Method for optimizing drilling fluid properties to clear cuttings from within a wellbore
By predicting and adjusting drilling fluid properties based on cuttings size distribution, the method addresses inefficiencies in existing models, improving drilling efficiency and reducing risks in wellbore operations.
Patent Information
- Application Number
- PCT/CN2025/092793
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2025-05-06
- Publication Date
- 2026-11-12
AI Technical Summary
Existing drilling fluid models fail to account for the non-uniform size and shape of cuttings in a wellbore, leading to inefficiencies and potential issues such as stuck pipes and non-productive time.
A method that incorporates a predicted cuttings size distribution into hydraulic models, using principles like Stokes' law and bit/rock interaction, to optimize drilling fluid properties and adjust them in real-time for effective cuttings transport.
Enhances drilling efficiency by ensuring accurate simulations of cuttings transport dynamics, reducing the risk of stuck pipes and non-productive time, and minimizing environmental impact through optimized fluid properties and flow rates.
Smart Images

Figure CN2025092793_12112026_PF_FP_ABST
Abstract
Description
METHOD FOR OPTIMIZING DRILLING FLUID PROPERTIES TO CLEAR CUTTINGS FROM WITHIN A WELLBOREBACKGROUND
[0001] When drilling a wellbore at a wellsite, a drill bit creates cuttings which should be removed to facilitate efficient drilling operations and preserve use of the downhole equipment. In order to clear cuttings from the wellbore, a drilling fluid or mud is circulated through the wellbore so that the cuttings may be collected and brought back up to the surface. Several parameters may determine how efficiently or effectual the drilling fluid may be in transporting the cuttings, most notably the profile or geometry of the wellbore, the properties of the drilling fluid, or other drilling parameters. Another parameter relates to the characteristics of the cuttings themselves, namely a size or shape of the cuttings being removed which may determine the resistance of the return flow of drilling fluid.
[0002] In order to provide an efficient application of drilling fluid possible, one or more models may be run in an attempt to determine how the drilling fluid may be applied or adjusted so as to effectively remove cuttings from a specific wellbore, given the various conditions of the wellsite, the wellbore, and the downhole equipment selected for use. In such models, many different parameters may be accounted for including an estimation of the shape of the cuttings. Often, the cuttings are considered be disks of equal size that are falling or traveling edgewise through the drilling fluid. However realistically, cuttings are seldom uniform in size or shape throughout the depth of the wellbore, therefore the dynamics of the circulating drilling fluid can be different from what the model may have originally estimated which in turn may lead to errors and costly down time.
[0003] What is needed is a new method which accounts for a changing size distribution of the cuttings as the wellbore is being dug, thereby increasing the efficiency of the wellsite and decreasing the likelihood of a stuck pipe or other issues which may lead to non-productive time.SUMMARY
[0004] Disclosed are methods, systems, and computer programs for optimizing drilling fluid properties for clearing cuttings from a wellbore. According to certain embodiments, the method includes receiving an initial data set that is related to a wellbore, estimating a size distribution of drill cuttings to be removed from the wellbore that is based on the initial data set, and then determining a cleaning parameter of the wellbore that is based on the estimated size distribution of the drill cuttings. In certain embodiments, a further data set related to the wellbore is then received so that the estimated the size distribution of drill cuttings to be removed from the wellbore may be revised based on the received further data set. The cleaning parameter of the wellbore may then be updated based on the revised estimated size distribution of the drill cuttings.
[0005] According to certain embodiments, a computing system having one or more processors and a memory system may be provided. The memory system may include one or more non-transitory computer-readable media storing instructions that, when executed by at least one of the one or more processors, cause the computing system to perform operations, the operations. In certain embodiments, the operations include receiving an initial data set related to a wellbore, estimating a size distribution of drill cuttings to be removed from the wellbore based on the initial data set, and then determining a cleaning parameter of the wellbore based on the estimated size distribution of the drill cuttings. The operations may also include receiving a further data set that is related to the wellbore, revising the estimated size distribution of drill cuttings to be removed from the wellbore based on the received further data set, and then updating the cleaning parameter of the wellbore based on the revised estimated size distribution of the drill cuttings. In certain embodiments, the operations include displaying the updated cleaning parameter on a screen and then performing a site action that is based on the updated cleaning parameter.
