System and method for testing mechanical properties of material in ultra-low-temperature and high-pressure environment
By combining a medium circulation system and a cold source supply system, and using heat exchangers and gas-liquid mixers to regulate temperature and pressure, the problems of low efficiency and insufficient accuracy in material performance testing at ultra-low temperatures in existing technologies have been solved, achieving stable control and wide applicability.
Patent Information
- Application Number
- PCT/CN2025/108957
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-09
- Filing Date
- 2025-07-16
- Publication Date
- 2026-11-12
AI Technical Summary
Existing low-temperature mechanical property testing devices for materials have difficulty in simultaneously and accurately adjusting temperature and pressure at ultra-low temperatures, and cannot take into account the influence of the medium on the material, resulting in low testing efficiency and inaccurate results.
The system employs a medium circulation system and a cold source supply system. Temperature and pressure are independently regulated through heat exchangers and gas-liquid mixers. A controllable cold source is formed by mixing ambient temperature gas and liquefied gas. The density of the medium is adjusted in accordance with the principle of mass conservation to ensure that the temperature and pressure inside the test chamber are mapped one-to-one.
It achieves stable control of material properties under ultra-low temperature and high pressure environments, improves test efficiency, can cover a variety of process conditions, reduces system construction costs, and is suitable for testing under various media and pressure combinations.
Smart Images

Figure CN2025108957_12112026_PF_FP_ABST
Abstract
Description
System and method for testing the mechanical properties of materials in ultra-low temperature and high pressure environments Technical Field
[0001] This invention belongs to the field of material mechanical property testing, specifically relating to a system and method for testing the mechanical properties of materials in ultra-low temperature and high pressure environments. Background Technology
[0002] Industrial gases have extremely low liquefaction temperatures at normal pressure; for example, liquid nitrogen has a temperature of -196℃, liquefied natural gas -163℃, and liquid hydrogen -253℃. When developing pressure-bearing equipment for the production, storage, and transportation of these cryogenic liquefied gases, such as liquid hydrogen storage tanks, vehicle-mounted cryogenic high-pressure hydrogen storage tanks, and high-pressure liquid nitrogen pumps, the first step is to study the mechanical properties of the materials at ultra-low temperatures.
[0003] Existing low-temperature mechanical property testing devices for materials can be broadly classified into two types: those with liquid cooling and those without liquid cooling.
[0004] Liquid cooling refers to the direct cooling of the test chamber using cryogenic liquefied gas, such as using liquid nitrogen at -196°C. The specimen to be stretched is immersed in the liquid nitrogen environment for tensile testing. The advantage of liquid cooling is that it can control the temperature relatively stably during the test. The disadvantage is that the test can only be conducted at certain specific saturation temperature points corresponding to the liquefied gas, and the test temperature and pressure cannot be adjusted.
[0005] Liquid-free cooling refers to using an active refrigeration unit and refrigerant to achieve the low-temperature environment of the test chamber, such as using a GM refrigeration unit to create the cold source. The advantage of liquid-free cooling is the ease of adjusting the required temperature and pressure environment for the test. Its disadvantage is the inability to precisely control the temperature and pressure within the test chamber during the test. For tests in liquid hydrogen or liquid helium environments below -196°C, a significant drawback of liquid-free cooling is the extremely long time required to achieve the required temperature and pressure environment, resulting in low test efficiency. Furthermore, liquid-free cooling cannot characterize the influence of the medium itself on material properties. For example, when testing metallic materials used in liquid hydrogen storage equipment in a liquid-free cooling device using helium as the refrigerant, it is impossible to characterize the potential hydrogen embrittlement effects of the liquid hydrogen medium.
[0006] Furthermore, although the design mentions a low-temperature material mechanical property testing system, which can use liquefied gas that the test material directly contacts during actual application as the cooling source for the experiment, thus solving the problem of low experimental efficiency in traditional techniques, this technical solution fails to consider the strong coupling relationship between temperature and pressure at low temperatures. This leads to difficulties in simultaneously and accurately adjusting both temperature and pressure during actual operation due to the mutual influence of temperature and pressure and uneven liquid filling. Summary of the Invention
[0007] The technical problem to be solved by the present invention is to overcome the shortcomings of the existing technology and provide a system and method for testing the mechanical properties of materials in ultra-low temperature and high pressure environments.
[0008] To solve the technical problem, the solution of the present invention is:
[0009] On one hand, this application provides a material mechanical property testing system for ultra-low temperature and high pressure environments, comprising: a medium circulation system and a cold source supply system. The medium circulation system includes a heat exchanger tube side, a circulation pump, and a test chamber. The test chamber is suitable for accommodating a universal testing machine for mechanical testing. The heat exchanger tube side, the circulation pump, and the test chamber are connected in sequence, and the medium outlet of the test chamber is connected to a vent pipe. The cold source supply system includes a heat exchanger shell side, a first valve group, a second valve group, a gas-liquid mixer, a liquefied gas pump, a room temperature gas storage tank, and a first liquefied gas storage tank. The first liquefied gas storage tank has its shell side housing the heat exchanger tube side. The outlet of the first liquefied gas storage tank is connected to the first valve group and the liquefied gas pump, respectively. The liquefied gas pump is connected to the second valve group. Both the first valve group and the second valve group are connected to the inlet of the gas-liquid mixer. The second valve group is also connected to the circulation pump. The outlet of the gas-liquid mixer is connected to one end of the heat exchanger shell side. The other end of the heat exchanger shell side is connected to the vent pipe through a discharge pipe. The heat exchanger shell side and the heat exchanger tube side form a countercurrent heat exchange.
[0010] According to one embodiment of this application, the cold source supply system further includes a second liquefied gas storage tank, the outlet of the second liquefied gas storage tank and the outlet of the first liquefied gas storage tank are both connected to a first reversing valve, the first reversing valve is also connected to the first valve group and the liquefied gas pump respectively; wherein, the second liquefied gas storage tank is equipped with a GM refrigeration unit and a low-temperature thermostat.
[0011] According to one embodiment of this application, the medium in the ambient temperature gas storage tank, the medium in the first liquefied gas storage tank, and the medium in the second liquefied gas storage tank are the same substance.
[0012] According to one embodiment of this application, the shell side of the heat exchanger is a cylindrical tank, and the tube side of the heat exchanger is constructed as a spiral tube disposed inside the tank.
[0013] According to one embodiment of this application, the heat exchanger shell side is provided with a fully enclosed hollow inner cylinder, and the spiral tube is arranged around the hollow inner cylinder.
[0014] According to one embodiment of this application, the test chamber includes a chamber body and a door body, wherein the door body is connected to the chamber body through a three-section spring-energy-storing dynamic sealing structure.
[0015] According to one embodiment of this application, the test chamber is equipped with a temperature measuring instrument and a pressure sensor, and a safety valve is provided on the test chamber. The medium outlet of the test chamber is connected to the vent pipe through the safety valve.
[0016] According to one embodiment of this application, a thermometer and a flow meter are provided at the outlet of the ambient temperature gas storage tank, and a pressure reducing valve is provided at the outlet of the gas-liquid mixer.
[0017] According to one embodiment of this application, a first pressure control valve is provided on the pipeline between the heat exchanger tube side and the vent pipe, a second pressure control valve is provided on the vent pipe, and a shut-off valve is provided on the pipeline between the test chamber and the heat exchanger tube side.
[0018] According to one embodiment of this application, the end of the vent pipe is connected to a waste gas recovery device.
[0019] On the other hand, this application proposes a method for testing the mechanical properties of materials in ultra-low temperature and high pressure environments. This method is applied to the aforementioned ultra-low temperature and high pressure environment material mechanical property testing system, and the testing method includes:
[0020] Adjust the first valve group to deliver room temperature gas from the room temperature gas storage tank to the test chamber via a liquefied gas pump, so as to provide a circulating medium for the test chamber;
[0021] Adjust the second valve group to allow the liquid medium in the first liquefied gas storage tank to enter the shell side of the heat exchanger through the gas-liquid mixer;
[0022] When the circulation pump is turned on, the circulating medium in the test chamber exchanges heat with the liquid medium in the shell side of the heat exchanger within the tube side, so that the circulating medium in the test chamber becomes the experimental target medium.
