Management system and management method
The management system addresses the inefficiencies of conventional IC tag-based systems by automating the calculation and management of projection materials, reducing user effort and ensuring stable operation of shot processing equipment through a processor-driven approach.
Patent Information
- Application Number
- PCT/JP2024/006996
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-29
- Filing Date
- 2024-02-27
- Publication Date
- 2024-12-05
AI Technical Summary
Conventional IC tag-based management systems for steel materials require significant user effort for attachment and detachment, leading to inefficiencies in managing shot processing devices and projection materials, which can result in operation stoppages due to consumable shortages and decreased productivity.
A management system and method that includes a shot processing device and a processor to automatically manage projection materials by acquiring and processing information on projection conditions, projection time, and initial inventory amounts, calculating the required material quantities, and outputting results, thereby reducing user effort and preventing shortages.
The system reduces user effort and prevents operation stoppages by automatically calculating and managing the required amounts of projection materials, improving productivity and ensuring stable operation of shot processing equipment.
Smart Images

Figure JP2024006996_05122024_PF_FP_ABST
Abstract
Description
Management system and management method
[0001] The present disclosure relates to a management system and a management method.
[0002] Conventionally, a method using IC tags has been known as a method for managing the delivery, storage, ordering, etc. of steel materials (see, for example, Patent Document 1).
[0003] Japanese Patent No. 5766590
[0004] However, the method described in Patent Document 1 requires the user to attach and detach the IC tag, which is time-consuming.
[0005] One aspect of the present disclosure aims to reduce the effort required by users.
[0006] A management system according to one aspect of the present disclosure is a management system that manages a projection material or a shot processing device that performs shot processing. This management system includes a shot processing device and a processor. The shot processing device projects projection material from a projection mechanism onto a workpiece to perform surface processing on the workpiece. The processor processes information related to the projection material or the shot processing device. The processor then acquires information related to the projection conditions of the projection material, information related to the projection time of the projection material, and information related to the initial value of inventory of the projection material or parts that are consumed by the shot processing. The processor then calculates the required amount of projection material or parts based on the information related to the projection conditions, information related to the projection time, and information related to the initial value of inventory, and outputs information related to the result of the calculation.
[0007] A management method according to one aspect of the present disclosure is a management method for managing a blast material or a shot processing device for a shot process that projects a blast material onto an item to be processed to perform surface processing on the item. This management method includes the following steps (1) to (7): (1) a step of setting the blast material projection conditions; (2) a step of projecting the blast material onto the item to be processed from a projection mechanism; (3) a step of acquiring information on the blast material projection conditions; (4) a step of acquiring information on the projection time of the blast material; (5) a step of acquiring information on the initial value of the inventory amount of parts that will be consumed by the blast material or shot process; (6) a step of calculating the required amount of parts that will be consumed by the blast material or shot process based on the information on the projection conditions, the information on the projection time, and the information on the initial value of the inventory amount; and (7) a step of outputting information on the result of the calculation.
[0008] According to one aspect of the present disclosure, it is possible to reduce the effort required of users to prevent operation stoppages due to shortages of consumables, thereby improving productivity.
[0009] 1 is a schematic configuration diagram of a management system according to a first embodiment of the present disclosure. FIG. 2 is a block diagram showing the hardware configurations of a user device and a management device. FIG. 3 is a functional block diagram of a processor of the management device according to the first embodiment of the present disclosure. FIG. 4 is a sequence chart showing an example of the flow of automatic order processing according to the first embodiment of the present disclosure. FIG. 5 is a functional block diagram of a processor of a management device according to a modified example of the first embodiment of the present disclosure. FIG. 6 is a schematic configuration diagram of an impeller-type projection mechanism. FIG. 7 is a schematic configuration diagram of an air-type (suction-type) projection mechanism. FIG. 8 is a schematic configuration diagram of an air-type (direct pressure-type) projection mechanism. FIG. 9 is a diagram explaining a method of calculating the required amount of parts consumed by shot processing. FIG. 10 is a diagram explaining a method of calculating the required amount of parts consumed by shot processing. FIG. 11 is a flowchart explaining a method of calculating the required amount of parts consumed by shot processing. FIG. 12 is a schematic configuration diagram of a management system according to a third embodiment of the present disclosure. FIG. 13 is a sequence chart showing an example of the flow of automatic order processing according to the third embodiment of the present disclosure. FIG. 14 is a schematic configuration diagram of a management system according to a fourth embodiment of the present disclosure. FIG. 15 is a sequence chart showing an example of the flow of automatic order processing according to the fourth embodiment of the present disclosure.
[0010] [Embodiment 1] A management system 100 according to embodiment 1 of the present disclosure will now be described in detail with reference to the drawings. The drawings used in the following description are schematic and do not necessarily reflect the actual product. For ease of illustration and understanding, the scale and aspect ratios may be altered and exaggerated from the actual product. In the drawings, identical parts are designated by the same reference numerals and their description will be omitted.
[0011] (Configuration Example of Management System 100) Fig. 1 is a schematic configuration diagram showing an example of the management system 100. As shown in Fig. 1, the management system 100 includes a shot processing facility 10 for performing shot processing, and a management device 50 capable of communicating with a user device 40 installed in the shot processing facility 10.
[0012] The shot processing equipment 10 is installed, for example, in the factory of a business that performs shot processing. The shot processing equipment 10 is equipped with a shot processing device 20, a storage 30 that stores consumables used in the shot processing, and a user device 40. The consumables include "projection material 26" and "parts worn by shot processing," which will be described later. "Parts worn by shot processing" mainly include parts that make up the projection mechanism 21, but also include consumable parts such as parts of the conveyor that transports the projection material (for example, piping such as a screw, bucket, and hose) and a table on which the workpiece to be processed (hereinafter referred to as work W) is placed.
