verification time, the accuracy of the effect verification time can be improved and the possibility of resolving problems occurring in the substrate processing apparatus 1 in a short time can be further increased. Note that the manufacturing instruction unit 15 may determine the effect verification time to be shorter than the predetermined verification time when the frequency with which the results of the mounting-related work have improved in a time shorter than the predetermined verification time is equal to or greater than a predetermined value.

[0086] For each of measures A and B shown in Figure 10, the expected value of the time it takes for the results of the implementation-related work to improve when measure A is selected, and the expected value of the time it takes for the results of the implementation-related work to improve when measure D is selected, are as follows.

[0087] If measure A is selected (i.e., if the measures are executed in the order measure A, measure B), the time required for the results of the implementation-related work to improve will be 9 minutes, which is the sum of the time to verify the effect if measure A alone is successful and the actual work time, with a 75% probability, and there is a 25% probability that measure A will fail and measure B will also be executed, resulting in a total of 32 minutes, which is the sum of 13 minutes, which is the sum of the time to verify the effect if measure A fails and the actual work time, and 19 minutes, which is the sum of the time to verify the effect if measure B is successful and the actual work time. Therefore, the expected value calculated when measure A is selected is 9 minutes x 75% + 32 minutes x 25% = 14.75 minutes.

[0088] If measure B is selected (i.e., if the measures are executed in the order measure B, then measure A), the time required for the results of the implementation-related work to improve will be 19 minutes, which is the sum of the time to verify the effect if measure B alone is successful and the actual work time, with a 100% probability, and will be 36 minutes, which is the sum of 27 minutes, the sum of the time to verify the effect if measure B fails and the actual work time, plus 9 minutes, the sum of the time to verify the effect if measure A is successful and the actual work time, with a 0% probability. Therefore, the expected value calculated when measure B is selected is 19 minutes x 100% + 36 minutes x 0% = 19 minutes.

[0089] Therefore, from among measures A and B shown in FIG. 10, the manufacturing instruction unit 15 selects measure A, which has a shorter expected time until the results of the mounting-related work improve.

[0090] In the above explanation, for simplicity's sake, two measures are used as an example of multiple measures with the same priority, and the method for calculating the expected value calculated when each measure is selected is explained. However, there may be three or more multiple measures with the same priority. For example, if there are three measures, A, B, and C, the expected value is calculated for each of the following execution orders: measure A, measure B, and measure C; measure A, measure C, and measure B; measure B, measure A, and measure C; measure B, measure C, and measure A; measure C, measure A, and measure B; and measure C, measure B, and measure A. The measure (execution order) that results in the shortest expected value is selected.

[0091] Furthermore, the multiple different measures may be multiple measures to address deterioration in equipment quality in the same substrate processing apparatus 1, or multiple measures to address deterioration in equipment quality in different substrate processing apparatuses 1.

[0092] Furthermore, the multiple different measures may be multiple different measures for one operational unit, or multiple different measures for different operational units. For example, multiple different measures for one operational unit may be cleaning and replacing one nozzle, etc. Also, multiple different measures for multiple operational units may be replacing the feeder, cleaning the nozzle, and cleaning the spindle, etc. For example, if multiple different measures for multiple operational units each have the same priority, one measure may be selected from the multiple different measures for the multiple operational units.

[0093] Furthermore, the manufacturing instruction unit 15 may determine the effect verification time and success rate depending on the worker who executes the countermeasure. For example, if the worker who executes the countermeasure has a high level of proficiency, the work time will be shorter and the success rate will be higher. Therefore, depending on the worker who executes the countermeasure, the countermeasure selected from multiple countermeasures with the same priority may change (in other words, the execution order of the countermeasures may change).

[0094] Furthermore, the manufacturing instruction unit 15 may evaluate the productivity of the substrate processing apparatus 1 after the countermeasures have been implemented. The selected countermeasure may change depending on the productivity evaluation results for each of multiple countermeasures with the same priority (in other words, the execution order of the countermeasures may change). Specifically, among multiple countermeasures with the same priority, the execution order of a countermeasure that reduces productivity may be lowered. An example of a countermeasure that reduces productivity is a reduction in the movement speed or movement acceleration of the mounting head. On the other hand, if the emphasis is on quality rather than productivity, the execution order of the countermeasure that reduces productivity does not need to be lowered.

