Method and system for controlling loading and unloading operations, and robot
Through the first robot and the second robot in conjunction with the telescopic transmission equipment, the visual positioning and multi-stage telescopic mechanism are used to solve the flexibility of loading and unloading of goods in a narrow space, automatic loading and unloading is realized, efficiency is improved, and manual labor is replaced.
Patent Information
- Application Number
- PCT/CN2023/135886
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-09-12
- Filing Date
- 2023-12-01
- Publication Date
- 2024-12-05
AI Technical Summary
The existing depalletizing robots have complex structures and poor flexibility, making them difficult to adapt to cargo loading and unloading tasks in narrow spaces, especially in ports and large storage centers.
Using a loading and unloading operation control method and system, the first robot and the second robot are used to cooperate with the telescopic conveyor or telescopic roller conveyor, and the dismantling and palletizing task of materials can be realized through the visual positioning system and the multi-stage telescopic mechanism, which can be used to achieve the dismantling and palletizing task in a narrow and small manner. Flexible adjustment of location and operating range in the space to replace manual labor.
It breaks through the limitations of the robot's own arm span length and the operating range of the robot's robot, realizes automatic loading and unloading in a narrow space, improves loading and unloading efficiency, and completely replaces manual labor.
Smart Images

Figure CN2023135886_05122024_PF_FP_ABST
Abstract
Description
Loading and unloading operation control method, system and robot Technical Field
[0001] The embodiments of the present disclosure relate to the fields of intelligent manufacturing and high-end manufacturing technology, and in particular to a loading and unloading operation control method, system, and robot. Background Art
[0002] With the widespread application of robotics and the continuous development of manufacturing robots, existing robots have become adaptable to a variety of applications. In particular, in scenarios such as intelligent picking, logistics and transportation, and warehouse management, palletizing and stacking robots are gradually being used to replace the high-intensity labor of human workers. Technical issues
[0003] Existing palletizing and unpalletizing robots are complex in structure and lack flexibility. Due to the limited arm reach and range of the robot's arms, they perform poorly in material loading scenarios such as ports and large warehouses, making them difficult to adapt to palletizing and unpalletizing cargo within confined spaces. Technical Solutions
[0004] Embodiments of the present disclosure provide a method, system, and robot for controlling loading and unloading operations.
[0005] In a first aspect, an embodiment of the present disclosure provides a loading and unloading operation control system, comprising: a first robot, a telescopic conveyor or a telescopic roller conveyor line, and a second robot, wherein the first robot places a material to be loaded on the telescopic conveyor or the telescopic roller conveyor line, so that the telescopic conveyor or the telescopic roller conveyor line conveys the material to an operating range of the second robot; or
[0006] The second robot places the material to be unloaded on the telescopic conveyor or the telescopic roller conveyor line, so that the telescopic conveyor or the telescopic roller conveyor line conveys the material to the operating range of the first robot; wherein:
[0007] The second robot is a mobile robot. When performing loading or unloading operations, it determines the position of the working space based on its own visual positioning system and moves to the designated working space. The working space includes: containers, carriages, flatbed trucks, warehouses, cabins, and engine rooms.
[0008] Optionally, the second robot includes: a first robotic arm, a second robotic arm, and a 3D visual positioning system, wherein the 3D visual positioning system includes a plurality of cameras, and the cameras are arranged at different positions on the second robot.
[0009] When performing loading operations, the first and second robotic arms of the second robot, with the assistance of the 3D vision positioning system, alternately grab materials from the telescopic conveyor or telescopic roller conveyor line and perform palletizing operations within a designated workspace according to a preset planned pallet pattern. When the spatial position within the workspace changes due to the stacking of materials, the second robot can actively adjust its position within the workspace according to the change in spatial position.
[0010] When performing an unloading operation, the first and second robotic arms of the second robot, with the assistance of the 3D vision positioning system, alternately grab materials from within a designated workspace according to preset depalletizing rules and place them on the telescopic conveyor or telescopic roller conveyor line. When the spatial position within the workspace changes due to unloading of materials, the second robot can actively adjust its position within the workspace according to the change in spatial position.
[0011] When the 3D visual positioning system captures depalletizing anomalies, it will promptly remind the operator to handle them. The depalletizing anomalies include: falling parts and stack tilting.
[0012] Optionally, the second robot further comprises: a first industrial computer and a second industrial computer, wherein the first industrial computer is used to control the first robotic arm to perform a grasping and / or placing task; and the second industrial computer is used to control the second robotic arm to perform a grasping and / or placing task; wherein the first industrial computer and the second industrial computer are integrated or independent structures.
[0013] The second robot also includes a mobile base, which is used to move to any position or pause at any position and determine the orientation angle according to the received control instructions; the first robotic arm is arranged on one side end of the mobile base, and the second robotic arm is arranged on the other side end of the mobile base; the corner ends of the mobile base are respectively provided with wheel floating mechanisms, and the wheel floating mechanisms are provided with wheels; the wheel floating mechanisms are used for floating buffering of the wheels to maintain stability on uneven ground, or to provide fixed support for the wheels; the wheels are used to drive the mobile base to move in all directions.
[0014] Optionally, the first robotic arm includes: a first supporting mechanism located on a first mobile chassis, a first joint of the first robotic arm, a second joint of the first robotic arm, and a first clamp located at an end of the first robotic arm;
[0015] The second robotic arm includes: a second supporting mechanism located on a second mobile chassis, a first joint of the second robotic arm, a second joint of the second robotic arm, and a second clamp located at the end of the second robotic arm.
[0016] Optionally, the first clamp and the second clamp both include: a back plate, an upper cover, and a plurality of suction cups located below the upper cover; the upper end surface of the back plate is connected to one side of the upper cover, and a right angle is formed between the back plate and the upper cover.
[0017] Optionally, when a telescopic conveyor is used for material transportation, the telescopic conveyor includes: a multi-stage telescopic mechanism, and the multi-stage telescopic mechanism is driven by a motor to achieve lateral length adjustment.
[0018] Optionally, the telescopic conveyor comprises: a first-stage telescopic mechanism, a second-stage telescopic mechanism, and a third-stage telescopic mechanism, wherein upper surfaces of the first-stage telescopic mechanism, the second-stage telescopic mechanism, and the third-stage telescopic mechanism are kept flush and share the same conveyor belt;
[0019] A guiding and positioning mechanism is also provided on the side where the telescopic conveyor is connected to the second robot, and the guiding and positioning mechanism is used to guide and position the materials on the telescopic conveyor.
[0020] Optionally, the telescopic conveyor further comprises: at least one height adjustment mechanism, the height adjustment mechanism being used to support the body of the telescopic conveyor and to achieve longitudinal adjustment to adapt to working scenes at different heights;
[0021] The telescopic conveyor further comprises: a buffer mechanism, the buffer mechanism being located downstream in the conveying direction of the telescopic conveyor and within the operating range of the second robot;
[0022] When the material is transferred to the buffer mechanism, the material is decelerated and stopped;
[0023] The telescopic conveyor further comprises: a roller, the roller being located below the chassis of the telescopic conveyor, the roller being connected to the servo motor to achieve autonomous movement of the telescopic conveyor;
[0024] The telescopic conveyor is located close to one side of the second robot. When operating, it extends a preset length into the working space or retracts a preset length according to a first control instruction sent remotely and / or a second control instruction generated by its own processor.
[0025] Optionally, the system further includes a remote control center, which establishes communication with the first robot and the second robot via a wired and / or wireless manner to send instructions to the first robot and the second robot to achieve the following tasks:
[0026] Controlling the first robot to move to one side of the telescopic conveyor or the telescopic roller conveyor line to perform a grabbing and / or placing task, and controlling the grabbing and / or placing speed;
[0027] Controlling the second robot to move into a designated workspace to perform a grab and / or place task, and controlling the grab and / or place speed;
[0028] It also includes: a code scanning mechanism, which is arranged on the conveying path of the telescopic conveyor or the telescopic roller conveyor line, and is used to read the identification code on the material to determine the product information of the material according to the identification code;
[0029] A quality inspection mechanism is provided on the conveying path of the telescopic conveyor or the telescopic roller conveyor line, and is used to obtain an image of the material so as to perform quality inspection based on the image of the material.
[0030] In a second aspect, an embodiment of the present disclosure provides a robot for use in the system according to any one of the first aspects, wherein the robot comprises: at least one industrial computer and a robotic arm located on a mobile chassis; the robotic arm comprises: two or more movable joints, and at least one clamp is installed at the end of the robotic arm;
[0031] During operation, the robot is used to grab and / or place materials.
[0032] In a third aspect, an embodiment of the present disclosure provides a method for controlling a loading and unloading operation, which is applied to the loading and unloading operation control system as described in the first aspect, and the method includes:
[0033] The remote control center sends a first movement instruction to the first robot, so that the first robot enters a waiting task state and moves to a depalletizing position or a palletizing position;
[0034] The remote control center sends a second movement instruction to the second robot, so that the second robot enters a waiting task state and moves to an initial loading position or an initial unloading position;
[0035] After receiving the arrival signal from the first robot and the arrival signal from the second robot, the remote control center starts the telescopic conveyor or the telescopic roller conveyor line;
[0036] The remote control center sends a depalletizing task to the first robot, so that the first robot performs the depalletizing task after receiving a placement signal fed back from the telescopic conveyor or the telescopic roller conveyor line; or the remote control center sends an unloading task to the second robot, so that the second robot performs the unloading task after receiving a placement signal fed back from the telescopic conveyor or the telescopic roller conveyor line;
[0037] The remote control center sends a loading task to the second robot so that the second robot performs the loading task after receiving a grabbing signal fed back from the telescopic conveyor or the telescopic roller conveyor line; or, the remote control center sends a palletizing task to the first robot so that the first robot performs the palletizing task after receiving a grabbing signal fed back from the telescopic conveyor or the telescopic roller conveyor line.
