Testing device and testing method for mechanical properties of spray anchor net support system
By designing a test device for spray anchor network support system including main frame, lifting lifting mechanism and mechanical testing mechanism, the problem that existing devices cannot restore actual engineering support conditions is solved, and the support system for spray anchor network is realized The mechanical performance test provides more accurate support performance data and supports the support design of underground engineering.
Patent Information
- Application Number
- PCT/CN2024/093927
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-08-18
- Filing Date
- 2024-05-17
- Publication Date
- 2024-12-05
AI Technical Summary
The existing mechanical performance testing device of the spray anchor net support system cannot accurately restore the layout of anchor rods under actual engineering support conditions, and lacks support design testing devices that can simulate deep and extremely high ground stress and other engineering environments, resulting in support. There are shortcomings in the system design.
A mechanical performance testing device for spray anchor network support system including main frame, lifting lifting mechanism, mechanical testing mechanism and monitoring mechanism was designed. The surrounding rock conditions were simulated through the mold group and the test platform to realize the multi-point anchoring of the anchor rod and Tests in different arrangements and dynamic and static mechanical performance tests are carried out using dynamic impact testing mechanisms and test loading mechanisms.
The device can flexibly adjust the mold group to simulate the layout of anchor rods in actual engineering, realize comprehensive testing of the dynamic and static mechanical properties of the spray anchor net support system, provide more accurate support performance data, and support the underground engineering Protection design.
Smart Images

Figure CN2024093927_05122024_PF_FP_ABST
Abstract
Description
Test device and test method for mechanical properties test of shotcrete mesh support system Technical Field
[0001] The present invention relates to the technical field of underground rock engineering support test equipment, and in particular to a mechanical performance test device and a test method for a shotcrete anchor net support system. Background Art
[0002] The geological conditions in deep underground projects differ significantly from those in surface projects. As underground projects continue to extend deeper into the Earth, complex environments characterized by "three highs and one disturbance" emerge. Underground excavation projects often face geological hazards such as large deformations and high-energy rockbursts. Therefore, a sound support system is crucial to ensuring the safety of underground structures. Support systems in underground projects often serve as the last line of defense against these hazards, playing a crucial protective role.
[0003] Strong dynamic disturbances often act directly on the support system of underground projects, causing deformation of the support system at the very least and failure of the support system at the worst, leading to major safety accidents. This not only seriously affects the normal production progress and project quality of underground projects, but also poses a serious threat to the life safety of construction workers and equipment safety. Therefore, economical, effective and reasonable support design and ensuring that the support system can perform its support function are major challenges facing deep underground projects. Among them, in-depth understanding of the support performance of the support system is the key to solving this problem.
[0004] In addition, shotcrete support is one of the most common support systems for underground rock and soil support and reinforcement. It usually consists of two parts: anchor rods, anchor cables and surface supports embedded in the rock mass. Effective support is a necessary condition for underground rock excavation design. The use of an inappropriate support system may lead to a series of problems and have a significant impact on the safety of workers and equipment. The effectiveness and performance of the shotcrete support system depends on the performance of the anchor rods and surface supports, their coordination, and the compatibility and interaction between the elements of the support system. Therefore, an accurate understanding of the mechanical behavior and failure mechanism of each component is also very important for surface support and overall support performance.
[0005] Looking at the relevant fields in China, research equipment related to the support performance of support systems has been under development, but the number is limited, and either they only tend to study the support mechanical properties of a single support element, ignoring the consideration of the overall support performance of the support system, or they consider the overall support, but the degree of simulation and restoration of the support system under actual engineering conditions is low. For example, the invention patent CN112903482A of China Coal Technology and Engineering Mining Research Institute Co., Ltd. is a multifunctional test bench for impact load testing of mining support materials, which tends to study the mechanical properties of a single support element and can realize impact load testing of test pieces such as anchor rods (cables), metal mesh, steel belts, and anchor bodies; the invention patent CN110274831A of Shandong University of Science and Technology is a comprehensive test device for anchor rod (cable) support structure testing and anchoring system performance, which can simulate the joint support of on-site anchor rods and metal mesh and conduct anchoring system performance testing; the invention patent CN114383947A of China University of Mining and Technology (Beijing) A multifunctional anchoring system dynamic-static coupling performance test system, which can test the mechanical properties of the anchoring system under dynamic-static coupling loading conditions; Shandong Jianzhu University's invention patent CN107941620A underground engineering anchor mesh sprayed support structure mechanical performance test and evaluation device and method, which can perform loading and unloading tests on different types of anchor mesh sprayed support structures such as single anchor rod, steel mesh or sprayed concrete, anchor rod + steel mesh combination, anchor rod + sprayed concrete combination, steel mesh + sprayed concrete combination or anchor rod + steel mesh + sprayed concrete combination, but neither has achieved a highly restored overall performance test function of the real sprayed anchor mesh support system.
[0006] Therefore, in order to better study the support performance of underground engineering support systems, it is urgent to design a support system construction and shotcrete support performance test device that has a high degree of restoration of the actual support system of the project, so as to provide reliable test equipment and test data for support design under engineering environments such as deep and extremely high ground stress, and provide strong support for the design of strong disturbance support systems.
[0007] Summary of the Invention
[0008] (1) Technical issues to be resolved
[0009] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a test device and a test method for the mechanical properties of a shotcrete mesh support system, which solves the technical problem that the existing test device for the mechanical properties of a shotcrete mesh support system is of a single form and cannot accurately restore the arrangement of anchor rods under actual engineering support conditions.
[0010] (2) Technical solution
[0011] In order to achieve the above-mentioned purpose, the present invention provides a mechanical performance test device for a shotcrete mesh support system, which includes: a main frame, a lifting and hoisting mechanism, a mechanical testing mechanism, a test platform and a monitoring mechanism; the lifting and hoisting mechanism is arranged on the main frame; the test platform includes a mold group and a support component to be tested; the mold group is movably arranged on the main frame, and the support component to be tested is arranged at the bottom end of the mold group; the mechanical testing mechanism is arranged corresponding to the support component to be tested, and is used to perform dynamic impact performance testing or static mechanical performance testing on the support component to be tested; the monitoring mechanism is communicatively connected to the test platform.
[0012] Optionally, the main frame includes a pedestal, frame columns, frame beams, platform columns and multiple sets of force transmission slide rails; the frame columns and platform columns are both arranged on the pedestal, the frame beams are connected to the frame columns, and the lifting and hoisting mechanism is arranged on the frame beams; the force transmission slide rails are connected to the platform columns; the mold group is slidably installed on the force transmission slide rails.
[0013] Optionally, the force transmission slide includes a first force transmission slide and a second force transmission slide; the first force transmission slide and the second force transmission slide each include two parallel branch force transmission slides; the two branch force transmission slides of the second force transmission slide are located on both sides of the first force transmission slide; the mold group includes an inner mold, an outer mold and an anchor rod to be tested; the inner mold is arranged on the first force transmission slide, and the outer mold is arranged between the first force transmission slide and the second force transmission slide; the anchor rod to be tested is detachably arranged in the inner mold and the outer mold.
[0014] Optionally, the inner mold includes an inner mold shell and a fixed beam; the inner mold shell is connected to the first force transmission slide rail through the fixed beam; the outer mold includes an outer mold shell and an outer mold clamp; the outer mold is arranged between the first force transmission slide rail and the second force transmission slide rail through the outer mold clamp.
[0015] Optionally, perforated tubes are provided in both the inner mold shell and the outer mold shell.
[0016] Optionally, the mechanical testing mechanism is a dynamic impact testing mechanism, which includes an impact weight, a jack, and a guide frame; the jack can be connected to the lifting and hoisting mechanism; the impact weight is detachably connected to the jack; the impact weight is set on the guide frame and can move along the guide frame, and the bottom end of the guide frame corresponds to the support assembly to be tested. Optionally, the guide frame is connected to the frame beam. The impact weight includes a weight frame, a weight, a locking wheel, and a protective tube; the locking wheel is connected to the weight frame, the weight is installed on the weight frame, and the bottom surface of the locking wheel abuts against the weight, and the protective tube is connected to the weight frame and is sleeved around the outside of the weight.
[0017] Optionally, the mechanical testing mechanism is a test loading mechanism, which includes a servo hydraulic jack and a longitudinal slide rail; the longitudinal slide rail is arranged on the frame column, and a longitudinal movable support is arranged on the longitudinal slide rail; the servo hydraulic jack is detachably arranged on the longitudinal movable support through a pressure-bearing beam; the bottom of the servo hydraulic jack corresponds to the support assembly to be tested, and is used to load the support assembly to be tested; the bottom of the support assembly to be tested is provided with an anchor pier, and the anchor pier is arranged on the pier anchor slide.
[0018] In a second aspect, the present invention provides a method for testing the dynamic impact performance of a shotcrete mesh support system. The method is implemented based on the above-mentioned test device for testing the mechanical performance of a shotcrete mesh support system. The test method includes the following steps: constructing a test platform, setting a mold group according to the test requirements, and pouring concrete into the mold group. When the concrete is fixed, the anchor rod to be tested is installed in the mold group; after the anchor rod to be tested is installed in the mold group, the mold group is installed on a force transmission slide rail so that the anchor rod to be tested is hung on the support assembly to be tested; a dynamic impact test mechanism, determining the impact area of the dynamic impact test according to the position of the test platform, a guide frame corresponding to the impact area, the guide frame connected to the frame beam, a crane connected to the lifting and hoisting mechanism, setting an impact weight of corresponding weight according to the test requirements, and connecting it to the crane. In the dynamic impact performance test, the impact weight is lifted by the lifting and hoisting mechanism to the guide frame position, the impact weight coincides with the central axis of the guide frame, the crane releases the impact weight, and the potential energy generated by the free fall of the impact weight acts on the support assembly to be tested on the test platform. The monitoring mechanism records the test data, and the impact test is completed.
