Program, information processing method, and information processing device

A system efficiently distributes excess power by categorizing properties and using predictive models to balance power consumption, addressing inefficiencies in demand response systems and ensuring optimal energy management without performance suppression.

WO2026234912A1PCT designated stage Publication Date: 2026-11-12DAIKIN INDUSTRIES LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2026/011340
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-05-09
Filing Date
2026-03-23
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

Existing demand response systems face inefficiencies in distributing excess power when predicted power consumption exceeds target power amounts for demand control, leading to potential penalties and suboptimal energy management.

Method used

A system that groups properties into two categories, distributing excess power from a first group performing demand control to a second group not performing control, using predicted power consumption models and adjustment capacity calculations to balance power distribution.

Benefits of technology

Enables efficient energy management by avoiding excessive suppression of power consumption, thus avoiding penalties and optimizing performance across multiple properties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2026011340_12112026_PF_FP_ABST
    Figure JP2026011340_12112026_PF_FP_ABST
Patent Text Reader

Abstract

[Solution] A program according to one aspect of the present invention causes a computer to execute processing of: acquiring a property of a first group that receives a request for a demand response and performs demand control and a property of a second group that receives a request for a demand response without performing the demand control; and distributing an excess power amount to the property of the second group when an expected power consumption amount of the property of the first group during the execution of the demand response exceeds a target power amount of the demand control.
Need to check novelty before this filing date? Find Prior Art

Description

Program, information processing method, and information processing apparatus

[0001] The present invention relates to a program, an information processing method, and an information processing apparatus.

[0002] In recent years, development of technologies related to demand response has been actively advanced. For example, Patent Document 1 discloses a demand response activation prediction system that determines a unit period as a candidate time when a value of a demand prediction value included in demand prediction data obtained based on demand history data for a predetermined period in a prediction target area satisfies a first condition, a second condition, and a third condition.

[0003] Japanese Patent No. 7646936

[0004] However, the invention according to Patent Document 1 has a problem that when the predicted power consumption at the time of executing demand response exceeds the target power amount for demand control, the excess power amount cannot be efficiently distributed.

[0005] In one aspect, an object is to provide a program and the like that can efficiently distribute the excess power amount when the predicted power consumption at the time of executing demand response exceeds the target power amount for demand control.

[0006] A program according to a first aspect causes a computer to execute processing of acquiring a first group of properties that receive a demand response request and perform demand control, and a second group of properties that do not perform demand control and receive a demand response request, and distributing an excess power amount to the properties of the second group when the predicted power consumption of the properties of the first group at the time of executing demand response exceeds a target power amount for demand control. According to one aspect of the present disclosure, when the predicted power consumption at the time of executing demand response exceeds the target power amount for demand control, the excess power amount can be efficiently distributed.

[0007] The program according to a second aspect is the program according to the first aspect, which equally distributes the excess power amount to each property of the second group.

[0008] The program from the third perspective is the program from the first perspective, which calculates a value related to the adjustable power consumption of the equipment used for each property in the second group, and distributes the excess power to each property in the second group according to the value related to power consumption.

[0009] The program from the fourth perspective is the program from the third perspective, which obtains the estimated power consumption of the entire property calculated based on past power consumption and weather information, and calculates a value related to power consumption by multiplying the obtained estimated power consumption of the entire property by the ratio of the amount of power that can be adjusted by each piece of equipment.

[0010] The fifth aspect of information processing is an information processing method that acquires a first group of properties that receive demand response requests and perform demand control, and a second group of properties that receive demand response requests but do not perform demand control, and when the expected power consumption of the first group of properties when demand response is performed exceeds the target power consumption for demand control, the excess power is distributed to the second group of properties.

[0011] The information processing device in the sixth aspect includes a control unit, which acquires a first group of properties that receive demand response requests and perform demand control, and a second group of properties that receive demand response requests but do not perform demand control, and when the expected power consumption of the first group of properties at the time of demand response execution exceeds the target power consumption for demand control, it distributes the excess power to the second group of properties.

