Network management service intention management method, device and system
By analyzing the execution results of the sub-network management intention and sending management instructions to the production entity during the execution of the network management intention, deciding whether to replace the management action group, the resource waste caused by the failure to achieve the sub-network management intention goal is solved, and the problem of resource waste is improved. The management efficiency and rationality of network management intentions.
Patent Information
- Application Number
- PCT/CN2024/090742
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-30
- Filing Date
- 2024-04-30
- Publication Date
- 2024-12-05
AI Technical Summary
During the execution of existing network management intentions, the goals of subnet management intentions are not fully achieved, resulting in waste of resources and unnecessary management action groups.
By sending the sub-network management intentions obtained from the network management intention decomposed to the network management service production entity one-to-one, receiving and analyzing the execution results, sending management instructions to the production entity that does not meet the standards based on the execution results of the network management intention, and deciding whether to replace it Manage action groups to avoid unnecessary replacements.
It improves the management efficiency of network management intentions, avoids waste of resources and unnecessary signaling interactions, and enhances the rationality of judging network management intentions to achieve goals.
Smart Images

Figure CN2024090742_05122024_PF_FP_ABST
Abstract
Description
A method, device and system for managing network management service intention
[0001] This application claims priority to the Chinese patent application filed with the State Intellectual Property Office of China on May 30, 2023, with application number 202310627382.X and application name “A method, device and system for managing network management service intentions”, the entire contents of which are incorporated by reference into this application. Technical Field
[0002] The present application relates to the field of communication technology, and more particularly, to a method, device and system for managing network management service intent. Background Art
[0003] Network management service consumers can express their demand for network management services through network management intents. With the advancement of network resource management, network management service consumers can decompose network management intents into multiple sub-network management intents, triggering multiple network management service producers to execute each sub-network management intent. If the goal of a sub-network management intent is not achieved, the corresponding network management service producer must replace the management action group used to achieve the goal of that sub-network management intent, so that the execution result of the network management intent is achieved. However, this execution result may exceed the goal of achieving the network management intent, which may result in unnecessary waste of resources.
[0004] Therefore, how to improve the management method of network management intentions is a technical problem that needs to be solved urgently.
[0005] Summary of the Invention
[0006] The present application provides a method, device and system for managing network management intent, which can improve the management mode of network management intent.
[0007] In a first aspect, a method for executing a network management intention is provided, which can be executed by a network management service consuming entity or a chip in the network management service consuming entity, and the method includes: sending N sub-network management intentions obtained by decomposing the network management intention one-to-one to N network management service producing entities; receiving N execution results corresponding to the N sub-network management intentions, the N execution results corresponding to the N network management entities, and obtaining an execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; sending management indication information to a non-compliant network management service producing entity based on the execution result of the network management intention, wherein the non-compliant network management service producing entity is a network management service producing entity among the N network management service producing entities that has not achieved the target of the corresponding sub-network management intention, and the management indication information indicates whether the non-compliant network management service producing entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.
[0008] Based on this technical solution, the consumer entity can determine whether the non-compliant production entity should replace the management action group through the execution of different sub-network management intentions. The non-compliant production entity determines whether to replace the management action group based on the instructions of the consumer entity, rather than replacing the management action group on its own based on the goal of not achieving the sub-network management intention. This can avoid the execution of unnecessary replacement actions of the management action group and improve the management method of network management intentions.
[0009] In combination with the first aspect, in certain implementations of the first aspect, the N execution results respectively include the performance indicator values of the managed entities of the corresponding sub-network management intentions, and the execution results of the network management intentions are obtained based on the N execution results, including: determining whether the execution results of the network management intentions are achieved or not based on the performance indicator values of the managed entities of the N sub-network management intentions.
[0010] Based on this technical solution, the consumer entity can determine whether the goal of the network management intention has been achieved through the performance indicator values returned by multiple production entities, rather than determining whether the goal of the network management intention has been achieved based on whether the goal of each sub-network management intention has been achieved. This improves the rationality of judging whether the network management intention has achieved its goal and further improves the management method of the network management intention.
[0011] In combination with the first aspect, in certain implementations of the first aspect, the execution result of the sub-network management intention sent by the non-compliant network management production entity also includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether the non-compliant network management production entity has a network management action group that can be used for replacement.
[0012] Based on this technical solution, the non-compliant management service production entity can also return action group exhaustion indication information, so that the consumer entity can know whether the non-compliant management service production entity has the ability to replace the management action group, avoiding the consumer entity instructing the production entity to replace the management action group when there is no replaceable management action group, causing unnecessary signaling interaction.
[0013] In combination with the first aspect, in certain implementations of the first aspect, before obtaining the execution result of the network management intention based on N execution results, the method also includes: sending action group freeze indication information to N network management service production entities respectively, and the action group freeze indication information instructs the N network management service production entities not to replace the network management action group based on the execution result of the corresponding sub-network management intention.
[0014] Based on this technical solution, the production entity can freeze the replacement management action group before receiving the management instruction information from the consumption entity, thereby reducing unnecessary replacement actions and improving the management method of network management intentions.
[0015] In combination with the first aspect, in certain implementations of the first aspect, the method also includes: adjusting the target of the sub-network management intention corresponding to the sub-standard network management service production entity based on N execution results, and the management indication information also indicates the adjusted target of the sub-network management intention corresponding to the sub-standard network management service production entity.
[0016] Based on this technical solution, the consumer entity can also adjust the target of the sub-network management intention based on the execution results of different sub-network management intentions, making the execution method of the network management intention more reasonable.
[0017] In combination with the first aspect, in certain implementations of the first aspect, before obtaining the execution result of the network management intention based on N execution results, the method also includes: sending trigger conditions for returning the execution result of the sub-network management intention to N network management service production entities respectively, and the trigger condition is that the goal of the corresponding sub-network management intention is not achieved within the detection time.
[0018] Based on this technical solution, the consumer entity can instruct the production entity to return the execution result when the target of the sub-network management intention is not achieved within the detection time, so that the consumer entity can promptly know the achievement status of the sub-network management intention and make timely judgments, which can improve the management performance of the network management intention.
[0019] In combination with the first aspect, in certain implementations of the first aspect, the execution results of the corresponding sub-network management intentions are received from N network management service production entities respectively, including: receiving the execution results of the corresponding sub-network management intentions from the non-compliant network management service production entity; sending achievement query information to other network management service production entities among the N network management service production entities except the non-compliant network management service production entity, the achievement query information requesting the return of the execution results of the corresponding sub-network management intentions; receiving the execution results of the corresponding sub-network management intentions from other network management service production entities.
[0020] Based on this technical solution, the consumer entity can send execution result query information to other production entities that have not returned execution results based on the return results of the production entity that did not meet the standards, or the goals of the sub-network management intention were not achieved, so that other production entities can return the execution results of the corresponding sub-network management intention to the consumer entity in a timely manner.
[0021] In combination with the first aspect, in certain implementations of the first aspect, the method also includes: when the execution result of the network management intention is achieved, determining that the non-compliant network management service production entity does not replace the network management action group, and the management instruction information instructs the non-compliant network management service production entity not to replace the network management action group; when the execution result of the network management intention is not achieved, determining that the non-compliant network management service production entity replaces the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group; or, when the execution result of the network management intention is not achieved and the non-compliant network management production entity has a network management action group that can be used for replacement, determining that the non-compliant network management service production entity replaces the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group.
[0022] Based on this technical solution, the consumer entity can determine whether the non-compliant production entity should change the management action group based on the achievement of different sub-network management intentions, rather than determining whether the network management intention has been achieved based on whether the goal of each sub-network management intention has been achieved. This improves the rationality of judging whether the network management intention has achieved its goal and can improve the management performance of the network management intention.
[0023] In combination with the first aspect, in some implementations of the first aspect, the N network management service production entities are respectively N different device management systems, or the N network management production entities are respectively N different network elements.
[0024] In combination with the first aspect, in certain implementations of the first aspect, the network management intent is an end-to-end intent, and the N sub-network management intents are N different management domain intents decomposed from the end-to-end intent.
[0025] On the second aspect, a method for managing network management intent is provided, which can be executed by a network management service production entity or a chip in the network management service production entity, and the method includes: receiving a sub-network management intent decomposed from the network management intent; sending an execution result of the sub-network management intent, and the execution result of the sub-network management intent indicates that the goal of the sub-network management intent has not been achieved; receiving management indication information, and the management indication information indicates whether to replace the network management action group used to achieve the goal of the sub-network management intent, and the management indication information is determined based on the execution result of the network management intent.
[0026] Regarding the beneficial technical effects of various implementation methods of the second aspect, please refer to the description of the relevant implementation methods of the first aspect and will not be repeated here.
[0027] In combination with the second aspect, in certain implementations of the second aspect, the execution result of the sub-network management intention includes the performance indicator value of the managed entity of the sub-network management intention, and the performance indicator value is used to determine whether the execution result of the network management intention is achieved or not.
[0028] In combination with the second aspect, in some implementations of the second aspect, the execution result of the sub-network management intention further includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether there is a network management action group that can be used for replacement.
[0029] In combination with the second aspect, in certain implementations of the second aspect, before sending the execution result of the sub-network management intention, the method also includes: receiving action group freeze indication information, the action group freeze indication information indicating that the network management action group is not replaced based on the execution result of the sub-network management intention.
[0030] In combination with the second aspect, in certain implementations of the second aspect, the management indication information further indicates a target of the adjusted sub-network management intention.
[0031] In combination with the second aspect, in certain implementations of the second aspect, before sending the execution result of the sub-network management intention, the method also includes: receiving a trigger condition for returning the execution result of the sub-network management intention, the trigger condition being that the goal of the sub-network management intention is not achieved within the detection time; sending the execution result of the sub-network management intention, including: sending the execution result of the sub-network management intention in response to the trigger condition being met.