[0038] Optionally, when a telescopic conveyor is used, the telescopic conveyor is located between the first robot and the second robot to transport the materials removed by the first robot to the operating range of the second robot, or to transport the materials unloaded by the second robot to the operating range of the first robot; when a telescopic roller conveyor line is used, one end of the telescopic roller conveyor line is pre-connected to the control console of the second robot.
[0039] Optionally, it also includes:
[0040] The remote control center receives feedback from the second robot on whether the code is full; or the remote control center receives feedback from the second robot on whether the code is empty;
[0041] If the remote control center receives the full code information or the empty code information, it will stop the telescopic conveyor or the telescopic roller conveyor line.
[0042] Optionally, it also includes:
[0043] The remote control center receives feedback from the first robot indicating whether the code is empty or full.
[0044] If the remote control center receives the empty information and the non-full information fed back by the second robot, it determines the empty depalletizing position and controls the first robot to continue the depalletizing task from the unempty depalletizing position; or, if the remote control center receives the full information and the non-empty information fed back by the second robot, it determines the full palletizing position and controls the first robot to continue the palletizing task at the unfull palletizing position;
[0045] If all the depalletizing positions are empty, the first robot is controlled to enter a waiting task state; or, if all the palletizing positions are full, the first robot is controlled to enter a waiting task state.
[0046] Optionally, it also includes:
[0047] The remote control center controls the first robot to perform a replenishment task at the empty depalletizing position; wherein the replenishment task is performed simultaneously with the depalletizing task; or,
[0048] The remote control center mobilizes the third robot to move the full pallet away from the palletizing position and replace it with a new pallet in the vacant palletizing position.
[0049] Optionally, the destacking task means that the first robot grabs the material at at least one destacking position according to a preset destacking rule and places the material on a telescopic conveyor or a telescopic roller conveyor line;
[0050] The loading task is: the second robot loads the materials on the telescopic conveyor or telescopic roller conveyor line into the designated working space according to the preset stacking rules;
[0051] The palletizing task is: the first robot loads the materials on the telescopic conveyor or telescopic roller conveyor line onto the pallet according to the preset palletizing rules;
[0052] The unloading task means that the second robot grabs the materials inside the working space according to the preset destacking rules and places them on the telescopic conveyor or telescopic roller conveyor line.
[0053] Optionally, it also includes:
[0054] When the spatial position of the material in the working space changes due to the stacking of the material, the remote control center sends a third movement instruction to the second robot so that the second robot can adjust its position in the working space according to the change in the spatial position.
[0055] Optionally, the remote control center receives the material product information uploaded by the code scanning agency and / or the quality inspection information uploaded by the quality inspection agency; wherein,
[0056] The code scanning mechanism is provided on the conveying path of the telescopic conveyor or the telescopic roller conveyor line, and is used to read the identification code on the material to determine the material product information according to the identification code;
[0057] The quality inspection mechanism is arranged on the conveying path of the telescopic conveyor or the telescopic roller conveyor line, and is used to obtain an image of the material to obtain quality inspection information based on the image of the material.
[0058] In a fourth aspect, an embodiment of the present disclosure provides a loading and unloading operation control device, comprising:
[0059] A processor and a memory, wherein the memory stores executable program instructions, and when the processor calls the program instructions in the memory, the processor is configured to:
[0060] Execute the steps of any one of the loading and unloading operation control methods according to the second aspect.
[0061] In a fifth aspect, an embodiment of the present disclosure provides a readable storage medium, characterized in that a computer program is stored on the readable storage medium; when the computer program is executed, the loading and unloading operation control method as described in any one of the second aspects is implemented. Beneficial effects
[0062] In the disclosed embodiment, a first robot places the material to be loaded on a telescopic conveyor or a telescopic roller conveyor line, so that the telescopic conveyor or the telescopic roller conveyor line conveys the material to the operating range of a second robot; or a second robot places the material to be unloaded on the telescopic conveyor or the telescopic roller conveyor line, so that the telescopic conveyor or the telescopic roller conveyor line conveys the material to the operating range of the first robot; when the second robot performs loading or unloading operations, it determines the position of the operating space based on its own visual positioning system and moves to the designated operating space, which includes: a container, a carriage, a flatbed truck, a warehouse, a cabin, and an engine room. This can overcome the limitations of the robot's own arm span and the operating range of the robot arm, solve the problem of loading and unloading goods in a narrow space, replace manual labor, achieve full automation, and effectively improve the efficiency of loading and unloading. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] FIG1 is a schematic diagram of an application scenario provided by an embodiment of the present disclosure;
[0064] FIG2 is a second schematic diagram of an application scenario provided by an embodiment of the present disclosure;
[0065] FIG3 is a third schematic diagram of an application scenario provided by an embodiment of the present disclosure;
[0066] FIG4 is a fourth schematic diagram of an application scenario provided by an embodiment of the present disclosure;
[0067] FIG5 is a first structural diagram of a second robot provided by an embodiment of the present disclosure;
[0068] FIG6 is a second structural diagram of a second robot provided by an embodiment of the present disclosure;
[0069] FIG7 is a schematic structural diagram of a first robot provided by an embodiment of the present disclosure;
[0070] FIG8 is a first structural diagram of a clamp provided in an embodiment of the present disclosure;
[0071] FIG9 is a second structural diagram of a clamp provided in an embodiment of the present disclosure;
[0072] FIG10 is a first structural diagram of a telescopic conveyor provided in an embodiment of the present disclosure;
[0073] FIG11 is a second structural diagram of a telescopic conveyor provided in an embodiment of the present disclosure;
[0074] FIG12 is a third structural diagram of a telescopic conveyor provided in an embodiment of the present disclosure;
[0075] FIG13 is a schematic diagram of a loading and unloading operation scenario provided by an embodiment of the present disclosure;
[0076] FIG14 is a flow chart of a method for controlling loading and unloading operations according to an embodiment of the present disclosure;
[0077] FIG15 is a flow chart of a method for controlling loading and unloading operations according to another embodiment of the present disclosure;
[0078] FIG16 is a flow chart of a method for controlling loading and unloading operations according to another embodiment of the present disclosure;
[0079] FIG17 is a schematic diagram of the structure of the first robot in the depalletizing position;
[0080] FIG18 is a schematic diagram of the structure of the stacking position of the first robot;
[0081] FIG19 is a flow chart of a method for controlling loading and unloading operations according to yet another embodiment of the present disclosure;
[0082] FIG20 is a schematic diagram of signaling interaction of a loading operation control method provided by an embodiment of the present disclosure;
[0083] FIG21 is a schematic diagram of signaling interaction of an offloading job control method provided by an embodiment of the present disclosure;
[0084] FIG22 is a schematic structural diagram of a mobile robot according to an embodiment of the present disclosure;
[0085] FIG23 is a schematic structural diagram of a wheel floating mechanism according to an embodiment of the present disclosure;
[0086] FIG24 is a cross-sectional schematic diagram of a wheel floating mechanism according to an embodiment of the present disclosure;
[0087] FIG25 is a schematic structural diagram of a braking mechanism according to an embodiment of the present disclosure;
[0088] In the picture:
[0089] 100-first robot, 110-industrial computer, 120-sensor, 130-mobile chassis, 140-support mechanism, 150-first joint, 160-second joint, 170-clamp, 171-back plate, 172-upper cover, 173-suction cup, 180-material, 200-telescopic conveyor, 210-height adjustment mechanism, 220-first-stage telescopic mechanism, 230-second-stage telescopic mechanism, 240-third-stage telescopic mechanism, 250-buffer mechanism, 260-conveyor belt, 270-material, 280-motor, 300-container, 400-second robot, 411-first industrial computer, 412-second industrial computer, 421-first light source, 422-second light source, 431-first mobile chassis, 432-second mobile chassis, 441-first supporting mechanism, 442-second supporting mechanism, 451-first joint of the first robotic arm, 452-second joint of the second robotic arm, 461-second joint of the first robotic arm, 462-second joint of the second robotic arm, 471-first fixture, 472-second fixture, 480-material. Implementation Methods of the Application
[0090] The following specific embodiments are used to describe in detail the technical solution of this application and how the technical solution of this disclosure solves the above technical problems. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments.
[0091] The following describes some embodiments of the present disclosure in detail with reference to the accompanying drawings. In the absence of conflict, the following embodiments and features therein may be combined with each other.
[0092] Figure 1 is a schematic diagram of an application scenario provided by an embodiment of the present disclosure. As shown in Figure 1 , the application scenario includes a first robot 100, a telescopic conveyor 200, and a container 300. The telescopic conveyor 200 has an automatic lateral telescoping function, which is used to transfer materials grasped by the first robot 100 into the container to complete the loading of the materials. Alternatively, the materials in the container 300 can be first unloaded onto the telescopic conveyor 200, which then transports the unloaded materials to the operating range of the first robot 100, completing the unloading of materials from the container to a pallet.
[0093] FIG2 is a second schematic diagram of an application scenario provided by an embodiment of the present disclosure. As shown in FIG2 , to more clearly illustrate the operation inside container 300, container 300 is hidden. A second robot 400 is provided on the other side of telescopic conveyor 200. The second robot 400 has two robotic arms that can operate simultaneously or alternately.
[0094] For example, the second robot 400 can be capable of autonomous movement or can be moved with the aid of external forces. In the scenario shown in Figure 2, the second mobile robot 400 is able to enter the interior of the container 300 and cooperate with the telescopic conveyor 200 to perform the task of unpacking and stacking materials within the container. Generally speaking, the interior space of a container is relatively narrow and deep. Therefore, during traditional loading and unloading processes, robots cannot directly unpack and stack materials according to preset requirements, requiring human assistance, which is inefficient.
