Work machine management system and work machine management method

The work machine management system calculates power usage from both fossil fuel and renewable sources to quantify greenhouse gas emissions, addressing the challenge of emissions from work machines and encouraging the use of cleaner energy sources.

WO2024232187A1PCT designated stage expired Publication Date: 2024-11-14KOMATSU LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/013224
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-08
Filing Date
2024-03-29
Publication Date
2024-11-14

AI Technical Summary

Technical Problem

Existing work machines with large capacity batteries that use fossil fuel energy for power generation emit greenhouse gases, and there is a need to quantify the amount of greenhouse gas emissions from these machines to combat global warming.

Method used

A work machine management system that includes a processor to calculate and store the power usage of both fossil fuel-based and renewable energy sources used to charge the battery, allowing for the determination of greenhouse gas emissions by calculating the usage amounts of each energy type.

Benefits of technology

Enables the accurate assessment of greenhouse gas emissions from work machines with large capacity batteries, promoting the use of renewable energy sources to reduce carbon footprint.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024013224_14112024_PF_FP_ABST
    Figure JP2024013224_14112024_PF_FP_ABST
Patent Text Reader

Abstract

A management system (1) of a work machine (2) comprises a processor (48). The processor (48) calculates the usage amount of power used for charging a battery (31) of the work machine (2), and causes a storage device (50) to store the usage amount. The power includes a first power for discharging a first amount of carbon dioxide in order to generate a unit amount of power, and / or a second power for discharging a second amount of carbon dioxide in order to generate a unit amount of power, the second amount being less than the first amount. The usage amount includes a first usage amount indicating the usage amount of the first power used for charging the battery, and a second usage amount indicating the usage amount of the second power used for charging the battery.
Need to check novelty before this filing date? Find Prior Art

Description

Work machine management system and work machine management method

[0001] The present disclosure relates to a work machine management system and a work machine management method.

[0002] Patent Document 1 discloses a technique for charging a vehicle battery.

[0003] Special Publication No. 2022-510390

[0004] From the viewpoint of preventing global warming, it is desirable to reduce greenhouse gas emissions. To prevent global warming, in the technical field related to work machines, work machines equipped with large-capacity batteries have been proposed. When the electricity used by a work machine is generated using fossil fuel energy, even use of a work machine with a large-capacity battery may result in the emission of greenhouse gases. It is necessary to understand the extent to which greenhouse gases are emitted by using a work machine with a large-capacity battery.

[0005] An object of the present disclosure is to determine whether or not the amount of greenhouse gases emitted is due to the use of a work machine having a large-capacity battery.

[0006] According to the present disclosure, there is provided a work machine management system. The work machine management system includes a processor. The processor calculates the amount of electricity used to charge the battery of the work machine and stores the amount of electricity used in a storage device. The electricity used to charge the battery includes one or both of a first electric power that emits a first amount of carbon dioxide to generate a unit amount of electricity and a second electric power that emits a second amount of carbon dioxide that is less than the first amount to generate the unit amount of electricity. The amount of electricity used includes a first amount of electricity used to charge the battery and a second amount of electricity used to charge the battery.

[0007] According to the present disclosure, it is possible to determine the extent to which greenhouse gases are being emitted by using a work machine having a large-capacity battery.

[0008] FIG. 1 is a diagram showing a management system for a work machine according to an embodiment. FIG. 2 is a diagram showing a shovel according to an embodiment. FIG. 3 is a diagram showing a control system for the shovel according to an embodiment. FIG. 4 is a diagram showing the relationship between a power plant and a charging station according to an embodiment. FIG. 5 is a diagram showing an example of power generation performance data according to an embodiment. FIG. 6 is a block diagram showing an on-board controller according to an embodiment. FIG. 7 is a flowchart showing a method for calculating carbon dioxide emissions due to charging of a battery according to an embodiment.

