A method and device for early warning of typhoon and flood disasters in power grid

By combining the mesoscale numerical forecasting model and the power grid typhoon flood disaster warning model, the problem of low reliability of the power grid typhoon flood disaster warning information is solved, the emergency response capacity and material allocation efficiency are improved, and losses are reduced.

CN111222662BActive Publication Date: 2024-11-12CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201811412754.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-11-26
Publication Date
2024-11-12
Estimated Expiration
2038-11-26

AI Technical Summary

Technical Problem

The existing technology of China Power Grid's typhoon flood disaster warning lacks effective monitoring methods and fine warning data sources, resulting in low reliability of early warning information, poor emergency response capabilities, low material allocation efficiency and large losses.

Method used

Obtain precipitation forecast information based on the mesoscale numerical forecast mode and input it into the pre-constructed power grid typhoon flood disaster warning model. The power grid typhoon flood disaster warning information is determined through the designed typhoon flood disaster forecast grid and characteristic parameters, so as to improve the reliability of the warning information. and emergency response capabilities.

Benefits of technology

It improves the reliability of the power grid typhoon and flood disaster warning information, enhances emergency response capabilities and material allocation efficiency, and reduces losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111222662B_ABST
    Figure CN111222662B_ABST
Patent Text Reader

Abstract

The present invention provides a method and device for warning typhoon and flood disasters in a power grid, which obtain precipitation forecast information based on a mesoscale numerical forecast model; the precipitation forecast information is input into a pre-constructed typhoon and flood disaster warning model for a power grid to obtain typhoon and flood disaster warning information for a power grid; the typhoon and flood disaster warning model for a power grid is determined by a pre-designed typhoon and flood disaster forecast grid and characteristic parameters of the typhoon and flood disaster forecast grid, and the obtained typhoon and flood disaster warning information for a power grid is highly reliable, ensuring that the power grid has a strong emergency response capability for typhoon and flood disasters, high material allocation efficiency, and reduced losses; the typhoon and flood disaster warning model for a power grid in the present invention is not only applicable to distribution networks, but also to transmission networks, and the typhoon and flood disaster warning model for a power grid takes into account the comprehensive influence of characteristic parameters of a disaster-prone environment, characteristic parameters of a disaster-bearing body, disaster loss information, and precipitation information, to provide a guarantee for the safety and stability of the power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power grid disaster prevention, and in particular relates to a power grid typhoon flood disaster early warning method and device. Background Art

[0002] The power system is a huge and complex system involving multiple links such as generation, transmission, transformation, distribution and use. Its safe operation is closely related to the meteorological environment. Among them, the distribution network is the main object that is vulnerable to floods. Typhoons often cause large-scale distribution line tripping, which manifests as a large number of group faults. These faults may be instantaneous tripping faults or permanent equipment damage, with the latter accounting for a higher proportion. At the same time, typhoons are often accompanied by heavy rains, which affect the foundations of poles and towers, which may also cause the above-mentioned damages, and may also cause waterlogging in distribution station buildings.

[0003] Strong typhoons are often accompanied by heavy rainfall, and heavy rains often easily cause waterlogging in cities. For example, during the "Molaodi" period, some cities in Fujian, such as Quanzhou, Fuzhou, and Xiamen, were affected by heavy rainfall, causing serious waterlogging. In a flood environment, distribution line faults and transformer faults can both cause distribution line outages. The impact of floods on distribution line faults is mainly reflected through insulator flashovers, which are mainly related to rainfall intensity.

[0004] Typhoon is one of the common natural disaster factors. In China, the provinces most significantly affected by typhoons include Guangdong, Fujian, Hainan, Zhejiang, Hunan, Jiangxi, etc. The above provinces have developed typhoon emergency warning mechanisms to varying degrees, and obtained meteorological forecast information such as typhoon path, level 10 wind circle and heavy rainfall forecast through public meteorological services to coordinate all sectors of society to fight against typhoon attacks. However, the study found that the real-time monitoring and early warning capabilities of typhoon flood disasters for power grids are currently mostly in the exploratory stage. In the existing technology, the early warning of typhoon flood disasters in power grids lacks effective monitoring means and key data sources for early warning and forecasting with sufficiently fine granularity. Only precipitation information is considered. By establishing a correlation between precipitation information and typhoon flood disasters, early warning information is obtained. The reliability of early warning information is low, the flood disaster warning is not targeted, the disaster area is extensive, the accident response preparation plan is not sufficient, the power grid typhoon flood disaster emergency response capability is poor, the material allocation efficiency is low, and the loss is large. Summary of the invention

