Tunnel deformation prediction method based on multi-source data fusion

Through multi-source data fusion and advanced data processing technology, the problems of incomplete data and simple processing methods in tunnel deformation monitoring are solved, accurate prediction and risk assessment of tunnel deformation are realized, and the reliability and efficiency of tunnel safety management are improved.

CN118981601AActive Publication Date: 2024-11-19四川西香高速建设开发有限公司 +2

Patent Information

Application Number
CN202410967584.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-19
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

The existing tunnel deformation monitoring method relies on a single data source, making it difficult to achieve multi-dimensional and comprehensive data integration, resulting in incompleteness and non-representation of monitoring data. The data processing method is simple and fails to effectively integrate various types of data. Intrinsic connections, failing to fully mine useful information in the data.

Method used

Using multi-source data fusion method, data is carried out by collecting and pre-processing tunnel data, including laying fiber grating sensors, geological radar systems and meteorological monitoring stations, using Pearson correlation coefficient, nuclear principal component analysis (PCA) and autoencoder technologies. Fusion and feature extraction, finite element and long-term memory network models are constructed to predict tunnel deformation, and risk levels are displayed and evaluated in real time through visual interfaces.

Benefits of technology

It significantly improves the early warning ability of tunnel deformation, enhances the data representation ability, can capture time series characteristics in historical data and make dynamic predictions, reduces safety hazards caused by data errors, and provides strong security operation and management for tunnel safety. technical support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118981601A_ABST
    Figure CN118981601A_ABST
Patent Text Reader

Abstract

The invention discloses a tunnel deformation prediction method based on multi-source data fusion, and relates to the technical field of tunnel deformation monitoring, and the method comprises the steps: collecting tunnel data, carrying out the preprocessing, and carrying out the fusion of the preprocessed tunnel data; extracting tunnel features, and constructing a tunnel deformation prediction model for tunnel deformation prediction; and performing evaluation and early warning on a real-time prediction result, constructing a visual interface to display tunnel data in real time, and storing, collecting and analyzing the generated tunnel data. According to the method, the tunnel data of the collected tunnel data are fused, the tunnel deformation prediction model is constructed for tunnel deformation prediction, the representation capacity of the data is optimized through the fusion method, time sequence features in historical data can be captured, dynamic prediction can be carried out based on current real-time data, the early warning capacity of tunnel deformation is remarkably improved, and the tunnel deformation prediction efficiency is improved. Powerful technical support is provided for safe operation management of the tunnel, and potential safety hazards caused by data errors are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel deformation monitoring, and in particular to a tunnel deformation prediction method based on multi-source data fusion. Background Art

[0002] As an important part of modern infrastructure, the stability and safety of tunnel engineering have always been the focus of engineering technology research. Traditional tunnel deformation monitoring methods mostly rely on point-to-point measurement technology, such as using a single sensor for data collection. Although these methods can provide certain monitoring data, they are often limited by the selection of monitoring points and the influence of environmental factors, and it is difficult to achieve global dynamic monitoring of tunnels. These traditional methods mostly use simple statistical methods in data processing and analysis, such as average value calculation or maximum and minimum value analysis. These processing methods cannot fully utilize the complex information contained in the large amount of collected data. Therefore, there is often great uncertainty in predicting tunnel deformation and conducting risk assessment.

[0003] The shortcomings of existing technologies in tunnel deformation prediction and assessment are mainly manifested in the following aspects: data collection in existing technologies mostly relies on a single source, making it difficult to achieve multi-dimensional and comprehensive data integration, which limits the comprehensiveness and representativeness of monitoring data; data processing methods are usually relatively simple and fail to effectively integrate and utilize the inherent connections between various types of data, which means that the useful information in the data has not been fully mined. Summary of the invention

[0004] In view of the problems existing in the above-mentioned existing tunnel deformation prediction method based on multi-source data fusion, the present invention is proposed.

[0005] Therefore, the problem to be solved by the present invention is that data collection in the prior art mostly relies on a single source, and it is difficult to achieve multi-dimensional and comprehensive data integration, which limits the comprehensiveness and representativeness of the monitoring data. The data processing method is usually relatively simple and fails to effectively integrate and utilize the inherent connections between various types of data, which makes the useful information in the data not fully mined.

