Managing measurement prediction with reporting and handover procedure

AI/ML-based measurement prediction techniques enhance UE handover processes in wireless communication systems by enabling proactive handover preparation, reducing latency and improving mobility performance in high-data-rate low-latency scenarios.

WO2026232270A1PCT designated stage Publication Date: 2026-11-12GOOGLE LLC +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2025/092867
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2025-05-06
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

Existing UE handover procedures in wireless communication systems, particularly in high-data-rate low-latency scenarios, suffer from increased frequency of unintended events such as handover failure, radio link failure, and throughput loss due to reactive handover schemes, which are inadequate for high UE mobility and micro cells.

Method used

Implementing artificial intelligence/machine learning (AI/ML) based measurement prediction methods for radio resource management (RRM) to anticipate handover events, allowing UEs to transmit prediction reports to the network, thereby enabling the base station to prepare handovers more efficiently based on predicted measurement results.

Benefits of technology

Reduces handover latency and improves mobility performance by allowing proactive handover preparation, minimizing interruptions and power consumption at the UE side.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2025092867_12112026_PF_FP_ABST
    Figure CN2025092867_12112026_PF_FP_ABST
Patent Text Reader

Abstract

This disclosure provides systems, devices, apparatus, and methods, including computer programs encoded on storage media, for managing measurement prediction with reporting and handover procedure. A UE (102) transmits (512), to a network entity (106), a prediction report according to a procedure (580) associated with measurement prediction (508). The prediction report is transmitted to the network entity (106) in response to a prediction (510) that an event will occur in association with the measurement prediction (508). The UE (102) communicates (516, 524, 542), with the network entity (106), based on an action performed in association with the transmitting the prediction report.
Need to check novelty before this filing date? Find Prior Art

Description

MANAGING MEASUREMENT PREDICTION WITH REPORTING AND HANDOVER PROCEDUREFIELD OF THE DISCLOSURE

[0001] This disclosure relates to wireless communications and, more particularly, to managing measurement prediction and reducing latency for handover.BACKGROUND

[0002] The Third Generation Partnership Project (3GPP) specifies a radio interface referred to as fifth generation (5G) new radio (NR) (5G NR) . An architecture for a 5G NR wireless communication system includes a 5G core (5GC) network, a 5G radio access network (5G-RAN) , a user equipment (5G UE) , etc. The 5G NR architecture seeks to provide increased data rates, decreased latency, and / or increased capacity compared to prior generation cellular communication systems.

[0003] Wireless communication systems, in general, provide various telecommunication services (e.g., telephony, video, data, messaging, etc. ) based on multiple-access technologies, such as orthogonal frequency division multiple access (OFDMA) technologies, that support communication with multiple UEs. Improvements in mobile broadband continue the progression of such wireless communication technologies. For example, some UE handover procedures may be interrupted or fail due to UE mobility, large radio resources, or other similar events, which provides a need for implementing improved radio resource management (RRM) techniques.SUMMARY

[0004] During communication between a user equipment (UE) and a radio access network (RAN) , the RAN triggers and executes a handover based on historical measurement result (s) and / or reporting event (s) from the UE. Thus, the handover process is reactive in nature, which may be adequate when handover is among macro cells, when UE mobility is low, and / or when the network is providing certain currently-available services. However, when UE mobility is high, when UE mobility is among micro cells (e.g., of high density) , or when cells provide both existing services and high-data-rate low-latency services, the existing reactive handover scheme may result in increased frequency of unintended events including handover failure, radio link failure, instances of the ping-pong phenomenon, throughput loss, too early / late handover, etc. To better support high-data-rate low-latency services, artificial intelligence  / machine learning (AI / ML) based measurement predictions methods may be implemented for radio resource reduction, less interruption during handover, and / or power consumption saving at UE side to improve the mobility performance and to mitigate failures, e.g., such as through radio resource management (RRM) measurement event prediction.

[0005] The measurement prediction is either indirect measurement prediction or direction measurement prediction. For indirect measurement event prediction, the UE performs measurements and obtains actual measurement results from the measurements, skips performing measurements and predicts measurement results based on the actual measurement results, and determines whether a configured event occurs (e.g., an entering condition for the configured event is met or an entering condition for the configured event has been satisfied for a duration) based on the predicted measurement results. Ifthe UE determines that the configured event occurs, the UE transmits a prediction report to a base station, indicating that the configured event is predicted to occur. For direct measurement event prediction, the UE directly predicts whether the configured event occurs. If the UE predicts that the configured event occurs, the UE transmits a prediction report to a base station, indicating that the configured event is predicted to occur.

[0006] In some scenarios, the configured event is event A3 (i.e., a neighbor cell becomes offset better than a serving cell) . When receiving the predicted measurement report indicating predicted event A3 occurs, the base station prepares a handover to the neighbor cell for the UE. As a result of the handover preparation, the base station obtains a handover command for handing over the UE to the neighbor cell. After transmitting the predicted measurement report, the UE still evaluates whether the configured event (i.e., non-predicted event A3) is triggered based on actual measurement results obtained by the UE from measurements performed by the UE. If the UE detects that the configured event (i.e., non-predicted event A3) occurs, the UE transmits an actual measurement report to the base station, indicating the configured event occurs. In response to receiving the actual measurement report, the base station transmits the handover command to the UE. The UE performs a handover to the neighbor cell in accordance with the handover command.

[0007] Because the UE is configured with measurement predictions, the UE skips performing measurements in predication windows even though the UE transmits the predicted measurement report. As a result, skipping performing actual measurement (s) may increase delay to detect the non-predicted event A3. Such delay propagates to a handover decision based on the non-predicted event A3.

[0008] Aspects of the present disclosure address the above-noted and other deficiencies by implementing techniques to manage measurement prediction and reduce handover latency. For example, according to some aspects, the UE transmits, to a network entity, a prediction report according to a procedure associated with measurement prediction. The prediction report is transmitted to the network entity in response to a prediction that an event will occur in association with the measurement prediction. The UE communicates, with the network entity, based on an action performed in association with the transmitting the prediction report.

[0009] According to some aspects, a base station included in the RAN (or a network entity of the base station) receives, from a UE, a prediction report according to a procedure for measurement prediction. The prediction report indicates a prediction that an event will occur in association with the measurement prediction of the procedure. The base station / network entity communicates, with the UE, based on the receiving the prediction report from the UE.BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Fig. 1A is a block diagram of an example system in which a radio access network (RAN) and a user equipment (UE) can implement the techniques of this disclosure for managing artificial intelligence / machine learning (AI / ML) techniques according to an embodiment.

[0011] Fig. 1B is a block diagram of an example base station including a central unit (CU) and a distributed unit (DU) that can operate in the system of FIG. 1A according to an embodiment.

[0012] Figs. 2A-2B are block diagrams of example protocol stacks according to which the UE communicates with a base station or a unit of a base station (e.g., CU / DU) according to embodiments.

[0013] Figs. 3A-3C illustrate example implementations of time domain prediction by a UE according to an embodiments.

[0014] Figs. 4A-4C illustrate timelines for handover procedures according to embodiments.

[0015] Figs. 5A-5D are signaling diagrams illustrating communications between a UE and a base station for measurement prediction and reporting procedures according to embodiments.

[0016] Figs. 6A-6D are signaling diagrams illustrating handover procedures associated with measurement prediction and reporting according to embodiments.

[0017] Figs. 7A-7E illustrate timelines for the UE to perform performance monitoring according to embodiments.

[0018] Figs. 8A-8C illustrate timelines for the UE to perform performance monitoring where an ending time of a monitoring duration is the first time for the UE to predict an event to occur according to embodiments.

[0019] Figs. 9A-9E are flowcharts of methods of wireless communication at a UE according to embodiments.

[0020] Figs. 10A-10E are flowcharts of methods of wireless communication at a network entity according to embodiments.

[0021] Fig. 11 is an example flowchart of a method of wireless communication at a UE according to an embodiment.

[0022] Fig. 12 is an example flowchart of a method of wireless communication at a network entity, such as a base station or a unit of a base station, according to an embodiment.

[0023] Fig. 13 illustrates a schematic diagram of modules, components, or circuitry that can provide an example implementation for a UE to perform measurements according to an embodiment. DETAILED DESCRIPTION OF THE DRAWINGS

[0024] Techniques of the disclosure are directed to handover scenarios. A base station can prepare a handover more quickly by selecting a target cell in advance based on measurement predictions. In some example aspects, the base station can use predicted measurement results for layer 3 (L3) mobility (including handovers) and / or the UE can request or initiate handovers based on predicted measurement results. The UE can perform L1 measurements or filtering as described in more detail later herein. Prediction parameters, including observation window size and prediction window size, can be configured by the network to reduce measurement workload for the UE.

[0025] Referring first to Fig. 1A, an example wireless communication system 100 in which communication devices can implement one or more of these techniques. The wireless communication system 100 includes a UE 102, a base station (BS) 104, a base station 106 and a core network (CN) 110. The base stations 104, 106 can operate in a radio access network (RAN) 105. The CN 110 may be or include an evolved packet core (EPC) 111, a fifth generation (5G) core (5GC) 160 and / or a sixth generation (6G) core (6GC) 170, for example. The base station 104 can be an eNB supporting an S1 interface for communicating with the EPC 111, an ng-eNB supporting an NG interface for communicating with the 5GC 160, or a gNB that supports an NR radio interface as well as an NG interface for communicating with the 5GC 160. The base station 104 can also be an 6G base station (BS) supporting the NG interface, a new NG interface, or a 6G BS-to-CN (e.g., N6G) interface for communicating with the 5GC 160 or the 6GC 170. To directly exchange messages with each other during the scenarios discussed below, the base stations 104 and 106 can support an X2, Xn, new Xn, or 6G BS-to-BS (e.g., X6G) interface. Among other components, the EPC 111 can include a Serving Gateway (SGW) 112, a Mobility Management Entity (MME) 114, and a Packet Data Network Gateway (PGW) 116. The SGW 112 is generally configured to transfer user-plane packets related to audio calls, video calls, Internet traffic, etc., and the MME 114 is configured to manage authentication, registration, paging, and other related functions. The PGW 116 provides connectivity from the UE to one or more external packet data networks, e.g., an Internet network and / or an Internet Protocol (IP) Multimedia Subsystem (IMS) network. The 5GC 160 includes a User Plane Function (UPF) 162 and an Access and Mobility Management (AMF) 164, and / or a Session Management Function (SMF) 166. The UPF 162 is generally configured to transfer user-plane packets related to audio calls, video calls, Internet traffic, etc., the AMF 164 is configured to manage authentication, registration, paging, and other related functions, and the SMF 166 is configured to manage PDU sessions. The 6GC 170 includes a 6G UPF 172 and a 6G AMF 174, and / or 6G SMF 176, similar to the UPF 162, the AMF 164 and the SMF 176 with enhanced functions respectively.

[0026] As illustrated in Fig. 1A, the base station 104 supports cell 124, and the base station 106 supports cells 126A, 126B, and 126C. The cells 124, 126A, 126B, and / or 126C can operate on the same carrier frequency or different carrier frequencies. For example, the cells 126A, 126B, and 126C operate on DL carrier frequencies f1, f2, and f3 respectively. The cell 124 may operate on the DL carrier frequency f1. When the cells 124, 126A, 126B, and / or 126C operate in a time division duplex (TDD) mode, the cells 124, 126A, 126B, and / or 126C operate in UL carrier frequencies that are the same as the DL carrier frequencies. When the cells 124, 126A, 126B, and / or 126C operate in a frequency division duplex (FDD) mode, the cells 124, 126A, 126B, and / or 126C operate in UL carrier frequencies different from the DL carrier frequencies. The cells 124, 126A, 126B, and / or 126C can partially overlap to provide seamless service continuity. Thus, while the UE 102 may move among the cells 124, 126A, 126B, and 126C, the UE 102 may still communicate with the CN 110 via these cells. In some other scenarios, the cells 126B and / or 126C may belong to one or more other base stations (e.g., the base station 104 and / or one or more additional base stations not shown in Fig. 1A) . In general, the wireless communication network 100 can include any suitable number of base stations supporting 6G cells, NR cells and / or EUTRA cells. More particularly, the EPC 111 can be connected to any suitable number of base stations supporting EUTRA cells, while the 5GC 160 and / or the 6GC 170 can be connected to any suitable number of base stations supporting 6G cells and / or NR cells. Although the examples below refer specifically to specific CN types (EPC, 5GC, 6GC) and RAT types (6G, 5G NR and EUTRA) , in general the techniques of this disclosure also can apply to other suitable radio access and / or core network technologies such as seventh generation (7G) radio access and / or 7G core network.