[0095] To address this issue, the disclosed embodiment of the present invention involves a first robot 100 loading materials onto a telescopic conveyor 200, which then transports the materials to the operating range of a second robot 400. Alternatively, the second robot 400 loads materials onto the telescopic conveyor 200, which then transports the materials to the operating range of the first robot 100. During operation, the second robot 400 moves to a designated operating space, such as a container or train compartment, based on first control instructions transmitted remotely and / or second control instructions generated by its own processor. This overcomes the limitations of the robot's arm's reach and operating range, solving the problem of stacking and unstacking cargo within narrow containers and train compartments. This replaces manual labor, achieves full automation, and effectively improves loading and unloading efficiency.
[0096] It should be noted that the present disclosure does not specifically limit the interior of the working space. It is only used here to distinguish it from a broad space. In addition to containers and carriages, it can also be inferred, such as flatbed trucks, warehouses, cabins, engine rooms, etc.
[0097] FIG3 is a third schematic diagram of an application scenario provided by an embodiment of the present disclosure, and FIG4 is a fourth schematic diagram of an application scenario provided by an embodiment of the present disclosure; as shown in FIG3 and FIG4, in addition to being applied to scenarios inside containers, this embodiment can also be applied to conventional loading and unloading scenarios. The first robot 100 and the second robot 400 can be mobile robots, and the telescopic conveyor 200 itself can also be flexibly moved by providing a mobile chassis, rollers, etc. It should be noted that in this embodiment, the second robot 400 is not limited to a two-arm robot. Even if it is a single-arm robot, it does not affect the realization of the effect of the embodiment of the present disclosure.
[0098] It should be noted that the telescopic conveyor 200 illustrated in Figures 1 to 3 may also employ a telescopic roller conveyor line or other conveying mechanism, and this embodiment does not specifically limit this. Other conveying mechanisms with similar functions for transferring materials between the first robot and the second robot are also within the scope of this disclosure.
[0099] It should be understood that the above naming of the components of the robot system is for identification purposes only and should not be construed as limiting the embodiments of the present disclosure.
[0100] An embodiment of the present disclosure provides a loading and unloading operation control system, including: a first robot, a telescopic conveyor or a telescopic roller conveyor line, and a second robot, wherein: the second robot is a mobile robot, and when performing loading operations, it determines the position of the working space based on its own visual positioning system and moves to the designated working space. The working space includes: containers, carriages, flatbed trucks, warehouses, cabins, and engine rooms.
[0101] In a possible embodiment, the first robot is used to place the material to be loaded on the telescopic conveyor or the telescopic roller conveyor line, so that the telescopic conveyor or the telescopic roller conveyor line conveys the material to the operating range of the second robot.
[0102] In another possible embodiment, the second robot is used to place the material to be unloaded on a telescopic conveyor or a telescopic roller conveyor line, so that the telescopic conveyor or the telescopic roller conveyor line transports the material to the operating range of the first robot.
[0103] For example, the interior of the working space described in the present disclosure is not limited to a container, a carriage, a flatbed truck, a warehouse, a cabin, or an engine room, but refers to a general space that is different from a vast space.
[0104] In this embodiment, since the containers, carriages, and flatbed trucks are movable, their positions cannot be completely consistent when parked, and there may be some deviation. To address this, the second robot can use its own visual positioning system to precisely position the containers, carriages, and flatbed trucks, allowing the second robot to smoothly move into these spaces.
[0105] FIG5 is a structural schematic diagram 1 of the second robot provided in an embodiment of the present disclosure. As shown in FIG5 , the second robot 400 in this embodiment may include: a first robotic arm, a second robotic arm, and a 3D visual positioning system.
[0106] In one possible embodiment, the first robotic arm and the second robotic arm of the second robot, with the assistance of a 3D vision positioning system, alternately grab materials from a telescopic conveyor or a telescopic roller conveyor line, and perform palletizing operations within a designated working space according to a preset planned pallet type; wherein: when the spatial position within the working space changes due to the stacking of materials, the second robot can actively adjust its position within the working space according to the change in spatial position.
[0107] For example, at the beginning, the second robot is positioned at a deeper place inside the working space. As the loading operation is carried out, more and more materials are stacked in the working space. At this time, the second robot can adaptively retreat from the inside of the working space according to the on-site stacking situation, thereby realizing flexible stacking of the robot inside the working space, improving loading efficiency, and greatly reducing the requirements for the robot's own arm span and working range.
[0108] In another possible embodiment, the first and second robotic arms of the second robot, with the assistance of a 3D vision positioning system, alternately grab materials from within a designated workspace according to preset depalletizing rules and place them on a telescopic conveyor or a telescopic roller conveyor line. The 3D vision positioning system includes multiple cameras, which are arranged at different locations on the second robot (e.g., an industrial computer, a support structure, or the robotic arm), wherein:
[0109] When the spatial position inside the workspace changes due to the unloading of materials, the second robot can actively adjust its position inside the workspace according to the change in spatial position;
[0110] When the 3D visual positioning system captures depalletizing anomalies, it will promptly remind the operator to handle them. The depalletizing anomalies include: falling parts and stack tilting.
[0111] For example, at the beginning, the second robot is positioned in a smaller area inside the working space. As the unloading operation is carried out, the remaining materials in the working space become less and less. At this time, the second robot can adaptively move into the working space according to the situation of the on-site materials, thereby realizing the flexible destacking of the robot inside the working space, improving the unloading efficiency, and greatly reducing the requirements for the robot's own arm span and working range.
[0112] In an optional embodiment, the second robot also includes: a first industrial computer and a second industrial computer, the first industrial computer is used to control the first robotic arm to perform grasping and / or placing tasks; the second industrial computer is used to control the second robotic arm to perform grasping and / or placing tasks.
[0113] In another optional embodiment, the first robotic arm includes: a first support mechanism located on a first mobile chassis, a first joint of the first robotic arm, a second joint of the first robotic arm, and a first clamp located at a distal end of the first robotic arm. The second robotic arm includes: a second support mechanism located on a second mobile chassis, a first joint of the second robotic arm, a second joint of the second robotic arm, and a second clamp located at a distal end of the second robotic arm.
[0114] In another optional embodiment, the first clamp and the second clamp both include: a back plate, an upper cover, and a plurality of suction cups located below the upper cover; the upper end surface of the back plate is connected to one side of the upper cover, and a right angle is formed between the back plate and the upper cover.
[0115] It should be noted that this embodiment only provides an optimal structure of a clamp and does not limit the specific type of clamp. In addition to the clamp with a suction cup, it can also include: a clamp with a claw, a fork, and other structures.
[0116] Figure 6 is a second structural schematic diagram of the second robot provided in an embodiment of the present disclosure. As shown in Figures 5 and 6, the second robot 400 may include: a first industrial computer 411, a second industrial computer 412, a first light source 421, a second light source 422, a first mobile chassis 431, a second mobile chassis 432, a first supporting mechanism 441, a second supporting mechanism 442, a first joint 451 of the first robotic arm, a second joint 452 of the second robotic arm, a second joint 461 of the first robotic arm, a second joint 462 of the second robotic arm, a first clamp 471, a second clamp 472, and material 480.
[0117] In an optional embodiment, the first industrial computer 411 and the second industrial computer 412 are integrated into an integrated structure or independent structures. The first mobile chassis 431 and the second mobile chassis 432 are used to support the second robot body to achieve free movement of the second robot.
[0118] In another alternative embodiment, the first industrial computer 411 and the second industrial computer 412 independently control the first and second robotic arms to perform the grabbing and placing tasks, respectively. For example, when the first robotic arm performs the grabbing task, the second robotic arm performs the placing task, or when the first robotic arm performs the placing task, the second robotic arm performs the grabbing task. This allows for spatial alternation and avoids overlapping motion spaces at the same time.
[0119] In this embodiment, the structures of the first clamp and the second clamp are set to adapt to the material, which can increase the flexibility of the clamp, maintain the overall stability of the stack during the depalletizing process, and enable the material to be grasped or placed at a higher position.
[0120] The disclosed embodiment also provides a robot, which includes: at least one industrial computer and a robotic arm located on a mobile chassis; the robotic arm includes: two or more movable joints, and at least one clamp is installed at the end of the robotic arm; when operating, the robot is used to perform material grabbing and / or placement.
[0121] FIG7 is a schematic diagram of the structure of a first robot provided by an embodiment of the present disclosure. As shown in FIG7 , the first robot 100 may include: an industrial computer 110, a sensor 120, a mobile chassis 130, a support mechanism 140, a first joint 150, a second joint 160, a clamp 170, and a material 180. The industrial computer 110 and the support mechanism 140 are both disposed on the mobile chassis 130. The industrial computer 110 is in communication with the drive motors of the first joint 150 and the second joint 160 to control the movement of the first joint 150 and the second joint 160 to a preset angle, thereby enabling the clamp 170 at the end of the robot arm to reach a specified position and perform a task of grabbing or placing the material 180.
[0122] FIG8 is a first schematic diagram of the structure of a clamp provided in an embodiment of the present disclosure, and FIG9 is a second schematic diagram of the structure of a clamp provided in an embodiment of the present disclosure. As shown in FIG8 and FIG9, the clamp 170 in this embodiment may include: a back plate 171, an upper cover 172, and suction cups 173. The upper end surface of the back plate 171 is connected to one side of the upper cover 172, and the back plate 171 and the upper cover 172 are at a right angle. A plurality of suction cups 173 are provided below the upper cover 172. The suction of the suction cups 173 grasps the material.
[0123] The clamp structure in this embodiment can keep the overall stability of the pallet during the depalletizing process and can achieve grasping or placement at a higher position.
[0124] FIG10 is a structural schematic diagram 1 of the telescopic conveyor provided in an embodiment of the present disclosure. As shown in FIG10 , the telescopic conveyor 200 in this embodiment may include: a multi-stage telescopic mechanism, which realizes lateral length adjustment under the drive of a motor.