[0006] According to certain embodiments, a non-transitory computer-readable medium storing instructions that, when executed by one or more processors of a computing system, cause the computing system to perform operations is provided. In certain embodiments, the operations include receiving an initial data set related to a wellbore. The received data may include historical drilling data, rock properties from a plurality of offset wells, an initial real-time set of drilling parameters, or a combination thereof. The initial real-time set of drilling parameters may include a depth of the wellbore, a design of a drill bit, or a density of a drilling fluid. In certain embodiments, the operations further include determining a size distribution of drill cuttings to be removed from the wellbore based on the initial data set and determining a cleaning parameter of the wellbore based on the size distribution of the drill cuttings. In certain embodiments, determining the cleaning parameter of the wellbore may include determining an optimal flow rate of a drilling fluid used in the wellbore based on the size distribution of the drill cuttings. The flow rate may be based on a critical velocity of the drilling fluid and a cross-sectional area of an annulus of the wellbore. Determining the cleaning parameter of the wellbore may also include determining a settling velocity of the drill cuttings in the drilling fluid or determining a pressure drop along a length of a cuttings bed within the wellbore. The pressure drop may be based on a porosity of a cuttings bed, a length of the cuttings bed, a superficial fluid velocity, and a diameter of particles in the drilling fluid. The operations may also include receiving a further data set related to the wellbore. The further data set includes a drill bit RPM, a weight on bit, a torque of the drill bit, or a surface analysis of the drill cuttings. In certain embodiments, the operation may also include revising the size distribution of drill cuttings to be removed from the wellbore based on the received further data set, updating the cleaning parameter of the wellbore based on the revised size distribution of the drill cuttings, and then displaying the updated cleaning parameter on a screen. A site action based on the updated cleaning parameter may then be performed. The site action may include generating or transmitting a signal that instructs or causes an action to occur. The action may include a physical action such as determining an optimal drilling fluid to be used in the wellbore, adjusting at least one parameter of a drilling fluid in real-time, mitigating issues related to cuttings erosion or settling, varying the optimal flowrate or density of the drilling fluid being pumped into the wellbore, selecting an optimal downhole equipment to use within the wellbore, selecting optimal operating conditions for the downhole equipment, or a combination thereof.BRIEF DESCRIPTION OF THE DRAWINGS
[0007] The disclosure is illustrated by way of example, and not by way of limitation in the figures of the accompanying drawings in which like reference numerals are used to refer to similar elements. It is appreciated that various features may not be drawn to scale, and the dimensions of various features may be arbitrarily increased or reduced for clarity of discussion. Further, it is contemplated that features of one or more embodiments may be incorporated in other embodiments without additional recitation.
[0008] Figure 1 illustrates an example of a system that includes various management components to manage various aspects of a geologic environment, according to an embodiment.
[0009] Figure 2 illustrates a graphical interface displaying a table listing each cutter of the drill bit, an area for each cutter, a volume for each cutter, and a force exerted by each cutter, according to an embodiment.
[0010] Figure 3 illustrates a graphical interface showing a predicted mass proportion of the cuttings versus a cutting depth, according to an embodiment.
[0011] Figure 4 illustrates a relationship between a cutting transport ration versus annular velocity, according to an embodiment.
[0012] Figure 5 illustrates a graphical interface showing a hole cleaning index (HCI) for a specific wellbore which classifies the HCI as either very good, good, fair, or poor as defined by respective thresholds and a corresponding depth, according to an embodiment.
[0013] Figure 6 illustrates a flowchart of a method for optimizing drilling fluid properties for clearing cuttings from a wellbore, according to an embodiment.
[0014] Figure 7 illustrates a schematic view of a computing system for performing at least a portion of the method (s) described herein, according to an embodiment.DETAILED DESCRIPTION
[0015] Reference will now be made in detail to embodiments, examples of which are illustrated in the accompanying drawings and figures. In the following detailed description, numerous specific details are set forth in order to provide a thorough understanding of the disclosed technology. However, it will be apparent to one of ordinary skill in the art that the disclosed embodiments may be practiced without these specific details. In other instances, well-known methods, procedures, components, circuits, and networks have not been described in detail so as not to unnecessarily obscure aspects of the embodiments.
[0016] It will also be understood that, although the terms first, second, etc., may be used herein to describe various elements, these elements should not be limited by these terms. These terms are used to distinguish one element from another. For example, a first object or step could be termed a second object or step, and, similarly, a second object or step could be termed a first object or step, without departing from the scope of the disclosure. The first object or step, and the second object or step, are both objects or steps, respectively, but they are not to be considered the same object or step.
[0017] The terminology used in the description of the disclosed techniques is for the purpose of describing particular embodiments and is not intended to be limiting. As used in the description of this disclosure and the appended claims, the singular forms “a, ” “an” and “the” are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will also be understood that the term "and / or" as used herein refers to and encompasses any combination of one or more of the associated listed items. It will be further understood that the terms "includes, " "including, " "comprises" and / or "comprising, " when used in this disclosure, specify the presence of stated features, integers, steps, operations, elements, and / or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and / or groups thereof.
[0018] As used herein, the term "if" may be construed to mean "when" or "upon" or "in response to determining" or "in response to detecting, " depending on the context.
[0019] Those with skill in the art will appreciate that while some terms in this disclosure may refer to absolutes, e.g., all of the components of a wavefield, all source receiver traces, each of a plurality of objects, etc., the methods and techniques disclosed herein may also be performed on fewer than all of a given thing, e.g., performed on one or more components and / or performed on one or more source receiver traces. Accordingly, in instances in the disclosure where an absolute is used, the disclosure may also be interpreted to be referring to a subset. System Overview
[0020] Figure 1 illustrates an example of a system 100 that includes various management components 110 to manage various aspects of a geologic environment 150 (e.g., an environment that includes a sedimentary basin, a reservoir 151, one or more faults 153-1, one or more geobodies 153-2, etc. ) . For example, the management components 110 may allow for direct or indirect management of sensing, drilling, injecting, extracting, etc., with respect to the geologic environment 150. In turn, further information about the geologic environment 150 may become available as feedback 160 (e.g., optionally as input to one or more of the management components 110) .
[0021] In the example of Figure 1, the management components 110 include a seismic data component 112, an additional information component 114 (e.g., well / logging data) , a processing component 116, a simulation component 120, an attribute component 130, an analysis / visualization component 142 and a workflow component 144. In operation, seismic data and other information provided per the components 112 and 114 may be input to the simulation component 120.