[0012] This is an explanatory diagram showing an overview of the wide-area demand response system. This is a block diagram showing an example of a server configuration. This is an explanatory diagram showing an example of a group DB record layout. This is an explanatory diagram explaining the process of distributing excess power. This is a flowchart showing the processing procedure when distributing excess power. This is a flowchart showing the processing procedure of the subroutine for calculating the target power amount for demand control.

[0013] The present invention will be described in detail below with reference to the drawings illustrating its embodiments.

[0014] (Embodiment 1) Embodiment 1 relates to a configuration in which, when the expected power consumption of a property in the first group during demand response execution exceeds the target power consumption for demand control, the excess power is distributed to the property in the second group.

[0015] Demand response is a mechanism that adjusts electricity usage to balance electricity supply and demand. In particular, it encourages properties to reduce electricity usage during peak demand periods, ensuring a stable supply even when electricity supply is tight.

[0016] In this embodiment, "property" refers to a single building, or a factory or university campus containing multiple buildings. For example, in the case of a manufacturing plant, "property" refers to multiple buildings such as production lines, warehouses, and office buildings. In the case of a university campus, multiple facilities such as lecture halls, research buildings, student dormitories, and sports facilities are located on a single site. In other words, "property" is not limited to a single building, but can also be applied to a group of buildings with multiple uses.

[0017] When implementing both demand response and demand control simultaneously in a single building, there are cases where the business viability of both cannot be met. Demand control is a mechanism that suppresses performance so that the total power consumption falls below a target value, and as long as the target value is achieved, excessive suppression of power consumption is permitted. However, in the case of demand response, it is necessary to operate according to the command value received from the AC (Aggregation Coordinator), so if performance is suppressed excessively beyond the command value, penalties will be imposed.

[0018] To solve these problems, in this embodiment, multiple properties can be grouped together as a single virtual group. For example, if the first group implements both the "demand response" function and the "demand control" function, even if excessive power consumption is suppressed by the "demand control" function, the virtual group formed by combining the first group and the other groups can comply with the command value set by the "demand response" function by adjusting the total power consumption of the other group (for example, the second group). In this way, by adjusting the power consumption of the virtual group, it is possible to avoid penalties that would occur if performance is excessively suppressed beyond the command value. Therefore, by using demand response and demand control in combination, efficient energy management can be achieved without excessively suppressing performance.

[0019] Figure 1 is an explanatory diagram showing an overview of a wide-area demand response (DR) system. The system of this embodiment includes an information processing device 1, an equipment controller 2, equipment 3, a DR control management system 91, a power company-owned system 92, an AC-owned system 93, and an air conditioning equipment centralized management system 94. Each device transmits and receives information via a network such as the Internet.

[0020] Information processing device 1 is an information processing device that processes, stores, and transmits various types of information. Information processing device 1 is, for example, a server device or a personal computer. In this embodiment, for simplicity, information processing device 1 will be read as server 1 below.

[0021] The equipment controller 2 is a device for controlling the operation of equipment 3 installed in the property in response to instructions from the information processing device 1. Equipment 3 includes, for example, air conditioning equipment, ventilation equipment, refrigeration equipment (e.g., refrigerated storage for food warehouses or display cases in supermarkets), lighting equipment, heating equipment, humidifiers, cooling equipment, pumps, or industrial machinery. One or more pieces of equipment 3 may be installed in the property.

[0022] In this embodiment, we describe an example where the equipment controller 2 is an air conditioning equipment controller and the equipment 3 is an air conditioning unit, but the same can be applied to other types of equipment controllers 2 and equipment 3. For simplicity, in the following, we will read "equipment controller 2" as "air conditioning equipment controller 2" and "equipment 3" as "air conditioning unit 3".

[0023] The air conditioning equipment controller 2 adjusts the operating mode or set temperature of the air conditioning equipment 3, or starts, stops, or changes operating parameters, based on environmental data such as temperature and humidity. The air conditioning equipment 3 is installed in the building and is a device that adjusts the indoor air, performing heating, cooling, ventilation, or humidity control. The air conditioning equipment 3 adjusts the temperature or humidity, etc., in response to instructions from the air conditioning equipment controller 2.

[0024] The DR control management system 91 is a system that performs DR control management. The DR control management system 91 transmits and receives data with the power company-owned system 92, the AC-owned system 93, and the centralized air conditioning equipment management system 94. In this embodiment, the server 1 functions as the DR control management system 91.

