Multi-target flexible painting workshop scheduling method and system under dynamic event
By building simulation models and multi-objective dynamic scheduling models in the automotive spraying workshop, combining particle swarm algorithms and rescheduling response mechanisms, the problem that the existing technology cannot adapt to dynamic characteristics is solved, and the production efficiency and flexibility of the flexible spraying workshop are improved.
Patent Information
- Application Number
- CN202410903721.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-07-08
AI Technical Summary
The existing automotive spray workshop scheduling methods mainly focus on static problems and simplified operation workshop environments, and cannot effectively adapt to dynamic characteristics, resulting in insufficient production efficiency and flexibility in flexible spray workshops.
The multi-objective flexible spray workshop scheduling method under dynamic events is adopted. By building a spray workshop simulation model, a multi-objective dynamic scheduling model is established, and the particle swarm algorithm and rescheduling response mechanism is combined, and the solution is optimized to improve the global optimal value of the scheduling scheme.
It improves the flexibility and production efficiency of the manufacturing industry, ensures the effectiveness and accuracy of the scheduling plan, can adapt to the impact of dynamic events, and improves the dynamic scheduling capabilities of the flexible spraying workshop.
Smart Images

Figure CN118963260A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of process scheduling, and in particular to a multi-objective flexible spray shop scheduling method and system under dynamic events. Background Art
[0002] At present, assembly line operation has gradually become the mainstream method in automobile production. Automobile production lines include welding, stamping, painting, powertrain, etc. Among them, the spray painting workshop, as a key link, has a great impact on the appearance and quality of automobile products. The automobile spray painting workshop includes: primer grinding and cleaning, mid-coat spraying, drying, forced cooling, topcoat spraying, topcoat drying, topcoat forced cooling, inspection and modification, spot repair and other processes, which are basically completed by industrial robots and auxiliary equipment instead of manual work. It has the characteristics of high degree of automation, high flexibility, and strong daily production capacity. Its production rhythm and flexibility are crucial to the production of complete vehicles.
[0003] With the continuous development of the automobile industry, automobile spraying workshops with a single model can no longer fully meet market demand. In order to meet the personalized needs of customers, the method of integrating spraying lines of multiple models into a flexible spraying system has been widely used. In the production process of flexible spraying workshops, in order to simultaneously improve the flexibility and production efficiency of the manufacturing industry, it is necessary to study the scheduling problem of flexible job shops. Existing optimization methods for workshop scheduling problems mainly focus on static problems and simplified job shop environments, and often cannot adapt to the dynamic characteristics of actual workshops. Summary of the invention
[0004] The present invention provides a multi-objective flexible spray shop scheduling method and system under dynamic events, which are used to solve the problems raised in the background technology.
[0005] A multi-objective flexible spray shop scheduling method under dynamic events, comprising:
[0006] S1: Based on the equipment parameters and related working parameters of the multi-objective flexible spraying workshop, a spraying workshop simulation model is built, and a static scheduling simulation is performed on the spraying workshop simulation model to determine the impact of dynamic events on the original scheduling plan;
[0007] S2: Based on the dynamic events of machine failure and urgent order insertion in the multi-objective flexible spray shop, a multi-objective dynamic flexible spray shop scheduling model with maximum completion time, maximum machine load and total machine load as the objectives is established;
[0008] S3: Based on the impact of dynamic events on the original scheduling plan and combined with constraints, a rescheduling response mechanism corresponding to dynamic events is established;
[0009] S4: Based on the particle swarm algorithm of the beetle whisker search strategy and combined with the rescheduling response mechanism, the multi-objective dynamic flexible spray workshop scheduling model is optimized and solved to obtain the global optimal value, and based on the global optimal value, the multi-objective flexible spray workshop scheduling solution is obtained.
[0010] Preferably, in S1, a spray painting workshop simulation model is constructed based on equipment parameters and related working parameters of a multi-objective flexible spray painting workshop, including:
[0011] Based on the basic process of the flexible spraying workshop, the model layer corresponding to the flexible spraying process is established using simulation software;
[0012] Insert the material generator, material terminator and material processor in the model layer in sequence, connect the material generator, material terminator and material processor with the connector to obtain the workstation corresponding to the basic process, set the material form module and process route table module, and construct the basic flexible spray workshop model;
[0013] Setting production parts in the basic flexible spray shop model and establishing data tables of production parts at different workstations;
[0014] An index relationship between workstations and data tables is established, and the index relationship is added to the basic flexible spray shop model to obtain a spray shop simulation model.
[0015] Preferably, in S1, static scheduling simulation is performed on the spraying workshop simulation model to determine the impact of dynamic events on the original scheduling plan, including:
[0016] Use the event controller to perform static and thorough operation, single-step operation and reset operation on the spray painting workshop simulation model, collect statistical data during the operation process, and determine whether the spray painting workshop simulation model is operating normally;
[0017] After confirming that the spray painting workshop simulation model is running normally, the algorithm parameters of the genetic algorithm are set, and the spray painting workshop simulation model is simulated based on the workshop data and the algorithm parameters to obtain the initial scheduling plan;
[0018] Customized machine failures and customized emergency orders are performed in the workstations of the spray shop simulation model, and the output results are obtained. The output results are compared with the original scheduling plan to obtain the impact of dynamic events on the original scheduling plan.