[0032] In combination with the second aspect, in certain implementations of the second aspect, the network management intent is an end-to-end intent, and the sub-network management intent is a management domain intent decomposed from the end-to-end intent.
[0033] In combination with the second aspect, in certain implementations of the second aspect, the method further includes: determining whether to replace the network management action group used to achieve the goal of the sub-network management intention based on the management indication information.
[0034] According to a third aspect, a method for executing a network management intention is provided, the method comprising: sending N sub-network management intentions decomposed from the network management intention one-to-one to N network management service production entities, the N network management service production entities respectively receiving the corresponding sub-network management intentions; the N network management service production entities respectively sending the execution results of the corresponding sub-network management intentions, receiving N execution results corresponding to the N sub-network management intentions, the N execution results corresponding to the N network management entities, and obtaining the execution results of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; sending management indication information to a non-compliant network management service production entity based on the execution result of the network management intention, the non-compliant network management service production entity receiving the management indication information, wherein the non-compliant network management service production entity is a network management service production entity among the N network management service production entities that has not achieved the target of the corresponding sub-network management intention, and the management indication information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.
[0035] Regarding the beneficial technical effects of various implementation methods of the third aspect, please refer to the description of the relevant implementation methods of the first aspect and will not be repeated here.
[0036] In combination with the third aspect, in certain implementations of the third aspect, the N execution results respectively include the performance indicator values of the managed entities of the corresponding sub-network management intentions, and the execution result of the network management intention is obtained based on the N execution results, including: determining whether the execution result of the network management intention is achieved or not based on the performance indicator values of the managed entities of the N sub-network management intentions.
[0037] In combination with the third aspect, in certain implementations of the third aspect, the execution result of the sub-network management intention sent by the non-compliant network management production entity also includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether the non-compliant network management production entity has a network management action group that can be used for replacement.
[0038] In combination with the third aspect, in certain implementations of the third aspect, before obtaining the execution result of the network management intention based on N execution results, the method also includes: sending action group freeze indication information to the N network management service production entities respectively, and the N network management service production entities respectively receive the action group freeze indication information, and the action group freeze indication information instructs the N network management service production entities not to replace the network management action group based on the execution result of the corresponding sub-network management intention.
[0039] In combination with the third aspect, in certain implementations of the third aspect, the method also includes: adjusting the target of the sub-network management intention corresponding to the sub-standard network management service production entity based on the N execution results, and the management indication information also indicates the adjusted target of the sub-network management intention corresponding to the sub-standard network management service production entity.
[0040] In combination with the third aspect, in certain implementations of the third aspect, before obtaining the execution result of the network management intention based on N execution results, the method also includes: sending trigger conditions for returning the execution result of the sub-network management intention to the N network management service production entities respectively, and the N network management service production entities respectively receive the trigger conditions for returning the execution result of the sub-network management intention, and the trigger condition is that the goal of the corresponding sub-network management intention is not achieved within the detection time.
[0041] In combination with the third aspect, in certain implementations of the third aspect, the execution results of the corresponding sub-network management intentions are received from the N network management service production entities respectively, including: receiving the execution results of the corresponding sub-network management intentions from the non-compliant network management service production entity, and the execution results of the corresponding sub-network management intentions of the non-compliant network management service production entity; sending achievement query information to other network management service production entities among the N network management service production entities except the non-compliant network management service production entity, and the other network management service production entities receiving the achievement query information, and the achievement query information requesting the return of the execution results of the corresponding sub-network management intentions; the other network management service production entities sending the execution results of the corresponding sub-network management intentions and receiving the execution results of the corresponding sub-network management intentions from the other network management service production entities.
[0042] In combination with the third aspect, in certain implementations of the third aspect, the method further includes: when the execution result of the network management intention is achieved, determining that the non-compliant network management service production entity does not replace the network management action group, and the management instruction information instructs the non-compliant network management service production entity not to replace the network management action group; when the execution result of the network management intention is not achieved, determining that the non-compliant network management service production entity replaces the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group; or, when the execution result of the network management intention is not achieved and the non-compliant network management production entity has a network management action group that can be used for replacement, determining that the non-compliant network management service production entity replaces the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group.
[0043] In combination with the third aspect, in some implementations of the third aspect, the N network management service production entities are respectively N different equipment management systems, or the N network management production entities are respectively N different network elements.
[0044] In combination with the third aspect, in certain implementations of the third aspect, the network management intent is an end-to-end intent, and the N sub-network management intents are N different management domain intents decomposed from the end-to-end intent.
[0045] In combination with the third aspect, in certain implementations of the third aspect, the method further includes: the non-compliant network management production entity determines whether to replace the network management action group used to achieve the goal of achieving the sub-network management intention based on the management indication information.
[0046] In a fourth aspect, a communication device is provided, which includes a transceiver unit and a processing unit, wherein the transceiver unit is used to send N sub-network management intentions obtained by decomposing the network management intention one-to-one to N network management service production entities; the transceiver unit is used to receive N execution results corresponding to the N sub-network management intentions, the N execution results corresponding to the N network management entities, and the execution result of the network management intention is obtained based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; the processing unit is used to send management indication information to the non-compliant network management service production entity based on the execution result of the network management intention, wherein the non-compliant network management service production entity is a network management service production entity among the N network management service production entities that has not achieved the target of the corresponding sub-network management intention, and the management indication information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.
[0047] Regarding the various implementation methods of the fourth aspect and the beneficial technical effects of various implementation methods, please refer to the description of the relevant implementation methods of the first aspect and will not be repeated here.
[0048] In a fifth aspect, a communication device is provided, which includes a transceiver unit and a processing unit, the transceiver unit being used to receive a sub-network management intention decomposed from a network management intention; the transceiver unit being used to send an execution result of the sub-network management intention, the execution result of the sub-network management intention indicating that the goal of the sub-network management intention has not been achieved; the transceiver unit being used to receive management indication information, the management indication information indicating whether to replace a network management action group used to achieve the goal of the sub-network management intention, the management indication information being determined based on the execution result of the network management intention.
[0049] Regarding the various implementation methods of the fifth aspect and the beneficial technical effects of the various implementation methods, please refer to the description of the relevant implementation methods of the first and second aspects and will not be repeated here.
[0050] In a sixth aspect, a communication device is provided, wherein the communication device is capable of implementing the first aspect or any possible implementation of the first aspect, the second aspect or any possible implementation of the second aspect, or the third aspect or any possible implementation of the third aspect. The functions can be implemented by hardware or by hardware executing corresponding software. The hardware or software includes one or more units corresponding to the above functions.
[0051] In a seventh aspect, a communication device is provided, comprising a processor and a memory. Optionally, the device may further comprise a transceiver. The memory is configured to store a computer program, and the processor is configured to call and execute the computer program stored in the memory, and control the transceiver to transmit and receive signals, so that the communication device performs the method according to the first aspect, or any possible implementation of any aspect of the first aspect.
[0052] Exemplarily, the communication device is a network management service production entity.
[0053] In an eighth aspect, a communication device is provided, comprising a processor and a memory. Optionally, the device may further comprise a transceiver. The memory is configured to store a computer program, and the processor is configured to call and execute the computer program stored in the memory and control the transceiver to transmit and receive signals, so that the communication device performs the method according to the second aspect, or any possible implementation of any aspect of the second aspect.
[0054] Exemplarily, the communication device is a network management service consumption entity.
[0055] In a ninth aspect, a communication device is provided, comprising a processor and a communication interface, wherein the communication interface is configured to receive data and / or information and transmit the received data and / or information to the processor, and the processor processes the data and / or information. The communication interface is further configured to output the processed data and / or information, so that the method according to the first aspect, or any possible implementation of any aspect of the first aspect, is executed. The communication device may be a chip used in a network management service production network element.
[0056] In a tenth aspect, a communication device is provided, comprising a processor and a communication interface, wherein the communication interface is configured to receive data and / or information and transmit the received data and / or information to the processor, and the processor processes the data and / or information. The communication interface is further configured to output the processed data and / or information, so that the method according to the second aspect, or any possible implementation of any aspect of the second aspect, is executed. The communication device may be a chip used in a network management service consumption network element.
[0057] In the eleventh aspect, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions. When the computer instructions are executed on a computer, the method in the first aspect, or any possible implementation of any aspect in the first aspect, is executed.
[0058] In the twelfth aspect, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions. When the computer instructions are executed on a computer, the method in the second aspect, or any possible implementation of any aspect in the second aspect, is executed.
[0059] In a thirteenth aspect, a computer program product is provided, comprising a computer program code, which, when run on a computer, enables the method according to the first aspect, or any possible implementation of any aspect in the first aspect, to be executed.
[0060] In a fourteenth aspect, a computer program product is provided, comprising a computer program code, which, when run on a computer, enables the method according to the second aspect, or any possible implementation of any aspect in the second aspect, to be executed.
[0061] In the fifteenth aspect, a wireless communication system is provided, comprising the communication device as described in the fourth aspect, and / or the communication device as described in the fifth aspect.
[0062] In the sixteenth aspect, a wireless communication system is provided, comprising a communication device as described in any one or more aspects from the fourth to the fifteenth aspect, or a communication device in any possible implementation of any of these aspects. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] FIG1 shows a schematic structural diagram of an intention IOC;
[0064] FIG2 is a schematic structural diagram of a communication system applicable to an embodiment of the present application;
[0065] FIG3 is a schematic flowchart of a method for managing network management intent provided in an embodiment of the present application;
[0066] FIG4 is another schematic flow chart of a method for managing network management intent provided in an embodiment of the present application;
[0067] 5 to 7 are schematic diagrams of possible communication devices provided in embodiments of the present application. DETAILED DESCRIPTION
[0068] The technical solution in this application will be described below with reference to the accompanying drawings.