[0022] In an example embodiment, the simulation component 120 may rely on entities 122. Entities 122 may include earth entities or geological objects such as wells, surfaces, bodies, reservoirs, etc. In the system 100, the entities 122 can include virtual representations of actual physical entities that are reconstructed for purposes of simulation. The entities 122 may include entities based on data acquired via sensing, observation, etc. (e.g., the seismic data 112 and other information 114) . An entity may be characterized by one or more properties (e.g., a geometrical pillar grid entity of an earth model may be characterized by a porosity property) . Such properties may represent one or more measurements (e.g., acquired data) , calculations, etc.
[0023] In an example embodiment, the simulation component 120 may operate in conjunction with a software framework such as an object-based framework. In such a framework, entities may include entities based on pre-defined classes to facilitate modeling and simulation. A commercially available example of an object-based framework is the framework (Redmond, Washington) , which provides a set of extensible object classes. In the framework, an object class encapsulates a module of reusable code and associated data structures. Object classes can be used to instantiate object instances for use in by a program, script, etc. For example, borehole classes may define objects for representing boreholes based on well data.
[0024] In the example of Figure 1, the simulation component 120 may process information to conform to one or more attributes specified by the attribute component 130, which may include a library of attributes. Such processing may occur prior to input to the simulation component 120 (e.g., consider the processing component 116) . As an example, the simulation component 120 may perform operations on input information based on one or more attributes specified by the attribute component 130. In an example embodiment, the simulation component 120 may construct one or more models of the geologic environment 150, which may be relied on to simulate behavior of the geologic environment 150 (e.g., responsive to one or more acts, whether natural or artificial) . In the example of Figure 1, the analysis / visualization component 142 may allow for interaction with a model or model-based results (e.g., simulation results, etc. ) . As an example, output from the simulation component 120 may be input to one or more other workflows, as indicated by a workflow component 144.
[0025] As an example, the simulation component 120 may include one or more features of a simulator such as the ECLIPSETM reservoir simulator (SLB, Houston Texas) , the INTERSECTTM reservoir simulator (SLB, Houston Texas) , etc. As an example, a simulation component, a simulator, etc. may include features to implement one or more meshless techniques (e.g., to solve one or more equations, etc. ) . As an example, a reservoir or reservoirs may be simulated with respect to one or more enhanced recovery techniques (e.g., consider a thermal process such as SAGD, etc. ) .
[0026] In an example embodiment, the management components 110 may include features of a commercially available framework such as the seismic to simulation software framework (SLB, Houston, Texas) . The framework provides components that allow for optimization of exploration and development operations. The framework includes seismic to simulation software components that can output information for use in increasing reservoir performance, for example, by improving asset team productivity. Through use of such a framework, various professionals (e.g., geophysicists, geologists, and reservoir engineers) can develop collaborative workflows and integrate operations to streamline processes. Such a framework may be considered an application and may be considered a data-driven application (e.g., where data is input for purposes of modeling, simulating, etc. ) .
[0027] In an example embodiment, various aspects of the management components 110 may include add-ons or plug-ins that operate according to specifications of a framework environment. For example, a commercially available framework environment marketed as the framework environment (SLB, Houston, Texas) allows for integration of add-ons (or plug-ins) into a framework workflow. The framework environment leverages tools (Microsoft Corporation, Redmond, Washington) and offers stable, user-friendly interfaces for efficient development. In an example embodiment, various components may be implemented as add-ons (or plug-ins) that conform to and operate according to specifications of a framework environment (e.g., according to application programming interface (API) specifications, etc. ) .
[0028] Figure 1 also shows an example of a framework 170 that includes a model simulation layer 180 along with a framework services layer 190, a framework core layer 195 and a modules layer 175. The framework 170 may include the commercially available framework where the model simulation layer 180 is the commercially available model-centric software package that hosts framework applications. In an example embodiment, the software may be considered a data-driven application. The software can include a framework for model building and visualization.
[0029] As an example, a framework may include features for implementing one or more mesh generation techniques. For example, a framework may include an input component for receipt of information from interpretation of seismic data, one or more attributes based at least in part on seismic data, log data, image data, etc. Such a framework may include a mesh generation component that processes input information, optionally in conjunction with other information, to generate a mesh.
[0030] In the example of Figure 1, the model simulation layer 180 may provide domain objects 182, act as a data source 184, provide for rendering 186 and provide for various user interfaces 188. Rendering 186 may provide a graphical environment in which applications can display their data while the user interfaces 188 may provide a common look and feel for application user interface components.
[0031] As an example, the domain objects 182 can include entity objects, property objects and optionally other objects. Entity objects may be used to geometrically represent wells, surfaces, bodies, reservoirs, etc., while property objects may be used to provide property values as well as data versions and display parameters. For example, an entity object may represent a well where a property object provides log information as well as version information and display information (e.g., to display the well as part of a model) .
[0032] In the example of Figure 1, data may be stored in one or more data sources (or data stores, generally physical data storage devices) , which may be at the same or different physical sites and accessible via one or more networks. The model simulation layer 180 may be configured to model projects. As such, a particular project may be stored where stored project information may include inputs, models, results and cases. Thus, upon completion of a modeling session, a user may store a project. At a later time, the project can be accessed and restored using the model simulation layer 180, which can recreate instances of the relevant domain objects.
