Prefabricated T-beam formwork hoisting device and method
By introducing main beam, legs, track, trolley, lifting assembly, lifting clamping mechanism and friction enhancing assembly into the T-beam hoisting device, the instability of T-beam formwork and concentrated load of the spreader in the prior art is solved. The problem has achieved higher lifting stability and safety.
Patent Information
- Application Number
- CN202411105146.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-05-31
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-01
AI Technical Summary
During the lifting process, the existing T-beam lifting device has insufficient friction, causing the T-beam formwork to be unstable, prone to inclination and shaking, and the load of the spreader is concentrated, and the stability is insufficient.
A prefabricated T-beam formwork hoisting device is designed, including main beam, legs, track, van, lifting assembly, rope, hoisting clamping mechanism and friction enhancing assembly. The suspension is improved by adjusting the assembly and friction enhancing block. The friction between the T-beams ensures stability and safety.
It effectively improves the stability of the T-beam during the lifting process, reduces the risk of tilt, ensures the safety and stability of the lifting, and avoids the unstable problem caused by concentrated load of the spreader.
Smart Images

Figure CN118877756A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of T-beam hoisting, and in particular to a prefabricated T-beam template hoisting device and method. Background Art
[0002] A T-beam refers to a beam with a "T"-shaped cross-section. The protruding parts on both sides are called flanges, and the middle part is called the web. Due to the advantages of T-beams such as high bending strength, reasonable cost, and strong adaptability, they are widely used in the fields of roads and bridges; among them, in the construction of bridges, highways, railways and urban roads, prefabricated T-beams are an important prefabricated component, and their hoisting construction has always been an important link in the project; after searching, in the prior art, a Chinese patent with patent application number CN202223305467.6 discloses "A T-beam hoisting device, including a T-beam body and a hoisting plate, the T-beam body includes flanges and webs, both sides of the flanges are pre-embedded with steel rings, a pulley is fixedly provided in the middle of the upper part of the hoisting plate, and steel wire ropes are provided at the four corners of the bottom of the hoisting plate. One end of the wire rope is fixedly connected to the lifting plate, and the other end is provided with a hook; a fixing plate is provided below the bottom of the web, and a fixing assembly is symmetrically provided above the fixing plate. The fixing assembly includes a vertical plate, two support rods and two vertical rods. One end of the two support rods is hinged to the bottom of the vertical plate, and the other end is provided with a groove, and bolts are passed through the groove. One end of the two vertical rods is hinged to the fixing plate, and the other end is commonly connected to a cross bar, and the cross bar fits with the web. The present invention fixes the T-beam body by a fixing plate, and connects the four corners of the fixing plate by a lifting plate, so that during the lifting process, the wire rope does not contact the T-beam body, thereby ensuring the quality of the T-beam", but the following defects still exist: (1) The friction between the hoist and the T-beam is small, and it is difficult to ensure the stability of the T-beam formwork during the hoisting process, which is prone to problems such as tilting and shaking.
[0003] (2) In addition, the load of the sling is relatively concentrated, and it is not stable enough during the lifting process.
[0004] Therefore, we make improvements to this and propose a prefabricated T-beam formwork lifting device. Summary of the invention
[0005] The purpose of the present invention is to address the problem that the friction between the existing hanger and the T-beam is relatively small, it is difficult to ensure the stability of the T-beam template during the lifting process, and problems such as tilting and shaking are prone to occur; in addition, the load of the hanger is relatively large, and it is not stable enough during the lifting process.
[0006] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions: Prefabricated T-beam formwork lifting device is used to improve the above problems.
[0007] The present invention is specifically as follows: It includes a main beam and supporting legs bolted at the four corners of the main beam, and also includes tracks symmetrically installed on the inner wall of the main beam, with a crane slidably connected between two groups of the tracks; a lifting component installed at the bottom center of the crane; a lifting rope hoisted below the lifting component; a lifting and clamping mechanism connected to the bottom end of the lifting rope, and the lifting and clamping mechanism also includes an adjustment component; a friction-increasing component symmetrically arranged at both ends of the lifting and clamping mechanism, and used to increase the friction between the sling and the T-beam to prevent tilting during lifting; a T-beam clamped between the lifting and clamping mechanism and the friction-increasing component.