[0125] Exemplarily, the telescopic conveyor includes: a first-level telescopic mechanism, a second-level telescopic mechanism, and a third-level telescopic mechanism. The upper surfaces of the first-level telescopic mechanism, the second-level telescopic mechanism, and the third-level telescopic mechanism remain flush and share the same conveyor belt.
[0126] Exemplarily, a guiding and positioning mechanism is provided on the side of the telescopic conveyor where it connects to the second robot. The guiding and positioning mechanism is used to guide and position the material on the telescopic conveyor. For example, a curved guide rail can be provided to guide and position the material. Alternatively, a pushing mechanism can be provided to push the material to a designated location when it reaches a preset position, thereby facilitating the second robot's grasping.
[0127] Exemplarily, the telescopic conveyor further includes: at least one height adjustment mechanism, which is used to support the body of the telescopic conveyor and achieve longitudinal adjustment to adapt to working scenarios at different heights.
[0128] Exemplarily, the telescopic conveyor also includes: a buffer mechanism, which is located downstream of the telescopic conveyor in the transmission direction and within the operating range of the second robot, or within the operating range of the first robot; when the material is transferred to the buffer mechanism, the material is decelerated and stopped.
[0129] In this embodiment, by providing a buffer mechanism, the second robot can keep the material in a stationary state when grasping the material, thereby effectively improving the success rate of grasping.
[0130] Exemplarily, the telescopic conveyor further includes: a roller, which is located below the chassis of the telescopic conveyor and is connected to a servo motor to achieve autonomous movement of the telescopic conveyor.
[0131] Exemplarily, the telescopic conveyor is located close to one side of the second robot. When operating, it extends a preset length into the working space or retracts a preset length according to a first control instruction sent remotely and / or a second control instruction generated by its own processor.
[0132] In this embodiment, the telescopic conveyor can automatically extend and retract to accommodate different operational scenarios. For example, during initial loading of a container, the telescopic conveyor can be extended deep inside the container. As the loading task progresses, the telescopic conveyor slowly retracts outward as needed, allowing the second robot operating inside the container to more efficiently load materials. Conversely, during unloading, the telescopic conveyor operates in the opposite direction, slowly extending further into the container as the unloading task progresses.
[0133] FIG11 is a second schematic diagram of the structure of a telescopic conveyor provided in an embodiment of the present disclosure, and FIG12 is a third schematic diagram of the structure of a telescopic conveyor provided in an embodiment of the present disclosure. In conjunction with FIG10 to FIG12 , the telescopic conveyor 200 in this embodiment may include: a height adjustment mechanism 210, a first-stage telescopic mechanism 220, a second-stage telescopic mechanism 230, a third-stage telescopic mechanism 240, a buffer mechanism 250, a conveyor belt 260, material 270, and a motor 280. Driven by the motor 280, the height adjustment mechanism 210 can be controlled to rise or fall to adapt to work scenarios at different heights. Driven by the motor 280, the first-stage telescopic mechanism 220, the second-stage telescopic mechanism 230, and the third-stage telescopic mechanism 240 can also be automatically controlled to perform horizontal telescopic movement to adapt to different transmission distances.
[0134] The present disclosure also provides a loading operation control system, which further includes a remote control center. The remote control center establishes communication with the first robot and the second robot via wired and / or wireless means to send instructions to the first robot and the second robot to achieve the following tasks:
[0135] 1) Controlling the first robot to move to one side of the telescopic conveyor to perform a grabbing and / or placing task, and controlling the grabbing and / or placing speed.
[0136] 2) Controlling the second robot to move into the designated workspace, perform a grabbing and / or placing task, and controlling the grabbing and / or placing speed.
[0137] For example, when a telescopic conveyor is used as a transport mechanism, the telescopic conveyor can also be remotely controlled by a remote control center, for example, the telescopic conveyor can be controlled by the remote control center to adjust its length and / or height.
[0138] In this embodiment, the remote control center can simultaneously control multiple robots and telescopic conveyors. For example, in a large port scenario, the remote control center can schedule multiple robots and telescopic conveyors, ensuring that the first and second robots can reach designated workstations and determining the height and length of the telescopic conveyor.
[0139] The present disclosure also provides a method for controlling loading and unloading operations, which is applied to the above-mentioned loading and unloading operation control system. The method may include the following steps:
[0140] Step A1: After the second robot reaches the designated working space, the height or length of the telescopic conveyor or the telescopic roller conveyor line is adjusted.
[0141] In this embodiment, the telescopic conveyor or the telescopic roller conveyor line is used to realize the transmission relay between the first robot and the second robot, that is, to adapt to the operating range of the first robot and the second robot in the height direction and the length direction.
[0142] Step A2: Determine the operating parameters of the first robot and the second robot.
[0143] The operation parameters in this embodiment include: the interval step size of the grasping or placing task, the motion parameters of the robot arm, the stacking type information, etc.
[0144] Step A3: Execute the material grabbing or placing task according to the operation parameters.
[0145] In this embodiment, a first robot places the material to be loaded on a telescopic conveyor or a telescopic roller conveyor line, which then transports the material to the operating range of a second robot. Alternatively, a second robot places the material to be unloaded on a telescopic conveyor or a telescopic roller conveyor line, which then transports the material to the operating range of the first robot. When the second robot is performing loading or unloading operations, it determines the location of its operating space based on its own visual positioning system and moves to a designated operating space, which includes a container, a carriage, a flatbed truck, a warehouse, a cabin, or an engine room. This overcomes the limitations of the robot's own arm span and the operating range of its robotic arm, solves the problem of stacking and unstacking goods in narrow spaces, replaces manual labor, and achieves full automation, effectively improving loading efficiency.
[0146] FIG13 is a schematic diagram of a loading and unloading operation scenario provided by an embodiment of the present disclosure. As shown in FIG13 , this application scenario includes: a first robot, a second robot, a remote control center, and a telescopic conveyor or a telescopic roller conveyor line; wherein the telescopic conveyor or the telescopic roller conveyor line is located between the first robot and the second robot to enable material transportation between the first robot and the second robot. The remote control center can establish communication with the first robot, the second robot, and the telescopic conveyor or the telescopic roller conveyor line via a wireless network and / or a wired network to send instructions to any one or more of the first robot, the second robot, and the telescopic conveyor or the telescopic roller conveyor line.
[0147] Exemplarily, the remote control center is used to send instructions to the first robot and the second robot to achieve the following tasks:
[0148] 1) Controlling the first robot to move to one side of the telescopic conveyor to perform a grabbing and / or placing task, and controlling the grabbing and / or placing speed.
[0149] 2) Controlling the second robot to move into the designated workspace, perform a grabbing and / or placing task, and controlling the grabbing and / or placing speed.
[0150] For example, when a telescopic conveyor is used as a transport mechanism, the telescopic conveyor can also be remotely controlled by a remote control center, for example, the telescopic conveyor can be controlled by the remote control center to adjust its length and / or height.
[0151] In this embodiment, the remote control center can simultaneously control multiple robots and telescopic conveyors. For example, in a large port scenario, the remote control center can schedule multiple robots and telescopic conveyors, ensuring that the first and second robots can reach designated workstations and determining the height and length of the telescopic conveyor.
[0152] Exemplarily, the first robot is used to place the material to be loaded on the telescopic conveyor or telescopic roller conveyor line, so that the telescopic conveyor or telescopic roller conveyor line transports the material to the operating range of the second robot; or, the second robot is used to place the material to be unloaded on the telescopic conveyor or telescopic roller conveyor line, so that the telescopic conveyor or telescopic roller conveyor line transports the material to the operating range of the first robot; wherein: the second robot is a mobile robot, and when performing loading operations, it determines the position of the working space according to its own visual positioning system and moves to the designated working space, and the working space includes: containers, carriages, flatbed trucks, warehouses, cabins, and engine rooms.
[0153] For example, the interior of the working space described in the present disclosure is not limited to a container, a carriage, a flatbed truck, a warehouse, a cabin, or an engine room, but refers to a general space that is different from a vast space.
[0154] In this embodiment, since the containers, carriages, and flatbed trucks are movable, their positions cannot be completely consistent when parked, and there may be some deviation. To address this, the second robot can use its own visual positioning system to precisely position the containers, carriages, and flatbed trucks, allowing the second robot to smoothly move into these spaces.
[0155] FIG14 is a flow chart of a method for controlling loading and unloading operations according to an embodiment of the present disclosure. As shown in FIG14 , the method according to this embodiment may include the following steps:
[0156] Step S1401: The remote control center sends a first movement instruction to the first robot.
[0157] In this embodiment, after establishing communication with the first robot, the remote control center proactively sends a first movement instruction to the first robot. Following this first movement instruction, the first robot enters a waiting state and moves to a depalletizing position. The first movement instruction may include depalletizing position information and other instructive information, such as depalletizing rules and a depalletizing timer.
[0158] Step S1402: The remote control center sends a second movement instruction to the second robot.
[0159] In one possible implementation, after establishing communication with the second robot, the remote control center proactively sends a second movement instruction to the second robot. In response to the second movement instruction, the second robot enters a waiting state and moves to the initial loading position. The initial loading position can be pre-set. For example, when loading a container, the second robot's innermost position in the container serves as the initial loading position, and palletizing is performed from the inside of the container toward the outside.
[0160] In another possible implementation, after establishing communication with the second robot, the remote control center proactively sends a second movement instruction to the second robot. In response to the second movement instruction, the second robot enters a waiting state and moves to an initial unloading position. The initial unloading position can be pre-set. For example, when unloading a container, the second robot's outermost position is used as the initial unloading position, and destacking is performed from the outside of the container toward the inside.
[0161] Step S1403: After receiving the arrival signal from the first robot and the arrival signal from the second robot, the remote control center starts the telescopic conveyor or the telescopic roller conveyor line.
