Power control method, device and equipment for ultra-high altitude wind turbine generator and medium
By obtaining the wind speed and operating data of the wind turbine, and using the PI controller and fuzzy feedforward controller to calculate the target parameters, the problem of unstable operation of the wind turbine in ultra-high altitude areas was solved, and the effects of stable output power and improved power generation performance were achieved.
Patent Information
- Application Number
- CN202410847130.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-10-01
AI Technical Summary
In ultra-high altitude areas, it is difficult to ensure the stability of wind turbine operations due to large wind speed changes and extreme weather conditions. Existing technologies are difficult to effectively cope with this, resulting in affected power generation performance and safety.
By obtaining the wind speed data and operating data of the wind turbine, the PI controller, adaptive model and fuzzy feedforward controller are used to calculate the target pitch angle and target speed to achieve constant power operation of the wind turbine, adapt to wind speed changes and improve stability. .
It achieves stable output power of wind turbines, improves power generation performance and safety, and enhances the ability to respond to extreme weather.
Smart Images

Figure CN118728641A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of wind power generation, and in particular to a power control method, device, equipment and medium for an ultra-high altitude wind turbine generator set. Background Art
[0002] At present, the development of inland wind resource-rich areas in China is approaching saturation, and the renewable energy subsidy reduction mechanism is in place. The ultra-high power generation hours brought by abundant wind energy resources can effectively alleviate the pressure on development companies in terms of project investment returns. my country's ultra-high altitude areas are particularly rich in wind energy resources. The technically exploitable wind power capacity in Tibet alone exceeds 10 million kilowatts, mainly concentrated in areas above 4,800 meters above sea level. In the future, the vast ultra-high altitude areas are bound to become an important area for wind energy development and utilization.
[0003] However, in ultra-high altitude areas, due to special climatic conditions such as thin air, low air pressure, large temperature changes, and large wind speed changes, the operating efficiency and safety of wind turbines face many challenges.
[0004] The related technology controls the pitch controller to output the pitch angle by fixing the parameters of the PI controller. However, the related technology is difficult to cope with the situations of large changes in wind speed at ultra-high altitudes and frequent extreme weather, and cannot guarantee the stability of the operation of the wind turbine. Summary of the invention
[0005] The present application provides a power control method, device, equipment and medium for an ultra-high altitude wind turbine to solve the problem that related technologies are difficult to cope with the situation of large wind speed changes at ultra-high altitudes and frequent extreme weather, and cannot ensure the stability of wind turbine operation. The method can stabilize the output power of the wind turbine, improve the power generation performance of the wind turbine, and enhance the safety of the wind turbine.
[0006] The first aspect of the present application provides a power control method for an ultra-high altitude wind turbine generator set, comprising the following steps:
[0007] Acquiring wind speed data of the environment in which the wind turbine is located and operating data of the wind turbine;
[0008] Determine a power difference between actual power and rated power according to the operating data, input the wind speed data and the power difference into a preset PI controller to obtain a target pitch angle and a target rotation speed; and
[0009] The wind turbine generator set is controlled to operate at the target pitch angle and target rotation speed to achieve constant power operation of the wind turbine generator set.
[0010] Optionally, in some embodiments, the wind speed data and the power difference are input into a preset PI controller to obtain a target pitch angle and a target rotation speed, including:
[0011] Inputting the wind speed data into a preset adaptive model to obtain PI control parameters at the current wind speed, and inputting the wind speed data into a preset fuzzy feedforward controller to obtain feedforward compensation parameters at the current wind speed;
[0012] The wind speed data, power difference PI control parameters and feedforward compensation parameters are input into the preset PI controller to obtain a target pitch angle and a target rotation speed.
[0013] Optionally, in some embodiments, before inputting the wind speed data into a preset adaptive model to obtain the PI control parameters under the current wind speed, the method further includes:
[0014] Acquiring first historical wind speed data of the wind turbine generator set;
[0015] Preprocessing the first historical wind speed data to obtain cleaned first historical wind speed data, and dividing the cleaned first historical wind speed data into training set data and test set data;
[0016] The training set data is used to train the neural network model to obtain a trained neural network model, the test set data is used to test the trained neural network model to obtain a test result, and the trained neural network model is optimized based on the test result to obtain the preset PI controller.