[0009] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings, but the present disclosure is not limited to the embodiments. The components of the embodiments described below can be combined as appropriate. In addition, some components may not be used.

[0010] [Overview of Management System] Fig. 1 is a diagram showing a management system 1 for a work machine 2 according to an embodiment. The management system 1 manages work machines 2 operating at a work site 3. In the embodiment, the work machines 2 are electric work machines powered by a battery pack and an electric motor. A plurality of work machines 2 are present at the work site 3. In the example shown in Fig. 1, the work machines 2 present at the work site 3 include a shovel 2A, a bulldozer 2B, and a dump truck 2C.

[0011] In the embodiment, no operator is on board the work machine 2. The work machine 2 is remotely controlled. A remote control room 4 is installed outside the work machine 2. The remote control room 4 is installed in a remote location on the work site 3. An information terminal 5 and a remote control device 6 for remotely controlling the work machine 2 are each disposed in the remote control room 4. The information terminal 5 and the remote control device 6 are each located outside the work machine 2. The information terminal 5 includes a computer system disposed in the remote control room 4.

[0012] The remote control device 6 is operated by an operator in the remote control room 4. When operated by the operator, the remote control device 6 generates an operation signal for remotely operating the work machine 2. The operation signal generated in the remote control device 6 is input to the information terminal 5. The information terminal 5 generates a remote operation command based on the operation signal from the remote control device 6. The information terminal 5 transmits the remote operation command to the work machine 2 via the communication system 7.

[0013] The work machine 2 operates based on remote operation commands transmitted from an information terminal 5 located outside the work machine 2. A camera that acquires image data of the work site 3 is provided on at least one of the work machine 2 and the work site 3. The image data of the work site 3 is transmitted to the information terminal 5 via a communication system 7 and displayed on a display device of the information terminal 5. The operator can operate the remote operation device 6 while checking the image data of the work site 3.

[0014] The communication system 7 may include a public communication line or a specific communication line. Examples of the communication system 7 include a mobile phone communication network or a satellite communication network. The communication system 7 may include the Internet or a local area network.

[0015] The management system 1 has a management server 8. The management server 8 includes a computer system. The management server 8 is able to communicate with the work machine 2 via the communication system 7. The management server 8 collects operation data of the work machine 2. The management server 8 outputs control commands to the work machine 2.

[0016] 2 is a view from the front left of a shovel 2A according to an embodiment. The shovel 2A has a revolving unit 9, a traveling unit 10, a work implement 11, and a work implement cylinder 12.

[0017] The rotating unit 9 is the body of the shovel 2A. The running unit 10 is a traveling device of the shovel 2A. The running unit 10 supports the rotating unit 9. The rotating unit 9 is supported by the running unit 10 so that it can rotate. The rotating unit 9 is disposed above the running unit 10. The running unit 10 runs while supporting the rotating unit 9. The running unit 10 has a pair of tracks 10A. The shovel 2A runs as the tracks 10A rotate.

[0018] The work implement 11 is connected to the front of the revolving unit 9. The work implement 11 includes a boom 11A connected to the front of the revolving unit 9, an arm 11B connected to the boom 11A, and a bucket 11C connected to the arm 11B. The work implement cylinder 12 includes a boom cylinder 12A that operates the boom 11A, an arm cylinder 12B that operates the arm 11B, and a bucket cylinder 12C that operates the bucket 11C.

[0019] [Control System] Figure 3 is a diagram showing a control system 30 of the shovel 2A according to this embodiment. The shovel 2A has the control system 30. The control system 30 has a battery 31, a charging device 32, a DC / DC converter 33, an inverter 34, an electric motor 35, a hydraulic pump 36, a main valve 37, a hydraulic actuator 38, an on-board controller 40, and a communication device 43.

[0020] The battery 31 is an internal battery mounted on the work machine 2. The battery 31 includes a secondary battery. In this embodiment, the battery 31 includes a lithium ion battery (LiB).