[0162] In this embodiment, the remote control center receives the arrival signal sent by the first robot and the arrival signal sent by the second robot respectively. If both signals are received, it means that the first robot and the second robot are already in place, and the telescopic conveyor or telescopic roller conveyor line can be started at this time.
[0163] For example, when a telescopic conveyor is used, the telescopic conveyor is located between the first robot and the second robot to transport the materials removed by the first robot to the operating range of the second robot; when a telescopic roller conveyor line is used, one end of the telescopic roller conveyor line is pre-connected to the control console of the second robot.
[0164] Step S1404: The remote control center sends a destacking task to the first robot, or sends an unloading task to the second robot.
[0165] In one possible implementation, the remote control center issues a depalletizing task to the first robot, causing the first robot to execute the depalletizing task after receiving a placement signal from a telescopic conveyor or a telescopic roller conveyor line. The depalletizing task involves the first robot grasping materials at at least one depalletizing position according to a preset depalletizing rule and placing them on the telescopic conveyor or the telescopic roller conveyor line.
[0166] In another possible implementation, the remote control center issues an unloading task to the second robot, causing it to execute the unloading task after receiving a placement signal from the telescopic conveyor or telescopic roller conveyor line. The unloading task involves the second robot grabbing materials from at least one destacking location (e.g., stacked materials in a container) according to a preset destacking rule and placing them on the telescopic conveyor or telescopic roller conveyor line.
[0167] Step S1405: The remote control center sends a loading task to the second robot, or sends a palletizing task to the first robot.
[0168] In one possible implementation, the remote control center issues a loading task to the second robot, instructing it to perform the loading task after receiving a grab signal from the telescopic conveyor or telescopic roller conveyor line. The loading task involves the second robot loading materials from the telescopic conveyor or telescopic roller conveyor line into a designated workspace according to pre-set stacking rules.
[0169] In another possible implementation, the remote control center sends a palletizing task to the first robot, causing the first robot to perform the palletizing task after receiving a grabbing signal from the telescopic conveyor or telescopic roller conveyor line. The palletizing task involves the first robot loading materials from the telescopic conveyor or telescopic roller conveyor line onto a pallet or other transport device according to pre-set palletizing rules.
[0170] This embodiment is applied to a loading operation control system comprising a first robot, a telescopic conveyor or a telescopic roller conveyor line, a second robot, and a remote control center. When a code scanning mechanism is provided on the conveying path of the telescopic conveyor or the telescopic roller conveyor line, the code scanning mechanism reads the identification code on the material to determine the material product information based on the identification code. When a quality inspection mechanism is provided on the conveying path of the telescopic conveyor or the telescopic roller conveyor line, the quality inspection mechanism captures an image of the material to obtain quality inspection information based on the image of the material.
[0171] In one case, a first movement instruction is sent to the first robot through the remote control center, so that the first robot enters a waiting task state and moves to the destacking position, and a second movement instruction is sent to the second robot, so that the second robot enters a waiting task state and moves to the initial loading position; after receiving the arrival signal sent by the first robot and the arrival signal sent by the second robot, the telescopic conveyor or the telescopic roller conveyor line is started; then a destacking task is sent to the first robot, so that the first robot performs the destacking task after receiving the placement signal fed back from the telescopic conveyor or the telescopic roller conveyor line; finally, a loading task is sent to the second robot, so that the second robot performs the loading task after receiving the grasping signal fed back from the telescopic conveyor or the telescopic roller conveyor line.
[0172] In another case, a first movement instruction is sent to the first robot through the remote control center, so that the first robot enters a waiting task state and moves to the palletizing position; a second movement instruction is sent to the second robot, so that the second robot enters a waiting task state and moves to the initial unloading position; after receiving the arrival signal sent by the first robot and the arrival signal sent by the second robot, the telescopic conveyor or the telescopic roller conveyor line is started; an unloading task is sent to the second robot, so that the second robot performs the unloading task after receiving the placement signal fed back from the telescopic conveyor or the telescopic roller conveyor line; a palletizing task is sent to the first robot, so that the first robot performs the palletizing task after receiving the grasping signal fed back from the telescopic conveyor or the telescopic roller conveyor line.
[0173] This embodiment can break through the limitations of the robot's own arm span length and the operating range of the robot arm, solve the problem of unstacking and palletizing goods in a narrow space, replace manual labor, fully realize automation, and effectively improve loading efficiency.
[0174] FIG15 is a flow chart of a method for controlling loading and unloading operations according to another embodiment of the present disclosure. As shown in FIG15 , the method in this embodiment may include:
[0175] Step S1501: The remote control center sends a first movement instruction to the first robot.
[0176] Step S1502: The remote control center sends a second movement instruction to the second robot.
[0177] Step S1503: After receiving the arrival signal from the first robot and the arrival signal from the second robot, the remote control center starts the telescopic conveyor or the telescopic roller conveyor line.
[0178] Step S1504: The remote control center sends a depalletizing task to the first robot, or sends an unloading task to the second robot.
[0179] Step S1505: The remote control center sends a loading task to the second robot, or sends a palletizing task to the first robot.
[0180] For the specific implementation methods and technical effects of steps S1501 to S1505 in this embodiment, please refer to the relevant descriptions of steps S1401 to S1405 in Figure 14, which will not be repeated here.
[0181] Step S1506: The remote control center receives feedback from the second robot on whether the code is full or empty.
[0182] In this embodiment, when the second robot performs the loading task, it collects the stacking scene image through its own visual system and determines whether the stack is full based on the stacking scene image. If not, the unfull stacking information is fed back to the remote control center, so that the remote control center controls the first robot to continue to transport the disassembled materials through the telescopic conveyor or telescopic roller conveyor line to the operating range of the second robot (the range of the robotic arm grasping).
[0183] In this embodiment, when the second robot performs the unloading task, it collects the unloading scene image through its own visual system, and determines whether it is empty based on the unloading scene image. If it is not empty, the non-empty information is fed back to the remote control center, so that the remote control center controls the second robot to continue to transport the disassembled materials through the telescopic conveyor or the telescopic roller conveyor line to the operating range of the first robot (the range of the robotic arm grasping).
[0184] Step S1507: If the remote control center receives the full code information or the empty code information, it stops the telescopic conveyor or the telescopic roller conveyor line.
[0185] In this embodiment, when the second robot captures the palletizing scene image through its own vision system and determines that the palletizing scene is full based on the palletizing scene image, it sends a full palletizing information to the remote control center, so that the remote control center stops the telescopic conveyor or telescopic roller conveyor line, thereby avoiding continuously conveying materials to the operating range of the second robot, causing material backlog or falling.
[0186] In this embodiment, when the second robot captures the unloading scene image through its own visual system and determines that it has been emptied based on the unloading scene image, it sends the emptying information to the remote control center so that the remote control center stops the telescopic conveyor or telescopic roller conveyor line, thereby avoiding the telescopic conveyor or telescopic roller conveyor line from idling.
[0187] In this embodiment, the remote control center uses the full-stack information fed back by the second robot to control the dispatch of loading tasks and whether to stop the telescopic conveyor or telescopic roller conveyor line, thereby ensuring the normal operation of the loading operation. The empty-stack information fed back by the second robot also controls the dispatch of unloading tasks and whether to stop the telescopic conveyor or telescopic roller conveyor line, thereby ensuring the normal operation of the unloading operation.
[0188] FIG16 is a flow chart of a method for controlling loading and unloading operations according to another embodiment of the present disclosure. As shown in FIG16 , the method in this embodiment may include:
[0189] Step S1601: The remote control center sends a first movement instruction to the first robot.
[0190] Step S1602: The remote control center sends a second movement instruction to the second robot.
[0191] Step S1603: After receiving the arrival signal from the first robot and the arrival signal from the second robot, the remote control center starts the telescopic conveyor or the telescopic roller conveyor line.
[0192] Step S1604: The remote control center sends a depalletizing task to the first robot, or sends an unloading task to the second robot.
[0193] Step S1605: The remote control center sends a loading task to the second robot, or sends a palletizing task to the first robot.
[0194] For the specific implementation methods and technical effects of steps S1601 to S1605 in this embodiment, please refer to the relevant descriptions of steps S1401 to S1405 in Figure 14, which will not be repeated here.
[0195] Step S1606: The remote control center receives feedback from the first robot on whether the code is empty or full.
[0196] In this embodiment, the first robot's own vision system or a vision system deployed around the first robot can capture images of the depalletizing position, and determine whether the corresponding depalletizing position is empty based on the captured images. The first robot then feeds back information on whether the depalletizing position is empty to the remote control center.
[0197] In this embodiment, the first robot's own vision system or a vision system deployed around the first robot can capture images of the pallet position and determine whether the corresponding pallet position is fully palletized based on the captured images. The first robot then feeds back the full palletization information to the remote control center.
[0198] Step S1607: If the remote control center receives the empty information and the non-full stacking information fed back by the second robot, it determines the empty depalletizing position and controls the first robot to continue to perform the depalletizing task from the unemptied depalletizing position; or, if the remote control center receives the full stacking information and the non-empty stacking information fed back by the second robot, it determines the full stacking position and controls the first robot to continue to perform the stacking task at the unfull stacking position.
[0199] Figure 17 is a schematic diagram of the depalletizing position structure of the first robot. As shown in Figure 17, two or more depalletizing positions can be set around the first robot. When there are two or more depalletizing positions, depalletizing can be performed in the first, second, and third depalletizing positions in sequence. When the first depalletizing position is empty, the emptying information is fed back to the remote control center. The remote control center controls the first robot to continue depalletizing from the second depalletizing position, and so on.