[0013] Shot treatment is a process in which shot material 26 is projected from the projection mechanism 21 toward the workpiece W and caused to collide with the workpiece W, thereby processing the surface of the workpiece W. "Shot treatment" includes blast treatment and shot peening. "Blast treatment" is a process in which the workpiece W is subjected to scale removal, burr removal, surface polishing, matte texture application, etc. "Shot peening" is a process in which compressive residual stress is applied to the surface of the workpiece W to improve fatigue strength, wear resistance, stress corrosion cracking resistance, heat dissipation, etc.
[0014] The projection mechanism 21 projects the blast material 26 onto the workpiece W inside the cabinet 22. Types of the projection mechanism 21 include, for example, an impeller-type projection mechanism and an air-type projection mechanism. In the first embodiment, a shot processing device 20 having an impeller-type projection mechanism 21a will be described as an example. The impeller-type projection mechanism 21a projects the blast material 26 onto the workpiece W by the centrifugal force of a rapidly rotating impeller. The air-type projection mechanism injects the blast material 26 onto the workpiece W by using air compressed by a compressor or the like. The air-type projection mechanism may be either a suction type or a direct pressure type.
[0015] The shot processing device 20 includes an impeller-type projection mechanism 21a for projecting projection material 26 onto the workpiece W, a sensor 27 for detecting projection conditions such as the projection speed of the projection material 26, a cabinet 22, a screw conveyor 23, and a bucket elevator 24.
[0016] The blast material 26 is, for example, fine metal particles, but is not limited to this and may be non-metallic fine particles, such as glass, ceramic, or sand particles.
[0017] The workpiece W is typically made of a hard material such as metal, ceramic, glass, or plastic, but is not limited to these and may be, for example, an elastic body such as rubber carrying hard abrasive grains.
[0018] The blast material 26 projected by the impeller-type blasting mechanism 21a collides with the workpiece W and then falls to the floor of the cabinet 22. The screw conveyor 23 is provided so that its upper end is located below the floor of the cabinet 22. The screw conveyor 23 transports the blast material 26 and other materials that have fallen to the floor of the cabinet 22 to a bucket elevator 24.
[0019] The bucket elevator 24 has a plurality of buckets. The bucket elevator 24 transports the blast material 26 and powder and granular material transported by the screw conveyor 23 upward using a plurality of buckets. The blast material 26 transported upward by the bucket elevator 24 is supplied to the blasting mechanism 21 to be projected again. However, the blast material 26 transported by the bucket elevator 24 includes not only reusable blast material 26 but also blast material 26 that has been cracked or chipped due to the shot processing and cuttings of the workpiece W. For this reason, before being supplied again to the impeller-type blasting mechanism 21a, the reusable blast material 26 is removed by a sorting mechanism (not shown), and the reusable blast material 26 is supplied to the impeller-type blasting mechanism 21a. The sorting mechanism may be, for example, a wind sorter or a sieve.
[0020] As a result of removing the worn projection material 26, the projection material 26 inside the shot processing device 20 decreases. If the projection material 26 decreases too much, it will affect the shot processing capacity, so new projection material 26 is supplied to the shot processing device 20 once it has decreased by a certain amount.
[0021] The sensor 27 detects projection conditions such as the projection speed of the projection material 26. Optimal projection conditions are set for each shot processing device 20 or each workpiece W depending on the shape, material and other physical properties of the workpiece W, the purpose of processing, etc. The shot processing device 20 projects the projection material 26 onto the workpiece W in accordance with the set projection conditions.
[0022] The projection conditions for the projection material 26 include the projection speed of the projection material 26, the projection amount of the projection material 26, the rotation speed of the impeller, and the value of the current flowing through the motor that rotates the impeller.
[0023] When the projection mechanism 21 is an air type, the projection conditions of the projection material 26 include the injection speed of the projection material 26, the injection amount of the projection material 26, and the injection pressure of the compressed air. The term "injection" is used when explaining air-type projection, but the term "injection" may be read as "projection" as appropriate.
[0024] The sensor 27 is connected to the impeller-type projection mechanism 21a and detects the projection speed of the projection material 26, the projection amount of the projection material 26, the rotation speed of the impeller, the value of the current flowing through the motor that rotates the impeller, and the like. Here, the projection speed of the projection material 26 may be calculated by calculation based on the current value of the impeller. Examples of sensors that detect this data include speed sensors, optical sensors, vibration sensors, and current sensors. Note that instead of the value of the current flowing through the motor that rotates the impeller, the value of the voltage applied to the motor or the value of the power supplied to the motor may be detected.
[0025] If the projection mechanism 21 is an air type, the sensor 27 connected to the projection mechanism 21 detects the above-mentioned ejection speed of the projection material 26, the ejection amount of the projection material 26, the ejection pressure of the compressed air, etc. Here, the ejection speed of the projection material 26 may be calculated by calculation based on the ejection speed of the compressed air. Examples of sensors that detect this data include a flow sensor, a pressure sensor, a vibration sensor, an acceleration sensor, and a gyro sensor.
[0026] The sensor 27 converts the detected data into an electrical signal and transmits it to the user device 40 .
[0027] Although not shown, the shot processing device 20 is provided with a timer that measures the projection time of the projection material 26. The projection time measured by the timer is converted into an electrical signal and transmitted to the user device 40.
[0028] The storage 30 is a container for storing consumables used in the shot processing, i.e., the blast material 26 and parts consumed by the shot processing. In the first embodiment, an example will be described in which the consumables managed by the management system 100 are the blast material 26. Management of parts consumed by the shot processing will be described in the second embodiment. The container 30a constituting the storage 30 is provided with a sensor 31 that detects the remaining amount of the stored blast material 26. Examples of sensors that detect the remaining amount of the blast material 26 include a level meter and a level switch. The sensor 31 can be of a paddle type, piston type, pendulum type, sounding type, capacitance type, vibration type, ultrasonic type, microwave type, radiation type, or the like, and is selected from these appropriately according to the properties of the blast material 26 to be detected. The sensor 31 converts the detected remaining amount data into an electrical signal and transmits it to the user device 40. The inventory amount may be the remaining amount in the container 30a, or the sum of the remaining amount in the containers 30a that make up the storage facility 30 and the remaining amount in the material storage location (not shown), but below, the remaining amount of projection material 26 in the container 30a will be described as the "inventory amount."