[0006] To solve the above technical problems, the present invention provides the following technical solutions: a tunnel deformation prediction method based on multi-source data fusion, which includes collecting tunnel data for preprocessing and fusing the preprocessed tunnel data; extracting tunnel features and constructing a tunnel deformation prediction model to predict tunnel deformation; evaluating and warning the results of real-time prediction, constructing a visual interface to display tunnel data in real time, and storing, collecting and analyzing the generated tunnel data.

[0007] As a preferred solution of the tunnel deformation prediction method based on multi-source data fusion described in the present invention, wherein: the collection of tunnel data for preprocessing refers to laying out fiber grating sensors inside the tunnel, setting the data collection frequency to once per second, collecting sensor data, including displacement and strain of the tunnel, using a geological radar system GPR to detect underground structures, obtaining tunnel soil compressive strength data, laying out meteorological monitoring stations in the tunnel area and its surroundings, collecting meteorological data in real time, and laying out a data recording system at the construction site to collect excavation length data;

[0008] The collected tunnel data are cleaned, the median filter and moving average methods are used to smooth the tunnel data, the linear interpolation method is used to fill the missing values ​​in the collected tunnel data, the tunnel data are standardized, the tunnel soil compressive strength and sensor data are spatially aligned using interpolation and supplementation methods, and the collected tunnel data are synchronized according to timestamps using the timestamp alignment algorithm.

[0009] As a preferred solution of the tunnel deformation prediction method based on multi-source data fusion of the present invention, the fusion of the pre-processed tunnel data refers to using the Pearson correlation coefficient to calculate the correlation between the historical sensor and meteorological data and the tunnel deformation. i , the formula is:

[0010]

[0011] where x i is the observed value of the i-th historical sensor and meteorological data, y i is the observed value of the i-th historical tunnel deformation, and is the average of historical sensor and meteorological data and historical tunnel deformation;

[0012] The weighted fusion weight is calculated as:

[0013]

[0014] where ω i is the weight of sensor and meteorological data, r i is the Pearson correlation coefficient between sensor and meteorological data and tunnel deformation, r j is the sum of correlation coefficients of data types, and n is the total number of sensors and meteorological data;

[0015] Perform weighted linear fusion on sensor and meteorological data, the formula is:

[0016]

[0017] Where D linear is the linear fusion of sensor and meteorological data, Di is the i-th sensor and meteorological data;

[0018] The Gaussian kernel function is used to perform kernel PCA on the tunnel soil compressive strength and excavation length data. The formula is:

[0019]

[0020] Where k(u,v) is the kernel function value between data points u and v, and σ is the broadband parameter of the kernel function;

[0021] Select the best σ value through cross-validation;

[0022] Calculate the kernel function values ​​between all data point pairs to form the kernel matrix K;

[0023] The kernel matrix K is centralized, and the formula is:

[0024] K ′ =K-1 o K-K1 o +1 o K1 o ,

[0025] Where K ′ is the centralized kernel matrix, 1 o is an o×o matrix, 1 o K is the column mean matrix, K1 o is the row mean matrix, 1 o K1 o is the adjustment item;

[0026] The centralized kernel matrix K ′ Perform eigendecomposition and select the top three eigenvectors as the main components according to the cumulative contribution rate;

[0027] The original data are mapped to a low-dimensional space using the selected principal components to obtain the tunnel soil compressive strength and excavation length data D after nonlinear fusion. kernel ;

[0028] The sensor and meteorological data after linear fusion are combined with the tunnel soil compressive strength and excavation length data after nonlinear fusion to form comprehensive tunnel data. The formula is:

[0029] D fusion =α·D linear +(1-α)·D kernel ,

[0030] Where D fusion is the comprehensive tunnel data, α is the adjustment parameter;

[0031] Collect the historical linear fusion of sensor and meteorological data and the nonlinear fusion of tunnel soil compressive strength and excavation length data, sort them according to the size of the data, and assign corresponding ranks. If the data are the same, assign the average rank;