[0200] For example, the remote control center can also control the first robot to perform a replenishment task at the emptied depalletizing location; wherein the replenishment task and the depalletizing task are executed simultaneously. Specifically, with reference to Figure 17, assuming that the first depalletizing location is emptied, the first robot can also simultaneously replenish the first depalletizing location while performing the depalletizing operation at the second depalletizing location. Replenishment refers to the transportation of materials from other mobile robots, forklifts, or conveyor belts to the first depalletizing location.
[0201] Figure 18 is a schematic diagram of the palletizing position structure of the first robot. As shown in Figure 18, two or more palletizing positions can be set up around the first robot. When there are two or more palletizing positions, the first, second, and third palletizing positions can be depalletized in sequence. When the first palletizing position is full, a full palletizing information is fed back to the remote control center. The remote control center controls the first robot to continue palletizing from the second palletizing position, and so on.
[0202] For example, the remote control center can also control other robots to transfer full pallets and replace empty pallets.
[0203] Step S1608: If all the depalletizing positions are empty, or all the palletizing positions are full, control the first robot to enter a waiting task state.
[0204] In this embodiment, assuming that all depalletizing positions are empty, each depalletizing position needs to be replenished. Replenishment takes time, so the first robot is first controlled to enter a waiting task state.
[0205] In this embodiment, if all pallets (palletizing positions) around the first robot are fully stacked, the first robot is first controlled to enter a waiting task state.
[0206] In this embodiment, the system receives information from the first robot indicating whether the stack is empty. Upon receiving information from the second robot indicating that the stack is not full, the system determines the empty stacking position and controls the first robot to continue the stacking task at the unempty stacking position. If all stacking positions are empty, the first robot is controlled to enter a waiting state. This allows for flexible stacking scheduling of the first robot and timely replenishment.
[0207] In this embodiment, the remote control center receives feedback from the first robot regarding whether the pallet is full. If the remote control center receives both full palletizing information and unpacked palletizing information from the second robot, it determines which palletizing positions are full and controls the first robot to continue palletizing at unfilled positions. If all palletizing positions are full, the first robot is controlled to enter a waiting state. This allows for flexible palletizing scheduling of the first robot to ensure smooth palletizing.
[0208] FIG19 is a flow chart of a method for controlling loading and unloading operations according to another embodiment of the present disclosure. As shown in FIG19 , the method in this embodiment may include:
[0209] Step S1901: The remote control center sends a first movement instruction to the first robot.
[0210] Step S1902: The remote control center sends a second movement instruction to the second robot.
[0211] Step S1903: After receiving the arrival signal from the first robot and the arrival signal from the second robot, the remote control center starts the telescopic conveyor or the telescopic roller conveyor line.
[0212] Step S1904: The remote control center sends a depalletizing task to the first robot, or sends an unloading task to the second robot.
[0213] Step S1905: The remote control center sends a loading task to the second robot, or sends a palletizing task to the first robot.
[0214] For the specific implementation methods and technical effects of steps S1901 to S1905 in this embodiment, please refer to the relevant descriptions of steps S1401 to S1405 in Figure 2, which will not be repeated here.
[0215] Step S1906: When the spatial position of the materials in the working space changes due to the stacking, the remote control center sends a third movement instruction to the second robot.
[0216] In this embodiment, when the spatial position inside the working space changes due to the stacking of materials, the remote control center sends a third movement instruction to the second robot so that the second robot can adjust its position inside the working space according to the change in spatial position.
[0217] In an optional embodiment, the second robot can also actively adjust its position within the working space according to changes in the spatial position.
[0218] For example, at the beginning, the second robot is positioned at a deeper place inside the working space. As the loading operation is carried out, more and more materials are stacked in the working space. At this time, the second robot can adaptively retreat from the inside of the working space according to the on-site stacking situation, thereby realizing flexible stacking of the robot inside the working space, improving loading efficiency, and greatly reducing the requirements for the robot's own arm span and working range.
[0219] For example, at the beginning, the second robot is positioned in a smaller depth inside the working space. As the unloading operation is carried out, more and more materials are unloaded in the working space. At this time, the second robot can adaptively move toward the part of the working space according to the on-site unloading situation, thereby realizing the flexible destacking of the robot inside the working space, improving the unloading efficiency, and greatly reducing the requirements for the robot's own arm span and working range.
[0220] FIG20 is a schematic diagram of signaling interaction of a loading operation control method provided in an embodiment of the present disclosure. As shown in FIG20 , the method in this embodiment may include the following steps:
[0221] Step B1: The remote control center sends a first movement instruction to the first robot.
[0222] Step B2: The remote control center sends a second movement instruction to the second robot.
[0223] Step B3: After the first robot moves to the depalletizing position according to the first movement instruction, it feeds back a position signal to the remote control center.
[0224] Step B4: After the second robot moves to the initial loading position according to the second movement instruction, it feeds back a position signal to the remote control center.
[0225] Step B5: The remote control center sends a start command to the telescopic conveyor / telescopic roller conveyor line.
[0226] Step B6: The remote control center sends a depalletizing task to the first robot.
[0227] Step B7: The remote control center sends a loading task to the second robot.
[0228] Step B8: The telescopic conveyor / telescopic roller conveyor line sends a placement signal to the first robot.
[0229] Step B9: The telescopic conveyor / telescopic roller conveyor line sends a grabbing signal to the second robot.
[0230] Step B10: The first robot performs the depalletizing task.
[0231] Step B11: The second robot performs the loading task.
[0232] Step B12: The remote control center sends a third movement instruction to the second robot.
[0233] In this embodiment, the second robot adjusts its position within the working space according to the third movement instruction.
[0234] Step B13: The second robot feeds back information on whether the code is full to the remote control center.
[0235] Step B14: The first robot feeds back information on whether the robot has been emptied to the remote control center.
[0236] Step B15: If all the depalletizing positions are empty, the remote control center sends a waiting state instruction to the first robot, so that the first robot enters the waiting state.
[0237] Step B16: If the code is full information is received from the second robot, the remote control center sends a stop command to the telescopic conveyor / telescopic roller conveyor line.
[0238] It should be noted that this embodiment does not limit the execution order of the above steps, and the order of steps can be adjusted according to actual conditions.
[0239] In this embodiment, a remote control center sends a first movement command to the first robot, causing it to enter a waiting state and move to the depalletizing position. A second movement command is sent to the second robot, causing it to enter a waiting state and move to the initial loading position. After receiving an arrival signal from the first robot and an arrival signal from the second robot, a telescopic conveyor or a telescopic roller conveyor line is activated. A depalletizing task is then sent to the first robot, causing it to perform the depalletizing task after receiving a placement signal from the telescopic conveyor or the telescopic roller conveyor line. Finally, a loading task is sent to the second robot, causing it to perform the loading task after receiving a grab signal from the telescopic conveyor or the telescopic roller conveyor line. This overcomes the limitations of the robot's arm span and operating range, solves the problem of depalletizing and stacking goods in confined spaces, replaces manual labor, and achieves full automation, effectively improving loading efficiency.
[0240] FIG21 is a schematic diagram of signaling interaction of an offload job control method provided in an embodiment of the present disclosure. As shown in FIG21 , the method in this embodiment may include the following steps:
[0241] Step C1: The remote control center sends a first movement instruction to the first robot.
[0242] Step C2: The remote control center sends a second movement instruction to the second robot.
[0243] Step C3: After the first robot moves to the stacking position according to the first movement instruction, it feeds back a position signal to the remote control center.
[0244] Step C4: After the second robot moves to the initial unloading position according to the second movement instruction, it feeds back a position signal to the remote control center.
[0245] Step C5: The remote control center sends a start command to the telescopic conveyor / telescopic roller conveyor line.
[0246] Step C6: The remote control center sends an unloading task to the second robot.
[0247] Step C7: The remote control center sends a palletizing task to the first robot.
[0248] Step C8: The telescopic conveyor / telescopic roller conveyor line sends a placement signal to the second robot.
[0249] Step C9: The telescopic conveyor / telescopic roller conveyor line sends a grabbing signal to the first robot.
[0250] Step C10: The second robot performs the unloading task.
[0251] Step C11: The first robot performs the palletizing task.
[0252] Step C12: The remote control center sends a third movement instruction to the second robot.
[0253] In this embodiment, the second robot adjusts its position within the working space according to the third movement instruction.
[0254] Step C13: The second robot feeds back information on whether the robot has been emptied to the remote control center.
[0255] Step C14: The first robot feeds back information on whether the code is full to the remote control center.
[0256] Step C15: If all the palletizing positions are full, the remote control center sends a waiting state instruction to the first robot, so that the first robot enters the waiting state.
[0257] Step C16: If the remote control center receives the emptying information fed back by the second robot, the remote control center sends a stop command to the telescopic conveyor / telescopic roller conveyor line.
[0258] It should be noted that this embodiment does not limit the execution order of the above steps, and the order of steps can be adjusted according to actual conditions.
[0259] Figure 22 is a structural schematic diagram of the mobile robot in an embodiment of the present disclosure. As shown in Figure 22, the mobile robot in the present disclosure includes: the integrated robotic arm described above, and also includes a mobile base; the mobile base is used to move to any position or pause at any position and determine the orientation angle according to the received control instructions; the integrated robotic arm is arranged on the mobile base, and is used to move the target box transported by the first conveyor to a discharge position, or move the target box on the discharge position to the first conveyor.
[0260] In the embodiment of the present disclosure, the mobile base includes: a base body 10, which is used to install a robotic arm and a robotic arm control device; wheels 20, which are used to drive the base body 10 to move; a wheel floating mechanism 30, which is used for floating buffering of the wheels 20 to keep the wheels fully grounded on uneven ground or to rigidly support the wheels 20, and the wheels 20 are connected to the base body 10 through the wheel floating mechanism 30.