[0027] With continued reference to Fig. 1A, the base station 104 includes processing hardware 130 that includes one or more general-purpose processors (e.g., CPUs) and a non-transitory computer-readable medium (CRM) storing instructions that the one or more general-purpose processors execute. Additionally or alternatively, the processing hardware 130 may include special-purpose processing units. According to an embodiment illustrated in Fig. 1 A, the processing hardware 130 includes a processor 132 to process data that the base station 104 transmits in the downlink direction, or data that the base station 104 receives in the uplink direction. The processing hardware 130 also includes a receiver 134 configured to transmit data in the downlink direction and to receive data in the uplink direction. The processing hardware 130 also includes a measurement controller 136 configured to manage measurement configurations. The processing hardware 130 further includes a measurement prediction controller 138 configured to manage (e.g., configure, release, activate, deactivate, enable, or disable) measurement prediction configurations for UEs as described in more detail later herein. The CRM (not shown) stores executable code that, when executed on the processor 132, enable the processor 132 to perform methods according to embodiments described in this section. The base station 106 includes generally similar components. In particular, components 140, 142, 144, 146, and 148 of the base station 106 may be similar to the components 130, 132, 134, 136, and 138 respectively.

[0028] The UE 102 includes processing hardware 150 that can include one or more general-purpose processors such as CPUs and non-transitory CRM storing machine-readable instructions executable on the one or more general-purpose processors, and / or special-purpose processing units. As schematically illustrated in Fig. 1A, the processing hardware 150 includes a processor 152 to prepare data that the UE 102 transmits in the uplink direction, or to process data that the UE 102 receives in the downlink direction. The processing hardware 150 also includes a transceiver 154 configured to transmit data in the uplink direction and to receive data in the downlink direction. The processing hardware 150 further includes a measurement controller 156 configured to manage measurement configurations, perform measurements and / or transmit measurement results. The process hardware 150 additionally includes a measurement prediction controller 158 configured to manage (e.g., configure, release, activate, deactivate, enable, or disable) measurement predictions.

[0029] Fig. 2A illustrates, in a simplified manner, an example protocol stack 200 according to which the UE 102 can communicate with an eNB / ng-eNB or a gNB 230 or 232 (e.g., one or more of the base stations 104, 106) .

[0030] In the example stack 200, a NR PHY 202B provides transport channels to a NR MAC sublayer 204B, which in turn provides logical channels to a NR RLC sublayer 206B. The NR RLC sublayer 206B in turn provides data transfer services to a NR PDCP sublayer 208B. The NR PDCP sublayer 208B in turn can provide data transfer services to a Service Data Adaptation Protocol (SDAP) 210B sublayer and / or a radio resource control (RRC) sublayer (not shown in Fig. 2A) . Similarly, a physical layer (PHY) 202A of 6G provides transport channels to the 6G MAC sublayer 204A, which in turn provides logical channels to the 6G RLC sublayer 206A. The 6G RLC sublayer 206A in turn provides RLC channels to a 6G PDCP sublayer 208A. The 6G PDCP sublayer 208A in turn can provide data transfer services to a 6G Service Data Adaptation Protocol (SDAP) sublayer 210A or a 6G radio resource control (RRC) sublayer (not shown in Fig. 2A) . In some implementations, the 6G SDAP sublayer 210A can be omitted. In such cases, the PDCP sublayer 208A may support functionalities of the SDAP sublayer 210A. The UE 102, in some implementations, supports both the 6G and the NR stack as shown in Fig. 2A, to support handover between 6G and NR base stations and / or to support DC over 6G and NR interfaces.

[0031] The 6G PDCP sublayer 208A and the NR PDCP sublayer 208B receive packets (e.g., from an Internet Protocol (IP) layer, layered directly or indirectly over the PDCP layer 208A or 208B) that can be referred to as service data units (SDUs) , and output packets (e.g., to the RLC layer 206A or 206B) that can be referred to as protocol data units (PDUs) . Except where the difference between SDUs and PDUs is relevant, this disclosure for simplicity refers to both SDUs and PDUs as “packets. ”

[0032] On a control plane, the 6G PDCP sublayer 208A and the NR PDCP sublayer 208B can provide signaling radio bearers (SRBs) or RRC sublayer (not shown in Fig. 2A) to exchange RRC messages or non-access-stratum (NAS) messages, for example. On a user plane, the 6G PDCP sublayer 208A and the NR PDCP sublayer 208B can provide Data Radio Bearers (DRBs) to support data exchange. Data exchanged on the 6G PDCP sublayer 208A and NR PDCP sublayer 208B can be SDAP PDUs, Internet Protocol (IP) packets or Ethernet packets.

[0033] Fig. 2B illustrates, in a simplified manner, an example protocol stack 250, which the UE 102 can communicate with a DU (e.g., DU 174) and a CU (e.g., CU 172) . The radio protocol stack 200 is functionally split as shown by the radio protocol stack 250 in Fig. 2B. The CU at any of the base stations 104 or 106 can hold all the control and upper layer functionalities (e.g., RRC 212, SDAP 210, PDCP 208) , while the lower layer operations (e.g., RLC 206, MAC 204, and PHY 202) are delegated to the DU. To support connection to a core network (e.g., 5GC or 6GC) , PDCP 208 provides DRBs to SDAP 210 and SRBs to RRC 212. In some implementations, the RRC 212, SDAP 210, and PDCP 208 are the 6G RRC 212A, 6G SDAP 210A, 6G PDCP 208A, respectively. In other implementations, the RRC 212, SDAP 210, and PDCP 208 are the NR RRC 212B, NR SDAP 210B, NR PDCP 208B, respectively.

[0034] Figs. 3A-3C illustrate example implementations in which a UE predicts continuous measurement results of a carrier frequency in a prediction window (PW) based on continuous historical measurement results of the carrier frequency in an observation window (OW) . Note, the historical measurement results in the OW are actual measurement results obtained by a UE based on measurements performed by the UE. In some implementations, the UE obtains the predicted measurement results and the historical measurement results for the same cell which can be a serving cell or a neighbor cell. In other implementations, the UE obtains the predicted measurement results and the historical measurement results for different cells. For example, the UE obtains the historical measurement results for a serving cell and obtains the predicted measurement results for a neighbor cell. The serving cell and the neighbor cell can be on the same or different frequency or RAT. In the Fig. 3, there is no gap between an OW and related PW. In some implementation, there can be a gap, e.g., at least one sampling or measurement periods between an OW and related PW.

[0035] Fig. 3A illustrates a diagram 300A of a certain mode or operational state of the UE, e.g., the calibration mode during which the UE trains or tunes an ML model (or called AI model) . OW 390A includes a certain number of consecutive observations (measurements) O1, O2, ... ON, where N >= 1. PW 392A includes a certain number of consecutive predictions P1, P2, ... PM, where M >= 1. In this example, N = M = 4, but in general the observation and prediction windows need not be of the same size, and the values of N and M can be any suitable positive integers.

[0036] The UE can train the ML model using the O1, O2, ..., ON to generate the predictions P1, P2, ... PM. Further, as illustrated in this example, the UE can collect observations within another OW 394A at the same time as generating predictions within PW 392A, to generate predictions in PW 396A. In particular, the UE in this example generates prediction P1 based on OW 390A and, for the same or different frequency (or set of frequencies) and for the same or different instance of time (e.g., one or more frames, timeslots, symbols) , generates an observation O'N within OW 394A. The overlap between PW 392A and OW 394A is one. In other words, the offset between OW 390A and OW 394A is one sampling or measurement period as measured in observation samples O or prediction samples P. More generally, the offset can be any suitable positive integer smaller than the size of the OW.

[0037] The UE can assess the difference between P1 and O'N to generate a feedback signal for training the ML model. A smaller difference P1 and O'N indicates greater accuracy of predictions, and greater difference accordingly indicates smaller accuracy of predictions. When the overlap between PW 392A and OW 394A is L > 1, the UE can assess the cumulative or average difference between groups of samples {P1, ... PL} and {O'N, ... O'N-L} .

[0038] In some implementations, the UE starts a new OW (not shown) with an offset of one relative to OW 394A, so that there is an overlap of one between the new OW and PW 396A, similar to the overlap between OW 394A and PW 392A. This approach does not provide power saving at the UE, and the UE in some implementations operates in the mode of Fig. 3A only when training or re-calibrating the ML model. In some implementations, the UE can operate in the mode of Fig. 3A for prediction. In Fig. 3A, the sliding length of the OW 390A and 394A is one sampling period or measurement period. It is understood that the sliding length can be any integrate number, e.g., 2 or 4 sampling periods or measurement periods.

[0039] Although Fig. 3A illustrates observations O2 and O'1 for example as distinct observations, these designations can be only logical, and the UE can perform a single observation that belongs both to OW 390A and OW 394A. In this sense, because each prediction is based on a certain number of prior observations, the UE operates OW 390A and 394A as a sliding OW, and accordingly operates PW394A and 396A as a sliding PW.

[0040] In some implementation, when the UE determines that the ML model is sufficiently accurate, the UE can operate without overlaps between OWs and PWs as illustrated in Fig. 3B. In some implementations, the UE is configured to operate in mode of Fig. 3B when training the ML model. In some implementations, the UE is configured to periodically re-enter the mode of Fig. 3A, so as to re-calibrate or fine-tune the ML model. When predictions are sufficiently accurate, the UE can consider the predictions applicable to the relevant carrier frequency, and provide an indication of applicability to the RAN.

[0041] In Fig. 3B, the diagram 300B illustrates an OW and a PW do not overlap. Thus, the UE generates predictions within PW 392B based on the observations in OW 390B, and then generates predictions within PW 396B based on the observations in OW 394B. The size of each of the OWs and the PWs is two in this example, and thus the UE generates two predictions based on two prior observations and expends approximately half the power required to generate observations at each instance of time.

[0042] In general, the OWs and the PWs in Fig. 3B can be of any suitable size, and the lengths of OWs and PWs need not be the same. In some implementations, the UE switches between the modes of Figs. 3A and 3B depending on the accuracy of predictions or based on timing as discussed above.

[0043] Now referring to Fig. 3C, the diagram 300C illustrates that the UE can implement a sliding OW 390C / 394C but omit certain observations to save power. In this example, the UE does not obtain an observation during gap G1, which is an occasion for a potential observation that occurs between two observations, within an OW 390C / 394C. The PW 392C / 396C in this example spans a single prediction based on three observations within the OW 390C / 394C, but the OW 390C / 394C spans five observation occasions. In this manner, the UE expends less power to generate the set of observations within the OW 390C / 394C.

[0044] It is understood that the UE can be configured to operate in mode of Fig. 3A, 3B or 3C when training the ML model. When the UE is deployed with the ML model, the UE can be configured to operate in mode of Fig. 3A, 3B or 3C for prediction. The modes to train a ML model or perform prediction on the ML model can be the same or different.

[0045] Figs. 4A, 4B, and 4C illustrate timelines 400A, 400B, and 400C for handover procedures. For example, Fig. 4A illustrates a legacy handover procedure based on actual event A3, where t2 corresponds to the entering condition for actual event A3 is fulfilled, t4 corresponds to receiving a measurement report indicating that actual event A3 occurs from the UE, t5 corresponds to transmitting a handover command to the UE, and t5+td corresponds to receiving a handover complete from the UE. In the diagram 400A, the UE first detect that the entering condition is met at time t2 and then after the time-to-trigger (TTT) (actual) duration 472A the UE determines that the configured event is complete and sends a measurement report to the base station at time t4. After receiving the measurement report from the UE, the base station prepares 474A a handover (HO) command, which is transmitted to the UE at time t5. Then, the UE performs 476A handover execution to the target, where the td corresponds to an interruption time during the handover.

[0046] Fig. 4B illustrates a timeline for both the legacy handover procedure and the prediction-based handover procedure. In the diagram 400B, the base station receives, from a UE at time t0, a measurement report for predicted event A3 or a prediction report (not shown) indicating that predicted event A3 will occurs at time t3. Thus, the base station begins to prepare 474B the handover command after time t0. At time t1, the entering condition for predicted event A3 is fulfilled, which triggers TTT (predicted) 473B. Afterwards, at time t2, the entering condition for actual event A3 is fulfilled, which triggers TTT (actual) 472B. At time t3, the predicted event A3 occurs and the base station receives, from the UE at time t4, a measurement report indicating that actual event A3 occurs. At time t4′, the base station transmits a handover command to the UE to begin handover execution 476B. At time t4′+td the base station receives a handover complete from the UE.

