Battery system and electric device

By setting the communication cycle and reserved period in the battery system, the communication between the battery management device and the battery unit is optimized, and the problem of low battery management efficiency is solved, and efficient battery parameter acquisition and management is achieved.

WO2024230147A1PCT designated stage expired Publication Date: 2024-11-14CONTEMPORARY AMPEREX TECHNOLOGY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/136897
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-10
Filing Date
2023-12-06
Publication Date
2024-11-14

AI Technical Summary

Technical Problem

As the number of battery cells managed by the battery management device and the number of parameters required to be collected increases, how to optimize the communication process between the battery management device and the battery cell to improve management efficiency has become an urgent problem.

Method used

By setting a predetermined communication cycle in the battery system, including an uplink period, a downlink period and a reserved period, the duration and maximum allowable number of communication cycles are set according to the needs of the battery management device, data conflicts and delay problems are alleviated, and communication efficiency is improved.

Benefits of technology

Effectively alleviate data conflicts, improve the communication efficiency between the battery management device and the battery unit, ensure timely acquisition of battery parameters, reduce power consumption, and optimize battery management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023136897_14112024_PF_FP_ABST
    Figure CN2023136897_14112024_PF_FP_ABST
Patent Text Reader

Abstract

The present application provides a battery system and an electric device. A battery management apparatus communicates with a plurality of battery cells in a predetermined communication cycle. The communication cycle is set according to a parameter uploading cycle of the battery cells required by the battery management apparatus. Each communication cycle comprises at least one downlink time period, an uplink time period corresponding to each battery cell, and a first reserved time period. The battery management apparatus issues downlink data to the battery cells by means of the downlink time period. The maximum allowable number of battery cells communicating with the battery management apparatus in each communication cycle is set according to the duration of the communication cycle, the total duration of the downlink time period in each communication cycle, the total duration of the uplink time periods in each communication cycle and the duration of the first reserved time period. In this way, the communication efficiency between the battery management apparatus and the battery cells can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Battery systems and electrical equipment

Technical field

[0001] The present application belongs to the field of battery technology, and in particular relates to a battery system and electrical equipment. [Background Technology]

[0002] With the widespread development of electric vehicles and energy storage systems, research is underway on high-performance, rechargeable batteries. Furthermore, in devices requiring high capacity and voltage, such as electric vehicles, multiple battery cells are typically connected in series or parallel, each managed by a battery management unit (BMU). However, with the increasing number of battery cells managed by BMUs and the number of parameters required to be collected, optimizing the communication between BMUs and battery cells to improve management efficiency has become a pressing issue.

[0003] [Summary of the invention]

[0004] The present application provides a battery system and electrical equipment, aiming to solve the above-mentioned technical problems existing in the prior art.

[0005] In order to solve the above technical problems, a technical solution adopted in the present application is: to provide a battery system, which includes a battery management device and multiple battery cells, and the battery management device communicates with the multiple battery cells in a predetermined communication cycle, wherein the communication cycle is set according to the parameter upload cycle of the battery cell required by the battery management device, and each communication cycle includes at least one downlink period, an uplink period corresponding to each battery cell, and a first reserved period. The battery management device sends downlink data to the battery cell through the downlink period, wherein the maximum allowable number of battery cells communicating with the battery management device in each communication cycle is set according to the length of the communication cycle, the total length of the downlink period in each communication cycle, the total length of the uplink period in each communication cycle, and the length of the first reserved period. Therefore, the communication cycle is set according to the parameter upload cycle of the battery cell required by the battery management device, and the maximum allowable number of battery cells communicating with the battery management device in each communication cycle is set according to the duration of the communication cycle, the total duration of the downlink period in each communication cycle, the total duration of the uplink period in each communication cycle, and the duration of the first reserved period. This can effectively alleviate the data conflict problem of different battery cells and improve the communication efficiency between the battery management device and the battery cells.

[0006] In some embodiments, the duration of the communication cycle is less than or equal to the duration of the parameter upload cycle, thereby enabling the battery management device to obtain the parameters of the battery cell in a timely manner in each communication cycle as required.

[0007] In some embodiments, the duration of the parameter upload cycle is less than or equal to 500 ms. This allows the battery management device to manage the battery cells in a timely manner according to the parameters of the battery cells, thereby improving management effects.

[0008] In some embodiments, the duration of the first reserved period is set at least according to the network delay between the battery unit and the battery management device, thereby alleviating the data conflict problem caused by the network delay.

[0009] In some embodiments, the duration of the first reserved period is greater than or equal to the network delay between the battery unit and the battery management device, thereby alleviating data conflict problems caused by network delay during the upload process.

[0010] In some embodiments, the network delay between the battery unit and the battery management device is less than or equal to 20 ms. This can reduce the proportion of the first reserved period in the entire communication cycle and improve data transmission efficiency.

[0011] In some embodiments, the duration of the first reserved period is set based on at least a processing delay of the battery management device for uplink data. This enables the battery management device to promptly process uplink data for the current communication cycle, alleviating data conflicts caused by processing delays of the battery management device.

[0012] In some embodiments, the first reserved period is longer than or equal to the time required for the battery management device to make a control decision based on the uplink data uploaded in the current communication cycle. This allows the battery management device to process the uplink data of the current communication cycle in a timely manner, mitigating data conflicts caused by processing delays in the battery management device.

[0013] In some embodiments, the uplink period includes an uplink transmission period and a second reserved period, wherein the uplink transmission period is used for the battery unit to upload uplink data to the battery management device. In this way, the uplink transmission periods of each battery unit can be effectively staggered, alleviating data conflict issues.