[0032] Calculate the linear fusion data D linear and nonlinear fusion data D kernel The Spearman rank correlation coefficient r s , if r s When the value is close to +1, it is a strong correlation, so increase the adjustment parameter α. s When the value is close to 0, it is a weak correlation, so the adjustment parameter α is reduced. s =0.5, the adjustment parameter α remains unchanged;

[0033] The initial adjustment parameter α is set to 0.5. The historical linear fusion of sensor and meteorological data and the nonlinear fusion of tunnel soil compressive strength and excavation length data are input into the formula. The adjustment parameter α is adjusted according to the actual application feedback. It is adjusted iteratively until the optimal adjustment parameter α is found. The linear fusion data D linear and nonlinear fusion data D kernel Substitute into the formula to get the comprehensive tunnel data D fusion .

[0034] As a preferred solution of the tunnel deformation prediction method based on multi-source data fusion of the present invention, wherein: the extraction of tunnel features refers to collecting comprehensive historical tunnel data for preprocessing and standardization to generate an autoencoder training set;

[0035] Construct an autoencoder network, including input layer, hidden layer and output layer;

[0036] Set the input layer to comprehensive tunnel data;

[0037] Use the autoencoder training set to train the autoencoder network model, and use the loss function and Adam optimizer to iteratively optimize the model parameters;

[0038] The integrated tunnel data D fusion Input it into the trained autoencoder network model to obtain the tunnel feature F.

[0039] As a preferred solution of the tunnel deformation prediction method based on multi-source data fusion described in the present invention, wherein: the construction of the tunnel deformation prediction model for tunnel deformation prediction refers to using the finite element method FEM to simulate the stress-strain state of the tunnel, building a simulation model based on the actual tunnel soil compressive strength and excavation length data, running the simulation model, and obtaining the deformation data S of the tunnel under different engineering conditions;

[0040] Collect historical tunnel data for preprocessing and standardization, and use the trained autoencoder network model to obtain historical tunnel features F ′ , generate model training set;

[0041] Construct a long short-term memory network LSTM network model, including input layer, LSTM layer and output layer;

[0042] Set the output layer to the historical tunnel feature F ′ ,Initially set up two layers of LSTM, each layer has 128 units;

[0043] Use the model training set to train the LSTM network model, and use the loss function and Adam optimizer to iteratively optimize the model parameters;

[0044] The tunnel feature F is input into the trained long short-term memory network LSTM network model to obtain the tunnel deformation prediction result P ′ ;

[0045] The error E is defined as the difference between the result S of the pseudo model and the prediction result P of the LSTM network model at the same time point in the same tunnel. ′ The difference is:

[0046] E=|SP ′ |;

[0047] Re-adjust the prediction results of the LSTM network model ′ The adjusted prediction result P is obtained as follows:

[0048]

[0049] Where τ is the standard deviation of the error E, and γ is the weighted adjustment factor;

[0050] Take P as the tunnel deformation prediction result.

[0051] As a preferred solution of the tunnel deformation prediction method based on multi-source data fusion of the present invention, wherein: the evaluation and early warning of the real-time prediction result refers to setting the risk level threshold R(t) as low risk, medium risk, high risk and extremely high risk by statistically analyzing the relationship between tunnel deformation data and known risk events based on historical tunnel data and engineering standards;

[0052] The risk level is evaluated using a logistic function, with the formula:

[0053]

[0054] Where R(t) is the risk level at time t, β and θ are adjustment parameters;

[0055] If R(t) < 0.25, it is judged as low risk, the tunnel deformation is within the minimum acceptable range, and there is no sign of damage in the near future;

[0056] If 0.25≤R(t)<0.5, it is judged as medium risk and a green warning is issued, indicating that the tunnel deformation exceeds the normal operating range but is not enough to cause immediate structural problems;

[0057] If 0.5≤R(t)<0.75, it is judged as high risk and a yellow warning is issued, indicating that the tunnel is severely deformed and requires immediate inspection and intervention;

[0058] If R(t)≥0.75, it is judged as extremely high risk and a red warning is issued. The tunnel deformation has reached a dangerous level and it is necessary to leave immediately.