[0019] Preferably, in S2, based on the dynamic events of machine failure and urgent order insertion in the multi-objective flexible spray shop, a multi-objective dynamic flexible spray shop scheduling model with maximum completion time, maximum machine load and total machine load as targets is established, including:
[0020] Determine the time and load impact characteristics of machine failure dynamic events and emergency order insertion dynamic events on the machining process;
[0021] The maximum completion time, the maximum load of the machine and the total load of the machine are taken as the main optimization targets, and the constraint conditions of the processing process of the flexible spraying workshop are established, and the objective function of the main optimization target is determined based on the constraint conditions;
[0022] A weight selection mechanism for maximum completion time, maximum machine load and total machine load is established, and a basic scheduling model is constructed by combining the objective function of the main optimization goal.
[0023] Adding fault dynamic events and emergency order insertion dynamic events to the basic scheduling model to establish a basic dynamic scheduling model;
[0024] The time impact characteristics and load impact characteristics are specifically marked with dynamic impact in the basic dynamic scheduling model to obtain a multi-objective dynamic flexible spray workshop scheduling model.
[0025] Preferably, the time impact characteristics and load impact characteristics are specifically marked as dynamic impacts in the basic dynamic scheduling model to obtain a multi-objective dynamic flexible spray shop scheduling model, including:
[0026] Adding the time impact characteristics and load impact characteristics to the corresponding objective function in the basic dynamic scheduling model, dynamically marking the objective function, and obtaining a dynamic objective function;
[0027] Dynamically marking the weight selection mechanism based on the dynamic objective function to obtain a dynamic weight selection mechanism;
[0028] Based on the dynamic objective function and dynamic weight selection mechanism, a multi-objective dynamic flexible spray workshop scheduling model is obtained.
[0029] Preferably, in S3, based on the impact of the dynamic event on the original scheduling plan and in combination with the constraint conditions, a rescheduling response mechanism corresponding to the dynamic event is established, including:
[0030] Based on the impact of the dynamic event on the original scheduling plan, combined with the constraint conditions, the impact value between the dynamic event and the plan characteristics is determined, and based on the corresponding relationship between the dynamic event and the plan characteristics, the dynamic event is classified to obtain passive impact events and active impact events, and based on the impact value between the dynamic event and the plan characteristics, the impact weights of the passive impact events and the active impact events are determined;
[0031] Determine the rescheduling method and rescheduling adjustment range based on passive impact events and active impact events and their corresponding impact weights;
[0032] An initial rescheduling model is established based on the rescheduling mode and the rescheduling adjustment range, and a rescheduling plan for a preset single dynamic event under the initial rescheduling model is obtained. A comprehensive analysis is performed on multiple preset single dynamic events and their corresponding rescheduling plans to determine the interaction characteristics between different single dynamic events;
[0033] Based on the interaction characteristics, multiple action branches are established for the initial rescheduling model, and action priorities are set between the multiple action branches. Based on the multiple action branches and action priorities, the initial rescheduling model is upgraded and optimized to obtain a target rescheduling model;
[0034] Input dynamic events into the target rescheduling model to obtain the corresponding rescheduling response mechanism of the dynamic events.
[0035] Preferably, the determining of the rescheduling mode and the rescheduling adjustment range based on the passive influencing events and the active influencing events and their corresponding influencing weights includes:
[0036] Determine that the rescheduling method for the passive impact event is a periodic rescheduling method, and determine the adjustment range of the rescheduling period based on the impact weight;
[0037] The rescheduling method for actively influencing events is determined to be event-driven rescheduling, and the adjustment range of the driven rescheduling is determined based on the impact weight.
[0038] Preferably, in S4, a particle swarm algorithm based on the beetle whisker search strategy is combined with a rescheduling response mechanism to optimize and solve the multi-objective dynamic flexible spray shop scheduling model to obtain a global optimal value, including:
[0039] Based on the coding crossover strategy, crossover and mutation operations are performed on the existing workshop processes to obtain new processes;
[0040] The beetle whisker search strategy and the particle swarm algorithm are integrated to obtain the beetle whisker search particle swarm algorithm, which is added to the multi-objective dynamic flexible spray shop scheduling model, and the model parameters are initialized. Based on the new process, combined with the rescheduling response mechanism, the reverse generation distance and hypervolume are used as evaluation indicators to obtain the initial global optimal solution;
[0041] Randomly obtain the position and speed of each beetle, obtain the fitness value of each beetle, and update each speed and position iteratively based on the update rule and fitness value;
[0042] After obtaining the iteration, the initial individual optimal solution and the initial global optimal solution are updated and compared with the value of the previous iteration to obtain the global optimal value.
[0043] Preferably, the multi-objective flexible spray shop scheduling scheme is obtained based on the global optimal value, including:
[0044] Determining model parameters of a multi-objective dynamic flexible spray shop scheduling model based on the global optimal value;
[0045] The specific values of the maximum completion time, the maximum machine load and the total machine load are determined, and the workshop processes to be scheduled are processed by the multi-objective dynamic flexible spray workshop scheduling model under the model parameters to obtain a multi-objective flexible spray workshop scheduling plan.