[0014] In some embodiments, the duration of the second reserved period is set based on at least a network delay from the battery unit to the battery management device, thereby alleviating data conflict issues caused by network delays during the upload process.

[0015] In some embodiments, the second reserved period is longer than or equal to the network delay between the battery unit and the battery management device, thereby alleviating data conflict issues caused by network delay during the upload process.

[0016] In some embodiments, the network delay between the battery unit and the battery management device is less than or equal to 20 ms. This can reduce the proportion of the second reserved period in the entire communication cycle and improve data transmission efficiency.

[0017] In some embodiments, the duration of the second reserved period is set at least according to the sampling synchronization difference of the battery cells, thereby alleviating the data conflict problem caused by the sampling synchronization difference.

[0018] In some embodiments, the duration of the second reserved period is greater than or equal to the sampling synchronization difference of the plurality of battery cells, thereby alleviating the data conflict problem caused by the sampling synchronization difference.

[0019] In some embodiments, the sampling synchronization difference of the multiple battery cells is less than or equal to 20ms. This can reduce the time proportion of the second reserved period in the entire communication cycle and improve data transmission efficiency.

[0020] In some embodiments, the maximum allowed number is less than or equal to the difference between the duration of the communication cycle, the total duration of the downlink period, and the first reserved period, divided by the total duration of the uplink period. This ensures that each battery unit communicating with the battery management device in each communication cycle has sufficient time to upload data.

[0021] In some embodiments, the uplink data includes voltage parameters, and at least some of the battery cells upload the voltage parameters in each communication cycle. This allows the battery management device to obtain the voltage parameters of at least some of the battery cells in each communication cycle, thereby enabling timely management.

[0022] In some embodiments, the uplink data also includes other operating parameters in addition to the voltage parameter. At least some of the battery cells selectively upload at least some of the other operating parameters during each communication cycle, such that the frequency of uploading at least some of the other operating parameters is less than or equal to the frequency of uploading the voltage parameter. This can reduce the amount of data transmitted during communication and the power consumption of the battery cells and the battery management device.

[0023] In some embodiments, the communication cycle includes a first communication cycle and a second communication cycle, wherein at least some battery cells upload a first set of operating parameters during a first upload period of the first communication cycle and upload a second set of operating parameters during a second upload period of the second communication cycle, wherein the position of the first upload period in the first communication cycle is at least partially the same as the position of the second upload period in the second communication cycle, and at least some of the operating parameters in the first set of operating parameters and the second set of operating parameters are of different parameter types. Thus, operating parameters of different parameter types can be reused in different communication cycles, which can shorten the communication cycle between the battery management device and the battery cells and improve management efficiency.

[0024] In some embodiments, the position of the first upload period in the first communication cycle is the same as the position of the second upload period in the second communication cycle, or the position of the first upload period in the first communication cycle is greater than or equal to 50% identical to the position of the second upload period in the second communication cycle. This can further shorten the communication cycle between the battery management device and the battery unit and improve management efficiency. Furthermore, only when the position of the first upload period and the second upload period is greater than or equal to 50% identical can period reuse be effective and improve management efficiency. If the positional similarity is less than 50%, the communication cycle between the battery management device and the battery unit cannot be significantly shortened, and management efficiency is relatively low.

[0025] In some embodiments, the downlink data includes sampling parameter indication data, which is used to indicate the parameter types that the battery unit needs to upload during the current communication cycle, wherein the sampling parameter indication data sent during at least some communication cycles indicates different parameter types. This allows the battery unit to upload operating parameters of different parameter types during different communication cycles, allowing operating parameters to be uploaded on demand, reducing the amount of communication data between the battery management device and the battery unit, and reducing the power consumption of the battery unit and the battery management device.

[0026] In order to solve the above technical problems, a technical solution adopted in the present application is: to provide an electrical device, which includes the battery system described in any of the above embodiments.

Brief Description of the Drawings

[0027] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present application. Those skilled in the art can also derive other drawings based on these drawings without inventive work, among which:

[0028] FIG1 is a structural diagram of an embodiment of a battery system of the present application;

[0029] FIG2 is a schematic diagram of a communication cycle of the first embodiment of the battery system of the present application;

[0030] FIG3 is a schematic diagram of a communication cycle of a second embodiment of a battery system of the present application;

[0031] FIG4 is a schematic diagram of a communication cycle of a third embodiment of a battery system of the present application;

[0032] FIG5 is a schematic structural diagram of an embodiment of an electrical device of the present application. [Specific implementation method]

[0033] The following detailed description of the embodiments of the present application is provided in conjunction with the accompanying drawings and examples. The following detailed description of the embodiments and the accompanying drawings are used to illustrate the principles of the present application, but are not intended to limit the scope of the present application, that is, the present application is not limited to the described embodiments.

[0034] In the description of this application, it should be noted that, unless otherwise specified, "multiple" means more than two; the terms "upper", "lower", "left", "right", "inside", "outside", etc., indicating directions or positional relationships, are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on this application. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. "Vertical" is not strictly perpendicular, but is within the allowable error range. "Parallel" is not strictly parallel, but is within the allowable error range.

[0035] The directional words appearing in the following description are all directions shown in the figures, and do not limit the specific structure of this application. In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.