[0019] In the third aspect, the present invention also provides another method for testing the static mechanical properties of a sprayed anchor net support system. This method is implemented based on the above-mentioned test device for testing the mechanical properties of a sprayed anchor net support system. The test method includes the following steps: constructing a test platform, setting a mold group according to the test requirements, and pouring concrete into the mold group. After the concrete is fixed, the anchor rod to be tested is installed in the mold group; after the anchor rod to be tested is installed in the mold group, the mold group is installed on a force transmission slide rail so that the anchor rod to be tested is hung with the support assembly to be tested; at the same time, the support assembly to be tested is connected to the anchor pier. The impact area of the dynamic impact test is determined according to the position of the test platform, and then a pressure beam equipped with a servo hydraulic jack is installed on the longitudinal movable support; and the bottom of the servo hydraulic jack corresponds to the support assembly to be tested. For the static mechanical performance test, the bottom of the servo hydraulic jack is pressed against the support assembly to be tested, and the monitoring mechanism records the test data, and the static mechanical performance test is completed.
[0020] (3) Beneficial effects
[0021] The beneficial effects of the present invention are as follows: the present invention provides a test device for testing the mechanical properties of a spray anchor mesh support system, wherein the mold group in the test platform provided in the device can simulate the surrounding rock and realize the simulation of the anchoring effect of the anchoring surrounding rock body, and the mold group can be movably arranged in the main frame, so that the mold group can not only simulate the situation in which multiple anchor rods are set in actual engineering to realize multi-point anchoring of the metal mesh, but also flexibly adjust the spacing and arrangement position between each mold in the mold group, thereby adapting to metal meshes of different sizes, so as to facilitate multi-type and multi-specification testing. In addition, the movably arranged mold group can also simulate the anchor rod arrangement form in actual engineering by adjusting the position, such as the plum blossom arrangement and rectangular arrangement form of anchor rod installation, etc., so as to simulate and restore various arrangements of anchor rods under actual engineering support conditions. The mechanical testing mechanism in the present invention can implement dynamic impact performance testing or static mechanical performance testing on the support component to be tested. The mechanical testing mechanism includes a dynamic impact testing mechanism and a test loading mechanism, both of which can be selected according to needs. The dynamic impact test mechanism provides the impact force required for dynamic impact testing, enabling simulation of rockbursts, multi-level rockbursts, and "chain" rockbursts interacting with support systems under deep, extremely high ground stress conditions. Flexible changes in the type of anchor rods or metal mesh facilitate the conduct of various tests. By measuring the displacement and deformation of the support components to be tested, the deformation and energy absorption performance of different anchor rods, metal meshes, and shotcrete mesh support components under dynamic impact stress conditions can be tested. Analysis of the test results allows for a quantitative evaluation of the impact resistance of different anchor rods, metal meshes, and shotcrete mesh support components, providing technical support for the selection of combined support systems for anchor rods, metal meshes, and shotcrete meshes used in underground projects.
[0022] The movable setting of the test loading mechanism diversifies the test methods of the present invention. That is, it can not only set up a variety of anchor test schemes to evaluate the overall energy absorption of the sprayed anchor mesh support structure, but also provide a basis for judging the role, energy absorption performance and failure mechanism of various support components in the entire support system, breaking the technical bottleneck of the previous support evaluation that lacked test equipment and relied on engineering experience. In addition, when conducting test loading tests on the sprayed anchor mesh support system, anchor rods consistent with actual engineering are driven into the concrete, improving the previous test equipment's inability to accurately restore the force applied to the anchor rods in the rock mass, and more accurately restore the actual working conditions.
[0023] In summary, the present invention can not only provide dynamic impact test and other test conditions for the shotcrete mesh support system through the dynamic impact test mechanism, but also can choose to use the test loading mechanism to realize the static pressurization test of the shotcrete mesh support system. The two share the main frame, lifting and hoisting device, test platform and monitoring system, which solves the technical problems existing in the existing technology and is conducive to promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 is a schematic diagram of the overall structure of a state of the mechanical performance test device of the spray anchor net support system of the present invention (the right side enclosure net is hidden in the figure); Figure 2 is a front view of Figure 1; Figure 3 is a right view of Figure 2 (the right side enclosure net is hidden in the figure); Figure 4 is a top view of Figure 1; Figure 5 is a schematic diagram of the main frame structure; Figure 6 is a schematic diagram of the structure of the lifting and hoisting mechanism; Figure 7 is a schematic diagram of the structure of the dynamic impact test mechanism; Figure 8 is a schematic diagram of the structure of the impact weight; Figure 9 is a schematic diagram of the structure of the test platform; Figure 10 is a schematic diagram of the structure of the inner mold; Figure 11 is a schematic diagram of the structure of the outer mold; Figure 12 is a schematic diagram of the structure of the casting accessories (outer mold); Figure 13 is a schematic diagram of the monitoring mechanism when using the dynamic impact test mechanism; Figure 14 is a three-dimensional schematic diagram of a form of cooperation between the force transmission slide rail and the column rail support; Figure 15 is another schematic diagram of the structure of the casting accessories (inner mold); Figure 16 is a partial enlarged view showing the lifting part structure; Figure 17 is a spray anchor net support FIG18 is a schematic diagram of the overall three-dimensional structure of another state of the test device for testing the mechanical properties of the support system (for the test loading mechanism); FIG18 is a schematic diagram of a top view of the structure shown in FIG17; FIG19 is a schematic diagram of a side view of the structure shown in FIG17; FIG20 is a schematic diagram of the structure of the test loading mechanism for the structure shown in FIG17; FIG21 is a schematic diagram of the structure of the pier anchor assembly and the loading assembly for the structure shown in FIG17; FIG22 is a schematic diagram of the structure of another state of the test device for testing the mechanical properties of the sprayed anchor net support system; FIG23 is a schematic diagram of the structure of the main components in FIG22; FIG24 is a schematic diagram of the structure of the lifting and hoisting mechanism in FIG22; FIG25 is a schematic diagram showing the installation form of the inner mold and the outer mold in FIG22; FIG26 is a schematic diagram showing the installation method of the servo hydraulic jack in FIG22; FIG27 is a schematic diagram showing the structure of the outer mold in FIG22; FIG28 is a schematic diagram of the structure of the servo hydraulic jack used in FIG26.
[0025] [Explanation of reference numerals] 100: main frame; 101: pedestal; 102: column foot; 103: frame column; 1031: connecting beam; 104: platform column; 1041: first platform column; 1042: second platform column; 1043: third platform column; 1044: fourth platform column; 1046: second secondary platform column; 1047: third secondary platform column; 1048: fourth secondary platform column; 105: column rail support; 1051: extension plane; 10511: bolt mounting hole; 106: frame beam; 1061: first connecting beam; 1062: second connecting beam; 1063: third connecting beam; 1064: fourth connecting beam; 107: diagonal support; 108: cap beam; 109: force transmission slide rail; 1091: first Force transmission rail; 10911: First force transmission rail; 10912: Second force transmission rail; 1092: Second force transmission rail; 10921: Third force transmission rail; 10922: Fourth force transmission rail; 1093: Bolt hole; 1094: Mounting bolt; 110: Safety enclosure; 121: Escalator; 200: Lifting mechanism; 201: Lifting beam; 202: Lifting member; 2021: Travel roller; 2022: Travel motor; 203: Paired sliding supports; 204: Paired transverse rails; 205: Longitudinal moving trolley; 206: Transverse moving trolley; 300: Dynamic impact test mechanism; 310: Impact weight; 311: Weight rack; 3111: Upper disc; 3112: Lower disc Disc; 3113: Coupling; 312: Weight; 3121: Notch; 313: Locking wheel; 314: Protective tube; 320: Lifter; 320: Lifter; 330: Guide frame; 3301: Hook; 500: Test platform; 530: Support assembly to be tested; 510: Inner mold; 511: Inner mold half mold; 512: Inner mold fastener; 5121: Inner mold upper slot; 5122: Inner mold middle slot; 5123: Inner mold lower slot; 513: Fixed beam; 514: Inner mold clamping plate; 5141: First clamping plate; 5142: Second clamping plate; 5143: Inner clamping plate connecting bolt; 515: Track clamping plate; 5151: First track clamping plate; 51511: Second positioning slot; 5152: Second track clamp; 51521: Third positioning slot; 516: Inner mold card; 520: Outer mold; 522: Outer mold fastener; 5221: Outer mold upper slot; 5222: Outer mold middle slot; 5223: Outer mold lower slot; 5224: Outer fastener bolt; 523: Outer mold clamp; 5231: Third clamp; 5232: Fourth clamp; 5234: Outer clamp connecting bolt; 5233: Fourth positioning slot; 530: Support assembly to be tested; 540: Casting accessories; 543: Perforated tube; 550: Clamping flange; 600: Monitoring mechanism; 610: Dynamic impact force monitor; 630: Displacement monitor; 640: Image collector; 650: Thermal energy monitor; 660: Data acquisition and display;900: Test loading mechanism; 901: Anchor rod; 920: Connecting rod; 921: Pier anchor slideway; 923: Anchor pier; 9231: Installation notch; 931: Servo hydraulic jack; 932: Pressure beam; 9321: Vertical tie bar; 9322: Tie bar hook; 933: Longitudinal movable support; 934: Longitudinal slide rail. DETAILED DESCRIPTION
[0026] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0027] An embodiment of the present invention proposes a test device and a test method for testing the mechanical properties of a shotcrete mesh support system, which includes a main frame 100, a lifting and hoisting mechanism 200, a mechanical testing mechanism, a test platform 500, and a monitoring mechanism 600. The lifting and hoisting mechanism 200 is arranged on the main frame 100. The test platform 500 includes a mold group and a support component to be tested 530. The mold group is movably arranged on the main frame 100, and the support component to be tested 530 is arranged at the bottom end of the mold group. The mechanical testing mechanism is arranged corresponding to the support component to be tested 530, and is used to perform a dynamic impact performance test or a static mechanical performance test on the support component to be tested 530. The monitoring mechanism 600 is communicatively connected to the test platform 500. It can well restore the layout of anchor rods under actual engineering support conditions, and not only provide dynamic impact test and other test conditions for the shotcrete anchor net support system through the dynamic impact test mechanism, but also can choose to use the test loading mechanism to realize the static pressure test of the shotcrete anchor net support system. The two share the main frame, lifting and hoisting device, test platform and monitoring system, which well solves the technical problem of the existing technology that the test device is single in form and cannot accurately restore the layout of anchor rods under actual engineering support conditions.