[0059] As a preferred solution of the tunnel deformation prediction method based on multi-source data fusion described in the present invention, wherein: the construction of a visualization interface to display tunnel data in real time refers to using the visualization software Tableau to build a visualization interface, including a real-time data flow chart to display the current deformation status and risk level of the tunnel, making a trend chart of historical data, displaying the change of tunnel deformation over time and designing an alarm indication interface, setting a prediction threshold, and displaying and warning the user when the prediction result P of the long short-term memory network LSTM network model exceeds the prediction threshold.

[0060] As a preferred solution of the tunnel deformation prediction method based on multi-source data fusion described in the present invention, the storage of tunnel data generated by collection and analysis refers to storing the tunnel data generated by tunnel collection and analysis in a database, implementing data security protection measures, and performing cloud backup regularly.

[0061] A computer device comprises: a memory and a processor; the memory stores a computer program, and the processor implements the steps of the tunnel deformation prediction method based on multi-source data fusion when executing the computer program.

[0062] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the tunnel deformation prediction method based on multi-source data fusion.

[0063] The beneficial effects of the present invention are as follows: the present invention collects tunnel data for fusion, extracts tunnel features, and constructs a tunnel deformation prediction model to predict tunnel deformation. The fusion method optimizes the data characterization capability, and can not only capture the time series features in historical data, but also perform dynamic prediction based on current real-time data, significantly improving the early warning capability of tunnel deformation, providing strong technical support for the safe operation and management of tunnels, and reducing safety hazards caused by data errors. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0065] Figure 1 Schematic diagram of the flow of tunnel deformation prediction method based on multi-source data fusion.

[0066] Figure 2 Schematic diagram of the structure of the tunnel deformation prediction method based on multi-source data fusion. DETAILED DESCRIPTION

[0067] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings.

[0068] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0069] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor is it a separate or selective embodiment that is mutually exclusive with other embodiments.

[0070] Example 1

[0071] Reference Figure 1 and Figure 2 , which is the first embodiment of the present invention, and provides a tunnel deformation prediction method based on multi-source data fusion. The tunnel deformation prediction method based on multi-source data fusion includes, S1, collecting tunnel data for preprocessing, and fusing the preprocessed tunnel data;

[0072] Specifically, collecting tunnel data for preprocessing means laying out fiber grating sensors inside the tunnel, setting the data collection frequency to once per second, collecting sensor data, including displacement and strain of the tunnel, using a geological radar system GPR to detect underground structures, obtaining tunnel soil compressive strength data, laying out meteorological monitoring stations in and around the tunnel area, collecting meteorological data in real time, and laying out a data recording system at the construction site to collect excavation length data;

[0073] The collected tunnel data are cleaned, the median filter and moving average methods are used to smooth the tunnel data, the linear interpolation method is used to fill the missing values ​​in the collected tunnel data, the tunnel data are standardized, the tunnel soil compressive strength and sensor data are spatially aligned using interpolation and supplementation methods, and the collected tunnel data are synchronized according to timestamps using the timestamp alignment algorithm.

[0074] By setting the data collection frequency to once per second, it can ensure that small changes in the tunnel structure are captured in real time, improving the sensitivity and timeliness of monitoring, which is of great significance for the rapid detection and response to potential tunnel deformation risks. The median filter and moving average method can effectively remove noise and outliers in the data, smooth the data curve, ensure the authenticity and accuracy of the data, and use the linear interpolation method to fill in the missing values ​​in the collected data to ensure the integrity of the data, which is crucial for subsequent data analysis and model training. Standardization of tunnel data can eliminate the influence of different dimensions and enhance the comparability of data. The timestamp alignment algorithm is used to synchronize data from different data sources to ensure the consistency of data in time and improve the effect of multi-source data fusion.