[0023] According to one embodiment of this application, if the density of the experimental target medium is lower than the density of the room temperature gas under the design pressure of the test chamber, the density of the circulating medium is kept consistent with the density of the experimental target medium by adjusting the pressure of the room temperature gas already filled in the medium circulation system.
[0024] If the density of the target medium in the experiment is equal to or higher than the density of the gas at room temperature under the design pressure of the test chamber, then density adjustment needs to be carried out by combining cooling and pressurization.
[0025] According to one embodiment of this application, the density adjustment by combining cooling and pressurization includes:
[0026] First, connect the ambient temperature gas storage tank and the liquefied gas storage tank to the gas-liquid mixer to form a temperature-controllable cold source in the gas-liquid mixer. Introduce the cold source into the shell side of the heat exchanger to exchange heat with the circulating medium in the tube side of the heat exchanger, thereby cooling the circulating medium. The pressure of the circulating medium will decrease as the temperature decreases.
[0027] The circulating medium is pressurized using ambient temperature gas from a gas storage tank, and then the circulating medium is cooled down. Through multiple pressurization and cooling operations, the density of the circulating medium in the circulating system is made consistent with the density of the experimental target medium.
[0028] According to one embodiment of this application, the testing method further includes a rewarming operation after the test experiment:
[0029] The circulating medium is discharged from the test chamber to the vent pipe, and then the ambient temperature gas storage tank is connected to the medium circulation system to fill the medium circulation system with ambient temperature gas.
[0030] Start the circulation pump to circulate the ambient temperature gas in the medium circulation system until the metal walls of the test chamber and the shell side of the heat exchanger are reheated.
[0031] Compared with the prior art, the beneficial effects of this application are:
[0032] 1. Compared with traditional liquid-free cooling methods, this application can use liquefied gas that is in direct contact with the test material during actual application as the refrigeration source required for the test, thereby solving the problem of low test efficiency in the case of using an active refrigerator in liquid-free cooling methods. At the same time, since the test system can be placed in a medium corresponding to the service conditions, the influence of the medium on the material can be considered.
[0033] 2. Compared to traditional liquid-cooled methods, this invention controls the required temperature and pressure conditions for the experiment by using a heat exchanger. Since the heat exchanger has a sufficiently large volume and heat exchange area compared to the test chamber, the temperature control power can increase with the temperature if pressure and temperature fluctuations occur during the experiment. Although temperature-pressure coupling exists for high-pressure gases at low temperatures, this solution achieves a one-to-one mapping relationship between temperature and pressure at a specific density of the gas or liquefied gas within the test chamber by determining the gas or liquefied gas density, thus solving the problem of difficulty in simultaneously adjusting temperature and pressure. Therefore, this invention can achieve stable temperature and pressure control of the test chamber and can withstand a large heat load, solving the problem of temperature and pressure coupling and instability in existing liquid-cooled low-temperature test devices.
[0034] 3. The ultra-low temperature and high pressure material performance testing system provided by this invention can utilize a gas-liquid mixer and a heat exchanger to control the temperature and pressure of liquefied gas or gas after vaporization. Therefore, this testing system can not only cover most of the process conditions in existing hydrogen or helium liquefaction devices, but also provide testing conditions for cryogenic gas application scenarios. This fulfills the testing requirements of materials under various typical media, temperature, and pressure combinations, solving the problem that existing liquid-cooled testing devices can only perform tests at specific temperature and pressure points.
[0035] 4. In the ultra-low temperature high pressure material performance testing system of the present invention, the equipment configuration, cold insulation technology, and liquefied gas circulation equipment can all adopt existing mature technologies; therefore, the overall system construction cost is low, it has very good feasibility, and it is suitable for widespread application. Attached Figure Description
[0036] To more clearly illustrate the technical solutions in the specific embodiments of this application or the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0037] Figure 1 is a schematic diagram of the ultra-low temperature and high pressure environment material mechanical property testing system according to an embodiment of this application;
[0038] Figure 2 is a schematic diagram of the shell side and tube side of the heat exchanger according to an embodiment of this application;
[0039] Figure 3 is a flowchart of the method for testing the mechanical properties of materials in an ultra-low temperature and high pressure environment according to an embodiment of this application.
[0040] [Explanation of reference numerals in attached drawings] 1: First liquefied gas storage tank; 2: Second liquefied gas storage tank; 3: Ambient temperature gas storage tank; 4: First valve group; 5: Reversing valve; 6: Liquefied gas pump; 7: Second valve group; 8: Gas-liquid mixer; 9: Check valve; 10: Circulation pump; 11: Shell side of heat exchanger; 12: Tube side of heat exchanger; 13: First pressure control valve; 14: Second pressure control valve; 15: Shut-off valve; 16: Waste gas recovery device; 17: Test chamber; 18: Vent pipe; 19: Hollow inner cylinder. Detailed Implementation
[0041] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0042] Unless otherwise defined, all technical and scientific terms used in this application have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains; the terminology used in the description of this application is for the purpose of describing particular embodiments only and is not intended to limit the application; the terms "comprising" and "having," and any variations thereof, in the description, claims, and accompanying drawings of this application are intended to cover non-exclusive inclusion. The terms "first," "second," etc., in the description, claims, or accompanying drawings of this application are used to distinguish different objects, not to describe a specific order or hierarchy.
[0043] In this application, the reference to "embodiment" means that a specific feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a mutually exclusive, independent, or alternative embodiment. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described in this application can be combined with other embodiments.
[0044] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation," "connection," "linking," and "attachment" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal communication between two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.
[0045] In this application, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, or B existing alone. Additionally, in this application, the character " / " generally indicates that the preceding and following related objects have an "or" relationship.
[0046] In this application, "multiple" refers to two or more (including two), and similarly, "multiple groups" refers to two or more (including two), and "multiple pieces" refers to two or more (including two).
[0047] Description of the invention principle:
[0048] 1. In the relevant technical solution, the cold source in the cold source storage tank is first introduced into the temperature and pressure regulating chamber, and then the temperature and pressure are increased through the ambient temperature gas storage tank. During the test, the internal pressure of the temperature and pressure regulating chamber is stabilized by a pressure control valve, and the temperature inside the chamber is adjusted by the cold source storage tank. The most prominent drawback of this technical solution is that it does not consider the coupling relationship between the temperature and pressure of the low-temperature gas. In actual operation, due to the mutual influence of temperature and pressure, and the uneven filling of liquid in the temperature and pressure regulating chamber (this unevenness is particularly obvious at temperatures far from the boiling point of the cold source), the filling speed of the cold source storage tank is difficult to adjust. This further leads to unclear control logic of the liquid pump in the control system design and places high demands on the arrangement of temperature sensors.
[0049] In this application, the applicant proposes an innovative solution: first, a room-temperature gas storage tank is connected to the tube side of the heat exchanger to fill the medium circulation system with room-temperature gas; then, the pressure difference between the room-temperature gas storage tank and the test chamber and heat exchanger tube side is used to pressurize the circulating medium in the medium circulation system, adjusting it to the gas density consistent with the required test conditions, and then cooling continues; alternatively, based on the fact that the pressure of the circulating medium decreases simultaneously with the temperature, the pressure of the circulating medium is replenished, and then adjusted to the density consistent with the required test conditions before cooling continues. This scheme considers and utilizes the problem of temperature-pressure coupling; based on the principle of mass conservation, the pressure of the circulating medium is simultaneously regulated after the temperature is regulated.
[0050] During the test in this application, the cold source in the shell side of the heat exchanger can be maintained at the temperature required by the test by mixing room temperature gas and liquefied gas through a gas-liquid mixer. By exchanging heat with the circulating medium in the tube side of the heat exchanger, stepless temperature regulation can be achieved over a large temperature range. This temperature regulation scheme is simple and mature, and can maintain good accuracy.