[0069] The technical solution of the present application can be applied to various network function virtualization (NFV) systems. The system can describe the current operator's business technology solutions, network construction solutions, and network operation and maintenance methods as patterns and strategies in a standard formal language, and implement the technical solutions and construction solutions based on these patterns and strategies. For example, the technical solution of the present application can be applied to one or more of the following systems: a wireless intent driven network (wIDN) system, an experiential networked intelligence (ENI) system, an intent driven management service (IDMS) system, or an open network automation platform (ONAP) system.
[0070] For the sake of clarity, some terms in the embodiments of this application are explained below.
[0071] For the sake of clarity, some terms in the embodiments of this application are explained below.
[0072] 1. Network management, network management services, network management service production entities, and network management service consumption entities
[0073] 1.1 Network Management
[0074] Network management refers to the management of network resources, including but not limited to monitoring, controlling and recording the performance and usage of network resources, and issuing management action groups to network resources (such as devices in the network) based on the detected network conditions to enable the network to operate effectively. For example, network management can be monitoring, testing, configuring, analyzing, evaluating and controlling network resources. Network management can also be timely reporting and handling when a network failure occurs, and coordinating and maintaining the efficient operation of the network system. Among them, network resources are the objects of network management, which can also be called network objects or managed entities. For example, network resources can be base station equipment, routers, switches, core network equipment, etc. In this regard, the embodiments of the present application do not make special limitations. For the convenience of description, the embodiments of the present application are explained using managed entities as an example, but they can be replaced with other objects of network management.
[0075] 1.2 Network Management Services
[0076] A network management service refers to a service that provides network management functions. The service producing entity usually provides the network management functions to the service consuming entity through a network interface (eg, a service-based interface).
[0077] 1.3 Network Management Service Production Entity
[0078] The entity providing the network management service is referred to as the network management service production entity. For example, the capabilities or functions of the network management service production entity may be deployed on a network element, referred to as the network management service production network element. The capabilities or functions of the network management service production entity may also be deployed on other devices, which is not limited in the embodiments of this application. For ease of description, the embodiments of this application use the network management service production entity as an example, but any other device that deploys the capabilities or functions of the network management service production entity may be substituted.
[0079] 1.4 Network Management Service Consumption Entities
[0080] The entity that calls network management is called a network management service consuming entity. For example, the capabilities or functions of the network management service consuming entity can be deployed on a certain network element, which is called a network management service consuming network element. The capabilities or functions of the network management service consuming entity can also be deployed on other devices, which is not limited in this embodiment of the present application. For ease of description, this embodiment of the present application uses the network management service consuming entity as an example, but any other device that deploys the capabilities or functions of the network management service consuming entity can be replaced.
[0081] 2. Network Management Intent (abbreviated as Intent)
[0082] A network management intent refers to a demand for network management services by a network management service consuming entity, and may also be referred to as a network management service demand. This term is not limited in the embodiments of the present application. For example, the network management intent may be an optical dedicated line service intent or an energy-saving intent, such as the intent defined in 3rd Generation Partnership Project (3GPP) standard specification 28.312.
[0083] In the intent-based interaction scenario of this application, there are two main roles: the network management provider entity and the network management service consumer entity. Among them, the network management provider entity can also be called the network management provider, or the intent provider (intent provider), or the intent handler (intent handler), etc. The network management service consumer entity can also be called the network management service consumer, or the intent consumer (intent consumer), or the intent owner (intent owner), etc.
[0084] Among them, the network management service consumption entity can be the caller of the network management service, and can perform operations such as creating, modifying, deleting, and querying network management intent expressions. It can be configured in a network management system (NMS), an element management system (EMS), or network equipment (NE). It can be a management function, a management function entity, a management entity, a network equipment, a network element, etc. This application does not limit this.
[0085] Intents can be applied to network systems to achieve desired performance targets for specific network devices within a specific scope. Intents can express expectations for network systems through formal specifications and descriptive information. Formal specifications can refer to the intent's specific syntax or semantics, while descriptive information can describe the intent's requirements, goals, and constraints.
[0086] An intent may include at least one intent expectation. Each intent expectation may represent the performance requirement of a network management service consuming entity for a specific network object. An intent expectation may consist of at least one expected target and an expected object, and each expected target may represent the performance requirement of a network management service consuming entity for a specific attribute of an expected object. For example, an intent expectation may include two expected targets, one of which is an average downlink throughput greater than 5Mbps, and the other is an end-to-end delay less than 10 milliseconds. If the average downlink throughput of the expected object is greater than 5Mbps, then the expected target for downlink throughput is met. If the end-to-end delay of the expected object is less than 10 milliseconds, then the expected target for delay is met. If both expected targets of an intent expectation are met, then the intent expectation is achieved.
[0087] An intent may also include an intent context. The intent context may represent constraints or conditions imposed by the network management service consumer on the intent. For example, the network management service consumer may constrain the duration of the intent through the intent context.
[0088] Intents may also include an expected context. The expected context may represent the constraints or conditions that a network management service consumer expects for an intent. For example, the network management service consumer may use the expected context to constrain the expected duration of the intent.
[0089] The intent may also include a target context, which may represent the constraints or conditions imposed by the network management service consumer on a desired target. For example, the network management service consumer may constrain the duration of the desired target through the target context.
[0090] The intent may also include an object context, which may indicate constraints or conditions on the network object to be acted upon by the network management service consumer. For example, the network management service consumer may use the object context to indicate the area where the intended network object is located.
[0091] The intent expectation, expected target and intent context introduced above can be used as information elements in the information object class (IOC) in the intent creation request. The network management service consumer entity can express its demand for network management services by sending the above information elements to the network management service producer entity.
[0092] The information element in the intent IOC can use a specific structure to express the demand for network management services. For example, Figure 1 shows a schematic structural diagram of an intent IOC.
[0093] Referring to Figure 1 , the intent IOC includes an intent expectation and an intent context. The intent expectation includes an expected object, an expected target, and an expected context. The expected object includes an expected object context, and the expected target includes a target context. It is understood that non-contextual information elements (such as intent IOC, intent expectation, expected object, or expected target) can include contextual information elements (such as intent context, expected object context, target context, expected context, etc.), and contextual information elements can be used to constrain non-contextual information elements.
[0094] It is understood that Figure 1 is a schematic illustration of the relationship between attributes in an intent IOC. Based on network management service requirements, the intent IOC may also include other attributes, and this application does not specifically limit this. It is also understood that this application does not specifically limit the number of attributes of the same type. For example, an intent IOC may include one or more parallel intent expectation attributes, and an intent expectation may also include one or more parallel desired target attributes.
[0095] 3. Network Management Intent Template
[0096] The network management intent template refers to the templated description information of the network management intent, which can also be called the network management service requirement template. The embodiment of this application does not limit this name. The intent template can be used to specify the syntax and semantics of the various attribute expressions introduced above. For example, the intent template can specify the field type, value type, etc. that can be used for each attribute in the IOC. Exemplarily, the intent template can include intent expectation description information for specifying how the intent expectation is expressed. The intent expectation description information can specify the type of expected target attributes that the intent expectation can contain, such as latency, bandwidth, maximum number of users, etc. The intent expectation description information can also specify the field type of each expected target. For example, the field type of the expected target for latency is a string, the field type of the expected target for bandwidth is a string, and the field type of the expected target for the maximum number of users is an integer. As another example, the intent template can also include intent context description information that specifies how the intent context and the expected context are expressed. The intent context description information can be used to specify the field type of the intent context, etc., and this application does not specifically limit this.
[0097] 4. Intent Expression
[0098] In the embodiment of the present application, the intent expression is an information formula that expresses the network management service intent, and can be the instantiation result of the network management intent template. Consumers of network management intent can instantiate the intent IOC according to the intent template to generate an intent expression, and the instantiated intent expression can be used for specific network services. For example, the intent expression can be represented by a list of a set of attribute and value key-value pairs (for example, a set of [attribute, value]) of the network management service intent.
[0099] Exemplarily, the intent expression includes a performance indicator information instance, a network object information instance, and a context information instance.
[0100] For example, a performance indicator information instance may include the value or value range of the target indicator requirement corresponding to the performance indicator information. For example, if the target indicator requirement corresponding to a performance indicator information template includes a bandwidth parameter, a performance indicator information instance may include a bandwidth parameter value of 20 Mbps, or a bandwidth parameter value range of 10 Mbps to 15 Mbps. For example, if the target indicator requirement corresponding to a performance indicator information template includes a latency parameter, a latency parameter instance may include a latency parameter value of 2 s, or a latency parameter value range of 1 s to 5 s.
[0101] The target network object indicated by the network object information instance is the instantiation result of the target network object indicated by the network object information template. Exemplarily, the target network object indicated by the network object information instance is one of the target network objects indicated by the network object information template, i.e., one of the physical or logical entities that implement the network management service. In this case, the network object information instance indicates a specific network object. For example, the network object information template indicates a network service, while the network object information instance indicates an energy-saving service.
[0102] The context information instance is used to indicate the constraints of the network management intent expression. Exemplarily, the context information instance includes the constraint parameters of the network management intent expression. For example, the context information instance may include the source and sink information corresponding to the target network object indicated by the network object instance.
[0103] Intent expectation information instances include performance indicator information instances and network object information instances.
[0104] In the embodiment of the present application, the "intention" transmitted through the message refers to the intention expression.
[0105] 5. Intent Examples
[0106] A network management intent instance refers to a network management intent processing process created locally by a network management service provider entity based on a received network management intent expression (e.g., a performance indicator information instance, a network object information instance, a context information instance).
[0107] The network management intent processing process is used to process network management intent expressions. For example, the network management intent processing process may include an identifier that identifies the process; computing resources that are used to perform operations such as network management intent translation and database query (e.g., a semantic knowledge base); and storage resources that are used to store network management intent expressions and network management intent translation results.
[0108] Among them, network management intent translation is used to convert the network management intent expression into a corresponding management action group, which can be an instruction acting on a physical entity or a logical entity, such as adjusting the antenna tilt angle of a base station or turning on the energy-saving switch of a cell.