[0008] As a preferred technical solution of the present invention, the lifting and clamping mechanism includes lifting rings respectively connected to the four corners of the bottom end of the lifting rope, a first X-shaped connecting rod installed between two adjacent groups of lifting rings, and an L-shaped sling symmetrically arranged at the end of any first X-shaped connecting rod away from the lifting ring, and an adjustment component is also arranged on the inner side wall of the horizontal section of any group of the L-shaped slings, and a bearing plate installed below the two adjacent groups of L-shaped slings, and detachable connecting parts are symmetrically arranged at both ends of the bearing plate, the connecting parts and the bearing plate are connected by bolts, and a first connecting rod is movably connected between the movable end of the adjustment component and the connecting part.
[0009] As a preferred technical solution of the present invention, the adjustment assembly includes a screw rod rotatably arranged on the inner side wall of the horizontal section of the L-shaped hanger, a crank handle fixedly installed on one end of the screw rod close to the outer wall of the vertical section of the L-shaped hanger, a slider threadedly connected to the outer wall of the screw rod, and a sliding rod symmetrically arranged on the inner side wall of the horizontal section of the L-shaped hanger, and the slider is slidably connected to the sliding rod, and the bottom end of the slider is movably connected to the first connecting rod.
[0010] As a preferred technical solution of the present invention, the friction-increasing assembly includes a connecting cross bar symmetrically arranged at the bottom end of a first X-shaped connecting rod, a second connecting rod symmetrically installed at one end of the connecting cross bar away from the first X-shaped connecting rod, a U-shaped part movably connected to the bottom end of the second connecting rod, a first mounting plate slidably connected to the bottom ends of two groups of U-shaped parts, a second mounting plate located below the first mounting plate, and a second X-shaped connecting rod symmetrically distributed and arranged between the first mounting plate and the second mounting plate, and a friction-increasing block is movably installed at one end of any group of the second X-shaped connecting rods close to the T-beam.
[0011] As a preferred technical solution of the present invention, the lifting assembly includes a driving drum installed at the bottom center of the overhead crane, a steel wire rope fixed to the outer wall of the driving drum, a pulley fixedly connected to the end of the steel wire rope away from the driving drum, a U-shaped frame installed between the pulleys, and a hook arranged at the bottom center of the U-shaped frame.
[0012] As a preferred technical solution of the present invention, the hook is connected to the lifting rope via a shackle, and the four corners of the lifting rope are connected to the lifting ring via a shackle.
[0013] As a preferred technical solution of the present invention, casters and a locking mechanism used in conjunction with the casters are rotatably mounted on the bottom ends of any group of legs.
[0014] As a preferred technical solution of the present invention, the second X-shaped connecting rod is movably connected to the intersection of the first mounting plate, and evenly distributed threaded holes are opened on the outer side wall of the second mounting plate, and the intersection of the second X-shaped connecting rod and the second mounting plate is connected by bolts.
[0015] As a preferred technical solution of the present invention, a railing is provided at one end of the main beam away from the support leg, and the railing is configured to be detachably connected; the friction-enhancing block, the load-bearing plate, the first mounting plate and the second mounting plate are all provided with anti-slip grooves at one end close to the T-beam.