[0028] To better understand the above technical solutions, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. Instead, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0029] Example 1:
[0030] As shown in Figures 1 and 2, the present invention provides a test device for testing the mechanical properties of a shotcrete mesh support system. For ease of description, the "test device for testing the mechanical properties of a shotcrete mesh support system" of the present invention will be referred to as the "test device." The test device comprises a main frame 100, a lifting and hoisting mechanism 200, a mechanical testing mechanism, a test platform 500, and a monitoring mechanism 600.
[0031] The lifting and hoisting mechanism 200 is mounted on the main frame 100 and is capable of lifting the test platform 500. The test platform 500 includes a mold assembly and a support assembly 530 to be tested. The mold assembly is movably mounted on the main frame 100, and the support assembly 530 to be tested is detachably mounted at the bottom of the mold assembly. The monitoring mechanism 600 is in communication with the test platform 500 and is used to obtain mechanical data from the mechanical testing mechanism on the support assembly 530 to be tested.
[0032] In this embodiment, a mold group is movably provided in the test platform 500 of the test device, that is, the mold group can move along the force transmission slide rail 109, so that during use, not only can multiple anchor rods 901 be simultaneously provided through the mold group to achieve multi-point anchoring of the metal mesh in the support assembly 530 to be tested, but the position of the mold group can also be flexibly adjusted to adjust the arrangement spacing of the anchor rods to adapt to metal meshes of different sizes, and the actual engineering can be simulated to achieve plum blossom arrangement and rectangular arrangement of anchor rod installation. The test device can simulate the construction of a real support assembly through the mold group and anchor rods of different specifications provided in the mold group, the metal mesh in the support assembly 530 to be tested, and sprayed concrete. In addition, the dynamic impact test mechanism 300 and the test loading mechanism 900 can be used as mechanical test mechanisms in the test device to perform mechanical performance tests on the support assembly 530 to be tested, and the dynamic impact test mechanism 300 and the test loading mechanism 900 can be used interchangeably.
[0033] As shown in Figures 3, 4, and 5, the main frame 100 includes a pedestal 101, column bases 102, frame columns 103, platform columns 104, column rail supports 105, frame beams 106, cap beams 108, and multiple sets of force-transmitting slide rails 109. Column bases 102 are mounted on the pedestal 101. The end of the frame column 103 near the pedestal 101 is connected to the column base 102. Frame beams 106 are connected to the frame column 103. Frame beams 106 are located above or at the top of the frame column 103, preferably at the top of the frame column 103. In a preferred embodiment, the column base 102 is a square cylindrical structure with a square tray connected to the bottom. The square tray is provided with bolt or anchor holes, and the square tray can be fixed to the pedestal 101 via bolts or anchors. The frame column 103 is preferably a square steel column that is inserted into and anchored in the column base 102. 1 and 7 , the frame beam 106 includes a first connecting beam 1061, a second connecting beam 1062, a third connecting beam 1063, and a fourth connecting beam 1064. The first connecting beam 1061 and the second connecting beam 1062 form a set of opposing connecting beams, while the third connecting beam 1063 and the fourth connecting beam 1064 form another set of opposing connecting beams. The first connecting beam 1061 and the second connecting beam 1062 are arranged parallel to each other, while the third connecting beam 1063 and the fourth connecting beam 1064 are arranged parallel to each other. The ends of the first connecting beam 1061 and the second connecting beam 1062 are connected to the third connecting beam 1063 and the fourth connecting beam 1064.
[0034] Referring to Figures 1, 2 and 6, the lifting and hoisting mechanism 200 is arranged on the frame beam 106, and the dynamic impact test mechanism 300 in the mechanical test mechanism can be arranged on the frame beam 106. The end of the platform column 104 close to the pedestal 101 is arranged on the pedestal 101 through the column foot 102. The setting method of the platform column 104 can be selected from the following setting methods: Setting method one of the platform column 104: as shown in Figure 1, the top ends of adjacent platform columns 104 in the same vertical plane are connected by a cap beam 108, that is, the two ends of the cap beam 108 are respectively detachably installed in the adjacent platform columns 104, and the "detachable" mentioned here can be achieved by well-known methods such as bolts. It should be noted here that the "same vertical plane" mentioned here refers to the plane where the two adjacent platform columns 104 in the X direction shown in Figure 1 are located.
[0035] Second arrangement of platform columns 104: Referring to Figures 22 and 23 , cap beams 108 are not provided at the tops of adjacent platform columns 104. Frame beams 106 are preferably I-beams. Mainframe 100 also includes diagonal braces 107, which connect at a 45° angle between frame columns 103 and frame beams 106 to ensure a stable connection between them.
[0036] The column rail support 105 is provided on the platform column 104, and the column rail support 105 is used to support the force transmission slide 109. One end of the force transmission slide 109 is fixed between the frame beam 106 and the pedestal 101, and the other end of the force transmission slide 109 is connected to the platform column 104 through the column rail support 105. A sliding channel is formed between adjacent force transmission slides 109, and the mold assembly is installed on the force transmission slide 109 and can slide along the force transmission slide 109. There are two ways to set up the force transmission slide 109 here. The first setting method of the force transmission slide 109: referring to Figure 1, one end of the force transmission slide 109 can be connected to the frame column 103, and the other end is connected to the platform column 104. In this method, a connecting beam 1031 can be provided on the frame column 103, and the connecting beam 1031 is connected to the force transmission slide 109. Second way to set up the force transmission slide rail 109: Referring to Figure 23, four sub-platform columns are also set on the base 101, namely the first sub-platform column 1045, the second sub-platform column 1046, the third sub-platform column 1047 and the fourth sub-platform column 1048. The sub-platform columns and the platform column 104 cooperate to support the force transmission slide rail 109.
[0037] The force transmission slide 109 includes a first force transmission slide 1091 and a second force transmission slide 1092. The first force transmission slide 1091 and the second force transmission slide 1092 each include two parallel branch force transmission slides. The two parallel branch force transmission slides in the first force transmission slide 1091 are located on the same horizontal plane, and the two parallel branch force transmission slides in the second force transmission slide 1092 are also located on the same horizontal plane.
[0038] When the above-mentioned “setting method 1 of the platform column 104 ” is adopted, the length of the second force transmission slide rail 1092 is smaller than the length of the first force transmission slide rail 1091 .
[0039] When the above-mentioned “second arrangement method of the platform column 104 ” is adopted, the length of the second force transmission slide rail 1092 is the same as the length of the first force transmission slide rail 1091 .
[0040] The main frame 100 is also provided with a safety enclosure net 110. The safety enclosure net 110 is arranged on three sides around the main frame 100. The safety enclosure net 110 is connected to the frame beam 106 and the frame column 103 respectively to block the flying debris of the test device during the test, thereby improving the safety of the test device and protecting the personal safety of the test personnel.
[0041] Further optionally, referring to Figures 5, 9 and 10, the two parallel branch force transmission rails of the first force transmission rail 1091 are respectively a first branch force transmission rail 10911 and a second branch force transmission rail 10912. The two parallel branch force transmission rails of the second force transmission rail 1092 are respectively a third branch force transmission rail 10921 and a fourth branch force transmission rail 10922. The third branch force transmission rail 10921 and the fourth branch force transmission rail 10922 are respectively arranged on both sides of the first branch force transmission rail 10911 and the second branch force transmission rail 10912. In the form shown in Figure 5, the lengths of the third branch force transmission rail 10921 and the fourth branch force transmission rail 10922 are shorter than those of the first branch force transmission rail 10911 and the second branch force transmission rail 10912, which facilitates the installation of the cap beam 108.
[0042] The first force transmission slide rail 1091 can be provided as two corresponding upper and lower ones. The second force transmission slide rail 1092 can also be provided as two corresponding upper and lower ones. The upper first force transmission slide rail 10911 and the second force transmission slide rail 10912 are located on the same horizontal plane as the upper third force transmission slide rail 10921 and the fourth force transmission slide rail 10922, while the lower first force transmission slide rail 10911 and the second force transmission slide rail 10912 are located on the same horizontal plane as the lower third force transmission slide rail 10921 and the fourth force transmission slide rail 10922.
[0043] 1 and 2 , there are four platform columns 104, namely a first platform column 1041, a second platform column 1042, a third platform column 1043, and a fourth platform column 1044. A first force-transmitting slide rail 10911 is connected to the first platform column 1041 via a column rail support 105, a second force-transmitting slide rail 10912 is connected to the second platform column 1042 via a column rail support 105, a third force-transmitting slide rail 10921 is connected to the third platform column 1043 via a column rail support 105, and a fourth force-transmitting slide rail 10922 is connected to the fourth platform column 1044 via a column rail support 105.
[0044] When using the aforementioned "Arrangement Method 1 for Platform Columns 104," first platform column 1041 and second platform column 1042 are located in the "same vertical plane," while third platform column 1043 and fourth platform column 1044 are also located in the "same vertical plane." This arrangement allows the vertical planes of first platform column 1041 and second platform column 1042 to be offset from the vertical planes of third platform column 1043 and fourth platform column 1044, facilitating the installation of cap beam 108.