[0036] With the widespread development of electric vehicles and energy storage systems, research is underway on high-performance, rechargeable batteries. Furthermore, in devices requiring high capacity and voltage, such as electric vehicles, multiple battery cells are typically connected in series or parallel, each managed by a battery management unit (BMU). However, with the increasing number of battery cells managed by BMUs and the number of parameters required to be collected, optimizing the communication between BMUs and battery cells to improve management efficiency has become a pressing issue.

[0037] Specifically, to improve the management efficiency of the battery management device, the battery management device needs to manage the battery cells at a higher management frequency, and therefore needs to obtain the operating parameters of the battery cells in a relatively short communication cycle. However, as the number of battery cells managed by the battery management device and the number of parameters that need to be collected continue to increase, the communication duration requirement is also gradually increasing, creating a conflict between the two. Therefore, it is necessary to strike a balance between these two conflicting requirements.

[0038] To address the above issues, the present application proposes a battery system. Referring to FIG1 , FIG1 is a schematic diagram illustrating the structure of an embodiment of the battery system of the present application. As shown in FIG1 , the battery system 100 of the present embodiment includes a battery management device 10 and a plurality of battery cells 20 .

[0039] In this embodiment, the battery management device 10 communicates with multiple battery cells 20 in a predetermined communication cycle, where the communication cycle is set based on the battery cell 20 parameter upload period required by the battery management device 10. Each communication cycle includes at least one downlink period, an uplink period corresponding to each battery cell 20, and a first reserved period. The battery management device 10 transmits downlink data to the battery cells 20 during the downlink period. The maximum allowable number of battery cells 20 that can communicate with the battery management device 10 during each communication cycle is set based on the duration of the communication cycle, the total duration of the downlink periods within each communication cycle, the total duration of the uplink periods within each communication cycle, and the duration of the first reserved period.

[0040] Before introducing the battery system 100 of the present application, please first refer to Figure 2, which is a schematic diagram of the communication cycle of the first embodiment of the battery system of the present application. The following description of each embodiment will be exemplified in conjunction with the specific timing diagram 2. As shown in Figure 2, each communication cycle of duration t1 is provided with a downlink period of duration t2, multiple uplink periods of duration t3, and a first retention period of duration t4. The duration t1 of the communication cycle is set based on the parameter upload period required by the battery management device 10 for the battery cells 20. During the downlink period, the battery management device 10 transmits downlink data to each battery cell 20 wirelessly connected to the battery management device 10. This downlink data can be used to instruct the battery cells 20 to collect and upload operating parameters. In response to the downlink data, the battery cells 20 upload uplink data during their corresponding uplink periods. The uplink data is the operating parameters collected by the battery cells 20 themselves. As shown in FIG2 , t1 is the duration of the communication cycle, t2 is the total duration of the downlink period in each communication cycle, t3 is the total duration of the uplink period corresponding to a single battery unit 20 in each communication cycle, and t4 is the duration of the first reserved period.

[0041] In the battery system 100 of this embodiment, the battery unit 20 in the battery system 100 can be a single battery cell, or can include a collection of multiple battery cells, including but not limited to a battery pack. It should be understood that the battery cells in the embodiments of the present application include but are not limited to lithium-ion batteries, lithium metal batteries, lead-acid batteries, nickel-cadmium batteries, silver-hydrogen batteries, lithium-sulfur batteries, lithium-air batteries, or sodium-ion batteries. Parameter upload cycles include but are not limited to voltage upload cycles, current upload cycles, and temperature upload cycles. In this embodiment, the voltage parameter is an important parameter of the battery system 100. Therefore, when setting the communication cycle of the battery system 100, it is mostly set according to the voltage upload cycle of the battery cell 20 required by the battery management device 10.

[0042] The battery management device 10 can be a battery management system (BMS), a central control platform for an electric vehicle, or an energy storage device, without limitation. Furthermore, the shape and arrangement of the battery cells 20 shown in FIG1 are merely illustrative and are not intended to be limiting. Furthermore, the communication methods employed include, but are not limited to, optical communication, Bluetooth communication, radio frequency communication, and the like.

[0043] In this embodiment, the battery management device 10 can determine the parameter upload cycle for the battery cells 20 required by the battery management device 10 based on its management requirements. Specifically, the interval at which the battery management device 10 requires the battery cells 20 to upload parameters can be determined. The communication cycle of the battery system 100 can be set based on the parameter upload cycle. Referring to Figure 2 , the maximum number of battery cells 20 allowed to communicate with the battery management device 10 during each communication cycle is set based on the communication cycle duration t1, the total duration t2 of the downlink periods within each communication cycle, the total duration t3 of the uplink periods within each communication cycle, and the duration t4 of the first reserved period. The total duration t2 of the downlink periods can be set based on the number of bytes of downlink data required to be sent to the battery cells 20 during each communication cycle and the downlink transmission rate. The total duration t3 of the uplink periods within each communication cycle can be set based on the number of bytes of uplink data required to be uploaded to the battery management device 10 during each communication cycle and the uplink transmission rate. The first reserved period, duration t4, is set to resolve data conflicts caused by various delays and is described in detail below.

[0044] Through the above-mentioned method, the data conflict problem of different battery cells 20 can be effectively alleviated, and the communication efficiency between the battery management device 10 and the battery cells 20 can be improved.

[0045] Optionally, the above setting method can be used in the wireless architecture design of the battery management device 10 and the battery cells 20, for example, the actual number of battery cells 20 communicating with the battery management device 10 in each communication cycle is set to be less than the maximum allowable number.