[0033] In the example of Figure 1, the geologic environment 150 may include layers (e.g., stratification) that include a reservoir 151 and one or more other features such as the fault 153-1, the geobody 153-2, etc. As an example, the geologic environment 150 may be outfitted with any of a variety of sensors, detectors, actuators, etc. For example, equipment 152 may include communication circuitry to receive and to transmit information with respect to one or more networks 155. Such information may include information associated with downhole equipment 154, which may be equipment to acquire information, to assist with resource recovery, etc. Other equipment 156 may be located remote from a well site and include sensing, detecting, emitting or other circuitry. Such equipment may include storage and communication circuitry to store and to communicate data, instructions, etc. As an example, one or more satellites may be provided for purposes of communications, data acquisition, etc. For example, Figure 1 shows a satellite in communication with the network 155 that may be configured for communications, noting that the satellite may additionally or instead include circuitry for imagery (e.g., spatial, spectral, temporal, radiometric, etc. ) .
[0034] Figure 1 also shows the geologic environment 150 as optionally including equipment 157 and 158 associated with a well that includes a substantially horizontal portion that may intersect with one or more fractures 159. For example, consider a well in a shale formation that may include natural fractures, artificial fractures (e.g., hydraulic fractures) or a combination of natural and artificial fractures. As an example, a well may be drilled for a reservoir that is laterally extensive. In such an example, lateral variations in properties, stresses, etc. may exist where an assessment of such variations may assist with planning, operations, etc. to develop a laterally extensive reservoir (e.g., via fracturing, injecting, extracting, etc. ) . As an example, the equipment 157 and / or 158 may include components, a system, systems, etc. for fracturing, seismic sensing, analysis of seismic data, assessment of one or more fractures, etc.
[0035] As mentioned, the system 100 may be used to perform one or more workflows. A workflow may be a process that includes a number of worksteps. A workstep may operate on data, for example, to create new data, to update existing data, etc. As an example, a may operate on one or more inputs and create one or more results, for example, based on one or more algorithms. As an example, a system may include a workflow editor for creation, editing, executing, etc. of a workflow. In such an example, the workflow editor may provide for selection of one or more pre-defined worksteps, one or more customized worksteps, etc. As an example, a workflow may be a workflow implementable in the software, for example, that operates on seismic data, seismic attribute (s) , etc. As an example, a workflow may be a process implementable in the framework. As an example, a workflow may include one or more worksteps that access a module such as a plug-in (e.g., external executable code, etc. ) . Method for Optimizing Drilling Fluid Properties within a Wellbore
[0036] The current disclosure is a workflow related to specifying a cuttings size which can be used in a customized fluid design that is tailored to efficiently transport cuttings from a wellbore. The workflow may also include adjusting properties of the drilling fluid to maintain effective cuttings transport as drilling conditions change in a real-time drilling operation at a wellsite.
[0037] According to certain embodiments, a predicted cuttings size distribution may be incorporated into one or more hydraulic models, including models based on Stokes'law and other sedimentation principles. The addition of the cuttings size distribution may result in more accurate simulations of cuttings transport dynamics and with these more accurate simulations, drilling fluids can be designed with optimal rheological properties such as viscosity, density, etc., so as to be tailored to efficiently transport the specific predicted size range of cuttings. By inputting the drilling change, it may also enable real-time adjustments to drilling fluid properties to maintain effective cuttings transport.
[0038] According to certain embodiments, the current workflow may incorporate a predicted or estimated cuttings size distribution into hydraulic models, including models based on bit / rock interaction, offset measurements calibration, Stokes'law, and other sedimentation principles in order to determine a cleaning parameter which may be subsequently used to optimize the cleaning of the wellbore. In certain embodiments, the workflow may leverage historical drilling data, rock properties, and real-time drilling parameters to accurately predict the size distribution of drill cuttings. By utilizing principles such as Stokes'law, the workflow may help in predicting and mitigating potential issues related to cuttings erosion or settling, ensuring a clean wellbore.
[0039] In certain embodiments, the workflow includes using bit design technologies to predict the distribution of cuttings sizes and then incorporating that prediction into fluid models to improve hole cleaning / cuttings transport while drilling an oil and gas well. For example, poly-crystalline diamond compact (PDC) drill bits are widely used in drilling engineering today. The rock-breaking mechanism of PDC cutters directly affects drilling performance, with mechanical specific energy (MSE) serving as a crucial index for assessing drilling efficiency. During the drilling operation, PDC bits produce cutting chips within the wellbore, and the distribution of these cutting sizes can further reflect overall drilling performance. The existing relationship between MSE and cutting size distribution may be leveraged to predict a cutting size distribution, enabling the evaluation of bit performance, the assessment of drilling process, and the improvement of hole cleaning.
[0040] According to certain embodiments, a cutting-size prediction model may be developed based on simulated MSE results. By applying a bit / rock interaction model used in bit design technologies, each cutter's cutting forces and contact area can be calculated, which allows for the determination of MSE. Figure 2 illustrates a graphical interface 200 displaying a table listing each cutter 202 of the drill bit, an area for each cutter 204, a volume for each cutter 206, and a force exerted by each cutter 208. In certain embodiments, the MSE of a cutter may at least be determined in part by a roughness index of the cutter. In certain embodiments, the MSE for each cutter may be determined by Equation 1: MSE=C· (rmax) D-3 (1) where rmax is a max radius of the cuttings, D is a fractal dimension that affects cutting size, and C is a constant value. In certain embodiments, the fractal dimension D may not be constant and instead may be dependent upon the depth at which the cuttings are removed, the angle at which the PDC bit presses into the rock (back-rake angle) , and a linear velocity of the cuttings through the drilling fluid. In certain embodiments, the fractal dimension D may be defined by Equation 2: D=D (h , θ , v) =D0+α·h+β·θ+γ·v (2) where h is a depth where the cuttings are removed, θ is a back-rake angle, v is a linear velocity of the cuttings, and where α, β, and γ are constant coefficients.