[0016] A method for hoisting a prefabricated T-beam template hoisting device comprises the following steps: S1: First, two sets of main beams are moved to the top of the T-beam to be lifted by using the outriggers and casters, and are placed at both ends of the T-beam respectively. Then, the lifting assembly is controlled to unwind, and the driving drum is started to rotate. At this time, the number of windings of the wire rope decreases, and the winding length becomes shorter, so that the wire rope drives the hook to move down until the hook is close to the lifting rope. Then, the unwinding is stopped, the hook is hung on the lifting rope, and the lifting assembly is started to rewind, driving the lifting rope to move up, and then the horizontal section and the vertical section of the L-shaped sling are attached to and contacted with the horizontal section of the T-beam. Then, the load-bearing plate is connected to the first connecting rod through the connecting piece, and the adjusting assembly is rotated. The screw rod is driven to rotate by the crank to adjust the position of the slider threadedly connected to it, thereby achieving the contact between the load-bearing plate and the vertical section of the T-beam. S2: When the first X-shaped connecting rod is extended, the second connecting rod is driven to move closer to each other through the connecting cross bar. In the process of the second connecting rod moving closer to each other, the U-shaped parts are driven to move closer to each other until the first mounting plate at the bottom of the U-shaped part abuts against the horizontal section of the T-beam. After the first mounting plate abuts against the horizontal section of the T-beam, the friction increasing block at one end of the second X-shaped connecting rod close to the vertical section of the T-beam is abutted against the vertical section of the T-beam, and then the end of the second X-shaped connecting rod away from the friction increasing block is connected to the second mounting plate, so that the second mounting plate abuts against the vertical section of the T-beam, thereby completing the preliminary work of T-beam hoisting; S3: Then turn on the lifting assembly and lift the T-beam to the specified position. During the lifting process, the friction between the lifting device and the T-beam is increased by using the first mounting plate, the second mounting plate and the friction increasing block that are in contact with the T-beam, thereby reducing the risk of tilting during the lifting of the T-beam and ensuring the safety and stability of the lifting. Then remove the second mounting plate and the load-bearing plate and the friction increasing assembly, leaving only the L-shaped lifting device in contact with the T-beam, and then control the lifting assembly to drop the T-beam to the specified position to achieve the installation of the T-beam.
[0017] Compared with the prior art, the present invention has the following beneficial effects: In the scheme of the present invention: 1. The first mounting plate at the bottom of the U-shaped part is set to contact the horizontal section of the T-beam. After the first mounting plate contacts the horizontal section of the T-beam, the friction-increasing block at one end of the second X-shaped connecting rod close to the vertical section of the T-beam is contacted with the vertical section of the T-beam, and then the end of the second X-shaped connecting rod away from the friction-increasing block is connected to the second mounting plate, so that the second mounting plate contacts the vertical section of the T-beam. In the process of hoisting, the first mounting plate, the second mounting plate and the friction-increasing block that contact the T-beam are used to increase the friction between the hoist and the T-beam, which solves the problem that the friction between the hoist and the T-beam in the prior art is small, it is difficult to ensure the stability of the T-beam template during the hoisting process, and it is easy to tilt and shake; 2. The horizontal and vertical sections of the L-shaped hanger are set to stick to and contact the horizontal section of the T-beam, and then the load-bearing plate is connected to the first connecting rod through a connecting piece. The adjustment component is rotated, and the screw rod is driven to rotate by the crank to adjust the position of the slider threadedly connected to it. The L-shaped hanger contacts the horizontal section of the T-beam, and the load-bearing plate contacts the vertical section of the T-beam. Multiple points of the T-beam can be supported, which solves the problem of concentrated load on the hanger and instability during lifting in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is one of the three-dimensional structural schematic diagrams of the present invention; Figure 2 This is the second schematic diagram of the three-dimensional structure of the present invention; Figure 3 This is one of the three-dimensional structural schematic diagrams of the hoisting and clamping mechanism of the present invention; Figure 4 This is one of the three-dimensional structural schematic diagrams of the friction-increasing assembly of the present invention; Figure 5 This is the second schematic diagram of the three-dimensional structure of the friction-increasing assembly of the present invention; Figure 6 This is the second schematic diagram of the three-dimensional structure of the hoisting and clamping mechanism of the present invention; Figure 7 For the present invention Figure 1 A schematic diagram of the enlarged structure of Indicated in the figure: 1. Main beam; 2. Outriggers; 3. Tracks; 4. Overhead crane; 5. Lifting assembly; 501. Driving drum; 502. Wire rope; 503. Pulley; 504. U-shaped frame; 505. Hook; 6. Lifting rope; 7. Lifting and clamping mechanism; 701. Lifting ring; 702. First X-shaped connecting rod; 703. L-shaped sling; 704. Load-bearing plate; 705. Connecting piece; 706. First connecting rod; 71. Adjusting assembly; 710. Screw; 711. Crank; 712. Sliding block; 713. Sliding rod; 8. Friction-increasing assembly; 801. Connecting cross bar; 802. Second connecting rod; 803. U-shaped piece; 804. First mounting plate; 805. Second mounting plate; 806. Second X-shaped connecting rod; 807. Friction-increasing block; 9. T-beam; 10. Threaded hole; 11. Handrail; 12. Caster. DETAILED DESCRIPTION
[0019] To make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be described clearly and completely in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them.
