Method for operating a battery energy storage system and battery energy storage
The method addresses SoC unbalance in battery energy storage systems by using controllers to adjust power setpoints based on state-of-charge and capacity, enhancing system reliability and efficiency.
Patent Information
- Application Number
- PCT/EP2024/087545
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2024-01-26
- Filing Date
- 2024-12-19
- Publication Date
- 2025-07-31
AI Technical Summary
Existing battery energy storage systems face challenges with state-of-charge (SoC) unbalance among connected units, leading to reduced utilization time and reliability, particularly when units are disconnected or reconnected due to failures or maintenance, and existing solutions like communication and hardware adaptations face issues with response time and cost.
A method involving controllers that adjust active power setpoints based on state-of-charge and capacity differences among battery energy storage units, using a first controller to generate a total control signal and a second controller to distribute power setpoints, ensuring balanced discharge and charge across units.
Enhances system availability by aligning SoC values and accounting for varying capacities, improving reliability and efficiency by optimizing power distribution among battery energy storage units.
Smart Images

Figure EP2024087545_31072025_PF_FP_ABST
Abstract
Description
[0001]2023PF12304 1 Description METHOD FOR OPERATING A BATTERY ENERGY STORAGE SYSTEM AND BATTERY ENERGY STORAGE The present invention relates generally to a method of operating a battery storage system, said battery energy storage comprising at least two batteries storage units capable of being charged to a maximum state of charge which batteries are connected to a grid for controllably discharging energy into the grid or being charged from the grid. Further, the invention relates to a Battery energy storage system. A Battery Energy Storage System (BESS) is a system that stores electrical energy in batteries and releases it when needed. It consists of several main components, including battery modules, a battery management system (BMS), inverters, transformers, and a control system. Battery modules: These consist of a large number of battery cells that are connected in series and in parallel to achieve the desired voltage and capacity. The battery cells can consist of different chemical compositions, such as lithium- ion, lead-acid or nickel-cadmium. Battery Management System (BMS): The BMS monitors and controls the charging and discharging process of the batteries to ensure optimal performance and lifespan. It monitors parameters such as voltage, current, temperature, and state of charge of each cell and ensures the balancing of the cells to ensure even usage. Inverters: These devices convert the direct current (DC) stored in the batteries into alternating current (AC), which is needed for most electrical applications. Inverters may also be able to convert AC to DC to charge the batteries. 2023PF12304 2 Transformers: Transformers are used to bring the voltage of the alternating current generated to the desired level, which is necessary for feeding into the electricity grid or for direct consumption. Control system: The control system monitors and controls the entire BESS, including communication with the power grid, optimization of charge and discharge cycles, and integration of renewable energy sources such as solar or wind power plants. A BESS offers numerous benefits, including stabilizing the power grid, integrating renewables, providing backup power, and reducing electricity costs through peak load management. It also helps improve grid reliability and efficiency, supporting the energy transition towards more sustainable energy sources. Battery Energy Storage Systems (BESS) are becoming more and more important in electrical power systems. This is becoming increasingly important as the integration of fluctuating renewable energy sources such as solar and wind power increases. When it comes to electricity generation, it must be taken into account that these renewable sources fluctuate in time. Having the ability to supply or absorb large amounts of power in milliseconds, batteries are in fact very suitable for ramp rate control or limitation, as well as for frequency regulation, load balancing or peak shaving. However, since energy capacity is still an important cost factor, it is crucial to correctly dimension the battery size to the application and to operate it in the least stressful way possible. Grid-scale Battery Energy Storage Systems (BESSs) usually consist of multiple Battery Energy Storage Systems units operating in parallel. During normal operation of the BESS, possible difference in charge and / or discharge of different 2023PF12304 3 BESS units could lead to unbalance between them; i.e., they would have different state-of-charges (SoCs). State of charge unbalance could also arise when a BESS or a set of BESSs are disconnected, for example, due to failure or normal maintenance, and then reconnected. State of charge unbalance between different BESS units will reduce the utilization time of some units, and thus less reliability of the system. It is, therefore, important to have a plant-level state of charge balancing in the BESS control. A BESS power and / or frequency control together with plant- level state of charge balancing has been addressed in the literature by establishing communication among BESS units, or through hardware adaptations in the power-electronics converter used in the BESS unit, and adaptive power and / or frequency droop control. The communication between several BESS units leads to issues with response time and reliability, hardware adaptation for BESS plants with several power converters can have its own complication and costs in practice, and adaptive droop control would be difficult to implement in a BESS plant with different types of power converters. This is where the invention comes in, the task of which is to improve the availability of a battery energy storage systems. The Problem is solved by a method of operating a battery energy storage system, said battery energy storage comprising at least two battery energy storage