[0047] Fig. 4C illustrates an example timeline for the prediction-based handover, where the UE sends the measurement report based on actual measurement at a different time than described in Fig. 4B. In Fig. 4B, the UE sends the measurement report indicating that actual event A3 occurs after the TTT (actual) 472B. However, in Fig. 4C, the UE sends the measurement report indicating that actual entering condition of event A3 is met when the entering condition of the event A3 is first met. That is, in the diagram 400C, the base station likewise receives from the UE at time t0, a measurement report for predicted event A3 or a prediction report (not shown) indicating that predicted event A3 will occurs at time t3. Thus, the base station begins to prepare 474C the handover command after time t0. At time t1, the entering condition for predicted event A3 is fulfilled, which triggers TTT (predicted) 473C. Afterwards, the base station receives from the UE at time t2, the measurement report indicating that an entering condition for actual event A3 is met. At time t2′, the base station transmits a handover command to the UE to begin handover execution 476C. At time t2′+td, the base station receives a handover complete from the UE.

[0048] Next, several example scenarios in which the base station operating in the system of Fig. 1A configures the UE to perform measurement prediction and prepares a handover for the UE based on a predicted measurement result.

[0049] Referring first to Fig. 5A, in a scenario 500A, the UE 102 initially communicates with the base station 106 via a serving cell (e.g., cell 126A shown in Fig. 1A) on a first DL carrier frequency and a first UL carrier frequency. The first DL carrier frequency and the first UL carrier frequency can be the same or different. The base station 106 transmits 502 a measurement configuration and 504 a measurement prediction configuration to the UE 102. In some implementations, the measurement prediction configuration includes one or more configuration parameter (s) for measurement prediction (e.g., indirect measurement prediction or direct measurement prediction) . In some implementations, the measurement prediction configuration includes an indication indicating indirect measurement prediction or direct measurement prediction. In some implementations, the measurement prediction configuration includes an indication indicating prediction domain information. The prediction domain can be at least one of the following: temporal domain, frequency domain, or spatial domain. In some implementations, the measurement prediction configuration includes an indication indicating prediction type information. The prediction type information can include at least one of the following: intra-frequency intra-cell prediction, intra-frequency inter-cell prediction, inter-frequency inter-cell prediction, inter-RAT prediction or others. In some implementations, the measurement prediction configuration includes an indication indicating cluster-based prediction, e.g., multiple inputs cells to predict one or multiple output cells. In some implementations, the measurement prediction configuration includes an indication indicating non-sliding prediction or sliding prediction. In some implementations, the base station 106 assigns a measurement prediction configuration identifier or identity (ID) indicating (e.g., identifying) the measurement prediction configuration and transmits the measurement prediction configuration ID to the UE 102 in event 504. In one implementation, the measurement prediction configuration includes the measurement prediction configuration ID. In another implementation, in event 504, the base station 106 includes the measurement prediction configuration ID and the measurement prediction configuration in a container (e.g., information element (IE) ) and transmits the container to the UE 102. To simplify the following description, the measurement prediction configuration can represent the measurement prediction configuration alone, the measurement prediction configuration and the measurement prediction configuration ID, or the container.

[0050] In some implementations, the measurement prediction configuration includes one or more configurations for measurement predictions. For example, the measurement prediction configuration includes an observation window configuration configuring an observation window. In another example, the measurement prediction configuration includes a prediction window configuration configuring a prediction window. In some implementations, the observation window and the prediction window recur periodically as described for Figs. 3A-3C.

[0051] In some implementations, the measurement prediction configuration includes one or more configurations for prediction reporting. For example, the measurement prediction configuration may include a prediction report configuration configuring an event (e.g., predicted event) for the UE 102 to predict. The prediction report configuration may include parameters for evaluating (e.g., determine) whether an event (e.g., predicted event) occurs. The prediction report configuration may configure criterion / criteria for the UE 102 to determine whether the event occurs or to send a prediction report. The prediction report configuration may configure a reference signal (RS) type indicating a RS that the UE uses to obtain (beam or cell) predicted measurement results. The RS may be a synchronization signal (SS)  / physical broadcast channel (PBCH) block or a channel state information RS (CSI-RS) . The prediction report configuration may configure a reporting format that may configure one or more quantities per cell and / or per beam that the UE 102 includes in a prediction report. The one or more quantities may include or be a RS received power (RSRP) , Reference Signal Received Quality (RSRQ) , Received Signal Strength Indicator (RSSI) , Signal to Interference plus Noise Ratio (SINR) , or others. Optionally, the one or more quantities can be L3 filtered result (s) . The reporting format may include other associated information such as the maximum number of cells and / or the maximum number of beams per cell to report.

[0052] In some implementations, the criterion / criteria includes a first inequality for evaluating whether a first entering condition for the event is fulfilled. The prediction report configuration may include first parameters for evaluating (e.g., determine) whether the first entering condition (i.e., the first inequality) is fulfilled. In some implementations, the criterion / criteria includes a second inequality for evaluating whether a first leaving condition (i.e., the second inequality) for the event is fulfilled. The prediction report configuration may include second parameters for evaluating (e.g., determine) whether the first leaving condition (i.e., the second inequality) is fulfilled. The second parameters may be the same as or different from the first parameters. In some implementations, the measurement prediction configuration or the prediction report configuration may not configure or configure a first time to trigger (TTT) (i.e., a value) indicating a time duration for which the first entering condition for the event has to be met in order to trigger a prediction report. In one example, if the first entering condition has been fulfilled, e.g., the first TTT is not configured or the first TTT is configured with a value set to zero, the UE 102 determines that the event occurs. In another example, ifthe first entering condition has been fulfilled for the first TTT (if configured with a non-zero value) , the UE 102 determines that the event occurs.

[0053] In other implementations, the UE 102 is not configured with a TTT (i.e., a value) indicating a time duration for which the entering condition for the event has to be met, e.g., in order to trigger a prediction report (first TTT) , or to trigger a measurement report (second TTT) , or the UE 102 is configured with a TTT (e.g., first TTT or second TTT) set to value 0. For example, the measurement prediction configuration or the prediction report configuration does not configure a TTT, or configures the TTT to 0. In one implementation, ifthe first entering condition is fulfilled, the UE 102 determines that the event occurs based on predictions and / or actual measurements. In another implementation, if the UE 102 is configured with a TTT (e.g., first TTT or second TTT) as describe below, the UE 102 may use the TTT. In this case, ifthe first entering condition has been fulfilled for the TTT, the UE 102 determines that the event occurs.

[0054] In other implementations, the measurement prediction configuration does not include the prediction report configuration. In such cases, the UE 102 uses a reporting configuration indicated or configured in the measurement configuration to determine whether to send a prediction report.

[0055] In some implementations, the base station 106 transmits the measurement configuration and the measurement prediction configuration in a single DL message (e.g., RRC reconfiguration message) to the UE 102. In response, the UE 102 may transmit a UL response message (e.g., a RRC reconfiguration complete message) . In other implementations, the base station 106 transmits the measurement configuration and the measurement prediction configuration in a first DL message (e.g., RRC reconfiguration message) and a second DL message (e.g., a RRC reconfiguration message) to the UE 102, respectively. In response to the first DL message and the second DL message, the UE 102 may transmit a first UL response message and a second UL response message, respectively. The measurement configuration may include some or all of the following: measurement object configuration, reporting configuration (e.g., to trigger a measurement report) , event triggered configuration, and / or second TTT. The measurement prediction configuration may include some or all of the following: measurement prediction configuration ID, prediction domain information, prediction type information, configurations for prediction reporting (e.g., to trigger a prediction report) , parameters for evaluating / determining whether an event (e.g., predicted event) occurs, and / or first TTT.

[0056] In some implementations, the measurement configuration configures measurement and reporting that are based on a measurement object configuration and a reporting configuration respectively. The measurement object configuration configures a measurement object on which the UE 102 perform measurements. The measurement object configures a second DL carrier frequency for measurement. In some implementations, the second DL carrier frequency is or is within the first DL carrier frequency. In other implementations, the second DL carrier frequency does not overlap with the first DL carrier frequency. In some implementations, the measurement object indicates a frequency / time location and / or a subcarrier spacing of reference signal (s) to be measured. The reporting configuration configures measurement result reporting. The reporting configuration may configure (e.g., include) a reporting type. The reporting configuration may configure criterion / criteria for the UE 102 to determine whether to send a measurement report. The reporting configuration may configure a reference signal (RS) type indicating a RS that the UE 102 uses to obtain (beam or cell) measurement results. The RS may be a SS / PBCH block or a CSI-RS. The reporting configuration may configure a reporting format that may configure one or more quantities per cell and / or per beam that the UE includes in a measurement report. The descriptions of one or more quantities can refer to the above ones and will not be repeated herein. The reporting format may include other associated information such as the maximum number of cells and / or the maximum number of beams per cell to report.

[0057] In some implementations, the reporting type is periodical or event triggered. Ifthe reporting type is periodical, the UE 102 periodically transmits a measurement report (e.g., MeasurementReport message) to the base station 106. The reporting configuration may include a periodicity for the periodical measurement reports. If the reporting type is event triggered, the reporting configuration may include an event trigger configuration configuring an event (e.g., trigger event) for the UE 102 to detect. The event in the event trigger configuration may be the same as the event (if configured or included) in the measurement prediction configuration. If the UE 102 detects the event (i.e., actual event) occurs as described below, the UE 102 transmits a measurement report to the base station 106. The event trigger configuration may include parameters for evaluating (e.g., determine) whether the event occurs. In some implementations, the criterion / criteria includes a third inequality for evaluating whether a second entering condition for the event is fulfilled. The event trigger configuration may include third parameters for evaluating (e.g., determine) whether the second entering condition (i.e., the third inequality) is fulfilled. The second entering condition may be the same as or different from the first entering condition. The third inequality may be the same as or different form the first inequality. The third parameters may be the same as or different from the first parameters. In some implementations, the criterion / criteria includes a fourth inequality for evaluating whether a second leaving condition (i.e., the fourth inequality) for the event is fulfilled. The event trigger configuration may include fourth parameters for evaluating (e.g., determine) whether the second leaving condition (i.e., the fourth inequality) is fulfilled. The second leaving condition may be the same as or different from the first leaving condition. The fourth inequality may be the same as or different form the second inequality. The fourth parameters may be the same as or different from the second parameters or the third parameters. The event trigger configuration may include a second TTT (i.e., a value) indicating a time duration during the entering condition for the event needs to be met in order to trigger a measurement report. In one example, the second TTT applies specifically to the evaluation (using actual measurements) of events that were predicted to occur. In some implementations, the first / second parameters in the event trigger configuration may include one or more offsets, one or more thresholds, a maximum number of RS indexes to report, a maximum number of cells to include in a measurement report, an indication indicating to include the best neighbor cells per serving frequency, an indication indicating to send a measurement report when the leaving condition is met for a cell in a cell triggered list, and / or a report quantity for measurement result (s) included in a measurement report. The second TTT may be shorter than, longer than, or equal to the first TTT.

[0058] In some implementations, the even trigger configuration includes an event ID indicating the event. In one implementation, the event ID is event A3 and the event is that the UE transmits a measurement report when the UE detects that a neighbor cell becomes offset better than a serving cell, e.g., in terms of the reporting quantity. In some implementations, the entering condition and the leaving condition for event A3 are as described in 3GPP specification 38.331. In other implementations, the event ID is event A5 and the event is that the UE detects that a service cell becomes worse than threshold 1 and a neighbor cell becomes better than threshold 2. The serving cell may be the cell 124 which may be primary cell or a primary secondary cell group (SCG) cell. In some implementations, the entering condition and the leaving condition for event A5 are as described in 3GPP specification 38.331.

[0059] In some implementations, the measurement configuration includes the measurement object configuration and the reporting configuration. In some implementations, the base station 106 transmits the measurement object configuration and the reporting configuration to the UE 102 in event 502 and / or one or more other DL messages (e.g., RRC reconfiguration messages) . In some implementations, the measurement configuration includes a measurement object ID, and / or a report configuration ID. The measurement object ID indicate the measurement object configuration. The report configuration ID indicates the reporting configuration. Thus, including the measurement object ID and the report configuration ID in the measurement configuration indicates that the measurement object configuration and the reporting configuration are associated with or part of the measurement configuration. The measurement configuration may include a measurement ID indicating (e.g., identifying) the measurement configuration. In some implementations, the measurement configuration configures inter-frequency measurement and reporting. In other implementations, the measurement configuration configures intra-frequency measurement and reporting.