[0020] Therefore, the following detailed description of the embodiments of the present invention is not intended to limit the scope of the invention claimed for protection, but merely represents some embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0021] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.
[0022] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0023] like Figure 1-7As shown, this embodiment proposes a prefabricated T-beam formwork lifting device, including a main beam 1 and support legs 2 bolted at the four corners of the main beam 1, and also includes rails 3 symmetrically installed on the inner wall of the main beam 1, and a crane 4 is slidably connected between two sets of rails 3; a lifting assembly 5 is installed at the bottom center of the crane 4; a lifting rope 6 is hoisted below the lifting assembly 5; a lifting and clamping mechanism 7 is connected to the bottom end of the lifting rope 6, and the lifting and clamping mechanism 7 also includes an adjustment assembly 71; a friction-increasing assembly 8 is symmetrically arranged at both ends of the lifting and clamping mechanism 7, and is used to increase the friction between the hoist and the T-beam to prevent tilting during lifting; a T-beam 9 is clamped between the lifting and clamping mechanism 7 and the friction-increasing assembly 8, and the lifting of the T-beam 9 is achieved by the coordinated use of the lifting assembly 5, the lifting and clamping mechanism 7 and the friction-increasing assembly 8.
[0024] like Figure 1 , Figure 2 , Figure 3 , Figure 5 and Figure 6 As shown, as a preferred embodiment, on the basis of the above method, further, the lifting and clamping mechanism 7 includes lifting rings 701 respectively connected to the four corners of the bottom end of the lifting rope 6, a first X-shaped connecting rod 702 installed between two adjacent groups of lifting rings 701, and an L-shaped sling 703 symmetrically arranged at the end of any first X-shaped connecting rod 702 away from the lifting ring 701, and an adjusting component 71 is also arranged on the inner side wall of the horizontal section of any group of L-shaped slings 703, and a bearing plate 704 installed below the two adjacent groups of L-shaped slings 703, and detachable connecting members 705 are symmetrically arranged at both ends of the bearing plate 704, and the connecting member 705 and the bearing plate 704 are connected by bolts, and a first connecting rod 706 is movably connected between the moving end of the adjusting component 71 and the connecting member 705, which can make the horizontal section and the vertical section of the L-shaped sling 703 stick to and abut against the horizontal section of the T-beam.
[0025] like Figure 1 , Figure 2 , Figure 3 , Figure 5 and Figure 6 As shown, as a preferred embodiment, on the basis of the above-mentioned method, the adjustment component 71 further includes a screw rod 710 rotatably arranged on the inner wall of the horizontal section of the L-shaped hanger 703, a crank handle 711 fixedly installed on the screw rod 710 near one end of the outer wall of the vertical section of the L-shaped hanger 703, a slider 712 threadedly connected to the outer wall of the screw rod 710, and a slide rod 713 symmetrically arranged on the inner wall of the horizontal section of the L-shaped hanger 703, and the slider 712 is slidably connected to the slide rod 713, and the bottom end of the slider 712 is movably connected to the first connecting rod 706 to achieve the interference between the load-bearing plate 704 and the vertical section of the T-beam.
[0026] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, as a preferred embodiment, on the basis of the above method, further, the friction-increasing component 8 includes a connecting cross bar 801 symmetrically arranged at the bottom end of the first X-shaped connecting rod 702, a second connecting rod 802 symmetrically installed at the end of the connecting cross bar 801 away from the first X-shaped connecting rod 702, a U-shaped part 803 movably connected to the bottom end of the second connecting rod 802, a first mounting plate 804 slidably connected to the bottom ends of the two groups of U-shaped parts 803, a second mounting plate 805 located below the first mounting plate 804, and a second X-shaped connecting rod 806 symmetrically arranged between the first mounting plate 804 and the second mounting plate 805. Any group of the second X-shaped connecting rods 806 is movably installed with a friction-increasing block 807 at one end close to the T-shaped beam 9, and the friction between the hanger and the T-beam is increased by the first mounting plate 804, the second mounting plate 805 and the friction-increasing block 807 that are in contact with the T-beam.