[0045] When the aforementioned "second arrangement of platform columns 104" is adopted, the first platform column 1041, the second platform column 1042, the third platform column 1043, and the fourth platform column 1044 are all located in the "same vertical plane." Meanwhile, if the aforementioned "second arrangement of force transmission rails 109" is adopted, the first platform column 1041 corresponds to the first auxiliary platform column 1045, the second platform column 1042 corresponds to the second auxiliary platform column 1046, the third platform column 1043 corresponds to the third auxiliary platform column 1047, and the fourth platform column 1044 corresponds to the fourth auxiliary platform column 1048.
[0046] In addition, an escalator 121 may be installed between the first platform column 1041 and the second platform column 1042. The provision of the escalator 121 makes the device more convenient for staff to use.
[0047] In the above embodiment, the main frame 100 is provided with a force-transmitting slide rail 109, and the mold assembly is mounted on the force-transmitting slide rail 109. This allows the mold assembly to move between the pedestal 101 and the frame beam 106, thereby simulating actual installation conditions through appropriate adjustments. The first force-transmitting slide rail 1091 forms a sliding channel, while the left and right sides of the first force-transmitting slide rail 1091 and the second force-transmitting slide rail 1092 each form a sliding channel. The mold assembly is installed in the sliding channel. The provision of the column rail support 105 makes installation of the force-transmitting slide rail 109 more convenient and quick.
[0048] The ends of the platform columns 104 are provided with detachable cap beams 108, which enhance the stability of the platform columns 104 and prevent the test platform 500 from shaking during testing. In a preferred embodiment, the column rail support 105 is preferably a square cylindrical structure. Referring to FIG14 , the square cylindrical structure is provided with bolt holes, which can be mounted on the platform columns 104 and fixed with bolts. An extension plane 1051 is provided on one side of the top of the square cylindrical structure. The extension plane 1051 can be used as a connection plane for the force transmission slide rail 109, that is, the force transmission slide rail 109 can be fixed on the extension plane 1051 by installing bolts. For example, a bolt mounting hole 10511 with an internal thread is provided on the extension plane 1051, and a bolt through hole 1093 is provided on the force transmission slide rail 109. The mounting bolt 1094 is passed through the bolt through hole 1093 and the bolt mounting hole 10511 in sequence, so that the mounting bolt 1094 is threadedly matched with the bolt mounting hole 10511, thereby detachably connecting the force transmission slide rail 109 to the extension plane 1051.
[0049] The two ends of the above-mentioned cap beam 108 are set as square structures, and the cap beam 108 can be detachably connected to the platform column 104. For example, an internal threaded bolt blind hole can be set at the top of the platform column 104, and through holes are set at the square structures at both ends of the cap beam 108. During installation, the through holes at the square structures at both ends of the cap beam 108 are matched with the internal threaded bolt blind holes at the top of the platform column 104, and then bolts are used to pass through the through holes at both ends of the cap beam 108 and the internal threaded bolt blind holes at the top of the platform column 104 in turn, and the bolts are threadedly matched with the internal threaded bolt blind holes at the top of the platform column 104, thereby detachably connecting the cap beam 108 to the top of the platform column 104.
[0050] When hoisting the inner mold 510 and the outer mold 520, the cap beam 108 can be removed to ensure that the sliding channel is unobstructed and the hoisting process proceeds smoothly. After the mold assembly is hoisted, installing the cap beam 108 on the platform column 104 can increase the structural stability of the main frame 100.
[0051] The lifting and hoisting mechanism 200 can be in one of the following two forms:
[0052] Form 1 of the lifting and hoisting mechanism 200: Referring to Figures 6 and 7 , the lifting and hoisting mechanism 200 includes a lifting beam 201, a lifting member 202, a pair of sliding supports 203, and a pair of transverse rails 204. The pair of transverse rails 204 are mounted on the third connecting beam 1063 and the fourth connecting beam 1064, respectively. The sliding supports 203 are mounted one-to-one on the transverse rails 204, and each end of the lifting beam 201 is connected to a sliding support 203. The lifting beam 201 is located between the first connecting beam 1061 and the second connecting beam 1062, and the lifting member 202 is slidably mounted on the lifting beam 201. In this embodiment, the lifting and hoisting mechanism 200, through the slidably mounted lifting member 202 and the sliding supports 203 mounted on the transverse rails 204, can simultaneously perform lifting in the longitudinal Y direction and the transverse X direction, making the lifting and hoisting mechanism 200 flexible and convenient to operate, and having a wide lifting range. In a preferred embodiment, the lifting member 202 is an electric hoist, which is small in size, light in weight, simple to operate, easy to use, and easy to install. The lifting member 202 can also be a winch. Taking the electric hoist as an example, referring to Figure 16 (an enlarged view of Figure 6), the electric hoist is provided with a travel roller 2021, which can roll along the hoisting beam 201. The travel roller 2021 is connected to a travel motor 2022, and the travel motor 2022 drives the travel roller 2021 to roll along the hoisting beam 201, thereby driving the entire electric hoist to move in the longitudinal Y direction along the hoisting beam 201. In this embodiment, an electric motor is provided on the sliding support 203, and the electric motor is slidingly connected to the transverse slide rail 204, that is, the transverse slide rail 204 can be a slide groove, and a roller is provided at the bottom of the sliding support 203, which is connected to the electric motor. The rolling of the roller is controlled by starting and stopping the electric motor, thereby controlling the sliding of the sliding support 203 on the transverse slide rail 204. The sliding of the sliding support 203 on the transverse slide rail 204 drives the lifting beam 201 to move horizontally in the transverse X direction.
[0053] Lifting and Hoisting Mechanism 200 Form 2: Referring to Figures 22 and 24, the lifting and hoisting mechanism 200 includes a lifting member 202, a longitudinally movable trolley 205, and a transversely movable trolley 206. A longitudinal chute is provided at the top of the first connecting beam 1061 and the second connecting beam 1062. The longitudinally movable trolley 205 extends into the longitudinal chute via longitudinally movable rollers and rolls along the longitudinal chute. The longitudinally movable trolley 205 is also provided with a longitudinally movable motor, which is connected to one of the longitudinally movable rollers at the bottom of the longitudinally movable trolley 205 to drive the longitudinally movable trolley 205 to move along the first connecting beam 1061 and the second connecting beam 1062. A transverse chute is provided at the top of the longitudinal moving trolley 205, with the direction of the transverse chute being perpendicular to the longitudinal chute. A transverse roller is provided at the bottom of the transverse moving trolley 206, which extends into and can roll along the transverse chute. A transverse moving motor is provided on the transverse moving trolley 206, which is connected to one of the transverse rollers to drive the transverse moving trolley 206 along the transverse chute. Through holes are provided in the middle of the longitudinal moving trolley 205 and the transverse moving trolley 206 to allow a lifting device, such as a hook, to pass through.
[0054] In a preferred embodiment, the lifting member 202 is an electric hoist, which is small in size, light in weight, simple to operate, easy to use, and easy to install. The lifting member 202 can also be a winch.
[0055] Referring to Figure 9, the mold assembly includes an inner mold 510, an outer mold 520, and the anchor rod to be tested. The inner mold 510 is positioned on the first force transmission rail 1091, and the outer mold 520 is positioned between the first force transmission rail 1091 and the second force transmission rail 1092. The anchor rod to be tested is detachably mounted within the inner mold 510 and the outer mold 520. Both the inner mold 510 and the outer mold 520 are hollow. The outer mold 520 and the inner mold 510 are approximately 3.2 meters long, allowing for driving anchor rods up to approximately 3.2 meters in length.
[0056] The support components to be tested include anchor rod and metal mesh combined support and anchor sprayed mesh combined support.
[0057] In this embodiment, the number of inner molds 510 and outer molds 520 can be increased or decreased according to the needs during actual use. The anchor rods to be tested are detachably arranged in the inner molds 510 and outer molds 520 one by one. The interiors of the inner molds 510 and outer molds 520 are both hollow. Concrete can be poured into the shells of the inner molds 510 and outer molds 520 to simulate the surrounding rock conditions in actual engineering. After the concrete solidifies, the anchor rods to be tested are installed from the bottom of the inner molds 510 and outer molds 520. Thereafter, the inner molds 510 and outer molds 520 are arranged on the sliding channel formed by the force transmission slide rails 109 according to the test needs. The anchor rod heads of the anchor rods to be tested installed in the inner molds 510 and outer molds 520 can be hung with metal mesh. This method is called combined support of anchor rods and metal mesh. Concrete is poured into the inner molds 510 and outer molds 520. In a preferred embodiment, the support assembly to be tested is an anchor-sprayed mesh combined support. The anchor-sprayed mesh combined support is a combined support structure that uses anchor rods, sprayed concrete, and metal mesh. The anchor-sprayed mesh combined support is suitable for surrounding rocks with poor stability and instability, medium-expansion and soft surrounding rocks, etc. Compared with the traditional anchor-sprayed structure, the anchor-sprayed mesh combined support increases the integrity and bending, tensile, and shear resistance of the sprayed concrete. This not only improves the support resistance of the sprayed concrete, but also significantly improves the crack resistance of the sprayed layer, relatively reduces the thickness of the sprayed concrete, and improves the flexibility and airtightness of the sprayed layer. At the same time, the metal mesh in the sprayed concrete can prevent cracks caused by shrinkage and improper maintenance, so that the pressure of the sprayed layer is more evenly distributed.
[0058] As shown in Figures 10, 11, and 15, inner mold 510 includes an inner mold shell, multiple symmetrically arranged inner mold fasteners 512, fixed beams 513, paired inner mold clamps 514, and paired track clamps 515. The inner mold clamps 514 include a first clamp 5141 and a second clamp 5142 that are detachably connected and arranged in parallel. The fixed beams 513 can be two I-beams, and the inner mold clamps 514 primarily serve to position the two I-beams and the inner mold shell.