[0060] In some implementations, the measurement configuration includes the measurement prediction configuration. In other implementations, the measurement configuration includes the measurement prediction configuration ID to indicate that the measurement prediction configuration is associated with the measurement configuration. In other implementations, the measurement prediction configuration includes the measurement ID to indicate that the measurement prediction configuration is associated with the measurement configuration. In some implementations, the configuration parameter (s) in the measurement prediction configuration configure an observation window (length) and / or number of actual (i.e., non-predicted) measurement results in the observation window used for prediction as described for Figs. 3A-3C. In the case of indirect measurement prediction, the configuration parameter (s) may configure a prediction window (length) and / or number of measurement results to predict in the prediction window as described for Figs. 3A-3C. In the case of direct measurement prediction, the configuration parameter (s) may configure a prediction window (length) for predicting occurrence of the event. In some implementations, the observation window and the prediction window periodically recur as described for Figs 3A-3C.

[0061] The UE 102 performs 506 measurements based on the measurement configuration. The UE 102 may perform 506 measurements for the serving cell and a neighbor cell. In some implementations, the UE 102 performs 506 measurements in a periodic observation window (i.e., recurred periodically) as described for Figs. 3A-3C. The UE 102 may perform 506 measurements for the serving cell and a neighbor cell in the periodic observation window. At event 508, the UE 102 suspends (i.e., skips) measurements and performs measurement predictions for the skipped measurements using an AI model, based on the measurement prediction configuration. In some implementations, the UE 102 skips measurements a prediction window (recurred periodically) and performs measurement predictions for the skipped measurements in the prediction window using the AI model, as described for Figs. 3B and 3C. The UE 102 may perform 508 measurement predictions in the periodic prediction window to obtain predicted measurement result (s) for the serving cell. The UE 102 may perform 508 measurement predictions in the periodic prediction window to obtain predicted measurement result (s) for the neighbor cell. The AI model may be a classification model or a regression model.

[0062] In some implementations, the UE 102 obtains intermediate measurement results (i.e., actual or non-predicted measurement results) from the measurements 506 and generates the at least one measurement result (i.e., actual or non-predicted measurement result) using the intermediate measurement results as described for Fig. 11. In some implementations, the UE 102 performs 508 the measurement predictions based on the measurements 506, the intermediate measurement results, and / or the at least one measurement result. In some implementations, in the measurement predictions, the UE 102 may predict one or more measurement result (s) based on the measurements 506, the intermediate measurement results, and / or the at least one measurement result. In some implementations, the predicted measurement result (s) include predicted RSRP value (s) . In some implementations, the UE 102 may predict one or more measurement result (s) for the serving cell based on the measurements for the serving cell and / or one or more other cell (s) , the intermediate measurement results for the serving cell and / or one or more other cell (s) , and / or the at least one actual measurement result for the serving cell and / or one or more the other cell (s) . In some implementations, the UE 102 may predict one or more measurement result (s) for the neighbor cell based on the measurements for the serving cell and / or one or more other cell (s) , the intermediate measurement results for the serving cell and / or one or more other cell (s) , and / or the at least one actual measurement result for the serving cell and / or one or more other cell (s) . The one or other cells described above may include the serving cell, the neighbor cell, and / or one or more additional cell (s) other than the serving cell and the neighbor cell.

[0063] In some implementations, the UE 102 determines (i.e., indirectly predict) whether the event occurs based on the predicted measurement result (s) for the serving cell and / or the predicted measurement result (s) for the neighbor cell. In some implementations, the UE 102 determines whether the entering condition is met, e.g., the first TTT is not configured or configured with the value set to 0, based on the predicted measurement result (s) for the serving cell and / or the predicted measurement result (s) for the neighbor cell. If the entering condition has been met for the first TTT if configured with the value set to a non-zero one, the UE 102 determines the event occurs (e.g., the event is triggered) . In other implementations, in the measurement predictions, the UE 102 directly predicts whether the event occurs based on the measurements 506, the intermediate measurement results, and / or the at least one non-predicted measurement result.

[0064] In some implementations, the UE 102 predicts 510 the event occurs based on a first predicted measurement result for the serving cell and / or a second predicted measurement result for the neighbor cell, as described above. In other implementations, the UE 102 predicts 510 the event occurs based on the measurements 506, the intermediate measurement results, and / or the at least one non-predicted measurement result, as described above. In response to the prediction 510, the UE 102 transmits 512 a prediction report to the base station 106, including a physical cell ID (PCI) of a neighbor cell, the measurement ID, the measurement prediction configuration ID, at least one measurement result (s) , and / or predicted time information. In one implementation, the measurement result (s) includes the first predicted measurement result and / or the second predicted measurement result. In another implementation, the measurement result (s) includes at least one first actual measurement result (s) for the serving cell, which the UE 102 obtains as described above. In yet another implementation, the measurement result (s) includes at least one second actual measurement result (s) for the neighbor cell, which the UE 102 obtains as described above. The UE 102 may use the first actual measurement result (s) and / or the second actual measurement result (s) to predict the event occurs. The UE 102 may use the first actual measurement result (s) to predict the first predicted measurement result. The UE 102 may use the second actual measurement result (s) to predict the second predicted measurement result.

[0065] In some implementations, the predicted time information includes a predicted future time where the UE 102 predicts the event occurs. In other implementations, the predicted time information includes a predicted future time where / when the UE 102 predicts the entering condition is met based on a predicted measurement result at least for the neighbor cell. In other implementations, the predicted time information includes a predicted future time where / when the UE 102 predicts the entering condition has been met for the first TTT based on a predicted measurement result at least for the neighbor cell. The predicted future time may be an absolute time. Alternatively, the predicted future time may be a system frame number (SFN) and / or a slot number. In yet other implementations, the predicted time information indicates a duration relative to a deterministic time point. For example, the deterministic time point is a time of a time slot where the base station 106 receives the prediction report. The time point may be absolute time. Alternatively, the time point may be a SFN and / or a slot number. The duration may be in units of milliseconds, sections, number of slots, or number of frames. Thus, the base station 106 determines a time point that the UE 102 predicts the event occurs, based on the deterministic time point and the duration. In some implementations, the predicted time information includes time information of the best or worst predicted measurement result.

[0066] In some implementations, the measurement ID (if included) in the prediction report indicates that the prediction report is associated with the measurement configuration and / or the measurement prediction configuration. In some implementations, the measurement prediction configuration ID (if included) in the prediction report indicates that the prediction report is associated with the measurement prediction configuration.

[0067] In some implementations, the prediction report is a measurement report message (e.g., MeasurementReport message) . In some implementations, the UE 102 includes a prediction indication in the measurement report message to indicate that the measurement report message includes predicted information. In other implementations, the UE 102 includes a prediction indication in the measurement report message to indicate the measurement result is a predicted measurement result.

[0068] The base station 106 determines to prepare a handover to the neighbor cell (i.e., a target cell) for the UE 102 based on the prediction report. The base station 106 operates the neighbor cell. In response to the determination, the base station 106 obtains (e.g., generates) 582 a handover command for handing over the UE 102 to the target cell. The handover command may include a lower layer configuration (e.g., a cell group configuration) for the UE 102 to communicate with the base station 106 via the target cell. In some implementations, the base station 106 includes a CU and one or more DUs (e.g. a first DU and / or a second DU) . The first DU operates the serving cell for the UE 102. In such cases, events 502, 504, and 512 occur between the UE 102 and the CU via the first DU. In some implementations, the first DU operates the serving cell. In response to determining the handover, the CU sends a CU-to-DU message to the first DU for the handover. The CU-to-DU message may include a cell ID of the target cell. In response, the first DU generates the lower layer configuration for the handover and sends a CU-to-DU message including the lower layer configuration to the CU. The CU generates the handover command including the lower layer configuration. In other implementations, the second DU operates the target cell. In response to determining the handover, the CU sends a CU-to-DU message to the second DU for the handover. The CU-to-DU message may include the cell ID. In response, the second DU generates the lower layer configuration for the handover and sends a CU-to-DU message including the lower layer configuration to the CU. The CU generates the handover command including the lower layer configuration.

[0069] In some implementations, the base station 106 may determine 514 to deactivate the measurement prediction configuration in response to receiving the prediction report. That is, the base station 106 determines to command the UE 102 to suspend performing measurement predictions configured by the measurement prediction configuration. In response to the determination 514, the base station 106 transmits 516 a prediction deactivation command to the UE 102, deactivating the measurement prediction configuration. In response to receiving the prediction deactivation command, the UE 102 deactivates 518 the measurement prediction configuration. That is, the UE 102 suspends performing measurement predictions configured by the measurement prediction configuration. In some implementations, the prediction deactivation command may include the measurement prediction configuration ID to indicate the measurement prediction configuration to be deactivated. The UE 102 identifies the measurement prediction configuration to deactivate in accordance with the measurement prediction configuration ID. In some implementations, the prediction deactivation command is a MAC control element (CE) . In one implementation, the MAC CE may include a deactivation indication (e.g., 1-bit field) . Alternatively, the MAC CE does not include a deactivation indication. In other implementations, the prediction deactivation command is a RRC message (e.g., a RRC reconfiguration message) . In one implementation, the RRC message may include a deactivation indication (e.g., 1-bit field) . Alternatively, the RRC message does not include a deactivation indication. In some implementations, the prediction deactivation command configures a deactivation duration. In such cases, the UE 102 deactivates 518 the measurement prediction configuration for the deactivation duration. In some implementations, the deactivation duration includes at least one PW.

[0070] In other implementations, the base station 106 may determine 514 to deactivate or release the measurement prediction configuration in response to receiving the prediction report. That is, the base station 106 determines to configure the UE 102 to deactivate or release the measurement prediction configuration. In response to the determination 514, the base station 106 transmits 516 a message (e.g., a RRC message such as a RRC reconfiguration message) to the UE 102, deactivating or releasing the measurement prediction configuration. In response to receiving the message, the UE 102 deactivates or releases 518 the measurement prediction configuration. Thus, the UE 102 stops performing measurement predictions configured by the measurement prediction configuration. In some implementations, the message may include the measurement prediction configuration ID to indicate the measurement prediction configuration to be released. The UE 102 identifies the measurement prediction configuration to release in accordance with the measurement prediction configuration ID.

[0071] In some implementations, events 514 and 516 are skipped. In such implementations, the UE 102 deactivates 518 the measurement prediction configuration in response to transmitting the prediction report. In some implementations, the measurement prediction configuration includes a first configuration configuring the UE 102 to do so. In some implementations, the first configuration configures deactivation duration information. In such cases, the UE 102 deactivates 518 the measurement prediction configuration for the deactivation duration information. In some implementations, the deactivation duration includes time information indicating when the measurement prediction configuration is deactivated. When the time indicated by the said time information reaches, the UE performs actual measurement. The said time information may indicate or be the starting of the PW where the predicted event occurs, a first time offset after the starting of the PW information where the predicted event occurs, a second time offset before the time where / when the predicted event is entered or triggered. Correspondingly, the UE 102 deactivates 518 the measurement prediction configuration form the starting of the PW where the predicted event occurs, from the offset after the starting of the PW information where the predicted event occurs, from a second time offset before the time where / when the predicted event occurs. In some implementations, the UE 102 deactivates 518 the measurement prediction configuration at least for at least one PW, at least until the time when the actual event occurs, or at least until the predicted future time.

[0072] In response to deactivating or releasing the measurement prediction configuration, the UE 102 resumes 520 performing measurements, e.g., based on the deactivation duration information, or in the periodic prediction window. For example, the UE 102 starts performing (i.e., no longer skips) measurements in the periodic prediction window. In other words, the UE 102 performs measurements in both the observation window and the prediction window. After the resuming 520, the UE 102 may perform measurements for the serving cell and / or at least a neighbor cell. The UE 102 may generate at least one third actual (i.e., non-predicted) measurement result (s) (e.g., RSRP value (s) ) for the serving cell from the measurements for the serving cell, as described for Fig. 11. The UE 102 may generate at least one fourth actual (i.e., non-predicted) measurement result (s) (e.g., RSRP value (s) for the neighbor cell from the measurements for the neighbor cell, as described for Fig. 11. In some implementations, the UE 102 determines whether the event occurs based on the third actual measurement result (s) and / or the fourth measurement result (s) . In some implementations, the UE 102 detects (e.g., determines) 522 the event occurs based on the third actual measurement result (s) and / or the actual fourth measurement result (s) . In some implementations, the UE 102 determines whether the second entering condition is met based on the third actual measurement result (s) and / or the fourth actual measurement result (s) . If the second entering condition has been met for the second TTT, the UE 102 determines 522 the event occurs. In other implementations, the UE 102 determines 522 the event occurs ifthe second entering condition is met for the first time based on the third actual measurement result and / or the fourth actual measurement result. In some implementations, the UE 102 determines to do so by disabling the second TTT (i.e., the UE 102 considers the second TTT as zero) . In other implementations, the base station 106 configures the UE 102 to do so in the measurement configuration or the measurement prediction configuration. For example, the base station 106 does not configure the second TTT or configures the second TTT set to zero. In another example, the measurement configuration includes a TTT disabled configuration indicating that the UE 102 disables TTT (e.g., the second TTT, if configured with a non-zero value) when a measurement prediction configuration (the measurement prediction configuration 504) received by the UE 102 is configured, enabled, or activated, or when the UE 102 evaluates the criterion / criteria for the configured event based on actual measurements in a prediction window. In accordance with the TTT disabled configuration, the UE 102 disables the second TTT when receiving 504 the measurement prediction configuration or performing 508 measurement predictions, or evaluating criterion / criteria for the configured event based on actual measurements in a prediction window. In yet another example, the measurement configuration includes a TTT disabled configuration indicating that the UE 102 disables TTT (e.g., the second TTT) when the second entering condition is met. In accordance with the TTT disabled configuration, the UE 102 disables the second TTT when the second entering condition is met.