[0051] 2. In the relevant technical solutions, to maintain the stability of the test chamber's temperature and pressure, the design volume of the temperature and pressure regulating chamber must be large enough. This chamber is essentially a spiral tube heat exchanger. To ensure the shell side of the heat exchanger withstands high internal pressure and the tube side withstands high external pressure, the wall thickness is extremely thick when using S31608 material. This not only makes spiral tube processing difficult, but also requires a large amount of cooling energy due to the large wall thickness. If liquefied gas cooling is used, a large amount of liquid hydrogen is needed to bring the temperature of the chamber to the corresponding temperature range, resulting in extremely high costs per test. Furthermore, since only hydrogen temperature and pressure conditions need to be maintained within the test chamber, most of the cooling energy within the chamber is wasted on cooling the walls, leading to difficulties in the rewarming process after the test.
[0052] In this application, on the one hand, only the heat exchanger tube side bears the high internal pressure, and due to its small tube diameter, the wall thickness does not need to be too thick; at the same time, the heat exchanger shell side only needs to bear a lower design pressure, and considering a conservative safety factor, the wall thickness can be significantly reduced compared to existing technologies. On the other hand, since only the outlet temperature of the heat exchanger tube side needs to be controlled, the heat exchanger shell side volume does not need to be large. It is even possible to place a fully enclosed hollow inner cylinder with a lower wall thickness requirement inside to reduce the heat exchanger shell side volume, which simplifies the manufacturing process and avoids the waste of cooling capacity.
[0053] 3. The relevant technical solutions do not consider the impact of the work done by the high-pressure liquid pump on the liquid temperature, making it impossible to achieve most critical operating conditions. Taking liquid hydrogen as an example, in reality, when using a liquid hydrogen pump to pressurize liquid hydrogen to a high pressure, a large amount of heat is introduced into the liquid hydrogen. In the scenario of a hydrogen refueling station with a large flow rate and equipped with a high-power GM chiller, this impact is small. However, in laboratory testing scenarios, the circulation pump or liquid hydrogen pump has a small flow rate, and the heat introduced by the pump operation not only cannot be ignored, but will become a major impact. Therefore, for many critical operating conditions such as high-pressure tests within the temperature range of 33K~50K and pressure of 35~45MPa (this test corresponds to the truck transportation scenario of low-temperature high-pressure hydrogen), testing is impossible due to the influence of the circulation pump or liquid hydrogen pump. Moreover, high-pressure, low-flow pumps need to be customized and are expensive.
[0054] In this application, instead of directly using a liquefied petroleum gas (LPG) pump to adjust the circulating medium to high pressure, an innovative combination of a gas-liquid mixer and a heat exchanger is employed to exchange heat between a temperature-controllable cold source and hydrogen used in the high-pressure test, ultimately achieving temperature and pressure regulation. Considering that even using a low-pressure LPG pump would generate some heat, this application further proposes setting up an LPG storage tank equipped with a GM refrigerator and a cryostat. A small-power GM refrigerator imparts a certain degree of subcooling to the LPG in this storage tank, thereby meeting the requirements of tests under extreme conditions, such as a temperature of 20K. Simultaneously, while maintaining circulation, the flow rate of the circulating pump is gradually reduced to decrease the introduced heat until the medium temperature in the test chamber reaches the experimental target value.
[0055] 4. The solution presented in this application breaks through conventional technical thinking, not adhering to the usual experimental experience of simultaneously adjusting the temperature and pressure of the test chamber. Instead, it utilizes high-pressure gas from a room-temperature gas storage tank to inject the experimental medium into the circulation system for pressure regulation and replenishment, thereby controlling the density of the medium within the test chamber. Then, temperature control in the heat exchanger is used to further control the temperature of the medium within the test chamber, thus solving the problem of gas temperature-pressure coupling at low temperatures, which is difficult to avoid in traditional testing techniques. Therefore, in this application's solution, since the medium density remains constant, the medium pressure decreases simultaneously with the temperature. When the medium temperature in the test chamber is regulated, the pressure is simultaneously regulated. Because the entire regulation process is stable and smooth, frequent opening and closing of the safety valve is avoided, reducing the problem of heat leakage in the test chamber.
[0056] 5. In traditional temperature and pressure control schemes, whether using a temperature and pressure regulating chamber or a heat exchanger, the main purpose is only to achieve cooling, while pressure control is achieved by a separate liquid pump. The strong coupling relationship between temperature and pressure of the experimental medium under low-temperature conditions has never been considered. While this application also uses a conventional shell-and-tube heat exchanger, it goes beyond conventional thinking by utilizing the heat exchanger to cool high-temperature gas from a low-temperature liquid. By combining a gas-liquid mixer and taking advantage of the large volume difference between the tube and shell sides of the heat exchanger, the test chamber is rapidly cooled by liquefied gas during the cooling process. During the mechanical experiment, the temperature of the temperature and pressure regulating chamber is controlled by changing the gas-liquid mixing ratio in the gas-liquid mixer, thereby achieving stepless temperature control of the test chamber during the experiment.
[0057] 6. Traditional cooling solutions sometimes use GM refrigerators and heating resistors to regulate the temperature of the experimental medium. However, this approach is not suitable for high-pressure gas environment testing. Firstly, electrically heating a portion of the high-pressure gas is dangerous. Secondly, achieving high-pressure conditions necessitates a significant increase in the thickness of the test chamber walls, resulting in a large heat capacity. Furthermore, GM refrigerators have a drawback: their cooling efficiency is low below the liquid temperature range, further extending the testing time. To shorten the testing time, existing solutions often involve increasing the number of GM refrigerators or employing liquid cooling, further increasing the overall experimental cost.
[0058] For operating conditions where the temperature is close to or below the boiling point of the target medium, this scheme innovatively proposes a staged cooling strategy. First, the liquid in the low-pressure liquefied petroleum gas (LPG) storage tank is used to cool the experimental medium. Then, the liquid in the LPG storage tank equipped with a GM refrigerator and a cryostat further cools the experimental medium. Since the heat leakage of the LPG storage tank is much smaller than that of the cold source supply system and the medium circulation system, this scheme can significantly reduce the refrigeration power requirements of the GM refrigerator while ensuring the cooling rate, further reducing the overall experimental cost.
[0059] This application proposes a material mechanical property testing system for ultra-low temperature and high pressure environment. The system includes a medium circulation system and a cold source supply system. The medium circulation system includes a heat exchanger tube side 12, a circulation pump 10, and a test chamber 17. The test chamber 17 is suitable for accommodating a universal testing machine for mechanical testing. The heat exchanger tube side 12, the circulation pump 10, and the test chamber 17 are connected in sequence. The medium outlet of the test chamber 17 is connected to a vent pipe 18.
[0060] The test chamber 17 is suitable for mounting a universal testing machine for mechanical testing in its internal cavity. The test chamber 17 has an inner and outer double chamber, with a gap between the two chambers and a vacuum maintained. The top and bottom panels of the double chamber are respectively provided with a medium outlet and a medium inlet. The universal testing machine mounted inside the test chamber 17 can perform mechanical tests such as tensile, compression, and fracture toughness by changing the fixtures.
[0061] As an optional solution, to reduce heat leakage and prevent air leakage, the door of the test chamber 17 adopts a three-stage spring-energy-storing dynamic seal. Specifically, the test chamber 17 may include a chamber body and a quick-opening flat cover, which can be connected to the chamber body through a three-stage spring-energy-storing dynamic seal structure.
[0062] The test chamber 17 is equipped with a temperature measuring instrument and a pressure sensor. A safety valve is also installed on the test chamber 17, and the medium outlet of the test chamber 17 can be connected to the safety valve. The safety valve is connected to the vent pipe 18 via a pipeline. When the test chamber 17 experiences overpressure, the experimental medium will be quickly discharged through the safety valve to prevent the test chamber 17 from failing.
