S-type characteristic recognition method and apparatus for pump turbine, and control method for pump turbine
By collecting the state parameters of the water pump turbine and calculating the relationship curve slope between speed and flow, using the positive and negative polarity and absolute value of the slope to determine whether it enters the S characteristic area, the problem of untimely identification in the prior art is solved, and the identification accuracy is improved degree and safety.
Patent Information
- Application Number
- PCT/CN2023/128670
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-22
- Filing Date
- 2023-10-31
- Publication Date
- 2024-11-28
AI Technical Summary
The prior art is difficult to identify in a timely manner that the pump turbine is about to enter or just enters the S characteristic zone, resulting in untimely speed regulation, which increases the probability of accidents.
By collecting the state parameters of the water pump turbine at every preset time interval, calculating the slope of the relationship between speed and flow, determining whether it enters the S characteristic area based on the positive and negative polarity and absolute value of the slope, and introducing the absolute value of the slope to improve the recognition accuracy .
Timely identification of the S-type characteristic zone of the water pump turbine is achieved, the identification accuracy is improved, and the failure rate and the probability of accidents are reduced.
Smart Images

Figure CN2023128670_28112024_PF_FP_ABST
Abstract
Description
A method, device and control method for identifying S-type characteristics of a pump-turbine Technical Field
[0001] The embodiments of the present invention relate to a pump-turbine control technology, and in particular to a method, device and control method for identifying S-type characteristics of a pump-turbine. Background Art
[0002] A pumped-storage power station is a large-scale energy storage system that can work as a water pump and a turbine. It has the dual attributes of a power plant and a user and can regulate the power system.
[0003] During the speed regulation process, a pump-turbine may enter the S-characteristic region. A pump-turbine operating in this region cannot directly carry a load from a no-load state. After load rejection, the turbine may experience unstable no-load operation. Therefore, the identification and early warning of the S-characteristic has gradually attracted attention. Currently, the identification of the S-characteristic is mainly based on the positive or negative slope of the pump-turbine's Qn curve (also known as the flow-speed curve).
[0004] However, this identification method cannot judge when the pump-turbine is about to enter the S characteristic zone or has just entered the S characteristic zone during the transition period, and the identification is often delayed.
[0005] Summary of the Invention
[0006] The present invention provides a method, device and control method for identifying the S-type characteristics of a pump-turbine, so as to improve the identification accuracy and make the identification more timely.
[0007] In a first aspect, an embodiment of the present invention provides a method for identifying an S-shaped characteristic of a pump-turbine. The method for identifying an S-shaped characteristic of a pump-turbine includes:
[0008] collecting a set of state parameters of the pump-turbine at every preset time interval, wherein the state parameters include the flow rate and speed of the pump-turbine;
[0009] Calculating the slope of the relationship curve between the rotational speed and flow rate of the pump-turbine within the current preset time interval;
[0010] Whether the pump turbine enters the S characteristic region is determined according to the positive or negative polarity and the absolute value of the slope.
[0011] Optionally, calculating the slope of the relationship curve between the rotational speed and flow rate of the pump-turbine within the current preset time interval includes:
[0012] The slope of the relationship curve within the current preset time interval is calculated according to the latest set of state parameters and the previous set of state parameters.
[0013] Optionally, judging whether the pump-turbine enters the S characteristic region according to the positive or negative polarity and the absolute value of the slope includes:
[0014] Determining whether the slope satisfies at least one of a first condition and a second condition, wherein the first condition is that the slope is positive, and the second condition is that the absolute value of the slope is greater than a first preset value;
[0015] If the slope satisfies at least one of the first condition and the second condition, it is determined that the pump-turbine has entered the S characteristic region;
[0016] If the slope does not satisfy the first condition and the second condition, it is determined that the pump turbine has not entered the S characteristic region.
[0017] Optionally, the first preset value is equal to the product of a preset coefficient and a historical slope, wherein the historical slope is the slope of the relationship curve within the previous preset time interval.