[0041] Next, assuming that cutting size follows the Gaudin-Schuhmann distribution function with coefficients (fractal dimension and rock constant) , a formula can be established to represent the mass proportion of various cutting sizes. Then, with the results from each cutter, the overall cutting size distribution for the entire bit can be obtained. In certain embodiments, the cutting proportion of the entire PDC bit for a selected cutting radius may be determined by Equation 3: where is a cutting proportion for the selected cutting radius of a single cutter, N is the total number of cutters on the PDC bit, and Vcutter_i is a volume of rock removed by cutter i.
[0042] Figure 3 illustrates a predicted mass proportion of the cuttings versus a cutting depth. For example, 29%of the cuttings at a cutting depth of 0.2mm are predicted to have a radius which falls within a range between 0.2mm and 0.3mm, while at a cutting depth of 1.4mm, only 5%of the cuttings are predicted to have a radius within that same size range. In certain embodiments, the prediction may be adjusted or revised using factors such as the depth of cut, weight on bit (WOB) , and the rate of penetration (ROP) , all of which can lead to significant differences in cutting size distribution. Additionally, the constant coefficients in the prediction model may also influence the distribution prediction. Additional calibration of the prediction may then be performed based on specific cutting conditions and rock materials. In certain embodiments, the predictions may be continuously improved by incorporating new data, leading to increasingly accurate forecasts over time.
[0043] According to certain embodiments, the workflow may be used to optimize drilling fluid properties by determining a specific cleaning parameter. Specifically, by predicting or estimating the size distribution of cuttings, the workflow may aid in designing drilling fluids with optimal rheological properties such as a viscosity, density, or the like which can be tailored to efficiently transport the specific predicted size range of cuttings. In certain embodiments, the workflow may enable real-time adjustments to drilling fluid properties to maintain effective cuttings transport as drilling conditions change.
[0044] According to certain embodiments, the workflow may use the determined cleaning parameter to improve hole cleaning efficiency. Knowledge of cuttings size distribution may allow for a precise calculation for optimizing a flowrate of the drilling fluid to ensure efficient transport of cuttings from the wellbore and prevent cuttings accumulation which can lead to non-productive time. In certain embodiments, the cleaning parameter to be determined may include a minimum flow rate of the drilling fluid, Qmin, required to lift cuttings may be determined by Equation 4: Qmin=Vc·A (4) where Vc is a critical velocity of the drill cuttings and A is a cross-sectional area of an annulus of a drill string. Utilizing principles such as Stokes'law, the workflow may assist in predicting and mitigating potential issues related to cuttings erosion or settling, thereby ensuring a clean wellbore. In certain embodiments, the cleaning parameter to be determined may be a settling velocity, Vs, of spherical particles in a fluid calculated using Stokes'law as defined by Equation 5: where ρp is a drill cuttings density, ρf is a density of the drilling fluid, g is the acceleration due to gravity, R is a radius of the drill cuttings, and μ is a dynamic viscosity of the drilling fluid.
[0045] According to certain embodiments, the workflow may be used to enhance hydraulic modeling. In some embodiments, the predicted cuttings size distribution seen in Figure 3 may be incorporated into hydraulic models, including but not limited to models based on Stokes'law and other sedimentation principles, which may result in more accurate simulations of cuttings transport dynamics. For example, previous hydraulic models may often consider only a single size for cuttings. However, by using a distribution of sizes, the workflow may allow for a more realistic and effective modeling scheme. For example, as seen in Figure 4, incorporating a predicted size distribution may lead to a higher cutting transport ratio for smaller cuttings as compared to a cutting transport ratio for larger cuttings. Additionally, as seen in Figure 5, modeling which takes a predicted size distribution of the cuttings into account can predict a hole cleaning index as it relates to a depth of the wellbore. In Figure 5, a graphical interface 500 is displayed on a screen showing a hole cleaning index (HCI) 502 for a specific wellbore which classifies the HCI 502 as either very good 504, good 506, fair 508, or poor 510 as defined by respective thresholds and a corresponding depth. For example, the HCI 502 may start out as being “good” for being above the good threshold 506 and below the fair threshold 508 for the first 1100 m of the wellbore. Then, due to changing inputs such as rock properties, a size distribution of cuttings measured at the surface, or other real-time drilling parameters, the HCI 502 may decrease and then cross beneath the good threshold 506, thereby classifying the HCI 502 of the subject wellbore as “very good” from a depth of about 1100 m to about 1500 m. As illustrated, the HCI 502 may then slightly increase to once again cross over the good threshold 506, thereby changing to classification of the cleaning of the wellbore from “very good” to “good” depending on the changing conditions of the wellbore, drill string, or the drilling fluid.
[0046] According to certain embodiments, the workflow may use the determined cleaning parameter used to provide a scenario analysis for different drilling parameters, thereby helping to identify optimal operational strategies for effective hole cleaning. In certain embodiments, a hydraulic transport of the cuttings can be modeled using the Ergun equation for pressure drop in packed beds as defined in Equation 6: where Δp is the pressure drop over a length of the a cuttings bed of the wellbore, ε is the porosity of the cuttings bed, L is a length of the cuttings bed, vs is a superficial fluid velocity, and Dp is a predicted diameter of the cuttings.