[0017] Optionally, in some embodiments, before the wind speed data is input into the preset fuzzy feedforward controller to obtain the feedforward compensation parameter at the current wind speed, the method further includes:
[0018] Acquiring second historical wind speed data of the wind turbine generator set and wind speed characteristics at ultra-high altitudes;
[0019] Fuzzy rules are defined according to the wind speed characteristics, and the second historical wind speed data is used as an independent variable and the pitch angle is used as a dependent variable. The pitch angle and the second historical wind speed data are fitted to establish the preset fuzzy feedforward controller.
[0020] Optionally, in some embodiments, after obtaining the wind speed data of the environment in which the wind turbine generator set is located and the operation data of the wind turbine generator set, the method further includes:
[0021] Determine whether the wind speed data is greater than the cut-out wind speed;
[0022] If the wind speed data is greater than the cut-out wind speed, the wind turbine generator set is controlled to stop running.
[0023] Optionally, in some embodiments, after obtaining the wind speed data of the environment in which the wind turbine generator set is located and the operation data of the wind turbine generator set, the method further includes:
[0024] Determining whether the wind speed data is less than the cut-in wind speed;
[0025] If the wind speed data is less than the cut-in wind speed, the target rotation speed of the wind turbine generator set is determined according to the wind speed data and a preset optimal tip speed ratio.
[0026] A second aspect of the present application provides a power control device for an ultra-high altitude wind turbine generator set, comprising:
[0027] An acquisition module, used to acquire wind speed data of the environment in which the wind turbine is located and operating data of the wind turbine;
[0028] a generating module, configured to determine a power difference between actual power and rated power according to the operating data, and input the wind speed data and the power difference into a preset PI controller to obtain a target pitch angle and a target rotation speed; and
[0029] The control module is used to control the wind turbine set to operate at the target pitch angle and target speed to achieve constant power operation of the wind turbine set.
[0030] Optionally, in some embodiments, the generating module includes:
[0031] A first generating unit, configured to input the wind speed data into a preset adaptive model to obtain a PI control parameter at a current wind speed, and input the wind speed data into a preset fuzzy feedforward controller to obtain a feedforward compensation parameter at the current wind speed;
[0032] The second generating unit is used to input the wind speed data, the power difference PI control parameter and the feedforward compensation parameter into the preset PI controller to obtain a target pitch angle and a target rotation speed.
[0033] Optionally, in some embodiments, before inputting the wind speed data into a preset adaptive model to obtain the PI control parameters under the current wind speed, the first generating unit further includes:
[0034] A first acquisition subunit, used to acquire first historical wind speed data of the wind turbine generator set;
[0035] a division subunit, configured to preprocess the first historical wind speed data to obtain cleaned first historical wind speed data, and divide the cleaned first historical wind speed data into training set data and test set data;
[0036] The first generating subunit is used to train the neural network model using the training set data to obtain a trained neural network model, test the trained neural network model using the test set data to obtain a test result, and optimize the trained neural network model based on the test result to obtain the preset PI controller.
[0037] Optionally, in some embodiments, before inputting the wind speed data into the preset fuzzy feedforward controller to obtain the feedforward compensation parameter at the current wind speed, the first generating unit further includes:
[0038] A second acquisition subunit is used to acquire second historical wind speed data of the wind turbine generator set and wind speed characteristics at ultra-high altitudes;
[0039] A subunit is established to define fuzzy rules according to the wind speed characteristics, and the second historical wind speed data is used as an independent variable and the pitch angle is used as a dependent variable, the pitch angle and the second historical wind speed data are fitted, and the preset fuzzy feedforward controller is established.