[0018] Optionally, the preset coefficient is equal to the historical minimum slope ratio of the pump-turbine, and the slope ratio is equal to the ratio of the slope of the relationship curve in the first preset time interval after the pump-turbine enters the S characteristic zone to the slope of the relationship curve in the last preset time interval before entering the S characteristic zone.
[0019] Optionally, the preset coefficient is related to recognition accuracy requirements.
[0020] In a second aspect, an embodiment of the present invention further provides an S-type characteristic identification device for a pump-turbine, comprising a state parameter acquisition module, a slope calculation module, and a judgment module.
[0021] The state parameter acquisition module is used to acquire a set of state parameters of the pump-turbine at every preset time interval, wherein the state parameters include the flow rate and speed of the pump-turbine;
[0022] The slope calculation module is used to calculate the slope of the relationship curve between the rotational speed and flow rate of the pump turbine within the current preset time interval;
[0023] The judging module is used to judge whether the pump turbine enters the S characteristic zone according to the positive or negative polarity and the absolute value of the slope.
[0024] Optionally, the judgment module includes a slope judgment unit, a first S-characteristic region determination unit, and a second S-characteristic region determination unit;
[0025] The slope determination unit is configured to determine whether the slope satisfies at least one of a first condition and a second condition, wherein the first condition is that the slope is positive, and the second condition is that the absolute value of the slope is greater than a first preset value;
[0026] a first S-characteristic region determining unit configured to determine that the pump-turbine has entered an S-characteristic region if the slope satisfies at least one of the first condition and the second condition;
[0027] The second S-characteristic region determining unit is configured to determine that the pump-turbine has not entered the S-characteristic region if the slope does not satisfy the first condition and the second condition.
[0028] In a third aspect, an embodiment of the present invention further provides a method for controlling a pump-turbine, the method comprising:
[0029] Using any of the S-type characteristic identification methods of the pump-turbine according to the first aspect, identifying whether the pump-turbine has entered the S-type characteristic region;
[0030] The pump-turbine is speed-regulated according to the identification result and the power generation of the pump-turbine.
[0031] Optionally, after identifying whether the pump-turbine has entered the S characteristic region, the method further includes:
[0032] When the identification result shows that the pump turbine has entered the S characteristic zone, an early warning signal is issued.
[0033] The present invention provides a method, device and control method for identifying the S-type characteristics of a pump-turbine, which collects a set of state parameters of the pump-turbine at preset time intervals, wherein the state parameters include the flow rate and speed of the pump-turbine. Based on the state parameters, a relationship curve between the speed and flow rate of the pump-turbine is determined. The slope of the relationship curve within the current preset time interval is calculated. Based on the positive and negative polarity and absolute value of the slope, it is judged whether the pump-turbine has entered the S-characteristic zone, thereby realizing the S-type characteristic identification of the pump-turbine. The method of judging whether the pump-turbine has entered the S-characteristic zone based on the absolute value of the slope is introduced, which can better identify the time when the pump-turbine has just entered the S-characteristic zone or is about to enter the S-characteristic zone, thereby improving the recognition accuracy and making the recognition more timely. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] FIG1 is a schematic diagram of a Qn curve of a pump-turbine provided by the present invention;
[0035] FIG2 is a flow chart of a method for identifying S-type characteristics of a pump-turbine according to an embodiment of the present invention;
[0036] FIG3 is a flow chart of another method for identifying S-type characteristics of a pump-turbine according to an embodiment of the present invention;
[0037] FIG4 is a schematic diagram of the composition of an S-type characteristic identification device for a pump-turbine provided by an embodiment of the present invention;
[0038] FIG5 is a schematic diagram showing the composition of another device for identifying S-type characteristics of a pump-turbine according to an embodiment of the present invention;
[0039] FIG6 is a schematic flow chart of a control method for a pump-turbine according to an embodiment of the present invention;
[0040] FIG7 is a flow chart of another pump-turbine control method provided by an embodiment of the present invention;
[0041] FIG8 is a schematic structural diagram of a control system of a pump-turbine provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0042] The present invention will be further described in detail below with reference to the accompanying drawings and examples. It will be understood that the specific embodiments described herein are intended only to illustrate the present invention and are not intended to limit the present invention. It should also be noted that, for ease of description, the accompanying drawings only illustrate portions relevant to the present invention, not all structures.