[0046] A scheduling system for a multi-objective flexible spray shop scheduling method under dynamic events, comprising:
[0047] The simulation module is used to build a spray shop simulation model based on the equipment parameters and related working parameters of the multi-objective flexible spray shop, and to perform static scheduling simulation on the spray shop simulation model to determine the impact of dynamic events on the original scheduling plan;
[0048] A model determination module is used to establish a multi-objective dynamic flexible spray shop scheduling model with maximum completion time, maximum machine load and total machine load as targets based on the dynamic events of machine failure and urgent order insertion in the multi-objective flexible spray shop;
[0049] The response determination module is used to establish a rescheduling response mechanism corresponding to the dynamic event based on the impact of the dynamic event on the original scheduling plan and in combination with the constraint conditions;
[0050] The scheme determination module is used to optimize and solve the multi-objective dynamic flexible spray workshop scheduling model based on the particle swarm algorithm of the longicorn beetle whisker search strategy, combined with the rescheduling response mechanism, to obtain the global optimal value, and based on the global optimal value, obtain the multi-objective flexible spray workshop scheduling scheme.
[0051] Compared with the prior art, the present invention has achieved the following beneficial effects:
[0052] Based on the equipment parameters and related working parameters of the multi-objective flexible spray workshop, a spray workshop simulation model is built, and a static scheduling simulation is performed on the spray workshop simulation model to determine the impact of dynamic events on the original scheduling plan, providing a simulation basis for multi-objective flexible spray workshop scheduling under dynamic events. Based on the dynamic events of machine failures and urgent order insertions in the multi-objective flexible spray workshop, a multi-objective dynamic flexible spray workshop scheduling model with maximum completion time, maximum machine load and total machine load as targets is established, and the impact of different dynamic events on the original optimal scheduling plan of the spray workshop is explored, which lays the foundation for the subsequent study of the rescheduling mechanism under dynamic events. Based on the impact of dynamic events on the original scheduling plan, Combined with the constraints, a rescheduling response mechanism corresponding to dynamic events is established. The establishment of the rescheduling response mechanism provides a basis for the subsequent determination of the multi-objective flexible spray workshop scheduling plan. The particle swarm algorithm based on the beetle whisker search strategy is combined with the rescheduling response mechanism to optimize and solve the multi-objective dynamic flexible spray workshop scheduling model to obtain the global optimal value. Based on the global optimal value, the multi-objective flexible spray workshop scheduling plan is obtained. An optimization algorithm based on the beetle whisker search strategy is proposed to reduce the number of solutions and improve the efficiency of the algorithm. Combined with the rescheduling response mechanism, the effectiveness and accuracy of the multi-objective flexible spray workshop scheduling plan are guaranteed. Finally, through the analysis of the dynamic characteristics of the workshop, the flexibility and production efficiency of the manufacturing industry are improved.
[0053] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures specifically pointed out in this application document.
[0054] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0056] Figure 1 It is a flow chart of a multi-objective flexible spray shop scheduling method under dynamic events in an embodiment of the present invention;
[0057] Figure 2 A flowchart of building a spray shop simulation model in an embodiment of the present invention;
[0058] Figure 3 It is a structural diagram of a multi-objective flexible spray shop scheduling system under dynamic events in an embodiment of the present invention. DETAILED DESCRIPTION
[0059] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0060] Embodiment 1:
[0061] The embodiment of the present invention provides a multi-objective flexible spray shop scheduling method under dynamic events, such as Figure 1 As shown, including:
[0062] S1: Based on the equipment parameters and related working parameters of the multi-objective flexible spraying workshop, a spraying workshop simulation model is built, and a static scheduling simulation is performed on the spraying workshop simulation model to determine the impact of dynamic events on the original scheduling plan;
[0063] S2: Based on the dynamic events of machine failure and urgent order insertion in the multi-objective flexible spray shop, a multi-objective dynamic flexible spray shop scheduling model with maximum completion time, maximum machine load and total machine load as the objectives is established;
[0064] S3: Based on the impact of dynamic events on the original scheduling plan and combined with constraints, a rescheduling response mechanism corresponding to dynamic events is established;
[0065] S4: Based on the particle swarm algorithm of the beetle whisker search strategy and combined with the rescheduling response mechanism, the multi-objective dynamic flexible spray workshop scheduling model is optimized and solved to obtain the global optimal value, and based on the global optimal value, the multi-objective flexible spray workshop scheduling solution is obtained.
[0066] In this embodiment, the dynamic events include a machine failure dynamic event and an emergency order insertion dynamic event.
[0067] In this embodiment, the impact of the dynamic event on the original scheduling plan includes the impact on time and load.
[0068] In this embodiment, the constraint conditions include, for example, completion time constraint, process start time constraint, sequence constraint and machine constraint.
[0069] In this embodiment, the rescheduling response mechanism satisfies the initiation of rescheduling and the determination of adjustment situations.