[0029] The user device 40 is a device installed in the shot processing equipment 10, and is, for example, a general-purpose computer.
[0030] The user device 40 acquires information regarding the projection conditions, projection time, and initial inventory value of the projection material 26 from the sensors 27 and 31 using a predetermined communication method. Hereinafter, when these sensors are not distinguished, they will be simply referred to as "each sensor." Communication may be performed either wired or wirelessly, and any communication method may be used as long as communication between the sensors is possible. In this embodiment, communication between the sensors and the user device 40 is described as being performed using Wi-Fi (registered trademark). Note that information regarding the projection conditions, projection time, and initial inventory value of the projection material 26 refers to data detected by each sensor converted into an electrical signal. Therefore, information regarding the projection conditions, projection time, and initial inventory value of the projection material 26 may be rephrased as information indicating the projection conditions, projection time, and initial inventory value of the projection material 26. An example of the "initial inventory value" is the inventory amount at the start of the shot process after adjusting the inventory amount.
[0031] The management device 50 is a device, such as a general-purpose computer, for managing consumables used in the shot processing equipment 10. There are no particular limitations on the installation location of the management device 50, but for example, the management device 50 is installed in the management center of a supplier that provides a consumables supply service.
[0032] (Hardware Configuration of User Device 40 and Management Device 50) Next, the hardware configuration of the user device 40 and management device 50 will be described with reference to Fig. 2. Fig. 2 is a block diagram showing the hardware configuration of the user device 40 and management device 50.
[0033] First, a description will be given of the hardware configuration of the user device 40. As shown in Fig. 2, the user device 40 includes a processor 41, a read-only memory (ROM) 42, a random access memory (RAM) 43, a storage device 44, a communication interface (I / F) 46, and a display 47. Each component is connected to each other via a bus 45 so as to be able to communicate with each other.
[0034] The processor 41 is an arithmetic unit, such as a CPU (Central Processing Unit), that executes various programs. The processor 41 reads programs from the ROM 42 or the storage device 44 and executes the programs using the RAM 43 as a working area.
[0035] The ROM 42 stores various programs and various data. The RAM 43 temporarily stores programs or data as a working area. Note that the computer-readable recording medium is not limited to the ROM 42 and RAM 43, and may include an EPROM (Erasable Programmable ROM), an EEPROM (Electrically Erasable Programmable ROM), etc.
[0036] The storage device 44 is configured with a hard disk drive (HDD), a solid state drive (SSD), flash memory, or the like, and stores various programs and various data. The storage device 44 stores information related to the projection conditions, projection time, and initial values of inventory amount of the projection material 26 transmitted from each sensor.
[0037] The display 47 is configured by a liquid crystal display or an organic EL display, and displays various information.
[0038] The communication I / F 46 is implemented as hardware such as a network adapter, communication software, or a combination thereof, and communicates with each sensor and with the management device 50. The communication between each sensor and the user device 40 has been described above. Although the communication between the user device 40 and the management device 50 is described as being performed using the Internet, other communication methods may also be used.
[0039] Next, the hardware configuration of the management device 50 will be described.
[0040] 2, the management device 50 includes a processor 51, a ROM 52, a RAM 53, a storage device 54, a communication I / F 56, and a display 57. Each component is connected to each other so as to be able to communicate with each other via a bus 55. The configurations of the processor 51, the ROM 52, the RAM 53, the storage device 54, the communication I / F 56, and the display 57 are similar to the configurations of the processor 41, the ROM 42, the RAM 43, the storage device 44, the communication I / F 46, and the display 47 of the user device 40 described above, and therefore description thereof will be omitted.
[0041] (Functions of Processor 51) Next, functions of the processor 51 of the management device 50 will be described with reference to Fig. 3. Fig. 3 is a functional block diagram of the processor 51 of the management device 50. As shown in Fig. 3, in the management device 50 of this embodiment, the processor 51 executes specific programs to function as a data acquisition unit 511, a calculation unit 512, and an automatic ordering unit 513.
[0042] The data acquisition unit 511 acquires information relating to the projection conditions, projection time, and initial values of inventory amount of the projection material 26 from the user device 40. The data acquisition unit 511 stores the acquired information in the storage device 54. The calculation unit 512 calculates the required amount of projection material 26 based on the information acquired by the data acquisition unit 511. The automatic ordering unit 513 performs processing to automatically order the required amount calculated by the calculation unit 512.
[0043] (Flow of Automatic Ordering Process) Next, an example of the flow of automatic ordering process executed by the management system 100 will be described with reference to Fig. 4. Fig. 4 is a sequence chart showing an example of the flow of automatic ordering process.
[0044] In step S101 , the processor 41 of the user device 40 acquires information about projection conditions, such as the projection speed of the projection material 26 , from the sensor 27 and stores it in the storage device 44 .
[0045] The process proceeds to step S102, where the processor 41 of the user device 40 acquires information relating to the projection time of the projection material 26 from the timer and stores it in the storage device 44.
[0046] The process proceeds to step S103 , where the processor 41 of the user device 40 acquires information about the initial value of the inventory amount of the projection material 26 from the sensor 31 and stores it in the storage device 44 .
[0047] The process proceeds to step S104, where the processor 41 of the user device 40 transmits to the management device 50 information relating to the projection conditions, projection time, and initial values of the inventory amount of the projection material 26 acquired in the processes of steps S101 to S103.
[0048] In step S105, the processor 51 of the management device 50 acquires information relating to the projection conditions, projection time, and initial values of inventory amount of the projection material 26 from the user device 40.
[0049] In step S106, the processor 51 of the management device 50 calculates the required amount of projection material 26 based on the information relating to the projection conditions, projection time, and initial values of inventory amount of the projection material 26 acquired in the processing of step S105.