[0075] Furthermore, the pre-processed tunnel data is fused by using the Pearson correlation coefficient to calculate the correlation between the historical sensor and meteorological data and the tunnel deformation. i , the formula is:

[0076]

[0077] where x i is the observed value of the i-th historical sensor and meteorological data, y i is the observed value of the i-th historical tunnel deformation, and is the average of historical sensor and meteorological data and historical tunnel deformation;

[0078] The weighted fusion weight is calculated as:

[0079]

[0080] where ω i is the weight of sensor and meteorological data, r i is the Pearson correlation coefficient between sensor and meteorological data and tunnel deformation, r j is the sum of correlation coefficients of data types, and n is the total number of sensors and meteorological data;

[0081] Perform weighted linear fusion on sensor and meteorological data, the formula is:

[0082]

[0083] Where D linear is the linear fusion of sensor and meteorological data, D i is the i-th sensor and meteorological data;

[0084] The Gaussian kernel function is used to perform kernel PCA on the tunnel soil compressive strength and excavation length data. The formula is:

[0085]

[0086] Where k(u,v) is the kernel function value between data points u and v, and σ is the broadband parameter of the kernel function;

[0087] Select the best σ value through cross-validation;

[0088] Calculate the kernel function values ​​between all data point pairs to form the kernel matrix K;

[0089] The kernel matrix K is centralized, and the formula is:

[0090] K ′ =K-1 o K-K1 o +1 o K1 o ,

[0091] Where K ′ is the centralized kernel matrix, 1 o is an o×o matrix, 1 o K is the column mean matrix, K1 o is the row mean matrix, 1 o K1 o is the adjustment item;

[0092] The centralized kernel matrix K ′ Perform eigendecomposition and select the top three eigenvectors as the main components according to the cumulative contribution rate;

[0093] The original data are mapped to a low-dimensional space using the selected principal components to obtain the tunnel soil compressive strength and excavation length data D after nonlinear fusion. kernel ;

[0094] The sensor and meteorological data after linear fusion are combined with the tunnel soil compressive strength and excavation length data after nonlinear fusion to form comprehensive tunnel data. The formula is:

[0095] D fusion =α·D linear +(1-α)·D kernel ,

[0096] Where Dfusion is the comprehensive tunnel data, α is the adjustment parameter;

[0097] Collect the historical linear fusion of sensor and meteorological data and the nonlinear fusion of tunnel soil compressive strength and excavation length data, sort them according to the size of the data, and assign corresponding ranks. If the data are the same, assign the average rank;

[0098] Calculate the linear fusion data D linear and nonlinear fusion data D kernel The Spearman rank correlation coefficient r s , if r s When the value is close to +1, it is a strong correlation, so increase the adjustment parameter α. s When the value is close to 0, it is a weak correlation, so the adjustment parameter α is reduced. s =0.5, the adjustment parameter α remains unchanged;

[0099] The initial adjustment parameter α is set to 0.5. The historical linear fusion of sensor and meteorological data and the nonlinear fusion of tunnel soil compressive strength and excavation length data are input into the formula. The adjustment parameter α is adjusted according to the actual application feedback. It is adjusted iteratively until the optimal adjustment parameter α is found. The linear fusion data D linear and nonlinear fusion data D kernel Substitute into the formula to get the comprehensive tunnel data D fusion .

[0100] By using the Pearson correlation coefficient to calculate the correlation between sensors, meteorological data and tunnel deformation, the data source with the greatest impact on tunnel deformation can be accurately identified, ensuring the scientificity and effectiveness of data fusion, making subsequent prediction models more accurate and reliable. The weighted fusion weights calculated are assigned different weights according to the relevance of each data. Such a dynamic weight adjustment mechanism enables the model to be flexibly adjusted when dealing with tunnel deformation under different environments and conditions, thereby improving the adaptability and accuracy of the prediction. Through linear fusion and nonlinear fusion of kernel PCA, linear and nonlinear data features can be comprehensively utilized to optimize the expression of data and enhance the model's ability to capture complex data structures. This fusion technology is particularly suitable for geological and construction data, which often contain complex Spatial and temporal relationships can be better understood and predicted through advanced fusion methods. In kernel PCA processing, the selected main components can represent the core features of the original data. The data mapped to low-dimensional space not only reduces the computational complexity, but also retains the most critical information, providing the possibility for high-accuracy prediction. Combining linear and nonlinear fusion results, the comprehensive tunnel data formed can fully reflect the actual deformation of the tunnel. By sorting and rank correlation analysis of these data, the present invention further optimizes the data processing flow, making the final tunnel deformation prediction result more accurate, calculating the Spearman rank correlation coefficient, and adjusting the model parameters according to the strength of the data correlation, so that the prediction model can be dynamically adjusted according to the actual performance of the data, thereby improving the flexibility and response speed of the model.