[0005] In order to overcome the shortcomings of the above-mentioned prior art such as low reliability of warning information, poor emergency response capability of power grid to typhoon and flood disasters, low efficiency of material allocation and large losses, the present invention provides a power grid typhoon and flood disaster warning method and device, which obtains precipitation forecast information based on a mesoscale numerical forecast model; inputs the precipitation forecast information into a pre-constructed power grid typhoon and flood disaster warning model to obtain power grid typhoon and flood disaster warning information; the power grid typhoon and flood disaster warning model is determined by a pre-designed typhoon and flood disaster forecast grid and characteristic parameters of the typhoon and flood disaster forecast grid, and the obtained power grid typhoon and flood disaster warning information has high reliability, ensuring that the power grid has a strong emergency response capability to typhoon and flood disasters, high efficiency of material allocation, and reduced losses.

[0006] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical scheme:

[0007] In one aspect, the present invention provides a method for early warning of typhoon and flood disasters in a power grid, comprising:

[0008] Obtain precipitation forecast information based on mesoscale numerical forecast models;

[0009] Inputting the precipitation forecast information into a pre-built power grid typhoon and flood disaster warning model to obtain power grid typhoon and flood disaster warning information;

[0010] The power grid typhoon flood disaster warning model is determined by a pre-designed typhoon flood disaster forecasting grid and characteristic parameters of the typhoon flood disaster forecasting grid.

[0011] The construction of the power grid typhoon flood disaster early warning model includes:

[0012] Set the minimum forecast unit for typhoon and flood disasters in the power grid;

[0013] Dividing the typhoon flood disaster forecast area into grids according to the minimum forecast unit to obtain a typhoon flood disaster forecast grid;

[0014] Determine the disaster-prone environment and carrier characteristic grid based on the typhoon flood disaster forecast characteristic parameters and the minimum forecast unit;

[0015] Determine the power grid typhoon flood damage information grid based on historical typhoon flood events and the minimum forecast unit;

[0016] parsing the radar warning information and determining a Doppler weather radar precipitation information grid based on the minimum forecast unit;

[0017] The disaster-prone environment and carrier feature grid, the power grid typhoon flood damage information grid and the Doppler weather radar historical precipitation information grid are associated with the power grid typhoon flood disaster to build a power grid typhoon flood disaster warning model.

[0018] The construction of the power grid typhoon flood disaster early warning model also includes:

[0019] The historical disaster-prone environment and carrier characteristics during multiple typhoon landings, historical damage information of typhoon flood disasters in the power grid, and historical precipitation information of Doppler weather radar are obtained, and the power grid typhoon flood disaster early warning model is tested.

[0020] The testing of the power grid typhoon flood disaster warning model includes:

[0021] According to the order of typhoon and flood disaster probabilities in historical fault distribution from high to low, grid areas with a preset proportion are screened out, and the precipitation information of the same period in history is used as the input of the power grid typhoon and flood disaster warning model to carry out power grid typhoon and flood disaster warning. If the consistency between the grid area obtained by the warning and the grid area with a preset proportion reaches above the preset threshold, the test passes; otherwise, the Doppler weather radar historical precipitation information grid is re-associated with the power grid typhoon and flood disaster, and the power grid typhoon and flood disaster warning model is re-tested.

[0022] The characteristic parameters include characteristic parameters of the disaster-prone environment, characteristic parameters of the disaster-bearing body, disaster damage information and precipitation information.

[0023] The characteristic parameters of the disaster-prone environment include terrain characteristics and underlying surface characteristics;

[0024] The characteristic parameters of the disaster-bearing body include the number, location and type of the poles and towers and the location of the station building;

[0025] The disaster damage information includes the time and location of the flood, the collapse of poles / towers and the flooding of station buildings.

[0026] The step of inputting the precipitation forecast information into a pre-built power grid typhoon and flood disaster warning model to obtain power grid typhoon and flood disaster warning information includes:

[0027] Inputting the precipitation forecast information and geographic information into the network typhoon and flood disaster warning model according to the minimum forecast unit;

[0028] Based on the typhoon and flood disaster warning model of the network, and according to the probability of occurrence of historical typhoon and flood disaster events, the typhoon and flood disaster warning risk probability is obtained;

[0029] Wherein, the precipitation information includes: grid precipitation.