[0046] Optionally, the above configuration can also serve as a basis for dynamic adjustments after the wireless architecture design is complete. In a specific application scenario, the battery management device 10 can adjust the parameter upload cycle based on specific operating conditions. For example, for electric vehicles or energy storage devices, the parameter upload cycle can be increased when the output power is relatively low, and decreased when the output power is relatively high. Another example is that the parameter upload cycle can be increased when the charging input power is relatively low, and decreased when the charging input power is relatively high. As a result, the communication cycle duration t1 will also change with changes in the parameter upload cycle. In this case, the battery management device 10 and the battery cells 20 can adjust the total duration t2 of the downlink period, the total duration t3 of the uplink period corresponding to each battery cell 20, or the maximum allowed number of battery cells 20 based on changes in the communication cycle duration t1. For example, the durations can be changed by changing the communication rate to ensure that the maximum allowed number remains unchanged. Alternatively, while the communication rate remains unchanged, the maximum allowed number can be changed to adjust the actual number of battery cells 20 communicating with the battery management device 10 during each communication cycle.

[0047] In another application scenario, if the number of battery cells 20 exceeds the maximum allowable number, the actual number of battery cells 20 communicating with the battery management device 10 in each communication cycle can be set to be less than or equal to the maximum allowable number based on the maximum allowable number. Furthermore, a communication connection can be selectively established between the battery management device 10 and different combinations of battery cells 20 in different communication cycles using a predetermined polling method. Specifically, the battery management device 10 can broadcast the battery identifiers or battery identifier ranges of the battery cells 20 for which wireless connections are to be established. A battery cell 20 establishes a wireless connection with the battery management device 10 when its own battery identifier is the same as the broadcasted battery identifier or is within the broadcasted battery identifier range.

[0048] Optionally, the duration t1 of the communication cycle may be less than or equal to the duration of the parameter upload cycle. Thus, the battery management device 10 can obtain the parameters of the battery cell 20 in a timely manner in each communication cycle as required.

[0049] Optionally, the parameter upload cycle is less than or equal to 500ms. In other embodiments, the parameter upload cycle can be further less than or equal to 200ms or 100ms. This allows the battery management device 10 to manage the battery cell 20 in a timely manner based on the parameters of the battery cell 20, thereby improving management effectiveness.

[0050] Optionally, the duration t4 of the first reserved period is set based on at least the duration t5 of the network delay between the battery cell 20 and the battery management device 10. This alleviates data conflicts caused by network delay. Specifically, the network delay t5 refers to the time required for data to be transmitted from one end of the network to the other. Because network delays are common between the battery cell 20 and the battery management device 10, uplink data from the previous communication cycle may not reach the battery management device 10 due to network delays before the battery management device 10 has already sent downlink data for the next communication cycle, resulting in data conflicts. Setting the first reserved period to a duration t4 effectively resolves this issue. Furthermore, the first reserved period can be a single period and can be optionally set after all uplink periods. In this case, there can also be multiple first reserved periods, set anywhere outside of the uplink and downlink periods as needed. Generally speaking, under normal conditions, the first reserved period of duration t4 only provides transmission redundancy for uplink and downlink data that should be transmitted during the uplink and downlink periods, and does not transmit any additional data. That is, the first reserved period is used to transmit uplink data and downlink data only when the uplink data or / and downlink data are delayed.

[0051] Optionally, as shown in FIG2 , the duration t4 of the first reserved period is greater than or equal to the duration t5 of the network delay between the battery unit 20 and the battery management device 10. This can more effectively alleviate data conflicts caused by the duration t5 of the network delay during the upload process. In this case, the average network delay within a certain time range (e.g., 1 hour) can be calculated as a benchmark, and the duration t4 of the first reserved period can be set to be greater than or equal to the duration t5 of the average network delay.

[0052] Optionally, the duration t5 of the network delay between the battery unit 20 and the battery management device 10 is less than or equal to 20ms. Furthermore, the duration t5 of the network delay between the battery unit 20 and the battery management device 10 is less than or equal to 10ms. Thus, the proportion of the first reserved period of duration t4 in the entire communication cycle can be reduced, thereby improving data transmission efficiency. Specifically, the greater the network delay, the longer the duration t4 of the first reserved period will be set, resulting in a shorter duration t3 used for the uplink period and a shorter duration t2 used for the downlink period in the communication cycle. Therefore, reasonably shortening the duration t5 of the network delay can increase the duration t3 of the uplink period and the duration t2 of the downlink period, thereby improving data transmission efficiency.

[0053] Optionally, the duration t4 of the first reserved period is set at least according to the processing delay of the uplink data by the battery management device 10. As a result, the battery management device 10 can process the uplink data of the current communication cycle in a timely manner, alleviating the data conflict problem caused by the processing delay of the battery management device 10. Specifically, as shown in Figure 2, the processing delay refers to the time t6 required for the battery management device 10 to process the uplink data uploaded by the battery unit 20 and make a control decision. In the first reserved period of duration t4, the battery management device 10 needs to process the collected uplink data. If the battery management device 10 has not finished processing the uplink data of the current communication cycle, and the uplink data of the next communication cycle has been uploaded, a data conflict will occur. The above problem can be effectively solved by setting the first reserved period of duration t4.

[0054] Optionally, as shown in Figure 2, the duration t4 of the first reserved period is greater than or equal to the time t6 required for the battery management device 10 to make a control decision based on the uplink data uploaded during the current communication cycle. This allows the battery management device to promptly process the uplink data of the current communication cycle, alleviating data conflicts caused by processing delays in the battery management device. Specific control decisions include, but are not limited to, balancing decisions, overvoltage alerts, undervoltage alerts, and temperature control decisions.