[0109] 6. Network Management Action Group (actions)
[0110] A network management action group is one or more network management actions generated by a network management service producer based on an intent expression. The network management service producer executes one or more network management actions to satisfy the intent of a network management service consumer. A network management action group can also be referred to as a management operation or an intent operation. A network management action group can be a set of operational instructions for a desired object (e.g., a physical or logical entity in the network system intended to act upon), consisting of one or more instructions. For example, adjusting the antenna tilt of a base station or turning on the energy-saving switch of a cell can be performed.
[0111] A network management service production entity can generate multiple management action groups based on intent expressions. During execution, the network management service production entity can select some of these management action groups to execute at a time. In other words, the management action groups generated by the network management service production entity based on the intent expression are selectable operations that can be used to satisfy the intent. The network management service production entity may select one of these network management action groups to execute to satisfy the intent, or it may select multiple network management action groups to execute to satisfy the intent.
[0112] The above describes the relevant terms involved in the embodiments of the present application. The following describes the application scenarios applicable to the embodiments of the present application in conjunction with Figure 2.
[0113] Figure 2 is a schematic structural diagram of a communication system applicable to an embodiment of the present application. First, the devices that may be involved in the communication system are described.
[0114] 1. Network Management Service Consuming Entity 210: This entity can be used to invoke management services, or intent services, to manage the network system. For example, Network Management Service Consuming Entity 210 can instantiate an intent template, set the desired intent for the network system and the intent context, generate an intent expression, and send the intent expression to Network Management Service Producing Entity 220 to implement the desired intent for the network system.
[0115] The network management service consumption entity 210 may also be referred to as a network management service consumer, an intent management service consumer, an intent consumer, or an intent owner, etc. In future communication systems, the network management service consumption entity may also have other names, which are not specifically limited in this application.
[0116] 2. Network management service production entities 221-222: can be used to provide management services. For example, the network management service production entities 221-222 can receive intent expressions from the network management service consumption entity 210 and perform intent translation, intent management, and intent execution and maintenance processes based on the intent expressions.
[0117] The network management service production entity 221-222 may also be referred to as an intent management service provider, a network management service producer, an intent provider, an intent handler, etc. In future communication systems, the network management service production entity may also have other names, and this application does not specifically limit this.
[0118] It is understandable that the above-mentioned entity can be a network element in a hardware device, a software function running on dedicated hardware, or a virtualized function instantiated on a platform (e.g., a cloud platform). It is understandable that the above-mentioned entity can be implemented by one device, or can be implemented by multiple devices together. In addition, the above-mentioned entity can also be a functional module within a system, such as a network management system (NMS), an equipment management system (EMS), or a functional module within a device, such as one or more functional modules within a network equipment (NE), and the network equipment can be a base station or a core network entity.
[0119] Exemplarily, the network management service consumption entity 210 can be deployed in the NMS, and the network management service production entities 221-222 can be deployed in different EMSs. The interaction between the network management service consumption entity 210 and the network management service production entities 221-222 can be carried out through information exchange through the interface between the NMS and the EMS.
[0120] As another example, the network management service consumption entity 210 can be deployed in the EMS, and the network management service production entities 221-222 can be deployed in different NEs. The interaction between the network management service consumption entity 210 and the network management service production entities 221-222 can be carried out through the interface between the NMS and the EMS.
[0121] It is understandable that the solution of the present application can also be applied to other systems including corresponding entities, which is not limited in the present application and is not specifically limited in the embodiments of the present application.
[0122] For the sake of simplicity, the network management service consumption entity is referred to as the consumption entity, and the network management service production entity is referred to as the production entity.
[0123] A consumer entity can decompose a network management intent into multiple sub-network management intents, and multiple production entities can execute multiple sub-network management intents respectively to achieve the goal of each sub-network management intent, thereby achieving the goal of the network management intent. However, in the process of executing this network management intent, in order to achieve the goal of each sub-network management intent, resources may be wasted. The embodiment of the present application provides a method and device for executing network management intent, which can improve the execution performance of network management intent. The method of the embodiment of the present application is first described below with reference to Figure 3.
[0124] FIG3 is a schematic flowchart of a method for executing network management intention provided in an embodiment of the present application.
[0125] S310: The consumer entity sends N sub-network management intents decomposed from the network management intent to N production entities one-to-one. Correspondingly, the N production entities receive the corresponding N sub-network management intents decomposed from the network management intent from the consumer entity.
[0126] It can be understood that N is an integer greater than or equal to 2. The embodiment of the present application does not impose any special restrictions on the number of production entities. One consumer entity can communicate with multiple production entities. For ease of understanding, the embodiment of the present application uses one consumer entity communicating with two production entities (production entity #1 and production entity #2) as an example.
[0127] In this scenario where the network management intent is achieved by executing a sub-network management intent, the consuming entity can also be referred to as the network management intent system, and the producing entity can also be referred to as the sub-network management intent system. The goal of fulfilling the network management intent can also be described as satisfying the network management intent, achieving the network management intent, etc.
[0128] It should also be understood that the embodiments of the present application do not impose any specific restrictions on the number of sub-network management intents into which a network management intent can be decomposed. The number of decomposed sub-network management intents can be the same as or different from the number of production entities. For ease of understanding, the embodiments of the present application illustrate the decomposition of a network management intent into two sub-network management intents (sub-network management intent #1 and sub-network management intent #2).
[0129] For example, the consumer entity sends sub-network management intention #1 to the producer entity #1, and the consumer entity sends sub-network management intention #2 to the producer entity #2.
[0130] It is understandable that in this application, the consumer entity and the production entity can communicate directly or through other entities, and this application does not specifically limit this. For example, the consumer entity can send sub-network management intention #1 directly to the production entity #1, or the consumer entity can send sub-network management intention #1 to the consumer entity #1 corresponding to the sub-network management intention #1 system, and the consumer entity #1 forwards the sub-network management intention #1 to the production entity #1. Similarly, the production entity #1 can send information directly to the consumer entity, or the production entity can send information to the consumer entity #1 corresponding to the sub-network management intention #1 system, and the consumer entity #1 forwards the information to the consumer entity, which will not be elaborated below.
[0131] The consumer entity can be decomposed based on the goal of the network management intention. For example, the network management intention is energy-saving intention, and the goal of this energy-saving intention is to achieve an energy-saving power value of 1000kw for base stations in a specific area. The consumer entity can decompose the network management intention into sub-network management intention #1: the energy-saving power value of base stations in sub-area #1 reaches 300kw; sub-network management intention #2: the energy-saving power value of base stations in sub-area #2 reaches 700kw. Among them, sub-area #1 and sub-area #2 are divided by the consumer entity based on the specific area. For a more detailed description of the decomposition of network management intentions by consumer entities, please refer to the description of Figure 4 below, which will not be repeated here.
[0132] In an embodiment of the present application, the network management intent may be referred to as an end-to-end intent, and the multiple sub-network management intents are multiple different management domain intents decomposed from the end-to-end intent.
[0133] The consumer entity can send intent creation request messages to N production entities respectively, and carry the corresponding sub-network management intent in the intent creation request message. For example, the consumer entity can send intent creation request message #1 to production entity #1, and the intent creation request message #1 includes sub-network management intent #1. Sub-network management intent #1 can include the target of sub-network management intent #1. For example, sub-network management intent #1 can adopt a data structure similar to Figure 1, including information such as intent expectation, expected target, and intent context. The consumer entity can also send intent creation request message #2 to production entity #2, and the intent creation request message #2 includes sub-network management intent #2. The description of sub-network management intent #2 can be similar to that of sub-network management intent #1, and will not be repeated here.
[0134] In this embodiment of the present application, the production entity determines whether to change the management action group based on the instruction of the consumer entity, and does not change the management action group based on the achievement of the sub-network management intention. This method of determining whether to change the management action group can be a default method between the consumer entity and the production entity, or it can be instructed by the consumer entity to the production entity.
[0135] Exemplarily, the consuming entity sends action group freeze indication information to the multiple producing entities respectively. Correspondingly, the multiple producing entities receive the action group freeze indication information from the consuming entity.
[0136] The action group freeze indication information instructs multiple production entities not to replace the network management action group based on the execution result of the corresponding sub-network management intention. For example, the consumer entity sends the action group freeze indication information to the production entity #1, and the consumer entity sends the action group freeze indication information to the production entity #2. The consumer entity can directly send the action group freeze indication information to the multiple production entities, or the consumer entity can also carry the action group freeze indication information in the intent creation request message, such as the intent creation request message contains the sub-network management intention and the action group freeze indication information (such as the actionfrozen element), or the intent creation request message contains the sub-network management intention, and the sub-network management intention contains the action group freeze indication information (for example, the intent context in the sub-network management intention contains the action group freeze indication information). Thus, the production entity can freeze and replace the management action group before receiving the management indication information from the consumer entity, thereby reducing unnecessary replacement actions.
[0137] Additionally, the consuming entity can instruct multiple producing entities when to return the results of executing the sub-network management intent. For example, the consuming entity sends trigger conditions for returning the results of executing the sub-network management intent to each of the producing entities. Correspondingly, the multiple producing entities receive the trigger conditions for returning the results of executing the sub-network management intent from the consuming entity.
[0138] Exemplarily, the consumer entity sends trigger condition #1 to the production entity #1 for returning the execution result of sub-network management intention #1, and the consumer entity sends trigger condition #2 to the production entity #2 for returning the execution result of sub-network management intention #2. For example, the trigger condition may be that the target of the corresponding sub-network management intention is not achieved within the detection time. For example, the consumer entity may instruct the production entity to detect whether the target of the sub-network management intention is achieved within 30 minutes. If the production entity does not achieve the target of the sub-network management intention within 30 minutes, the production entity returns the execution result of the sub-network management intention. In this case, the production entity receives the execution result of not achieving the sub-network management intention, and may actively query other production entities for the execution results of other sub-network management intentions.