[0021] The charging device 32 is connected to a charging station 23 provided outside the work machine 2. The charging station 23 charges the battery 31 using a commercial power source. The charging device 32 includes an AC / DC converter. The charging device 32 charges the battery 31 with power supplied from the charging station 23.

[0022] The DC / DC converter 33 boosts the voltage from the battery 31. The DC / DC converter 33 supplies the direct current from the battery 31 to the inverter .

[0023] The inverter 34 converts the direct current from the DC / DC converter 33 into a three-phase alternating current and supplies it to the electric motor 35. The electric motor 35 is driven based on the three-phase alternating current supplied from the inverter 34.

[0024] The electric motor 35 is a power source for the work machine 2. The electric motor 35 is driven based on electric power from the battery 31.

[0025] The hydraulic pump 36 is driven by the electric motor 35. The hydraulic pump 36 discharges hydraulic oil. The hydraulic oil discharged from the hydraulic pump 36 is supplied to a hydraulic actuator 38 via a main valve 37. The hydraulic actuator 38 of the excavator 2A includes a work implement cylinder 12.

[0026] It should be noted that an electric actuator may be provided in the excavator 2A instead of the hydraulic actuator 38. The work implement cylinder 12 may be an electric cylinder. When an electric actuator is provided in the excavator 2A instead of the hydraulic actuator 38, the hydraulic pump 36 and the main valve 37 are omitted.

[0027] The on-board controller 40 includes a computer system. The communication device 43 is connected to the on-board controller 40. The communication device 43 communicates with the management server 8 wirelessly.

[0028] [Power generation performance data] Fig. 4 is a diagram showing the relationship between the power plant 20 and the charging station 23 according to the embodiment. Electric power generated in the power plant 20 is supplied to the charging station 23 via a power transmission facility 24. The power transmission facility 24 supplies electric power to a power supply area 25 in which the charging station 23 is located. There are multiple power plants 20. There are multiple power supply areas 25. In the example shown in Fig. 4, the power plant 20 includes a first power plant 21 and a second power plant 22. The power supply area 25 includes a first area 25A and a second area 25B. If the power supply area 25 is located in Japan, the first area 25A is, for example, the Kanto region, and the second area 25B is, for example, the Tohoku region.

[0029] The charging station 23 charges the battery 31 using power from a commercial power supply. A charging station 23 is located in each of the first area 25A and the second area 25B. A work site 3 is located in each of the first area 25A and the second area 25B. The charging station 23 may be located at the work site 3 or outside the work site 3. The work machine 2 operates by consuming power generated in the power plant 20.

[0030] In the embodiment, the consumption by the work machine 2 of the electric power generated at the power plant 20 includes the consumption of the electric power of the battery 31 that has been charged with the electric power generated at the power plant 20. Note that the electric power generated at the power plant 20 may be consumed directly by the work machine 2 without being used to charge the battery 31.

[0031] In this embodiment, the electric power consumed by the work machine 2 includes one or both of a first electric power and a second electric power. The first electric power is electric power that emits a first amount of carbon dioxide to generate a unit amount of electric power. The second electric power is electric power that emits a second amount of carbon dioxide that is less than the first amount to generate the unit amount of electric power. The unit amount is a predetermined amount. In other words, the amount of carbon dioxide emitted when generating the second electric power is less than the amount of carbon dioxide emitted when generating the first electric power.

[0032] The first electric power is electric power generated using non-renewable energy. Non-renewable energy is energy generated from resources with finite reserves. Non-renewable energy includes fossil fuel energy such as oil, coal, and natural gas. When the first electric power is generated using non-renewable energy, carbon dioxide is emitted.

[0033] The second power is power generated using renewable energy. Renewable energy is energy that is always present in nature. Renewable energy includes natural energy such as solar, wind, and hydropower. When the second power is generated using renewable energy, no carbon dioxide is emitted.