units capable of being charged to a maximum state of charge which batteries are connected to a grid for controllably discharging energy into the grid or being charged from the grid, wherein said method comprises the following steps: 2023PF12304 4 - Acquisition of a first value (active power set point (PREF_PCC)) and transmission to the first controller unit (1a) - Capture a second value (measured active power from the BESS (PMeas_PCC)) and transmit it to the first controller unit (1a) - Generating a controller output signal (total control active power set point (PREF_PCS)) in the first controller unit (1a), taking into account the first value and the second value - Transmitting the controller output signal (total control active power set point (PREF_PCS)) to a second controller unit (1b) - Measure one state of charge value (SoCBatt_i) for each battery energy storage unit - Sending the state of charge value (SoCBatt_i) for each battery energy storage unit to the second controller unit (1b) - Generate one controller output signal (active power set point to (PREF_PCS_i)) for a power electronic converter connected to each battery energy storage unit, taking into account the state of charge values (SoCBatt_i), wherein following applies: i=1,2,…,n (n is the number of batteries). There are different modes to calculate a total active power set point (PREF_PCS) depending on the user´s choice: no power control, only power control (active power set point (PREF_PCC) is compared to the measured active power (PMeas_PCC) and the error is processed by a regulator), and power-frequency control which injects a certain total control active power set point (PREF_PCS) into the grid (or absorbs from the grid) depending if the measured active power (PMeas_PCC) is less than (or greater than) a reference range. Further the problem is solved by a battery energy storage system, comprising at least two battery energy storage units, which are connectable to a grid by means of a converter and 2023PF12304 5 transformer, and a first controller and a second controller for controlling to either charge the batteries with electric energy from the grid, or discharge electric energy from the batteries into the grid, wherein the second controller are provided for monitoring the actual state of charge and the capacity of the batteries. The problem is solved by requesting the batteries with higher State of charge to discharge faster, and requesting those with less state of charge to discharge lower. Advantageous further developments are specified in the depending claims. A secondary controller, e.g. power plant controller is proposed to handle the above described problem, by sending different power setpoints to the different BESS units. The overall power demand for the BESS plant is generated by direct power control or frequency and / or power droop, and then it is distributed among different units, according to their state of charge level. As a battery unit undergoes charge and discharge cycles, its state of health gradually changes, leading to a decrease in its capacity. Also, different BESS units in parallel operation may for this reason have different capacities over a period of time. The invention proposes a state of charging balancing method which takes different BESS capacities into account. The proposed plant controller incorporates a functionality capable of distributing active power setpoints to the individual BESS units to counteract, in all the possible operating modes, the possible SoC unbalance aligning the SoCs of all the units to the same value taking into consideration the possibility of the BESS units having different capacities over time. 2023PF12304 6 The properties, features and advantages of this invention described above, and the way in which these can be achieved, will be explained in more detail in conjunction with the invention so as to be clearer and more markedly understandable. One exemplary embodiment of the invention will be described below with reference to the drawing. This is intended not to illustrate the exemplary embodiment to scale, but rather the drawing, where it is conducive to clarification, is set out in a schematized and / or slightly distorted form. With regard to additions to the teaching which is directly apparent in the drawing, reference is made to the relevant prior art. Identical components or components with the same function are marked with the same reference signs. Embodiments of the invention are described below on the basis of the drawings. These are not intended to represent the embodiments to scale, but rather the drawing, where useful for explanation, is executed in schematized and / or slightly distorted form. The figures illustrate: Figure 1 illustrates a controller for a battery energy storage system according to the invention. Figure 1 illustrates a controller 1 for a battery energy storage system according to the invention. The controller unit 1 comprises a first controller 1a and a second controller 1b, which are explained in more detail below. The controller unit 1 is used for a method of operating a battery energy storage system. The battery energy storage system comprises at least two batteries capable of being 2023PF12304 7 charged to a maximum state of charge which batteries are connected to a grid for controllably discharging energy into the grid or being charged from the grid. Each battery is characterized by a state of charge SoCBatt_i(i=01,2,…,n). That means if there are n batteries then there are n values for the state of charge SoCBatt_i. Further each battery is characterized by a capacity CAPBatt_i(i=1,2,…,n). That means if there are the same number n of batteries then there are n values for the capacitiy CAPBatt_i. A first value, called Active Power Set Point PREF_PCC, is fed to the first controller unit 1a. A second value, which corresponds to a Measured Active Power PMeas_PCCfrom the battery system, is measured and fed to the first controller unit 1a. A third value, which corresponds to a measured frequency fMeas_PCC, is also fed to the first controller unit 1a. Furthermore, a limit value SoClimitfor the state of charge is determined and fed to the first controller unit 1a. A mode Mode_p can also be entered or selected via an input. The first controller unit 1a is generating a first controller output signal with a P / f controller 2, which corresponds to a total control active power set point PREF_PCS.In a first step the first controller unit 1a is taking into account the first value and the second value. The total control active power set point PREF_PCSis then transferred to the second controller unit 1b. The value PREF_PCSis sent to a dispatch center 3. Likewise, the SoC and BAC values are processed via an SoC / CAP unit 4 with values from the dispatch center 3, and the active power set point PREF_PCS_i(i=1,2,…,n) is determined and output for each battery or PCSi(i=1,2,…,n). 