[0047] By predicting potential hole cleaning issues, the workflow may allow for proactive measures to be taken, thereby reducing the risk of stuck pipe incidents and other problems that lead to non-productive time (NPT) . Additionally, optimizing drilling fluid properties and flow rates based on cuttings size distribution and sedimentation models may reduce the volume of waste cuttings and drilling fluids that need to be managed, leading to a lower environmental impact. Exemplary Workflow
[0048] Figure 6 provides an exemplary detailed workflow 600 for optimizing drilling fluid properties for clearing cuttings from a wellbore at a wellsite. In certain embodiments, the workflow 600 includes receiving an initial data set related to a wellbore, as at 602. The received data may include historical drilling data, rock properties from a plurality of offset wells, an initial real-time set of drilling parameters, or a combination thereof. The initial real-time set of drilling parameters may include a depth of the wellbore, a design of a drill bit, or a density of a drilling fluid.
[0049] In certain embodiments, the workflow 600 further includes estimating a size distribution of drill cuttings to be removed from the wellbore based on the initial data set as at 604 and then determining a cleaning parameter of the wellbore based on the estimated size distribution of the drill cuttings, as at 606. In certain embodiments, determining the cleaning parameter of the wellbore 606 may include determining an optimal flow rate of a drilling fluid used in the wellbore based on the size distribution of the drill cuttings. The flow rate may be based on a critical velocity of the drilling fluid and a cross-sectional area of an annulus of the wellbore. Determining the cleaning parameter of the wellbore may also include determining a settling velocity of the drill cuttings in the drilling fluid or determining a pressure drop along a length of a cuttings bed within the wellbore. The pressure drop may be based on a porosity of a cuttings bed, a length of the cuttings bed, a superficial fluid velocity, and a diameter of particles in the drilling fluid.
[0050] In certain embodiments, the workflow 600 may also include receiving a further data set related to the wellbore, as at 608. The further data set may include a drill bit RPM, a weight on bit, a torque of the drill bit, or a surface analysis of the drill cuttings. In certain embodiments, the further data set may include any results obtained from image recognition techniques such as lithographic procedures performed at the surface of the wellbore, including but not limited to automated lithographic procedures or processes.
[0051] In certain embodiments, the workflow 600 may also include revising the estimated size distribution of drill cuttings to be removed from the wellbore based on the received further data set as at 610, updating the cleaning parameter of the wellbore based on the revised size distribution of the drill cuttings as at 612, and then displaying the updated cleaning parameter on a screen as at 614. In certain embodiments, revising the estimated size distribution of drill cuttings to be removed from the wellbore includes revising the estimated size distribution based on the results of any image recognition techniques performed related to the wellsite. For example, if an automated lithographic procedure is carried out on the returned drilling fluid, the size distribution of the drill cuttings to be removed may be adjusted so as to compensate, anticipate, or otherwise react to the lithographic results.
[0052] According to certain embodiments, the workflow 600 may further include performing a site action that is based on the updated cleaning parameter, as at 616. The site action may include generating or transmitting a signal that instructs or causes an action to occur. The action may include a physical action such as determining an optimal drilling fluid to be used in the wellbore, adjusting at least one parameter of a drilling fluid in real-time, mitigating issues related to cuttings erosion or settling, varying the flowrate or density of the drilling fluid being pumped into the wellbore, selecting an optimal downhole equipment to use within the wellbore, selecting optimal operating conditions for the downhole equipment, or a combination thereof. Exemplary Computing System
[0053] In some embodiments, the methods of the present disclosure may be executed by a computing system. Figure 7 illustrates an example of such a computing system 700, in accordance with some embodiments. The computing system 700 may include a computer or computer system 701A, which may be an individual computer system 701A or an arrangement of distributed computer systems. The computer system 701A includes one or more analysis modules 702 that are configured to perform various tasks according to some embodiments, such as one or more methods disclosed herein. To perform these various tasks, the analysis module 702 executes independently, or in coordination with, one or more processors 704, which is (or are) connected to one or more storage media 706. The processor (s) 704 is (or are) also connected to a network interface 707 to allow the computer system 701A to communicate over a data network 709 with one or more additional computer systems and / or computing systems, such as 701B, 701C, and / or 701D (note that computer systems 701B, 701C and / or 701D may or may not share the same architecture as computer system 701A, and may be located in different physical locations, e.g., computer systems 701A and 701B may be located in a processing facility, while in communication with one or more computer systems such as 701C and / or 701D that are located in one or more data centers, and / or located in varying countries on different continents) .
[0054] A processor may include a microprocessor, microcontroller, processor module or subsystem, programmable integrated circuit, programmable gate array, or another control or computing device.