[0095] Furthermore, the manufacturing instruction unit 15 may acquire a required accuracy that is predetermined according to the type of process performed by the substrate processing apparatus 1, the size of components to be mounted on the substrate, etc., and determine whether the content of the countermeasure satisfies the required accuracy. Specifically, if the content of the countermeasure does not satisfy the required accuracy, the countermeasure may not be selected.

[0096] Returning to the explanation in Figure 4, next, the manufacturing instruction unit 15 instructs the line management device 50 to execute the selected countermeasures (step S17), and the line management device 50 causes the substrate processing apparatus 1 to implement the instructed countermeasures (step S18).

[0097] For example, the production management device 2 may include a display control unit that displays the countermeasures on the display unit 115 of the substrate processing apparatus 1. For example, the manufacturing instruction unit 15 may have the function of a display control unit. For example, the manufacturing instruction unit 15 displays on the display unit 115 a countermeasure selected from multiple countermeasures with the same priority and other countermeasures that were not selected, arranged in order of execution. By viewing the execution order of the countermeasures displayed on the display unit 115, the worker can understand not only the content of the countermeasure to be executed first but also the content of the next countermeasure to be executed if the countermeasure does not improve the results of the mounting-related work, thereby enabling the worker to promptly start the countermeasure. Note that the manufacturing instruction unit 15 may also display on the display unit 115 the time or success rate of verifying the effectiveness of the countermeasure, in addition to the countermeasure.

[0098] After the substrate processing apparatus 1 implements the selected countermeasure, the mounting log is sent to the production management apparatus 2, and the effect verification unit 16 performs the effect verification process (step S19). If the results of the mounting-related work have not improved (NG at the branch in step S19), the next countermeasure is selected and implemented, and the effect verification process is performed. If the results of the mounting-related work have improved (OK at the branch in step S19), the process ends. Note that if a new problem is discovered from the mounting log, the process is performed again from step S12.

[0099] As described above, when multiple countermeasures with the same priority are extracted as countermeasures for addressing a problem (deterioration of equipment quality) occurring in the substrate processing apparatus 1, selecting a countermeasure with a high frequency of improving the results of mounting-related work (in other words, a high success rate) from among the multiple countermeasures with the same priority may increase the time required to resolve the problem occurring in the substrate processing apparatus 1. This is because even a countermeasure with a high success rate may require a long time to verify its effectiveness, and ultimately, it may take a long time to resolve the problem. Therefore, by selecting one countermeasure from the multiple countermeasures with the same priority based on the effectiveness verification time, it is possible to increase the possibility of quickly resolving the problem occurring in the substrate processing apparatus 1.

[0100] While the production management device 2 and substrate processing apparatus 1 of the present disclosure have been described above based on the embodiments, the present disclosure is not limited to the above-described embodiments. As long as they do not deviate from the spirit of the present disclosure, various modifications conceivable by those skilled in the art to the present embodiments and configurations constructed by combining components of different embodiments are also included within the scope of the present disclosure.

[0101] For example, in the above embodiment, an example has been described in which the production management device 2 includes the arbitration unit 14 , but the production management device 2 does not necessarily have to include the arbitration unit 14 .

[0102] For example, the present disclosure can be realized not only as the production management device 2 but also as a production management method including steps (processing) performed by the components that make up the production management device 2.

[0103] As shown in FIG. 4, the production management method includes a status monitoring step (step S12) for detecting deterioration in equipment quality based on information indicating the results of mounting-related work acquired from a substrate processing apparatus 1 having an execution unit 114 that executes mounting-related work on a substrate; a manufacturing instruction step (step S17) for causing the substrate processing apparatus 1 to execute a deterioration countermeasure process with a higher priority from among a plurality of different deterioration countermeasure processes extracted as deterioration countermeasure processes for dealing with deterioration in equipment quality; and an effect verification step (step S19) for performing an effect verification process after the substrate processing apparatus 1 has executed the deterioration countermeasure process to confirm whether the results of the mounting-related work performed by the substrate processing apparatus 1 that executed the deterioration countermeasure process have improved. In the manufacturing instruction step, if the plurality of different deterioration countermeasure processes include multiple deterioration countermeasure processes of the same priority ("multiple" in the branch of step S14), one deterioration countermeasure process is selected from the multiple deterioration countermeasure processes of the same priority based on an effect verification time that includes at least the time required for the effect verification process (step S16), and is caused to be executed by the substrate processing apparatus 1.