[0063] The test chamber 17, the circulating pump 10 and the heat exchanger tube 12 are connected by pipelines to form a circulation loop, thereby obtaining a medium circulation system. The medium outlet of the test chamber 17 can be connected to the vent pipe 18 through the outlet pipeline. The end of the vent pipe 18 can be connected to the waste gas recovery device 16, which can be equipped with an air bath gasifier.
[0064] The cold source supply system may include a heat exchanger shell side 11, a first valve group 4, a second valve group 7, a gas-liquid mixer 8, a liquefied gas pump 6, a normal temperature gas storage tank 3, and a first liquefied gas storage tank 1. The heat exchanger shell side 11 houses the heat exchanger tube side 12. The heat exchanger shell side 11 housing the heat exchanger tube side 12 can constitute a complete heat exchanger, which can be a spiral tube heat exchanger.
[0065] The outlet of the first liquefied gas storage tank 1 is connected to the first valve group 4 and the liquefied gas pump 6. The liquefied gas pump 6 is connected to the second valve group 7. Both the first valve group 4 and the second valve group 7 are connected to the inlet of the gas-liquid mixer 8. The second valve group 7 is also connected to the pipeline where the circulating pump 10 is located. The outlet of the gas-liquid mixer 8 is connected to one end of the shell side 11 of the heat exchanger. The other end of the shell side 11 of the heat exchanger is connected to the vent pipe 18 through the discharge pipeline. The shell side 11 of the heat exchanger and the tube side 12 of the heat exchanger form a counter-current heat exchange. That is to say, the flow direction of the medium in the shell side 11 of the heat exchanger can be opposite to the flow direction of the medium in the tube side 12 of the heat exchanger.
[0066] In some embodiments of this application, the cooling supply system further includes a second liquefied gas storage tank 2, the outlet of the second liquefied gas storage tank 2 and the outlet of the first liquefied gas storage tank 1 are both connected to a first reversing valve 5, and the first reversing valve 5 is also connected to a first valve group 4 and a liquefied gas pump 6 respectively; wherein, the second liquefied gas storage tank 2 is equipped with a GM refrigerator and a low-temperature thermostat.
[0067] The outlet pipelines of the first liquefied gas storage tank 1 and the second liquefied gas storage tank 2 can be connected in parallel to the first reversing valve 5. The pipeline after the first reversing valve 5 can be divided into two paths: one path is connected to the first valve group 4 on the outlet pipeline of the ambient temperature gas storage tank 3, and the other path is connected to the second valve group 7 via the liquefied gas pump 6. The first valve group 4 is also connected to the inlet of the gas-liquid mixer 8 via a pipeline. The second valve group 7 is also connected to the inlet of the gas-liquid mixer 8 and the pipeline where the circulating pump 10 is located via pipelines. The outlet of the gas-liquid mixer 8 is connected to one end of the shell side 11 of the heat exchanger via a pipeline. The other end of the shell side 11 of the heat exchanger is connected to the vent pipe 18 via a discharge pipeline. The shell side 11 of the heat exchanger and the tube side 12 of the heat exchanger form a countercurrent heat exchange.
[0068] As an optional design, the heat exchanger shell side 11 has a cylindrical tank structure with inlets and outlets at both ends. The heat exchanger tube side 12 is a spiral tube structure located inside the heat exchanger shell side 11, with inlets and outlets connected to the heat exchanger tube side 12 arranged in a centrally symmetrical manner on the heat exchanger shell side 11. A fully enclosed hollow inner cylinder 19 is nested inside the spiral tube structure. The spiral tube structure can be arranged around the hollow inner cylinder 19 to further reduce the volume of the cooling medium within the heat exchanger shell side 11, reduce cold source consumption, and avoid short-circuiting and flow deviation, thereby improving heat exchange efficiency. The tube side thickness of the spiral tube heat exchanger structure must meet strength requirements, the radial dimensions of the spiral coil must meet design specifications, and the spiral tube must ensure a certain heat exchange area to achieve a certain power of heat exchange, ensuring that the test cooling time is not too long. A first pressure control valve 13 can be installed on the pipeline between the spiral heat exchanger tube side 12 and the vent pipe 18; a second pressure control valve 14 can be installed on the vent pipe 18; and a shut-off valve 15 can be installed on the pipeline between the test chamber 17 and the spiral heat exchanger tube side 12. The circulating pump 10 can be a plunger-type high-pressure diaphragm pump to ensure the flow of experimental media of different compositions; and the circulating pump should have an adjustable flow rate, allowing the flow rate to be reduced while maintaining circulation during mechanical testing, thereby minimizing heat loss and reducing the amount of cold source used.
[0069] As an optional solution, the ambient temperature gas storage tank 3 can be a spherical tank with an internal gas pressure much greater than the maximum pressure required for the test, and a volume sufficient to provide sufficient ambient temperature high-pressure gas to the test chamber 17. A thermometer and flow meter can be installed at the outlet of the ambient temperature gas storage tank 3, and the real-time density of the liquefied gas or gas in the test chamber 17 can be obtained by measuring the flow rate at the outlet and using the flow formula. A pressure reducing valve can be installed at the outlet of the gas-liquid mixer 8; the circulating pump 10 is a diaphragm reciprocating pump; a one-way valve 9 can be installed on the pipeline between the circulating pump 10 and the heat exchanger tube side 12. The pressure reducing valves inside the first valve group 4 and the second valve group 7 can be used to reduce the pressure of the gas or liquefied gas to the required pressure. The volumes of the first liquefied gas storage tank 1 and the second liquefied gas storage tank 2 are both much larger than the volume of the test chamber. The liquefied gas in the storage tanks is directly supplied by the liquefaction equipment, and the subcooling requirement is low. The GM refrigeration unit can complete the cooling of the liquefied gas within a certain time and overcome the heat leakage of the storage tank itself through a low-temperature thermostat. When cooling the system, the higher-temperature liquefied gas storage tank initially provides cooling. If the temperature cannot decrease further, the lower-temperature liquefied gas storage tank, equipped with a set of GM chillers and a cryostat, further provides cooling until the required test temperature is reached. The temperature of the cold source at the outlet can be regulated by adjusting the pressure and flow rate of the liquefied gas and gas at the inlet of the gas-liquid mixer 8. Using pressure-reducing valves in the valve group and at the outlet of the liquefied gas pump, it can be ensured that the liquefied gas or gas flowing into the shell side 11 of the heat exchanger does not exceed the design pressure.
[0070] This application also provides a method for testing the mechanical properties of materials in ultra-low temperature and high pressure environments. This method is applied to the aforementioned ultra-low temperature and high pressure environment material mechanical property testing system, and the method includes:
[0071] Adjust the first valve group 4 to deliver the ambient temperature gas in the ambient temperature gas storage tank 3 to the test chamber 17 through the liquefied gas pump, so as to provide the test chamber 17 with a circulating medium.
[0072] Adjust the second valve group 7 to allow the liquid medium in the first liquefied gas storage tank 1 to enter the heat exchanger shell side 11 through the gas-liquid mixer 8;
[0073] When the circulation pump 10 is turned on, the circulating medium in the test chamber 17 exchanges heat with the liquid medium in the shell side 11 of the heat exchanger in the tube side 12 of the heat exchanger, so that the circulating medium in the test chamber 17 becomes the experimental target medium.
[0074] It should be noted that when the ambient temperature gas in the ambient temperature gas storage tank 3 first enters the test chamber 17, the temperature and pressure do not meet the requirements, so it is a normal medium. After cooling and pressurization, the temperature and pressure meet the test conditions, and the medium in the test chamber 17 becomes the test target medium. At this time, the various performance characteristics of the materials in the test chamber 17 can be tested.
[0075] According to some embodiments of this application, if the density of the experimental target medium is lower than the density of the gas at room temperature under the design pressure of the test chamber 17, the density of the circulating medium is kept consistent with the density of the experimental target medium by adjusting the pressure of the circulating medium already filled in the medium circulation system; if the density of the experimental target medium is equal to or higher than the density of the gas at room temperature under the design pressure of the test chamber 17, then density adjustment is required by combining cooling and pressurization.