[0040] Optionally, in some embodiments, after acquiring the wind speed data of the environment in which the wind turbine is located and the operation data of the wind turbine, the acquisition module further includes:
[0041] A first judging unit, used to judge whether the wind speed data is greater than the cut-out wind speed;
[0042] The stopping subunit is used to control the wind turbine set to stop running when the wind speed data is greater than the cut-out wind speed.
[0043] Optionally, in some embodiments, after acquiring the wind speed data of the environment in which the wind turbine is located and the operation data of the wind turbine, the acquisition module further includes:
[0044] A second judging subunit, used to judge whether the wind speed data is less than the cut-in wind speed;
[0045] The determination subunit is used to determine the target rotation speed of the wind turbine generator set according to the wind speed data and a preset optimal tip speed ratio when the wind speed data is less than the cut-in wind speed.
[0046] A third aspect of the present application provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the power control method for an ultra-high altitude wind turbine as described in the above embodiment.
[0047] A fourth aspect of the present application provides a computer-readable storage medium having a computer program stored thereon, the program being executed by a processor to implement the power control method for an ultra-high altitude wind turbine as described in the above embodiment.
[0048] Thus, the wind speed data of the environment in which the wind turbine is located and the operating data of the wind turbine are obtained; the power difference between the actual power and the rated power is determined according to the operating data, and the wind speed data and the power difference are input into the preset PI controller to obtain the target pitch angle and the target speed; the wind turbine is controlled to operate at the target pitch angle and the target speed to achieve constant power operation of the wind turbine. Thus, the problem that the relevant technology is difficult to cope with the situation of large changes in wind speed at ultra-high altitudes and many extreme weather conditions, and the stability of the operation of the wind turbine generator set cannot be guaranteed, and the output power of the wind turbine generator set can be stabilized, the power generation performance of the wind turbine generator set can be improved, and the safety of the wind turbine generator set can be enhanced.
[0049] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0051] Figure 1 A flow chart of a power control method for an ultra-high altitude wind turbine generator set provided according to an embodiment of the present application;
[0052] Figure 2 A block diagram of a power control device for an ultra-high altitude wind turbine generator set provided according to an embodiment of the present application;
[0053] Figure 3 It is a schematic diagram of the structure of an electronic device provided according to an embodiment of the present application. DETAILED DESCRIPTION
[0054] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0055] The power control method, device, equipment and medium of the ultra-high altitude wind turbine of the embodiment of the present application are described below with reference to the accompanying drawings. In view of the problem that the related technology mentioned in the above background technology is difficult to cope with the situation of large wind speed changes at ultra-high altitudes and many extreme weather conditions, and cannot guarantee the stability of the operation of the wind turbine generator set, the present application provides a power control method for ultra-high altitude wind turbine generator sets, in which the wind speed data of the environment in which the wind turbine generator set is located and the operation data of the wind turbine generator set are obtained, and the power difference between the actual power and the rated power is determined according to the operation data, the wind speed data and the power difference are input into the preset PI controller to obtain the target pitch angle and the target speed, and the wind turbine generator set is controlled to operate at the target pitch angle and the target speed to achieve constant power operation of the wind turbine generator set. Thus, the problem that the related technology is difficult to cope with the situation of large wind speed changes at ultra-high altitudes and many extreme weather conditions, and cannot guarantee the stability of the operation of the wind turbine generator set is solved, the output power of the wind turbine generator set can be stabilized, the power generation performance of the wind turbine generator set can be improved, and the safety of the wind turbine generator set can be enhanced.
[0056] Specifically, Figure 1 A schematic flow chart of a power control method for an ultra-high altitude wind turbine set provided in an embodiment of the present application.
[0057] like Figure 1 As shown, the power control method of the ultra-high altitude wind turbine generator system includes the following steps:
[0058] In step S101, wind speed data of the environment in which the wind turbine generator set is located and operation data of the wind turbine generator set are obtained.
[0059] Among them, the wind speed data includes the wind speed, temperature, etc. of the environment in which the wind turbine is located. The wind speed data is obtained through meteorological data analysis and can also be directly obtained through sensors. No specific limitation is made here. The operating data includes the actual operating power of the wind turbine.