[0043] The S characteristic of a pump-turbine is a key factor restricting its safe and stable operation. Referring to the Qn curve of a pump-turbine shown in Figure 1, if a pump-turbine exhibits a severe S characteristic, i.e., if it enters the S characteristic zone, the pump-turbine unit cannot be directly loaded from no-load operation, making grid-connected startup of the pump-turbine difficult. Furthermore, pump-turbines with a pronounced S characteristic may experience unstable no-load operation after load shedding, seriously compromising their operational safety.
[0044] As described in the background art, currently, whether the pump-turbine has entered the S characteristic is mostly determined by the positive or negative slope of the Qn curve. However, this identification method cannot correctly judge the transition stage when the pump-turbine is about to enter the S characteristic zone or has just entered the S characteristic zone, and early warnings are often not timely. The inventors have found that the data points on the Qn curve are collected discretely. There may be a data point before and after the preset time period that is taken in the negative slope zone, while another data point is taken in the positive slope zone. This may cause the slope of the straight line connecting these two points to be negative. As a result, the pump-turbine is judged to have not entered the S characteristic zone when in fact it has already exhibited the S characteristic. This erroneous or delayed identification result will lead to untimely speed regulation and increase the probability of accidents of the pump-turbine.
[0045] Based on this, an embodiment of the present invention proposes a method for identifying the S-type characteristics of a pump-turbine. The S-type characteristics identification method is applied to a pumped storage station and can be started according to a speed control instruction. FIG2 is a flow chart of a method for identifying the S-type characteristics of a pump-turbine provided by an embodiment of the present invention. Referring to FIG2 , the method for identifying the S-type characteristics of a pump-turbine includes:
[0046] S101. Collect a group of pump-turbine status parameters at preset time intervals.
[0047] The state parameters include the flow rate and speed of the pump turbine; the preset time interval refers to a determined time interval set for state parameter collection, and the duration of all preset time intervals is equal.
[0048] Specifically, during the operation of the pump-turbine, a speed measuring device and a flow measuring device installed at the pump-turbine can be used to respectively collect the speed and flow of the pump-turbine. The speed and flow collected at the same time belong to the same set of state parameters. A set of pump-turbine state parameters is collected at preset time intervals. The preset time interval can be set based on the rated power of the pump-turbine and the user's speed regulation requirements. For example, the preset time interval can be equal to 1 minute.
[0049] For example, when a pumped-storage station receives a speed regulation instruction, it indicates that the pump-turbine within the pumped-storage station needs to be speed-regulated. Subsequently, within a preset speed regulation cycle, the power generation, speed, and flow of the pump-turbine are measured multiple times using a power sensing component, a speed measurement device, and a flow measurement device. The duration of the preset speed regulation cycle can be determined based on the average value of the pump-turbine's historical speed regulation cycles. Within the speed regulation cycle, a set of state parameters is collected at preset time intervals, and the speed regulation cycle can include multiple preset time intervals.
[0050] S102: Determine a relationship curve between the rotational speed and flow rate of the outlet pump turbine based on the state parameters.
[0051] Specifically, based on the multiple sets of state parameters collected, a relationship curve between the rotational speed and flow rate of the pump-turbine is determined. For example, the relationship curve between the rotational speed and flow rate of the pump-turbine can be obtained by fitting the multiple sets of state parameters, or the relationship curve between the rotational speed and flow rate of the pump-turbine can be obtained by sequentially connecting the plotted points of the multiple sets of state parameters. This step of determining the relationship curve between the rotational speed and flow rate of the pump-turbine can facilitate the speed regulator to make a judgment based on experience on whether the pump-turbine has entered the S characteristic zone, and does not actually affect the implementation of the subsequent identification steps. Therefore, the step of determining the relationship curve between the rotational speed and flow rate of the pump-turbine can be omitted in some identification embodiments.