[0025] The power company-owned system 92 monitors the power supply and demand situation and transmits data regarding the market supply-demand balance or the stability of power supply to the AC-owned system 93 in order to respond to peak times or fluctuations in demand.

[0026] The AC ownership system 93 is a system for adjusting and efficiently managing the power consumption of multiple properties (consumers) or equipment. Specifically, the AC ownership system 93 transmits commands to the DR control management system 91 to the target management group to reduce or adjust power consumption.

[0027] The management group includes a first group that receives demand response requests and performs demand control, and a second group that receives demand response requests but does not perform demand control. Demand response and demand control will be described later.

[0028] The centralized air conditioning equipment management system 94 is a system that centrally manages air conditioning equipment 3 installed in properties included in the management group, and transmits setting commands to the corresponding air conditioning equipment 3 through each air conditioning equipment controller 2.

[0029] In this embodiment, Server 1 acquires properties in a first group that receive demand response requests and perform demand control, and properties in a second group that receive demand response requests but do not perform demand control. Specifically, Server 1 acquires management group information from the group DB 151. The management group information includes property information (property identification information, whether or not demand response control is performed, or whether or not demand control is performed, etc.). Based on the acquired management group information, Server 1 identifies properties that belong to the first group and the second group, respectively. If the expected power consumption of a property in the first group during demand response execution exceeds the target power consumption for demand control, Server 1 distributes the excess power to the properties in the second group.

[0030] Figure 2 is a block diagram showing an example configuration of Server 1. Server 1 includes a control unit 11, a storage unit 12, a communication unit 13, a reading unit 14, and a large-capacity storage unit 15. Each component is connected by bus B.

[0031] The control unit 11 includes a computing device such as a CPU (Central Processing Unit), MPU (Micro-Processing Unit), GPU (Graphics Processing Unit), FPGA (Field Programmable Gate Array), DSP (Digital Signal Processor), or quantum processor. The control unit 11 reads and executes a control program 1P (program product) stored in the storage unit 12, thereby performing various information processing or control processing related to the server 1. The control program 1P described in this embodiment may be provided on a recording medium or distributed from an external computer.

[0032] Furthermore, the control program 1P can be deployed on a single computer, at a single site, or distributed across multiple sites and run on multiple computers interconnected by a communication network.

[0033] In Figure 2, the control unit 11 is described as a single processor, but it may be a multiprocessor. The control unit 11 may perform various information processing or control processing on the same processor within the server 1, or it may perform them on different processors within the server 1.

[0034] The storage unit 12 includes memory elements such as RAM (Random Access Memory) and ROM (Read Only Memory), and stores control programs 1P or data necessary for the control unit 11 to execute processing. The storage unit 12 also temporarily stores data necessary for the control unit 11 to execute arithmetic processing. The communication unit 13 is a communication module for performing communication-related processing, and transmits and receives information with the power company-owned system 92, the AC-owned system 93, or the centralized air conditioning equipment management system 94, etc., via the network N.

[0035] The reading unit 14 reads a portable storage medium 1a, including a CD (Compact Disc)-ROM or a DVD (Digital Versatile Disc)-ROM. The control unit 11 may read the control program 1P from the portable storage medium 1a via the reading unit 14 and store it in the large-capacity storage unit 15. Alternatively, the control unit 11 may download the control program 1P from another computer via a network N or the like and store it in the large-capacity storage unit 15. Furthermore, the control unit 11 may also read the control program 1P from the semiconductor memory 1b.

[0036] The large-capacity storage unit 15 includes a recording medium such as an HDD (Hard disk drive) or an SSD (Solid State Drive). The large-capacity storage unit 15 includes a group database 151. The group database 151 stores information about groups containing multiple properties. The group database 151 may be stored on an external server or cloud server.

[0037] In this embodiment, the storage unit 12 and the large-capacity storage unit 15 may be configured as a single storage device. Furthermore, the large-capacity storage unit 15 may be composed of multiple storage devices. Moreover, the large-capacity storage unit 15 may be an external storage device connected to the server 1.