[0034] In the example shown in FIG. 4 , the first power is generated at the first power plant 21. The second power is generated at the second power plant 22. The power transmission equipment 24 supplies one or both of the first power from the first power plant 21 and the second power from the second power plant 22 to the charging station 23. The charging station 23 may be supplied with both the first power generated at the first power plant 21 and the second power generated at the second power plant. That is, the charging station 23 is supplied with the first power at a first ratio (A%) and the second power at a second ratio (B%). A and B are each a real number between 0 and 100. The sum of A and B is 100. The power used to charge the battery 31 is composed of A% of the first power and B% of the second power. From the perspective of preventing global warming, the second power is more preferable than the first power for charging the battery 31. From the perspective of preventing global warming, it is preferable that the power consumed by the work machine 2 be the second power rather than the first power.

[0035] The power generation performance data related to the power supplied to the charging station 23 is published by the publishing organization 26. An example of the publishing organization 26 is a power transmission company that manages the power plant 20. The publishing organization 26 may be a government organization. The publishing organization 26 publishes the amount of power generated of the first power and the amount of power generated of the second power supplied from the power plant 20 to the power supply area 25.

[0036] 5 is a diagram illustrating an example of power generation performance data according to the embodiment. The power generation performance data includes first power generation performance data indicating the power generation performance of the first power and second power generation performance data indicating the power generation performance of the second power. The first power generation performance data represents the performance value of the amount of power generated using non-renewable energy for each past time interval. The second power generation performance data represents the performance value of the amount of power generated using renewable energy for each past time interval. Furthermore, the first power generation performance data represents a first ratio (A%) of the first power, and the second power generation performance data represents a second ratio (B%) of the second power.

[0037] As shown in Fig. 5, the actual value of the amount of power generation may vary for each time interval. The first ratio and the second ratio may vary for each time interval.

[0038] [On-Vehicle Controller] FIG. 6 is a block diagram showing an on-vehicle controller 40 according to an embodiment. The management server 8 and the on-vehicle controller 40 each include a computer system. The on-vehicle controller 40 includes a processor 48 such as a central processing unit (CPU), a main memory 49 including a nonvolatile memory such as a read-only memory (ROM) and a volatile memory such as a random access memory (RAM), a storage 50, and an interface 51 including an input / output circuit. The functions of the on-vehicle controller 40 are stored in the storage 50 as a computer program. The processor 48 reads the computer program from the storage 50, loads it into the main memory 49, and executes processing in accordance with the computer program. The computer program may be distributed to the management server 8 via a network.

[0039] Similarly, the management server 8 has a processor, a main memory, a storage, and an interface.

[0040] The processor 48 includes a power generation performance data acquisition unit 48A, a usage amount calculation unit 48B, and an emission amount calculation unit 48C.

[0041] The power generation performance data acquisition unit 48A acquires power generation performance data published by the publishing organization 26. The publishing organization 26 has a distribution server that distributes the power generation performance data. The power generation performance data acquisition unit 48A acquires the power generation performance data published by the publishing organization 26 via the communication system 7.

[0042] The usage amount calculation unit 48B calculates the amount of power used to charge the battery 31 of the work machine 2. The amount of power used to charge the battery 31 includes a first usage amount indicating the amount of first power used to charge the battery 31, and a second usage amount indicating the amount of second power used to charge the battery 31. The usage amount calculation unit 48B calculates the first usage amount indicating the amount of first power used to charge the battery 31 of the work machine 2, and the second usage amount indicating the amount of second power used to charge the battery 31.

[0043] The usage amount calculation unit 48B calculates the first usage amount and the second usage amount based on the power generation record data. The usage amount calculation unit 48B can calculate the first usage amount indicating the usage amount of the first power used to charge the battery 31 based on the first power generation record data including the performance value of the power generation amount of the first power and the first ratio, and the charging time and charging duration of the battery 31 using the charging station 23. The usage amount calculation unit 48B can calculate the second usage amount indicating the usage amount of the second power used to charge the battery 31 based on the second power generation record data including the performance value of the power generation amount of the second power and the second ratio, and the charging time and charging duration of the battery 31 using the charging station 23.