[0052] For example, the state parameters are plotted sequentially to form parameter points. The speed and flow rate in the state parameters are used as the horizontal and vertical coordinates of the relationship curve between the speed and flow rate of the pump-turbine. Based on the state parameters collected in step S101, the points are plotted sequentially in the order in which they were collected. For each set of pump-turbine state parameters collected, a parameter point can be determined.
[0053] Then, according to the order in which the state data is collected, the parameter points are connected in sequence to determine the relationship curve. According to the order in which the corresponding state data is collected, the parameter points are connected in sequence. Two adjacent points can be connected with a straight line, thereby determining the relationship curve between the speed and flow of the pump turbine. The image of the relationship curve can be seen in Figure 1.
[0054] S103: Calculate the slope of the relationship curve within the current preset time interval.
[0055] Specifically, the current preset time interval refers to the complete preset time interval closest to the current time interval, that is, the preset time interval before the current time interval. The slope within the current preset time interval can be calculated based on data fitted to the relationship curve within the preset time interval, or can be calculated based on the first and last sets of state parameters of the preset time interval.
[0056] S104. Determine whether the pump-turbine enters the S characteristic region based on the positive or negative polarity and the absolute value of the slope.
[0057] Specifically, whether the pump-turbine has entered the S-characteristics zone is determined based on the positive and negative poles and the absolute value of the slope of the relationship curve within the current preset time interval. On the one hand, in conjunction with FIG1 , it is known that the pump-turbine is prone to enter the S-type characteristic zone during the transition process of different operating conditions. The S-type characteristic zone is characterized by a positive slope characteristic appearing on the curved portion of the Qn curve, that is, the slope dQ / dn>0. Therefore, this embodiment defines that one of the judgment conditions for judging whether the pump-turbine has entered the S-type characteristic zone can be the slope dQ / dn>0. For example, if the slope of the relationship curve within the current preset time interval is a positive value, it indicates that the pump-turbine has entered the S-characteristics zone. At this time, the operating state of the pump-turbine is unstable and manual speed regulation is required.
[0058] On the other hand, continuing with FIG1 , after the relationship curve enters the S-characteristics region, the absolute value of the slope of the Qn curve, |dQ / dn|, increases rapidly. Therefore, by comparing the slope of the relationship curve in the current preset time interval with the slope of the historical preset time interval, it can be determined whether the relationship curve has entered the S-characteristics region. For example, if the absolute value of the slope of the relationship curve in the current preset time interval is greater than the preset value, it can indicate that the pump-turbine is at the edge of the S-characteristics region or has just entered the S-characteristics region. At this time, the rate of change of the relationship curve is much greater than the average level during normal operation of the pump-turbine, and the pump-turbine will soon enter or has already entered an unstable operating state. The preset value here can be determined based on the slope of the historical preset time period. For example, the preset value can be equal to twice the slope of the relationship curve in the previous preset time interval.
[0059] The present embodiment provides a method for identifying the S-type characteristics of a pump-turbine, which collects a set of state parameters of the pump-turbine at preset time intervals, wherein the state parameters include the flow rate and speed of the pump-turbine. Based on the state parameters, a relationship curve between the speed and flow rate of the pump-turbine is determined. The slope of the relationship curve within the current preset time interval is calculated. Based on the positive and negative polarity and absolute value of the slope, it is determined whether the pump-turbine has entered the S-characteristic zone, thereby realizing the S-type characteristic identification of the pump-turbine. The method of judging whether the pump-turbine has entered the S-characteristic zone based on the absolute value of the slope is introduced, which can better identify the time when the pump-turbine has just entered the S-characteristic zone or is about to enter the S-characteristic zone, thereby improving the recognition accuracy and making the recognition more timely.
[0060] FIG3 is a flow chart of another method for identifying an S-type characteristic of a pump-turbine according to an embodiment of the present invention. Referring to FIG3 , the method for identifying an S-type characteristic of a pump-turbine includes:
[0061] S201. Collect a group of pump-turbine status parameters at preset time intervals.
[0062] Step S201 is identical to the aforementioned step S101 and will not be described again here.
[0063] S202: Calculate the slope of the relationship curve within a current preset time interval based on the latest set of state parameters and the previous set of state parameters.