[0139] For another example, the consumer entity may further instruct multiple producers on the time and / or period for sending the execution results of the sub-network management intent. For example, the consumer entity may instruct the producer entity to return the execution results one hour after receiving the sub-network management intent, or instruct the producer entity to return the execution results every two hours, etc. This application does not specifically limit this.
[0140] The consumer entity can directly send trigger conditions to multiple production entities, or the consumer entity can also carry trigger conditions in the intent creation request message, for example, the intent creation request message includes the sub-network management intent and trigger conditions (such as return period or duration information element), or the intent creation request message includes the sub-network management intent, and the sub-network management intent includes trigger conditions (for example, the intent context in the sub-network management intent includes trigger conditions). In this way, the production entity can return the execution result of the sub-network management intent based on the trigger condition or under what circumstances.
[0141] S320, multiple production entities execute network management action groups based on different sub-network management intentions.
[0142] Exemplarily, production entity #1 executes network management action group #1 based on sub-network management intention #1, and production entity #2 executes network management action group #2 based on sub-network management intention #2.
[0143] For example, production entity #1 can execute management action group #1 based on sub-network management intention #1 to achieve the goal of sub-network management intention #1. For example, sub-network management intention #1 is energy-saving intention, and production entity #1 determines that the executable management action group #1 includes: timed carrier shutdown, symbol shutdown and RF module sleep in order to achieve the goal of energy-saving intention. Among them, timed carrier shutdown can mean that during a specific time period (such as in the early morning when the data transmission volume is relatively low), production entity #1 can trigger the managed entity of sub-network management intention #1 to shut down the carrier of the RF module to achieve energy saving. Symbol shutdown can mean that when there is no data carried on the symbol, production entity #1 can trigger the managed entity to shut down the power amplifier to achieve energy saving. RF module sleep can mean that during a specific time period, production entity #1 can trigger the RF module of the base station to be in sleep state to achieve energy saving. Production entity #1 can execute any one or more of timed carrier shutdown, symbol shutdown and RF module sleep. For example, when production entity #1 executes timed carrier shutdown, production entity #1 can send a carrier shutdown instruction to all base stations in sub-area #1, so that the managed entity executes carrier shutdown.
[0144] It is understandable that the above example is an example of a production entity as a device management system capable of managing a base station. The production entity executing a network management action group may include the production entity triggering the managed entity to execute a network management action group. In this case, the consumer entity may be a network management system. The embodiment of the present application can also be applied to a scenario where the production entity is a network element (such as a base station). In this case, the consumer entity may be a device management system. For ease of description, the following mainly takes the production entity as an example of a device management system to introduce the execution method provided in the embodiment of the present application, but the present application does not specifically limit this.
[0145] It is understandable that the embodiment of the present application takes production entity #1 as an unqualified production entity and production entity #2 as a qualified production entity as an example, that is, production entity #1 does not achieve the goal of sub-network management intention #1 by executing management action group #1, and production entity #2 achieves the goal of sub-network management intention #2 by executing management action group #2. For example, the goal of sub-network management intention #1 is to achieve an energy-saving power value of 300kW (the goal of network management intention is to achieve an energy-saving power value of 1000kW), however, production entity #1 saves 280kW of energy by executing management action group #1, and does not achieve the goal of sub-network management intention #1. The goal of sub-network management intention #2 is to achieve an energy-saving power value of 700kW, and production entity #2 saves 750kW of energy by executing management action group #2, and achieves the goal of sub-network management intention #2.
[0146] In the present application, after executing management action group #1, production entity #1 did not replace management action group #1 because it failed to achieve the goal of sub-network management intention #1. For example, in the above example, production entity #1 saved 280kW of energy by executing management action group #1, and production entity #2 saved 750kW of energy by executing management action group #2. The power value saved by production entity #1 and production entity #2 has reached 280+750=1030kw, that is, the total power value is greater than the target of 1000kw, and the goal of network management intention has been achieved. In this case, it is actually unnecessary for production entity #1 to replace management action group #1. If production entity #1 replaces management action group #1 based on the failure to achieve the goal of sub-network management intention #1, it may cause the base station to frequently turn on or off the energy-saving feature, affecting the execution of other services of the base station, reducing service coverage, data capacity and user experience. For example, unnecessary carrier shutdown will reduce the throughput of the cell and users. Therefore, in the solution provided in the embodiment of the present application, production entity #1 can avoid executing unnecessary replacement actions of management action group #1, which can improve the execution performance of network management intention.
[0147] S330, the consumer entity receives N execution results corresponding to N sub-network management intentions, and the N execution results come from N network management entities.
[0148] Correspondingly, N production entities send the execution results of N sub-network management intentions respectively.
[0149] Schematically, producer entity #1 sends the execution result of sub-network management intent #1 to consumer entity, and producer entity #2 sends the execution result of sub-network management intent #2 to consumer entity. The consumer entity determines the execution result of the network management intent based on the execution results of sub-network management intent #1 and sub-network management intent #2.
[0150] The production entity can detect the achievement of the sub-network management intent and return an execution result to the consumer entity based on the achievement. For example, the execution results of different sub-network management intents respectively include the performance indicator values of the managed entities of the corresponding sub-network management intents. For example, the execution result of sub-network management intent #1 returned by production network element #1 includes the performance indicator values of the managed entities of sub-network management intent #1. For example, the execution result includes an achievement status information element (such as a fulfillmentinfo information element), and the achievement status information element can include an achievement status sub-information element (such as a fulfillmentstatus sub-information element) and a performance indicator information element (such as a value sub-information element). The achievement status sub-information element can indicate whether the goal of the sub-network management intent has been achieved, and the value sub-information element can indicate the performance indicator value. For example, the value sub-information element in the execution result of sub-network management intent #1 can indicate that the energy-saving power value is 280kW. It can be seen that the consumer entity can determine whether the goal of the network management intent has been achieved based on the performance indicator values returned by multiple production entities, rather than determining whether the goal of the network management intent has been achieved based on whether the goal of each sub-network management intent has been achieved, thereby improving the rationality of judging whether the network management intent has achieved the goal.
[0151] It is understood that the performance indicator value may also be referred to as the current performance value or the achieved value for fulfillment, and may be expressed in various forms. For example, it may be the performance indicator value that the managed entity of the current sub-network management intent has achieved (e.g., an energy-saving power value of 280kW), or it may be the difference between the managed entity of the current sub-network management intent and the achieved target (e.g., the difference between the energy-saving power value and the achieved target is 20kW). This application does not impose any particular limitation on this.
[0152] Optionally, the execution result of the sub-network management intention returned by the non-compliant production entity also includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether the non-compliant production entity has a network management action group that can be used for replacement. For example, the execution result of the sub-network management intention #1 returned by production entity #1 may include the action group exhaustion indication information. For example, an action group exhaustion information element (such as actionAllTried) may be defined in the execution result of the sub-network management intention #1. If production entity #1 generates three management action groups based on sub-network management intention #1: timed carrier shutdown, symbol shutdown, and RF module sleep, and production entity #1 executes timed carrier shutdown but has not yet executed symbol shutdown and RF module sleep, then the action group exhaustion indication information indicates that production entity #1 can replace the management action group. If production entity #1 has executed all management action groups, then the action group exhaustion indication information indicates that production entity #1 cannot replace the management action group.
[0153] It is understandable that the execution result returned by the qualified production entity (the production entity that has achieved the corresponding sub-network management intention) may include action group exhaustion indication information or may not include action group exhaustion indication information, and this application does not specifically limit this.
[0154] If the consumer entity instructs the production entity to return the triggering condition of the execution result of the sub-network management intention (such as that described in step S310), the production entity can return the execution result of the sub-network management intention to the consumer entity in response to the satisfaction of the triggering condition. For example, if the consumer entity instructs the production entity that if the target of the sub-network management intention is not achieved within the detection time, then the unqualified production entity will return the execution result of the sub-network management intention to the consumer entity at this time. Based on the return result of the unqualified production entity, or the existence of the target of the sub-network management intention that has not been achieved, the consumer entity can send an execution result query information to other production entities that have not returned an execution result, so that other production entities can return the corresponding execution result of the sub-network management intention to the consumer entity in response to the execution result query information. For example, as shown in Figure 3, production entity #1 did not achieve the target of sub-network management intention #1 within the detection time. Production entity #1 returns the execution result of sub-network management intention #1 to the consumer entity in response to the satisfaction of the triggering condition. Based on the execution result of Network Management Intent #1, the consuming entity proactively sends an execution result query message to Producing Entity #2. This query message requests Producing Entity #2 to return the execution result. Producing Entity #2 responds to this query message and returns the execution result of Sub-Network Management Intent #2 to the consuming entity. This allows the consuming entity to determine the execution result of the Network Management Intent based on the execution results of different Sub-Network Management Intents.
[0155] If the consumer entity instructs the producer entity to return the execution result of the sub-network management intent at a time and / or period, then each producer entity may return the execution result of the sub-network management intent to the consumer entity based on the time and / or period. This application does not impose any special restrictions on this.
[0156] The consumer entity can determine whether the network management intention is achieved based on the execution results of different sub-network management intentions returned by multiple production entities. The way in which the consumer entity determines whether the network management intention is achieved is related to the type of network management intention or the way it is decomposed. For example, for an energy-saving intention with an energy-saving power value of 1000kW, the consumer entity can sum the performance indicator value (280kW) in the execution result of sub-network management intention #1 and the performance indicator value (750kW) in the execution result of sub-network management intention #2 to determine that the target of the network management intention (1000kW) has been achieved. For another example, when the average throughput rate of a specific area reaches a specific threshold, the consumer entity can perform weighted averaging on the returned performance indicator values to determine whether the target of the network management intention is achieved. This application does not specifically limit this.