[0050] (Method of Calculating the Required Amount of Projection Material 26) Here, an example of a method of calculating the required amount of projection material 26 will be described.
[0051] The processor 51 of the management device 50 calculates the amount of projection material 26 used in the shot processing using the projection conditions of the projection material 26 and the projection time of the projection material 26. Next, the processor 51 of the management device 50 subtracts the amount of projection material 26 used from the initial value of the inventory amount of the projection material 26 to calculate the current inventory amount of the projection material 26.
[0052] Here, the processor 51 of the management device 50 may calculate the usage amount of the projection material 26 from the projection time for each fluctuating projection condition. The projection conditions may fluctuate from moment to moment due to various factors such as changes in the remaining amount of projection material 26 in the shot processing device 20 and the dust collection air volume. For example, if the projection conditions are set and managed using a table according to the remaining amount of projection material 26 in the shot processing device 20, the dust collection air volume, etc., the projection conditions may fluctuate from moment to moment due to changes in these conditions. The processor 51 of the management device 50 may calculate the usage amount for each specific point from the projection time for each fluctuating projection condition.
[0053] Furthermore, the processor 51 of the management device 50 may calculate the total usage amount of the projection material 26 from the relationship between the average value of the projection conditions and the cumulative projection time. For example, when the projection condition is the projection amount of the projection material 26, the "average value of the projection conditions" means the average value of the projection amount calculated from the sum of the projection amount when the dust collection air volume is A, the projection amount when the dust collection air volume is B, and the projection amount when the dust collection air volume is C. The average value of the projection conditions can be calculated in a similar manner even when the projection condition is the projection speed of the projection material 26, the rotation speed of the impeller, or the like.
[0054] Furthermore, the processor 51 of the management device 50 may calculate the total amount of projection material 26 used from the relationship between the preset projection conditions and the cumulative projection time.
[0055] Next, the processor 51 of the management device 50 compares the current inventory amount of the projection material 26 with the threshold value. This threshold value is set appropriately in advance through experiments, simulations, etc.
[0056] If the comparison shows that the current inventory of projection material 26 is below the threshold, processor 51 of management device 50 calculates the amount of projection material 26 required to make the inventory of projection material 26 exceed the threshold. At this time, processor 51 of management device 50 may calculate the amount of projection material 26 required to make the inventory of projection material 26 exceed the threshold, taking into account the period from ordering the projection material 26 to delivery date. This is because if shot processing is carried out during the period from ordering the projection material 26 to delivery date, the inventory of projection material 26 will continue to decrease.
[0057] The processor 51 of the management device 50 may plot the amount of projection material 26 used for each projection time of the projection material 26, and calculate the amount of projection material 26 used over the entire projection time by integrating the plotted trajectory.
[0058] Furthermore, the "computation performed by the processor 51 of the management device 50" may include, when the current inventory of the projection material 26 falls below a threshold, predicting the amount of projection material 26 required to make the inventory of the projection material 26 exceed a threshold, and determining whether the current inventory of the projection material 26 has reached the line (threshold) required for ordering.
[0059] The processor 51 of the management device 50 performs processing to automatically order the calculated required amount of projection material 26 (step S107).
[0060] 4 is an example, and new steps may be added without departing from the scope of the invention. Furthermore, the processes of steps S101 to S103 may be performed simultaneously.
[0061] [Variation of First Embodiment] Next, a variation of the first embodiment will be described with reference to Fig. 5. Fig. 5 is a functional block diagram of the processor 51 of the management device 50. As shown in Fig. 5, the processor 51 of the management device 50 may function as a notification unit 514 that notifies the user device 40 instead of the automatic ordering unit 513.
[0062] In the above description, a process is performed to automatically order the calculated required amount of projection material 26, but as an alternative to such automatic ordering process, the processor 51 of the management device 50 may notify the user device 40 of information related to the required amount of projection material 26. Information related to the required amount of projection material 26 is, for example, information indicating the current inventory of projection material 26, information indicating the amount of projection material 26 used, etc. The display 47 of the user device 40 displays information indicating the current inventory of projection material 26, information indicating the amount of projection material 26 used, etc. This allows users working at the shot processing equipment 10 to understand the inventory amount without having to check the inventory amount of projection material 26 themselves, reducing the user's workload related to inventory management.
[0063] Furthermore, the processor 51 of the management device 50 may notify a remote location via wired or wireless communication using a LAN (Local Area Network) or the like of information relating to the required amount of projection material 26. Examples of notification destinations include the supplier's purchasing officer, the supplier's equipment maintenance department, the delivery destination's purchasing officer, and the delivery destination's maintenance and inspection service department.
[0064] The processor 51 of the management device 50 may suggest placing an order at the same time as notifying the user device 40. For example, the processor 51 of the management device 50 may suggest by displaying on the display 47 of the user device 40 a message such as, "The inventory of the projection material 26 will be low in x number of days. Would you like to place an order?" The suggestion method and notification method are not particularly limited and may be set appropriately according to the circumstances of each user.
[0065] (Operational Effects) As described above, the management system 100 according to the first embodiment provides the following operational effects.
[0066] The processor 51 of the management device 50 acquires information related to the projection conditions of the projection material 26, acquires information related to the projection time of the projection material 26, and acquires information related to the initial value of the inventory amount of the projection material 26. The processor 51 of the management device 50 calculates the required amount of projection material 26 based on the information related to the projection conditions, information related to the projection time, and information related to the initial value of the inventory amount. The processor 51 of the management device 50 outputs information related to the results of the calculation.
[0067] When the information relating to the calculation results is output to a user device 40 installed in the shot processing equipment 10, users working at the shot processing equipment 10 do not need to check the inventory of the projection material 26 themselves, reducing the user's workload for inventory management. In other words, the above configuration makes it possible to reduce the user's workload for preventing operation stoppages due to a shortage of consumables (projection material 26), thereby improving productivity.