[0044] The usage amount calculation unit 48B records the calculated first usage amount and second usage amount. In this embodiment, the usage amount calculation unit 48B stores the calculated first usage amount and second usage amount in the usage amount memory unit 50A of the storage 50. The usage amount calculation unit 48B also transmits the calculated first usage amount and second usage amount to the management server 8.

[0045] The emission calculation unit 48C calculates the amount of carbon dioxide emission resulting from charging the battery 31 based on the specified carbon dioxide emission calculation method and the first and second usage amounts. The carbon dioxide emission amount includes the carbon dioxide equivalent emissions of greenhouse gases. The carbon dioxide emission amount is calculated based on the amount of activity, an emission coefficient, and a global warming potential (GWP). The amount of activity includes the amount of electricity used to charge the battery 31 (the first and second usage amounts). The emission coefficient refers to the amount of carbon dioxide emission per amount of activity.

[0046] Examples of methods for calculating carbon dioxide emissions include a method for calculating Scope 1 (direct emissions), a method for calculating Scope 2 (indirect emissions), and a method for calculating Scope 3 (other emissions).

[0047] The emission amount calculation unit 48C records the calculated amount of carbon dioxide emission. The emission amount calculation unit 48C records the amount of carbon dioxide emission emitted when the battery 31 is charged. The emission amount calculation unit 48C records the amount of carbon dioxide emission emitted when the work machine 2 is operating. In an embodiment, the emission amount calculation unit 48C stores the calculated amount of carbon dioxide emission in the emission amount memory unit 50B of the storage 50. The emission amount calculation unit 48C also transmits the calculated amount of carbon dioxide emission to the management server 8.

[0048] 7 is a flowchart showing a method for calculating the amount of carbon dioxide emitted by charging the battery 31 according to this embodiment. The power generation record data acquisition unit 48A acquires power generation record data from the publishing organization 26 (step SA1).

[0049] Based on the power generation history data acquired in step SA1, the usage amount calculation unit 48B calculates a first usage amount indicating the usage amount of the first power used to charge the battery 31, and a second usage amount indicating the usage amount of the second power. The usage amount calculation unit 48B calculates the first usage amount based on the first power generation history data including the history value of the power generation amount of the first power and the first ratio, and the time and duration of charging the battery 31 using the charging station 23. The usage amount calculation unit 48B calculates the second usage amount based on the second power generation history data including the history value of the power generation amount of the second power and the second ratio, and the time and duration of charging the battery 31 using the charging station 23 (step SA2).

[0050] The emission amount calculation unit 48C calculates the amount of carbon dioxide emitted by charging the battery 31 based on the specified carbon dioxide emission calculation method and the first and second usage amounts calculated in step SA2 (step SA3).

[0051] The first and second usage amounts calculated in step SA2 are stored in usage amount storage unit 50A. The carbon dioxide emission amount calculated in step SA3 is stored in emission amount storage unit 50B. The first and second usage amounts calculated in step SA2 are transmitted from on-board controller 40 to management server 8 via communication system 7. The carbon dioxide emission amount calculated in step SA3 is transmitted from on-board controller 40 to management server 8 via communication system 7 (step SA4).

[0052] The management server 8 stores the first and second usage amounts and the carbon dioxide emission amount. The carbon dioxide emission amount stored in the management server 8 may be reported to an administrative agency.

[0053] [Effects] As described above, according to the embodiment, the processor 48 calculates the usage amount of the first power and the usage amount of the second power used to charge the battery 31 of the work machine 2. Carbon dioxide is emitted when the first power is generated, and no carbon dioxide is emitted when the second power is generated. By calculating the usage amounts of the first power and the second power used to charge the battery 31, or the ratio between the first power and the second power used to charge the battery 31, it is possible to determine how much greenhouse gas is being emitted by using the work machine 2 having the battery 31.