[0104] For example, the present disclosure can be realized as a program for causing a computer (processor) to execute steps included in the production management method. Furthermore, the present disclosure can be realized as a non-transitory computer-readable recording medium, such as a CD-ROM, on which the program is recorded.

[0105] For example, when the present disclosure is realized as a program (software), each step is performed by running the program using hardware resources such as a computer's CPU, memory, input / output circuits, etc. In other words, each step is performed by the CPU acquiring data from memory or input / output circuits, etc., performing calculations, and outputting the calculation results to memory or input / output circuits, etc.

[0106] In the above-described embodiment, each component included in the production management device 2 and the substrate processing device 1 may be configured with dedicated hardware, or may be realized by executing a software program suitable for each component. Each component may be realized by a program execution unit such as a CPU or processor reading and executing a software program recorded on a recording medium such as a hard disk or semiconductor memory.

[0107] Some or all of the functions of the production management device 2 and the substrate processing apparatus 1 according to the above-described embodiments are typically realized as an LSI, which is an integrated circuit. These may be individually integrated into single chips, or some or all of them may be integrated into a single chip. Furthermore, the integrated circuit is not limited to an LSI, and may be realized using a dedicated circuit or a general-purpose processor. An FPGA (Field Programmable Gate Array), which can be programmed after LSI fabrication, or a reconfigurable processor, which can reconfigure the connections and settings of circuit cells within an LSI, may also be used.

[0108] Furthermore, if an integrated circuit technology that can replace LSI emerges due to advances in semiconductor technology or other derived technologies, that technology may naturally be used to integrate the components included in the production management device 2 and the substrate processing device 1.

[0109] In addition, this disclosure also includes forms obtained by making various modifications to the embodiments that a person skilled in the art would think of, and forms realized by arbitrarily combining the components and functions in each embodiment within the scope of the present disclosure.

[0110] (Additional Notes) The above description of the embodiments discloses the following techniques.

[0111] (Technology 1) A production management device comprising: a status monitoring unit that detects deterioration in equipment quality based on information indicating results of mounting-related work acquired from a substrate processing apparatus having an execution unit that executes the mounting-related work on a substrate; a manufacturing instruction unit that causes the substrate processing apparatus to execute a deterioration response process with a higher priority from among a plurality of different deterioration response processes extracted as deterioration response processes to address deterioration in equipment quality; and an effect verification unit that, after the substrate processing apparatus has executed the deterioration response process, performs an effect verification process to confirm whether or not results of the mounting-related work performed by the substrate processing apparatus that executed the deterioration response process have improved, wherein, when the plurality of different deterioration response processes include a plurality of deterioration response processes with the same priority, the manufacturing instruction unit selects one deterioration response process from the plurality of deterioration response processes with the same priority based on an effect verification time that includes at least a time required for the effect verification process, and causes the substrate processing apparatus to execute it.

[0112] According to this, when multiple deterioration countermeasure processes with the same priority are extracted as deterioration countermeasure processes for addressing a problem (deterioration in equipment quality) occurring in the substrate processing apparatus, selecting one of the deterioration countermeasure processes with the same priority that has a high frequency of improving the results of mounting-related work (in other words, a high success rate) may lengthen the time required to resolve the problem occurring in the substrate processing apparatus. This is because even a deterioration countermeasure process with a high success rate may require a long time to verify the effectiveness of that deterioration countermeasure process, and ultimately, it may take a long time to resolve the problem. Therefore, by selecting one deterioration countermeasure process from the multiple deterioration countermeasure processes with the same priority based on the effectiveness verification time, the possibility of quickly resolving the problem occurring in the substrate processing apparatus can be increased.

[0113] (Technology 2) The production management device according to Technology 1, wherein the plurality of different deterioration countermeasure processes are a plurality of deterioration countermeasure processes for countering deterioration of equipment quality in the same substrate processing apparatus.

[0114] This allows a deterioration response process that increases the likelihood of resolving the problem in a short period of time to be selected from multiple deterioration response processes of the same priority for a problem that has occurred in a single substrate processing apparatus.