[0030] The minimum forecast unit is 3km×3km.

[0031] On the other hand, the present invention also provides a power grid typhoon flood disaster early warning device, comprising:

[0032] An acquisition module is used to obtain precipitation forecast information based on a mesoscale numerical forecast model;

[0033] A determination module, used for inputting the precipitation forecast information into a pre-built power grid typhoon and flood disaster warning model to obtain power grid typhoon and flood disaster warning information;

[0034] The power grid typhoon flood disaster warning model is determined by a pre-designed typhoon flood disaster forecasting grid and characteristic parameters of the typhoon flood disaster forecasting grid.

[0035] The device comprises a modeling module, and the modeling module is specifically used for:

[0036] Set the minimum forecast unit for typhoon and flood disasters in the power grid;

[0037] Dividing the typhoon flood disaster forecast area into grids according to the minimum forecast unit to obtain a typhoon flood disaster forecast grid;

[0038] Determine the disaster-prone environment and carrier characteristic grid based on the typhoon flood disaster forecast characteristic parameters and the minimum forecast unit;

[0039] Determine the power grid typhoon flood damage information grid based on historical typhoon flood events and the minimum forecast unit;

[0040] parsing the radar warning information and determining a Doppler weather radar precipitation information grid based on the minimum forecast unit;

[0041] The disaster-prone environment and carrier feature grid, the power grid typhoon flood damage information grid and the Doppler weather radar historical precipitation information grid are associated with the power grid typhoon flood disaster to build a power grid typhoon flood disaster warning model.

[0042] The modeling module is also specifically used for:

[0043] The historical disaster-prone environment and carrier characteristics during multiple typhoon landings, historical damage information of typhoon flood disasters in the power grid, and historical precipitation information of Doppler weather radar are obtained, and the power grid typhoon flood disaster early warning model is tested.

[0044] The modeling module is also specifically used for:

[0045] According to the order of typhoon and flood disaster probabilities in historical fault distribution from high to low, grid areas with a preset proportion are screened out, and the precipitation information of the same period in history is used as the input of the power grid typhoon and flood disaster warning model to carry out power grid typhoon and flood disaster warning. If the consistency between the grid area obtained by the warning and the grid area with a preset proportion reaches above the preset threshold, the test passes; otherwise, the Doppler weather radar historical precipitation information grid is re-associated with the power grid typhoon and flood disaster, and the power grid typhoon and flood disaster warning model is re-tested.

[0046] The characteristic parameters include characteristic parameters of the disaster-prone environment, characteristic parameters of the disaster-bearing body, disaster damage information and precipitation information.

[0047] The characteristic parameters of the disaster-prone environment include terrain characteristics and underlying surface characteristics;

[0048] The characteristic parameters of the disaster-bearing body include the number, location and type of the poles and towers and the location of the station building;

[0049] The disaster damage information includes the time and location of the flood, the collapse of poles / towers and the flooding of station buildings.

[0050] The determination module is specifically used for:

[0051] Inputting the precipitation forecast information and geographic information into the network typhoon and flood disaster warning model according to the minimum forecast unit;

[0052] Based on the typhoon and flood disaster warning model of the network, and according to the probability of occurrence of historical typhoon and flood disaster events, the typhoon and flood disaster warning risk probability is obtained;

[0053] Wherein, the precipitation information includes: grid precipitation.

[0054] The minimum forecast unit is 3km×3km.

[0055] Compared with the closest prior art, the technical solution provided by the present invention has the following beneficial effects:

[0056] In the power grid typhoon flood disaster warning method provided by the present invention, precipitation forecast information is obtained based on a mesoscale numerical forecast model; the precipitation forecast information is input into a pre-constructed power grid typhoon flood disaster warning model to obtain power grid typhoon flood disaster warning information; the power grid typhoon flood disaster warning model is determined by a pre-designed typhoon flood disaster forecast grid and characteristic parameters of the typhoon flood disaster forecast grid, and the obtained power grid typhoon flood disaster warning information has high reliability, ensuring that the power grid has a strong emergency response capability for typhoon flood disasters, high material allocation efficiency, and reduced losses;