[0073] In response the detection 522, the UE 102 transmits 524 a measurement report (e.g., MeasurementReport message) including a fifth one of the third actual measurement result (s) and / or a sixth one of the fourth actual measurement result (s) . The measurement report can be triggered when the UE 102 detects that the entering condition of the configured event is first met (e.g., second TTT=0, or disabling non-zero second TTT) or the entering condition of the configured event has been satisfied for a configured duration (e.g., non-zero second TTT) . The fifth actual measurement result may be the most recent actual measurement result. The sixth actual measurement result may be the most recent actual measurement result. In some implementations, the UE 102 includes the measurement ID in the measurement report to indicate that the measurement report is associated with the measurement configuration. In some implementations, the UE 102 includes the PCI of the serving cell in the measurement report to indicate the fifth actual measurement result is associated with the serving cell. In some implementations, the UE 102 includes the PCI of the neighbor cell in the measurement report to indicate the sixth actual measurement result is associated with the neighbor cell.

[0074] After (e.g., in response to) receiving the measurement report, the base station 106 determines 526 to send the handover command to the UE 102. In response to the determination 526, the base station 106 transmits 528 the handover command to the UE 102 via the serving cell. In response, the UE 102 accesses the target cell and transmits 530 a handover complete message to a target base station 104 via the target cell, in accordance with the lower layer configuration. The handover command and the handover complete message may be a RRC reconfiguration message and a RRC reconfiguration complete message, respectively. To access the target cell, the UE 102 may perform a random access procedure with the base station 106 via the target cell. If the random access procedure is a four-step random access procedure, the UE 102 may transmit the handover complete message in a message 3 MAC PDU to the base station 106 in the four-step random access procedure. If the random access procedure is a two-step random access procedure, the UE 102 may transmit the handover complete message in a message A MAC PDU to the base station 106 in the two-step random access procedure. If the random access procedure is a contention-free random access procedure, the UE 102 may transmit the handover complete message in a MAC PDU to the base station 106 after completing the random access procedure.

[0075] The events 502, 504, 506, 508, 510, and 512 are collectively referred to in Fig. 5A as a measurement prediction and reporting procedure 580. The events 514, 516, 518, 520, 522, and 524 are collectively referred to in Fig. 5A as a measurement and reporting without prediction procedure 584.

[0076] Fig. 5B depicts a scenario 500B similar to the scenario 500A. The differences between the scenarios 500A and 500B are described below. After event 520, the UE 102 does not detect the event occurs within a first period of time and therefore does not transmit a measurement report like event 524 of Fig. 5A. Thus, the base station 106 determines 532 no non-predicted measurement result for the event and the target cell from the UE 102 for a second period of time. That is, the base station 104 does not receive a measurement report like event 524 from the UE 102 for the second period of time. In response to the determination 532, the base station 106 cancels 590 the prepared handover (e.g., discards the handover command and / or releases resources prepared for the handover) . The second period of time may be shorter than or equal to the first period of time. The base station 106 may predetermine the second period of time. As described for Fig. 5A, the base station 106 may include the CU and one or more DUs (e.g. the first DU and / or the second DU) . If the first DU operates the target cell, the CU may obtain the lower layer configuration from the first DU as described for Fig. 5A. To cancel the prepared handover, the CU transmits a CU-to-DU message (e.g., UE Context Modification Request or UE Context Release Command message) to the first DU to release prepared resources (e.g., the lower layer configuration) for the UE 102. In some implementation, the CU-to-DU message includes a cause indicating a prediction error or low prediction accuracy. In response, the first DU releases the resources prepared for the handover and transmits a DU-to-CU message (e.g., UE Context Modification Response or UE Context Release Complete message) to the CU to confirm that the first DU releases the prepared resources.

[0077] In some implementations, the base station 106 starts a timer with a timer value in response to determining to prepare the handover or the event 582. The base station sets to the second period of time. If the base station 106 receives a non-predicted measurement result for the event and the target cell from the UE 102 (e.g., the measurement report 524 in Fig. 5A) , the base station 106 stops the timer value and transmits the handover command to the UE as described for events 526, 528 and 530. The non-predicted measurement result can be triggered when the UE detects that the entering condition of the configured event is first met (e.g., second TTT=0, or disabling non-zero second TTT) or the entering condition of the configured event has been satisfied for a configured duration (e.g., non-zero second TTT) . Otherwise, if the base station 106 does not receive a non-predicted measurement result for the event and the target cell from the UE 102 (e.g., the measurement report 524 in Fig. 5A) and the timer expires, the base station 106 cancel 590 the prepared handover. The base station 106 may transmit 534, to the UE 102, a prediction activation command or measurement prediction configuration. The UE 102 activates or performs 536 measurement predictions based on the prediction activation command or measurement prediction configuration.

[0078] Fig. 5C depicts a scenario 500C similar to the scenario 500A. The differences among the scenarios 500A, 500B and 500C are described below. In the scenario 500C, the base station 106 transmits 538 a performance report configuration to the UE 102, configuring performance monitoring and reporting for measurement predictions. Event 538 may occur after or before event 580. In some implementations, the UE 102, after (e.g., in response to) predicting the event occurs or transmitting a measurement report indicating the predicted event, performs 540 performance monitoring for measurement predictions configured by the measurement prediction configuration. Based on the performance monitoring and in accordance with the performance report configuration, the UE 102 transmits 542 a performance report to the base station 106. In this scenario, events 522 and 524 do not occur. In some implementations, the UE 102 triggers transmission of the performance report when the predicted future time (i.e., the time when a predicted event occurs) arrives. In some implementations, the UE 102 triggers transmission of the performance report at the end of at least a prediction window. In some implementations, the performance report configuration may configure the UE 102 to perform performance monitoring and reporting described above.

[0079] In some implementations, the base station 106 may cancel 590 the prepared handover based on the performance report. In some implementations, based on the performance report, the base station 106 may transmit 516 a prediction deactivation command to the UE 102, deactivating the measurement prediction configuration. In other implementations, based on the performance report, the base station 106 may transmit 516 a message (e.g., a RRC message such as a RRC reconfiguration message) to the UE 102, releasing the measurement prediction configuration. In some implementations, the performance report indicates performance of measurement predictions configured by the measurement prediction configuration. Thus, the base station 106 performs the action (s) as described for event (s) 590 and / or 516 because the performance is not good or not expected by the base station 104. In some implementations, the performance report includes one or multiple metric (s) indicating the performance. In some implementations, the UE 102 obtains (e.g., calculates) the one or multiple metric (s) while performing the performance monitoring. For example, the one or multiple metric (s) include precision, recall, Fl score, missed event detection, false event detection, and / or true event prediction. In some implementations, if the metric (s) is below or equal to (respective) threshold (s) , the base station 106 performs the action (s) as described for event (s) 590 and / or 516. If the metric (s) is above or equal to the (respective) threshold (s) , the base station 106 may retain the prepared handover. In other implementations, if the metric (s) is above or equal to (respective) threshold (s) , the base station 106 performs the action (s) as described for event (s) 590 and / or 516. If the metric (s) is below or equal to the (respective) threshold (s) , the base station 106 may retain the prepared handover.

[0080] In some implementations, the performance report includes an actual (i.e., non-predicted) measurement result for the neighbor cell. The UE 102 may include a PCI of the neighbor cell in the performance report to indicate the actual measurement result for the neighbor cell. The UE 102 obtains the first actual measurement result from the measurements for the neighbor cell, as described for Fig. 5A or Fig. 11. In some implementations, if the first actual measurement result is below or equal to a first threshold (condition 1) , the base station 106 performs the action (s) as described for event (s) 590 and / or 516. If the first actual measurement result is above or equal to the first threshold, the base station 106 may retain the prepared handover. In some implementations, the performance report includes a second actual (i.e., non-predicted) measurement result for the serving cell. The UE 102 may include a PCI of the serving cell in the performance report to indicate the second actual measurement result for the serving cell. The UE 102 obtains the second actual measurement result from the measurements for the neighbor cell as described for Fig. 5A or Fig. 11. In some implementations, if the second actual measurement result is above or equal to a second threshold (condition 2) , the base station 106 performs the action (s) as described for event (s) 590 and / or 516. If the second actual measurement result is below or equal to the second threshold, the base station 106 may retain the prepared handover. In some implementations, if the condition 1 and condition 2 are met, the base station 106 performs the action (s) as described for event (s) 590 and / or 516. Otherwise, the base station 106 may retain the prepared handover. The first threshold and the second threshold may be the same threshold (e.g., the same value) or different thresholds (e.g., different values) .

[0081] In some implementations, the performance report configuration configures (e.g., includes) a triggering condition and / or a triggering type for sending a performance report after the prediction report. In accordance with the performance report, the UE 102 transmits 542 the performance report after transmitting the prediction report. In some implementations, if the triggering type is periodical, the UE 102 periodically transmits 542 the performance report to the base station 106. The performance report configuration may include a periodicity for the periodical performance reports. If the performance report configuration includes a triggering condition and the UE 102 detects that the triggering condition is met, the UE 102 transmits the performance report. For example, the triggering condition is the second entering condition. In another example, the triggering condition is one or multiple threshold (s) for the one or multiple metric (s) . In some implementations, the UE 102 obtains (e.g., calculates) the one or multiple metric (s) while performing the performance monitoring. In some implementations, if the metric (s) is below or equal to (respective) threshold (s) , the UE 102 transmits 542 the performance report. In some implementations, the performance report configuration configures the UE 102 to transmit a performance report at a predicted future time. In accordance with the performance report configuration, the UE 102 transmits 542 the performance report at the predicted future time, as illustrated in Fig. 7A or 8A. If the metric (s) is above or equal to the (respective) threshold (s) , the UE 102 does not transmit the performance report. In other implementations, if the metric (s) is above or equal to (respective) threshold (s) , the UE 102 transmits 542 the performance report. If the metric (s) is below or equal to the (respective) threshold (s) , the UE 102 does not transmit the performance report.

[0082] In some implementations, the performance report configuration configures (e.g., includes) a reporting time for sending a performance report. The reporting time can be the predicted future time. Thus, the UE 102 transmits 542 the performance report at the reporting time.

[0083] In some implementations, the performance report configuration may configure the UE 102 to report time information in the performance report. The time information indicates a time duration associated with occurrence of the predicted event reported in the prediction report. The UE 102 performs performance monitoring in the time duration for transmitting the performance report at the predicted future time. In some implementations, the time information can include a first starting time indicating a start of the time duration ending at the predicted future time. For example, the first starting time indicates when the second entering condition for the actual event is fulfilled as illustrated in Fig. 7B. In another example, the first starting time indicates when the first entering condition for the predicted event is fulfilled, as illustrated in Fig. 7C. In yet another example, the first starting time indicates a start of the PW where the UE predicts the event occurs as illustrated in Fig. 7D or Fig. 8B. In other implementations, the time information can indicate (e.g., include) a time offset to the predicted future time as illustrated in Fig. 7E or Fig. 8C. The base station 106 may configure different time offsets corresponding to different time durations which may represent different reliability of the performance report. For example, with longer and / or closer monitoring period, the monitoring results is evaluated based on more comprehensive and / or relevant measurements and predictions. The may be beneficial for the base station 106 to evaluate the reliability for the parameters in the performance report. The base station 106 may determine to cancel or retain the prepared handover based on the time information in addition to the metric (s) described above.

[0084] Fig. 5D depicts a scenario 500D similar the scenarios 500A and 500C. The differences among the scenarios 500A, 500C, and 500D are described below. The base station 106 determines to retain the prepared handover for the UE 102 as described for Fig. 5C. Later on, events 524, 526, 528, and 530 may occur as described for Fig. 5A. In some alternative implementations, the base station 106 may make determination 526 in response to the performance report without waiting for receiving the measurement report from the UE 102. In response to such determination, the base station 106 transmits 528 the handover command to the UE 102. In some alternative implementations, the base station 106 may make determination 526 in response to the measurement report from the UE 102. In response to such determination, the base station 106 transmits 528 the handover command to the UE 102.