[0055] Optionally, as shown in FIG2 , the upload period of duration t3 includes an uplink transmission period of duration t32 and a second reserved period of duration t31, wherein the uplink transmission period of duration t32 is for the battery unit 20 to upload uplink data to the battery management device 10. In this way, the uplink transmission periods of each battery unit 20 can be effectively staggered to alleviate the data conflict problem. The second reserved period of duration t31 can be set before and / or after the uplink transmission period of the same upload period. Generally speaking, under normal conditions, the second reserved period of duration t31 also only provides transmission redundancy for the uplink data and downlink data that should have been transmitted in the uplink period and the downlink period, and does not transmit other additional data.

[0056] Optionally, the duration t31 of the second reserved period is set based on at least the duration t5 of the network delay between the battery cell 20 and the battery management device 10. This can alleviate data conflicts caused by network delays during the upload process. Specifically, due to the widespread network delay between the battery cell 20 and the battery management device 10, data conflicts may occur during the same communication cycle when uplink data uploaded by one battery cell 20 has not yet been received by the battery management device 10 while another battery cell 20 has already begun uploading uplink data. Setting a second reserved period of duration t31 effectively resolves this issue.

[0057] 2 , the duration t31 of the second reserved period is greater than or equal to the duration t5 of the network delay between the battery unit 20 and the battery management device 10. This can alleviate the data conflict problem caused by the network delay during the upload process.

[0058] Optionally, the duration t5 of the network delay between the battery unit 20 and the battery management device 10 is less than or equal to 20ms. Furthermore, the duration t5 of the network delay between the battery unit 20 and the battery management device 10 is preferably less than or equal to 10ms. Thus, the proportion of the second reserved period of duration t31 in the entire communication cycle can be reduced, thereby improving data transmission efficiency. Similar to the above description, the greater the duration t5 of the network delay, the longer the duration t31 of the second reserved period will be set, resulting in a shorter duration t3 for the uplink period and t2 for the downlink period in the communication cycle. Therefore, reasonably reducing the duration t5 of the network delay can increase the duration t3 of the uplink period and the duration t2 of the downlink period, thereby improving data transmission efficiency.

[0059] Optionally, the duration t31 of the second reserved period is set based on at least the sampling synchronization differences among the battery cells 20. This alleviates data conflicts caused by sampling synchronization differences. Specifically, sampling synchronization differences refer to the differences in the time it takes different battery cells 20 to complete sampling of corresponding operating parameters, as shown by t7 in Figure 2. In this embodiment, there are two factors that contribute to sampling synchronization differences between battery cells 20: one is the time it takes for the battery cells 20 to complete sampling of their own operating parameters, and the other is the network latency differences between the battery management device 10 and the different battery cells. Because uploading uplink data requires waiting for the sampling of the corresponding operating parameters to complete before executing, sampling synchronization differences can lead to differences in the timing of uplink data uploads. Consequently, a battery cell 20 that should have uploaded uplink data earlier may have delayed its sampling completion, causing its uplink data upload time to overlap with that of other battery cells 20, leading to data conflicts. Setting a second reserved period of duration t31 effectively addresses this issue.

[0060] Optionally, the duration t31 of the second reserved period is greater than or equal to the duration t7 of the sampling synchronization difference of the multiple battery cells 20. Thus, the data conflict problem caused by the sampling synchronization difference of the multiple battery cells 20 can be alleviated.

[0061] Optionally, the duration t7 of the sampling synchronization difference of the battery cell 20 is less than or equal to 20ms. This can reduce the proportion of the second reserved period of duration t31 in the entire communication cycle, thereby improving data transmission efficiency. The specific reasons are similar to the network delay described above and will not be repeated here.

[0062] Optionally, the maximum allowable number is less than or equal to the difference between the communication cycle duration t1, the total duration of the downlink period, and the duration t4 of the first reserved period, divided by the total duration t3 of the uplink period. This ensures that each battery cell 20 communicating with the battery management device 10 has sufficient time to upload data during each communication cycle. The specific method for setting the maximum allowable number will be described below in conjunction with the specific timing diagram 2.

[0063] As shown in FIG2 , the maximum allowable number M of battery cells 20 communicating with the battery management device 10 in each communication cycle satisfies the following formula: M≤(t1-t2-t4) / t3 (1)

[0064] As shown in FIG2 , t1 is the duration of the communication cycle, t2 is the total duration of the downlink period in each communication cycle, t3 is the total duration of the uplink period corresponding to a single battery unit 20 in each communication cycle, and t4 is the duration of the first reserved period.

[0065] Furthermore, as described in the previous embodiment, the duration of the network delay between the battery unit 20 and the battery management device 10 is represented by t5, and the duration of the first reserved period t4 is set based on the duration t5 of the network delay between the battery management device 10 and, in FIG2 , is set to be greater than the duration t5 of the network delay. The time required for the battery management device 10 to make a control decision based on the uplink data uploaded in the current communication cycle is represented by t6, and the duration t4 of the first reserved period is set based on the time t6 required for decision-making and, in FIG2 , is set to be greater than the time t6 required for decision-making.

[0066] Furthermore, each uplink period t3 includes a second reserved period of duration t31 and an uplink transmission period of duration t32. At this time, the duration t31 of the second reserved period is set based on the duration t5 of the network delay between the battery management devices 10 and is set to be greater than the duration t5 of the network delay in FIG2 .