[0068] When using the management system 100, the projection conditions for the projection material 26 are set as a prerequisite.
[0069] The information on the projection conditions also includes at least one of the projection speed and projection amount of the projection material 26. By using the projection speed or projection amount of the projection material 26, the processor 51 of the management device 50 can accurately calculate the required amount of projection material 26.
[0070] The processor 51 of the management device 50 may also perform processing to display information regarding the required amount of projection material 26 on the display 47 of the user device 40. This eliminates the need for users working at the shot processing equipment 10 to check the inventory of projection material 26 themselves, reducing the burden on users regarding inventory management.
[0071] Furthermore, the processor 51 of the management device 50 may perform processing to notify a remote location of information regarding the required amount of projection material 26. This makes it possible to notify information regarding the required amount of projection material 26 even when the shot processing equipment 10 is located in a remote location.
[0072] Furthermore, the processor 51 of the management device 50 may perform processing to order the projection material 26 based on information regarding the required amount of projection material 26. This eliminates the need for users working at the shot processing equipment 10 to order the projection material 26, confirm delivery dates with suppliers, and maintain and manage the shot processing equipment 20 until the projection material 26 is delivered, thereby reducing the user's workload. Furthermore, automatic ordering processing can ensure stable operation of the shot processing equipment 10.
[0073] Second Embodiment Next, a second embodiment of the present disclosure will be described below. For convenience of explanation, the same reference numerals will be used to designate components having the same functions as those described in the first embodiment, and the description thereof will not be repeated.
[0074] In the first embodiment, the projection material 26 is taken as a consumable item used in the shot processing, and a process for automatically ordering the projection material 26 is described. In the second embodiment, the components that make up the projection mechanism 21 are taken as consumable items used in the shot processing and described. As described above, the projection mechanism 21 may be either an impeller type or an air type.
[0075] Figure 6 shows representative examples of parts that can be replaced among the parts that make up the impeller-type projection mechanism 21a: a distributor 70 that stirs the projection material 26, a control cage 71 that regulates the direction in which the projection material 26 is projected, and a blade 72.
[0076] FIG. 7 shows a nozzle 75, an air jet 76, and a nozzle body 77 as typical examples of parts to be replaced in a suction-type projection mechanism 21b, which is one of the air-type projection mechanisms.
[0077] FIG. 8 shows a nozzle 80, a nozzle body 81, and a nozzle clamp 82 as typical examples of parts to be replaced in a direct pressure type projection mechanism 21c of the air type projection mechanisms.
[0078] Hereinafter, when there is no need to distinguish between these parts, they will be simply referred to as "each part." Each part is a consumable item, and therefore needs to be replaced when the amount of wear becomes too great. The inventory of each part is stored in the storage warehouse 30. When replacing a part, it is taken out from the storage warehouse 30 and replaced.
[0079] The processor 51 of the management device 50 calculates the required quantity of each part based on information regarding the blasting conditions, blasting time, and initial inventory amount of each part. Examples of the blasting conditions for each part include, for an impeller, the rotation speed of the impeller and the value of the current flowing through the motor that rotates the impeller, and for a nozzle 75, the injection pressure of the compressed air injected from the nozzle 75.
[0080] (Method for Calculating Required Amount of Each Component) An example of a method for calculating the required amount of each component will be described with reference to Fig. 9. The horizontal axis of Fig. 9 indicates time, and the vertical axis indicates operation items of the shot processing equipment 10 and procurement items of consumables.
[0081] The processor 51 of the management device 50 may calculate the required quantity of each part as γ when the following two conditions are met. The two conditions are: Condition 1: T1-(T3+(T2×α))≦0, and Condition 2: β<γ. β and γ are not shown in FIG. 9.
[0082] T1 in Figure 9 indicates the lifespan of a consumable item. An example of an input condition for T1 is the timing at which the consumable item is replaced. The input condition for T1 may be a threshold value set based on the timing at which the consumable item is replaced. The "input condition" here refers to the condition when a user working at the shot processing equipment 10 inputs data into the user device 40.
[0083] T2 indicates the delivery date of the consumables. The input condition for T2 is a predetermined value.
[0084] T3 indicates the projection time or spray time. If the consumable is a part that constitutes the impeller-type projection mechanism 21a, T3 is the projection time. On the other hand, if the consumable is a part that constitutes the air-type projection mechanism 21b, T3 is the spray time. The input condition for T3 is the projection time or spray time after the replacement of the consumable.
[0085] α indicates the safety factor of delivery time. The "safety factor of delivery time" is an index set based on the concept of delivery destination, the distance from the shipping destination to the facility, etc. The input condition for α is the safety factor of delivery time.
[0086] β indicates the inventory amount at the delivery destination. The input condition for β is the inventory amount at the delivery destination.
[0087] γ indicates a predetermined order amount.
[0088] In FIG. 9, the period from t1 to t2 indicates T3, and the period from t2 to t3 indicates T2'. T2' = T2 × α. Furthermore, α > 1. As shown in Condition 1, consumables are replaced when T3 + T2' is equal to or greater than T1. In this case, if Condition 2 is satisfied, the processor 51 of the management device 50 may calculate the required amount as γ. In this case, the processor 51 of the management device 50 may perform processing to automatically order γ, which is a predetermined amount.
[0089] Next, the blade 72, which is one of the consumables, will be described with reference to FIG.
[0090] T1 shown in FIG. 10 indicates the lifespan (600 hours) of the blade 72. T2 indicates the delivery date (120 hours) of the blade 72. T3 indicates the projection time (450 hours). In FIG. 10, α is set to 1.5. Therefore, T2' is 180 hours. β, which is the inventory quantity at the delivery destination, is set to 5 sets. γ, which is the predetermined order quantity, is set to 8 sets.
[0091] In the example shown in FIG. 10, T1-(T3+(T2×α)) is -30, which satisfies condition 1. It is also assumed that condition 2 is satisfied. In this case, the processor 51 of the management device 50 can calculate the required quantity of blades 72 as γ and automatically place an order at the timing indicated by t4.
