Method and system for judging blockage of concrete spray head by using sensor

Through pressure and vibration sensors, the nozzle status is monitored in real time, and the blockage problem is automatically detected and dealt with, which solves the problems of manual detection of hysteresis and low efficiency in the prior art, improves construction efficiency and quality, and is suitable for different types of nozzles.

CN118961173APending Publication Date: 2024-11-15CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411248314.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the prior art, concrete nozzle clogging detection relies on manual inspection, resulting in low construction efficiency, progress impact and quality problems, and delayed detection, making it difficult to deal with clogging problems in a timely manner.

Method used

Pressure sensors and vibration sensors are used to monitor the pressure and vibration of the nozzle in real time. Through data acquisition, preprocessing and feature extraction, we can determine whether the nozzle is blocked, and trigger an alarm when a blockage is detected and automatically perform the operation of shutting down or switching the backup nozzle.

Benefits of technology

Real-time monitoring and automated processing are realized, which reduces detection lag time and manual intervention, improves construction efficiency and quality, reduces downtime and rework costs, and reduces false alarm rates. It is suitable for nozzles of different models and specifications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118961173A_ABST
    Figure CN118961173A_ABST
Patent Text Reader

Abstract

The invention relates to a method and system for judging blockage of a concrete spray head through sensors, and the system comprises a pressure sensor and a vibration sensor which are installed near the concrete spray head and used for monitoring the changes of pressure and vibration in the spraying process in real time; the data acquisition unit is responsible for acquiring and converting signals; the data processing unit performs preprocessing and feature extraction; the judging unit is used for comparing the processed data with a reference model to judge whether the spray head is blocked or not; the alarm unit triggers an alarm when blockage is detected; and the control unit executes an automatic control action, such as shutdown or switching of a standby spray head. The method comprises the steps of sensor installation, data acquisition, data preprocessing, feature extraction, comparative judgment, alarm control and the like. The device can detect nozzle blockage in real time, is high in automation degree, reduces construction interruption, improves the construction efficiency and quality, and is suitable for various concrete spraying scenes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of concrete construction, and relates to a method and a system for judging the blockage of a concrete nozzle by using a sensor. Background Art

[0002] Concrete spraying technology is an important construction method in modern construction projects, and is widely used in fields such as tunnels, bridges, underground projects and building reinforcement. Spraying concrete technology forms a dense and uniform concrete layer by spraying concrete mixture onto the construction surface. It has the advantages of fast construction speed, high efficiency and strong operability. However, in actual applications, clogging of concrete nozzles is a common problem, which seriously affects the construction quality and efficiency.

[0003] The main reasons for the blockage of concrete sprinkler are as follows:

[0004] Problems with concrete mixture composition: The mixture contains large aggregate particles or impurities, which can easily gather at the nozzle during the spraying process and cause blockage.

[0005] Equipment wear: Long-term use causes uneven wear on the inner wall of the nozzle, forming an irregular surface and increasing the risk of clogging.

[0006] Improper operation: Improper control of the spray angle, pressure or irregular operation may also cause nozzle blockage.

[0007] In the prior art, the method for detecting blockage of concrete sprinkler heads mainly relies on manual inspection: workers check and clean the sprinkler heads after the machine is shut down. This method is not only time-consuming and laborious, but also requires frequent shutdowns, affecting construction progress and efficiency. Summary of the invention

[0008] In view of this, the purpose of the present invention is to solve the above-mentioned problem and provide a method and system for determining whether a concrete sprinkler is blocked by using a sensor.