[0261] FIG23 is a schematic structural diagram of the wheel floating mechanism in the embodiment of the present disclosure, and FIG24 is a schematic cross-sectional diagram of the wheel floating mechanism in the embodiment of the present disclosure. As shown in FIG23 and FIG24, the wheel floating mechanism in the present disclosure includes: a suspension guide seat 201, the suspension guide seat 201 includes a guide plate 2011, an upper end cover 2012 and a lower end cover 2013, the upper end of the guide plate 2011 is provided with the upper end cover 2012, and the lower end is provided with the lower end cover 2013; a ball screw assembly, including a ball screw 209 and a screw nut 2010, the upper end of the ball screw 209 is connected to the first bearing The upper end cover 2012 is connected to the lower end cover 2013 at the lower end through the second bearing, and the screw nut 2010 is rotatably connected to the ball screw 209; the suspension connecting plate 202 is connected to the ball screw 209 through the screw nut 2010, and the suspension connecting plate 202 is used to install the wheel; the braking mechanism 203 is used to brake the ball screw after receiving the wheel control signal; the compression spring 208 is sleeved on the outside of the ball screw, the lower end of the compression spring 208 is connected to the suspension connecting plate 202, and the upper end is connected to the upper end cover 2012.
[0262] In an embodiment of the invention, the ball screw 209 is coaxially arranged with the compression spring 208, and the guide plate 2011 is parallel to the compression spring 208. The upper end cover 2012 and the lower end cover 2013 are perpendicular to the guide plate 2011, so that the upper end cover 2012 and the lower end cover 2013 are parallel. In this embodiment of the present disclosure, when the braking mechanism 203 is de-energized, the braking mechanism 203 brakes the ball screw, achieving rigid support for the wheel. When the braking mechanism 203 is energized, the ball screw can rotate within the first and second bearings under the drive of the screw nut 2010, and the screw nut 2010 moves up and down along the ball screw 209 to achieve floating cushioning for the wheel.
[0263] In the embodiment of the present disclosure, when the screw nut 2010 moves upward along the ball screw 209, the compression spring 208 is compressed, and when the screw nut 2010 moves downward along the ball screw 209, the compression spring 208 is stretched. Through the energy storage and release of the compression spring 208, floating buffering of the wheel is achieved.
[0264] In the embodiment of the present disclosure, a first guide rail 206 and a second guide rail are respectively provided on the front side of the guide plate 2011 and on both sides of the compression spring 208; the suspension connecting plate 202 is connected to the first guide rail 206 through a first slider 207 and is connected to the second guide rail through a second slider.
[0265] In the embodiment of the present disclosure, the first guide rail 206 and the second guide rail are arranged in parallel, and the suspension connecting plate 202 can slide along the first guide rail 206 and the second guide rail through the first slider 207 and the second slider.
[0266] In the embodiment of the present disclosure, an upper limit rod 204 is provided on the upper side surface of the suspension connecting plate 202. When the suspension connecting plate 202 moves upward, the upper limit rod 204 presses against the upper end cover 2012 for limiting the position; a lower limit rod 205 is provided on the lower side surface of the suspension connecting plate 202. When the suspension connecting plate 202 moves downward, the lower limit rod 205 presses against the lower end cover 2013 for limiting the position.
[0267] In the embodiment of the present disclosure, a first threaded hole is provided on the suspension connecting plate 202, and the upper limit rod 204 is connected to the upper side surface of the suspension connecting plate 202 through the first threaded hole; a second threaded hole is provided on the suspension connecting plate 202, and the lower limit rod 205 is connected to the lower side surface of the suspension connecting plate 202 through the second threaded hole.
[0268] In the embodiment of the present disclosure, a shock-absorbing pad is provided at the free end of the limiting rod for shock absorption when the upper limiting rod 204 contacts the upper end cover 2012 and when the lower limiting rod 205 contacts the lower end cover 2013 .
[0269] In the embodiment of the present disclosure, the upper limit rod 204 is limited by contacting the upper end cover 2012 through the shock-absorbing pad provided thereon, and the shock-absorbing pad can reduce the vibration during contact; the lower limit rod 205 is limited by contacting the lower end cover 2013 through the shock-absorbing pad provided thereon, and the shock-absorbing pad can reduce the vibration during contact.
[0270] FIG25 is a schematic structural diagram of a brake mechanism in an embodiment of the present disclosure. As shown in FIG25 , the brake mechanism 203 includes an electromagnet 2031 , an upper cover plate 2034 , a movable brake pad 2032 , and a fixed brake pad 2033 ;
[0271] The movable brake pad 2032 is connected to the electromagnet 2031 through an elastic member; the sleeve of the fixed brake pad 2033 is sleeved on the ball screw, and the main brake plate of the fixed brake pad 2033 is arranged between the movable brake pad 2032 and the upper cover plate 2034; the electromagnet 2031 is used to apply electromagnetic force to the movable brake pad 2032. When the electromagnet 2031 is powered on, the electromagnet 2031 absorbs the movable brake pad 2032. At this time, the elastic member is in a compressed state and the ball screw 209 can rotate. When the electromagnet 2031 is powered off, the movable brake pad 2032 is driven by the elastic member to move toward the fixed brake pad 2033 to brake the ball screw 209.
[0272] The upper cover plate 2034 is fixed on the electromagnet 2031 .
[0273] In the embodiment of the present disclosure, a rotating seat is provided on the base, the upper end of the rotating seat is rotatably connected to the mechanical arm, the upper end of the mechanical arm is rotatably connected to the mechanical fork arm, the front end of the mechanical fork arm is provided with a first adapter shell, a first joint module is provided in the first adapter shell, both ends of the first joint module are rotatably connected to the mechanical wrist arm, a second joint module is provided on the mechanical wrist arm, and a fixture adapter flange is provided on the second joint module. This can not only reduce the overall structural weight and overall power consumption, but also improve the flexibility of the mechanical arm;
[0274] In the embodiment of the present disclosure, a balancing cylinder is provided to connect the upper end of the balancing cylinder to the mechanical arm and the lower end to the rotating seat, thereby reducing the requirement for the output torque of the drive motor. Therefore, a 48V drive motor can be set to drive the movement of a medium-sized industrial mechanical arm.
[0275] The present disclosure also provides a loading and unloading operation control device. The loading and unloading operation control device in this embodiment may include a processor and a memory. The memory is used to store computer programs (such as applications and functional modules that implement the above-mentioned method), computer instructions, and the like. These computer programs and computer instructions may be partitioned and stored in one or more memories. Furthermore, these computer programs, computer instructions, and data may be accessed by the processor.
[0276] The aforementioned computer programs, computer instructions, etc. may be partitioned and stored in one or more memories. Furthermore, the aforementioned computer programs, computer instructions, data, etc. may be invoked by a processor. The processor is configured to execute the computer programs stored in the memories to implement the various steps of the methods described in the aforementioned embodiments. For details, please refer to the relevant descriptions in the preceding method embodiments.
[0277] The processor and memory can be independent structures or integrated structures. When the processor and memory are independent structures, the memory and processor can be coupled via a bus.
[0278] The loading operation control device of this embodiment can execute the technical solution in the above method. Its specific implementation process and technical principles can be found in the relevant description of the above method, which will not be repeated here.
[0279] Those skilled in the art will appreciate that various aspects of the present application can be implemented as systems, methods, or program products. Therefore, various aspects of the present application can be specifically implemented in the following forms: a complete hardware implementation, a complete software implementation (including firmware, microcode, etc.), or an implementation that combines hardware and software aspects, which may be collectively referred to herein as a "circuit," "module," or "platform."
[0280] In the several embodiments provided in the present disclosure, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are merely schematic. For example, the division of units is only a logical function division. In actual implementation, there may be other division methods, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0281] It should be noted that the module division in the embodiments of the present disclosure is illustrative and represents only a logical functional division. In actual implementation, other division methods may be used. The functional modules in the embodiments of the present disclosure may be integrated into a single processing module, or each module may exist physically separately, or two or more modules may be integrated into a single module. The aforementioned integrated modules may be implemented in either hardware or software functional modules.
Claims
1. A loading and unloading operation control system, characterized in that: include: A first robot, a telescopic conveyor or a telescopic roller conveyor line, and a second robot, wherein the first robot places the material to be loaded on the telescopic conveyor or the telescopic roller conveyor line, so that the telescopic conveyor or the telescopic roller conveyor line conveys the material to the operating range of the second robot; or The material to be unloaded is placed on the telescopic conveyor or the telescopic roller conveyor line by the second robot, so that the telescopic conveyor or the telescopic roller conveyor line conveys the material to the working range of the first robot; wherein: The second robot is a mobile robot. When performing loading or unloading operations, it determines the position of the working space based on its own visual positioning system and moves to the designated working space. The working space includes: containers, carriages, flatbed trucks, warehouses, cabins, and engine rooms.
2. The loading and unloading operation control system according to claim 1, characterized in that: The second robot comprises: a first mechanical arm, a second mechanical arm, and a 3D visual positioning system, wherein the 3D visual positioning system comprises a plurality of cameras, and the cameras are arranged at different positions of the second robot. When performing loading operations, the first robot arm and the second robot arm, with the assistance of the 3D visual positioning system, alternately grab materials from the telescopic conveyor or the telescopic roller conveyor line, and perform palletizing operations in the designated working space according to the preset planned pallet type; wherein: when the spatial position of the working space changes due to the stacking of materials, the second robot can actively adjust its position in the working space according to the change in spatial position; When performing the unloading operation, the first robot arm and the second robot arm, with the assistance of the 3D visual positioning system, alternately grab materials from the designated working space according to the preset depalletizing rules and place them on the telescopic conveyor or the telescopic roller conveyor line; wherein: when the spatial position of the working space changes due to the unloading of materials, the second robot can actively adjust its position in the working space according to the change in spatial position; When the 3D visual positioning system captures depalletizing anomalies, it will promptly remind the operator to handle them. The depalletizing anomalies include: falling parts and tilted stacks.