[0059] The inner mold clamping plate 514 and the track clamping plate 515 can position the inner mold 510 in one of the following two ways:
[0060] Positioning method 1: Referring to Figures 10, 11, and 15, the first clamping plate 5141 and the second clamping plate 5142 are respectively located at the top and bottom of the two I-beams of the fixed beam 513, thereby clamping the two I-beams. The first clamping plate 5141 and the second clamping plate 5142 are provided with a first positioning groove 5144 for accommodating the insertion of the two I-beams to ensure stability between the two I-beams and keep the two I-beams always parallel to each other so as not to affect use. In addition, the two I-beams can be overlapped only on the first and second force transmission rails 10911, 10912, or can be overlapped on the first, second, third, and fourth force transmission rails 10911, 10912, 10921, and 10922. The first clamping plate 5141 and the second clamping plate 5142 are detachably connected by an inner clamping plate connecting bolt 5143. Referring to Figure 15 , the inner mold fastener 512 has three slots on either side: an upper inner mold slot 5121, a middle inner mold slot 5122, and a lower inner mold slot 5123. An inner mold clip 516 is provided on the inner mold housing. The inner mold clip 516 is primarily designed to snap into the upper inner mold slot 5121 and the lower inner mold slot 5123, while the middle inner mold slot 5122 allows the two I-beams that secure the beam 513 to pass through. The inner mold fastener 512 and the inner mold clip 516 are detachably connected via inner fastener bolts 5124. The inner mold clamping plate 514 is provided with through-holes for the inner mold housing and the inner mold fastener 512 to pass through. Specifically, the inner mold clamping plate 514 is sleeved over the inner mold fastener 512 and the inner mold clip 516, thereby securing the inner mold fastener 512, the inner mold clip 516, and, consequently, the inner mold housing. Preferably, the inner dimensions of the through hole in the inner mold clamping plate 514 are such that they can be fitted over the inner mold fastener 512 and the inner mold card 516. It should be noted that the outer wall of the inner mold card 516 does not protrude beyond the outer wall of the inner mold fastener 512, but is preferably aligned with the outer wall of the inner mold fastener 512.
[0061] The track clamp 515 includes a first track clamp 5151 and a second track clamp 5152, and the first track clamp 5151 and the second track clamp 5152 are arranged in parallel. The track clamp 515 is used to clamp the fixed beam 513 and the force transmission slide rail. Taking the two I-beams of the fixed beam 513 that are simultaneously overlapped on the first branch force transmission slide rail 10911, the second branch force transmission slide rail 10912, the third branch force transmission slide rail 10921 and the fourth branch force transmission slide rail 10922 as an example, the track clamp 515 is divided into two groups, and the two groups of track clamps 515 are located on both sides of the inner mold shell. The first track clamp 5151 and the second track clamp 5152 of one group of track clamps 515 connect the two I-beams on one side of the inner mold shell with the first branch force transmission slide rail 10911 and the fourth branch force transmission slide rail 10922. The force-transmitting slide rails 10922 are clamped together. Specifically, the first rail clamping plate 5151 is located at the top of the two I-beams. Its bottom surface is provided with a second positioning slot 51511 for engaging the two I-beams. The second rail clamping plate 5152 is located at the bottom of the first and third force-transmitting slide rails 10911, 10921. Its top surface is provided with a third positioning slot 51521 for engaging the first and fourth force-transmitting slide rails 10911, 10922. The first and second rail clamping plates 5151, 5152 are detachably connected via rail clamping plate bolts 5153. Similarly, the first and second rail clamping plates 5151, 5152 of another set of rail clamping plates 515 clamp the two I-beams on the other side of the inner mold shell to the second and third force-transmitting slide rails 10912, 10921.
[0062] Positioning method 2:
[0063] As shown in Figures 23, 25, and 27, the first clamping plate 5141 and the second clamping plate 5142 are respectively positioned at the top and bottom of the two I-beams, thereby clamping the two I-beams to ensure stability between the two I-beams. In this method, a clamping flange 550 is provided on the outer wall of the inner mold shell. The clamping flange 550 is provided in at least one group, with each group consisting of two corresponding upper and lower flanges. The top of the first clamping plate 5141 supports the upper clamping flange 550 of the group, while the bottom of the second clamping plate 5142 contacts the top surface of the lower clamping flange 550, thereby positioning the mold shell. In addition, the two I-beams of the fixed beam 513 can be overlapped only on the first force-transmitting slide rail 10911 and the second force-transmitting slide rail 10912, or can be overlapped on the first force-transmitting slide rail 10911, the second force-transmitting slide rail 10912, the third force-transmitting slide rail 10921, and the fourth force-transmitting slide rail 10922. The first clamping plate 5141 and the second clamping plate 5142 are detachably connected by inner clamping plate connecting bolts.
[0064] The track clamping plate 515 includes a first track clamping plate 5151 and a second track clamping plate 5152. The first track clamping plate 5151 and the second track clamping plate 5152 are arranged in parallel. The track clamping plate 515 is used to clamp the fixed beam 513 and the force transmission slide rail. Taking the example of two I-beams of fixed beam 513 being simultaneously overlapped on first, second, third, and fourth force-transmitting rails 10911, 10912, 10921, and 10922, the track clamps 515 are divided into two groups. The two groups of track clamps 515 are located on either side of the inner mold shell. The first and second track clamps 5151, 5152 of one group of track clamps 515 clamp the two I-beams on one side of the inner mold shell to the first and fourth force-transmitting rails 10911, 10922. Specifically, the first track clamp 5151 is located on top of the two I-beams, while the second track clamp 5152 is located on the bottom of the first and fourth force-transmitting rails 10911, 10922. The first and second track clamps 5151, 5152 are detachably connected via track clamp bolts 5153. Similarly, the first track clamp 5151 and the second track clamp 5152 of another set of track clamps 515 clamp the two I-beams on the other side of the inner mold shell with the second force transmission slide 10912 and the third force transmission slide 10921.
[0065] The inner mold shell is removably mounted within the sliding channel formed by the first force-transmitting slide rail 10911 and the second force-transmitting slide rail 10912. The inner mold fastener 512 is connected to the inner mold shell. Furthermore, two inner mold fasteners 512 symmetrically arranged in the same horizontal plane abut against each other to clamp the inner mold. In this arrangement, notches corresponding to the shape of the outer wall of the inner mold shell can be provided on the inner side of the inner mold fastener 512. When the two inner mold fasteners 512 symmetrically arranged in the same horizontal plane abut against each other, the notches in the two inner mold fasteners 512 form a channel for the inner mold shell to pass through.
[0066] The outer mold 520 includes an outer mold shell, a plurality of symmetrically arranged outer mold fasteners 522 and outer mold clamps 523 arranged in pairs. The outer mold clamps 523 include a third clamp 5231 and a fourth clamp 5232 that are detachably connected, and the third clamp 5231 and the fourth clamp 5232 are arranged in parallel. The outer mold clamp 523 is mainly used to install the outer mold shell in the sliding channel formed between the first force transmission slide 1091 and the second force transmission slide 1092, that is, the outer mold shell is arranged in the sliding channel formed between the first force transmission slide 1091 and the second force transmission slide 1092. Taking the outer mold shell being arranged between the first branch force transmission slide 10911 and the fourth branch force transmission slide 10922 as an example, the positioning method of the outer mold shell can adopt one of the following methods:
[0067] Positioning Method 1: Referring to Figures 11 and 12 , the third and fourth clamping plates 5231 and 5232 are located at the top and bottom of the first and fourth force-transmitting rails 10911 and 10922, respectively. Fourth positioning slots 5233 are provided at the bottom of the third and top of the fourth clamping plates 5231 and 5232, respectively, for accommodating the first and fourth force-transmitting rails 10911 and 10922. The third and fourth clamping plates 5231 and 5232 are detachably connected via outer clamping plate connecting bolts 5234. The outer mold fasteners 522 are connected to the outer mold shell, with two symmetrically positioned outer mold fasteners 522 abutting against each other in the same horizontal plane. In this method, notches can be provided on the inner sides of the outer mold fasteners 522 to conform to the outer wall of the outer mold shell. When the two symmetrically positioned outer mold fasteners 522 abut against each other, the notches in the two outer mold fasteners 522 form a passage for the outer mold shell to pass through. Referring to Figure 12 , the outer mold fastener 522 has three slots on either side: an upper outer mold slot 5221, a middle outer mold slot 5222, and a lower outer mold slot 5223. An outer mold clip 524 is provided on the outer mold housing. The clip 524 is primarily configured to engage with the upper and lower outer mold slots 5221 and 5223. The middle outer mold slot 5222 allows the first and fourth force-transmitting slide rails 10911 and 10922 to pass through. The outer mold fastener 522 and the clip 524 are connected via outer fastener bolts 5224. Furthermore, the outer mold clamping plate 523 is provided with through-holes for the outer mold housing and the outer mold fastener 522 to pass through. Specifically, the outer mold clamping plate 523 is positioned over the outer mold fastener 522 and the outer mold clip 524, thereby securing the outer mold fastener 522, the outer mold clip 524, and the inner mold housing. In this embodiment, the outer mold clip 524 does not protrude beyond the outer mold fastener 522. Preferably, the outer wall of the outer mold clip 524 is aligned with the outer wall of the outer mold fastener 522. Preferably, the inner dimensions of the through-holes in the outer mold clamping plate 523 are sufficient to fit over the outer mold fastener 522 and the outer mold clip 524.
[0068] Positioning Method 2: Referring to Figures 23, 25, 26, and 27, the third clamping plate 5231 and the fourth clamping plate 5232 are located at the top and bottom of the first force-transmitting slide rail 10911 and the fourth force-transmitting slide rail 10922, respectively. The third clamping plate 5231 and the fourth clamping plate 5232 are detachably connected via outer clamping plate connecting bolts 5234. In this method, a clamping flange 550 is provided on the outer wall of the outer and inner mold shells. The clamping flanges 550 are provided in at least one group, with each group consisting of two corresponding upper and lower flanges. The top of the third clamping plate 5231 supports the upper clamping flange 550 of the group, while the bottom of the fourth clamping plate 5232 contacts the top surface of the lower clamping flange 550, thereby positioning the outer mold shell.