[0038] Server 1 may perform various information processing and control processes as a single computer, or it may be performed in a distributed manner across multiple computers. Furthermore, Server 1 may be implemented using multiple virtual machines located within a single server, or it may be implemented using a cloud server.

[0039] Figure 3 is an explanatory diagram showing an example of the record layout of Group DB 151. Group DB 151 includes columns for Group ID, Group Name, Type, Property ID, Air Conditioning Equipment ID, Maximum Power Consumption, and Coefficient. The Group ID column stores the ID of each group, which is used to uniquely identify each group. The Group Name column stores the name of the group.

[0040] The Type column stores the type of group. Group types include groups that receive demand response requests and perform demand control, and groups that receive demand response requests but do not perform demand control. The Property ID column stores the uniquely identified property ID to identify the property within each group. A group may contain one or more properties.

[0041] The air conditioner ID column stores air conditioner IDs for identifying the air conditioners 3 installed in the property. The maximum power consumption column stores the maximum power consumption determined by the rated capacity or design specifications of the air conditioner 3. The coefficient column stores values related to power consumption that can be adjusted within a range that does not impair comfort. The coefficients will be described later.

[0042] Note that the storage mode of each DB described above is an example, and other storage modes may be used as long as the relationship between data is maintained.

[0043] Figure 4 is an explanatory diagram for describing the process of allocating excess power amount. The management group includes a first group and a second group. Note that although examples of the first group and the second group are described in Figure 4, the number of groups may be three or more.

[0044] The first group is a group that receives a demand response request and performs demand control, and includes a single or a plurality of properties. The second group is a group that receives a demand response request without performing demand control, and includes a single or a plurality of properties.

[0045] The identification process for the first group and the second group will be described. The server 1 acquires management group information from the group DB 151. Note that the server 1 may acquire the management group information from the AC ownership system 93. The management group information includes property information. The property information includes property identification information (property ID), as well as the type of group classified based on the presence or absence of demand response control, the presence or absence of demand control, and the like. Based on the acquired management group information, the server 1 refers to the group DB 151 to identify the properties corresponding to each of the first group and the second group.

[0046] As illustrated, the first group includes property 84, property 85, and property 86. The second group includes property 81, property 82, and property 83.

[0047] The AC-owned system 93 acquires the market demand-supply balance status through communication with the power company-owned system 92. The demand-supply balance status is an index indicating the state of oversupply or shortage in the electricity market based on the real-time power supply amount and demand amount. Specifically, the demand-supply balance status includes an oversupply state where supply exceeds demand, a supply shortage state where demand exceeds supply, and the like.

[0048] Based on the acquired demand-supply balance status, the AC-owned system 93 transmits an adjustment command for adjusting the power consumption (ΔP [kW]) in the target time period to the target management group to the DR control management system 91. The adjustment command includes a command value indicating the variation amount of power consumption to be adjusted in the target time period for the target management group.

[0049] A positive ΔP [kW] indicates that the power consumption needs to be increased in the management group (oversupply). A negative ΔP [kW] indicates that the power consumption needs to be reduced in the management group (supply shortage). For example, in the case of an adjustment command including "ΔP = 10 kW", the power consumption is increased or decreased by 10 kW for the target time period for the relevant management group.

[0050] The server 1 receives the adjustment command transmitted from the AC-owned system 93. The server 1 acquires the predicted power consumption (predicted power consumption amount) at the time of demand response execution for the properties in the first group. The predicted power consumption amount for the first group is acquired using a predicted power consumption output model. The predicted power consumption output model may be generated by regression analysis or a machine learning algorithm (for example, linear regression, random forest, neural network, etc.) using a large volume of past actual power consumption data and weather information (for example, temperature, humidity, sunshine duration, seasonal variation, etc.).

[0051] Specifically, Server 1 obtains the amount of electricity consumed in the preceding time period (for example, 30 minutes prior) from the power company's system 92. Server 1 obtains climate information corresponding to the preceding time period from an external Japan Meteorological Agency server or weather data distribution system, etc. Server 1 inputs the obtained amount of electricity consumed in the preceding time period and the climate information corresponding to the preceding time period into the predicted electricity consumption output model and outputs the predicted electricity consumption for the first group in the time period corresponding to the target time period. Similarly, Server 1 obtains the predicted electricity consumption for the second group using the predicted electricity consumption output model.