[0085] Next, several example scenarios are described in Figs. 6A-6D in which the source base station (S-BS) 106 operating in the system of Fig. lA prepares a handover to a target cell for a UE 102 with a target base station (T-BS) 104 operating in the system of Fig. lA, based on a prediction report (e.g., event 512 of Fig. 5A) for the target cell. Generally speaking, similar events in Fig. 5A-5D and Figs. 6A-6D are labeled with similar reference numbers, with differences discussed below where appropriate. With the exception of the differences shown in the figures and discussed below, any of the other implementations discussed with respect to a particular event (e.g., for messaging and processing) may apply to events labeled with similar reference numbers in other figures.

[0086] In some implementation, the handover request 636 can include an indication indicating that the handover decision is determined based on prediction results. In some implementation, the handover cancel 690 can include a cause indicating that the handover decision is canceled due to low prediction accuracy or prediction error.

[0087] Referring to Fig. 6A, elements 528, 530, 580, and 584 have already been described with respect to Figs. 5A-5D. However, in the diagram 600A, the S-BS 106 and the T-BS 104 perform a handover request procedure 682. In particular, the S-BS 106 transmits 636 a handover request to the T-BS 104, and the T-BS 104 transmits 638 a handover request acknowledgment (e.g., handover command) to the S-BS 106. The S-BS 106 subsequently determines 626 to send the handover command to the UE 102.

[0088] Figs. 6B-6C illustrate a handover cancel 690. Referring to Fig. 6B, elements 514, 516, 518, 532, and 580 have already been described with respect to Figs. 5A-5D, and procedure 682 has already been described with respect to Fig. 6A. Referring to Fig. 6C, elements 516, 518, 538, 540, 542, and 580 have already been described with respect to Figs. 5A-5D, and procedure 682 has already been described with respect to Fig. 6A. In the diagram 600B, the S-BS 106 transmits 690 the handover cancel to the T-BS 104 after the S-BS 106 determines 532 no non-predicted measurement result for the event and neighbor cell is received. In the diagram 600C, the S-BS 106 transmits 690 the handover cancel to the T-BS 104 after the S-BS 106 receives 542 the performance report from the UE 102.

[0089] Referring to Fig. 6D, elements 524, 528, 530, 538, 540, 542, and 580 have already been described with respect to Figs. 5A-5D, and elements 626 and 682 have already been described with respect to Fig. 6A. The difference between the diagram 600A and the diagram 600D is that in the diagram 600D the S-BS 106 determines 626 to send the handover command after receiving 524 the measurement report, whereas in the diagram 600A the S-BS 106 determines 626 to send the handover command after the procedure 584.

[0090] Figs. 7A-7E illustrate example timelines for the UE to perform the performance monitoring. Several features illustrated in Figs. 7A-7E have already been discussed with respect to Figs. 4A-4C. For example, the timelines of diagrams 700A-700E each begin with the UE transmitting a measurement report (MR) (or a prediction report (not shown in Figs. 7A-7E) ) to the base station. The MR serves as a predicted event triggering report to begin a handover (HO) preparation window. Other previously described windows illustrated in Figs. 7A-7E that have also already been discussed with respect to Figs. 4A-4C include the TTT (predicted) window, the TTT (actual) window, and the HO execution window. As likewise illustrated in the diagrams 700A-700E, the HO execution window begins with the UE receiving an HO command (HO CMD) from the base station and ends with the UE transmitting an HO complete (HO CMP) message to the base station.

[0091] Referring to Fig. 7A, the diagram 700A is similar to the diagram 400B of Fig. 4B, except that the diagram 700A also illustrates an actual event triggering time 771A during the HO execution window, which is further illustrated in Figs. 7B-7E. Comparing the diagrams 700A-700E to the diagrams 400A-400C, the MR (i.e., predicted event triggering report) corresponds to t0, the predicted event entering time corresponds to tl, the actual event entering time corresponds to t2, the performance report at the predicted future time corresponds to t4, the HO CMD corresponds to t4’, and the HO CMP message corresponds to t4’+td. The predicted / actual event entering time refers to the time when the entering condition (s) of a configured event is firstly met based on predicted / actual measurement results. The predicted / actual event triggering time refers to the time when the entering condition (s) of a configured event has been satisfied for a configured predicted / actual duration based on predicted / actual measurement results. The monitoring time duration can be configured by the network, predefined in the specification or up to UE implementation. Based on the performance report, the network may determine to send the handover command. This enables the early handover command compared the case that the network determines to send the handover command when receiving the measurement report indicating that the entering condition (s) for the configured event has been satisfied for a duration. When the performance is accurate and / or reliable, this may avoid the too late handover or other potential issues.

[0092] Referring to Fig. 7B, the monitoring time duration is shown as 775B for the UE to perform the performance monitoring. For example, in the diagram 700B, the performance monitoring duration 775B starts from the actual event entering time 777B (i.e., start of TTT (actual) ) and ends at the time when the predicted event has been satisfied for the predicted TTT. At the end of the performance monitoring duration, the UE 102 transmit 779B the performance report to the network, e.g., at the predicted future time indicated in the MR. That is, the actual event entering condition is first met based on the actual measurement result, and the performance monitoring duration 775B ends at the time when the UE sends the performance report.

[0093] At the time when the UE predicts that the configured event is satisfied for the predicted TTT, the UE sends 779B the performance report. At the actual event entering time 777B, the event related entering condition is satisfied for the first time based on the actual measurement results, such that the UE performs performance monitoring for the monitoring duration 775B as being between the two time points 777B and 779B, as illustrated in Fig. 7B.

[0094] Referring to Fig. 7C, the diagram 700C illustrates that the monitoring duration 775C is the same as the predicted TTT, which starts from the predict event entering time 778C and ends at the predicted event trigging time. The performance report is sent 779C at the predicted future time.

[0095] Referring to Fig. 7D, the diagram 700D illustrates an example performance monitoring duration 775D that begins before the predicted event entering time 778D. The monitoring duration 775D begins at the start of the PW 792D. That is, the performance monitoring duration 775D starts at the beginning of the prediction window 792Dwhere the event is predicted to occur based on the predicted result. The monitoring duration 775D runs until the event is met for the TTT (predicted) , and the performance report is sent 779D at the predicted future time.

[0096] Referring to Fig. 7E, the diagram 700E illustrates another example performance monitoring duration 775E based on a time offset that precedes the predicted future event triggering time indicated in the MR. The time offset may be configured by the network, predefined in specification or up to UE implementation. The performance monitoring duration 775E starts in advance as indicated by the time offset before the predicted event triggering time.

[0097] Figs. 8A-8C illustrate timelines for the UE to perform performance monitoring where an ending time of the monitoring duration is the first time for the UE to predict an event to occur. That is, in Figs. 7A-7E, the ending of the performance monitoring duration 775 corresponds to the predict event, which means that the event is predicted to be fulfilled at the end of the TTT (prediction) window. However, in Fig. 8A-8C, the ending of the monitoring duration is the first time for the UE to predict that the event will occur. Thus, the difference between Figs. 7A-7E and Figs. 8A-8C is how the ending time of the monitoring duration is defined.

[0098] In some implementations, the network configures the details of the monitoring duration to the UE in the performance report configuration. In other implementations, the monitoring duration is implemented on UE-side. When the UE reports the performance report, the UE may provide the monitoring duration information to the network to inform the network the of the performance duration. If the performance monitoring duration is configured by the network, the UE may not include the monitoring duration information in the performance report.

[0099] Regarding Figs. 8A-8C, where the TTT (predicted) window follows the performance report, the diagram 800A of Fig. 8A illustrates a first example where the monitoring duration 875A comprises a zero value that aligns with the transmission of the performance report. The diagram 800B of Fig. 8B illustrates a second example where the monitoring duration 875B precedes the transmission of the performance report. In particular, the monitoring duration 875B begins the start of the PW and ends at the predicted event entering time. The diagram 800C of Fig. 8C illustrates a third example where the monitoring duration 875C is based on a time offset in advance to the predicted event entering time. The time offset in the diagram 800C may be network configured.

[0100] Next, several example methods, which can be implemented in a UE (e.g., the UE 102 in Figs. 1, 2, or 5A-6D) or a base station (e.g., the base station 104 or the base station 106 in Figs. in Figs. 1, 2, or 5A-6D) , are discussed with reference to Figs. 9A-10E. Descriptions described for Figs. 1, 2, or 5A-6D can apply to Figs. 9A-10E. Generally speaking, similar events in Figs. 5A-6D and 9A-10E are labeled with similar reference numbers that share two least significant digits, with differences discussed below where appropriate. For example, event 502 of Fig. 5A is similar to event 902 of Figs. 9A-9D, event 582 of Figs. 5A-5D and event 682 of Figs. 6A-6D are similar to event 1082 of Figs. 10A-10E, etc. With the exception of the differences shown in the figures and discussed below, any of the other implementations discussed with respect to a particular event (e.g., for messaging and processing) may apply to events labeled with similar reference numbers in other figures.

[0101] Fig. 9A illustrates an example method 900A, which can be implemented by a UE. The method 900A begins at block 902, where the UE receives a measurement configuration from a RAN. At block 904, the UE receives a measurement prediction configuration from the RAN. At block 906, the UE performs measurements in accordance with the measurement configuration. At block 908, the UE suspends measurements in a periodic prediction window and performs measurement prediction in accordance with the measurement prediction configuration. At block 910, the UE predicts an event occurs based on the measurement prediction. At block 912, the UE transmits a prediction report to the RAN in response to predicting the event occurs. At block 918A, the UE deactivates or releases the measurement prediction in response to predicting the event or transmitting the predicted measurement result. At block 920A, the UE resumes measurements in the periodic prediction window in response to deactivating or releasing the measurement prediction. The flow proceeds to block 922 or block 934. At block 922, the UE detects the event occurs based on one or more non-predicted measurement results. At block 924, the UE transmits a measurement report to the RAN in response to detecting the event occurs. In some implementations, the measurement report includes the one or more non-predicted measurement results. At block 934, the UE receives a prediction activation command or a measurement prediction configuration from the RAN. At block 936, the UE activates or performs the measurement prediction in accordance with the measurement prediction configuration.

[0102] In some implementations, the measurement prediction configuration is associated with the measurement configuration. In some implementations, the measurement prediction configuration configures the UE to predict the event. In other implementations, the measurement prediction configuration configures the UE to predict measurement results (e.g., RSRP values) . In some implementations, the prediction report includes an ID indicating the prediction report is associated with the measurement configuration. In some implementations, the prediction report includes an ID indicating the prediction report is associated with the measurement prediction configuration.

[0103] In some implementations, the UE starts a timer after (e.g., in response to) deactivating or releasing the measurement prediction or resuming measurements in the periodic prediction window. After (e.g., in response to) expiry of the timer, the UE performs block 908 (again) . While the timer is running, the UE continues performing measurements in the periodic prediction window. In other implementations, the UE performs block 908 (again) after (e.g., in response to) block 922 or 924.

[0104] Fig. 9B is a flow diagram of an example method 900B similar to the method 900A, except that the method 900B includes blocks 916 and 918B instead of block 918A. At block 916, the UE receives, from the RAN, a prediction deactivation command or an indication of releasing the measurement prediction configuration. At block 918B, the UE deactivates or releases the measurement prediction in response to receiving the prediction deactivation command or the indication of releasing the measurement prediction configuration.

[0105] Fig. 9C is a flow diagram of an example method 900C similar to the method 900A, except that the method 900C includes blocks 950, 918C and 920C instead of blocks 918A and 920C. At block 950, the UE receives a first configuration from the RAN, configuring the UE to suspend the measurement prediction upon predicting an event occurs. At block 918C, the UE suspends the measurement prediction in response to predicting the event or transmitting the predicted measurement result. At block 920C, the UE resumes measurements in the periodic prediction window in response to suspending the measurement prediction.

[0106] Fig. 9D is a flow diagram of an example method 900D similar to the method 900C, except that the method 900D includes blocks 944 instead of blocks 950, 934 and 936. At block 944, the UE determines whether to receive a configuration that configures suspending the measurement prediction upon predicting an event occurs. If the UE receives a configuration that configures suspending the measurement prediction upon predicting an event occurs (i.e., “Yes” branch of block 944) , the flow proceeds to blocks 918C, 920C, 922 and 924. Otherwise, if the UE does not receive a configuration that configures suspending the measurement prediction upon predicting an event occurs (i.e., “No” branch of block 944) , the flow skips blocks 918C and 920C and proceeds to blocks 922 and 924.