[0009] In order to achieve the above object, the present invention provides the following technical solutions:

[0010] A system for determining the blockage of a concrete sprinkler using sensors, including a pressure sensor, a vibration sensor, and a control and processing system;

[0011] The pressure sensor is installed on the high-pressure pipeline near the concrete nozzle to monitor the pressure changes during the spraying process in real time;

[0012] The vibration sensor is installed on the sprinkler or the sprinkler's fixed bracket to monitor the vibration of the concrete sprinkler in real time;

[0013] The control and processing system includes a data acquisition unit, a data processing unit, a judgment unit, an alarm unit, and a control unit;

[0014] The data acquisition unit is connected to the pressure sensor and the vibration sensor, and is responsible for collecting data from the pressure sensor and the vibration sensor, and converting analog signals into digital signals;

[0015] The data processing unit receives the data from the data acquisition unit, and performs preprocessing and feature extraction on the data;

[0016] The judgment unit compares the processed data with a normal state reference to judge whether the nozzle is clogged;

[0017] The alarm unit triggers an alarm when the judgment unit detects a blockage;

[0018] When the judging unit detects a blockage, the control unit executes an automatic control action to shut down the machine or switch to a spare nozzle.

[0019] A method for determining whether a concrete sprinkler is blocked by using a sensor comprises the following steps:

[0020] S1. Install pressure sensors and vibration sensors near concrete sprinkler heads;

[0021] S2, collecting data from the pressure sensor and the vibration sensor during the injection process;

[0022] S3, preprocessing the collected data to remove noise and interference;

[0023] S4, extracting characteristic values ​​of pressure signal and vibration signal;

[0024] S5, comparing the current characteristic value with a preset normal state benchmark to determine whether there is a blockage;

[0025] S6. When a blockage is detected, the alarm system is triggered and control actions can be automatically performed.

[0026] Further, in step S1, the pressure sensor is installed on the high-pressure pipeline near the nozzle, and the vibration sensor is installed on the nozzle or on a fixed bracket of the nozzle.

[0027] Furthermore, the preprocessing of the pressure and vibration signals includes filtering, and the extracted characteristic values ​​include the average value, instantaneous rate of change, and standard deviation of the pressure signal, and the amplitude and spectrum energy of the vibration signal.

[0028] Furthermore, when the system is initialized, the pressure and vibration data under normal conditions for a period of time are recorded to establish a baseline model; the baseline model includes the average value, instantaneous change rate, standard deviation of the pressure signal, and the normal range and statistical parameters of the amplitude and spectral energy of the vibration signal.

[0029] Further, in step S5, when any of the following conditions is met, it is determined that the nozzle is blocked abnormally:

[0030] A) The average pressure value is 20% or more higher than the normal pressure value;

[0031] B) The instantaneous rate of pressure change is 50% or more higher than the normal range,

[0032] C) The pressure standard deviation exceeds twice the normal range;

[0033] D) The vibration amplitude is 30% or more above the normal range;

[0034] E) The spectral energy of the vibration signal is 40% or more higher than the normal range in certain frequency bands.

[0035] The beneficial effects of the present invention are:

[0036] 1. Real-time monitoring and improved response speed: The present invention uses pressure sensors and vibration sensors to monitor the working status of concrete sprinklers in real time, so that the system can quickly sense the blockage of sprinklers. Compared with the traditional method that relies on manual inspection, it reduces the detection lag time and greatly improves the response speed, so that timely countermeasures can be taken in the early stage of blockage to avoid further deterioration of the problem.

[0037] 2. Automated operation improves construction efficiency: The present invention realizes automatic detection and processing of concrete nozzle blockage through an integrated judgment unit and control unit. When the system detects blockage, it can automatically trigger an alarm and execute shutdown or switch to a spare nozzle without manual intervention. Automated operation not only reduces dependence on human resources, but also avoids frequent manual shutdown inspections, significantly improving construction efficiency.

[0038] 3. Reduce downtime and optimize construction progress: Since the system can detect and automatically handle nozzle blockage at the early stage, the number and time of unexpected downtime caused by blockage problems are reduced. Compared with the traditional manual inspection method, the present invention effectively avoids frequent shutdowns caused by blockage problems, optimizes the construction progress, and ensures that the project proceeds as planned.

[0039] 4. Improve construction quality and reduce rework: By real-time monitoring and timely handling of blockage problems, the present invention can effectively prevent problems such as uneven concrete spraying and material waste caused by nozzle blockage, thereby improving construction quality. Since blockage problems can be discovered and handled in a timely manner, construction defects caused by blockage are reduced, thereby reducing subsequent rework costs.