[0052] Server 1 calculates the target power consumption for demand control according to the command value included in the received adjustment command. Specifically, Server 1 distributes ΔP [kW] of power consumption within the management groups (Group 1 and Group 2) in the time period preceding the target time period (for example, 30 minutes prior), and calculates the target power consumption values ​​(Pb [kW]) for Group 1 and Group 2 for Group 2 to be consumed in the time period preceding.

[0053] Server 1 calculates the target power consumption (Q [kW]) for the next period (e.g., 30 minutes) based on predetermined demand control parameters. The target power consumption (Q [kW]) is calculated based on predetermined demand control parameters and is expressed by the following formula (1): Target power consumption = Expected power consumption [kW] - (Command value × (Adjustment capacity of the property / Total adjustment capacity of properties belonging to the group)) ... (1)

[0054] Adjustment capacity is a value relating to the amount of power consumption that can be adjusted by the air conditioning equipment 3 used for each property. The value relating to power consumption is calculated based on the expected total power consumption of all properties in the group for the next period, the ratio of the amount of power that can be adjusted by each air conditioning equipment 3 (the ratio of the amount of power that can be adjusted by air conditioning equipment 3 to the total power consumption of the property), and a coefficient, and is expressed by the following formula (2): Value relating to power consumption (adjustment capacity) = Expected total power consumption of the property × Ratio of power × Coefficient …(2)

[0055] The coefficient is a value related to the amount of electricity consumption that can be adjusted without compromising comfort. To adjust electricity consumption while maintaining the comfort of the property, the coefficient is pre-set in group DB151. For properties where a wide range of adjustment is possible without compromising comfort, the coefficient is set to a large value. Conversely, for properties where the range of adjustment without compromising comfort is small, the coefficient is set to a small value.

[0056] For example, if adjustments can be made within a range that does not significantly affect comfort, such as temperature or humidity, the coefficient may be set to a value such as 1.2. Alternatively, if there is a possibility of significantly impairing comfort, the coefficient may be set to a value such as 0.8.

[0057] The process for calculating the ratio of power consumption will now be explained. Server 1 obtains the maximum power consumption and coefficient of the air conditioning equipment 3 installed in each property from the group DB 151, based on the group ID, property ID, and air conditioning equipment ID of the first group.

[0058] Server 1 obtains parameters such as the operating mode (e.g., cooling, heating, or ventilation), temperature setting, airflow adjustment, or operating time of each air conditioning unit 3 via the centralized air conditioning unit management system 94, based on the group ID, property ID, and air conditioning unit ID of the first group. Based on the obtained parameters, Server 1 calculates the range of power that each air conditioning unit 3 can adjust.

[0059] Server 1 calculates the adjustment capacity of each property (a value relating to the amount of power consumption that can be adjusted by the air conditioning equipment 3 installed in the property) using the above formula (2), based on the maximum power consumption and coefficient of each air conditioning unit 3 obtained and the calculated range of power that each air conditioning unit 3 can adjust.

[0060] Server 1 then calculates the target power consumption for demand control of each property using the above-described formula (1), based on the estimated power consumption of the first group obtained, the command value included in the received adjustment command, and the calculated adjustment capacity of each property belonging to the first group. Server 1 calculates the sum of the calculated target power consumption for demand control of each property as the target power consumption for demand control of the first group.

[0061] Server 1 determines whether the estimated power consumption of the properties in the first group acquired during demand response execution exceeds the calculated target power consumption for demand control.

[0062] First, we will explain the process when the expected power consumption exceeds the target power consumption for demand control. When the expected power consumption exceeds the target power consumption for demand control, Server 1 calculates the excess power consumption (expected power consumption - target power consumption for demand control). Server 1 distributes the calculated excess power consumption to the second group of properties (for example, properties 81, 82, and 83). The distribution process includes distribution based on the adjustment capacity of the properties, or equal distribution, etc.