3. The loading and unloading operation control system according to claim 2, characterized in that: The second robot further comprises: a first industrial computer and a second industrial computer, wherein the first industrial computer is used to control the first mechanical arm to perform a grabbing and / or placing task; the second industrial computer is used to control the second mechanical arm to perform a grabbing and / or placing task; wherein: the first industrial computer and the second industrial computer are an integrated structure or an independent structure; The second robot also includes a mobile base, which is used to move to any position or pause at any position and determine the orientation angle according to the received control instructions; the first mechanical arm is arranged on one side end of the mobile base, and the second mechanical arm is arranged on the other side end of the mobile base; the corner ends of the mobile base are respectively provided with wheel floating mechanisms, and the wheel floating mechanisms are provided with wheels; the wheel floating mechanisms are used for floating buffering of the wheels to maintain stability on uneven ground, or to provide fixed support for the wheels; the wheels are used to drive the mobile base to move in all directions.
4. The loading and unloading operation control system according to claim 2, characterized in that: The first mechanical arm comprises: a first supporting mechanism located on a first mobile chassis, a first joint of the first mechanical arm, a second joint of the first mechanical arm, and a first clamp located at the end of the first mechanical arm; The second mechanical arm comprises: a second supporting mechanism located on a second mobile chassis, a first joint of the second mechanical arm, a second joint of the second mechanical arm, and a second clamp located at the end of the second mechanical arm.
5. The loading and unloading operation control system according to claim 4, characterized in that: The first clamp and the second clamp both include: a back plate, an upper cover, and a plurality of suction cups located below the upper cover; the upper end surface of the back plate is connected to one side of the upper cover, and a right angle is formed between the back plate and the upper cover.
6. The loading and unloading operation control system according to claim 1, characterized in that: When a telescopic conveyor is used for material transportation, the telescopic conveyor comprises: a multi-stage telescopic mechanism, and the multi-stage telescopic mechanism can realize lateral length adjustment under the drive of a motor.
7. The loading and unloading operation control system according to claim 6, characterized in that: The telescopic conveyor comprises: a first-level telescopic mechanism, a second-level telescopic mechanism, and a third-level telescopic mechanism, wherein the upper surfaces of the first-level telescopic mechanism, the second-level telescopic mechanism, and the third-level telescopic mechanism are kept flush and share the same conveyor belt; A guiding and positioning mechanism is also provided on the side where the telescopic conveyor is connected to the second robot, and the guiding and positioning mechanism is used to guide and position the materials on the telescopic conveyor.
8. The loading and unloading operation control system according to claim 6, characterized in that: The telescopic conveyor further comprises: at least one height adjustment mechanism, the height adjustment mechanism being used to support the body of the telescopic conveyor and realize longitudinal adjustment to adapt to working scenes of different heights; The telescopic conveyor further comprises: a buffer mechanism, the buffer mechanism being located downstream in the conveying direction of the telescopic conveyor and within the operating range of the second robot; When the material is transferred to the buffer mechanism, the material is decelerated and stopped; The telescopic conveyor further comprises: a roller, the roller being located below the chassis of the telescopic conveyor, the roller being connected to a servo motor to realize autonomous movement of the telescopic conveyor; The telescopic conveyor is located close to one side of the second robot. When operating, it extends a preset length into the working space or retracts a preset length according to a first control instruction sent remotely and / or a second control instruction generated by its own processor.
9. The loading and unloading operation control system according to any one of claims 1 to 8, characterized in that: Also includes: A remote control center, wherein the remote control center establishes communication with the first robot and the second robot by wired means and / or wireless means, and is used to send instructions to the first robot and the second robot to achieve the following tasks: Control the first robot to move to one side of the telescopic conveyor or the telescopic roller conveyor line to perform a grabbing and / or placing task, and control the grabbing and / or placing speed; Control the second robot to move into a designated working space, perform a grabbing and / or placing task, and control a grabbing and / or placing speed; It also includes: a code scanning mechanism, which is arranged on the transmission path of the telescopic conveyor or the telescopic roller conveyor line, and is used to read the identification code on the material to determine the product information of the material according to the identification code; A quality inspection mechanism is arranged on the conveying path of the telescopic conveyor or the telescopic roller conveyor line, and is used to obtain an image of the material to perform quality inspection based on the image of the material.
10. A robot, characterized in that: In the system as claimed in any one of claims 1 to 9, the robot comprises: at least one industrial computer and a mechanical arm located on a mobile chassis; the mechanical arm comprises: two or more movable joints, and at least one clamp is installed at the end of the mechanical arm; During operation, the robot is used to grab and / or place materials.
11. A method for controlling loading and unloading operations, characterized in that: Applied in the loading and unloading operation control system according to claim 9, the method comprises: The remote control center sends a first movement instruction to the first robot, so that the first robot enters a waiting task state and moves to a depalletizing position or a palletizing position; The remote control center sends a second movement instruction to the second robot, so that the second robot enters a waiting task state and moves to an initial loading position or an initial unloading position; After receiving the arrival signal sent by the first robot and the arrival signal sent by the second robot, the remote control center starts the telescopic conveyor or the telescopic roller conveyor line; The remote control center sends a depalletizing task to the first robot, so that the first robot performs the depalletizing task after receiving a placement signal fed back from the telescopic conveyor or the telescopic roller conveyor line; or the remote control center sends an unloading task to the second robot, so that the second robot performs the unloading task after receiving a placement signal fed back from the telescopic conveyor or the telescopic roller conveyor line; The remote control center sends a loading task to the second robot so that the second robot performs the loading task after receiving a grabbing signal fed back from the telescopic conveyor or the telescopic roller conveyor line; or, the remote control center sends a palletizing task to the first robot so that the first robot performs the palletizing task after receiving a grabbing signal fed back from the telescopic conveyor or the telescopic roller conveyor line.
12. The method according to claim 11, characterized in that When a telescopic conveyor is used, the telescopic conveyor is located between the first robot and the second robot to transport the materials removed by the first robot to the operating range of the second robot, or to transport the materials unloaded by the second robot to the operating range of the first robot; when a telescopic roller conveyor line is used, one end of the telescopic roller conveyor line is pre-connected to the control console of the second robot.
13. The method according to claim 11, characterized in that Also includes: The remote control center receives information from the second robot about whether the code is full; Alternatively, the remote control center receives feedback from the second robot on whether to dismantle the robot; If the remote control center receives the full code information or the empty code information, the telescopic conveyor or the telescopic roller conveyor line will be stopped.
14. The method according to claim 11, characterized in that Also includes: The remote control center receives feedback from the first robot on whether the code is empty or full; If the remote control center receives the empty information and the non-full stacking information fed back by the second robot, the remote control center determines the empty depalletizing position and controls the first robot to continue to perform the depalletizing task from the unempty depalletizing position; or, if the remote control center receives the full stacking information and the non-empty stacking information fed back by the second robot, the remote control center determines the full stacking position and controls the first robot to continue to perform the stacking task at the unfull stacking position; If all the depalletizing positions are empty, the first robot is controlled to enter a waiting task state; or, if all the palletizing positions are full, the first robot is controlled to enter a waiting task state.
15. The method according to claim 14, characterized in that Also includes: The remote control center controls the first robot to perform a replenishment task on the emptied depalletizing position; wherein the replenishment task is performed synchronously with the depalletizing task; or, The remote control center mobilizes the third robot to move the full pallet away from the palletizing position and replace the new pallet in the vacant palletizing position.
16. The method according to any one of claims 11 to 15, characterized in that The depalletizing task means that the first robot grabs the material at at least one depalletizing position according to the preset depalletizing rule and places it on the telescopic conveyor or telescopic roller conveyor line; The loading task means that the second robot loads the materials on the telescopic conveyor or telescopic roller conveyor line into the designated working space according to the preset stacking rules; The palletizing task means: the first robot loads the materials on the telescopic conveyor or telescopic roller conveyor line onto the pallet according to the preset palletizing rules; The unloading task means that the second robot grabs the materials inside the working space according to the preset destacking rules and places them on the telescopic conveyor or telescopic roller conveyor line.
17. The method according to any one of claims 11 to 15, characterized in that Also includes: When the spatial position of the material in the working space changes due to the stacking of the material, the remote control center sends a third movement instruction to the second robot so that the second robot can adjust its position in the working space according to the change in the spatial position.
18. The method according to any one of claims 11 to 15, characterized in that The remote control center receives the material product information uploaded by the code scanning agency and / or the quality inspection information uploaded by the quality inspection agency; The code scanning mechanism is arranged on the conveying path of the telescopic conveyor or the telescopic roller conveyor line, and is used to read the identification code on the material to determine the material product information according to the identification code; The quality inspection mechanism is arranged on the conveying path of the telescopic conveyor or the telescopic roller conveyor line, and is used to obtain the image of the material to obtain quality inspection information based on the image of the material.
19. A loading and unloading operation control device, characterized in that: include: A processor and a memory, wherein the memory stores executable program instructions, and when the processor calls the program instructions in the memory, the processor is used to: Execute the steps of the loading and unloading operation control method described in any one of claims 11 to 18.
20. A readable storage medium, characterized in that: The readable storage medium stores a computer program; when the computer program is executed, the loading and unloading operation control method according to any one of claims 11 to 18 is implemented.
Citation Information
Patent Citations
Unmanned truck loading system and method
CN109095059A
Loading system
CN208716462U
Stacking device for material stacking and packaging line and material stacking and packaging line
CN212386758U
Cargo handling device for container cargo handling vehicle and container cargo handling vehicle
JP1999348642A
Cited By
Automatic container loading and unloading system and method
CN120462945A
Plate loading robot applied to installation of insulating plate of cargo tank of large LNG (Liquefied Natural Gas) ship
CN120619797A
Automatic loading system
CN121107127A