[0057] The power grid typhoon and flood disaster warning device provided by the present invention comprises an acquisition module and a determination module, wherein the acquisition module is used to acquire precipitation forecast information based on a mesoscale numerical forecast model; the determination module is used to input the precipitation forecast information into a pre-constructed power grid typhoon and flood disaster warning model to obtain power grid typhoon and flood disaster warning information; the power grid typhoon and flood disaster warning model is determined by a pre-designed typhoon and flood disaster forecast grid and characteristic parameters of the typhoon and flood disaster forecast grid, and the obtained power grid typhoon and flood disaster warning information has high reliability, ensuring that the power grid has a strong emergency response capability for typhoon and flood disasters, high material allocation efficiency, and reduced losses;

[0058] The typhoon and flood disaster warning model for the power grid in the present invention is not only applicable to distribution networks, but also to transmission networks. The typhoon and flood disaster warning model for the power grid takes into account the comprehensive influence of characteristic parameters of the disaster-prone environment, characteristic parameters of the disaster-bearing body, disaster loss information and precipitation information, providing guarantee for the safety and stability of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 It is a flow chart of the power grid typhoon and flood disaster early warning method in embodiment 1 of the present invention. DETAILED DESCRIPTION

[0060] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0061] Example 1

[0062] Embodiment 1 of the present invention provides a method for early warning of typhoon and flood disasters in a power grid, and the specific flow chart is as follows: Figure 1 As shown, the specific process is as follows:

[0063] S101: Obtain precipitation forecast information for the next 0-72 hours based on the mesoscale numerical forecast model;

[0064] S102: inputting the precipitation forecast information into a pre-built power grid typhoon and flood disaster warning model to obtain typhoon and flood disaster warning information on each 3km×3km grid of the power grid for the next 0-72 hours;

[0065] The above-mentioned power grid typhoon flood disaster warning model is determined by the pre-designed typhoon flood disaster forecast grid and the characteristic parameters of the typhoon flood disaster forecast grid.

[0066] The construction of the above-mentioned power grid typhoon flood disaster warning model includes:

[0067] Set the minimum forecast unit for typhoon and flood disasters in the power grid;

[0068] The typhoon flood disaster forecast area is divided into grids according to the minimum forecast unit to obtain the typhoon flood disaster forecast grid;

[0069] Determine the disaster-prone environment and carrier characteristic grid based on the typhoon flood disaster forecast characteristic parameters and the minimum forecast unit;

[0070] Determine the power grid typhoon flood damage information grid based on historical typhoon flood events and the smallest forecast unit;

[0071] Analyze radar warning information and determine Doppler weather radar precipitation information grid based on the minimum forecast unit;

[0072] The disaster-prone environment and carrier feature grids, the power grid typhoon flood damage information grid and the Doppler weather radar historical precipitation information grid are associated with the power grid typhoon flood disaster to build a power grid typhoon flood disaster early warning model.

[0073] The construction of the typhoon and flood disaster warning model for the power grid also includes: obtaining the historical disaster-prone environment and carrier characteristics during multiple typhoon landings in history, the historical damage information of typhoon and flood disasters in the power grid, and the historical precipitation information of Doppler weather radar, and testing the typhoon and flood disaster warning model for the power grid.

[0074] Test the power grid typhoon flood disaster warning model, including:

[0075] According to the order of typhoon and flood disaster probabilities in historical fault distribution from high to low, grid areas with a preset proportion are screened out, and the precipitation information of the same period in history is used as the input of the power grid typhoon and flood disaster warning model to carry out power grid typhoon and flood disaster warning. If the consistency between the grid area obtained by the warning and the grid area with a preset proportion reaches above the preset threshold, the test passes; otherwise, the Doppler weather radar historical precipitation information grid is re-associated with the power grid typhoon and flood disaster, and the power grid typhoon and flood disaster warning model is re-tested.

[0076] The above-mentioned characteristic parameters include characteristic parameters of disaster-prone environment, characteristic parameters of disaster-bearing body, disaster loss information and precipitation information.

[0077] The characteristic parameters of disaster-prone environment include topographic characteristics and underlying surface characteristics;

[0078] The characteristic parameters of the disaster-bearing body include the number, location and type of the poles and towers and the location of the station building;

[0079] The disaster damage information includes the time and location of the flood, the collapse of poles / towers and the flooding of station buildings.