[0115] (Technology 3) The production management device according to Technology 1 or 2, wherein the manufacturing instruction unit selects one deterioration countermeasure process from the plurality of deterioration countermeasure processes of the same priority based on the effect verification time and the frequency with which the results of the mounting-related work by the substrate processing apparatus that executed the deterioration countermeasure process have improved.

[0116] Even if a measure has a short effect verification time, the frequency with which the results of the mounting-related work are improved (success rate) may be low, and if such a deterioration correction process is selected, other deterioration correction processes may also end up being executed, which may lengthen the time required to resolve the problem that has occurred in the substrate processing apparatus. Therefore, by taking the success rate into consideration in addition to the effect verification time, deterioration correction processes with a low success rate are less likely to be selected, and the possibility of resolving the problem that has occurred in the substrate processing apparatus in a short time can be further increased.

[0117] (Technology 4) The production management device according to Technology 3, wherein the manufacturing instruction unit calculates an expected value of the time required for the results of the mounting-related work by the substrate processing apparatus to improve when the deterioration countermeasure process is selected for each of the plurality of deterioration countermeasure processes of the same priority, based on the effect verification time and the frequency with which the results of the mounting-related work by the substrate processing apparatus that has executed the deterioration countermeasure process have improved, and selects the one deterioration countermeasure process that has the shortest calculated expected value.

[0118] This allows for the selection of a deterioration response procedure that reduces the expected time required for the results of mounting-related work to improve, thereby further increasing the likelihood of resolving problems that occur in the substrate processing apparatus in a short period of time.

[0119] (Technology 5) A production management device according to any one of Technologies 1 to 4, wherein a predetermined verification time is assigned to the effect verification process, and the manufacturing instruction unit further determines the effect verification time to be shorter than the predetermined verification time when it is confirmed whether or not the results of the mounting-related work have improved in a time shorter than the predetermined verification time.

[0120] For example, if the deterioration countermeasure processing is successful, the effect verification time may be shorter than the predetermined verification time. This is because if the deterioration countermeasure processing is successful, the effect is often obtained in a short time, and the effect verification time is likely to be short. Therefore, if it is confirmed that the results of the mounting-related work have improved in a time shorter than the predetermined verification time, the effect verification time can be set to a time shorter than the predetermined verification time. This can improve the accuracy of the effect verification time and further increase the possibility of solving a problem occurring in the substrate processing apparatus in a short time.

[0121] (Technology 6) The production management device described in any one of Technologies 1 to 5, wherein the manufacturing instruction unit further collects information regarding the time required for the effect verification process for each of the multiple deterioration response processes that have been executed, and determines the effect verification time for each of the multiple deterioration response processes based on the information.

[0122] According to this, by determining the effect verification time as the time actually required for the effect verification process in the environment in which the production management device is applied, the accuracy of the effect verification time in the environment in which the production management device is applied can be improved, and the possibility of resolving problems that occur in the substrate processing device in a short period of time can be further increased.

[0123] (Technology 7) The production management device described in Technology 3 or 4, wherein the manufacturing instruction unit collects information regarding the frequency with which the results of the mounting-related work by the substrate processing apparatus that executed the deterioration countermeasure processing for each of the plurality of deterioration countermeasure processings of the same priority improved, determines an execution order of the plurality of deterioration countermeasure processings of the same priority based on the information and the effect verification time, and causes the substrate processing apparatus to execute the deterioration countermeasure processing in accordance with the determined execution order.

[0124] According to this, the execution order determined based on information regarding the frequency with which the results of mounting-related work have improved and the effect verification time is an execution order that is likely to shorten the time required to resolve problems that have occurred in the substrate processing apparatus, and therefore, by having the substrate processing apparatus perform deterioration response processing in accordance with this execution order, the possibility of resolving problems that have occurred in the substrate processing apparatus in a short period of time can be increased.

[0125] (Technology 8) The production management device according to any one of technologies 1 to 7, wherein the effectiveness verification time further includes the work time required for work performed as a deterioration countermeasure process.

[0126] According to this, by including the time required for the effect verification process as well as the work time required for the work performed as a deterioration response process in the effect verification time, the accuracy of the effect verification time can be improved, and the possibility of resolving problems that occur in the substrate processing apparatus in a short period of time can be further increased.