[0055] The storage media 706 may be implemented as one or more computer-readable or machine-readable storage media. Note that while in the example embodiment of Figure 7 storage media 706 is depicted as within computer system 701A, in some embodiments, storage media 706 may be distributed within and / or across multiple internal and / or external enclosures of computing system 701A and / or additional computing systems. Storage media 706 may include one or more different forms of memory including semiconductor memory devices such as dynamic or static random access memories (DRAMs or SRAMs) , erasable and programmable read-only memories (EPROMs) , electrically erasable and programmable read-only memories (EEPROMs) and flash memories, magnetic disks such as fixed, floppy and removable disks, other magnetic media including tape, optical media such as compact disks (CDs) or digital video disks (DVDs) , disks, or other types of optical storage, or other types of storage devices. Note that the instructions discussed above may be provided on one computer-readable or machine-readable storage medium, or may be provided on multiple computer-readable or machine-readable storage media distributed in a large system having possibly plural nodes. Such computer-readable or machine-readable storage medium or media is (are) considered to be part of an article (or article of manufacture) . An article or article of manufacture may refer to any manufactured single component or multiple components. The storage medium or media may be located either in the machine running the machine-readable instructions, or located at a remote site from which machine-readable instructions may be downloaded over a network for execution.
[0056] It should be appreciated that computing system 700 is merely one example of a computing system, and that computing system 700 may have more or fewer components than shown, may combine additional components not depicted in the example embodiment of Figure 7, and / or computing system 700 may have a different configuration or arrangement of the components depicted in Figure 7. The various components shown in Figure 7 may be implemented in hardware, software, or a combination of both hardware and software, including one or more signal processing and / or application specific integrated circuits.
[0057] Further, the steps in the processing methods described herein may be implemented by running one or more functional modules in information processing apparatus such as general purpose processors or application specific chips, such as ASICs, FPGAs, PLDs, or other appropriate devices. These modules, combinations of these modules, and / or their combination with general hardware are included within the scope of the present disclosure.
[0058] Computational interpretations, models, and / or other interpretation aids may be refined in an iterative fashion; this concept is applicable to the methods discussed herein. This may include use of feedback loops executed on an algorithmic basis, such as at a computing device (e.g., computing system 700, Figure 7) , and / or through manual control by a user who may make determinations regarding whether a given step, action, template, model, or set of curves has become sufficiently accurate for the evaluation of the risk index.
[0059] The steps in the processing methods described above may be implemented by running one or more functional modules in information processing apparatus such as general purpose processors or application specific chips, such as ASICs, FPGAs, PLDs, or other appropriate devices. These modules, combinations of these modules, and / or their combination with general hardware are included within the scope of this disclosure.
[0060] Of course, many processing techniques for collected data, including one or more of the techniques and methods disclosed herein, may also be used successfully with collected data types other than seismic or other subsurface modeling data. While certain implementations have been disclosed in the context of seismic or other subsurface data collection and processing, those with skill in the art will recognize that one or more of the methods, techniques, and computing systems disclosed herein can be applied in many fields and contexts where data involving structures arrayed in a multi-dimensional space and / or subsurface region of interest may be collected and processed, e.g., medical imaging techniques such as tomography, ultrasound, MRI and the like for human tissue; radar, sonar, and LIDAR imaging techniques; mining area surveying and monitoring, oceanographic surveying and monitoring, and other appropriate multi-dimensional imaging problems.
[0061] Some examples of equations and mathematical expressions may have been provided in this disclosure. But those with skill in the art will appreciate that variations of these expressions and equations, alternative forms of these expressions and equations, and related expressions and equations that can be derived from the example equations and expressions provided herein may also be successfully used to perform the methods, techniques, and workflows related to the embodiments disclosed herein.
[0062] The foregoing description, for purposes of explanation, has been described with reference to specific embodiments. However, the illustrative discussions above are not intended to be exhaustive or to limit the described embodiments to the precise forms disclosed. Many modifications and variations are possible in view of the above teachings. The embodiments were chosen and described in order to explain the principles of this disclosure and its practical applications, to thereby enable others skilled in the art to use the disclosed approach and various embodiments with various modifications as are suited to the particular use contemplated.
Claims
1.A method for modifying drilling fluid properties for clearing cuttings from a wellbore, the method comprising:receiving (602) an initial data set related to a wellbore;estimating (604) a size distribution of drill cuttings to be removed from the wellbore based on the initial data set;determining (606) a cleaning parameter of the wellbore based on the estimated size distribution of the drill cuttings;receiving (608) a further data set related to the wellbore;revising (610) the estimated the size distribution of drill cuttings to be removed from the wellbore based on the received further data set; andupdating (612) the cleaning parameter of the wellbore based on the revised estimated size distribution of the drill cuttings.2.The method of claim 1, further comprising displaying (614) the updated cleaning parameter on a screen.3.The method of claims 1 or 2, wherein the received data comprises historical drilling data, rock properties from a plurality of offset wells, an initial real-time set of drilling parameters, or a combination thereof,wherein the initial data set comprises a depth of the wellbore, a design of a drill bit, a viscosity of a drilling fluid, or a density of the drilling fluid,wherein determining the cleaning parameter of the wellbore comprises determining an optimal flow rate or a viscosity of a drilling fluid used in the wellbore,wherein determining the cleaning parameter of the wellbore comprises determining a settling velocity of the