[0060] Specifically, the embodiments of the present application can obtain wind speed data and operating data to adjust the output power of the wind turbine in real time according to the wind speed data and operating data, so that the output power of the wind turbine is stabilized within an appropriate range, avoiding the problem of wind turbine damage caused by excessive wind speed changes.
[0061] Optionally, in some embodiments, after obtaining the wind speed data of the environment in which the wind turbine is located and the operating data of the wind turbine, it also includes: judging whether the wind speed data is greater than the cut-out wind speed; if the wind speed data is greater than the cut-out wind speed, controlling the wind turbine to stop running.
[0062] Among them, the cut-out wind speed is the shutdown wind speed or the stop wind speed, which refers to the maximum wind speed for the wind turbine to generate electricity connected to the grid. Once the wind speed exceeds the cut-out wind speed, the wind turbine will be cut out of the grid to protect the unit from damage. The cut-out wind speed can be pre-set, obtained through a limited number of experiments, or obtained through a limited number of computer simulations, and is not specifically limited here.
[0063] Specifically, the embodiment of the present application can control the wind turbine to stop running when the current wind speed is greater than the cut-out wind speed, so as to prevent the wind turbine from being damaged by excessive wind speed.
[0064] Optionally, in some embodiments, after obtaining the wind speed data of the environment in which the wind turbine is located and the operating data of the wind turbine, it also includes: determining whether the wind speed data is less than the cut-in wind speed; if the wind speed data is less than the cut-in wind speed, determining the target speed of the wind turbine according to the wind speed data and a preset optimal tip speed ratio.
[0065] Among them, the cut-in wind speed refers to the minimum wind speed required for the wind turbine to start generating electricity and connect it to the grid. When the wind speed reaches or exceeds the cut-in wind speed, the control system of the wind turbine will allow the wind wheel to start rotating and drive the generator to start generating electricity. The cut-in wind speed can be pre-set, obtained through a limited number of experiments, or obtained through a limited number of computer simulations, and is not specifically limited here; the tip speed ratio refers to the ratio of the linear velocity of the tip of the wind turbine blade to the wind speed.
[0066] It is understandable that under low wind speed conditions, the embodiments of the present application can adjust the rotation speed of the wind turbine to maintain it near the optimal tip speed ratio to maximize the capture of wind energy and convert it into electrical energy.
[0067] Specifically, the embodiment of the present application can calculate the current actual tip speed ratio based on the wind speed and rotation speed measured in real time, and compare the actual tip speed ratio with the preset optimal tip speed ratio. If the actual tip speed ratio is different from the preset optimal tip speed ratio, it is necessary to adjust the rotation speed of the wind turbine through the control system to make it close to the preset optimal tip speed ratio.
[0068] In step S102, the power difference between the actual power and the rated power is determined according to the operating data, and the wind speed data and the power difference are input into a preset PI controller to obtain a target pitch angle and a target rotation speed.
[0069] It can be understood that when the wind speed is too high, in order to avoid overloading the unit, the pitch angle can be increased to reduce the windward area of the blades, thereby reducing the captured energy and the power output of the unit. On the contrary, when the wind speed is low, reducing the pitch angle can increase the windward area of the blades, increase the captured energy and the power output of the unit.
[0070] Furthermore, in some embodiments, before inputting the wind speed data into a preset adaptive model to obtain the PI control parameters at the current wind speed, it also includes: acquiring first historical wind speed data of the wind turbine group; preprocessing the first historical wind speed data to obtain cleaned first historical wind speed data, and dividing the cleaned first historical wind speed data into training set data and test set data; training a neural network model using the training set data to obtain a trained neural network model, testing the trained neural network model using the test set data to obtain a test result, and optimizing the trained neural network model based on the test result to obtain a preset PI controller.
[0071] It should be noted that in the implementation of the present application, a large amount of operating data of the wind turbines can be acquired in advance, and a preset PI controller can be established by analyzing the wind speed data and power.