[0069] Furthermore, in this embodiment, referring to FIG15 , the inner mold shell is composed of two symmetrical inner mold halves 511 connected in correspondence. Referring to FIG12 , the outer mold shell is composed of two symmetrical outer mold halves 521 connected in correspondence. Anti-slip ribs 544 are provided within both the outer mold halves 521 and the inner mold halves 511 to prevent concrete from shifting relative to the inner walls of the inner and outer mold shells during testing, thereby affecting test accuracy. The aforementioned first positioning grooves 5144, second positioning grooves 51511, third positioning grooves 51521, and fourth positioning grooves 5233 facilitate installation of the inner mold plate 514, track plate 515, and outer mold plate 523, while also improving their stability after installation.
[0070] The mold set is detachably provided with a casting accessory 540 , that is, both the inner mold 510 and the outer mold 520 are detachably provided with a casting accessory 540 , and the arrangement method is similar.
[0071] Referring to Figure 12 , the pouring attachment 540 mounted on the outer mold 520 is shown as an example. The pouring attachment 540 includes a top cover 541 and a bottom cover 542. The top cover 541 is connected to one end of the outer mold 520, while the bottom cover 542 is connected to the other end of the outer mold 520. In a preferred embodiment, the pouring attachment 540 also includes a perforated tube 543 disposed within the outer mold housing. One end of the perforated tube 543 is connected to the bottom cover 542, while the other end is connected to the top cover 541. The inner cavity of the perforated tube 543 communicates with the outside through the top cover 541 and the bottom cover 542.
[0072] The hole-keeping tube 543 is used to be set in the inner mold shell and the outer mold shell when pouring concrete into the inner mold 510 and the outer mold 520. The hole-keeping tube 543 can prevent liquid concrete from leaking out from the top cover 541 and the bottom cover 542. Because if the hole-keeping tube 543 is not provided, in order to ensure the subsequent installation of the anchor rod, holes need to be provided in the top cover 541 and the bottom cover 542. At the same time, the hole-keeping tube 543 can form a reserved hole, eliminating the need for additional drilling, which facilitates the subsequent installation of the anchor rod. The hole-keeping tube 543 is removed after the concrete is poured and formed, forming a reserved hole for the anchor rod connection. The use of the hole-keeping tube 543 eliminates the subsequent drilling process, speeds up the installation of the test device, and improves efficiency. However, during the test process, the hole-keeping tube 543 can also be omitted during pouring, and the anchor rod can be installed using an anchor drilling rig to simulate the actual anchor rod drilling process.
[0073] In addition, the mechanical testing mechanism of the present invention is selected to be used as the dynamic impact testing mechanism 300 or the testing loading mechanism 900 .
[0074] 7 and 8 , when a dynamic impact test mechanism 300 is used, the dynamic impact test mechanism 300 is disposed on the main frame 100. The dynamic impact test mechanism 300 can provide the impact force required for the dynamic impact performance test of the test platform 500.
[0075] The dynamic impact test mechanism 300 includes an impact weight 310, a jack 320 and a guide frame 330. The guide frame 330 is connected to the frame beam 106. Further preferably, the top of the guide frame 330 is hung on the first connecting beam 1061 and the second connecting beam 1062 through a detachable hook 3301. The central axis of the guide frame 330 can be located in the same vertical plane as the lifting central axis of the lifting member 202. The "lifting central axis" mentioned here refers to the central axis of the component lifted by the lifting member 202 when it is working. The impact weight 310 can be connected to the lifting member 202 in the lifting and hoisting mechanism 200, and the impact weight 310 is detachably connected to the jack 320. The impact weight 310 is set on the guide frame 330 and can move along the guide frame 330. The bottom end of the guide frame 330 corresponds to the support assembly 530 to be tested. The impact weight 310 includes a weight frame 311, a weight 312, a locking wheel 313, and a protective tube 314. The locking wheel 313 is connected to the weight frame 311, and the weight 312 is installed between the weight frame 311 and the locking wheel 313. The bottom surface of the locking wheel 313 abuts the weight 312. The protective tube 314 is connected to the weight frame 311 and is sleeved around the outer periphery of the weight 312.
[0076] In this embodiment, the lifter 320 is preferably a power-off electromagnetic lifter 320. When the power-off electromagnetic lifter 320 is not powered on, the electromagnetic lifter 320 can continuously maintain suction to prevent the impact weight 310 from falling. When the power is on, the electromagnetic lifter 320 loses suction, causing the impact weight 310 to fall. The use of the power-off electromagnetic lifter 320 can prevent the impact weight 310 from falling due to a sudden power outage during the test, thereby improving the stability and safety of the test device. In addition, the setting of the power-off electromagnetic lifter 320 can also maintain suction for a long time without consuming electricity, effectively saving energy and improving economy. During the test, the impact weight 310 is detachably connected to the electromagnetic lifter 320, that is, connected by suction. The impact weight 310 is lifted to the upper portion of the dynamic impact test impact zone by lifting the lifting member 202 in the lifting mechanism 200 to provide the impact force required for the dynamic impact test and to allow the impact weight 310 to be placed on the guide frame 330. The placement of the guide frame 330 prevents the impact weight 310 from deviating from the predetermined trajectory due to the external environment during the test, further improving the stability of the dynamic impact test mechanism 300 and preventing damage to the device. Furthermore, preferably, the guide frame 330 in this embodiment can be a cylindrical structure, as shown in FIG7 , which can be a cage-shaped cylindrical structure surrounded by steel bars. Of course, other known cylindrical structures can also be used. During use, the impact weight 310 is lifted to the upper end of the cylindrical guide frame 330 by the lifting member 202, and its lower end is inserted into the upper end of the cylindrical structure. In this way, during the test, the impact weight 310 can slide downward from the upper end of the guide frame 330 until it emerges from the lower end of the guide frame 330 to complete the test. Further preferably, referring to FIG. 8 , a hanging ring may be provided on the top of the electromagnetic lifter 320 , and the lifting member 202 may hook the hanging ring through a hook to lift the impact weight 310 .
[0077] Furthermore, with respect to the impact weight 310, the weight frame 311 is an integrated component, consisting of two opposing circular discs, an upper disc 3111 and a lower disc 3112, and a connecting shaft 3113. The two circular discs are respectively an upper disc 3111 and a lower disc 3112. The upper disc 3111 provides a suction surface for the jack 320, the lower disc 3112 carries the weight 312, and the side of the lower disc 3112 is provided with a threaded line. The connecting shaft 3113 connects the upper disc 3111 and the lower disc 3112, and the shaft body of the connecting shaft 3113 is provided with a threaded line. The weight 312 is detachably connected to the weight frame 311. The weight 312 can adopt a circular opening design, that is, a notch 3121 is provided in the circular disc-shaped weight 312 to facilitate the addition and removal of the weight 312, thereby achieving the weight increase or decrease of the impact weight 310. The principle of increasing or decreasing the weight 312 is shown in FIG. 8 . The weight 312 is sleeved on the connecting shaft 3113 through the notch 3121 .
[0078] The locking wheel 313 has a threaded inner ring and is coaxially threadedly connected to the connecting shaft 3113 of the weight rack 311. By turning the locking wheel 313, the locking wheel 313 moves along the connecting shaft 3113, thereby compressing the weight 312. A protective tube 314 is disposed around the weight rack 311 and also encloses the weight 312. Threaded threads are provided at the bottom of the inner sidewall of the protective tube 314, which engage with threads on the side of the lower disc 3112. To ensure the threaded connection between the protective tube 314 and the lower disc 3112, the diameter of the weight 312 is no larger than that of the lower disc 3112.
[0079] As shown in Figure 13 , for the dynamic impact test mechanism 300 , the monitoring mechanism 600 includes a dynamic impact force monitor 610, a displacement monitor 630, an image collector 640, a thermal energy monitor 650, and a data acquisition and display device 660. The dynamic impact force monitor 610 is located at the bottom of the impact weight 310 or on the side of the support assembly 530 to be tested near the force transmission rail 109. The displacement monitor 630 is located on the pedestal 101 to monitor the displacement of the support assembly 530 to be tested. The displacement monitor 630 can be located below the support assembly 530 to be tested, which can be a metal mesh. The image collector 640 is located on the pedestal 101, and the thermal energy monitor 650 is located corresponding to the support assembly 530 to be tested. The dynamic impact force monitor 610, displacement monitor 630, image collector 640, and thermal energy monitor 650 are all connected to the data acquisition and display device 660.
[0080] In this embodiment, the dynamic impact force monitor 610 is preferably an impact force sensor, which is installed at the bottom of the impact weight 310 or is set on the side of the support assembly 530 to be tested that is subjected to the impact force. The impact force sensor is used to monitor the impact force provided by the impact weight 310. The dynamic impact force monitor 610 can also be a strain gauge force sensor. The displacement monitor 630 is preferably a laser displacement meter, which is set on the platform 101 to monitor the displacement of the support assembly 530 to be tested. The displacement monitor 630 can also be an inductive displacement sensor or a potentiometer displacement sensor. The image collector 640 is preferably a high-speed camera, which is installed below the test platform 500 to collect image information of the support mechanism to be tested during the test process. The image collector 640 can also be a scanner. The thermal energy monitor 650 is preferably an infrared thermal imager, which is installed on one side of the support assembly 530 to be tested below the test platform 500 to collect thermal energy changes of the support assembly 530 to be tested. The data acquisition and display 660 includes a signal conditioner, a data acquisition card and a computer, and is used to collect and visualize the force, displacement, image information and thermal energy changes of the support assembly 530 to be tested.