[0080] Based on the designed typhoon flood disaster forecast grid, the digital elevation information spatially belonging to a certain 3km×3km grid is divided; then the digital elevation characteristics of each typhoon flood disaster forecast grid are calculated, including the average altitude and the maximum altitude difference, and a total of n eigenvalues ​​are obtained. The n eigenvalues ​​constitute the terrain characteristics of the nth grid.

[0081] In the process of gridding the characteristic parameters of disaster-prone environment and disaster-bearing body, the terrain characteristics and underlying surface characteristics of each line and station building are analyzed according to the natural environment of the area where the power grid line and station building are located, and the quantitative disaster-prone environment parameters are given; at the same time, based on the characteristics of the line and station building themselves, the vulnerability of the disaster-bearing body is quantified according to historical flood disaster events. In the process of gridding the underlying surface characteristics of the characteristic parameters of disaster-prone environment, the USGS data set of NASA is used to extract the underlying surface information with a resolution of 1km×1km. According to the early warning grid, the underlying surface information that is spatially subordinate to a certain 3km×3km grid is divided, and the main proportion of the underlying surface information in each grid is calculated. The underlying surface characteristics of the grid are characterized by the land use type with the largest proportion.

[0082] During the gridding process of precipitation information, the grid division is based on the granularity of the power grid's typhoon and flood disaster warning, and the horizontal resolution and coordinate system of the two remain consistent.

[0083] Input the precipitation forecast information into the pre-built power grid typhoon flood disaster warning model to obtain the power grid typhoon flood disaster warning information, including:

[0084] Input precipitation forecast information and geographic information into the network's typhoon and flood disaster warning model according to the smallest forecast unit;

[0085] Based on the online typhoon and flood disaster warning model, the typhoon and flood disaster warning risk probability is obtained according to the probability of historical typhoon and flood disaster events;

[0086] The precipitation information includes grid precipitation.

[0087] The minimum forecast unit is 3km×3km.

[0088] Example 2

[0089] Based on the same inventive concept, Embodiment 2 of the present invention provides a power grid typhoon flood disaster early warning device, which specifically includes:

[0090] An acquisition module is used to obtain precipitation forecast information based on a mesoscale numerical forecast model;

[0091] A determination module is used to input the precipitation forecast information into a pre-built power grid typhoon and flood disaster warning model to obtain power grid typhoon and flood disaster warning information;

[0092] The power grid typhoon flood disaster warning model is determined by the pre-designed typhoon flood disaster forecast grid and the characteristic parameters of the typhoon flood disaster forecast grid.

[0093] The device provided in Embodiment 2 of the present invention includes a modeling module, and the modeling module is specifically used for:

[0094] Set the minimum forecast unit for typhoon and flood disasters in the power grid;

[0095] The typhoon flood disaster forecast area is divided into grids according to the minimum forecast unit to obtain the typhoon flood disaster forecast grid;

[0096] Determine the disaster-prone environment and carrier characteristic grid based on the typhoon flood disaster forecast characteristic parameters and the minimum forecast unit;

[0097] Determine the power grid typhoon flood damage information grid based on historical typhoon flood events and the smallest forecast unit;

[0098] Analyze radar warning information and determine Doppler weather radar precipitation information grid based on the minimum forecast unit;

[0099] The disaster-prone environment and carrier feature grids, the power grid typhoon flood damage information grid and the Doppler weather radar historical precipitation information grid are associated with the power grid typhoon flood disaster to build a power grid typhoon flood disaster early warning model.

[0100] The modeling module also obtains the historical disaster-prone environment and carrier characteristics during multiple typhoon landings, the historical damage information of typhoon flood disasters in the power grid, and the historical precipitation information of Doppler weather radar, and verifies the power grid typhoon flood disaster warning model. Specifically, according to the order of typhoon flood disaster probability from high to low in the historical fault distribution, a preset proportion of grid areas is screened out, and the historical precipitation information of the same period is used as the input of the power grid typhoon flood disaster warning model to conduct a power grid typhoon flood disaster warning. If the consistency between the grid area obtained by the warning and the grid area of ​​the preset proportion reaches above the preset threshold, the test passes; otherwise, the Doppler weather radar historical precipitation information grid is re-associated with the power grid typhoon flood disaster, and the power grid typhoon flood disaster warning model is re-verified.