[0072] Specifically, the basic formula of the PI controller is:
[0073]
[0074] Among them, u(t) is the control signal, e(t) is the error signal, K P is the proportional gain, K i is the integral gain, τ is the lag time constant, and t is the time.
[0075] The default PI controller is:
[0076] U(s) = G(s)·E(s);
[0077] Among them, E(s) is the power difference and G(s) is the transfer function.
[0078]
[0079] Among them, K is the proportional magnification factor, λ1 and λ2 are adjustable parameters, T1 is the time constant, and T2 is the inertia time constant.
[0080] In the embodiment of the present application, under different wind speed conditions, by adjusting the value of the adjustable parameter, the PI controller can continuously adjust the output power, so that the wind turbine can achieve a fast and stable effect.
[0081] Optionally, in some embodiments, wind speed data and power difference are input into a preset PI controller to obtain a target pitch angle and a target speed, including: inputting the wind speed data into a preset adaptive model to obtain PI control parameters at the current wind speed, and inputting the wind speed data into a preset fuzzy feedforward controller to obtain feedforward compensation parameters at the current wind speed; inputting the wind speed data, power difference PI control parameters and feedforward compensation parameters into a preset PI controller to obtain the target pitch angle and the target speed.
[0082] Furthermore, in some embodiments, before inputting the wind speed data into a preset fuzzy feedforward controller to obtain the feedforward compensation parameters at the current wind speed, it also includes: obtaining the second historical wind speed data of the wind turbine and the wind speed characteristics at ultra-high altitudes; defining fuzzy rules according to the wind speed characteristics, and using the second historical wind speed data as an independent variable and the pitch angle as a dependent variable, fitting the pitch angle and the second historical wind speed data, and establishing a preset fuzzy feedforward controller.
[0083] It is understandable that the PI controller has a certain hysteresis. The embodiment of the present application can set up a fuzzy feedforward controller to adjust the control signal in advance based on the prediction of future disturbances in the system to offset the impact of the disturbance on the system. There is no need to wait for feedback information after the disturbance causes the system to respond, so as to respond more quickly.
[0084] It should be noted that the embodiments of the present application can use fuzzy set theory to process uncertain or fuzzy information, simulate empirical judgment through a series of fuzzy rules, and realize the control of the system. The fuzzy controller converts the input variables into fuzzy sets, applies fuzzy rules for reasoning, and then converts the obtained fuzzy output into an accurate control signal.
[0085] Specifically, the embodiments of the present application can obtain a large amount of high-quality historical data of wind speed and corresponding pitch angle. The wind speed data should cover a wide range of wind speeds to ensure the generalization capability of the controller.
[0086] First, the embodiment of the present application can remove outliers and missing values in the wind speed data and the corresponding pitch angles, normalize the data, and ensure data quality. Then, according to the wind speed range, fuzzy sets of wind speed are defined, such as "low wind speed", "medium wind speed", and "high wind speed", and appropriate membership functions are assigned to each fuzzy set: Similarly, fuzzy sets of pitch angles are defined, such as "small pitch", "moderate pitch", and "large pitch", and corresponding membership functions are set; then a fuzzy rule base is established, and fuzzy rules are formulated based on the principles of wind energy conversion and the characteristics of ultra-high altitude wind turbines, such as: "If the wind speed is medium wind speed, the pitch angle should be moderate pitch." The number and details of the rules depend on the complexity of the system and the control accuracy requirements.
[0087] In addition, the embodiments of the present application can combine the data fitting results, adjust the weights of the rules, optimize the control effect, use wind speed data as input and pitch angle as output, perform regression analysis or machine learning methods (such as neural networks, support vector machines, etc.) to fit the relationship between wind speed and pitch angle, and assist in the formulation and optimization of fuzzy rules.
[0088] Therefore, the embodiments of the present application can design a feedforward control strategy based on a fitting model or empirical data, so that under specific wind speed conditions, the controller can adjust the pitch angle in advance to quickly respond to wind speed changes and reduce system response time.