[0040] 5. Accurate judgment and reduced false alarm rate: The present invention uses the characteristic value comparison of multiple signals for judgment, including the average value, instantaneous change rate, standard deviation of the pressure signal, and the amplitude and spectrum energy of the vibration signal. This multi-dimensional data analysis method can more accurately judge whether the nozzle is blocked, reduce the false alarm rate, and ensure that the system can make correct judgments and responses when blockage occurs.

[0041] 6. Strong adaptability and good scalability: The design of the system of the present invention has strong adaptability and scalability, and is suitable for concrete sprinklers of different models and specifications. By adjusting the benchmark model and parameters, the system can adapt to various construction environments and material types. In addition, the system can also be integrated into existing concrete spraying equipment without large-scale transformation, which is convenient for promotion and application.

[0042] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:

[0044] Figure 1 It is a schematic diagram of a system for determining whether a concrete nozzle is blocked by using a sensor in the present invention.

[0045] Figure numerals: 1-concrete conveying box; 2-concrete nozzle; 3-fixed bracket; 4-pressure sensor; 5-vibration sensor; 6-control and processing system. DETAILED DESCRIPTION

[0046] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.

[0047] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0048] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0049] Please refer to Figure 1 , a system for determining the blockage of a concrete sprinkler using a sensor, comprising:

[0050] Pressure sensor 4: installed on the high-pressure pipeline near the concrete nozzle 2 to monitor the pressure changes during the spraying process in real time;

[0051] Vibration sensor 5: installed on the fixing bracket 3 of the concrete sprinkler 2, to monitor the vibration of the concrete sprinkler 2 in real time;

[0052] Control and processing system 6, the control and processing system includes a data acquisition unit, a data processing unit, a judgment unit, an alarm unit, and a control unit;

[0053] The data acquisition unit is connected to the pressure sensor 4 and the vibration sensor 5, and is responsible for collecting data from the pressure sensor 4 and the vibration sensor 5, and converting the analog signal into a digital signal;

[0054] The data processing unit receives the data from the data acquisition unit, and performs preprocessing and feature extraction on the data;

[0055] The judgment unit compares the processed data with a normal state reference to judge whether the nozzle is clogged;

[0056] The alarm unit triggers an alarm when the judgment unit detects a blockage;

[0057] When the judging unit detects a blockage, the control unit executes an automatic control action to shut down the machine or switch to a spare nozzle.

[0058] A method for determining whether a concrete sprinkler is blocked by using a sensor comprises the following steps:

[0059] S1. Install a pressure sensor 4 and a vibration sensor 5 near the concrete sprinkler 2; the pressure sensor 4 is installed on the high-pressure pipeline near the sprinkler, and the vibration sensor 5 is installed on the sprinkler or on the sprinkler's fixed bracket 3. The sensor range covers the pressure and vibration range that may occur during the spraying process, ensuring that it can reflect the pressure and vibration changes at the sprinkler in real time and accurately.

[0060] S2, collect data from the pressure sensor 4 and the vibration sensor 5 during the injection process; set the sampling frequency to 100 Hz, collect data from the pressure sensor 4 and the vibration sensor 5 through the data acquisition unit, use ADC to convert the analog signal output by the sensor into a digital signal, and transmit it to the data processing unit.

[0061] S3. Preprocess the collected data to remove noise and interference; the preprocessing of pressure and vibration signals includes filtering, and the extracted characteristic values ​​include the average value, instantaneous change rate, standard deviation of the pressure signal, and the amplitude and spectral energy of the vibration signal.

[0062] S4, extracting characteristic values ​​of pressure signal and vibration signal;

[0063] S5. Compare the current characteristic value with the preset normal state benchmark to determine whether there is blockage; when any of the following conditions is met, it is determined that the nozzle is blocked abnormally:

[0064] A) The average pressure value is 20% or more higher than the normal pressure value;

[0065] B) The instantaneous rate of pressure change is 50% or more higher than the normal range,

[0066] C) The pressure standard deviation exceeds twice the normal range;

[0067] D) The vibration amplitude is 30% or more above the normal range;

[0068] E) The spectral energy of the vibration signal is 40% or more higher than the normal range in certain frequency bands.