[0064] Specifically, the latest set of state parameters and the previous set of state parameters are the state parameters collected at the beginning and end of the current preset time interval, which can be used to calculate the slope of the relationship curve in the previous preset time interval. The calculation formula is: in, It refers to the slope of the relationship curve within the i-th preset time interval, Q i+1 It refers to the flow rate of the pump turbine in the i+1th group of state parameters, Q i It refers to the flow rate of the pump turbine in the i-th group of state parameters, n i+1 Refers to the speed of the pump turbine in the i+1th group of state parameters, n i It refers to the speed of the pump turbine in the i-th group of state parameters, and i is a natural number not equal to 0.
[0065] S203: Determine whether the slope satisfies at least one of the first condition and the second condition.
[0066] Specifically, the first condition is that the slope is positive, which can be expressed as If the slope of the relationship curve of the pump-turbine within the current preset time period satisfies the first condition, it indicates that the pump-turbine has entered the S-characteristic region and the operation of the pump-turbine has become unstable. In this case, it can be directly determined that the pump-turbine has entered the S-characteristic region.
[0067] The formula for calculating the absolute value of the slope is: in, The second condition is that the absolute value of the slope is greater than the first preset value, which can be expressed as X represents a first preset value. If the slope of the pump-turbine relationship curve within the current preset time period satisfies the second condition, it indicates that the pump-turbine has just entered or is about to enter the S-characteristics region, and the pump-turbine will soon become unstable. At this point, it can also be determined that the pump-turbine has entered the S-characteristics region.
[0068] For example, the first preset value is equal to the product of the preset coefficient and the historical slope, wherein the historical slope can be the slope of the relationship curve in the last preset time interval, or can be equal to the average of the slopes of the relationship curve in the previous preset time intervals. For example, when the historical slope is equal to the slope of the relationship curve in the last preset time interval, the second condition is that the absolute value of the slope is greater than the first preset value, which can also be expressed by the formula: in, It refers to the absolute value of the slope within the i+1th preset time interval, and a is the preset coefficient.
[0069] In one method of determining the preset coefficient, the preset coefficient may also be equal to the historical minimum slope ratio of the pump-turbine. The slope ratio is equal to the ratio of the slope of the relationship curve in the first preset time interval after the pump-turbine enters the S-characteristic region to the slope in the last preset time interval before entering the S-characteristic region. For example, the absolute value of the slope in the preset time interval corresponding to when the pump-turbine is judged to have entered the S-characteristic region in the historical data is taken as |k s |and the absolute value of the slope in the previous preset time interval|k s-1 |, the ratio of the two is the slope ratio Wherein, the subscript j represents the jth historical speed regulation cycle, and the subscript s represents the first preset time interval just entering the S characteristic area. Finally, a=min{a1,a2,...,a j ,...a m} is the preset coefficient. The subscript a represents the speed regulation cycle number corresponding to the pump-turbine being judged to enter the S-characteristic region. The numbers are set based on actual conditions and do not need to be consecutive. m is the total number of speed regulation cycles corresponding to the pump-turbine being judged to enter the S-characteristic region in the historical data.
[0070] In another way to determine the value of the preset coefficient, the preset coefficient can also be related to the recognition accuracy requirement. In situations where high recognition accuracy is not required, the required multiple value can be directly estimated, such as directly taking a=2 or a=5. The smaller a is, the higher the recognition accuracy.
[0071] S204: If the slope satisfies at least one of the first condition and the second condition, it is determined that the pump-turbine has entered the S characteristic region.
[0072] Specifically, if at least one of the first and second conditions is met, it indicates that the pump-turbine has entered the S-characteristics region or will soon enter the S-characteristics region. "Soon" here can mean less than or equal to 1 minute. Therefore, it can be determined that the pump-turbine has entered the S-characteristics region, facilitating the rapid restoration of the pump-turbine to normal operating conditions through speed regulation, improving the timeliness of speed regulation, and reducing the pump-turbine failure rate.
[0073] S205: If the slope does not satisfy the first condition and the second condition, it is determined that the pump-turbine has not entered the S characteristic region.