[0089] The function of the fuzzy feedforward controller is to give a suitable pitch angle feedforward value according to the wind speed, and add it to the output of the PID controller as the pitch angle setting value of the variable pitch system. When the wind speed increases, the output of the fuzzy feedforward controller is positive, and the pitch angle setting value is increased in time to increase the pitch angle and reduce the wind energy absorbed by the wind rotor. Conversely, the output of the fuzzy feedforward controller is negative, which increases the energy absorbed by the wind rotor, thereby maintaining constant power above the rated wind speed. The rapid compensation effect of the feedforward controller can effectively overcome the shortcomings of the PID controller's adjustment lag.
[0090] In step S103, the wind turbine generator set is controlled to operate at a target pitch angle and a target rotation speed to achieve constant power operation of the wind turbine generator set.
[0091] Specifically, the embodiment of the present application can quickly adjust the pitch angle and speed of the wind turbine according to the current wind speed and operating status of the environment in which the wind turbine is located, so that the wind turbine outputs stable power.
[0092] According to the power control method of the ultra-high altitude wind turbine set proposed in the embodiment of the present application, by obtaining the wind speed data of the environment in which the wind turbine set is located and the operating data of the wind turbine set, and determining the power difference between the actual power and the rated power according to the operating data, the wind speed data and the power difference are input into the preset PI controller to obtain the target pitch angle and the target speed, and the wind turbine set is controlled to operate at the target pitch angle and the target speed to achieve constant power operation of the wind turbine set. Thus, the problem that the relevant technology is difficult to cope with the situation of large changes in wind speed at ultra-high altitudes and many extreme weather conditions, and the stability of the operation of the wind turbine set cannot be guaranteed, the output power of the wind turbine set can be stabilized, the power generation performance of the wind turbine set can be improved, and the safety of the wind turbine set can be enhanced.
[0093] Next, a power control device for an ultra-high altitude wind turbine generator set proposed according to an embodiment of the present application will be described with reference to the accompanying drawings.
[0094] Figure 2 It is a block diagram of a power control device for an ultra-high altitude wind turbine generator set according to an embodiment of the present application.
[0095] like Figure 2 As shown, the power control device 10 of the ultra-high altitude wind turbine group includes: an acquisition module 100 , a generation module 200 and a control module 300 .
[0096] The acquisition module 100 is used to acquire the wind speed data of the environment in which the wind turbine is located and the operation data of the wind turbine.
[0097] The generating module 200 is used to determine the power difference between the actual power and the rated power according to the operating data, and input the wind speed data and the power difference into a preset PI controller to obtain a target pitch angle and a target rotation speed.
[0098] The control module 300 is used to control the wind turbine generator set to operate at a target pitch angle and a target rotation speed to achieve constant power operation of the wind turbine generator set.
[0099] Optionally, in some embodiments, the generation module 200 includes: a first generation unit and a second generation unit.
[0100] Among them, the first generating unit is used to input the wind speed data into a preset adaptive model to obtain the PI control parameters under the current wind speed, and input the wind speed data into a preset fuzzy feedforward controller to obtain the feedforward compensation parameters under the current wind speed.
[0101] The second generating unit is used to input the wind speed data, the power difference PI control parameter and the feedforward compensation parameter into a preset PI controller to obtain a target pitch angle and a target rotation speed.
[0102] Optionally, in some embodiments, before inputting the wind speed data into a preset adaptive model to obtain the PI control parameters under the current wind speed, the first generating unit further includes: a first acquiring subunit, a dividing subunit and a third generating subunit.
[0103] Wherein, the first acquisition subunit is used to acquire first historical wind speed data of the wind turbine generator set.
[0104] The division subunit is used to preprocess the first historical wind speed data to obtain cleaned first historical wind speed data, and divide the cleaned first historical wind speed data into training set data and test set data.
[0105] The third generating subunit is used to train the neural network model using the training set data to obtain the trained neural network model, test the trained neural network model using the test set data to obtain the test result, and optimize the trained neural network model based on the test result to obtain the preset PI controller.