[0063] When using distribution processing based on the adjustment capacity of the property, first, Server 1 calculates a value (adjustment capacity) related to the amount of power consumption that the air conditioning equipment 3 to be used can adjust for each property in the second group. Specifically, based on the group ID, property ID, and air conditioning equipment ID of the second group, Server 1 obtains the maximum power consumption and coefficient of the air conditioning equipment 3 installed in each property belonging to the second group from the group DB 151.

[0064] Server 1 obtains parameters such as the operating mode (e.g., cooling, heating, or ventilation), temperature setting, airflow adjustment, or operating time of each air conditioning unit 3 via the centralized air conditioning equipment management system 94, based on the group ID, property ID, and air conditioning equipment ID of the second group. Based on the obtained parameters, Server 1 calculates the range of power that each air conditioning unit 3 can adjust.

[0065] Server 1 calculates the adjustment capacity (a value relating to the amount of power consumption that can be adjusted by the air conditioning equipment 3 installed in the property) for each property belonging to the second group, using the above formula (2), based on the acquired maximum power consumption and coefficient of each air conditioning unit 3 and the calculated range of power that each air conditioning unit 3 can adjust.

[0066] Next, Server 1 distributes the excess power to each property according to the adjustment capacity of each property belonging to the second group, which has been calculated. Specifically, Server 1 adds the excess power to the target power value (Pa[kW]) of the second group to calculate a new target power value (Pa'[kW]) for the second group. Server 1 transmits the newly calculated target power value for the second group and the adjustment capacity of each property belonging to the second group to the air conditioning equipment controller 2 corresponding to the second group via the air conditioning equipment centralized management system 94. The air conditioning equipment controller 2 corresponding to the second group sets the power consumption for each air conditioning unit 3 based on the new target power value for the second group and the adjustment capacity of each property transmitted from Server 1.

[0067] Furthermore, Server 1 transmits the calculated target power consumption for demand control to the air conditioning equipment controller 2 corresponding to the first group. The air conditioning equipment controller 2 corresponding to the first group controls each air conditioning unit 3 belonging to the first group to consume the target power consumption for demand control transmitted from Server 1.

[0068] In addition, equal distribution processing can be used. Equal distribution processing is a process that distributes the excess power amount equally to each property in the second group in group DB 151. Specifically, server 1 adds the excess power amount to the target power value (Pa [kW]) of the second group and calculates a new target power value (Pa' [kW]) for the second group. Server 1 transmits the calculated new target power value for the second group to the air conditioning equipment controller 2 corresponding to that second group via the air conditioning equipment centralized management system 94.

[0069] The air conditioning equipment controller 2 corresponding to the second group calculates the amount of power consumption to be distributed equally to each air conditioning unit 3 based on the new power target value for the second group transmitted from the server 1 and the number of air conditioning units 3 installed in the properties belonging to the second group. The air conditioning equipment controller 2 corresponding to the second group sets the calculated power consumption to each air conditioning unit 3. The process of transmitting the target power amount for demand control to the air conditioning equipment controller 2 corresponding to the first group is the same as the process described above, so the explanation is omitted.

[0070] Next, we will explain the process when the expected power consumption does not exceed the target power consumption for demand control. If the expected power consumption does not exceed the target power consumption for demand control, Server 1 transmits the calculated target power value (Pb [kW]) for the first group to the air conditioning equipment controller 2 corresponding to the first group via the air conditioning equipment centralized management system 94. The air conditioning equipment controller 2 corresponding to the first group controls each air conditioning unit 3 belonging to the first group to consume the target power value for the first group transmitted from Server 1.

[0071] Furthermore, Server 1 transmits the calculated target power value (Pa [kW]) for the second group to the air conditioning equipment controller 2 corresponding to the second group via the air conditioning equipment centralized management system 94. The air conditioning equipment controller 2 corresponding to the second group controls each air conditioning unit 3 belonging to the second group to consume the target power value for the second group transmitted from Server 1.

[0072] Figure 5 is a flowchart showing the processing procedure when distributing excess power. The control unit 11 of server 1 receives an adjustment command transmitted from the AC ownership system 93 via the communication unit 13 (step S111). The adjustment command is an adjustment command for adjusting the power consumption (ΔP [kW]) during the target time period for the target management group.