[0074] Specifically, if both the first condition and the second condition are not satisfied, it indicates that the pump-turbine has not entered the S characteristic region or will soon enter the S characteristic region, so it can be determined that the pump-turbine has not entered the S characteristic region.
[0075] The present embodiment provides a method for identifying the S-type characteristics of a pump-turbine. A set of state parameters of the pump-turbine is collected at preset time intervals, and the slope of the relationship curve within the current preset time interval is calculated based on the latest set of state parameters and the previous set of state parameters. A determination is made as to whether the slope satisfies at least one of the first condition and the second condition. If the slope satisfies at least one of the first condition and the second condition, it is determined that the pump-turbine has entered the S-characteristic zone. If the slope does not satisfy the first condition and the second condition, it is determined that the pump-turbine has not entered the S-characteristic zone, thereby achieving determination of the state of the pump-turbine. The state of the pump-turbine is identified based on the two slope conditions, thereby improving the identifiable range of the S-characteristic zone and the accuracy of state identification.
[0076] An embodiment of the present invention provides an S-type characteristic identification device for a pump-turbine. FIG4 is a schematic diagram of the composition of an S-type characteristic identification device for a pump-turbine provided by an embodiment of the present invention. Referring to FIG4 , the S-type characteristic identification device 400 for a pump-turbine includes a state parameter acquisition module 401, a slope calculation module 402, and a judgment module 403. The state parameter acquisition module 401 is used to collect a set of state parameters of the pump-turbine at preset time intervals, wherein the state parameters include the flow rate and speed of the pump-turbine; the slope calculation module 402 is used to calculate the slope of the relationship curve between the speed and flow rate of the pump-turbine within the current preset time interval; and the judgment module 403 is used to judge whether the pump-turbine has entered the S-characteristic zone based on the positive and negative polarity and absolute value of the slope.
[0077] Figure 5 is a schematic diagram of the composition of another S-type characteristic identification device for a pump-turbine provided by an embodiment of the present invention. In combination with Figures 4 and 5, the judgment module 403 includes a slope judgment unit 501, a first S-characteristic zone determination unit 502, and a second S-characteristic zone determination unit 503. The slope judgment unit 501 is used to judge whether the slope meets at least one of a first condition and a second condition, wherein the first condition is that the slope is positive, and the second condition is that the absolute value of the slope is greater than a first preset value; the first S-characteristic zone determination unit 502 is used to determine that the pump-turbine has entered the S-characteristic zone if the slope meets at least one of the first condition and the second condition; the second S-characteristic zone determination unit 503 is used to determine that the pump-turbine has not entered the S-characteristic zone if the slope does not meet the first condition and the second condition.
[0078] An embodiment of the present invention provides a control method for a pump-turbine. FIG6 is a flow chart of a control method for a pump-turbine provided by an embodiment of the present invention. Referring to FIG6 , the control method for a pump-turbine includes:
[0079] S601. Using the S-type characteristic identification method of the pump-turbine, identify whether the pump-turbine enters the S-characteristic region.
[0080] Specifically, the S-type characteristic identification method of the pump-turbine adopted in this embodiment can be the S-type characteristic identification method of the pump-turbine provided in any embodiment of the present invention, and the solution obtained by various obvious changes, readjustments, combinations and substitutions that can be made by technical personnel in this field on this basis.
[0081] S602: regulating the speed of the pump-turbine according to the identification result and the power generation of the pump-turbine.
[0082] Specifically, the state parameters may include not only the flow rate and speed of the pump-turbine but also the power generation of the pump-turbine. Combining the identification results and the power generation, the pump-turbine speed can be regulated to achieve the target power generation of the pump-turbine. For example, the speed regulation of the pump-turbine can be implemented by changing the inclination angle of the guide vanes of the pump-turbine.
[0083] The control method for a pump-turbine provided in this embodiment adopts an S-type characteristic identification method of a pump-turbine to identify whether the pump-turbine has entered the S-characteristic region, and then adjusts the speed of the pump-turbine according to the identification result and the power generation of the pump-turbine, thereby achieving accurate control of the pump-turbine. By identifying whether the pump-turbine has entered the S-characteristic region and combining the power generation of the pump-turbine to control the pump-turbine, the stability and safety of the pump-turbine are improved.