[0101] S2, extracting tunnel features and constructing a tunnel deformation prediction model to predict tunnel deformation;

[0102] Specifically, extracting tunnel features refers to collecting comprehensive historical tunnel data for preprocessing and standardization to generate an autoencoder training set;

[0103] Construct an autoencoder network, including input layer, hidden layer and output layer;

[0104] Set the input layer to the integrated tunnel data, and the nodes of the output layer to the integrated tunnel data D fusion The number of features is equal;

[0105] Use the autoencoder training set to train the autoencoder network model, and use the loss function and Adam optimizer to iteratively optimize the model parameters;

[0106] The integrated tunnel data D fusion Input it into the trained autoencoder network model to obtain the tunnel feature F.

[0107] By preprocessing and standardizing the collected comprehensive historical tunnel data, it is ensured that the data has a consistent format and scale before being input into the autoencoder. Standardization ensures that data of different magnitudes or units can be analyzed at the same scale, enhancing the reliability of data processing and the effect of subsequent learning models. The construction of the training set is based on actual historical data, which ensures the practical application value of the learning process and the representativeness of the data. The equal setting of the number of nodes in the input and output layers ensures that the model can try to restore the input data during the learning process, so that the model can learn the most critical features of the data, which is the key to extracting the intrinsic structure of the data. The deep feature extraction method is superior to the traditional statistical method because it can reveal the nonlinearity and complex patterns in the data, providing more in-depth and comprehensive insights for tunnel deformation prediction.

[0108] Furthermore, constructing a tunnel deformation prediction model to predict tunnel deformation means using a finite element method FEM to simulate the stress-strain state of the tunnel, constructing a simulation model based on actual tunnel soil compressive strength and excavation length data, running the simulation model, and obtaining deformation data S of the tunnel under different engineering conditions;

[0109] Collect historical tunnel data for preprocessing and standardization, and use the trained autoencoder network model to obtain historical tunnel features F ′ , generate model training set;

[0110] Construct a long short-term memory network LSTM network model, including input layer, LSTM layer and output layer;

[0111] Set the output layer to the historical tunnel feature F ′ ,Initially set up two layers of LSTM, each layer has 128 units;

[0112] Use the model training set to train the LSTM network model, and use the loss function and Adam optimizer to iteratively optimize the model parameters;

[0113] The tunnel feature F is input into the trained long short-term memory network LSTM network model to obtain the tunnel deformation prediction result P ′ ;

[0114] The error E is defined as the difference between the result S of the pseudo model and the prediction result P of the LSTM network model at the same time point in the same tunnel. ′ The difference is:

[0115] E=|SP ′ |;

[0116] Re-adjust the prediction results of the LSTM network model P ′ The adjusted prediction result P is obtained as follows:

[0117]

[0118] Where τ is the standard deviation of the error E, and γ is the weighted adjustment factor;

[0119] Take P as the tunnel deformation prediction result.

[0120] Detailed simulation models are constructed based on actual geological and construction data, allowing engineers to predict the structural stress response of the tunnel before actual construction, thereby optimizing the design and preventing potential structural problems. By running these simulation models, deformation data of the tunnel under different engineering conditions can be obtained, providing scientific decision support for actual construction. The LSTM model can make full use of the deep information contained in historical data. The autoencoder plays a role in data noise reduction and feature compression, making the data input to the LSTM network more refined and with higher information density. The difference between the finite element simulation result S and the LSTM prediction result P is evaluated by defining the error E. This method can not only verify the accuracy of the prediction model, but also correct the model through real-time data and adjust the LSTM model using weighted adjustment factors, further enhancing the model's adaptability to new data. This dynamic adjustment mechanism ensures that the model can provide reliable prediction results throughout the life cycle of the tunnel project, thereby significantly improving the safety and efficiency of the tunnel project.