[0106] Optionally, in some embodiments, before inputting the wind speed data into a preset fuzzy feedforward controller to obtain the feedforward compensation parameters at the current wind speed, the first generating unit further includes: a second acquiring subunit and an establishing subunit.
[0107] The second acquisition subunit is used to acquire the second historical wind speed data of the wind turbine generator set and the wind speed characteristics at ultra-high altitudes.
[0108] A subunit is established to define fuzzy rules according to wind speed characteristics, and the second historical wind speed data is used as an independent variable and the pitch angle is used as a dependent variable. The pitch angle and the second historical wind speed data are fitted to establish a preset fuzzy feedforward controller.
[0109] Optionally, in some embodiments, after acquiring the wind speed data of the environment in which the wind turbine is located and the operation data of the wind turbine, the acquisition module further includes: a first judgment unit and a stop subunit.
[0110] The first judgment unit is used to judge whether the wind speed data is greater than the cut-out wind speed.
[0111] The stop subunit is used to control the wind turbine to stop running when the wind speed data is greater than the cut-out wind speed.
[0112] Optionally, in some embodiments, after acquiring the wind speed data of the environment in which the wind turbine is located and the operation data of the wind turbine, the acquisition module 100 further includes: a second judgment subunit and a determination subunit.
[0113] The second judgment subunit is used to judge whether the wind speed data is less than the cut-in wind speed.
[0114] The determination subunit is used to determine the target rotation speed of the wind turbine generator set according to the wind speed data and a preset optimal blade tip speed ratio when the wind speed data is less than the cut-in wind speed.
[0115] It should be noted that the above explanation of the embodiment of the power control method for an ultra-high altitude wind turbine generator set is also applicable to the power control device for an ultra-high altitude wind turbine generator set of this embodiment, and will not be repeated here.
[0116] According to the power control device for the ultra-high altitude wind turbine set proposed in the embodiment of the present application, by obtaining the wind speed data of the environment in which the wind turbine set is located and the operating data of the wind turbine set, and determining the power difference between the actual power and the rated power according to the operating data, the wind speed data and the power difference are input into the preset PI controller to obtain the target pitch angle and the target speed, and the wind turbine set is controlled to operate at the target pitch angle and the target speed to achieve constant power operation of the wind turbine set. Thus, the problem that the related technology is difficult to cope with the situation of large changes in wind speed at ultra-high altitudes and many extreme weather conditions, and the stability of the operation of the wind turbine set cannot be guaranteed, the output power of the wind turbine set can be stabilized, the power generation performance of the wind turbine set can be improved, and the safety of the wind turbine set can be enhanced.
[0117] Figure 3 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. The electronic device may include:
[0118] A memory 301 , a processor 302 , and a computer program stored in the memory 301 and executable on the processor 302 .
[0119] When the processor 302 executes the program, the power control method of the ultra-high altitude wind turbine generator set provided in the above embodiment is implemented.
[0120] Furthermore, the electronic device further comprises:
[0121] The communication interface 303 is used for communication between the memory 301 and the processor 302 .
[0122] The memory 301 is used to store computer programs that can be run on the processor 302 .
[0123] The memory 301 may include a high-speed RAM (Random Access Memory) memory, and may also include a non-volatile memory, such as at least one disk memory.
[0124] If the memory 301, the processor 302 and the communication interface 303 are implemented independently, the communication interface 303, the memory 301 and the processor 302 can be connected to each other through a bus and communicate with each other. The bus can be an ISA (Industry Standard Architecture) bus, a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0125] Optionally, in a specific implementation, if the memory 301, the processor 302 and the communication interface 303 are integrated on a chip, the memory 301, the processor 302 and the communication interface 303 can communicate with each other through an internal interface.
[0126] The processor 302 may be a CPU (Central Processing Unit), or an ASIC (Application Specific Integrated Circuit), or one or more integrated circuits configured to implement the embodiments of the present application.
[0127] An embodiment of the present application further provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the power control method for an ultra-high altitude wind turbine as described above.
[0128] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms are not necessarily directed to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or N embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0129] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, "N" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0130] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.