[0084] FIG7 is a flow chart of another method for controlling a pump-turbine according to an embodiment of the present invention. Referring to FIG7 , the method for controlling a pump-turbine includes:
[0085] S701. Utilize the S-type characteristic identification method of the pump-turbine to identify whether the pump-turbine enters the S-characteristic region.
[0086] S702: regulating the speed of the pump-turbine according to the identification result and the power generation of the pump-turbine.
[0087] S703. When the identification result shows that the pump-turbine has entered the S characteristic zone, an early warning signal is issued.
[0088] Specifically, the relative order of steps S702 and S703 is not limited. In other embodiments, a warning signal may be issued first based on the recognition result, and then the speed of the pump-turbine may be adjusted based on the recognition result and the power generation of the pump-turbine.
[0089] For example, FIG8 is a schematic diagram of a pump-turbine control system according to an embodiment of the present invention. Referring to FIG8 , a pumped-storage power station may include multiple pump-turbines M, a speed meter 801 corresponding to each pump-turbine, a flow meter 802, a control switch S1, a first voltage transformer V1, and a first current transformer A1 (only the measurement and control equipment corresponding to one pump-turbine is shown), a transformer T, a grid-connected switch K, a second current transformer A2, and a second voltage transformer V2. The first side of the grid-connected switch K is connected to the grid via the second current transformer A2 and the second voltage transformer V2. The second side of the grid-connected switch K is connected to the pump-turbines M via the transformer T, the first voltage transformer V1, the first current transformer A1, and the control switch S1. The first current transformer A1 and the first voltage transformer V1 can respectively collect the current and voltage on the pump-turbine M side, while the second current transformer A2 and the second voltage transformer V2 can respectively collect the current and voltage on the grid-side bus. The analog current and voltage signals collected by each current transformer and voltage transformer enter corresponding signal conditioning circuits for signal conditioning and high-frequency noise removal. The corresponding analog-to-digital converter then converts the analog current or voltage signals into digital signals and transmits them to the control device 803. The control device 803 can implement any of the aforementioned identification or control methods. Specifically, the control device 803 can calculate the power generation of each pump-turbine M using the digitized current and voltage signals. The speed meter 801 and flow meter 802 respectively collect the flow rate within the runner and the speed of the pump-turbine M and transmit them to the control device. The S-type characteristic recognition device in the control device 803 can identify whether the corresponding pump-turbine M has entered the S-type characteristic zone based on the flow rate and speed, output the S-type characteristic recognition result, and issue a warning signal if any pump-turbine M enters the S-type characteristic zone, reminding other pump-turbines M to be aware of the impact of the turbine's speed regulation when regulating their speed and alerting them of the impending operation of the grid-connected switch.
[0090] The S-type characteristic identification method, device and control method of the pump-turbine provided by the embodiment of the present invention collect a group of state parameters of the pump-turbine at preset time intervals, wherein the state parameters include the flow rate and speed of the pump-turbine. Based on the state parameters, a relationship curve between the speed and flow rate of the pump-turbine is determined. The slope of the relationship curve within the current preset time interval is calculated. According to the positive and negative polarity and absolute value of the slope, it is judged whether the pump-turbine has entered the S characteristic zone, thereby realizing the S-type characteristic identification of the pump-turbine. The method of judging whether the pump-turbine has entered the S characteristic zone according to the absolute value of the slope is introduced, which can better identify the time when the pump-turbine has just entered the S characteristic zone or is about to enter the S characteristic zone, thereby improving the recognition accuracy and making the recognition more timely.
[0091] The above-mentioned product can execute the method provided by any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0092] Note that the above are only preferred embodiments of the present invention and the technical principles employed. Those skilled in the art will appreciate that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments, combinations, and substitutions are possible for those skilled in the art without departing from the scope of the present invention. Therefore, although the present invention has been described in detail through the above embodiments, the present invention is not limited to the above embodiments and may include many other equivalent embodiments without departing from the scope of the present invention. The scope of the present invention is determined by the scope of the appended claims.