[0092] Next, another example of a method for calculating the required quantity of each part will be described with reference to Fig. 11. The flowchart shown in Fig. 11 omits the flow related to the exchange of data between the user device 40 and the management device 50. The flowchart shown in Fig. 11 starts with the projection time reset.
[0093] In step S201, shot processing is performed in the shot processing equipment 10. Next, the processor 51 of the management device 50 determines whether the projection time is equal to or greater than a predetermined value. The predetermined value here is "T1-T2×α" described in FIG. 9. If the determination result in step S202 is NO, the process returns to step S201. On the other hand, if the determination result in step S202 is YES, the process proceeds to step S203.
[0094] In step S203, the processor 51 of the management device 50 determines whether the inventory amount of the given part is equal to or less than the required replacement amount. If the determination result in step S203 is YES, the processor 51 of the management device 50 performs processing to automatically order the given part. The processor 51 of the management device 50 can calculate the difference between the inventory amount and the required replacement amount as the required amount of the given part. If the determination result in step S203 is NO, the processing proceeds to step S205.
[0095] In step S205, the processor 51 of the management device 50 determines whether the projection time is equal to or greater than T1. The process waits until the projection time is equal to or greater than T1 (NO in step S205). When the projection time is equal to or greater than T1, the process proceeds to step S206, where the desired part is replaced.
[0096] In step S207, processor 51 of management device 50 determines whether the inventory amount of the given part is equal to or less than the required inventory amount. If the determination result in step S207 is YES, processor 51 of management device 50 performs processing to automatically order the given part. Processor 51 of management device 50 can calculate the difference between the inventory amount and the required inventory amount as the required amount of the given part. If the determination result in step S207 is NO, the series of processes ends.
[0097] 11 is merely an example, and new steps may be added without departing from the spirit of the invention. Also, the processes of steps S207 and S208 may be omitted.
[0098] In the second embodiment, similarly to the first embodiment, the processor 51 of the management device 50 may notify the user device 40 of information regarding the required quantity of each part, instead of automatic ordering processing.
[0099] (Operational Effects) As described above, according to the second embodiment, the following operational effects can be obtained.
[0100] The processor 51 of the management device 50 acquires information related to the projection conditions of the projection material 26, acquires information related to the projection time of the projection material 26, and acquires information related to the initial value of the inventory amount of parts consumed by the shot processing. The processor 51 of the management device 50 calculates the required amount of parts consumed by the shot processing based on the information related to the projection conditions, information related to the projection time, and information related to the initial value of the inventory amount. The processor 51 of the management device 50 outputs information related to the result of the calculation.
[0101] If the information regarding the calculation results is output to a user device 40 installed in the shot processing equipment 10, users working at the shot processing equipment 10 will no longer need to check the inventory of parts consumed by shot processing themselves, reducing the user's workload regarding inventory management.
[0102] The projection mechanism 21 may also be an impeller-type projection mechanism 21a. In this case, the information on the projection conditions includes at least one of information on the rotational speed of the impeller and information on the power of the impeller. The information on power is either the value of the current flowing through the motor that rotates the impeller, the value of the voltage applied to the motor, or the value of the power supplied to the motor. The processor 51 of the management device 50 can calculate the required amounts of the distributor 70, control cage 71, blades 72, etc. by using the information on the rotational speed of the impeller or the information on the power of the impeller.
[0103] The projection mechanism 21 may also be an air-type projection mechanism 21b. In this case, the information on the projection conditions includes at least one of information on the injection pressure of the compressed air injected from the nozzle 75 and information on the injection amount of the projection material 26. By using the information on the injection pressure or the information on the injection amount of the projection material 26, the processor 51 of the management device 50 can calculate the required amounts of the nozzle 75, air jet 76, nozzle body 77, etc.
[0104] Next, a third embodiment of the present disclosure will be described below. For ease of explanation, the same reference numerals will be used to designate components having the same functions as those described in the first embodiment, and the description thereof will not be repeated.
[0105] 12 is a schematic configuration diagram showing an example of a management system 200 according to the third embodiment. The third embodiment differs from the first embodiment in that a sensor 28 is connected to the bucket elevator 24.
[0106] The sensor 28 is, for example, a current sensor that measures the value of a current flowing through a motor that drives the bucket elevator 24. The sensor 28 converts the detected current value into an electrical signal and transmits it to the user device 40. Note that instead of a current sensor, the sensor 28 may be a voltage sensor that measures the voltage value applied to the motor, or a power sensor that measures the power supplied to the motor.
[0107] When blast material 26 is recovered and reused, the magnitude of the current flowing through the motor driving the bucket elevator 24 varies depending on the amount of blast material 26 recovered. Therefore, it is possible to estimate the amount of recovered blast material 26 based on the current value. Here, to calculate the required amount of blast material 26, it is necessary to set the amount of blast material 26 to be recovered as reusable. That is, this is set taking into account the amount of blast material 26 removed due to the shot processing. The amount of removal may be calculated with reference to the processing capacity of the sorting mechanism described above (such as the suction air volume in air sorting, the mesh size and vibration force of the sieve, etc.), or may be set based on experiments or simulations. The processor 51 of the management device 50 can accurately calculate the required amount of blast material 26 by adding information about the recovery conditions of the blast material 26 to the information described in the first embodiment.
[0108] (Flow of Automatic Order Processing) An example of the flow of automatic order processing executed by the management system 200 will be described with reference to Fig. 13. However, since the processing of steps S301 to S303 is similar to the processing of steps S101 to S103 shown in Fig. 4, the description thereof will be omitted.
[0109] In step S304, the processor 41 of the user device 40 acquires information about the recovery conditions from the sensor 28 and stores the information in the storage device 44. The information about the recovery conditions is information indicating the current value measured by the sensor 28.