[0070] The beneficial effects of the above design scheme are: by building a spray workshop simulation model based on the equipment parameters and related working parameters of the multi-objective flexible spray workshop, and performing static scheduling simulation on the spray workshop simulation model, the impact of dynamic events on the original scheduling plan is determined, and a simulation basis is provided for multi-objective flexible spray workshop scheduling under dynamic events. Based on the dynamic events of machine failures and urgent order insertions in the multi-objective flexible spray workshop, a multi-objective dynamic flexible spray workshop scheduling model with maximum completion time, maximum machine load and total machine load as targets is established, and the impact of different dynamic events on the original optimal scheduling plan of the spray workshop is explored, which lays the foundation for the subsequent study of the rescheduling mechanism under dynamic events. The impact of the plan is considered, and the corresponding rescheduling response mechanism of dynamic events is established in combination with the constraints. The rescheduling response mechanism is established to provide a basis for the subsequent determination of the multi-objective flexible spray workshop scheduling plan. The particle swarm algorithm based on the beetle whisker search strategy is combined with the rescheduling response mechanism to optimize and solve the multi-objective dynamic flexible spray workshop scheduling model to obtain the global optimal value. Based on the global optimal value, the multi-objective flexible spray workshop scheduling plan is obtained. An optimization algorithm based on the beetle whisker search strategy is proposed to reduce the number of solutions and improve the efficiency of the algorithm. Combined with the rescheduling response mechanism, the effectiveness and accuracy of the multi-objective flexible spray workshop scheduling plan are guaranteed. Finally, through the analysis of the dynamic characteristics of the workshop, the flexibility and production efficiency of the manufacturing industry are improved.
[0071] Embodiment 2:
[0072] Based on Example 1, the present invention provides a multi-objective flexible spray shop scheduling method under dynamic events, such as Figure 2 As shown, in S1, based on the equipment parameters and related working parameters of the multi-objective flexible spraying workshop, a spraying workshop simulation model is built, including:
[0073] Based on the basic process of the flexible spraying workshop, the model layer corresponding to the flexible spraying process is established using simulation software;
[0074] Insert the material generator, material terminator and material processor in the model layer in sequence, connect the material generator, material terminator and material processor with the connector to obtain the workstation corresponding to the basic process, set the material form module and process route table module, and construct the basic flexible spray workshop model;
[0075] Setting production parts in the basic flexible spray shop model and establishing data tables of production parts at different workstations;
[0076] An index relationship between workstations and data tables is established, and the index relationship is added to the basic flexible spray shop model to obtain a spray shop simulation model.
[0077] In this embodiment, the basic processes of the flexible spray painting workshop include four major categories: PVC sealing, mid-coating process, topcoat process and body finishing, and one flexible spray painting process corresponds to one model layer.
[0078] In this embodiment, the simulation software, such as Plant Simulation, can provide various convenient and fast modules, can help users quickly build models and simulate, and provide rich interfaces.
[0079] In this embodiment, the material producer, material terminator and material processor are used for the generation, termination and processing of the material.
[0080] The beneficial effect of the above design scheme is: by building a spray workshop simulation model based on the equipment parameters and related working parameters of the multi-objective flexible spray workshop, a simulation basis is provided for the multi-objective flexible spray workshop scheduling under dynamic events.
[0081] Embodiment 3:
[0082] Based on Example 2, the embodiment of the present invention provides a multi-objective flexible spray shop scheduling method under dynamic events. In S1, a static scheduling simulation is performed on the spray shop simulation model to determine the impact of the dynamic event on the original scheduling plan, including:
[0083] Use the event controller to perform static and thorough operation, single-step operation and reset operation on the spray painting workshop simulation model, collect statistical data during the operation process, and determine whether the spray painting workshop simulation model is operating normally;
[0084] After confirming that the spray painting workshop simulation model is running normally, the algorithm parameters of the genetic algorithm are set, and the spray painting workshop simulation model is simulated based on the workshop data and the algorithm parameters to obtain the initial scheduling plan;
[0085] Customized machine failures and customized emergency orders are performed in the workstations of the spray shop simulation model, and the output results are obtained. The output results are compared with the original scheduling plan to obtain the impact of dynamic events on the original scheduling plan.
[0086] The beneficial effects of the above design scheme are: customized machine failures and customized emergency orders are performed in the workstations of the spray workshop simulation model, and output results are obtained. The output results are compared with the original scheduling plan to obtain the impact of dynamic events on the original scheduling plan, providing a reference basis for determining the subsequent rescheduling response mechanism.
[0087] Embodiment 4:
[0088] Based on Example 1, the embodiment of the present invention provides a multi-objective flexible spray shop scheduling method under dynamic events. In S2, based on the dynamic events of machine failure and urgent order insertion in the multi-objective flexible spray shop, a multi-objective dynamic flexible spray shop scheduling model with maximum completion time, maximum machine load and total machine load as targets is established, including:
[0089] Determine the time and load impact characteristics of machine failure dynamic events and emergency order insertion dynamic events on the machining process;
[0090] The maximum completion time, the maximum load of the machine and the total load of the machine are taken as the main optimization targets, and the constraint conditions of the processing process of the flexible spraying workshop are established, and the objective function of the main optimization target is determined based on the constraint conditions;
[0091] A weight selection mechanism for maximum completion time, maximum machine load and total machine load is established, and a basic scheduling model is constructed by combining the objective function of the main optimization goal.
[0092] Adding fault dynamic events and emergency order insertion dynamic events to the basic scheduling model to establish a basic dynamic scheduling model;
[0093] The time impact characteristics and load impact characteristics are specifically marked with dynamic impact in the basic dynamic scheduling model to obtain a multi-objective dynamic flexible spray workshop scheduling model.