[0067] In addition, the sampling synchronization difference of the battery unit 20 is represented by t7. The duration t31 of the second reserved period is set according to the sampling synchronization difference t7, and is set to be greater than the sampling synchronization difference t7 in FIG.

[0068] Optionally, based on the above embodiment, the uplink data uploaded by the battery cells 20 to the battery management device 10 includes voltage parameters, and at least some of the battery cells 20 upload the voltage parameters during each communication cycle. Specifically, as described above, since voltage parameters are important parameters that the battery management device 10 needs to obtain in a timely manner, the above method enables the battery management device 10 to obtain the voltage parameters of at least some of the battery cells 20 during each communication cycle, thereby performing timely management.

[0069] Optionally, the uplink data uploaded by the battery cells 20 to the battery management device 10 also includes other operating parameters in addition to voltage parameters. At least some of the battery cells 20 selectively upload at least some of the other operating parameters during each communication cycle, such that the upload frequency of at least some of the other operating parameters is less than or equal to the upload frequency of the voltage parameters. Other operating parameters in addition to voltage parameters include, but are not limited to, current parameters, temperature parameters, or air pressure parameters. Since other operating parameters are less important and less frequently needed than voltage parameters, the above method can reduce the amount of data transmitted during communication and reduce the power consumption of the battery cells 20 and the battery management device 10.

[0070] Please refer to Figure 3, which is a schematic diagram of the communication cycle of the second embodiment of the battery system of the present application. In other embodiments, as shown in Figure 3, each communication cycle of duration t1 is provided with a first downlink period of duration t21, multiple first uplink periods of duration t31, multiple second downlink periods of duration t22, multiple second uplink periods of duration t32, and a first retention period of duration t4. The duration t1 of the communication cycle is set based on the parameter upload period of the battery cell 20 required by the battery management device 10.

[0071] As shown in Figure 3, the battery management device 10 sends first downlink data to the battery cells 20 wirelessly connected to the battery management device 10 during the first downlink period of duration t21. The first downlink data can be used to instruct the battery cells 20 to collect and upload working parameters. In response to the first downlink data, the battery cells 20 upload first uplink data during their respective corresponding first uplink periods of duration t31. The first uplink data is the working parameters collected by the battery cells 20 themselves. The battery management device 10 further sends second downlink data for each battery cell 20 wirelessly connected to the battery management device 10 during each second downlink period of duration t22. Each battery cell 20 responds to the second downlink data for itself by feeding back second uplink data during the corresponding second uplink period of duration t32. The second downlink data can be used to control the corresponding battery cell 20 to perform corresponding work, including but not limited to balancing actions.

[0072] As shown in FIG3 , the total duration of the downlink period in each communication cycle is t2=t21+M×t22, and the total duration of the uplink period corresponding to a single battery unit 20 in each communication cycle is t3=t31+t32. Substituting the above formula, we can obtain: M≤(t1-t21-M×t22-t4) / (t31+t32) (2)

[0073] By solving Formula 2, the maximum allowable number M of battery cells 20 communicating with the battery management device 10 in each communication cycle can also be obtained.

[0074] Please refer to Figure 4, which is a schematic diagram of the communication cycle of the third embodiment of the battery system of the present application. As shown in Figure 4, in this embodiment, the communication cycle of the battery system 100 includes a first communication cycle T1 and a second communication cycle T2.

[0075] Each of the first communication cycle T1 and the second communication cycle T2 includes a downlink period of duration t2 and multiple uplink periods of duration t3. The battery management device 10 transmits downlink data to the battery unit 20 wirelessly connected to the battery management device 10 during the downlink periods of the first communication cycle T1 and the second communication cycle T2. The battery unit 20 uploads the collected operating parameters during the uplink period corresponding to the first communication cycle T1 in response to the downlink data of the first communication cycle T1. The battery unit 20 uploads the collected operating parameters during the uplink period corresponding to the second communication cycle T2 in response to the downlink data of the second communication cycle T2.

[0076] Optionally, the communication cycle may include a first communication cycle T1 and a second communication cycle T2. At least some of the battery cells 20 upload a first set of operating parameters during a first upload period of duration t3 in the first communication cycle T1, and upload a second set of operating parameters during a second upload period of duration t3 in the second communication cycle T2. The position of the first upload period in the first communication cycle is at least partially the same as the position of the second upload period in the second communication cycle, and at least some of the operating parameters in the first and second sets of operating parameters are of different parameter types. Generally speaking, an uplink period is required for data upload for operating parameters of different parameter types in each communication cycle. Therefore, as the number of operating parameters increases, the duration t3 of the uplink period increases, thereby lengthening the overall duration of the communication cycle. By setting the position of the first upload period in the first communication cycle to be at least partially the same as the position of the second upload period in the second communication cycle, operating parameters of different parameter types can be reused in different communication cycles, shortening the communication cycle between the battery management device 10 and the battery cells 20 and improving management efficiency.

[0077] In this embodiment, the position of the first upload period in the first communication cycle T1 is at least partially the same as the position of the second upload period in the second communication cycle T2, which means that after the starting point of the first communication cycle is aligned with the starting point of the second communication cycle on the time axis, the first upload period and the second upload period at least partially overlap.