[0081] During a dynamic impact test, concrete is poured into the inner and outer mold shells of the mold assembly. Once the concrete is set, the hole-retaining tube 543 is removed, creating a hole for the anchor rod to be tested in the original location of the hole-retaining tube 543. The anchor rod to be tested is then installed in this hole, completing the installation of the anchor rod to be tested in the mold assembly. Once the anchor rod to be tested is installed in the mold assembly, the mold assembly is mounted on the force transmission slide rail 109, allowing the anchor rod to be tested to be hung on the support assembly 530 to be tested.
[0082] The dynamic impact test area is determined based on the position of the test platform 500. The guide frame 330 is installed so that it corresponds to the impact area and is attached to the frame beam 106 via a hook 3301. A jack 320 is connected to the lifting and hoisting mechanism 200. An impact weight 310 of appropriate weight is set according to the test requirements and connected to the jack 320.
[0083] In the dynamic impact performance test, the impact weight 310 is lifted by the lifting and hoisting mechanism 200 to the position of the guide frame 330, and the impact weight 310 coincides with the central axis of the guide frame 330. The jack 320 releases the impact weight 310, so that the potential energy generated by the free fall of the impact weight 310 acts on the area to be impacted of the support assembly 530 to be tested, and the monitoring mechanism 600 records the test data. The dynamic impact force monitor 610 and the displacement monitor 630 process the force value signal and the impact displacement signal at the moment of impact through the data acquisition and display 660, and transmit them to the computer for storage and analysis for subsequent test data analysis and processing, so as to accurately analyze the support performance of the support assembly 530 to be tested under dynamic impact force. The image collector 640 and the thermal energy monitor 650 collect and summarize the image information and thermal energy changes and perform visualization processing.
[0084] Regarding the test loading mechanism 900, the test loading mechanism 900 is set in the main frame 100, and the monitoring mechanism is respectively communicated with the lifting and hoisting mechanism 200 and the test loading mechanism 900. In this embodiment, through the setting of the test loading mechanism 900, the test device can adjust any loading position by longitudinally moving the support 933 during use. The pier anchor system composed of the anchor pier 923 and the like can realize the test of a single support assembly 530 to be tested or the support assembly 530 to be tested + sprayed concrete. It can also realize the test of the support assembly 530 to be tested + anchor rod and the support assembly 530 to be tested + anchor rod + sprayed concrete, providing an evaluation for various anchoring forms of actual engineering, which has important on-site guidance significance. In addition, the setting of the lifting and hoisting mechanism 200 can transport the mold to any desired position to test the support combination structure of any commonly used anchoring spacing at full scale.
[0085] In a preferred embodiment, as shown in FIG21 , the test loading mechanism 900 includes a servo hydraulic jack 931 and a longitudinal slide rail 934. The servo hydraulic jack 931 may be arranged in one of the following ways:
[0086] Method 1 for installing the servo hydraulic jack 931: Referring to Figure 21, a longitudinal slide rail 934 is provided on the frame column 103, and a longitudinal movable support 933 is provided on the longitudinal slide rail 934. The servo hydraulic jack 931 is detachably mounted on the longitudinal movable support 933 via a pressure-bearing crossbeam 932. The servo hydraulic jack 931 and the pressure-bearing crossbeam 932 can be configured to be "detachable," and the pressure-bearing crossbeam 932 and the longitudinal movable support 933 can also be configured to be "detachable." The "detachable" mentioned here can adopt any known detachable method, such as bolt connection, and will not be described in detail here.
[0087] In this embodiment, a pressure-bearing beam 932 is mounted on a longitudinally movable support 933. A motor and pulley are installed within the longitudinally movable support 933, allowing the longitudinally movable support 933 to slide freely on a longitudinal slide rail 934. A servo-hydraulic jack 931 is mounted on the pressure-bearing beam 932, with a replaceable pressure head at its base for applying static force. A through-hole can be provided in the pressure-bearing beam 932 to facilitate the passage of the servo-hydraulic jack 931 and the mold.
[0088] The second setting method of the servo hydraulic jack 931: Referring to Figures 26 and 28, the servo hydraulic jack 931 is set on the pressure beam 932, and vertical ties 9321 are set at both ends of the pressure beam 932. The top of the vertical ties 9321 is provided with a ties hook 9322, and the vertical ties 9321 are located in the sliding channel formed between the first force transmission slide 1091 and the second force transmission slide 1092. That is, referring to Figure 26, the first force transmission slide 1091 and the second force transmission slide 1092 are both upper and lower groups, and the vertical ties 9321 at one end of the pressure beam 932 is located at the second sub-force transmission slide below. Between the slide rail 10912 and the third force-transmitting slide rail 10921 below, the tie bar hook 9322 corresponding to the vertical tie bar 9321 is hung on the second force-transmitting slide rail 10912 below and the third force-transmitting slide rail 10921 below; and the vertical tie bar 9321 at the other end of the pressure beam 932 is located between the first force-transmitting slide rail 10911 below and the fourth force-transmitting slide rail 10922 below, and the tie bar hook 9322 corresponding to the vertical tie bar 9321 is hung on the first force-transmitting slide rail 10911 below and the fourth force-transmitting slide rail 10922 below. In this method, the first force transmission slide rail 10911, the second force transmission slide rail 10912, the third force transmission slide rail 10921 and the fourth force transmission slide rail 10922 located at the bottom can all be greater in vertical thickness than the first force transmission slide rail 10911, the second force transmission slide rail 10912, the third force transmission slide rail 10921 and the fourth force transmission slide rail 10922 located above. For example, referring to Figure 26, multiple groups of I-beams can be stacked from bottom to top.
[0089] Referring to Figure 21 , the bottom end of a servo-hydraulic jack 931 abuts the metal mesh of the support assembly 530 to be tested, applying force to the support assembly 530. Both the servo-hydraulic jack 931 and the longitudinally movable support 933 are in communication with the monitoring mechanism. An anchor pier 923 is located at the bottom of the support assembly 530, mounted on a pier-anchor slideway 921.
[0090] In a preferred embodiment, referring to FIG. 21 , an anchor pier 923 and a pier anchor slide 921 constitute a pier anchor assembly. The pier anchor slide 921 is disposed on a pedestal 101, and the anchor pier 923 is detachably mounted on the pier anchor slide 921. "Detachable" herein means that the anchor pier 923 can be detached from the pier anchor slide 921. Any known method can be employed, such as allowing the anchor pier 923 to slide directly out of the end of the pier anchor slide 921. The anchor pier 923 is also provided with anchor holes for mounting a metal mesh of the support assembly 530 to be tested, and at least one pair of anchor piers 923 can be fixed to the anchor slide via an anchor plate 922. Furthermore, for stability, the anchor piers 923 can be connected using connecting rods 920. The anchor piers 923 to be connected can be selected based on the needs.
[0091] In this embodiment, at least three groups of pier anchor slideways 921 are provided, and the three groups of pier anchor slideways 921 are arranged parallel to each other on the pedestal 101. The pier anchor slideways 921 can be groove-shaped, wherein a mounting beam 9211 is disposed within the groove, preferably a T-beam. The anchor pier 923 can be a cylindrical structure, for example. The bottom of the anchor pier 923 is provided with a mounting notch 9231 that engages with the mounting beam 9211, allowing the anchor pier 923 to slide freely within the pier anchor slideways 921. Furthermore, the number and position of the anchor piers 923 can be adjusted as needed to ensure that the pier anchor assembly can stably suspend the metal mesh of the support assembly 530 to be tested.
[0092] In the method for testing loading mechanism 900, the support assembly 530 to be tested is a metal mesh. The monitoring mechanism includes a pressure monitor, a displacement monitor, an image collector, a thermal energy monitor, and a data acquisition display. The pressure monitor is located on the side of the metal mesh near the force transmission slide 109. The displacement monitor is located on the pedestal 101 to monitor the displacement of the metal mesh. The image collector is also located on the pedestal 101. The thermal energy monitor is located corresponding to the metal mesh. The monitor, displacement monitor, image collector, and thermal energy monitor are all connected to the data acquisition display.
[0093] In one embodiment of the present invention, the test object, i.e., the support assembly 530 to be tested, is a single metal mesh. The main structures required for the test include loading components such as the servo hydraulic jack 931 and the pier anchor assembly. Before testing, the anchor pier 923 is first slid into the appropriate position on the pier anchor slide 921. If there are three anchor piers 923 on the pier anchor slides 921 on both sides of the pier anchor slide 921 and two anchor piers 923 in the middle pier anchor slide 921, this constitutes a "3-2-3" anchor pier 923 test scheme. Similarly, a "4-3-4" anchor pier 923 test scheme can also be formed. Furthermore, the metal mesh of the support assembly 530 to be tested can be bolted into the threaded hole of the anchor pier 923. A pressure sensor is installed between the anchor pier 923 and the bolt. The pressure sensor is connected to the control and monitoring system to obtain the required pre-tightening force. A displacement sensor is installed on the metal mesh and is connected to the monitoring mechanism. During the experiment, the displacement data information of each part of the metal mesh can be obtained in real time.
[0094] Building on the above implementation, multiple laser displacement meters can be installed around the metal mesh on pedestal 101, communicating and connecting to a control and monitoring system to comprehensively monitor the deformation of the metal mesh's bottom. Finally, the pressure beam 932 is slid into the appropriate loading position, and the servo-hydraulic jack 931 applies a downward static load to the pressure head, which in turn applies a static load to the metal mesh until the metal mesh fails.
[0095] In one embodiment of the present invention, taking the support combination structure of metal mesh + anchor rod + shotcrete as an example, the main structural parts of the invention required for the test are the servo hydraulic jack 931 and other loading components and the mold group. Before the test, the mold group is first fixed with a special anchor frame, and then concrete is poured into the inner mold 510 and the outer mold 520, and the anchor rods to be tested are driven into the inner mold 510 and the outer mold 520. The anchor rods can be driven through the holes left by the hole-keeping tube 543. After being cured to the required strength, the mold is lifted by the electric hoist 202, hoisted to the appropriate position on the force transmission slide rail 109, and installed.