[0094] The beneficial effects of the above design scheme are: by determining the time impact characteristics and load impact characteristics of the dynamic events of machine failure and the dynamic events of urgent order insertion on the processing process, the maximum completion time, the maximum machine load and the total machine load are taken as the main optimization targets, and the constraints of the flexible spray workshop processing process are established. The objective function of the main optimization target is determined based on the constraints, and the weight selection mechanism of the maximum completion time, the maximum machine load and the total machine load is established. Combined with the objective function of the main optimization target, a basic scheduling model is constructed to realize simulation scheduling, and then the dynamic events of failure and the dynamic events of urgent order insertion are added to the basic scheduling model to establish a basic dynamic scheduling model; the time impact characteristics and the load impact characteristics are specifically marked with dynamic impact in the basic dynamic scheduling model to obtain a multi-objective dynamic flexible spray workshop scheduling model, and the simulation of dynamic scheduling is realized, in order to explore the impact of different dynamic events on the original optimal scheduling plan of the spray workshop, and to lay a foundation for studying the rescheduling mechanism under dynamic events.
[0095] Embodiment 5:
[0096] Based on Example 4, the embodiment of the present invention provides a multi-objective flexible spray shop scheduling method under dynamic events, and the time impact characteristics and load impact characteristics are specifically marked with dynamic impact in the basic dynamic scheduling model to obtain a multi-objective dynamic flexible spray shop scheduling model, including:
[0097] Adding the time impact characteristics and load impact characteristics to the corresponding objective function in the basic dynamic scheduling model, dynamically marking the objective function, and obtaining a dynamic objective function;
[0098] Dynamically marking the weight selection mechanism based on the dynamic objective function to obtain a dynamic weight selection mechanism;
[0099] Based on the dynamic objective function and dynamic weight selection mechanism, a multi-objective dynamic flexible spray workshop scheduling model is obtained.
[0100] The beneficial effects of the above design scheme are: by adding the time impact characteristics and load impact characteristics to the corresponding objective function in the basic dynamic scheduling model, the objective function is dynamically marked to obtain a dynamic objective function; based on the dynamic objective function, the weight selection mechanism is dynamically marked to obtain a dynamic weight selection mechanism, and based on the dynamic objective function and the dynamic weight selection mechanism, a multi-objective dynamic flexible spray workshop scheduling model is obtained, and dynamic marking is performed from two aspects: dynamic changes of functions and dynamic changes of function participation weights, to ensure the flexibility and accuracy of the multi-objective dynamic flexible spray workshop scheduling model.
[0101] Embodiment 6:
[0102] Based on Example 1, the embodiment of the present invention provides a multi-objective flexible spray shop scheduling method under dynamic events. In S3, based on the impact of the dynamic event on the original scheduling plan and combined with the constraint conditions, a rescheduling response mechanism corresponding to the dynamic event is established, including:
[0103] Based on the impact of the dynamic event on the original scheduling plan, combined with the constraint conditions, the impact value between the dynamic event and the plan characteristics is determined, and based on the corresponding relationship between the dynamic event and the plan characteristics, the dynamic event is classified to obtain passive impact events and active impact events, and based on the impact value between the dynamic event and the plan characteristics, the impact weights of the passive impact events and the active impact events are determined;
[0104] Determine the rescheduling method and rescheduling adjustment range based on passive impact events and active impact events and their corresponding impact weights;
[0105] An initial rescheduling model is established based on the rescheduling mode and the rescheduling adjustment range, and a rescheduling plan for a preset single dynamic event under the initial rescheduling model is obtained. A comprehensive analysis is performed on multiple preset single dynamic events and their corresponding rescheduling plans to determine the interaction characteristics between different single dynamic events;
[0106] Based on the interaction characteristics, multiple action branches are established for the initial rescheduling model, and action priorities are set between the multiple action branches. Based on the multiple action branches and action priorities, the initial rescheduling model is upgraded and optimized to obtain a target rescheduling model;
[0107] Input dynamic events into the target rescheduling model to obtain the corresponding rescheduling response mechanism of the dynamic events.
[0108] The beneficial effects of the above design scheme are: by establishing an initial rescheduling model based on the rescheduling mode and the rescheduling adjustment range, obtaining the rescheduling plan of the preset single dynamic event under the initial rescheduling model, comprehensively analyzing multiple preset single dynamic events and their corresponding rescheduling plans, determining the interaction characteristics between different single dynamic events, establishing multiple action branches for the initial rescheduling model based on the interaction characteristics, and setting the action priorities between the multiple action branches, upgrading and optimizing the initial rescheduling model based on the multiple action branches and action priorities, and obtaining the target rescheduling model, ensuring the comprehensiveness and accuracy of the obtained scheduling model in the target under multi-target dynamic events, inputting the dynamic events into the target rescheduling model to obtain the corresponding rescheduling response mechanism of the dynamic events, ensuring the accuracy of the obtained rescheduling response mechanism, and providing a basis for the subsequent determination of the multi-target flexible spray workshop scheduling plan.
[0109] Embodiment 7:
[0110] Based on Example 6, an embodiment of the present invention provides a multi-objective flexible spray shop scheduling method under dynamic events, wherein the rescheduling method and the rescheduling adjustment range are determined based on passive influencing events and active influencing events and their corresponding influencing weights, including:
[0111] Determine that the rescheduling method for the passive impact event is a periodic rescheduling method, and determine the adjustment range of the rescheduling period based on the impact weight;
[0112] The rescheduling method for actively influencing events is determined to be event-driven rescheduling, and the adjustment range of the driven rescheduling is determined based on the impact weight.