[0110] In step S305, the processor 41 of the user device 40 transmits to the management device 50 information regarding the projection conditions, projection time, initial inventory amount, and collection conditions of the projection material 26 acquired in steps S301 to S304.
[0111] In step S306, the processor 51 of the management device 50 acquires information from the user device 40 regarding the projection conditions, projection time, initial value of inventory amount, and collection conditions of the projection material 26.
[0112] In step S307, the processor 51 of the management device 50 calculates the required amount of projection material 26 based on the information regarding the projection conditions, projection time, initial inventory amount, and collection conditions of the projection material 26 acquired in step S306.
[0113] In step S308, the processor 51 of the management device 50 performs processing to automatically order the required amount of projection material 26 calculated in step S307.
[0114] In the third embodiment, similarly to the first embodiment, the processor 51 of the management device 50 may notify the user device 40 of information regarding the required amount of projection material 26 instead of automatic ordering processing.
[0115] (Operational Effects) As described above, the management system 200 according to the third embodiment provides the following operational effects.
[0116] The processor 51 of the management device 50 further acquires information on the recovery conditions for reusing the projection material 26 after projection, and calculates the required amount of projection material 26 based on the information on the projection conditions, information on the projection time, information on the initial value of the inventory amount, and information on the recovery conditions. By adding information on the recovery conditions to the information on the projection conditions, information on the projection time, and information on the initial value of the inventory amount, it becomes possible to accurately calculate the required amount of projection material 26.
[0117] The processor 51 of the management device 50 may also add information about the collection conditions when calculating the required amount of each part as described in the second embodiment.
[0118] The processor 51 of the management device 50 may also calculate the amount of projection material 26 used from a random number table that combines information about projection conditions and information about recovery conditions.
[0119] Next, a fourth embodiment of the present disclosure will be described below. For ease of explanation, the same reference numerals will be used to designate components having the same functions as those described in the first embodiment, and the description thereof will not be repeated.
[0120] 14 is a schematic diagram showing an example of a management system 300 according to the fourth embodiment. The fourth embodiment differs from the first embodiment in that a sensor 29 for detecting the number of processed works W is provided in the cabinet 22.
[0121] The sensor 29 is, for example, an infrared sensor. The sensor 29 counts the number of workpieces W that have been shot inside the cabinet 22. The sensor 29 converts the counted number of workpieces W that have been shot into an electrical signal and transmits it to the user device 40. In the fourth embodiment, the number of workpieces W that have been shot is used instead of the projection time of the projection material 26. This is because information regarding the projection time is obtained by calculation based on the number of workpieces W that have been shot.
[0122] (Flow of Automatic Order Processing) An example of the flow of automatic order processing executed by the management system 300 will be described with reference to Fig. 15. However, since the processing of steps S401 and S403 is similar to the processing of steps S101 and S103 shown in Fig. 4, the description thereof will be omitted.
[0123] In step S402 , the processor 41 of the user device 40 acquires information about the number of processed works W from the sensor 29 and stores it in the storage device 44 .
[0124] In step S404, the processor 41 of the user device 40 transmits to the management device 50 information indicating the projection conditions of the projection material 26 acquired in steps S401 to S403, the number of workpieces W to be processed, and the initial values of the inventory amount of the projection material 26.
[0125] In step S405, the processor 51 of the management device 50 acquires information indicating the projection conditions of the projection material 26, the number of workpieces W to be processed, and the initial value of the inventory amount of the projection material 26 from the user device 40.
[0126] In step S406, the processor 51 of the management device 50 calculates the required amount of projection material 26 based on the projection conditions of the projection material 26 acquired in step S405, the number of workpieces W to be processed, and information indicating the initial value of the inventory amount of projection material 26.
[0127] In step S407, the processor 51 of the management device 50 performs processing to automatically order the required amount of projection material 26 calculated in step S406.
[0128] In the fourth embodiment, similarly to the first embodiment, the processor 51 of the management device 50 may notify the user device 40 of information regarding the required amount of projection material 26 instead of automatic ordering processing.
[0129] (Operational Effects) As described above, according to the fourth embodiment, the following operational effects can be obtained.
[0130] The processor 51 of the management device 50 calculates the required amount of projection material 26 using the number of processed workpieces W instead of the projection time of the projection material 26. When the required amount calculated in this way is output to a user device 40 installed in the shot processing equipment 10, the user working at the shot processing equipment 10 does not need to check the inventory of projection material 26 himself, reducing the user's workload for inventory management.
[0131] The processor 51 of the management device 50 may also use the number of processed workpieces W instead of the projection time of the projection material 26 when calculating the required amount of each part as described in the second embodiment.
[0132] [Example of Implementation by Software] The functions of the management device 50 can be realized by a program that causes a computer to function as the management device 50, and a program that causes a computer to function as each control block of the management device 50.
[0133] In this case, the management device 50 includes a computer having at least one device (e.g., a processor) and at least one storage device (e.g., a memory) as hardware for executing the program. The computer executes the program to realize each function described in each embodiment.
[0134] The program may be stored non-transitoryly in one or more computer-readable recording media. The recording media may or may not be included in the management device 50. In the latter case, the program may be supplied to the management device 50 via any wired or wireless transmission medium.
[0135] In addition, some or all of the functions of each control block can be realized by a logic circuit. For example, an integrated circuit in which a logic circuit that functions as each control block is formed is also included in the scope of the present disclosure. In addition, the functions of each control block can also be realized by, for example, a quantum computer.
[0136] Furthermore, each process described in each embodiment may be executed by AI (Artificial Intelligence). In this case, the AI may run on the management device 50 or on another device (for example, an edge computer or a cloud server).
[0137] The present disclosure is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present disclosure.
[0138] [Additional Notes] The present disclosure can also be expressed as follows.