[0027] like Figure 1 , Figure 2 and Figure 7 As shown, as a preferred embodiment, on the basis of the above-mentioned method, further, the lifting assembly 5 includes a driving drum 501 installed at the bottom center of the overhead crane 4, a wire rope 502 fixed to the outer wall of the driving drum 501, a pulley 503 fixedly connected to the end of the wire rope 502 away from the driving drum 501, a U-shaped frame 504 installed between the pulleys 503 and a hook 505 arranged at the bottom center of the U-shaped frame 504. By setting the lifting assembly 5, the lifting and lowering of the T-beam can be achieved.
[0028] like Figure 1 , Figure 2 , Figure 5 , Figure 6 and Figure 7 As shown, as a preferred embodiment, on the basis of the above method, further, the hook 505 and the lifting rope 6 are connected by a shackle, and the four corners of the lifting rope 6 are connected to the lifting ring 701 by a shackle, and the hook 505, the lifting rope 6 and the lifting ring 701 are connected by the set shackle, which improves the stability during the lifting process.
[0029] like Figure 1 , Figure 2 As shown, as a preferred embodiment, on the basis of the above method, further, casters 12 and a locking mechanism used in conjunction with the casters 12 are rotatably installed at the bottom end of any group of legs 2, and the casters 12 are used to move the legs 2 to the top of the T-beam to be lifted.
[0030] like Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, as a preferred embodiment, on the basis of the above-mentioned method, further, the second X-shaped connecting rod 806 is movably connected with the first mounting plate 804 at the intersection, and evenly distributed threaded holes 10 are opened on the outer side wall of the second mounting plate 805, and the second X-shaped connecting rod 806 and the second mounting plate 805 are connected at the intersection by bolts, and the second mounting plate 805 is set to abut against the vertical section of the T-beam.
[0031] like Figure 1 , Figure 2 As shown, as a preferred embodiment, on the basis of the above-mentioned method, further, a railing 11 is provided at one end of the main beam 1 away from the support leg 2, and the railing 11 is configured to be detachably connected; the friction increasing block 807, the load-bearing plate 704, the first mounting plate 804 and the second mounting plate 805 are all provided with anti-skid grooves at one end close to the T-beam 9, and the safety of the operator is improved by the provision of the railing 11, and the friction of the friction increasing block 807, the load-bearing plate 704, the first mounting plate 804 and the second mounting plate 805 on the T-beam 9 is increased by the provision of the anti-skid groove.
[0032] Specifically, when the prefabricated T-beam formwork lifting device is used: first, the two sets of main beams 1 are moved to the top of the T-beam to be lifted by the legs 2 and the casters 12, and are placed at the two ends of the T-beam respectively, and then the lifting assembly 5 is controlled to unwind, and the driving drum 501 is started to rotate. At this time, the number of winding circles of the wire rope 502 decreases, and the winding length becomes shorter, so that the wire rope 502 drives the hook 505 to move downward until the hook 505 is close to the lifting rope 6, and then the unwinding is stopped, and the wire rope 502 is driven by the hook 505 to move downward. The hook 505 is hung on the lifting rope 6, and the lifting assembly 5 is started to be wound up, driving the lifting rope 6 to move upward, and then the horizontal section and the vertical section of the L-shaped sling 703 are attached to and abutted against the horizontal section of the T-beam, and then the bearing plate 704 is connected to the first connecting rod 706 through the connecting piece 705, and the adjusting assembly 71 is rotated to drive the screw rod 710 to rotate through the crank 711, so as to adjust the position of the slider 712 threadedly connected thereto, and then the bearing plate 704 is abutted against the vertical section of the T-beam; When the first X-shaped connecting rod 702 is extended, the second connecting rod 802 is driven to move closer to each other through the connecting cross bar 801. In the process of the second connecting rod 802 moving closer to each other, the U-shaped member 803 is driven to move closer to each other until the first mounting plate 804 at the bottom of the U-shaped member 803 abuts against the horizontal section of the T-beam. After the first mounting plate 804 abuts against the horizontal section of the T-beam, the friction increasing block 807 at one end of the second X-shaped connecting rod 806 close to the vertical section of the T-beam is abutted against the vertical section of the T-beam, and then the end of the second X-shaped connecting rod 806 away from the friction increasing block 807 is connected to the second mounting plate 805, so that the second mounting plate 805 abuts against the vertical section of the T-beam, thereby completing the preliminary work of T-beam hoisting; Then open the lifting assembly 5 and lift the T-beam to the specified position. During the lifting process, the friction between the sling and the T-beam is increased by the first mounting plate 804, the second mounting plate 805 and the friction increasing block 807 that are in contact with the T-beam, thereby reducing the risk of tilting during the lifting of the T-beam and ensuring the safety and stability of the lifting. Then remove the second mounting plate 805 and the load-bearing plate 704 and the friction increasing assembly 8, leaving only the L-shaped sling 703 in contact with the T-beam, and then control the lifting assembly 5 to drop the T-beam to the specified position to achieve the installation of the T-beam.