[0101] The characteristic parameters include characteristic parameters of the disaster-prone environment, characteristic parameters of the disaster-bearing body, disaster loss information and precipitation information.

[0102] The characteristic parameters of disaster-prone environment include topographic characteristics and underlying surface characteristics;

[0103] The characteristic parameters of the disaster-bearing body include the number, location and type of the poles and towers and the location of the station building;

[0104] The disaster damage information includes the time and location of the flood, the collapse of poles / towers and the flooding of station buildings.

[0105] The above determination module inputs the precipitation forecast information into the pre-built power grid typhoon flood disaster warning model to obtain the power grid typhoon flood disaster warning information. The specific process is as follows:

[0106] Input precipitation forecast information and geographic information into the network's typhoon and flood disaster warning model according to the smallest forecast unit;

[0107] Based on the online typhoon and flood disaster warning model, the typhoon and flood disaster warning risk probability is obtained according to the probability of historical typhoon and flood disaster events;

[0108] Among them, precipitation information includes: grid precipitation.

[0109] The minimum forecast unit is 3km×3km.

[0110] For the convenience of description, the various parts of the above-mentioned device are divided into various modules or units according to their functions and described separately. Of course, when implementing the present application, the functions of each module or unit can be implemented in the same or multiple software or hardware.

[0111] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0112] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0113] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0114] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0115] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Ordinary technicians in the relevant field can still modify or make equivalent substitutions to the specific implementation methods of the present invention with reference to the above embodiments. Any modifications or equivalent substitutions that do not depart from the spirit and scope of the present invention are within the scope of protection of the claims of the present invention to be approved.

Claims

1. A method for early warning of typhoon and flood disasters in a power grid, characterized in that: include: Obtain precipitation forecast information based on mesoscale numerical forecast models; Inputting the precipitation forecast information into a pre-built power grid typhoon and flood disaster warning model to obtain power grid typhoon and flood disaster warning information; The power grid typhoon flood disaster warning model is determined by a pre-designed typhoon flood disaster forecast grid and characteristic parameters of the typhoon flood disaster forecast grid; The construction of the power grid typhoon flood disaster early warning model includes: Set the minimum forecast unit for typhoon and flood disasters in the power grid; Dividing the typhoon flood disaster forecast area into grids according to the minimum forecast unit to obtain a typhoon flood disaster forecast grid; Determine the disaster-prone environment and carrier characteristic grid based on the typhoon flood disaster forecast characteristic parameters and the minimum forecast unit; Determine the power grid typhoon flood damage information grid based on historical typhoon flood events and the minimum forecast unit; parsing the radar warning information and determining a Doppler weather radar precipitation information grid based on the minimum forecast unit; The disaster-prone environment and carrier feature grid, the power grid typhoon flood damage information grid and the Doppler weather radar historical precipitation information grid are associated with the power grid typhoon flood disaster to construct a power grid typhoon flood disaster warning model; The characteristic parameters include characteristic parameters of the disaster-prone environment, characteristic parameters of the disaster-bearing body, disaster damage information and precipitation information.

2. The method for early warning of typhoon and flood disasters in power grid according to claim 1, characterized in that: The construction of the power grid typhoon flood disaster early warning model also includes: The historical disaster-prone environment and carrier characteristics during multiple typhoon landings, historical damage information of typhoon flood disasters in the power grid, and historical precipitation information of Doppler weather radar are obtained, and the power grid typhoon flood disaster early warning model is tested.

3. The method for early warning of typhoon and flood disasters in power grid according to claim 2, characterized in that: The testing of the power grid typhoon flood disaster warning model includes: According to the order of typhoon and flood disaster probabilities in historical fault distribution from high to low, grid areas with a preset proportion are screened out, and the precipitation information of the same period in history is used as the input of the power grid typhoon and flood disaster warning model to carry out power grid typhoon and flood disaster warning. If the consistency between the grid area obtained by the warning and the grid area with a preset proportion reaches above the preset threshold, the test passes; otherwise, the Doppler weather radar historical precipitation information grid is re-associated with the power grid typhoon and flood disaster, and the power grid typhoon and flood disaster warning model is re-tested.

4. The method for early warning of typhoon and flood disasters in power grid according to claim 1, characterized in that: The characteristic parameters of the disaster-prone environment include terrain characteristics and underlying surface characteristics; The characteristic parameters of the disaster-bearing body include the number, location and type of the pole / tower and the location of the station building; The disaster damage information includes the time and location of the flood, the collapse of poles / towers and the flooding of station buildings.