[0107] Fig. 9E illustrates an example method 900E, which can be implemented by a UE. The method 900E begins at block 980, where the UE performs a measurement prediction and reporting with a RAN. At block 938, the UE receives a performance reporting configuration from the RAN. At block 940, the UE performs performance monitoring based on the performance reporting configuration. At block 942, the UE transmits a performance report to the RAN based on the performance monitoring. The flow proceeds to blocks 922 and 924 or blocks 934 and 936.

[0108] Fig. 10A illustrates an example method 1000A, which can be implemented by a base station. The method 1000A begins at block 1002, where the base station transmits a measurement configuration to a UE. At block 1004, the base station transmits a measurement prediction configuration to the UE, configuring the UE to perform measurement prediction. At block 1012, the base station receives a prediction report from the UE. At block 1082, the base station obtains a handover command for handing over the UE to a neighbor cell based on the prediction report. At block 1052, the base station starts a timer for canceling the handover. At block 1016, the base station transmits, to the UE, a prediction deactivation command or an indication of releasing the measurement prediction configuration. At block 1024, the base station receives a measurement report from the UE, including one or more non-predicted measurement results. At block 1028A, the base station transmits the handover command to the UE in response to the measurement report. At block 1054, the base station stops the timer in response to receiving the measurement report.

[0109] Fig. 10B is a flow diagram of an example method 1000B similar to the method 1000A, except that the method 1000B includes block 1050 instead of block 1016. At block 1050, the base station transmits a first configuration to the UE, configuring the UE to suspend the measurement prediction upon predicting an event occurs.

[0110] Fig. 10C is a flow diagram of an example method 1000C similar to the method 1000A, except that the method 1000C includes blocks 1032 and 1090C instead of blocks 1024, 1028A and 1054. At block 1032, the base station detects the timer expires. At block 1090C, the base station cancels the handover in response to expiry of the timer.

[0111] Fig. 10D is a flow diagram of an example method 1000D similar to the methods 1000A, 1000B and 1000C, except that the method 1000D includes blocks 1050 instead of block 1016.

[0112] Fig. 10E is a flow diagram of an example method 1000E similar to the method 1000A, except that the method 1000E includes blocks 1038, 1042E and 1090E instead of blocks 1052, 1024 and 1054. At block 1038, the base station transmits a performance reporting configuration to the UE. At block 1042E, the base station receives a performance report from the UE, indicating performance of the measurement prediction. The flow proceeds to blocks 1090E, 1016 or block 1028E. At block 1090E, the base station cancels the handover in response to receiving the performance report.

[0113] FIG. 11 illustrates a flowchart 1100 of a method of wireless communication at a UE. With reference to Figs. 5A-5D, the method may be performed by the UE 102. In embodiments, the UE 102 transmits 1112, to a network entity, a prediction report according to a procedure associated with measurement prediction-the prediction report is transmitted to the network entity in response to a prediction that an event will occur in association with the measurement prediction. For example, referring to Fig. 5A, the UE 102 transmits 512, to a base station 106, a prediction report including, e.g., a PCI, measurement ID, measurement prediction configuration ID, measurement result (s) , and / or predicted time information. The prediction report is transmitted to the base station 106 in response to a prediction 510 that an event will occur in association with the measurement prediction 508.

[0114] The UE 102 receives 1138, from the network entity, a performance report configuration-the performance report being transmitted to the network entity based on the performance report configuration. For example, referring to Figs. 5C-5D, the UE 102 receives 538, from the base station 106, a performance report configuration. The UE 102 transmits 542 the performance report to the base station 106 based on the performance report configuration.

[0115] The UE 102 communicates 1125, with the network entity, based on an action performed in association with the transmitting the prediction report. To perform the action in association with the transmitting the prediction report, the UE may receive 1116 a prediction deactivation command or configuration release; deactivate, release, or suspend 1118 measurement prediction; and / or perform 1141 performance monitoring and reporting procedure. For example, referring to Figs. 5A-5D, the UE 102 may receive 516 a prediction deactivation command or an indication of releasing the measurement prediction configuration. In further examples, the UE 102 may deactivate or release 518 the measurement prediction configuration after transmitting the prediction report and / or receiving the prediction deactivation command or configuration release. In still further examples, the UE 102 may perform 540 performance monitoring for transmission 542 of the performance report.

[0116] The UE 102 performs 1120, after at least one of deactivating the measurement prediction, releasing the configuration, or suspending the measurement prediction, measurements in a periodic prediction window. For example, referring to Figs. 5A-5B, the UE 102 resumes 520 measurements in the periodic prediction window after deactivating or releasing 518 the measurement prediction configuration.

[0117] The UE 102 transmits 1124, to the network entity, a measurement report of the measurements based on prediction deactivation or a released measurement prediction configuration. For example, referring to Figs. 5A and 5D, the UE 102 transmits 524, to the base station 106, a measurement report including, e.g., a measurement ID, PCI, and / or measurement results.

[0118] The UE 102 receives 1134, from the network entity, a prediction activation command to resume the measurement prediction in the periodic prediction window, or a measurement prediction configuration for configuring the measurement prediction in the periodic prediction window. For example, referring to Fig. 5B, the UE 102 receives 534, from the base station 106, a prediction activation command or measurement prediction configuration.

[0119] The UE 102 performs 1136 the measurement prediction based on at least one of a prediction activation command or the measurement prediction configuration. For example, referring to Fig. 5B, the UE 102 activates or performs 536 measurement predictions based on the prediction activation command or measurement prediction configuration. FIG. 11 describes a method from a UE-side of a wireless communication link, whereas FIG. 12 describes a method from a network-side of the wireless communication link.

[0120] FIG. 12 is a flowchart 1200 of a method of wireless communication at a network entity. With reference to Figs. 5A-5D, the method may be performed by one or more network entities 104, which may correspond to a base station or a unit of the base station, such as an RU, a DU, and / or a CU. In embodiments, the network entity 106 receives 1212, from a UE, a prediction report according to a procedure for measurement prediction-the prediction report indicates a prediction that an event will occur in association with the measurement prediction of the procedure. For example, referring to Figs. 5A, the base station 106 receives 512, from the UE 102, a prediction report including, e.g., a PCI, measurement ID, measurement prediction configuration ID, measurement result (s) , and / or predicted time information. The prediction report is received from the UE 102 in response to a prediction 510 that an event will occur in association with the measurement prediction 508.

[0121] The network entity 106 initiates 1252, after obtaining a handover command for a handover of the UE to a neighbor cell, a timer for cancelling the handover when the timer expires before the handover occurs. For example, referring to Figs. 5A-5D and 10A-10D, the base station 106 obtains 582 a handover command for handing over the UE 102 to a neighbor cell and starts 1052 at timer for cancelling the handover.

[0122] The network entity 106 determines 1214 to deactivate the measurement prediction or release the configuration for the measurement prediction. For example, referring to Figs. 5A-5B, the base station 106 determines 514 to deactivate or release the measurement prediction configuration.

[0123] The network entity 106 transmits 1238, to the UE, a performance report configuration-the performance report is transmitted to the network entity based on the performance report configuration. For example, referring to Figs. 5C-5D, the base station 106 transmits 538, to the UE 102, a performance report configuration. The base station 106 receives 542 the performance report from the UE 102 based on the performance report configuration.

[0124] The network entity 106 communicates 1225, with the UE, based on the receiving the prediction report from the UE. For example, the network entity 106 transmits 1216 a prediction deactivation command or configuration release; receives 1224 a measurement report based on prediction deactivation, a released measurement prediction configuration, or a suspended measurement prediction; and / or receives 1242 the performance report for the measurement prediction. For example, referring to Figs. 5A-5D, the base station 106 may transmit 516, to the UE 102, a prediction deactivation command or an indication of releasing the measurement prediction configuration. In further examples, the base station 106 may receive 524, from the UE 102, the measurement report including, e.g., a measurement ID, PCI, and / or measurement results. In still further examples, the base station 106 may receive 542, from the UE 102, a performance report for UE predictions.

[0125] The network entity 106 cancels 1290 the handover based on expiration of the timer or stopping the timer in response to receiving the measurement report. For example, referring to Figs. 5B-5C, the base station 106 stops or cancels 590 the prepared handover procedure, e.g., based on the expiration of a timer or receiving the measurement report from the UE 102.

[0126] The network entity 106 transmits 1234, to the UE, a prediction activation command to resume the measurement prediction in the periodic prediction window, or a measurement prediction configuration for configuring the measurement prediction in the periodic prediction window. For example, referring to Figs. 5A-5D, the base station 106 transmits 534, to the UE 102, a prediction activation command or measurement prediction configuration.

[0127] Fig. 13 illustrates a schematic diagram 1300 of modules, components or circuitry that can provide an example implementation for a UE to perform reference signal measurements. When the UE is in RRC_CONNECTED mode, the UE measures multiple beams 1362 (or at least one beam) of a cell. The UE then averages the measurements results or power values to derive the cell quality. In doing so, the UE is configured to consider a subset of the detected beams. Filtering 1364a-136c takes place at two different levels: at the physical layer filtering 1364a is done to derive beam quality and then filtering 1364b-1364c is done at RRC level to derive cell quality from multiple beams. The UE derives cell quality from beam measurements in the same way for the serving cell (s) and for the non-serving cell (s) . The gNB (an example of the base station) may configure the UE to provide measurement reports 1366 that contain the measurement results of the X best beams. K beams correspond to the measurements on SSB or CSI-RS resources configured for L3 mobility by gNB and detected by UE at L1. The control points / blocks / modules shown in Figure 13 are further described below.

[0128] Point A shows measurements (beam specific samples) internal to the physical layer for internal layer 1 filtering of the inputs measured at point A. Exact filtering is implementation dependent. How the measurements are actually executed in the physical layer by an implementation (inputs A and Layer 1 filtering) is not constrained by the standard. Point A1 shows measurements (i.e. beam specific measurements) reported by layer 1 to layer 3 after layer 1 filtering.

[0129] For beam consolidation / selection, beam specific measurements are consolidated to derive cell quality. The behavior of the beam consolidation / selection is standardized and the configuration of this module is provided by RRC signaling. The reporting period at point B equals one measurement period at A1. At point B, a measurement (i.e. cell quality) is derived from beam-specific measurements reported to layer 3 after beam consolidation / selection, followed by Layer 3 filtering for cell quality, where filtering is performed on the measurements provided at point B. The behavior of the Layer 3 filters is standardized and the configuration of the layer 3 filters is provided by RRC signaling. The filtering reporting period at point C equals one measurement period at B, where C corresponds to a measurement after processing in the layer 3 filter. The reporting rate is the same as the reporting rate at point B. This measurement is used as input for one or more evaluation of reporting criteria. The evaluation of reporting criteria checks whether actual measurement reporting is necessary at point D. The evaluation can be based on more than one flow of measurements at reference point C, e.g., to compare between different measurements. This is illustrated by input C and C1. The UE evaluates the reporting criteria at least every time a new measurement result is reported at point C, C1. The reporting criteria are standardized and the configuration is provided by RRC signaling (UE measurements) . Point D corresponds to measurement report information (message) sent on the radio interface.

[0130] For L3 Beam filtering, filtering is performed on the measurements (i.e. beam specific measurements) provided at point A1. The behavior of the beam filters is standardized and the configuration of the beam filters is provided by RRC signaling. The filtering reporting period at E equals one measurement period at A1, where E corresponds to a measurement (i.e. beam-specific measurement) after processing in the beam filter. The reporting rate is the same as the reporting rate at point A1. This measurement is used as input for selecting the X measurements to be reported. Beam selection for beam reporting is based on selecting the X measurements from the measurements provided at point E. The behavior of the beam selection is standardized and the configuration of this module is provided by RRC signaling. At point F, the beam measurement information is included in a measurement report (sent) on the radio interface.

[0131] Layer 1 filtering introduces a certain level of measurement averaging. How and when the UE exactly performs the required measurements is implementation specific to the point that the output at B fulfils the performance requirements set in 3GPP TS 38.133. Layer 3 filtering for cell quality and related parameters used are specified in 3GPP TS 38.331 and do not introduce any delay in the sample availability between B and C. Measurement at point C, C1 is the input used in the event evaluation. L3 Beam filtering and related parameters used are specified in TS 38.331 and do not introduce any delay in the sample availability between E and F.

[0132] The following description may be applied to the description above.

[0133] Generally speaking, description for one of the above figures can apply to another of the above figures. Examples, implementations and methods described above can be combined, if there is no conflict. An event or block described above can be optional or omitted. For example, an event or block with dashed lines in the figures can be optional. The description described from the perspective of the receiving node also applies to the sending node. For example, a description that a receiving node (e.g., DU) receives a message from a sending node (e.g., CU) may be replaced by the sending node sending a message to the receiving node. Similarly, a description that a receiving node (e.g., CU) receives a message from a sending node (e.g., DU) may be replaced by the sending node sending a message to the receiving node.