[0078] Please refer to Figures 2 and 4. As shown in Figure 4, the sampling parameter indication data sent in different communication cycles is different, so the parameters transmitted in the uplink period in different communication cycles are also different. As shown in Figure 2, a second reserved period is set in each uplink period. The duration t31 of the second reserved period is set based on factors such as the sampling synchronization differences of the battery cell 20 and the network delay between the battery cell 20 and the battery management device 10. The sampling synchronization differences of different parameters in different cycles may be different, so the duration t31 of the second reserved period set in different cycles is also different, which results in the position of the first upload period in the first communication cycle and the position of the second upload period in the second communication cycle being different.

[0079] Furthermore, in other embodiments, the position of the first upload period in the first communication cycle T1 may be the same as the position of the second upload period in the second communication cycle T2. That is, after aligning the starting point of the first communication cycle T1 with the starting point of the second communication cycle T2 on the time axis, the first upload period and the second upload period completely overlap. Alternatively, the position of the first upload period in the first communication cycle and the position of the second upload period in the second communication cycle are greater than or equal to 50% identical, that is, after aligning the starting point of the first communication cycle with the starting point of the second communication cycle on the time axis, the position of the first upload period and the second upload period are greater than or equal to 50%. In addition, the degree of similarity between the positions of the first upload period and the second upload period refers to the ratio of the overlapping portion of the first upload period and the second upload period to the first upload period or the second upload period. Therefore, by setting the position of the first upload period in the first communication cycle T1 to be the same as the position of the second upload period in the second communication cycle T2, or the position of the first upload period in the first communication cycle T1 to the position of the second upload period in the second communication cycle T2 to be greater than or equal to 50%, the communication cycle between the battery management device 10 and the battery cell 20 can be further shortened, and the management efficiency can be improved. The similarity between the positions of the first upload period and the second upload period must be greater than or equal to 50% to make the period reuse effective and improve the management efficiency. If the similarity of the positions is less than 50%, the communication cycle between the battery management device 10 and the battery cell 20 cannot be significantly shortened, and its management efficiency is relatively low.

[0080] When the position similarity between the first upload period and the second upload period is greater than or equal to 60%, the effect of communication cycle period multiplexing is improved, and the management efficiency of the battery management device 10 is further improved; when the position similarity between the first upload period and the second upload period is greater than or equal to 80%, the effect of communication cycle period multiplexing is significantly improved, and the management efficiency of the battery management device 10 is also significantly improved; when the positions of the first upload period and the second upload period completely overlap, the effect of communication cycle period multiplexing reaches the maximum value, thereby maximizing the management efficiency of the battery management device 10.

[0081] Optionally, at least some of the operating parameters in the first and second sets of operating parameters, whose parameter types are different, are used to characterize different operating indicators of the battery cell 20. For example, the first set of operating parameters may include any combination of voltage parameters, current parameters, temperature parameters, and pressure parameters of the battery cell 20. The second set of operating parameters may include any combination of voltage parameters, current parameters, temperature parameters, and pressure parameters of the battery cell 20 and may be at least partially different from the first set of operating parameters. In a specific application scenario, the battery management device 10 may require different operating parameters of the battery cell 20 at different frequencies. For example, the voltage parameter has a higher weight for monitoring battery status, so the voltage parameter needs to be obtained in every communication cycle; while parameters such as temperature and pressure parameters have a lower weight for monitoring battery status and can be obtained every few communication cycles. Therefore, the first set of operating parameters may include voltage parameters and temperature parameters, while the second set of operating parameters may include voltage parameters and pressure parameters.

[0082] Optionally, the downlink data includes sampling parameter indication data, which is used to indicate the parameter types that the battery cell 20 needs to upload during the current communication cycle, wherein the sampling parameter indication data sent during at least some communication cycles indicates different parameter types. For example, during the first communication cycle T1, the sampling parameter indication data may indicate that the operating parameters uploaded by the battery cell 20 to the battery management device 10 include voltage parameters and temperature parameters. During the second communication cycle T2, the sampling parameter indication data may indicate that the operating parameters uploaded by the battery cell 20 to the battery management device 10 include voltage parameters and pressure parameters. This allows the battery cell 20 to upload operating parameters of different parameter types during different communication cycles, allowing operating parameters to be uploaded on demand, reducing the amount of communication data between the battery management device 10 and the battery cell 20, and reducing the power consumption of the battery cell 20 and the battery management device 10. Specifically, unique upload indicators can be assigned to different operating parameters. Different upload indicator combinations are used in different communication cycles to form the above-mentioned sampling parameter indication data.

[0083] As shown in Figure 4, the sampling parameter indication data 1 of the first communication cycle T1 is used to indicate the parameter type that the battery cell 20 needs to upload within the first communication cycle T1, and the sampling parameter indication data 2 of the second communication cycle T2 is used to indicate the parameter type that the battery cell 20 needs to upload within the second communication cycle T2, thereby enabling the same battery cell to upload working parameters of different parameter types in the first communication cycle T1 and the second communication cycle T2. The specific selection method is as described above and will not be repeated here.

[0084] In addition, as described above, at least some of the battery units 20 upload the first set of operating parameters and the second set of operating parameters in the uplink period of the first communication cycle T1 and the uplink period of the second communication cycle T2, respectively, and the parameter types of at least some of the operating parameters in the first set of operating parameters and the second set of operating parameters are different. At this time, since the position of the uplink period of the first communication cycle T1 in the first communication cycle T1 is at least partially the same as the position of the uplink period of the second communication cycle T2 in the second communication cycle T2, time period multiplexing of operating parameters of different parameter types in different communication cycles is achieved.