[0113] The beneficial effect of the above design scheme is: by determining the rescheduling method and the rescheduling adjustment range based on passive impact events and active impact events and their corresponding impact weights, a basis is provided for establishing a rescheduling model.
[0114] Embodiment 8:
[0115] Based on Example 1, the embodiment of the present invention provides a multi-objective flexible spray shop scheduling method under dynamic events. In S4, a particle swarm algorithm based on a longhorn beard search strategy is combined with a rescheduling response mechanism to optimize and solve a multi-objective dynamic flexible spray shop scheduling model to obtain a global optimal value, including:
[0116] Based on the coding crossover strategy, crossover and mutation operations are performed on the existing workshop processes to obtain new processes;
[0117] The beetle whisker search strategy and the particle swarm algorithm are integrated to obtain the beetle whisker search particle swarm algorithm, which is added to the multi-objective dynamic flexible spray shop scheduling model, and the model parameters are initialized. Based on the new process, combined with the rescheduling response mechanism, the reverse generation distance and hypervolume are used as evaluation indicators to obtain the initial global optimal solution;
[0118] Randomly obtain the position and speed of each beetle, obtain the fitness value of each beetle, and update each speed and position iteratively based on the update rule and fitness value;
[0119] After obtaining the iteration, the initial individual optimal solution and the initial global optimal solution are updated and compared with the value of the previous iteration to obtain the global optimal value.
[0120] The beneficial effects of the above design scheme are: through the particle swarm algorithm based on the longicorn search strategy, combined with the rescheduling response mechanism, the multi-objective dynamic flexible spray workshop scheduling model is optimized and solved to obtain the global optimal value, and the longicorn is used instead of the particles. The position information is updated in real time during the iteration process to prevent the particle swarm algorithm from falling into the problem of local optimization, and it is no longer limited to single-objective parameter optimization, making the dynamic flexible workshop parameter optimization more effective and simpler, reducing the number of solutions, and improving the efficiency of the algorithm. Combined with the rescheduling response mechanism, the effectiveness and accuracy of the multi-objective flexible spray workshop scheduling plan are guaranteed. Finally, through the analysis of the dynamic characteristics of the workshop, the flexibility and production efficiency of the manufacturing industry are improved.
[0121] Embodiment 9:
[0122] Based on Example 1, the embodiment of the present invention provides a multi-objective flexible spray shop scheduling method under dynamic events, wherein the multi-objective flexible spray shop scheduling scheme is obtained based on the global optimal value, including:
[0123] Determining model parameters of a multi-objective dynamic flexible spray shop scheduling model based on the global optimal value;
[0124] The specific values of the maximum completion time, the maximum machine load and the total machine load are determined, and the workshop processes to be scheduled are processed by the multi-objective dynamic flexible spray workshop scheduling model under the model parameters to obtain a multi-objective flexible spray workshop scheduling plan.
[0125] The beneficial effects of the above design scheme are: ensuring the effectiveness and accuracy of the multi-objective flexible spray workshop scheduling scheme, and ultimately improving the flexibility and production efficiency of the manufacturing industry through the analysis of the dynamic characteristics of the workshop.
[0126] Embodiment 10:
[0127] Based on Example 1, the present invention provides a scheduling system for a multi-objective flexible spray shop scheduling method under dynamic events, such as Figure 3 As shown, including:
[0128] The simulation module is used to build a spray shop simulation model based on the equipment parameters and related working parameters of the multi-objective flexible spray shop, and to perform static scheduling simulation on the spray shop simulation model to determine the impact of dynamic events on the original scheduling plan;
[0129] A model determination module is used to establish a multi-objective dynamic flexible spray shop scheduling model with maximum completion time, maximum machine load and total machine load as targets based on the dynamic events of machine failure and urgent order insertion in the multi-objective flexible spray shop;
[0130] The response determination module is used to establish a rescheduling response mechanism corresponding to the dynamic event based on the impact of the dynamic event on the original scheduling plan and in combination with the constraint conditions;
[0131] The scheme determination module is used to optimize and solve the multi-objective dynamic flexible spray workshop scheduling model based on the particle swarm algorithm of the longicorn beetle whisker search strategy, combined with the rescheduling response mechanism, to obtain the global optimal value, and based on the global optimal value, obtain the multi-objective flexible spray workshop scheduling scheme.
[0132] In this embodiment, the dynamic events include a machine failure dynamic event and an emergency order insertion dynamic event.
[0133] In this embodiment, the impact of the dynamic event on the original scheduling plan includes the impact on time and load.
[0134] In this embodiment, the constraint conditions include, for example, completion time constraint, process start time constraint, sequence constraint and machine constraint.
[0135] In this embodiment, the rescheduling response mechanism satisfies the initiation of rescheduling and the determination of adjustment situations.