2023PF12304 8 The controller unit 1 incorporates a functionality capable of adjusting further the processed active power setpoints in order to correct possible errors arising from BESS units with different capacities. According to the invention a complete solution is provided that includes the power / frequency control together with plant-level SoC balancing, as well as potential difference in the BESS capacities. There is a converter for each battery. Following is a more detailed explanation of the operating mode of the controller unit 1. Figure 1 shows the combined power / frequency response with plant level state of charge balancing scheme. The P / f controller 2 consists of three working modes (Mode_p). For mode_0, there is no closed-loop control; it just acts as a limiter to align the active power setpoint PREF_PCC, with the maximum / minimum active power capabilities. For mode_1, the measured power at PCC (point of common coupling), PMEAS_PCC, is compared with PREF_PCCand a PI regulator is used to ensure the active power achievement. For mode_2, a similar process as mode_1 is repeated on the power path, but the reference power is adjusted based on a droop curve proportional to the frequency. The scheme is enhanced by adding state of charge (SoC) limits, meaning that when SoC of the battery system is outside an adjustable bandwidth, the charging / discharging is ceased. The SoC balancing function adjusts the power reference of each power conversion system (PCS) depending on the SoC and capacity of the connected battery system as shown in figure 2023PF12304 9 1. Batteries with relatively higher SoC or high-capacity levels will be subject to more discharge. Although the invention has been further illustrated and described in detail by the preferred embodiment, the invention is not limited by the disclosed examples and other variants can be derived by the skilled person without leaving the scope of protection of the invention.
Claims
2023PF12304 10 Patent claims 1. Method of operating a battery energy storage system (BESS), said battery energy storage system comprising at least two battery energy storage units capable of being charged to a maximum state-of-charge which batteries are connected to a grid for controllably discharging energy into the grid or being charged from the grid, characterized in that said method comprises the following steps: - Acquisition of a first value and transmission to the first controller unit (1a), wherein the first value is the active power set point (PREF_PCC) - Capture a second value and transmit it to the first controller unit (1a), wherein the second value is the measured active power from the BESS (PMeas_PCC) - Generating a first controller output signal in the first controller unit (1a), taking into account the first value and the second value, wherein the controller output signal is the total control active power set point (PREF_PCS) - Transmitting the controller output signal to a second controller unit (1b) - Measure one state of charge value (SoCBatt_i) for each battery energy storage unit - Sending the state of charge value (SoCBatt_i) and the capacity values (CAPBatt_i) for each battery energy storage unit to the second controller unit (1b) - Generate second controller output signals for a power electronic converter connected to each battery energy storage unit, taking into account the state of charge values (SoCBatt_i) and capacity values (CAPBatt_i), wherein the second controller output signals are active power set points (PREF_PCS_i), wherein following applies: i=1,2,…,n, wherein n is the number of batteries.2023PF12304 11 2. Method according to claim 1, with the next steps: - Measures a value for each of the capacities (CAPbatt_i) for each battery energy storage unit - Sending the value CAPbatt_ifor each battery energy storage unit to the second controller unit (1b) - Generate one controller output signal for each battery, wherein the controller output signal is the active power set point (PREF_PCS_i), taking into account the value CAPbatt_i, wherein following applies: i=1,2,…,n, wherein n is the number of batteries.
3. Method according to claim 1 or 2, with the next steps: - Capture a third value and transmit it to the first controller unit (1a), wherein the third value is the measured frequency fMeas_PCC- Generating the controller output signal in the first controller unit, taking into account the third value, wherein the controller output signal is the total control active power set point (PREF_PCS).
4. Battery energy storage system for conducting the method according to claim 1, comprising at least two batteries, which are connectable to a grid by means of a converter and transformer, and a first controller unit (1a) and a second controller unit (1b) for controlling to either charge the batteries with electric energy from the grid or discharge electric energy from the batteries into the grid, characterized in that the second controller unit (1b) are provided for monitoring the actual state-of-charge and the capacity of the batteries.
Citation Information
Patent Citations
Grid Frequency Control Device and Method Based on Battery Energy Storage System
CN112003303B
SoC cooperative control method applied to multiple energy storage units
CN113507151A
Method and system for distributing PCS active power by energy storage AGC considering SOC sorting
CN113541174A
Battery energy storage system SOC balance control method based on droop control
CN115000996A
Frequency Responsive Charge Sustaining Control of Electricity Storage Systems for Ancillary Services on an Electrical Power Grid
US20100090532A1