[0073] The control unit 11 obtains the predicted power consumption for the first group and the predicted power consumption for the second group (step S112). Specifically, the control unit 11 inputs the power consumption for the previous time period (for example, 30 minutes prior) and the weather information corresponding to that previous time period into the predicted power consumption output model, and outputs the predicted power consumption for the first group for the time period corresponding to the target time period. Similarly, the control unit 11 obtains the predicted power consumption for the second group using the predicted power consumption output model.

[0074] The control unit 11 executes a subroutine for calculating the target power consumption for demand control according to the command value included in the received adjustment command (step S113). The subroutine for calculating the target power consumption will be described later. The control unit 11 determines whether the expected power consumption of the first group of properties during demand response execution exceeds the calculated target power consumption for demand control (step S114).

[0075] If the expected power consumption exceeds the target power consumption for demand control (YES in step S114), the control unit 11 calculates the excess power consumption (expected power consumption - target power consumption for demand control) (step S115). Based on the group ID, property ID, and air conditioning equipment ID of the second group, the control unit 11 obtains the maximum power consumption and coefficient of the air conditioning equipment 3 installed in each property belonging to the second group from the group DB 151 of the large-capacity storage unit 15 (step S116).

[0076] The control unit 11 calculates the range of power that each air conditioning unit 3 belonging to the second group can adjust (step S117). Specifically, based on the group ID, property ID, and air conditioning unit ID of the second group, the control unit 11 obtains parameters such as the operating mode (e.g., cooling, heating, or ventilation), temperature setting, airflow adjustment, or operating time of each air conditioning unit 3 via the centralized air conditioning unit management system 94. Based on the obtained parameters, the control unit 11 calculates the range of power that each air conditioning unit 3 can adjust.

[0077] The control unit 11 calculates the adjustment capacity of each property belonging to the second group using the above-described formula (2), based on the acquired maximum power consumption and coefficient of each air conditioning unit 3 and the calculated range of power that each air conditioning unit 3 can adjust (step S118). The control unit 11 adds the excess power amount (expected power consumption - target power amount) to the target power value (Pa [kW]) of the second group and calculates a new target power value (Pa' [kW]) for the second group (step S119).

[0078] The control unit 11 transmits the calculated new power target value for the second group and the adjustment capacity of each property belonging to the second group to the air conditioning equipment controller 2 corresponding to the second group via the centralized air conditioning equipment management system 94 using the communication unit 13 (step S120). The control unit 11 transmits the calculated demand control target power amount to the air conditioning equipment controller 2 corresponding to the first group using the communication unit 13 (step S121). The control unit 11 then terminates processing.

[0079] If the expected power consumption does not exceed the target power consumption for demand control (NO in step S114), the control unit 11 transmits the target power value for the first group (Pb [kW]) and the target power value for the second group (Pa [kW]) via the communication unit 13 (step S122).

[0080] Specifically, the control unit 11 transmits the calculated target power value (Pb [kW]) for the first group to the air conditioning equipment controller 2 corresponding to the first group via the centralized air conditioning equipment management system 94 using the communication unit 13. The control unit 11 then transmits the calculated target power value (Pa [kW]) for the second group to the air conditioning equipment controller 2 corresponding to the second group via the centralized air conditioning equipment management system 94 using the communication unit 13. The control unit 11 then terminates its processing.

[0081] Figure 6 is a flowchart showing the processing procedure of a subroutine for calculating the target power consumption for demand control. The control unit 11 of the server 1 distributes ΔP [kW] of power consumption within the management groups (first group and second group) in the time period preceding the target time period (for example, 30 minutes prior), and calculates the target power consumption of the first group (Pb [kW]) and the target power consumption of the second group (Pa [kW]) to be consumed in the time period preceding (step S01).

[0082] The control unit 11 obtains the maximum power consumption and coefficient of the air conditioning equipment 3 installed in each property from the group DB 151 of the large-capacity storage unit 15, based on the group ID, property ID, and air conditioning equipment ID of the first group (step S02).