[0076] According to some embodiments of this application, the density adjustment by combining cooling and pressurization includes:
[0077] First, connect the ambient temperature gas storage tank 3 and the first liquefied gas storage tank 1 to the gas-liquid mixer 8 simultaneously to form a temperature-controllable cold source in the gas-liquid mixer 8. Introduce the cold source into the shell side 11 of the heat exchanger to exchange heat with the circulating medium in the tube side 12 of the heat exchanger to cool down the circulating medium. The pressure of the circulating medium will decrease as the temperature decreases.
[0078] The circulating medium is pressurized using room temperature gas in room temperature gas storage tank 3, and then cooled down. Through multiple pressurization and cooling operations, the density of the circulating medium in the circulating system is made consistent with the density of the experimental target medium.
[0079] According to some embodiments of this application, the testing method further includes a rewarming operation after the test experiment:
[0080] The circulating medium is discharged from the test chamber 17 to the vent pipe 18, and then the ambient temperature gas storage tank 3 is connected to the medium circulation system to fill the medium circulation system with ambient temperature gas.
[0081] Start the circulation pump 10 to circulate the room temperature gas in the medium circulation system until the metal wall and heat exchanger shell of the test chamber 17 are reheated.
[0082] A cold source supply system is constructed using a heat exchanger shell side 11, a gas-liquid mixer 8, a normal temperature gas storage tank 3, a liquefied gas pump 6, and at least one liquefied gas storage tank (first liquefied gas storage tank 1 and / or second liquefied gas storage tank 2) to provide the experimental target medium and serve as a cold source for heat exchange; a medium circulation system is constructed using a test chamber 17, a circulation pump 10, and a heat exchanger tube side 12 to cool the circulating medium through heat exchange; the experimental target medium and the cold source are the same substance, and its form is gaseous, liquid, or supercritical fluid.
[0083] Connect the ambient temperature gas storage tank 3 to the heat exchanger tube side 12 and the test chamber 17, and fill the medium circulation system with ambient temperature gas. Pressurize the filled ambient temperature gas by relying on the pressure difference between the ambient temperature gas storage tank 3 and the medium circulation system.
[0084] If the density of the experimental target medium is lower than the density of the gas at room temperature under the design pressure of the test chamber, the gas density is adjusted to match the density of the experimental target medium by adjusting the pressure of the gas already charged in the circulation system. If the density of the experimental target medium is equal to or higher than the density of the gas at room temperature under the design pressure of test chamber 17, density adjustment is required by combining cooling and pressurization: First, connect the room temperature gas storage tank 3 and the liquefied gas storage tank (first liquefied gas storage tank 1 or / and second liquefied gas storage tank 2) to the gas-liquid mixer 8 to form a temperature-controllable cold source in the gas-liquid mixer 8. Introduce the cold source into the shell side 11 of the heat exchanger to exchange heat with the circulating medium in the tube side 12 of the heat exchanger to cool the circulating medium. The pressure of the circulating medium will decrease as the temperature decreases. Use the room temperature gas in the room temperature gas storage tank 3 to pressurize the circulating medium, and then continue to cool it. Through multiple pressurization and cooling operations, the density of the medium in the circulation system will eventually match the density of the experimental target medium.
[0085] The ratio of ambient gas to liquefied gas entering the gas-liquid mixer 8 is controlled to keep the temperature in the shell side 11 of the heat exchanger consistent with the experimental target temperature. While maintaining circulation, the flow rate of the circulation pump 10 is gradually reduced to reduce the introduced heat until the temperature of the medium in the test chamber 17 reaches the experimental target value. Since the density of the medium in the medium circulation system remains constant, based on the principle of mass conservation, the temperature and pressure of the medium in the test chamber 17 and the tube side 12 of the heat exchanger can be adjusted simultaneously.
[0086] The rewarming procedure after the test experiment is as follows: First, discharge the circulating medium from the test chamber 17 to the vent pipe 18; then connect the ambient temperature gas storage tank 3 to the medium circulation system and fill the medium circulation system with ambient temperature gas; start the circulation pump 10 to circulate the ambient temperature gas in the medium circulation system until the rewarming of the metal wall and heat exchanger shell side of the test chamber 17 is completed.
[0087] This invention is applicable to various experimental conditions. The target experimental medium can be hydrogen, liquid hydrogen, or supercritical hydrogen fluid, or nitrogen, liquid nitrogen, or supercritical nitrogen fluid. During the process of adjusting the density of the target experimental medium, pressurization or pressure replenishment is performed using hydrogen or nitrogen stored in a room-temperature gas storage tank, with a pressure range selectable from 50 to 98 MPa. Two liquefied gas storage tanks are provided; one provides liquid hydrogen (e.g., at 22 K), liquid nitrogen (e.g., at 80 K), or liquefied natural gas (e.g., at 115 K); the other is equipped with a GM refrigerator and a cryostat, providing liquid hydrogen (e.g., at 18 K), liquid nitrogen (e.g., at 75 K), or liquefied natural gas (e.g., at 105 K) at relatively lower temperatures. For extremely low-temperature experimental conditions, a higher-temperature liquid is first used to cool the circulating medium in the circulation system, and then a lower-temperature liquid is used for further cooling.
[0088] Specific application examples under different experimental conditions.
[0089] Implementation Case 1:
[0090] Target medium and conditions: Hydrogen gas, pressure 5 MPa, temperature 100 K;
[0091] 1. Preparation stage:
[0092] (1) Standby high-pressure gas at ambient temperature: Hydrogen is supplied to the ambient temperature gas storage tank 3 by an external compressor to reach the design pressure of the ambient temperature gas storage tank 3.
[0093] (2) Purge and discharge air: Adjust the first valve group 4 and the second valve group 7, open the first pressure control valve 13 and the second pressure control valve 14, and use the ambient temperature hydrogen in the ambient temperature gas storage tank 3 to purge the gas-liquid mixer 8, the shell side of the heat exchanger 11, the tube side of the heat exchanger 12 and the test chamber 17. The purging gas is finally discharged to the waste gas recovery device 16 through the vent pipe 18.
[0094] 2. Adjust the density of the hydrogen gas used in the experiment:
[0095] Adjust the first valve group 4 to connect the ambient temperature gas storage tank 3 to the heat exchanger tube side 12 and the test chamber 17 via the liquefied gas pump 6. Use the pressure reducing valve in the first valve group 4 to adjust the outlet pressure of the ambient temperature gas storage tank 3 to 16.2 MPa, thus maintaining the hydrogen pressure in the test chamber 17 at 16.2 MPa. The density of hydrogen at a pressure of 5 MPa and a temperature of 100 K is the same as the density of hydrogen at a pressure of 16.2 MPa and a temperature of 298 K, both being 12 kg / m³.
[0096] When temperature regulation is performed while maintaining the same density, the coupling relationship between temperature and pressure can be utilized; when subsequent temperature regulation is performed, pressure regulation can be achieved simultaneously. The first pressure control valve 13 is used to maintain the hydrogen pressure in the shell side 11 and tube side 12 of the heat exchanger below the design pressure of the shell side 11 and tube side 12 of the heat exchanger.
[0097] 3. Temperature adjustment stage:
[0098] (1) Adjust the reversing valve 5 to cool the test system using liquid hydrogen from the second liquefied gas storage tank 2. Specifically, adjust the second valve group 7 to allow liquid hydrogen to enter the heat exchanger shell side 11 through the gas-liquid mixer 8. Use the second pressure control valve 14 on the vent pipe to maintain the pressure of the heat exchanger shell side 11 below the design pressure, and discharge excess liquid hydrogen. Turn on the circulation pump 10 to circulate the hydrogen (i.e., the circulating medium) in the test chamber 17 and the heat exchanger tube side 12, and perform convective heat exchange with the low-temperature liquid hydrogen in the heat exchanger shell side 11 to achieve a stable decrease in the temperature of the circulating medium until the temperature approaches 100K.