[0033] All technical features in this embodiment can be freely combined according to actual needs.
[0034] The above embodiments are preferred implementation schemes of the present invention. In addition, the present invention may also be implemented in other ways. Any obvious replacement without departing from the concept of the present technical solution is within the protection scope of the present invention.
Claims
1. A prefabricated T-beam formwork hoisting device, comprising a main beam (1) and legs (2) bolted to four corners of the main beam (1), characterized in that: Also includes, Tracks (3) are symmetrically mounted on the inner wall of the main beam (1), and a crane (4) is slidably connected between two sets of the tracks (3); A lifting assembly (5) is installed at the bottom center of the overhead traveling crane (4); A lifting rope (6) is installed below the lifting assembly (5); A hoisting and clamping mechanism (7) connected to the bottom end of the hoisting rope (6), the hoisting and clamping mechanism (7) further comprising an adjustment component (71); The friction increasing components (8) are symmetrically arranged at both ends of the hoisting clamping mechanism (7) and are used to increase the friction between the hoisting device and the T-beam to prevent tilting during the hoisting process; The T-shaped beam (9) is clamped between the hoisting and clamping mechanism (7) and the friction-increasing assembly (8).
2. A prefabricated T-beam formwork hoisting device according to claim 1, characterized in that: The hoisting and clamping mechanism (7) comprises lifting rings (701) respectively connected to the four corners of the bottom end of the lifting rope (6), a first X-shaped connecting rod (702) installed between two adjacent groups of lifting rings (701), and an L-shaped lifting device (703) symmetrically arranged at the end of any of the first X-shaped connecting rods (702) away from the lifting ring (701), and an adjusting component (71) is also arranged on the inner side wall of the horizontal section of any group of the L-shaped lifting devices (703), and a bearing plate (704) installed below the two adjacent groups of L-shaped lifting devices (703), and detachable connecting members (705) are symmetrically arranged at both ends of the bearing plate (704), and the connecting member (705) and the bearing plate (704) are connected by bolts, and a first connecting rod (706) is movably connected between the movable end of the adjusting component (71) and the connecting member (705).
3. A prefabricated T-beam formwork hoisting device according to claim 2, characterized in that: The adjustment component (71) includes a screw rod (710) rotatably arranged on the inner side wall of the horizontal section of the L-shaped hanger (703), a crank (711) fixedly installed on one end of the screw rod (710) close to the outer wall of the vertical section of the L-shaped hanger (703), a slider (712) threadedly connected to the outer wall of the screw rod (710), and a slide rod (713) symmetrically arranged on the inner side wall of the horizontal section of the L-shaped hanger (703), wherein the slider (712) is slidably connected to the slide rod (713), and the bottom end of the slider (712) is movably connected to the first connecting rod (706).
4. The prefabricated T-beam formwork hoisting device according to claim 2, characterized in that: The friction-increasing assembly (8) comprises a connecting cross bar (801) symmetrically arranged at the bottom end of a first X-shaped connecting rod (702), a second connecting rod (802) symmetrically mounted at one end of the connecting cross bar (801) away from the first X-shaped connecting rod (702), a U-shaped member (803) movably connected to the bottom end of the second connecting rod (802), a first mounting plate (804) slidably connected to the bottom ends of two groups of U-shaped members (803), a second mounting plate (805) located below the first mounting plate (804), and second X-shaped connecting rods (806) symmetrically arranged between the first mounting plate (804) and the second mounting plate (805), wherein a friction-increasing block (807) is movably mounted at one end of any group of the second X-shaped connecting rods (806) close to the T-shaped beam (9).