5. The power grid typhoon flood disaster early warning method according to claim 1, characterized in that: The step of inputting the precipitation forecast information into a pre-built power grid typhoon and flood disaster warning model to obtain power grid typhoon and flood disaster warning information includes: Inputting the precipitation forecast information and geographic information into the network typhoon and flood disaster warning model according to the minimum forecast unit; Based on the typhoon and flood disaster warning model of the network, and according to the probability of occurrence of historical typhoon and flood disaster events, the typhoon and flood disaster warning risk probability is obtained; Wherein, the precipitation information includes: grid precipitation.

6. The power grid typhoon flood disaster early warning method according to claim 1 or 5, characterized in that: The minimum forecast unit is 3km×3km.

7. A power grid typhoon flood disaster early warning device, characterized in that: include: An acquisition module is used to obtain precipitation forecast information based on a mesoscale numerical forecast model; A determination module, used for inputting the precipitation forecast information into a pre-built power grid typhoon and flood disaster warning model to obtain power grid typhoon and flood disaster warning information; The power grid typhoon flood disaster warning model is determined by a pre-designed typhoon flood disaster forecast grid and characteristic parameters of the typhoon flood disaster forecast grid; The device comprises a modeling module, and the modeling module is specifically used for: Set the minimum forecast unit for typhoon and flood disasters in the power grid; Dividing the typhoon flood disaster forecast area into grids according to the minimum forecast unit to obtain a typhoon flood disaster forecast grid; Determine the disaster-prone environment and carrier characteristic grid based on the typhoon flood disaster forecast characteristic parameters and the minimum forecast unit; Determine the power grid typhoon flood damage information grid based on historical typhoon flood events and the minimum forecast unit; parsing the radar warning information and determining a Doppler weather radar precipitation information grid based on the minimum forecast unit; The disaster-prone environment and carrier feature grid, the power grid typhoon flood damage information grid and the Doppler weather radar historical precipitation information grid are associated with the power grid typhoon flood disaster to construct a power grid typhoon flood disaster warning model; The characteristic parameters include characteristic parameters of the disaster-prone environment, characteristic parameters of the disaster-bearing body, disaster damage information and precipitation information.

8. The power grid typhoon flood disaster early warning device according to claim 7, characterized in that: The modeling module is also specifically used for: The historical disaster-prone environment and carrier characteristics during multiple typhoon landings, historical damage information of typhoon flood disasters in the power grid, and historical precipitation information of Doppler weather radar are obtained, and the power grid typhoon flood disaster early warning model is tested.

9. The power grid typhoon flood disaster early warning device according to claim 8, characterized in that: The modeling module is also specifically used for: According to the order of typhoon and flood disaster probabilities in historical fault distribution from high to low, grid areas with a preset proportion are screened out, and the precipitation information of the same period in history is used as the input of the power grid typhoon and flood disaster warning model to carry out power grid typhoon and flood disaster warning. If the consistency between the grid area obtained by the warning and the grid area with a preset proportion reaches above the preset threshold, the test passes; otherwise, the Doppler weather radar historical precipitation information grid is re-associated with the power grid typhoon and flood disaster, and the power grid typhoon and flood disaster warning model is re-tested.

10. The power grid typhoon flood disaster early warning device according to claim 7, characterized in that: The characteristic parameters of the disaster-prone environment include terrain characteristics and underlying surface characteristics; The characteristic parameters of the disaster-bearing body include the number, location and type of the pole / tower and the location of the station building; The disaster damage information includes the time and location of the flood, the collapse of poles / towers and the flooding of station buildings.

11. The power grid typhoon flood disaster early warning device according to claim 7, characterized in that: The determination module is specifically used for: Inputting the precipitation forecast information and geographic information into the network typhoon and flood disaster warning model according to the minimum forecast unit; Based on the typhoon and flood disaster warning model of the network, and according to the probability of occurrence of historical typhoon and flood disaster events, the typhoon and flood disaster warning risk probability is obtained; Wherein, the precipitation information includes: grid precipitation.

12. The power grid typhoon flood disaster early warning device according to claim 7 or 11, characterized in that: The minimum forecast unit is 3km×3km.