[0157] S340: The consumer entity determines whether the substandard production entity should change the management action group.
[0158] For example, the consumer entity can determine whether the non-compliant production entity should change management action group #1 based on the execution result of the network management intent. If the execution result of the network management intent is achieved, the consumer entity can determine that the non-compliant production entity does not change the network management action group. If the execution result of the network management intent is not achieved, the consumer entity can determine that the non-compliant production entity should change the action group.
[0159] If the execution result returned by the non-compliant production entity also includes an action group exhaustion indication information, when the execution result of the network management intent is not achieved, the consumer entity can determine whether the non-compliant production entity should replace the management action group based on the execution result of the network management intent and the action group exhaustion indication information. When the action group exhaustion indication information indicates that the non-compliant production entity has a management action group that can be used for replacement, the consumer entity can determine that production entity #1 replaces the management action group. When the action group exhaustion indication information indicates that the non-compliant production entity does not have a management action group that can be used for replacement, even if the goal of the network management intent is not achieved, the consumer entity does not instruct the non-compliant production entity to replace the management action group. In this case, the consumer entity can re-execute the above steps starting from step S310, that is, the consumer entity can re-decompose the network management intent.
[0160] The consuming entity may also adjust the target of at least one sub-network management intent based on the execution results of different sub-network management intents returned by multiple producing entities. In this case, the consuming entity may execute the following step S350.
[0161] Optionally, at S350 , the consumer entity adjusts a target of the sub-network management intention.
[0162] Exemplarily, the consumer entity adjusts the target of the sub-network management intent corresponding to the production entity that does not meet the standard. Still taking the energy-saving intention (target is 1000kW) as an example, production entity #1 achieves an energy-saving power value of 280kW (target is 300kW), and production entity #2 achieves an energy-saving power value of 750kW (target is 700kW). Based on the execution result, the consumer entity can adjust the target of the sub-network management intention #1 corresponding to production entity #1 to achieve 270kW, so that the target of sub-network management intention #1 and the target of network management intention can both be achieved. In addition, the consumer entity can also adjust the target of the sub-network management intention #2 corresponding to production entity #2 to achieve 730kW, so that the decomposition method of network management intention is more reasonable.
[0163] S360, the consumer entity sends management instruction information to the production entity that does not meet the standards.
[0164] Correspondingly, the non-compliant production entity receives management instruction information from the consumer entity.
[0165] The non-compliant production entity is a production entity that fails to achieve the target of the corresponding sub-network management intention among the multiple production entities. The management instruction information indicates whether the non-compliant production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.
[0166] Exemplarily, the consumer entity sends management instruction information to the producer entity #1, where the management instruction information instructs the producer entity #1 whether to replace the network management action group #1 used to achieve the goal of the sub-network management intention #1.
[0167] If the consumer entity also adjusts the target of the sub-network management intention #1 through step S350 described above, the management indication information may also indicate the adjusted target of the sub-network management intention #1.
[0168] The non-compliant production entity (production entity #1) can determine whether to change the management action group based on the management instruction information. If the management instruction information indicates not to change the management action group, production entity #1 does not change management action group #1. That is, production entity #1 does not perform unnecessary changes to the management action group, thus avoiding resource waste. If the management instruction information indicates to change the management action group, the non-compliant production entity can perform the following action S370.
[0169] Optionally, S370, a management action group for replacing non-compliant production entities.
[0170] Exemplarily, production entity #1 replaces management action group #1.
[0171] Production entity #1 can determine to replace the management action group based on the management instruction information. When the management instruction information indicates to replace the management action group #1, production entity #1 can select other management action groups that can be executed (such as symbol shutdown or RF module sleep that has not been executed yet) to execute in order to achieve the goal of sub-network management intention #1.
[0172] If the consuming entity further adjusts the target of the sub-network management intention #2 in step S360, the consuming entity may further perform the following step S380.
[0173] Optionally, at S380, the consumer entity sends adjustment instruction information to the qualified production entity (production entity #2). Correspondingly, the qualified production entity receives the adjustment instruction information from the consumer entity.
[0174] The adjustment instruction information indicates the adjusted target of sub-network management intention #2. Therefore, production entity #2 can execute sub-network management intention #2 based on the adjusted target during the duration of sub-network management intention #2.
[0175] Based on this technical solution, the consumer entity can determine whether the non-compliant production entity should replace the management action group based on the achievement of different sub-network management intentions. The non-compliant production entity determines whether to replace the management action group based on the instructions of the consumer entity, rather than replacing the management action group on its own based on the goal of not achieving the sub-network management intention. This can avoid unnecessary execution of management action group replacement actions and improve the management method of network management intentions.
[0176] The above describes the method for executing the network management intent provided by the present application. Before sending different sub-network management intents to multiple production entities, the consumer entity may also collect capability information of the production entity for decomposing the network management intent. To facilitate understanding of the embodiment of the present application, the following still takes production entity #1 and production entity #2 as an example, and briefly describes the method for executing this network management intent in conjunction with Figure 4. For a more detailed description of the relevant steps, please refer to Figure 3, which will not be repeated below.
[0177] FIG4 is another schematic flowchart of a method for network management intention provided in an embodiment of the present application.
[0178] Optionally, in S401, the consumer entity obtains a network management service intention.
[0179] The consumer entity can obtain the network management service intent, such as the data structure shown in Figure 1. The management service intent may include information such as intent expectation, target, intent context, etc.
[0180] Optionally, in S402 , the consumer entity sends capability query information #1 to the producer entity #1.
[0181] Capability Query Message #1 may request that producer #1 return the capability of producer #1 to execute the network management intent. For example, the consumer may determine capability attributes related to the network management intent, such as energy saving attributes and latency attributes. Capability Query Message #1 may include the capability attributes, instructing producer #1 to return capability information corresponding to the capability attributes.
[0182] Optionally, at S403, the consumer entity sends capability query information #2 to the producer entity #2
[0183] Capability query information #2 may be similar to capability query information #1, and reference may be made to the above description.
[0184] Optionally, in S404, the production entity #1 sends capability information #1 to the consumption entity.
[0185] Production entity #1 can return the capability value to the consumer entity based on the capability attribute in capability query information #1. For example, capability query information #1 requests to query the energy-saving capability, and production entity #1 can return the expected power saving value or range to the consumer entity, such as returning the power saving of 200kw to 500kw.
[0186] Optionally, in S405 , the production entity #2 sends capability information #2 to the consumption entity.
[0187] Capability information #2 may be similar to capability information #1, and reference may be made to the above description.
[0188] Optionally, in S406 , the consumer entity decomposes the network management intent based on capability information #1 and capability information #2.
[0189] Schematically, the consumer entity can decompose the goal of the network management intention (such as saving 1000kw of energy) into the goal of sub-network management intention #1 (such as saving 300kw of energy) and the goal of sub-network management intention #2 (such as saving 700kw of energy), and decompose the managed objects of the network management intention into the managed objects of sub-network management intention #1 and the managed objects of sub-network management intention #2.
[0190] S407, the consumer entity sends a request message #1 to the producer entity #1.
[0191] Request message #1 is used to request production entity #1 to execute sub-network management intent #1. Request message #1 includes sub-network management intent #1, which includes the target of sub-network management intent #1 and may also include a managed object. Request message #1 may also include action group freeze indication information and / or trigger conditions.
[0192] S408, the consumer entity sends a request message #2 to the producer entity #2.
[0193] Request message #2 is used to request production entity #2 to execute sub-network management intent #2. Request message #2 includes sub-network management intent #2, which includes the target of sub-network management intent #2 and may also include managed objects. Request message #2 may also include action group freeze indication information and / or trigger conditions.
[0194] S409, production entity #1 executes management action group #1.
[0195] Production entity #1 executes management action group #1 to achieve the goal of sub-network management intention #1. If production entity #1 fails to achieve the goal of sub-network management intention #1, production entity #1 does not change the management action group at this time.
[0196] S410, production entity #2 executes management action group #2.
[0197] Production entity #2 executes management action group #2 to achieve the goal of sub-network management intention #2. If production entity #2 fails to achieve the goal of sub-network management intention #2, production entity #2 does not change the management action group at this time.
[0198] S411, the production entity #1 sends the execution result of the sub-network management intention #1 to the consumption entity.
[0199] Optionally, S412, the consumer entity sends achievement status query information to the producer entity #2.
[0200] S413, the production entity #2 sends the execution result of the sub-network management intention #2 to the consumption entity.
[0201] S414, the consumer entity obtains the execution result of the network management intention.
[0202] For the description of steps S411 to S414 , reference may be made to the description of step S330 above, which will not be repeated here.
[0203] S415, the consumer entity determines whether the producer entity #1 changes the network management action group.
[0204] For the description of step S415 , reference may be made to the description of step S340 above, which will not be repeated here.
[0205] Optionally, at S416 , the consumer entity adjusts a target of the sub-network management intention.
[0206] For the description of step S416 , please refer to the description of step S350 above, which will not be repeated here.
[0207] S417, the consumer entity sends management instruction information to the producer entity #1.
[0208] For the description of step S417, please refer to the description of step S360 above, which will not be repeated here.
[0209] Optionally, in S418, the production entity #1 determines a replacement management action group based on the management instruction information.
[0210] For the description of step S418, please refer to the description of step S370 above and will not be repeated here.
[0211] Optionally, in S419, the consumer entity sends adjustment instruction information to the producer entity #2.
[0212] For the description of step S419, please refer to the description of step S380 above and will not be repeated here.
[0213] Based on this technical solution, the consumer entity can determine whether the non-compliant production entity should replace the management action group based on the achievement of different sub-network management intentions. The non-compliant production entity determines whether to replace the management action group based on the instructions of the consumer entity, rather than replacing the management action group on its own based on the goal of not achieving the sub-network management intention. This can avoid unnecessary execution of management action group replacement actions and improve the execution performance of network management intentions.