[0099] (2) Control the first valve group 4 and the second valve group 7 to adjust the flow rate and pressure of hydrogen and liquid hydrogen flowing into the gas-liquid mixer 8. Mix the liquid hydrogen from the first liquefied gas storage tank 1 with the room temperature hydrogen from the room temperature gas storage tank 3 in a certain proportion to keep the hydrogen temperature at the outlet of the gas-liquid mixer 8 at 100K, and finally stabilize the temperature of the heat exchanger shell side 11 at 100K. Gradually reduce the flow rate of the circulating pump 10 to reduce the heat introduced by the pump operation, and precisely adjust the temperature of the hydrogen in the test chamber 17 until the temperature of the hydrogen in the test chamber 17 reaches the set test temperature.
[0100] Since the hydrogen density remains constant within the test chamber 17 and the heat exchanger tube side 12, the pressure is adjusted simultaneously according to the law of conservation of mass. Furthermore, because the heat exchanger tube side 12 is a spiral tube design, it has a large heat exchange area and can deform appropriately, enabling it to withstand heat leakage from the test system environment and the heat generated during the test due to changes in the shape of the sample.
[0101] 4. Rewarming stage:
[0102] (1) Discharge the low-temperature hydrogen gas used in the test: Open the first pressure control valve 13, the second pressure control valve 14 and the shut-off valve 15 to gradually discharge the low-temperature hydrogen gas in the test chamber 17.
[0103] (2) Introducing room temperature hydrogen to reheat the metal wall: Close the second pressure control valve 14, adjust the first valve group 4 so that room temperature low pressure hydrogen enters the heat exchanger tube side 11 and the test chamber 17 through the liquid hydrogen pump (i.e., liquefied gas pump 6), and the reheating of the metal wall of the test chamber 17 is completed by circulating the hydrogen through the circulation pump 10. On the other hand, since the heat exchanger tube side 12 is a spiral tube structure, the reheating of the heat exchanger shell side 11 can also be completed at the same time during the circulation process.
[0104] Implementation Case 2:
[0105] Target medium and conditions: Nitrogen gas, pressure 5 MPa, temperature 250 K;
[0106] 1. Preparation stage:
[0107] (1) Standby high-pressure gas at ambient temperature: Nitrogen is supplied to the ambient temperature gas storage tank 3 by an external compressor to reach the design pressure of the ambient temperature gas storage tank 3.
[0108] (2) Purge and discharge air: Adjust the first valve group 4 and the second valve group 7, open the first pressure control valve 13 and the second pressure control valve 14, and use room temperature nitrogen to purge the gas-liquid mixer 8, the shell side of the heat exchanger 11, the tube side of the heat exchanger 12 and the test chamber 17. The purging gas is finally discharged through the vent pipe 18.
[0109] 2. Adjust the density of the nitrogen gas used in the experiment:
[0110] Adjust the first valve group 4 to connect the ambient temperature gas storage tank 3 to the heat exchanger tube side 12 and the test chamber 17 via the liquid hydrogen pump 6. Use the pressure reducing valve in the first valve group 4 to adjust the outlet pressure of the ambient temperature gas storage tank 3 to 6.1 MPa, that is, maintain the nitrogen pressure in the test chamber 17 at 6.1 MPa (the nitrogen density at 5 MPa and 250 K is the same as the nitrogen density at 6.1 MPa and 298 K, both being 70 kg / m3).
[0111] 3. Temperature adjustment stage:
[0112] (1) Adjust the reversing valve 5 to cool the test system using the low-pressure liquid nitrogen from the second liquefied gas storage tank 2. Adjust the second valve group 7 so that the liquid nitrogen enters the shell side 11 of the heat exchanger through the gas-liquid mixer 8. Turn on the circulation pump 10 to circulate the nitrogen (i.e., the circulating medium) in the test chamber 17 and the tube side 12 of the heat exchanger, and perform convective heat exchange with the low-temperature, low-pressure liquid nitrogen in the shell side 11 of the heat exchanger to achieve a stable decrease in the temperature of the circulating medium until the temperature approaches 250K.
[0113] (2) Adjust the first valve group 4 and the second valve group 7 to regulate the flow rate and pressure of nitrogen and liquid nitrogen flowing into the gas-liquid mixer 8, so that the low-pressure liquid nitrogen from the first liquefied gas storage tank 1 and the room-temperature nitrogen from the room-temperature gas storage tank 3 are mixed in a certain proportion, so that the nitrogen temperature at the outlet of the gas-liquid mixer 8 reaches 250K, and finally the temperature of the shell side 11 of the heat exchanger is stabilized at 250K. Reduce the flow rate of the circulating pump 10 to reduce the input heat, so that the nitrogen in the test chamber 17 is precisely conditioned to reach the corresponding test temperature.
[0114] Since the hydrogen density remains constant within the test chamber 17 and the heat exchanger tube side 12, the medium pressure is simultaneously adjusted during the temperature regulation process, according to the law of conservation of mass. Furthermore, because the heat exchanger tube side 12 has a spiral tube structure, it has a large heat exchange area and can deform appropriately, enabling it to withstand heat leakage from the test system environment and the heat generated by changes in the sample shape during the test.
[0115] 4. Rewarming stage:
[0116] (1) Discharge the low-temperature nitrogen gas used in the test: Open the second pressure control valve 14 to gradually discharge the low-temperature nitrogen gas in the test chamber 17.
[0117] (2) Introducing room temperature hydrogen gas to rewarm the metal wall: Close the second pressure control valve 14, adjust the first valve group 4 so that room temperature low-pressure nitrogen gas enters the heat exchanger tube side 11 and the test chamber 17 through the liquid nitrogen pump (i.e., the liquefied gas pump 6), and completes the rewarming of the metal wall of the test chamber 17 by circulating the nitrogen gas through the circulation pump 10. On the other hand, since the heat exchanger tube side 12 is a spiral tube structure, the rewarming of the heat exchanger shell side 11 is also completed at the same time.
[0118] Implementation Case 3:
[0119] Target medium and conditions: supercritical hydrogen, pressure 50 MPa, temperature 50 K;
[0120] 1. Preparation stage:
[0121] (1) Standby high-pressure gas at ambient temperature: Hydrogen is supplied to the ambient temperature gas storage tank 3 by an external compressor to reach the design pressure of the ambient temperature gas storage tank 3.
[0122] (2) Purge and discharge air: Adjust the first valve group 4 and the second valve group 7, open the first pressure control valve 13 and the second pressure control valve 14, and use room temperature hydrogen to purge the gas-liquid mixer 8, the shell side of the heat exchanger 11, the tube side of the heat exchanger 12 and the test chamber 17. The purging gas is finally discharged through the vent pipe 18.
[0123] 2. Adjust the density of the supercritical hydrogen used in the experiment:
[0124] (1) Adjust the first valve group 4 so that the ambient temperature gas storage tank 3 is connected to the heat exchanger tube side 12 through the liquid hydrogen pump (i.e., the liquefied gas pump 6). Use the pressure reducing valve in the first valve group 4 to adjust the outlet pressure of the ambient temperature gas storage tank 3 to 50MPa. 50MPa is the maximum pressure that the shell of the test chamber 17 can withstand.