[0085] It is worth noting that the time period multiplexing of the above-mentioned sampling parameter indication data and working parameters can be used in combination or separately.

[0086] Optionally, this application further provides an electrical device. See Figure 5 , which is a schematic diagram of the structure of one embodiment of the electrical device of this application. As shown in Figure 5 , the electrical device 200 includes the battery system 100 described in the above embodiment. It should be understood that the electrical device can be a power unit for an automobile, ship, or the like, or can be an electric vehicle or other electrical device.

[0087] The above description is merely an embodiment of the present application and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A battery system, It is characterized in that The battery system includes a battery management device and a plurality of battery cells. The battery management device communicates with the plurality of battery cells in a predetermined communication cycle, wherein the communication cycle is set according to a parameter upload cycle of the battery cells required by the battery management device, each of the communication cycles includes at least one downlink period, an uplink period corresponding to each of the battery cells, and a first reserved period, and the battery management device sends downlink data to the battery cells via the downlink period, wherein the maximum allowable number of battery cells communicating with the battery management device in each of the communication cycles is set according to the duration of the communication cycle, the total duration of the downlink periods in each of the communication cycles, the total duration of the uplink periods in each of the communication cycles, and the duration of the first reserved period.

2. The battery system according to claim 1, It is characterized in that The duration of the communication cycle is less than or equal to the duration of the parameter upload cycle.

3. The battery system according to claim 2, It is characterized in that The duration of the parameter upload cycle is less than or equal to 500ms.

4. The battery system according to any one of claims 1 to 3, It is characterized in that The duration of the first reserved period is set at least according to a network delay between the battery unit and the battery management device.

5. The battery system according to claim 4, It is characterized in that The duration of the first reserved period is greater than or equal to a network delay between the battery unit and the battery management device.

6. The battery system according to claim 4 or 5, It is characterized in that The network delay between the battery unit and the battery management device is less than or equal to 20ms.

7. The battery system according to any one of claims 1 to 6, It is characterized in that The duration of the first reserved period is set at least according to a processing delay of the uplink data by the battery management device.

8. The battery system according to claim 7, It is characterized in that The duration of the first reserved period is greater than or equal to the time required for the battery management device to make a control decision based on the uplink data uploaded in the current communication cycle.

9. The battery system according to any one of claims 1 to 8, It is characterized in that The uplink period includes an uplink transmission period and a second reserved period, wherein the uplink transmission period is for the battery unit to upload uplink data to the battery management device.

10. The battery system according to claim 9, It is characterized in that The duration of the second reserved period is set at least according to a network delay from the battery unit to the battery management device.

11. The battery system according to claim 10, It is characterized in that The duration of the second reserved period is greater than or equal to a network delay between the battery unit and the battery management device.

12. The battery system according to claim 10 or 11, It is characterized in that The network delay between the battery unit and the battery management device is less than or equal to 20ms.

13. The battery system according to any one of claims 10 to 12, It is characterized in that The duration of the second reserved period is set at least according to the sampling synchronization difference of the battery unit.

14. The battery system according to claim 13, It is characterized in that The duration of the second reserved period is greater than or equal to a sampling synchronization difference of the plurality of battery cells.

15. The battery system according to claim 14, It is characterized in that The sampling synchronization difference of the multiple battery cells is less than or equal to 20 ms.

16. The battery system according to claim 1, It is characterized in that The maximum allowed number is less than or equal to a result obtained by further dividing the difference between the duration of the communication cycle and the total duration of the downlink period and the first reserved period by the total duration of the uplink period.

17. The battery system according to any one of claims 1 to 16, It is characterized in that The uplink data includes voltage parameters, and at least part of the battery units upload the voltage parameters in each communication cycle.

18. The battery system according to claim 17, It is characterized in that The uplink data also includes other operating parameters besides the voltage parameters, and at least part of the battery units selectively upload at least part of the other operating parameters in each communication cycle, so that the upload frequency of at least part of the other operating parameters is less than or equal to the upload frequency of the voltage parameters.

19. The battery system according to any one of claims 1 to 18, It is characterized in that The communication cycle includes a first communication cycle and a second communication cycle, wherein at least part of the battery cells upload a first set of operating parameters in a first upload period of the first communication cycle, and upload a second set of operating parameters in a second upload period of the second communication cycle, wherein the position of the first upload period in the first communication cycle is at least partially the same as the position of the second upload period in the second communication cycle, and the parameter types of at least part of the operating parameters in the first set of operating parameters and the second set of operating parameters are different.

20. The battery system according to claim 19, wherein a position of the first upload period in the first communication cycle is the same as a position of the second upload period in the second communication cycle, or a degree of similarity between a position of the first upload period in the first communication cycle and a position of the second upload period in the second communication cycle is greater than or equal to 50%.

21. The battery system according to any one of claims 1 to 19, It is characterized in that The downlink data includes sampling parameter indication data, and the sampling parameter indication data is used to indicate the parameter type that the battery unit needs to upload in the current communication cycle, wherein the parameter types indicated by the sampling parameter indication data sent down in at least some of the communication cycles are different.

22. An electrical device, It is characterized in that The electrical equipment comprises a battery system as described in any one of claims 1-21.

Citation Information

Patent Citations

  • Data transmission method and device for private network communication

    CN102711272A

  • Energy storage system

    CN110896157A

  • Battery address management method and battery management system

    CN111131542A

  • Battery module with series connected cells, internal relays and internal battery management system

    US20220216711A1