[0127] (Technology 9) The production management device according to any one of Technologies 1 to 8, further comprising a display control unit that displays a deterioration response process on a display unit, and the display control unit displays one deterioration response process selected from the plurality of deterioration response processes of the same priority and other deterioration response processes that were not selected, arranged in order of execution on the display unit.

[0128] By viewing the execution order of the deterioration countermeasure processes displayed on the display unit, the worker can grasp not only the content of the deterioration countermeasure process that will be executed first, but also the content of the deterioration countermeasure process that will be executed next if the results of the implementation-related work are not improved by the deterioration countermeasure process, and can quickly start the deterioration countermeasure process.

[0129] (Technology 10) A substrate processing apparatus comprising: an execution unit that performs mounting-related work on a substrate; an operation control unit that controls the operation of the execution unit; and a notification unit that notifies an external device of information regarding the quality of the mounting-related work for each of a plurality of work units that make up the execution unit, and receives an instruction for a deterioration response process selected in a production management apparatus described in any of Technologies 1 to 9, wherein the operation control unit executes the deterioration response process indicated by the received instruction.

[0130] This makes it possible to provide a substrate processing apparatus that can increase the possibility of solving problems that occur in the substrate processing apparatus in a short time.

[0131] (Technology 11) A production management method including: a status monitoring step for detecting deterioration in equipment quality based on information indicating results of mounting-related work acquired from a substrate processing apparatus having an execution unit that executes the mounting-related work on a substrate; a manufacturing instruction step for causing the substrate processing apparatus to execute a deterioration response process with a higher priority from among a plurality of different deterioration response processes extracted as deterioration response processes for dealing with deterioration in equipment quality; and an effect verification step for performing an effect verification process after the substrate processing apparatus has executed the deterioration response process to confirm whether or not results of the mounting-related work performed by the substrate processing apparatus that executed the deterioration response process have improved, wherein in the manufacturing instruction step, when the plurality of different deterioration response processes include a plurality of deterioration response processes with the same priority, one deterioration response process is selected from the plurality of deterioration response processes with the same priority based on an effect verification time that includes at least a time required for the effect verification process, and the substrate processing apparatus is caused to execute the deterioration response process.

[0132] This makes it possible to provide a production management method that can increase the possibility of solving problems that occur in the substrate processing apparatus in a short time.

[0133] (Technology 12) A program for causing a computer to execute the production management method described in Technology 11.

[0134] This makes it possible to provide a program that can increase the possibility of solving a problem occurring in a substrate processing apparatus in a short time.

[0135] The present disclosure can be used to manage substrate processing apparatuses.

[0136] REFERENCE SIGNS LIST 1 Substrate processing apparatus 2 Production management device 3 Memory unit 5 Data creation device 6 Sensor 7 Input device 8 Peripheral device 11 Acquisition unit 12 Status monitoring unit 13 Countermeasure decision unit 14 Arbitration unit 15 Manufacturing instruction unit 16 Effect verification unit 30 Communication network 40 Mounting line 50 Line management device 111 Main control unit 112 Operation control unit 113 Image processing unit 114 Execution unit 115 Display unit 116 Notification unit M1 Substrate supply device M2 Substrate transfer device M3 Printing device M4, M5 Mounting device M6 Reflow device M7 Substrate recovery device M8 Inspection device

Claims

1. A production management device comprising: a status monitoring unit that detects deterioration of equipment quality based on information indicating results of mounting-related work obtained from a substrate processing apparatus having an execution unit that executes mounting-related work on a substrate; a manufacturing instruction unit that causes the substrate processing apparatus to execute a deterioration countermeasure process having a high priority from among a plurality of different deterioration countermeasure processes extracted as deterioration countermeasure processes for dealing with deterioration of equipment quality; and an effect verification unit that performs an effect verification process to confirm whether or not results of the mounting-related work by the substrate processing apparatus that executed the deterioration countermeasure process have improved after the substrate processing apparatus has executed the deterioration countermeasure process, wherein when the plurality of different deterioration countermeasure processes include a plurality of deterioration countermeasure processes of the same priority, the manufacturing instruction unit selects one of the plurality of deterioration countermeasure processes of the same priority based on an effect verification time that includes at least a time required for the effect verification process, and causes the substrate processing apparatus to execute it.