[0069] S6. When the nozzle is detected to be clogged, the alarm unit immediately triggers an audible and visual alarm and sends a message prompt. The control unit performs control actions such as automatic shutdown or switching to a backup nozzle, and records the alarm event and treatment measures for subsequent analysis and optimization.

[0070] Before use, when the system is initialized, the pressure and vibration data under normal conditions for a period of time are recorded to establish a benchmark model; the benchmark model includes the average value, instantaneous rate of change, standard deviation of the pressure signal, and the normal range and statistical parameters of the amplitude and spectral energy of the vibration signal.

[0071] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.

Claims

1. A system that uses sensors to determine if a concrete sprinkler is clogged. It is characterized in that Includes pressure sensors, vibration sensors, control and processing systems; The pressure sensor is installed on the high-pressure pipeline near the concrete nozzle to monitor the pressure changes during the spraying process in real time; The vibration sensor is installed on the sprinkler or the sprinkler's fixed bracket to monitor the vibration of the concrete sprinkler in real time; The control and processing system includes a data acquisition unit, a data processing unit, a judgment unit, an alarm unit, and a control unit; The data acquisition unit is connected to the pressure sensor and the vibration sensor, and is responsible for collecting data from the pressure sensor and the vibration sensor, and converting analog signals into digital signals; The data processing unit receives the data from the data acquisition unit, and performs preprocessing and feature extraction on the data; The judgment unit compares the processed data with a normal state reference to judge whether the nozzle is clogged; The alarm unit triggers an alarm when the judgment unit detects a blockage; When the judging unit detects a blockage, the control unit executes an automatic control action to shut down the machine or switch to a spare nozzle.

2. A method for determining whether a concrete sprinkler is clogged using a sensor. Features: The following steps are involved: S1. Install pressure sensors and vibration sensors near concrete sprinkler heads; S2, collecting data from the pressure sensor and the vibration sensor during the injection process; S3, preprocessing the collected data to remove noise and interference; S4, extracting characteristic values ​​of pressure signal and vibration signal; S5, comparing the current characteristic value with a preset normal state benchmark to determine whether there is a blockage; S6. When a blockage is detected, the alarm system is triggered and control actions can be automatically performed.

3. The method for determining the blockage of a concrete nozzle by using a sensor according to claim 2, Features: In step S1, the pressure sensor is installed on a high-pressure pipeline near the nozzle, and the vibration sensor is installed on the nozzle or on a fixed bracket of the nozzle.

4. The method for determining the blockage of a concrete nozzle by using a sensor according to claim 3, Features: The preprocessing of the pressure and vibration signals includes filtering, and the extracted characteristic values ​​include the average value, instantaneous rate of change, and standard deviation of the pressure signal, and the amplitude and spectrum energy of the vibration signal.

5. The method for determining the blockage of a concrete nozzle by using a sensor according to claim 4, Features: When the system is initialized, the pressure and vibration data under normal conditions for a period of time are recorded to establish a baseline model; the baseline model includes the average value, instantaneous change rate, standard deviation of the pressure signal, and the normal range and statistical parameters of the amplitude and spectrum energy of the vibration signal.

6. The method for determining the blockage of a concrete nozzle by using a sensor according to claim 2, It is characterized in that In step S5, when any of the following conditions is met, it is determined that the nozzle is blocked abnormally: A) The average pressure value is 20% or more higher than the normal pressure value; B) The instantaneous rate of pressure change is 50% or more higher than the normal range, C) The pressure standard deviation exceeds twice the normal range; D) The vibration amplitude is 30% or more above the normal range; E) The spectral energy of the vibration signal is 40% or more higher than the normal range in certain frequency bands.

Citation Information

Cited By

  • Equipment health monitoring system, method and device for gas dredging device and medium

    CN119492534A