[0136] The beneficial effects of the above design scheme are: by building a spray workshop simulation model based on the equipment parameters and related working parameters of the multi-objective flexible spray workshop, and performing static scheduling simulation on the spray workshop simulation model, the impact of dynamic events on the original scheduling plan is determined, and a simulation basis is provided for multi-objective flexible spray workshop scheduling under dynamic events. Based on the dynamic events of machine failures and urgent order insertions in the multi-objective flexible spray workshop, a multi-objective dynamic flexible spray workshop scheduling model with maximum completion time, maximum machine load and total machine load as targets is established, and the impact of different dynamic events on the original optimal scheduling plan of the spray workshop is explored, which lays the foundation for the subsequent study of the rescheduling mechanism under dynamic events. The impact of the plan is considered, and the corresponding rescheduling response mechanism of dynamic events is established in combination with the constraints. The rescheduling response mechanism is established to provide a basis for the subsequent determination of the multi-objective flexible spray workshop scheduling plan. The particle swarm algorithm based on the beetle whisker search strategy is combined with the rescheduling response mechanism to optimize and solve the multi-objective dynamic flexible spray workshop scheduling model to obtain the global optimal value. Based on the global optimal value, the multi-objective flexible spray workshop scheduling plan is obtained. An optimization algorithm based on the beetle whisker search strategy is proposed to reduce the number of solutions and improve the efficiency of the algorithm. Combined with the rescheduling response mechanism, the effectiveness and accuracy of the multi-objective flexible spray workshop scheduling plan are guaranteed. Finally, through the analysis of the dynamic characteristics of the workshop, the flexibility and production efficiency of the manufacturing industry are improved.
[0137] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention belong to the scope of this application document and its equivalent technology, the present invention is also intended to include these changes and variations.
Claims
1. A multi-objective flexible spray shop scheduling method under dynamic events, It is characterized in that include: S1: Based on the equipment parameters and related working parameters of the multi-objective flexible spraying workshop, a spraying workshop simulation model is built, and a static scheduling simulation is performed on the spraying workshop simulation model to determine the impact of dynamic events on the original scheduling plan; S2: Based on the dynamic events of machine failure and urgent order insertion in the multi-objective flexible spray shop, a multi-objective dynamic flexible spray shop scheduling model with maximum completion time, maximum machine load and total machine load as the objectives is established; S3: Based on the impact of dynamic events on the original scheduling plan and combined with constraints, a rescheduling response mechanism corresponding to dynamic events is established; S4: Based on the particle swarm algorithm of the beetle whisker search strategy and combined with the rescheduling response mechanism, the multi-objective dynamic flexible spray workshop scheduling model is optimized and solved to obtain the global optimal value, and based on the global optimal value, the multi-objective flexible spray workshop scheduling solution is obtained.
2. According to the multi-objective flexible spray shop scheduling method under dynamic events according to claim 1, It is characterized in that In S1, a spray painting workshop simulation model is constructed based on the equipment parameters and related working parameters of the multi-objective flexible spray painting workshop, including: Based on the basic process of the flexible spraying workshop, the model layer corresponding to the flexible spraying process is established using simulation software; Insert the material generator, material terminator and material processor in the model layer in sequence, connect the material generator, material terminator and material processor with the connector to obtain the workstation corresponding to the basic process, set the material form module and process route table module, and construct the basic flexible spray workshop model; Setting production parts in the basic flexible spray shop model and establishing data tables of production parts at different workstations; An index relationship between workstations and data tables is established, and the index relationship is added to the basic flexible spray shop model to obtain a spray shop simulation model.
3. According to the multi-objective flexible spray shop scheduling method under dynamic events according to claim 2, It is characterized in that In S1, static scheduling simulation is performed on the spraying workshop simulation model to determine the impact of dynamic events on the original scheduling plan, including: Use the event controller to perform static and thorough operation, single-step operation and reset operation on the spray painting workshop simulation model, collect statistical data during the operation process, and determine whether the spray painting workshop simulation model is operating normally; After confirming that the spray painting workshop simulation model is running normally, the algorithm parameters of the genetic algorithm are set, and the spray painting workshop simulation model is simulated based on the workshop data and the algorithm parameters to obtain the initial scheduling plan; Customized machine failures and customized emergency orders are performed in the workstations of the spray shop simulation model, and the output results are obtained. The output results are compared with the original scheduling plan to obtain the impact of dynamic events on the original scheduling plan.
4. According to the multi-objective flexible spray shop scheduling method under dynamic events according to claim 1, It is characterized in that In S2, based on the dynamic events of machine failure and urgent order insertion in the multi-objective flexible spray shop, a multi-objective dynamic flexible spray shop scheduling model with maximum completion time, maximum machine load and total machine load as targets is established, including: Determine the time and load impact characteristics of machine failure dynamic events and emergency order insertion dynamic events on the machining process; The maximum completion time, the maximum load of the machine and the total load of the machine are taken as the main optimization targets, and the constraint conditions of the processing process of the flexible spraying workshop are established, and the objective function of the main optimization target is determined based on the constraint conditions; A weight selection mechanism for maximum completion time, maximum machine load and total machine load is established, and a basic scheduling model is constructed by combining the objective function of the main optimization goal. Adding fault dynamic events and urgent order insertion dynamic events to the basic scheduling model to establish a basic dynamic scheduling model; The time impact characteristics and load impact characteristics are specifically marked with dynamic impact in the basic dynamic scheduling model to obtain a multi-objective dynamic flexible spray workshop scheduling model.
5. According to the multi-objective flexible spray shop scheduling method under dynamic events according to claim 4, It is characterized in that The time impact characteristics and load impact characteristics are specifically marked in the basic dynamic scheduling model to obtain a multi-objective dynamic flexible spray shop scheduling model, including: Adding the time impact characteristics and load impact characteristics to the corresponding objective function in the basic dynamic scheduling model, dynamically marking the objective function, and obtaining a dynamic objective function; Dynamically marking the weight selection mechanism based on the dynamic objective function to obtain a dynamic weight selection mechanism; Based on the dynamic objective function and dynamic weight selection mechanism, a multi-objective dynamic flexible spray workshop scheduling model is obtained.