[0214] It can also be understood that in the above-mentioned method embodiments, the methods and operations implemented by the production entity can also be implemented by components that can be produced by the production entity (such as chips or circuits); in addition, the methods and operations implemented by the consumer entity can also be implemented by components that can be consumed by the consumer entity (such as chips or circuits), without limitation.
[0215] Corresponding to the methods provided in the above-mentioned method embodiments, embodiments of the present application also provide corresponding apparatuses, which include modules for executing the corresponding methods in the above-mentioned method embodiments. The modules may be software, hardware, or a combination of software and hardware. It is understood that the technical features described in the above-mentioned method embodiments are also applicable to the following apparatus embodiments.
[0216] Referring to Figure 5 , as an example, Figure 5 is a schematic diagram of a communication device 10 provided in an embodiment of the present application. Device 10 includes a transceiver unit 11 and a processing unit 12. Transceiver unit 11 can be used to implement corresponding communication functions. Transceiver unit 11 can also be referred to as a communication interface or communication unit. Processing unit 12 can be used to process data or information.
[0217] Optionally, the device 10 further includes a storage unit, which can be used to store instructions and / or data. The processing unit 12 can read the instructions and / or data in the storage unit so that the device implements the aforementioned various method embodiments.
[0218] In one possible design, the device 10 can be used to execute the actions performed by the production entity in the above method embodiments. In this case, the device 10 can be a production entity or a component of a production entity. The transceiver unit 11 is used to execute the transceiver-related operations on the production entity side in the above method embodiments, and the processing unit 12 is used to execute the processing-related operations on the production entity side in the above method embodiments.
[0219] The first possible implementation method is that the transceiver unit 11 is used to send N sub-network management intentions obtained by decomposing the network management intention one-to-one to N network management service production entities; the transceiver unit 11 receives N execution results corresponding to the N sub-network management intentions, and the N execution results correspond to the N network management entities, and obtains the execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; the processing unit 12 is used to send management indication information to the non-compliant network management service production entity based on the execution result of the network management intention, wherein the non-compliant network management service production entity is a network management service production entity among the N network management service production entities that has not achieved the target of the corresponding sub-network management intention, and the management indication information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.
[0220] The apparatus 10 can implement the steps or processes performed by the production entity in the method embodiments according to the embodiments of the present application. The apparatus 10 may include units for executing the methods performed by the production entity in the method embodiments according to the embodiments of the present application. The specific processes for each unit to perform the above-mentioned corresponding steps have been described in detail in the above-mentioned method embodiments and will not be repeated here for the sake of brevity.
[0221] Another possible design is that the device 10 can be used to execute the actions performed by the consumer entity in the above method embodiments. In this case, the device 10 can be a consumer entity or a component of a consumer entity, the transceiver unit 11 is used to execute the transceiver-related operations on the consumer entity side in the above method embodiments, and the processing unit 12 is used to execute the processing-related operations on the consumer entity side in the above method embodiments.
[0222] In a first possible implementation method, the transceiver unit 11 is used to receive a sub-network management intention decomposed from the network management intention; the transceiver unit 11 is used to send the execution result of the sub-network management intention, and the execution result of the sub-network management intention indicates that the goal of the sub-network management intention has not been achieved; the transceiver unit 11 is used to receive management indication information, and the management indication information indicates whether to replace the network management action group used to achieve the goal of the sub-network management intention, and the management indication information is determined based on the execution result of the network management intention.
[0223] The apparatus 10 can implement the steps or processes corresponding to those performed by the consumer entity in the method embodiment according to the embodiment of the present application. The apparatus 10 may include units for executing the method performed by the consumer entity in the method embodiment according to the embodiment of the present application. The specific process of each unit executing the above-mentioned corresponding steps has been described in detail in the above-mentioned method embodiments and will not be repeated here for the sake of brevity.
[0224] It is understandable that the device 10 here is embodied in the form of a functional unit. The term "unit" here may refer to an application specific integrated circuit (ASIC), an electronic circuit, a processor (such as a shared processor, a dedicated processor or a group processor, etc.) and a memory for executing at least one software or firmware program, a merged logic circuit and / or other suitable components that support the described functions. In an optional example, those skilled in the art will understand that the device 10 may be specifically a production entity in the above-mentioned embodiment, and may be used to execute the various processes and / or steps corresponding to the production entity in the above-mentioned method embodiments; or, the device 10 may be specifically a consumer entity in the above-mentioned embodiment, and may be used to execute the various processes and / or steps corresponding to the consumer entity in the above-mentioned method embodiments. To avoid repetition, it will not be described here.
[0225] The apparatus 10 of each of the above-mentioned solutions has the function of implementing the corresponding steps performed by the communication equipment (such as a production entity or a consumption entity) in the above-mentioned method. The functions can be implemented by hardware, or the corresponding software can be implemented by hardware. The hardware or software includes at least one module corresponding to the above-mentioned functions; for example, the transceiver unit can be replaced by a transceiver (for example, the sending unit in the transceiver unit can be replaced by a transmitter, and the receiving unit in the transceiver unit can be replaced by a receiver), and other units, such as the processing unit, can be replaced by a processor to respectively perform the sending and receiving operations and related processing operations in each method embodiment.
[0226] In addition, the transceiver unit 11 may also be a transceiver circuit (for example, may include a receiving circuit and a sending circuit), and the processing unit may be a processing circuit.
[0227] It should be noted that the apparatus in FIG5 may be the device in the aforementioned embodiment, or may be a chip or chip system, such as a system on chip (SoC). The transceiver unit may be an input / output circuit or a communication interface; the processing unit may be a processor, microprocessor, or integrated circuit integrated on the chip. This is not limited here.
[0228] Referring to Figure 6 , as an example, Figure 6 is a schematic diagram of another communication device 20 provided in an embodiment of the present application. The device 20 includes a processor 21, which is coupled to a memory 22. Optionally, the device 20 also includes the memory 22. The memory 22 is used to store computer programs or instructions and / or data. The processor 21 is used to execute the computer programs or instructions stored in the memory 22, or read the data stored in the memory 22, to perform the methods described in the above method embodiments.
[0229] Optionally, there is at least one processor 21.
[0230] Optionally, there is at least one memory 22.
[0231] Optionally, the memory 22 is integrated with the processor 21 or provided separately.
[0232] Optionally, as shown in Figure 6, the device 20 further includes a transceiver 23, which is used to receive and / or send signals. For example, the processor 21 is used to control the transceiver 23 to receive and / or send signals.
[0233] As a solution, the device 20 is used to implement the operations performed by the production entity in the above various method embodiments.
[0234] For example, the processor 21 is configured to execute computer programs or instructions stored in the memory 22 to implement the relevant operations of the production entity in the above various method embodiments. For example, the method executed by the production entity in the embodiment shown in FIG3 .
[0235] As another solution, the device 20 is used to implement the operations performed by the consumer entity in the above various method embodiments.
[0236] For example, the processor 21 is configured to execute computer programs or instructions stored in the memory 22 to implement the relevant operations of the consumer entity in the above various method embodiments. For example, the method executed by the consumer entity in the embodiment shown in FIG3 .
[0237] It is understood that the processor mentioned in the embodiments of the present application may be a central processing unit (CPU), or may be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc.
[0238] It is also understood that the memory mentioned in the embodiments of the present application may be a volatile memory and / or a non-volatile memory. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM). For example, RAM can be used as an external cache. As an example and not a limitation, RAM includes the following forms: static random access memory (SRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDR SDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM), and direct rambus RAM (DR RAM).
[0239] When the processor is a general-purpose processor, a DSP, an ASIC, an FPGA or other programmable logic device, a discrete gate or transistor logic device, or a discrete hardware component, the memory (storage module) may be integrated into the processor.
[0240] Memory described herein is intended to comprise, but not be limited to, these and any other suitable types of memory.
[0241] 7 , as an example, is a schematic diagram of a chip system 30 provided in accordance with an embodiment of the present application. The chip system 30 (or processing system) includes a logic circuit 31 and an input / output interface 32 .
[0242] The logic circuit 31 may be a processing circuit in the chip system 30. The logic circuit 31 may be coupled to a storage unit and call instructions in the storage unit so that the chip system 30 can implement the methods and functions of the various embodiments of the present application. The input / output interface 32 may be an input / output circuit in the chip system 30, outputting information processed by the chip system 30 or inputting data or signaling information to be processed into the chip system 30 for processing.
[0243] Specifically, for example, if a production entity installs the chip system 30 , the logic circuit 31 is coupled to the input / output interface 32 , and the input / output interface 32 can input the wake-up signal to the logic circuit 31 for processing.
[0244] As a solution, the chip system 30 is used to implement the operations performed by the production entity in the above various method embodiments.
[0245] For example, the logic circuit 31 is used to implement the processing-related operations performed by the production entity in the above method embodiments, such as the processing-related operations performed by the production entity in the embodiment shown in Figure 3; the input / output interface 32 is used to implement the sending and / or receiving-related operations performed by the production entity in the above method embodiments, such as the sending and / or receiving-related operations performed by the production entity in the embodiment shown in Figure 3.
[0246] As another solution, the chip system 30 is used to implement the operations performed by the consumer entity in the above various method embodiments.
[0247] For example, the logic circuit 31 is used to implement the processing-related operations performed by the consumer entity in the above method embodiments, such as the processing-related operations performed by the consumer entity in the embodiment shown in Figure 3; the input / output interface 32 is used to implement the sending and / or receiving-related operations performed by the consumer entity in the above method embodiments, such as the sending and / or receiving-related operations performed by the consumer entity in the embodiment shown in Figure 3.
[0248] An embodiment of the present application further provides a computer-readable storage medium on which computer instructions for implementing the methods executed by the device in the above-mentioned method embodiments are stored.
[0249] For example, when the computer program is executed by a computer, the computer can implement the methods performed by the production entity in each embodiment of the above method.