[0083] The control unit 11 calculates the range of power that each air conditioning unit 3 belonging to the first group can adjust (step S03). Specifically, based on the group ID, property ID, and air conditioning unit ID of the first group, the control unit 11 obtains parameters such as the operating mode (e.g., cooling, heating, or ventilation), temperature setting, airflow adjustment, or operating time of each air conditioning unit 3 via the centralized air conditioning unit management system 94. Based on the obtained parameters, the control unit 11 calculates the range of power that each air conditioning unit 3 can adjust.

[0084] The control unit 11 calculates the adjustment capacity of each property belonging to the first group using the above-described formula (2), based on the acquired maximum power consumption and coefficient of each air conditioning unit 3 and the calculated range of power consumption that each air conditioning unit 3 can adjust (step S04). The control unit 11 calculates the target power consumption for demand control of each property using the above-described formula (1), based on the acquired estimated power consumption of the first group, the command value included in the received adjustment command, and the calculated adjustment capacity of each property belonging to the first group (step S05).

[0085] The control unit 11 calculates the sum of the target power consumption for each property's demand control as the target power consumption for the first group of demand control (step S06). The control unit 11 then finishes the subroutine for calculating the target power consumption and returns.

[0086] According to this embodiment, if the expected power consumption of the first group of properties during demand response execution exceeds the target power consumption for demand control, the excess power can be distributed to the second group of properties.

[0087] According to this embodiment, it is possible to distribute excess power to each property in the second group according to the power consumption value that can be adjusted by the air conditioning equipment 3 used for each property in the second group.

[0088] According to this embodiment, it is possible to distribute the excess power equally among the properties in the second group.

[0089] According to this embodiment, by using demand response and demand control in combination, it becomes possible to achieve efficient energy management without excessively suppressing performance.

[0090] The embodiments disclosed herein should be considered in all respects to be illustrative and not restrictive. The scope of the invention is indicated by the claims, not in the sense described above, and all modifications within the sense and scope equivalent to the claims are intended.

[0091] The matters described in each embodiment can be combined with each other. Furthermore, the independent and dependent claims described in the claims can be combined with each other in any combination, regardless of the form of reference. In addition, the claims use a form in which claims referencing two or more other claims (multi-claim form), but are not limited to this. A form in which multi-claims referencing at least one multi-claim (multi-multi-claim) may also be used.

[0092] 1 Information Processing Unit (Server) 11 Control Unit 12 Storage Unit 13 Communication Unit 14 Reading Unit 15 Large Capacity Storage Unit 151 Group DB 1a Portable Storage Medium 1b Semiconductor Memory 1P Control Program 2 Equipment Controller (Air Conditioning Equipment Controller) 3 Equipment (Air Conditioning Equipment) 91 DR Control Management System 92 Power Company Owned System 93 AC Owned System 94 Air Conditioning Equipment Centralized Management System B Bus N Network

Claims

1. A program that acquires a first group of properties that receive demand response requests and perform demand control, and a second group of properties that receive demand response requests but do not perform demand control, and causes a computer to execute a process to distribute the excess power to the second group of properties when the expected power consumption of the first group of properties at the time of demand response execution exceeds the target power consumption for demand control.

2. The program according to claim 1, which distributes the excess power amount equally to each property in the second group.

3. The program according to claim 1, which calculates a value relating to the adjustable power consumption of the equipment used for each property in the second group, and distributes the excess power to each property in the second group according to the value relating to the power consumption.

4. The program according to claim 3, which obtains an estimated total power consumption for the entire property calculated based on past power consumption and weather information, and calculates a value related to power consumption by multiplying the obtained estimated total power consumption for the entire property by the ratio of the amount of power that can be adjusted by each piece of equipment.

5. An information processing method that acquires a first group of properties that receive demand response requests and perform demand control, and a second group of properties that receive demand response requests but do not perform demand control, and distributes the excess power to the second group of properties when the expected power consumption of the first group of properties at the time of demand response execution exceeds the target power consumption for demand control.

6. An information processing device comprising a control unit, wherein the control unit acquires a first group of properties that receive demand response requests and perform demand control, and a second group of properties that receive demand response requests but do not perform demand control, and distributes the excess power to the second group of properties when the expected power consumption of the first group of properties at the time of demand response execution exceeds the target power consumption for demand control.