6. According to the multi-objective flexible spray shop scheduling method under dynamic events according to claim 1, It is characterized in that In S3, based on the impact of the dynamic event on the original scheduling plan and in combination with the constraint conditions, a rescheduling response mechanism corresponding to the dynamic event is established, including: Based on the impact of the dynamic event on the original scheduling plan, combined with the constraint conditions, the impact value between the dynamic event and the plan characteristics is determined, and based on the corresponding relationship between the dynamic event and the plan characteristics, the dynamic event is classified to obtain passive impact events and active impact events, and based on the impact value between the dynamic event and the plan characteristics, the impact weights of the passive impact events and the active impact events are determined; Determine the rescheduling method and rescheduling adjustment range based on passive impact events and active impact events and their corresponding impact weights; An initial rescheduling model is established based on the rescheduling mode and the rescheduling adjustment range, and a rescheduling plan for a preset single dynamic event under the initial rescheduling model is obtained. A comprehensive analysis is performed on multiple preset single dynamic events and their corresponding rescheduling plans to determine the interaction characteristics between different single dynamic events; Based on the interaction characteristics, multiple action branches are established for the initial rescheduling model, and action priorities are set between the multiple action branches. Based on the multiple action branches and action priorities, the initial rescheduling model is upgraded and optimized to obtain a target rescheduling model; Input dynamic events into the target rescheduling model to obtain the corresponding rescheduling response mechanism of the dynamic events.
7. A multi-objective flexible spray shop scheduling method under dynamic events according to claim 6, It is characterized in that The determining of the rescheduling mode and the rescheduling adjustment range based on the passive impact events and the active impact events and their corresponding impact weights includes: Determine that the rescheduling method for the passive impact event is a periodic rescheduling method, and determine the adjustment range of the rescheduling period based on the impact weight; The rescheduling method for actively influencing events is determined to be event-driven rescheduling, and the adjustment range of the driven rescheduling is determined based on the impact weight.
8. According to the multi-objective flexible spray shop scheduling method under dynamic events according to claim 1, It is characterized in that In S4, the particle swarm algorithm based on the beetle whisker search strategy is combined with the rescheduling response mechanism to optimize and solve the multi-objective dynamic flexible spray shop scheduling model to obtain the global optimal value, including: Based on the coding crossover strategy, crossover and mutation operations are performed on the existing workshop processes to obtain new processes; The beetle whisker search strategy and the particle swarm algorithm are integrated to obtain the beetle whisker search particle swarm algorithm, which is added to the multi-objective dynamic flexible spray shop scheduling model, and the model parameters are initialized. Based on the new process, combined with the rescheduling response mechanism, the reverse generation distance and hypervolume are used as evaluation indicators to obtain the initial global optimal solution; Randomly obtain the position and speed of each beetle, obtain the fitness value of each beetle, and update each speed and position iteratively based on the update rule and fitness value; After obtaining the iteration, the initial individual optimal solution and the initial global optimal solution are updated and compared with the value of the previous iteration to obtain the global optimal value.
9. The multi-objective flexible spray shop scheduling method under dynamic events according to claim 1, It is characterized in that Based on the global optimal value, a multi-objective flexible spray shop scheduling scheme is obtained, including: Determining model parameters of a multi-objective dynamic flexible spray shop scheduling model based on the global optimal value; The specific values of the maximum completion time, the maximum machine load and the total machine load are determined, and the workshop processes to be scheduled are processed by the multi-objective dynamic flexible spray workshop scheduling model under the model parameters to obtain a multi-objective flexible spray workshop scheduling plan.
10. The scheduling system of the multi-objective flexible spray shop scheduling method under dynamic events according to claim 1, It is characterized in that include: The simulation module is used to build a spray shop simulation model based on the equipment parameters and related working parameters of the multi-objective flexible spray shop, and to perform static scheduling simulation on the spray shop simulation model to determine the impact of dynamic events on the original scheduling plan; A model determination module is used to establish a multi-objective dynamic flexible spray shop scheduling model with maximum completion time, maximum machine load and total machine load as targets based on the dynamic events of machine failure and urgent order insertion in the multi-objective flexible spray shop; The response determination module is used to establish a rescheduling response mechanism corresponding to the dynamic event based on the impact of the dynamic event on the original scheduling plan and in combination with the constraint conditions; The scheme determination module is used to optimize and solve the multi-objective dynamic flexible spray workshop scheduling model based on the particle swarm algorithm of the longicorn beetle whisker search strategy, combined with the rescheduling response mechanism, to obtain the global optimal value, and based on the global optimal value, obtain the multi-objective flexible spray workshop scheduling scheme.
Citation Information
Patent Citations
Dynamic flexible job-shop scheduling method based on multi-objective evolutionary algorithm
CN104268722A
Flexible job-shop dynamic scheduling method based on variable weight scheduling range
CN107065803A
Method for solving flexible job shop scheduling based on particle swarm algorithm of longicorn beard search
CN111311077A
Dynamic multi-target flexible job shop scheduling method based on improved artificial bee colony algorithm
CN113569484A
Flexible production workshop scheduling method for snail powder production enterprise
CN114460908A