[0125] (2) Adjust the reversing valve 5 to cool the test system using liquid hydrogen from the second liquefied gas storage tank 2. Adjust the second valve group 7 to allow liquid hydrogen to enter the heat exchanger shell side 11 through the gas-liquid mixer 8. Start the circulation pump 10 to circulate the hydrogen (i.e., the circulating medium) in the test chamber 17 and the heat exchanger tube side 12, and perform convective heat exchange with the low-temperature liquid hydrogen in the heat exchanger shell side 11 to achieve a stable decrease in the temperature of the circulating medium. At this time, due to the conservation of mass, the temperature and pressure of the hydrogen in the test chamber 17 decrease simultaneously. When the pressure drops to 5 MPa, stop cooling. At this time, the gas pressure in the test chamber 17 is lower than the maximum pressure that the shell of the test chamber 17 can withstand. Adjust the first valve group 4 to continue connecting the ambient temperature gas storage tank 3 to the heat exchanger tube side 12 through the liquid hydrogen pump (i.e., the liquefied gas pump 6). Use the pressure reducing valve in the first valve group 4 to adjust the outlet pressure of the ambient temperature gas storage tank 3 to 50 MPa to replenish the pressure of the test chamber 17 and the heat exchanger tube side 12. After pressurization, cooling was continued. Through multiple pressurization and cooling operations, the density of supercritical hydrogen in test chamber 17 finally reached the density corresponding to supercritical hydrogen at a pressure of 50 MPa and a temperature of 50 K.
[0126] 3. Temperature adjustment stage:
[0127] Adjusting the first valve group 4 and the second valve group 7 regulates the flow rate and pressure of hydrogen and liquid hydrogen flowing into the gas-liquid mixer 8, ensuring that the liquid hydrogen from the second liquefied gas storage tank 2 and the hydrogen from the ambient temperature gas storage tank 3 are mixed in a certain proportion. This allows the hydrogen temperature at the outlet of the gas-liquid mixer 8 to reach 50K, ultimately stabilizing the temperature of the heat exchanger shell side 11 at 50K. Reducing the flow rate of the circulating pump 10 decreases the input heat, allowing the supercritical hydrogen in the test chamber 17 to be precisely temperature-controlled to reach the corresponding test temperature.
[0128] Since the supercritical hydrogen density remains constant within the test chamber 17 and the heat exchanger tube side 12, the pressure is simultaneously adjusted according to the law of conservation of mass. Furthermore, because the heat exchanger tube side 12 has a spiral tube structure with a large heat exchange area, it can deform appropriately and withstand heat leakage from the test system environment as well as heat generated during the test due to changes in the shape of the sample.
[0129] 4. Rewarming stage:
[0130] (1) Discharge of supercritical hydrogen for the test: Open the second pressure control valve 14 to gradually discharge the supercritical hydrogen inside the test chamber 17.
[0131] (2) Introducing room temperature hydrogen to rewarm the metal wall: Close the second pressure control valve 14, adjust the first valve group 4 so that room temperature low-pressure hydrogen enters the heat exchanger tube side 11 and the test chamber 17 through the liquid hydrogen pump (i.e., liquefied gas pump 6), and the hydrogen is circulated by the circulation pump 10 to complete the rewarming of the metal wall of the test chamber 17. On the other hand, since the heat exchanger tube side 12 is a spiral tube structure, the rewarming of the heat exchanger shell side 11 is also completed at the same time.
[0132] Implementation Case 4:
[0133] Target medium and conditions: Liquid hydrogen, pressure 0.4 MPa, temperature 20 K;
[0134] 1. Preparation stage:
[0135] (1) Standby high-pressure gas at ambient temperature: Hydrogen is supplied to the ambient temperature gas storage tank 3 by an external compressor to reach the design pressure of the ambient temperature gas storage tank 3.
[0136] (2) Purge and discharge air: Adjust the first valve group 4 and the second valve group 7, open the first pressure control valve 13, the second pressure control valve 14 and the shut-off valve 15, and use room temperature hydrogen to purge the gas-liquid mixer 8, the shell side of the heat exchanger 11, the tube side of the heat exchanger 12 and the test chamber 17. The purging gas is finally discharged through the vent pipe 18.
[0137] 2. Adjust the density of the liquid hydrogen used in the experiment.
[0138] (1) Adjust the first valve group 4 so that the ambient temperature gas storage tank 3 is connected to the heat exchanger tube side 12 through the liquid hydrogen pump (i.e., the liquefied gas pump 6). Use the pressure reducing valve in the first valve group 4 to adjust the outlet pressure of the ambient temperature gas storage tank 3 to 50MPa. 50MPa is the maximum pressure that the shell of the test chamber 17 can withstand.
[0139] (2) Adjust the reversing valve 5 to first use the liquid hydrogen in the first liquefied gas storage tank 1 to cool the test system. Adjust the second valve group 4 to allow the liquid hydrogen to enter the heat exchanger shell side 11 through the gas-liquid mixer 8. Turn on the circulation pump 10 to circulate the hydrogen (i.e., the circulating medium) in the test chamber 17 and the heat exchanger tube side 12, and perform convective heat exchange with the low-temperature liquid hydrogen in the heat exchanger shell side 11 to achieve a stable decrease in the temperature of the circulating medium. At this time, due to the conservation of mass, the temperature and pressure of the hydrogen in the test chamber 17 decrease simultaneously. When the pressure drops to 5MPa, stop cooling. At this time, the gas pressure in the test chamber 17 is lower than the maximum pressure that the shell of the test chamber 17 can withstand. Adjust the first valve group 4 to continue connecting the ambient temperature gas storage tank 3 to the heat exchanger tube side 12. Use the pressure reducing valve in the first valve group 4 to adjust the outlet pressure of the ambient temperature gas storage tank 3 to 50MPa to replenish the pressure of the test chamber 17 and the heat exchanger tube side 11. After pressurization, cooling continues. Through multiple pressurization and cooling operations, the hydrogen density inside test chamber 17 reaches the density corresponding to liquid hydrogen at a pressure of 0.4 MPa and a temperature of 20 K. Furthermore, this operation stabilizes the temperature inside test chamber 17 at 22 K. In contrast, in existing technologies, because the heat leakage of the related temperature and pressure regulation systems is much higher than that of the liquefied gas storage tank, achieving the difficult-to-achieve 20 K temperature point in the liquid hydrogen temperature range requires the use of expensive, higher-powered refrigerators or the use of large quantities of scarce liquid helium per test to offset the heat leakage of the test system equipment and the heat input from the liquid hydrogen pump.
[0140] 3. Temperature adjustment stage:
[0141] Adjust the first reversing valve 5, and use the second liquefied gas storage tank 2, which is equipped with a set of GM refrigerators and a low-temperature thermostat, as a cold source. Adjust the first valve group 4 and the second valve group 7 to directly introduce 20K liquid hydrogen into the shell side 11 of the heat exchanger, so that the temperature of the shell side 11 of the heat exchanger is stabilized at 20K. Gradually reduce the flow rate of the circulation pump 10 to reduce the input heat, so that the liquid hydrogen in the test chamber 17 reaches the corresponding test temperature through precise temperature adjustment.
[0142] Since the density of liquid hydrogen in the test chamber 17 and the heat exchanger tube side 12 remains constant, the pressure is adjusted simultaneously according to the law of conservation of mass. Furthermore, because the heat exchanger tube side 12 has a spiral tube structure, it has a large heat exchange area and can deform appropriately, enabling it to withstand heat leakage from the system environment and the heat generated by changes in the shape of the sample during the test.
[0143] In other words, in this application, the circulating medium in the experimental chamber 17 is first cooled by the medium in the first liquefied gas storage tank 1. When the temperature drops to a certain level, the circulating medium in the experimental chamber 17 is cooled by the medium in the second liquefied gas storage tank 2, thereby greatly reducing the cooling cost.
[0144] 4. Rewarming stage:
[0145] (1) Discharge the test liquid hydrogen: Open the second pressure control valve 14 to gradually discharge the liquid hydrogen in the test chamber 17.
[0146] (2) Introducing room temperature hydrogen to rewarm the metal wall: Close the second pressure control valve 14, adjust the first valve group 4 so that room temperature low-pressure hydrogen enters the heat exchanger tube side 11 and the test chamber 17 through the liquid hydrogen pump (i.e., liquefied gas pump 6), and the hydrogen is circulated by the circulation pump 10 to complete the rewarming of the metal wall of the test chamber 17. On the other hand, since the heat exchanger tube side 12 is a spiral tube structure, the rewarming of the heat exchanger shell side 11 is also completed at the same time.