drill cuttings in the drilling fluid,wherein determining the cleaning parameter of the wellbore comprises determining a pressure drop along a length of a cuttings bed within the wellbore, orwherein the further data set comprises a drill bit RPM, a weight on bit, a torque of the drill bit, or a surface image analysis of the drill cuttings.4.The method of claim 2, wherein displaying the updated cleaning parameter on a screen comprises displaying a hole cleaning index (500) of the wellbore according to a depth of the wellbore.5.The method of any of the preceding claims, further comprising performing (616) a site action based on the updated cleaning parameter.6.A computing system, comprising:one or more processors (704) ;a memory system (706) comprising one or more non-transitory computer-readable media storing instructions that, when executed by at least one of the one or more processors, cause the computing system to perform operations, the operations comprising:receiving (602) an initial data set related to a wellbore;estimating (604) a size distribution of drill cuttings to be removed from the wellbore based on the initial data set;determining (606) a cleaning parameter of the wellbore based on the estimated size distribution of the drill cuttings;receiving (608) a further data set related to the wellbore;revising (610) the estimated size distribution of drill cuttings to be removed from the wellbore based on the received further data set;updating (612) the cleaning parameter of the wellbore based on the revised estimated size distribution of the drill cuttings;displaying (614) the updated cleaning parameter on a screen; andperforming (616) a site action based on the updated cleaning parameter.7.The computing system of claim 6, wherein determining the cleaning parameter of the wellbore comprises:determining an optimal flow rate of a drilling fluid used in the wellbore;determining a settling velocity of the drill cuttings in the drilling fluid; ordetermining a pressure drop along a length of a cuttings bed within the wellbore.8.The computing system of claim 7, wherein determining the optimal flow rate of a drilling fluid used in the wellbore comprises a minimum flowrate of the drilling fluid required to lift the drill cuttings.9.The computing system of claim 8, wherein the minimum flowrate of the drilling fluid required to lift the drill cuttings is based on a critical velocity of the drill cuttings and a cross-sectional area of an annulus of a drill string.10.The computing system of any one of claims 7-9, wherein determining a settling velocity of the drill cuttings in the drilling fluid is based on a density of the drill cuttings, a density of the drilling fluid, a radius of the drill cuttings, and a dynamic viscosity of the drilling fluid.11.The computing system of any one of claims 7-10, wherein determining a pressure drop along a length of a cuttings bed within the wellbore is based on a porosity of the cuttings bed, a length of the cuttings bed, a superficial fluid velocity, and a predicted diameter of the drill cuttings.12.The computing system of any one of claims 6-11, wherein estimating (604) a size distribution of drill cuttings to be removed from the wellbore based on the initial data set comprises:determining a mechanical specific energy (MSE) of a drill bit comprising a plurality of cutters;determining a cutting proportion for each cutter of the drill bit based on the MSE; andcombing the cutting proportion for each cutter to provide a cutting proportion for the entire drill bit.13.The computing system of claim 12, wherein the MSE of the drill bit is based on a max radius of the drill cuttings and a fractal dimension, wherein the fractal dimension is based on a depth where the drill cuttings are removed, a back-rake angle, and a linear velocity of the drill cuttings.14.The computing system of any one claims 6-13, wherein performing (616) the site action comprises generating or transmitting a signal that instructs or causes an action to occur, wherein the action comprises a physical action, and wherein the physical action comprises determining an optimal drilling fluid to be used in the wellbore, adjusting at least one parameter of a drilling fluid in real-time, mitigating issues related to cuttings erosion or settling, varying the optimal flowrate or density of the drilling fluid being pumped into the wellbore, selecting an optimal downhole equipment to use within the wellbore, selecting optimal operating conditions for the downhole equipment, or a combination thereof.15.A non-transitory computer-readable medium storing instructions that, when executed by one or more processors of a computing system, cause the computing system to perform operations, the operations comprising:receiving (602) an initial data set related to a wellbore, wherein the received data comprises historical drilling data, rock properties from a plurality of offset wells, an initial real-time set of drilling parameters, or a combination thereof, wherein the initial real-time set of drilling parameters comprises a depth of the wellbore, a design of a drill bit, or a density of a drilling fluid;estimating (604) a size distribution of drill cuttings to be removed from the wellbore based on the initial data set;determining (606) a cleaning parameter of the wellbore based on the estimated size distribution of the drill cuttings, wherein determining the cleaning parameter of the wellbore comprises:determining an optimal flow rate of a drilling fluid used in the wellbore based on the size distribution of the drill cuttings, wherein the flow rate is based on a critical velocity of the drilling fluid and a cross-sectional area of an annulus of the wellbore;determining a settling velocity of the drill cuttings in the drilling fluid; ordetermining a pressure drop along a length of a cuttings bed within the wellbore, wherein the pressure drop is based on a porosity of a cuttings bed, a length of the cuttings bed, a superficial fluid velocity, and a diameter of particles in the drilling fluid;receiving (608) a further data set related to the wellbore, wherein the further data set comprises a drill bit RPM, a weight on bit, a torque of the drill bit, or a surface analysis of the drill cuttings;revising (610) the estimated size distribution of drill cuttings to be removed from the wellbore based on the received further data set;updating (612) the cleaning parameter of the wellbore based on the revised estimated size distribution of the drill cuttings;displaying (614) the updated cleaning parameter on a screen; andperforming (616) a site action based on the updated cleaning parameter, wherein performing the site action comprises generating or transmitting a signal that instructs or causes an action to occur, wherein the action comprises a physical action, and wherein the physical action comprises determining an optimal drilling fluid to be used in the wellbore, adjusting at least one parameter of a drilling fluid in real-time, mitigating issues related to cuttings erosion or settling, varying the optimal flowrate or density of the drilling fluid being pumped into the wellbore, selecting an optimal downhole equipment to use within the wellbore, selecting optimal operating conditions for the downhole equipment, or a combination thereof.