[0096] Furthermore, if the outer molds 520 are arranged in two groups on either side of the inner mold 510, with each group containing four molds and the inner molds 510 being three, then the required anchor spacing is adjusted, the molds are secured with clamps 313, and a metal mesh of the required specification is anchored to the bottom of the mold group through the anchor rods in the molds. Concrete is then sprayed on the bottom of the metal mesh, forming a "4-3-4" anchoring test scheme. Similarly, a "3-2-3" anchoring test scheme can also be formed.
[0097] Furthermore, a pressure sensor may be provided at the nut that secures the metal mesh to the mold, so as to obtain the required pre-tightening force of the anchor rod.
[0098] Building on the above implementation, displacement sensors can be installed between the shotcrete and the metal mesh, allowing real-time monitoring of the mesh's deformation. Furthermore, acoustic emission monitoring sensors and optical fibers can be embedded within and on the concrete surface to monitor cracking, temperature, and deformation within the anchor.
[0099] On the basis of the above implementation, in order to comprehensively monitor the overall deformation of the concrete and the metal mesh, multiple laser displacement meters can be set around the metal mesh to communicate and connect with the monitoring mechanism to comprehensively monitor the deformation of the bottom of the concrete or the metal mesh.
[0100] In one embodiment, after the pressure beam 932 is slid into the appropriate loading position, the servo hydraulic jack 931 applies a static load to the metal mesh through the pressure head until the support assembly 530 under test fails, thereby scientifically and rationally evaluating the energy absorption threshold of the support assembly 530 under test. The above-mentioned support combination structure can be a sprayed anchor mesh support system, a metal mesh + anchor rod, a metal mesh + sprayed concrete, or a single metal mesh.
[0101] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood to indicate or imply relative importance or implicitly specify the number of the technical features indicated. Therefore, a feature specified as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "plurality" means two or more, unless otherwise specifically defined.
[0102] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, and those skilled in the art can understand the specific meanings of the above terms in the present invention according to the specific circumstances. In the description of this specification, the description of the term "embodiment" and the like means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in an appropriate manner in any one or more embodiments or examples. In addition, those skilled in the art can combine and combine the different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are mutually inconsistent. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Those skilled in the art can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A test device for testing the mechanical properties of a shotcrete anchor mesh support system, characterized by: The device comprises: a main frame (100), a lifting and hoisting mechanism (200), a mechanical testing mechanism, a testing platform (500) and a monitoring mechanism (600); The lifting and hoisting mechanism (200) is arranged on the main frame (100); The test platform (500) comprises a mold group and a support assembly to be tested (530); the mold group is movably arranged on the main frame (100), and the support assembly to be tested (530) is arranged at the bottom end of the mold group; The mechanical testing mechanism is provided corresponding to the support assembly (530) to be tested, and is used to perform a dynamic impact performance test or a static mechanical performance test on the support assembly (530) to be tested; The monitoring mechanism (600) is in communication connection with the test platform (500).
2. The mechanical performance testing device for the spray anchor mesh support system according to claim 1, characterized in that: The main frame (100) includes a pedestal (101), a frame column (103), a frame beam (106), a platform column (104) and a plurality of groups of force transmission slide rails (109); The frame column (103) and the platform column (104) are both arranged on the pedestal (101), the frame beam (106) is connected to the frame column (103), and the lifting and hoisting mechanism (200) is arranged on the frame beam (106); The force transmission slide rail (109) is connected to the platform column (104); the mold assembly is slidably mounted on the force transmission slide rail (109).
3. The mechanical performance testing device for the spray anchor mesh support system according to claim 2, characterized in that: The force transmission slide rail (109) comprises a first force transmission slide rail (1091) and a second force transmission slide rail (1092); the first force transmission slide rail (1091) and the second force transmission slide rail (1092) each comprise two parallel branch force transmission slide rails; the two branch force transmission slide rails of the second force transmission slide rail (1092) are located on both sides of the first force transmission slide rail (1091); The mold set comprises an inner mold (510), an outer mold (520) and an anchor rod to be tested; the inner mold (510) is arranged on the first force transmission slide rail (1091), and the outer mold (520) is arranged between the first force transmission slide rail (1091) and the second force transmission slide rail (1092); The anchor rod to be tested is detachably arranged on the inner mold (510) and the outer mold (520).
4. The mechanical performance testing device for the spray anchor mesh support system according to claim 3, characterized in that: The inner mold (510) comprises an inner mold shell and a fixed beam (513); the inner mold shell is connected to the first force transmission slide rail (1091) via the fixed beam (513); The outer mold (520) comprises an outer mold shell and an outer mold clamping plate (523); the outer mold (520) is arranged between the first force transmission slide rail (1091) and the second force transmission slide rail (1092) through the outer mold clamping plate (523).
5. The mechanical performance testing device for the spray anchor mesh support system according to claim 4, characterized in that: A hole-retaining tube (543) is provided in both the inner mold shell and the outer mold shell.
6. The mechanical performance testing device for the spray anchor mesh support system according to any one of claims 2 to 5, characterized in that: The mechanical testing mechanism is a dynamic impact testing mechanism (300), and the dynamic impact testing mechanism (300) comprises an impact weight (310), a jack (320), and a guide frame (330); The jack (320) can be connected to the lifting and hoisting mechanism (200); The impact weight (310) is detachably connected to the jack (320); the impact weight (310) is arranged on the guide frame (330) and can move along the guide frame (330); the bottom end of the guide frame (330) corresponds to the support assembly (530) to be tested.
7. The mechanical performance testing device for the spray anchor mesh support system according to claim 6, characterized in that: The guide frame (330) is connected to the frame beam (106); The impact weight (310) includes a weight frame (311), a weight (312), a locking wheel (313) and a protective tube (314); The locking wheel (313) is connected to the weight rack (311), the weight (312) is installed on the weight rack (311), and the bottom surface of the locking wheel (313) is in contact with the weight (312), and the protective tube (314) is connected to the weight rack (311) and is sleeved on the periphery of the weight (312).
8. The mechanical performance testing device for the spray anchor mesh support system according to any one of claims 2 to 5, characterized in that: The mechanical testing mechanism is a test loading mechanism (900), and the test loading mechanism (900) includes a servo hydraulic jack (931) and a longitudinal slide rail (934); the longitudinal slide rail (934) is arranged on the frame column (103), and a longitudinal movable support (933) is arranged on the longitudinal slide rail (934); the servo hydraulic jack (931) is arranged on the longitudinal movable support (933) through a pressure-bearing crossbeam (932); the bottom of the servo hydraulic jack (931) corresponds to the support assembly to be tested (530), and is used to load force on the support assembly to be tested (530); An anchor pier (923) is provided at the bottom of the support assembly (530) to be tested, and the anchor pier (923) is provided on the pier anchor slideway (921).
9. A method for testing the dynamic impact performance of a shotcrete mesh support system, the method being implemented based on the mechanical performance testing device for the shotcrete mesh support system according to claim 7, characterized in that: The test method comprises the following steps: A test platform (500) is constructed, a mold set is set according to test requirements, and concrete is poured into the mold set. After the concrete is fixed, the anchor rod to be tested is installed in the mold set. After the anchor rod to be tested is installed in the mold set, the mold set is installed on a force transmission slide rail (109), so that the anchor rod to be tested is hung with a support assembly to be tested (530); A dynamic impact test mechanism (300) is provided, wherein an impact region of a dynamic impact test is determined according to the position of the test platform (500), the guide frame (330) corresponds to the impact region, the guide frame (330) is connected to the frame beam (106), the jack (320) is connected to the lifting and hoisting mechanism (200), and an impact weight (310) of a corresponding weight is set according to test requirements and connected to the jack (320); In a dynamic impact performance test, the impact weight (310) is hoisted by the lifting and hoisting mechanism (200) to the position of the guide frame (330), the impact weight (310) coincides with the central axis of the guide frame (330), the jack (320) releases the impact weight (310), and the potential energy generated by the free fall of the impact weight (310) acts on the support assembly (530) to be tested of the test platform (500), the monitoring mechanism (600) records the test data, and the impact test is completed.
10. A method for testing the static mechanical properties of a shotcrete mesh support system, the method being implemented based on the mechanical properties testing device for a shotcrete mesh support system according to claim 8, characterized in that: The test method comprises the following steps: Construct a test platform (500), set up the mold set according to the test requirements, and pour concrete on the In the mold group, after the concrete is fixed, the anchor rod to be tested is installed in the mold group; after the anchor rod to be tested is installed in the mold group, the mold group is installed on the force transmission slide rail (109), so that the anchor rod to be tested is hung with the support assembly to be tested (530); at the same time, the support assembly to be tested (530) is connected to the anchor pier (923); The impact area of the dynamic impact test is determined according to the position of the test platform (500), and then a pressure beam (932) equipped with a servo hydraulic jack (331) is installed on the longitudinal movable support (933); and the bottom of the servo hydraulic jack (931) corresponds to the support assembly (530) to be tested; Static mechanical performance test: the bottom of the servo hydraulic jack (931) is pressed against the support assembly (530) to be tested, and the monitoring mechanism (600) records the test data, and the static mechanical performance test is completed.
Citation Information
Patent Citations
Anchor stock mechanical response test device under dynamic and static combined load and using method thereof
CN107748064A
Anchoring body axial impact resistance testing method and testing stand
CN112880958A
Dynamic and static coupling performance testing system for multifunctional anchoring system
CN114383947A
Dynamic and static mechanical property testing system and method for engineering rock mass
CN114720298A
Dynamic and static combined test system and method for active supporting system of underground engineering
CN115452548A
Cited By
Impact resistance testing device for LED display screen
CN119935470A
Protection system bearing performance test device and test method
CN120467637A
Multi-purpose loading test device and method for large-span bridge cable system substructure
CN120740967A