Claims
1. A method for identifying the S-type characteristics of a pump-turbine, characterized in that: include: Collecting a set of state parameters of the pump-turbine at every preset time interval, wherein the state parameters include the flow rate and speed of the pump-turbine; Calculating the slope of the relationship curve between the rotation speed and flow rate of the pump turbine within the current preset time interval; Judging whether the pump-turbine has entered the S characteristic zone according to the positive and negative polarity and the absolute value of the slope includes: judging whether the slope satisfies at least at least one of a first condition and a second condition, wherein the first condition is that the slope is positive, and the second condition is that the absolute value of the slope is greater than a first preset value, the first preset value is equal to the product of a preset coefficient and a historical slope, and the historical slope is the slope of the relationship curve within the last preset time interval; if the slope satisfies at least one of the first condition and the second condition, it is determined that the pump-turbine has entered the S characteristic zone; if the slope does not satisfy the first condition and the second condition, it is determined that the pump-turbine has not entered the S characteristic zone.
2. The method for identifying the S-type characteristics of a pump turbine according to claim 1, characterized in that: Calculating the slope of the relationship curve between the rotation speed and flow rate of the pump turbine within the current preset time interval includes: The slope of the relationship curve within the current preset time interval is calculated according to the latest set of state parameters and the previous set of state parameters.
3. The S-type characteristic identification method of a pump turbine according to claim 1 or 2, characterized in that: The preset coefficient is equal to the historical minimum slope ratio of the pump-turbine, and the slope ratio is equal to the ratio of the slope of the relationship curve in the first preset time interval after the pump-turbine enters the S characteristic zone to the slope of the relationship curve in the last preset time interval before entering the S characteristic zone.
4. The method for identifying the S-type characteristics of a pump turbine according to claim 3, characterized in that: The preset coefficient is related to the recognition accuracy requirement.
5. A device for identifying S-type characteristics of a pump turbine, characterized in that: include: A state parameter acquisition module, used to acquire a set of state parameters of the pump-turbine at preset time intervals, wherein the state parameters include the flow rate and rotation speed of the pump-turbine; A slope calculation module, used to calculate the slope of the relationship curve between the rotation speed and flow rate of the pump turbine within the current preset time interval; A judgment module is used to judge whether the pump-turbine has entered the S characteristic zone according to the positive and negative polarity and absolute value of the slope, and the judgment module includes a slope judgment unit, a first S characteristic zone determination unit and a second S characteristic zone determination unit; the slope judgment unit is used to judge whether the slope satisfies at least one of a first condition and a second condition, wherein the first condition is that the slope is positive, and the second condition is that the absolute value of the slope is greater than a first preset value, the first preset value is equal to the product of a preset coefficient and a historical slope, and the historical slope is the slope of the relationship curve within the last preset time interval; the first S characteristic zone determination unit is used to determine that the pump-turbine has entered the S characteristic zone if the slope satisfies at least one of the first condition and the second condition; the second S characteristic zone determination unit is used to determine that the pump-turbine has not entered the S characteristic zone if the slope does not satisfy the first condition and the second condition.
6. A control method for a pump turbine, characterized in that: include: Using the S-type characteristic identification method of a pump-turbine according to any one of claims 1 to 4, identifying whether the pump-turbine enters the S characteristic zone; The speed of the pump-turbine is regulated according to the identification result and the power generation of the pump-turbine.
7. The control method of a pump turbine according to claim 6, characterized in that: After identifying whether the pump turbine has entered the S characteristic zone, it also includes: When the identification result shows that the pump turbine has entered the S characteristic zone, an early warning signal is issued.
Citation Information
Patent Citations
Judgment method for liquid column separation of reversible pump turbine
CN115450821A
Dynamic test method and device for S characteristic curve of pump turbine
CN115879388A
S-shaped characteristic identification method and device of pump turbine and control method
CN116292034A
Turbine for pump
CN1193691A
Turbomachine and speed regulator for turbomachine
CN1497172A
Cited By
Water turbine operation characteristic curve data extraction method
CN121564372A