[0134] In some implementations, “message” is used and can be replaced by “information element (IE) ” , and vice versa. In some implementations, “IE” is used and can be replaced by “field” , and vice versa. In some implementations, “configuration” can be replaced by “configurations” or “configuration parameters” , and vice versa. In some implementations, the “indication” can be replaced by “indicator” , and vice versa. In some implementations, the “measurement prediction” can be replaced by “measurement prediction function” , “measurement AI / ML inference” .. In some implementations, the “non-predicted” can be replaced by “actual” , or vice versa.

[0135] A user device in which the techniques of this disclosure can be implemented (e.g., the UE 102) can be any suitable device capable of wireless communications such as a smartphone, a tablet computer, a laptop computer, a mobile gaming console, a point-of-sale (POS) terminal, a health monitoring device, a drone, a camera, a media-streaming dongle or another personal media device, a wearable device such as a smartwatch, a wireless hotspot, a femtocell, or a broadband router. Further, the user device in some cases may be embedded in an electronic system such as the head unit of a vehicle or an advanced driver assistance system (ADAS) . Still further, the user device can operate as an internet-of-things (IoT) device or a mobile-internet device (MID) . Depending on the type, the user device can include one or more general-purpose processors, a computer-readable memory, a user interface, one or more network interfaces, one or more sensors, etc.

[0136] Certain embodiments are described in this disclosure as including logic or a number of components or modules. Modules may can be software modules (e.g., code, or machine-readable instructions stored on non-transitory machine-readable medium) or hardware modules. A hardware module is a tangible unit capable of performing certain operations and may be configured or arranged in a certain manner. A hardware module can comprise dedicated circuitry or logic that is permanently configured (e.g., as a special-purpose processor, such as a field programmable gate array (FPGA) or an application-specific integrated circuit (ASIC) , a digital signal processor (DSP) , etc. ) to perform certain operations. A hardware module may also comprise programmable logic or circuitry (e.g., as encompassed within a general-purpose processor or other programmable processor) that is temporarily configured by software to perform certain operations. The decision to implement a hardware module in dedicated and permanently configured circuitry, or in temporarily configured circuitry (e.g., configured by software) may be driven by cost and time considerations.

[0137] When implemented in software, the techniques can be provided as part of the operating system, a library used by multiple applications, a particular software application, etc. The software can be executed by one or more general-purpose processors or one or more special-purpose processors.

[0138] Upon reading this disclosure, those of skill in the art will appreciate still additional and alternative structural and functional designs for handling mobility between base stations through the principles disclosed herein. Thus, while particular embodiments and applications have been illustrated and described, it is to be understood that the disclosed embodiments are not limited to the precise construction and components disclosed herein. Various modifications, changes and variations, which will be apparent to those of ordinary skill in the art, may be made in the arrangement, operation and details of the method and apparatus disclosed herein without departing from the spirit and scope defined in the appended claims.

[0139] The following examples are illustrative only and may be combined with other examples or teachings described herein, without limitation.

[0140] Example 1 is a method of wireless communication at a UE, including: transmitting, to a network entity, a prediction report according to a procedure associated with measurement prediction, the prediction report being transmitted to the network entity in response to a prediction that an event will occur in association with the measurement prediction; and communicating, with the network entity, based on an action performed in association with the transmitting the prediction report.

[0141] Example 2 may be combined with Example 1 and includes that the action performed in association with the transmitting the prediction report comprises at least one of: receiving, from the network entity, a predication deactivation command, receiving, from the network entity, an indication of releasing a configuration for the measurement prediction, deactivating the measurement prediction, releasing the configuration for the measurement prediction, suspending the measurement prediction, performing performance monitoring of the measurement prediction, or transmitting, to the network entity, a performance report for the measurement prediction.

[0142] Example 3 may be combined with Example 2 and further includes performing, after at least one of deactivating the measurement prediction, releasing the configuration, or suspending the measurement prediction, measurements in a periodic prediction window.

[0143] Example 4 may be combined with Example 3 and includes that the communicating with the network entity further includes at least one of: transmitting, to the network entity, a measurement report of the measurements based on prediction deactivation, transmitting, to the network entity, the measurement report of the measurements based on a released measurement prediction configuration.

[0144] Example 5 may be combined with Example 3 and further includes receiving, from the network entity, a prediction activation command to resume the measurement prediction in the periodic prediction window.

[0145] Example 6 may be combined with Example 3 and further includes receiving, from the network entity, a measurement prediction configuration for configuring the measurement prediction in the periodic prediction window.

[0146] Example 7 may be combined with any of Examples 5-6 and further includes performing the measurement prediction based on at least one of the prediction activation command or the measurement prediction configuration.

[0147] Example 8 may be combined with Example 2 and further includes receiving, from the network entity, a performance report configuration, the performance report being transmitted to the network entity based on the performance report configuration.

[0148] Example 9 may be combined with any of Examples 1-8 and includes that the procedure associated with measurement prediction further includes: receiving, from the network entity, a second configuration for suspending the measurement prediction in response to the prediction that the event will occur.

[0149] Example 10 is a method of wireless communication at a network entity, including: receiving, from a UE, a prediction report according to a procedure for measurement prediction, the prediction report indicating a prediction that an event will occur in association with the measurement prediction of the procedure; and communicating, with the UE, based on the receiving the prediction report from the UE.

[0150] Example 11 may be combined with Example 10 and includes that the communicating, with the UE, based on the receiving the prediction report includes at least one of: transmitting, to the UE, a predication deactivation command, transmitting, to the UE, an indication of releasing a configuration for the measurement prediction, receiving, from the UE, a measurement report based on prediction deactivation, receiving, from the UE, the measurement report based on a released measurement prediction configuration, receiving, from the UE, the measurement report based on a suspended measurement prediction, or receiving, from the UE, a performance report for the measurement prediction.

[0151] Example 12 may be combined with Example 11 and further includes at least one of: determining to deactivate the measurement prediction, the prediction deactivation command being transmitted to the UE based on the determining to deactivate the measurement prediction, or determining to release the configuration for the measurement prediction, the indication of releasing the configuration being transmitted to the UE based on the determining to release the configuration.

[0152] Example 13 may be combined with any of Examples 10-12 and further includes obtaining, based on the prediction report, a handover command for a handover of the UE to a neighbor cell, and initiating a timer for cancelling the handover of the UE when the timer expires before the handover occurs.

[0153] Example 14 may be combined with Example 13 and further includes stopping the timer in response to receiving the measurement report from the UE.

[0154] Example 15 may be combined with Example 13 and further includes detecting that the timer expires before the handover occurs; and cancelling the handover based on expiration of the timer.

[0155] Example 16 may be combined with any of Examples 10-15 and further includes transmitting, to the UE, a prediction activation command to initiate the measurement prediction in a periodic prediction window.

[0156] Example 17 may be combined with any of Examples 10-15 and further includes transmitting, to the UE, a measurement prediction configuration for configuring the measurement prediction in a periodic prediction window.

[0157] Example 18 may be combined with Example 11 and further includes transmitting, to the UE, a performance report configuration, the performance report being transmitted to the network entity based on the performance report configuration.

[0158] Example 19 may be combined with any of Examples 10-18 and includes that the procedure for the measurement prediction further includes: transmitting, to the UE, a second configuration for suspending the measurement prediction in response to the prediction that the event will occur.

[0159] Example 20 is an apparatus for wireless communication for implementing a method as in any of Examples 1-19.

[0160] Example 21 is an apparatus for wireless communication including means for implementing a method as in any of Examples 1-19.

[0161] Example 22 is a non-transitory computer-readable medium storing computer executable code, the code when executed by a processor causes the processor to implement a method as in any of Examples 1-19.

[0162] Example 23 is a computer program product for implementing a method as in any of Examples 1-19.

Claims

1.A method of wireless communication at a user equipment, UE, (102) comprising:transmitting (512) , to a network entity (106) , a prediction report according to a procedure (580) associated with measurement prediction (508) , the prediction report being transmitted to the network entity (106) in response to a prediction (510) that an event will occur in association with the measurement prediction (508) ; andcommunicating (516, 524, 542) , with the network entity (106) , based on an action performed in association with the transmitting the prediction report.2.The method of claim 1, wherein the action performed in association with the transmitting the prediction report comprises at least one of:receiving (516) , from the network entity (106) , a predication deactivation command,receiving (516) , from the network entity (106) , an indication of releasing a configuration for the measurement prediction,deactivating (518) the measurement prediction,releasing (518) the configuration for the measurement prediction,suspending (918C) the measurement prediction,performing (540) performance monitoring of the measurement prediction, ortransmitting (542) , to the network entity (106) , a performance report for the measurement prediction.3.The method of claim 2, further comprising:performing (520, 920C) , after at least one of deactivating the measurement prediction, releasing the configuration, or suspending the measurement prediction, measurements in a periodic prediction window.4.The method of claim 3, wherein the communicating with the network entity further comprises at least one of:transmitting (524) , to the network entity (106) , a measurement report of the measurements based on prediction deactivation,transmitting (524) , to the network entity (106) , the measurement report of the measurements based on a released measurement prediction configuration.5.The method of claim 3, further comprising:receiving (534) , from the network entity (106) , a prediction activation command to resume the measurement prediction in the periodic prediction window.6.The method of claim 3, further comprising:receiving (534) , from the network entity (106) , a measurement prediction configuration for configuring the measurement prediction in the periodic prediction window.7.The method of any of claims 5-6, further comprising:performing (536) the measurement prediction based on at least one of the prediction activation command or the measurement prediction configuration.8.The method of claim 2, further comprising:receiving (538) , from the network entity (106) , a performance report configuration, the performance report being transmitted to the network entity based on the performance report configuration.9.The method of any of claims 1-8, wherein the procedure (580) associated with measurement prediction (508) further comprises:receiving (950) , from the network entity (106) , a second configuration for suspending the measurement prediction in response to the prediction (510) that the event will occur.10.A method of wireless communication at a network entity (106) , comprising:receiving (512) , from a user equipment, UE, (102) , a prediction report according to a procedure (580) for measurement prediction, the prediction report indicating a prediction that an event will occur in association with the measurement prediction of the procedure (580) ; andcommunicating (516, 524, 542) , with the UE (102) , based on the receiving the prediction report from the UE (102) .11.The method of claim 10, wherein the communicating, with the UE, based on the receiving the prediction report comprises at least one of:transmitting (516) , to the UE (102) , a predication deactivation command,transmitting (516) , to the UE (102) , an indication of releasing a configuration for the measurement prediction,receiving (524) , from the UE (102) , a measurement report based on prediction deactivation,receiving (524) , from the UE (102) , the measurement report based on a released measurement prediction configuration,receiving, from the UE, the measurement report based on a suspended measurement prediction, orreceiving (542) , from the UE (102) , a performance report for the measurement prediction.12.The method of claim 11, further comprising at least one of:determining (514) to deactivate the measurement prediction, the prediction deactivation command being transmitted (516) to the UE based on the determining to deactivate the measurement prediction, ordetermining (514) to release the configuration for the measurement prediction, the indication of releasing the configuration being transmitted (516) to the UE based on the determining to release the configuration.13.The method of any of claims 10-12, further comprising:obtaining (1082) , based on the prediction report, a handover command for a handover of the UE (102) to a neighbor cell, andinitiating (1052) a timer for cancelling the handover of the UE (102) when the timer expires before the handover occurs.14.The method of claim 13, further comprising:stopping (1054) the timer in response to receiving (524) the measurement report from the UE (102) .15.The method of claim 13, further comprising:detecting (1032) that the timer expires before the handover occurs; andcancelling (1090C) the handover based on expiration of the timer.16.The method of any of claims 10-15, further comprising:transmitting (534) , to the UE (102) , a prediction activation command to initiate the measurement prediction in a periodic prediction window.17.The method of any of claims 10-15, further comprising:transmitting (534) , to the UE (102) , a measurement prediction configuration for configuring the measurement prediction in a periodic prediction window.18.The method of claim 11, further comprising:transmitting (538) , to the UE (102) , a performance report configuration, the performance report being transmitted to the network entity based on the performance report configuration.19.The method of any of claims 10-18, wherein the procedure (580) for the measurement prediction further comprises:transmitting (1050) , to the UE (102) , a second configuration for suspending the measurement prediction in response to the prediction that the event will occur.20.An apparatus for wireless communication comprising a memory, a transceiver, and a processor coupled to the memory and the transceiver, the apparatus being configured to implement a method as in any of claims 1-19.