[0250] For another example, when the computer program is executed by a computer, the computer can implement the methods performed by the consumer entity in each embodiment of the above method.
[0251] An embodiment of the present application also provides a computer program product, comprising instructions, which, when executed by a computer, implement the methods performed by a production entity or a consumption entity in the above-mentioned method embodiments.
[0252] An embodiment of the present application further provides a communication system, which includes the production entity and the consumption entity in the above embodiments.
[0253] The explanation of the relevant contents and beneficial effects of any of the above-mentioned devices can be referred to the corresponding method embodiments provided above, which will not be repeated here.
[0254] In the several embodiments provided in this application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. In actual implementation, there may be other division methods, such as at least two units or components can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0255] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes at least one computer instruction. When the computer program instruction is loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. For example, the computer can be a personal computer, a server, or a network device, etc. The computer instruction can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instruction can be transmitted from one website, computer, server or data center to another website, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode. The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that includes at least one available medium integrated. The available medium may be a magnetic medium (e.g., a floppy disk, a hard disk, a magnetic tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid state disk (SSD)). For example, the aforementioned available medium includes, but is not limited to, various media that can store program code, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.
[0256] The above description is merely a specific embodiment of the present application, but the scope of protection of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in this application should be included in the scope of protection of this application. Therefore, the scope of protection of this application should be based on the scope of protection of the claims.
Claims
1. A method for managing network management intentions, characterized in that: The method comprises: Sending N sub-network management intentions decomposed from the network management intention to N network management service production entities one-to-one; Receiving N execution results corresponding to N sub-network management intentions, the N execution results corresponding to the N network management entities, and obtaining an execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; Based on the execution result of the network management intention, management instruction information is sent to the non-compliant network management service production entity, wherein the non-compliant network management service production entity is a network management service production entity among the N network management service production entities that has not achieved the target of the corresponding sub-network management intention, and the management instruction information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.
2. The method according to claim 1, characterized in that The N execution results respectively include performance indicator values of managed entities of corresponding sub-network management intentions, and the execution result of the network management intention obtained based on the N execution results includes: The execution result of the network management intention is determined to be achieved or not based on the performance indicator values of the managed entities of the N sub-network management intentions.
3. The method according to claim 1 or 2, characterized in that The execution result of the sub-network management intention from the non-compliant network management production entity further includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether the non-compliant network management production entity has a network management action group that can be used for replacement.
4. The method according to any one of claims 1 to 3, characterized in that Before obtaining the execution result of the network management intention based on the N execution results, the method further includes: Action group freezing indication information is sent to the N network management service production entities respectively, and the action group freezing indication information instructs the N network management service production entities not to change the network management action group based on the execution result of the corresponding sub-network management intention.
5. The method according to any one of claims 1 to 4, characterized in that The method further comprises: The target of the sub-network management intention corresponding to the non-compliant network management service production entity is adjusted based on the N execution results, and the management indication information also indicates the adjusted target of the sub-network management intention corresponding to the non-compliant network management service production entity.
6. The method according to any one of claims 1 to 5, characterized in that Before obtaining the execution result of the network management intention based on the N execution results, the method further includes: A trigger condition for returning the execution result of the sub-network management intention is sent to each of the N network management service production entities, and the trigger condition is that the target of the corresponding sub-network management intention is not achieved within the detection time.
7. The method according to claim 6, characterized in that The receiving the execution results of the corresponding sub-network management intentions from the N network management service production entities respectively includes: Receiving the execution result of the corresponding sub-network management intention from the non-compliant network management service production entity; Sending achievement status query information to other network management service production entities among the N network management service production entities except the network management service production entity that does not meet the standards, wherein the achievement status query information requests to return the execution result of the corresponding sub-network management intention; Receive the execution result of the corresponding sub-network management intention from the other network management service production entity.
8. The method according to any one of claims 1 to 7, characterized in that The method further comprises: In the case where the execution result of the network management intention is achieved, determining that the non-compliant network management service production entity does not change the network management action group, and the management instruction information instructs the non-compliant network management service production entity not to change the network management action group; In the case where the execution result of the network management intention is not achieved, the non-compliant network management service production entity is determined to replace the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group; or, in the case where the execution result of the network management intention is not achieved and the non-compliant network management production entity has a network management action group that can be used for replacement, the non-compliant network management service production entity is determined to replace the network management action group, and the management instruction information instructs the non-compliant network management service production entity to replace the network management action group.
9. The method according to any one of claims 1 to 8, characterized in that The N network management service production entities are respectively N different equipment management systems, or the N network management production entities are respectively N different network elements.
10. The method according to any one of claims 1 to 9, characterized in that The network management intent is an end-to-end intent, and the N sub-network management intents are N different management domain intents decomposed from the end-to-end intent.
11. A method for managing network management intentions, characterized in that: The method comprises: receiving a sub-network management intent decomposed from the network management intent; Sending an execution result of the sub-network management intention, wherein the execution result of the sub-network management intention indicates that a goal of the sub-network management intention has not been achieved; Management indication information is received, wherein the management indication information indicates whether to replace a network management action group used to achieve a target of the sub-network management intention, and the management indication information is determined based on an execution result of the network management intention.
12. The method according to claim 11, characterized in that The execution result of the sub-network management intention includes the current performance value of the managed entity of the sub-network management intention, and the performance indicator value is used to determine whether the execution result of the network management intention is achieved or not.
13. The method according to claim 11 or 12, characterized in that The execution result of the sub-network management intention further includes action group exhaustion indication information, and the action group exhaustion indication information indicates whether there is a network management action group that can be used for replacement.
14. The method according to any one of claims 11 to 13, characterized in that Before sending the execution result of the sub-network management intention, the method further includes: Action group freezing indication information is received, where the action group freezing indication information indicates not to change the network management action group based on the execution result of the sub-network management intention.
15. The method according to any one of claims 11 to 14, characterized in that The management indication information also indicates the adjusted target of the sub-network management intention.
16. The method according to any one of claims 11 to 15, characterized in that Before sending the execution result of the sub-network management intention, the method further includes: receiving a trigger condition for returning an execution result of the sub-network management intention, wherein the trigger condition is that a target of the sub-network management intention is not achieved within a detection time period; The execution result of sending the sub-network management intention includes: In response to the trigger condition being met, sending the execution result of the sub-network management intention.
17. The method according to any one of claims 11 to 16, characterized in that The method further comprises: Based on the management instruction information, it is determined whether to replace the network management action group used to achieve the target of the sub-network management intention.
18. The method according to any one of claims 11 to 17, characterized in that The network management intent is an end-to-end intent, and the sub-network management intent is a management domain intent decomposed from the end-to-end intent.
19. A method for managing network management intentions, characterized in that: The method comprises: Sending N sub-network management intentions decomposed from the network management intention to N network management service production entities one-to-one, and the N network management service production entities receive the corresponding sub-network management intentions respectively; The N network management service production entities respectively send the execution results of the corresponding sub-network management intentions, receive N execution results corresponding to the N sub-network management intentions, the N execution results correspond to the N network management entities, and obtain the execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; Based on the execution result of the network management intention, management instruction information is sent to the non-compliant network management service production entity, and the non-compliant network management service production entity receives the management instruction information, wherein the non-compliant network management service production entity is a network management service production entity among the N network management service production entities that has not achieved the target of the sub-network management intention, and the management instruction information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.
20. A device for managing network management intentions, characterized in that: The device comprises a transceiver unit and a processing unit. The transceiver unit is used to send N sub-network management intentions obtained by decomposing the network management intention to N network management service production entities one-to-one; The transceiver unit is used to receive N execution results corresponding to N sub-network management intentions, the N execution results corresponding to the N network management entities, and obtain the execution result of the network management intention based on the N execution results, wherein the N execution results include an execution result indicating that it has not been achieved; The processing unit is used to send management instruction information to the non-compliant network management service production entity based on the execution result of the network management intention, wherein the non-compliant network management service production entity is a network management service production entity among the N network management service production entities that has not achieved the target of the sub-network management intention, and the management instruction information indicates whether the non-compliant network management service production entity should replace the network management action group used to achieve the target of the corresponding sub-network management intention.
21. A device for managing network management intentions, characterized in that: The device comprises a transceiver unit and a processing unit. The transceiver unit is used to receive the sub-network management intent decomposed from the network management intent; The transceiver unit is used to send the execution result of the sub-network management intention, and the execution result of the sub-network management intention indicates that the goal of the sub-network management intention has not been achieved; The transceiver unit is used to receive management indication information, where the management indication information indicates whether to replace the network management action group used to achieve the target of the sub-network management intention, and the management indication information is determined based on the execution result of the network management intention.
22. A communication system, comprising an apparatus for executing the method according to any one of claims 1 to 10 and an apparatus for executing the method according to any one of claims 11 to 18.
23. The system of claim 22, wherein: Also included are managed entities for network management purposes.
24. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed on a computer, the computer is caused to execute the method according to any one of claims 1 to 10, or the computer is caused to execute the method according to any one of claims 11 to 18.
25. A computer program product, characterized in that The method comprises a computer program code, which, when executed on a computer, causes the computer to implement the method according to any one of claims 1 to 10 or causes the computer to implement the method according to any one of claims 11 to 18.
26. A communication device, characterized in that: include: A processor, configured to execute a computer program stored in a memory so that the apparatus performs the method as claimed in any one of claims 1 to 10, or configured to execute a computer program stored in a memory so that the apparatus performs the method as claimed in any one of claims 11 to 18.
27. The device according to claim 26, characterized in that The apparatus also includes the memory.
Citation Information
Patent Citations
Management method, device and system for network management service intention
CN119071349A
Intention decomposition method and device
CN114902716A
Dynamic intention guarantee method and device in computer network and storage medium
CN115250223A
Intention processing method and device
CN115277425A
Transforming intent expressions into commands and configurations
US20220276892A1