[0054] Other Embodiments In the above-described embodiment, the first power usage amount and the second power usage amount used to charge the battery 31 of the shovel 2A are calculated. The first power usage amount and the second power usage amount used to charge the battery 31 of the bulldozer 2B may be calculated. The first power usage amount and the second power usage amount used to charge the battery 31 of the dump truck 2C may be calculated.

[0055] 1...Management system, 2...Construction machine, 2A...Shovel, 2B...Bulldozer, 2C...Dump truck, 3...Work site, 4...Remote control room, 5...Information terminal, 6...Remote control device, 7...Communication system, 8...Management server, 9...Rotating body, 10...Traveling body, 10A...Crawler, 11...Construction machine, 11A...Boom, 11B...Arm, 11C...Bucket, 12...Construction machine cylinder, 12A...Boom cylinder, 12B...Arm cylinder, 12C...Bucket cylinder, 20...Power plant, 21...First power plant, 22...Second power plant, 23...Charging station, 24...Power transmission equipment, 25... Power supply area, 25A...first area, 25B...second area, 26...publication organization, 30...control system, 31...battery, 32...charging device, 33...DC / DC converter, 34...inverter, 35...electric motor, 36...hydraulic pump, 37...main valve, 38...hydraulic actuator, 40...on-board controller, 43...communication device, 48...processor, 48A...power generation performance data acquisition unit, 48B...usage calculation unit, 48C...emissions calculation unit, 49...main memory, 50...storage, 50A...usage memory unit, 50B...emissions memory unit, 51...interface.

Claims

1. A work machine management system comprising a processor that calculates an amount of electricity usage used to charge a battery of a work machine, and stores the amount of usage in a storage device, the electricity including one or both of a first electricity that emits a first amount of carbon dioxide to generate a unit amount of electricity, and a second electricity that emits a second amount of carbon dioxide less than the first amount to generate the unit amount of electricity, and the amount of usage including a first usage amount indicating the amount of the first electricity used to charge the battery, and a second usage amount indicating the amount of the second electricity used to charge the battery.

2. A work machine management system according to claim 1, wherein the first electric power is generated using non-renewable energy, and the second electric power is generated using renewable energy.

3. A management system for a work machine as described in claim 2, wherein the processor acquires power generation performance data including first power generation performance data representing, for each time interval, an actual value of the amount of power generated using the non-renewable energy, and second power generation performance data representing, for each time interval, an actual value of the amount of power generated using the renewable energy, and calculates the first usage amount and the second usage amount based on the power generation performance data.

4. A work machine management system as described in claim 3, wherein the processor calculates the amount of carbon dioxide emissions resulting from charging the battery based on a specified method of calculating the amount of carbon dioxide emissions and the first usage amount and the second usage amount, and stores the amount of carbon dioxide emissions in the memory device.

5. A method for managing a work machine, comprising: calculating an amount of electricity used to charge a battery of a work machine; and recording said amount of electricity usage, wherein said electricity includes one or both of a first electricity that emits a first amount of carbon dioxide to generate a unit amount of electricity and a second electricity that emits a second amount of carbon dioxide less than the first amount to generate the unit amount of electricity, and said amount of electricity usage includes a first amount of electricity usage indicating the amount of electricity used to charge the battery, and a second amount of electricity usage indicating the amount of electricity used to charge the battery.

Citation Information

Patent Citations

  • Device for calculation of carbon dioxide emissions in electric vehicle

    JP2010198279A

  • Charger / feeder, charge / feed management apparatus, energy management system and charge / feed management method

    JP2014135877A

  • Method for power visualization and device for power visualization

    WO2012032947A1

  • Information processing device, information processing method, and program for same

    WO2021241650A1

  • Manufactured object information management device, method, and program

    WO2021241651A1