[0139] A management system according to a first aspect of the present disclosure is a management system for managing a projection material or a shot processing device that performs shot processing, and includes: a shot processing device that projects the projection material from a projection mechanism onto an item to be processed to perform surface processing of the item; and a processor that can process information related to the projection material or the shot processing device, wherein the processor acquires information related to the projection conditions of the projection material, acquires information related to the projection time of the projection material, acquires information related to the initial value of the inventory amount of the projection material or parts that will be consumed by the shot processing, calculates the required amount of the projection material or parts based on the information related to the projection conditions, the information related to the projection time, and the information related to the initial value of the inventory amount, and outputs information related to the result of the calculation.
[0140] The management system according to Aspect 2 of the present disclosure may be configured in Aspect 1 above, wherein the information on the projection conditions includes at least one of the projection speed and projection amount of the projection material.
[0141] A management system according to aspect 3 of the present disclosure may be configured such that, in aspect 1 or 2 above, the projection mechanism is an impeller-type projection mechanism, and the information regarding the projection conditions includes at least one of information regarding the rotational speed of the impeller and information regarding the power of the impeller.
[0142] A management system according to aspect 4 of the present disclosure may be configured such that, in aspect 1 or 2 above, the projection mechanism is an air-type projection mechanism, and the information about the projection conditions includes at least one of information about the injection pressure of compressed air injected from the nozzle and information about the injection amount of the projection material.
[0143] In the management system according to aspect 5 of the present disclosure, in any of aspects 1 to 4 above, the processor may further acquire information regarding recovery conditions for reusing the projection material after projection, and calculate the required amount of the projection material or the part based on the information regarding the projection conditions, the information regarding the projection time, the information regarding the initial value of the inventory amount, and the information regarding the recovery conditions.
[0144] The management system according to aspect 6 of the present disclosure may be configured in any one of aspects 1 to 5 above, wherein the information relating to the projection time is information obtained by calculation based on the number of processed articles.
[0145] The management system according to aspect 7 of the present disclosure may be configured in any one of aspects 1 to 6 above, wherein the processor performs processing to display information regarding the required amount on a display.
[0146] The management system according to aspect 8 of the present disclosure may be configured in any one of aspects 1 to 7 above, wherein the processor performs processing to notify a remote location of information relating to the required amount.
[0147] The management system according to aspect 9 of the present disclosure may be configured in any of aspects 1 to 8 above, wherein the processor performs processing to order the projection material or the parts based on information regarding the required quantity.
[0148] A management method according to aspect 10 of the present disclosure is a management method for managing a projection material or shot processing device for a shot process in which projection material is projected onto a workpiece to perform surface processing of the workpiece, and includes the steps of setting projection conditions for the projection material, projecting the projection material onto the workpiece from a projection mechanism, acquiring information regarding the projection conditions of the projection material, acquiring information regarding the projection time of the projection material, acquiring information regarding an initial value of an inventory amount of the projection material or parts that will be consumed by the shot process, calculating a required amount of the projection material or parts based on the information regarding the projection conditions, the information regarding the projection time, and the information regarding the initial value of the inventory amount, and outputting information regarding the result of the calculation.
[0149] 100, 200, 300 Management system, 20 Shot processing device, 21 Projection mechanism, 26 Projection material, 51 Processor, 50 Management device
Claims
1. A management system for managing a projection material or shot processing device that performs shot processing, comprising: a shot processing device that projects the projection material from a projection mechanism onto a workpiece to perform surface processing of the workpiece; and a processor capable of processing information about the projection material or the shot processing device, wherein the processor acquires information about the projection conditions of the projection material, acquires information about the projection time of the projection material, acquires information about an initial value of an inventory amount of the projection material or parts that are consumed by the shot processing, calculates a required amount of the projection material or the parts based on the information about the projection conditions, information about the projection time, and information about the initial value of the inventory amount, and outputs information about the result of the calculation.
2. The management system according to claim 1, wherein the information on the projection conditions includes at least one of the projection speed and projection amount of the projection material.
3. The management system according to claim 1 or 2, wherein the projection mechanism is an impeller-type projection mechanism, and the information on the projection conditions includes at least one of information on the rotation speed of the impeller and information on the power of the impeller.
4. The management system according to claim 1 or 2, wherein the projection mechanism is an air-type projection mechanism, and the information on the projection conditions includes at least one of information on the injection pressure of the compressed air ejected from the nozzle and information on the amount of the projection material ejected.
5. A management system as described in any one of claims 1 to 4, wherein the processor further acquires information regarding recovery conditions for reusing the projection material after projection, and calculates the required amount of the projection material or the parts based on the information regarding the projection conditions, the information regarding the projection time, the information regarding the initial value of the inventory amount, and the information regarding the recovery conditions.
6. The management system according to any one of claims 1 to 5, wherein the information relating to the projection time is obtained by calculation based on the number of processed objects.
7. The management system according to any one of claims 1 to 6, wherein the processor performs processing for displaying information relating to the required amount on a display.
8. The management system according to any one of claims 1 to 7, wherein the processor performs processing for notifying information relating to the required amount to a remote location.
9. The management system according to any one of claims 1 to 8, wherein the processor performs processing to order the projection material or the parts based on information relating to the required amount.
10. A method for managing a projection material or shot processing device for a shot process in which a projection material is projected onto a workpiece to perform surface processing of the workpiece, the method comprising the steps of: setting projection conditions for the projection material; projecting the projection material onto the workpiece from a projection mechanism; acquiring information relating to the projection conditions of the projection material; acquiring information relating to the projection time of the projection material; acquiring information relating to an initial value of an inventory amount of the projection material or parts consumed by the shot process; calculating a required amount of the projection material or parts based on the information relating to the projection conditions, the information relating to the projection time, and the information relating to the initial value of the inventory amount; and outputting information relating to a result of the calculation.
Citation Information
Patent Citations
IC tag and steel material management system
JP5766590B2
Shot blast device monbitoring system
JP2002011665A
Method for setting shot peening condition and shot peening machine
JP2003159651A
Method of setting shot peening condition
JP2020146797A
Information processing device and program, information processing method, and information processing system
JP2021159920A