[0147] Based on the above description and application examples, it can be seen that the ultra-low temperature and high pressure environment material performance testing system provided by this invention uses liquefied gas as the cold source for the test, which can solve the problem of low testing efficiency in active refrigerators used in liquid-free cooling methods. By controlling the temperature and pressure conditions required for the test through a heat exchanger, the problem of unstable temperature and pressure in existing low-temperature testing devices with or without liquid cooling is solved. The temperature and pressure coupling problem of gas or liquefied gas during the test is solved by ensuring a certain density of test gas or liquefied gas. The ultra-low temperature and high pressure material performance testing system provided by this invention can cover most of the process conditions in existing hydrogen liquefaction or liquefied gas storage and transportation devices, realizing the testing requirements of materials under typical media, temperature, and pressure combinations, solving the problem that existing liquid-cooled testing devices can only be tested at specific temperature points and pressures. At the same time, it solves the problem of temperature and pressure coupling during temperature and pressure regulation, and reduces testing costs and required cooling power by using a liquefied gas storage tank equipped with a GM refrigerator and a low-temperature thermostat, as well as a low-pressure liquefied gas storage tank. The ultra-low temperature test chamber and heat exchanger configured in this invention can use vacuum winding insulation, which is a mature existing insulation technology. Therefore, this invention has a very high degree of feasibility.
[0148] It should also be noted that the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0149] The various embodiments in this specification are described in a progressive manner. Similar or identical parts between embodiments can be referred to interchangeably. Each embodiment focuses on describing the differences from other embodiments. In particular, the system embodiments are basically similar to the method embodiments, so the description is relatively simple; relevant parts can be referred to the descriptions in the method embodiments.
[0150] The above description is merely an embodiment of this application and is not intended to limit the scope of this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the scope of the claims of this application.
[0151] Although embodiments of this application have been described in conjunction with the accompanying drawings, those skilled in the art can make various modifications and variations without departing from the spirit and scope of this application, and such modifications and variations all fall within the scope defined by the appended claims.
Claims
1. A system for testing the mechanical properties of materials in an ultra-low temperature and high pressure environment, characterized in that, include: The medium circulation system includes a heat exchanger tube side, a circulation pump, and a test chamber. The test chamber is suitable for accommodating a universal testing machine used for mechanical testing. The heat exchanger tube side, the circulation pump, and the test chamber are connected in sequence. The medium outlet of the test chamber is connected to a vent pipe. A cold source supply system includes a heat exchanger shell side, a first valve group, a second valve group, a gas-liquid mixer, a liquefied gas pump, a normal temperature gas storage tank, and a first liquefied gas storage tank. The heat exchanger shell side houses the heat exchanger tube side. The outlet of the first liquefied gas storage tank is connected to the first valve group and the liquefied gas pump. The liquefied gas pump is connected to the second valve group. Both the first and second valve groups are connected to the inlet of the gas-liquid mixer. The second valve group is also connected to the circulation pump. The outlet of the gas-liquid mixer is connected to one end of the heat exchanger shell side. The other end of the heat exchanger shell side is connected to a vent pipe through a discharge pipe. The heat exchanger shell side and the heat exchanger tube side form a countercurrent heat exchange.
2. The ultra-low temperature and high pressure environment material mechanical property testing system according to claim 1, characterized in that, The cold source supply system also includes a second liquefied gas storage tank. The outlet of the second liquefied gas storage tank and the outlet of the first liquefied gas storage tank are both connected to a first reversing valve. The first reversing valve is also connected to the first valve group and the liquefied gas pump, respectively. The second liquefied gas storage tank is equipped with a GM refrigeration unit and a cryogenic thermostat.
3. The ultra-low temperature and high pressure environment material mechanical property testing system according to claim 2, characterized in that, The medium in the ambient temperature gas storage tank, the medium in the first liquefied gas storage tank, and the medium in the second liquefied gas storage tank are the same substance.
4. The ultra-low temperature and high pressure environment material mechanical property testing system according to claim 1, characterized in that, The heat exchanger shell side is a cylindrical tank, and the heat exchanger tube side is a spiral tube located inside the tank.
5. The ultra-low temperature and high pressure environment material mechanical property testing system according to claim 4, characterized in that, The heat exchanger shell side is provided with a fully enclosed hollow inner cylinder, and the spiral tube is arranged around the hollow inner cylinder.
6. The ultra-low temperature and high pressure environment material mechanical property testing system according to claim 1, characterized in that, The test chamber includes a chamber body and a door body, and the door body is connected to the chamber body through a three-section spring-energy-storing dynamic sealing structure.
7. The ultra-low temperature and high pressure environment material mechanical property testing system according to claim 6, characterized in that, The test chamber is equipped with a temperature measuring instrument and a pressure sensor. A safety valve is installed on the test chamber, and the medium outlet of the test chamber is connected to the vent pipe through the safety valve.
8. The ultra-low temperature and high pressure environment material mechanical property testing system according to claim 1, characterized in that, The outlet of the ambient temperature gas storage tank is equipped with a thermometer and a flow meter, and the outlet of the gas-liquid mixer is equipped with a pressure reducing valve.
9. The ultra-low temperature and high pressure environment material mechanical property testing system according to claim 1, characterized in that, A first pressure control valve is installed on the pipeline between the heat exchanger tube side and the vent pipe, a second pressure control valve is installed on the vent pipe, and a shut-off valve is installed on the pipeline between the test chamber and the heat exchanger tube side.
10. The ultra-low temperature and high pressure environment material mechanical property testing system according to claim 1, characterized in that, The end of the vent pipe is connected to the waste gas recovery device.
11. A method for testing the mechanical properties of materials in ultra-low temperature and high pressure environments, characterized in that, This test method is applied to the ultra-low temperature high pressure environment material mechanical property testing system according to any one of claims 1-10, and the test method includes: Adjust the first valve group to deliver room temperature gas from the room temperature gas storage tank to the test chamber via a liquefied gas pump, so as to provide a circulating medium for the test chamber; Adjust the second valve group to allow the liquid medium in the first liquefied gas storage tank to enter the shell side of the heat exchanger through the gas-liquid mixer; When the circulation pump is turned on, the circulating medium in the test chamber exchanges heat with the liquid medium in the shell side of the heat exchanger within the tube side, so that the circulating medium in the test chamber becomes the experimental target medium.
12. The method for testing the mechanical properties of materials in ultra-low temperature and high pressure environments according to claim 11, characterized in that, If the density of the target medium is lower than the density of the gas at room temperature under the design pressure of the test chamber, the density of the circulating medium can be kept consistent with the density of the target medium by adjusting the pressure of the circulating medium already filled in the medium circulation system. If the density of the target medium in the experiment is equal to or higher than the density of the gas at room temperature under the design pressure of the test chamber, then density adjustment needs to be carried out by combining cooling and pressurization.
13. The method for testing the mechanical properties of materials in ultra-low temperature and high pressure environments according to claim 12, characterized in that, The density adjustment combining cooling and pressurization includes: First, connect the ambient temperature gas storage tank and the first liquefied gas storage tank to the gas-liquid mixer to form a temperature-controllable cold source. Introduce the cold source into the shell side of the heat exchanger to exchange heat with the circulating medium in the tube side of the heat exchanger, thereby cooling the circulating medium. The pressure of the circulating medium will decrease as the temperature decreases. The circulating medium is pressurized using ambient temperature gas from a gas storage tank, and then the circulating medium is cooled down. Through multiple pressurization and cooling operations, the density of the circulating medium in the circulating system is made consistent with the density of the experimental target medium.
14. The method for testing the mechanical properties of materials in ultra-low temperature and high pressure environments according to claim 11, characterized in that, The testing method also includes a post-test retemperature operation: The circulating medium is discharged from the test chamber to the vent pipe, and then the ambient temperature gas storage tank is connected to the medium circulation system to fill the medium circulation system with ambient temperature gas. Start the circulation pump to circulate the ambient temperature gas in the medium circulation system until the metal walls of the test chamber and the shell side of the heat exchanger are reheated.