[0131] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiment, the N steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array, a field programmable gate array, etc.
[0132] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0133] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A power control method for an ultra-high altitude wind turbine generator set, characterized in that: The following steps are involved: Acquiring wind speed data of the environment in which the wind turbine is located and operating data of the wind turbine; Determine the power difference between the actual power and the rated power according to the operating data, input the wind speed data and the power difference into a preset PI controller to obtain a target pitch angle and a target speed; as well as The wind turbine generator set is controlled to operate at the target pitch angle and target rotation speed to achieve constant power operation of the wind turbine generator set.
2. The method according to claim 1, characterized in that Inputting the wind speed data and the power difference into a preset PI controller to obtain a target pitch angle and a target rotation speed includes: Inputting the wind speed data into a preset adaptive model to obtain PI control parameters at the current wind speed, and inputting the wind speed data into a preset fuzzy feedforward controller to obtain feedforward compensation parameters at the current wind speed; The wind speed data, power difference PI control parameters and feedforward compensation parameters are input into the preset PI controller to obtain a target pitch angle and a target rotation speed.
3. The method according to claim 2, characterized in that Before inputting the wind speed data into a preset adaptive model to obtain the PI control parameters under the current wind speed, the method further includes: Acquiring first historical wind speed data of the wind turbine generator set; Preprocessing the first historical wind speed data to obtain cleaned first historical wind speed data, and dividing the cleaned first historical wind speed data into training set data and test set data; The training set data is used to train the neural network model to obtain a trained neural network model, the test set data is used to test the trained neural network model to obtain a test result, and the trained neural network model is optimized based on the test result to obtain the preset PI controller.
4. The method according to claim 2, characterized in that: Before inputting the wind speed data into the preset fuzzy feedforward controller to obtain the feedforward compensation parameter at the current wind speed, the method further includes: Acquiring second historical wind speed data of the wind turbine generator set and wind speed characteristics at ultra-high altitudes; Fuzzy rules are defined according to the wind speed characteristics, and the second historical wind speed data is used as an independent variable and the pitch angle is used as a dependent variable. The pitch angle and the second historical wind speed data are fitted to establish the preset fuzzy feedforward controller.
5. The method according to claim 1, characterized in that After obtaining the wind speed data of the environment in which the wind turbine generator set is located and the operation data of the wind turbine generator set, the method further includes: Determine whether the wind speed data is greater than the cut-out wind speed; If the wind speed data is greater than the cut-out wind speed, the wind turbine generator set is controlled to stop running.
6. The method according to claim 1, characterized in that After obtaining the wind speed data of the environment in which the wind turbine generator set is located and the operation data of the wind turbine generator set, the method further includes: Determining whether the wind speed data is less than the cut-in wind speed; If the wind speed data is less than the cut-in wind speed, the target rotation speed of the wind turbine generator set is determined according to the wind speed data and a preset optimal tip speed ratio.
7. A power control device for an ultra-high altitude wind turbine generator set, characterized in that: include: An acquisition module, used to acquire wind speed data of the environment in which the wind turbine is located and operating data of the wind turbine; A generating module, configured to determine a power difference between actual power and rated power according to the operating data, and input the wind speed data and the power difference into a preset PI controller to obtain a target pitch angle and a target speed; as well as The control module is used to control the wind turbine set to operate at the target pitch angle and target speed to achieve constant power operation of the wind turbine set.
8. The device according to claim 7, characterized in that The generating module comprises: A first generating unit, configured to input the wind speed data into a preset adaptive model to obtain a PI control parameter at a current wind speed, and input the wind speed data into a preset fuzzy feedforward controller to obtain a feedforward compensation parameter at the current wind speed; The second generating unit is used to input the wind speed data, the power difference PI control parameter and the feedforward compensation parameter into the preset PI controller to obtain a target pitch angle and a target rotation speed.
9. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the power control method for an ultra-high altitude wind turbine as described in any one of claims 1 to 6.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: The program is executed by a processor to implement the power control method for an ultra-high altitude wind turbine generator set as described in any one of claims 1-6.