5. The prefabricated T-beam formwork hoisting device according to claim 1, characterized in that: The lifting assembly (5) comprises a driving drum (501) installed at the bottom center of the overhead crane (4), a steel wire rope (502) fixed to the outer wall of the driving drum (501), a pulley (503) fixedly connected to the end of the steel wire rope (502) away from the driving drum (501), a U-shaped frame (504) installed between the pulleys (503), and a hook (505) arranged at the bottom center of the U-shaped frame (504).
6. A prefabricated T-beam formwork hoisting device according to claim 5, characterized in that: The lifting hook (505) and the lifting rope (6) are connected via a shackle, and the four corners of the lifting rope (6) and the lifting ring (701) are connected via a shackle.
7. The prefabricated T-beam formwork hoisting device according to claim 1, characterized in that: The bottom end of any group of the legs (2) is rotatably mounted with a caster (12) and a locking mechanism used in conjunction with the caster (12).
8. The prefabricated T-beam formwork hoisting device according to claim 4, characterized in that: The second X-shaped connecting rod (806) is movably connected to the first mounting plate (804) at the intersection, and evenly distributed threaded holes (10) are opened on the outer side wall of the second mounting plate (805), and the second X-shaped connecting rod (806) and the second mounting plate (805) are connected at the intersection by bolts.
9. The prefabricated T-beam formwork hoisting device according to claim 7, characterized in that: A handrail (11) is provided at one end of the main beam (1) away from the supporting leg (2), and the handrail (11) is configured to be detachably connected; and an anti-slip groove is provided at one end of the friction-enhancing block (807), the bearing plate (704), the first mounting plate (804) and the second mounting plate (805) close to the T-beam (9).
10. A method for hoisting a prefabricated T-beam formwork hoisting device according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: First, the two sets of main beams (1) are moved to the top of the T-beam to be lifted by means of the legs (2) and the casters (12), and are placed at the two ends of the T-beam respectively. Then, the lifting assembly (5) is controlled to unwind, and the driving drum (501) is started to rotate. At this time, the number of windings of the wire rope (502) decreases, and the winding length shortens, so that the wire rope (502) drives the hook (505) to move downward until the hook (505) approaches the lifting rope (6). Then, the unwinding is stopped, and the hook (505) is hung on the lifting rope (6). 6), start the lifting assembly (5) to reel in, drive the lifting rope (6) to move upward, and then make the horizontal section and the vertical section of the L-shaped sling (703) stick to and contact the horizontal section of the T-beam, then connect the bearing plate (704) to the first connecting rod (706) through the connecting piece (705), rotate the adjustment assembly (71), drive the screw rod (710) to rotate through the crank (711), thereby adjusting the position of the slider (712) threadedly connected thereto, and then achieve the contact between the bearing plate (704) and the vertical section of the T-beam; S2: while the first X-shaped connecting rod (702) is extended, the second connecting rod (802) is driven to move closer to each other through the connecting cross bar (801). In the process of the second connecting rod (802) moving closer to each other, the U-shaped member (803) is driven to move closer to each other until the first mounting plate (804) at the bottom of the U-shaped member (803) abuts against the horizontal section of the T-beam. After the first mounting plate (804) abuts against the horizontal section of the T-beam, the friction increasing block (807) at one end of the second X-shaped connecting rod (806) close to the vertical section of the T-beam abuts against the vertical section of the T-beam, and then the end of the second X-shaped connecting rod (806) away from the friction increasing block (807) is connected to the second mounting plate (805), so that the second mounting plate (805) abuts against the vertical section of the T-beam, thereby completing the preliminary work of T-beam hoisting; S3: Then, the lifting assembly (5) is turned on and the T-beam is lifted to the designated position. During the lifting process, the friction between the lifting device and the T-beam is increased by using the first mounting plate (804), the second mounting plate (805) and the friction increasing block (807) that are in contact with the T-beam, thereby reducing the risk of tilting during the lifting of the T-beam and ensuring the safety and stability of the lifting. Then, the second mounting plate (805) and the bearing plate (704) and the friction increasing assembly (8) are removed, leaving only the L-shaped lifting device (703) in contact with the T-beam. Then, the lifting assembly (5) is controlled to drop the T-beam to the designated position, thereby achieving the installation of the T-beam.