2. The production management device according to claim 1, wherein the plurality of different deterioration countermeasure processes are a plurality of deterioration countermeasure processes for dealing with deterioration of equipment quality in the same substrate processing apparatus.

3. The production management device of claim 1 or 2, wherein the manufacturing instruction unit selects one of the plurality of deterioration countermeasures having the same priority based on the effectiveness verification time and the frequency with which the results of the mounting-related work by the substrate processing device that executed the deterioration countermeasure are improved.

4. The production management device of claim 3, wherein the manufacturing instruction unit calculates an expected value of the time required for the results of the mounting-related work by the substrate processing apparatus to improve when the deterioration countermeasure is selected for each of the multiple deterioration countermeasures of the same priority based on the effect verification time and the frequency with which the results of the mounting-related work by the substrate processing apparatus that has executed the deterioration countermeasure is improved, and selects the one deterioration countermeasure that has the shortest calculated expected value.

5. A production management device as described in claim 1 or 2, wherein a predetermined verification time is assigned to the effect verification process, and the manufacturing instruction unit further determines the effect verification time to be a time shorter than the predetermined verification time when it is confirmed that the results of the mounting-related work have improved in a time shorter than the predetermined verification time.

6. The production management device of claim 1 or 2, wherein the manufacturing instruction unit further collects information regarding the time required for the effectiveness verification process for each of the multiple deterioration response processes that have been executed, and determines the effectiveness verification time for each of the multiple deterioration response processes based on the information.

7. The production management device of claim 3, wherein the manufacturing instruction unit collects information regarding the frequency with which results of the mounting-related work have improved by the substrate processing apparatus which executed the deterioration countermeasure process for each of the plurality of deterioration countermeasure processes having the same priority, determines an execution order for the plurality of deterioration countermeasure processes having the same priority based on the information and the effectiveness verification time, and causes the substrate processing apparatus to execute the deterioration countermeasure processes in accordance with the determined execution order.

8. The production management device according to claim 1 or 2, wherein the effect verification time further includes a work time required for work executed as a deterioration countermeasure process.

9. The production management device according to claim 1 or 2, further comprising a display control unit which displays the deterioration response process on a display unit, and the display control unit displays on the display unit one deterioration response process selected from the plurality of deterioration response processes having the same priority and other deterioration response processes not selected, in order of execution.

10. A substrate processing apparatus comprising: an execution unit which performs mounting-related work on a substrate; an operation control unit which controls the operation of said execution unit; and a notification unit which notifies an external device of information relating to the quality of the mounting-related work of each of a plurality of work units constituting said execution unit, and receives instructions for deterioration countermeasure processing selected in the production management apparatus described in claim 1, wherein said operation control unit executes the deterioration countermeasure processing indicated by the received instructions.

11. A production management method comprising: a status monitoring step of detecting deterioration in equipment quality based on information indicating results of mounting-related work obtained from a substrate processing apparatus having an execution unit that executes mounting-related work on a substrate; a manufacturing instruction step of having the substrate processing apparatus execute a deterioration countermeasure process having a high priority from among a plurality of different deterioration countermeasure processes extracted as deterioration countermeasure processes for dealing with deterioration in equipment quality; and an effect verification step of performing an effect verification process to confirm whether or not results of the mounting-related work by the substrate processing apparatus that executed the deterioration countermeasure process have improved after the substrate processing apparatus executes the deterioration countermeasure process, wherein in the manufacturing instruction step, when the plurality of different deterioration countermeasure processes include a plurality of deterioration countermeasure processes of the same priority, one deterioration countermeasure process is selected from the plurality of deterioration countermeasure processes of the same priority based on an effect verification time that includes at least a time required for the effect verification process, and the substrate processing apparatus is caused to execute the deterioration countermeasure process in the substrate processing apparatus.

12. A program for causing a computer to execute the production management method according to claim 11.

Citation Information

Patent Citations

  • Output apparatus, ouput method, and output program for fail factor estimating means

    JP2005327909A

  • Processing apparatus for substrate

    JP2008311393A

  • Substrate production management device and substrate production management method

    JP2018018917A

  • Error-handling support device

    WO2016157303A1