[0121] S3, evaluate and warn the results of real-time prediction, build a visual interface to display tunnel data in real time, and store, collect and analyze the generated tunnel data;

[0122] Specifically, the evaluation and early warning of the real-time prediction results refers to setting the risk level threshold R(t) as low risk, medium risk, high risk and extremely high risk by statistically analyzing the relationship between tunnel deformation data and known risk events based on historical tunnel data and engineering standards;

[0123] The risk level is evaluated using a logistic function, with the formula:

[0124]

[0125] Where R(t) is the risk level at time t, β and θ are adjustment parameters, which are obtained based on historical data statistics and control the slope and midpoint of the function respectively;

[0126] If R(t) < 0.25, it is judged as low risk, the tunnel deformation is within the minimum acceptable range, and there is no sign of damage in the near future;

[0127] If 0.25≤R(t)<0.5, it is judged as medium risk and a green warning is issued, indicating that the tunnel deformation exceeds the normal operating range but is not enough to cause immediate structural problems;

[0128] If 0.5≤R(t)<0.75, it is judged as high risk and a yellow warning is issued, indicating that the tunnel is severely deformed and requires immediate inspection and intervention;

[0129] If R(t)≥0.75, it is judged as extremely high risk and a red warning is issued. The tunnel deformation has reached a dangerous level and it is necessary to leave immediately.

[0130] By setting the risk level threshold R(t) based on historical tunnel data and engineering standards, the present invention can identify potential risk levels in advance. The implementation of this step provides a scientific evaluation basis for tunnel safety management, making risk management more systematic and quantitative. By statistically analyzing the relationship between tunnel deformation data and known risk events, this method not only enhances the practical application value of the prediction model, but also improves the accuracy of its early warning. The use of logical functions to evaluate risk levels is the innovation of the present invention. This method can smoothly handle the conversion of risk levels and avoid misjudgment caused by mutations. The logical function can reasonably divide the risk level into four levels: low, medium, high and extremely high according to the actual distribution of risk data, so that risk assessment is more in line with the risk characteristics of actual deformation conditions. For different risk levels, the present invention defines clear early warning signals, such as green, yellow and red warnings. These warnings can promptly notify relevant personnel and systems to take corresponding measures. Low risk levels maintain normal monitoring, medium risk levels require enhanced monitoring, and high risk and extremely high risk levels require emergency measures, such as reinforcement or evacuation, to ensure the safety of personnel and equipment.

[0131] Furthermore, building a visualization interface to display tunnel data in real time refers to using visualization software Tableau to build a visualization interface, including a real-time data flow chart to display the current deformation status and risk level of the tunnel, making a trend chart of historical data to display the change of tunnel deformation over time and designing an alarm indication interface, setting a prediction threshold, and displaying and warning the user when the prediction result P of the long short-term memory network LSTM network model exceeds the prediction threshold.

[0132] By building a real-time visualization interface, the safety status of the tunnel can be fully monitored, including displacement, strain, and environmental parameters. Through real-time data flow charts and historical trend charts, managers can understand the current status and historical changes of the tunnel at any time, providing a reliable basis for tunnel safety management. During the tunnel construction process, the real-time display of construction data and tunnel deformation through the visualization interface can help construction personnel adjust the construction plan in time, reduce the impact on the tunnel structure, and improve construction safety and efficiency. During the tunnel construction process, the real-time display of construction data and tunnel deformation through the visualization interface can help construction personnel adjust the construction plan in time, reduce the impact on the tunnel structure, and improve construction safety and efficiency. The visualization interface can not only display monitoring data in real time, but also perform deformation prediction and risk assessment through the LSTM model. Managers can make scientific decisions and emergency plans based on the prediction results and risk levels to ensure the long-term safe operation of the tunnel.

[0133] Furthermore, storing the tunnel data generated by the collection and analysis means storing the tunnel data generated by the tunnel collection and analysis in a database, implementing data security protection measures, and performing cloud backup on a regular basis.

[0134] Storing the collected tunnel data and analysis results in the database can provide high reliability and durability. The database system ensures the security and integrity of the data during the storage process through data redundancy and logging mechanisms. Data can be restored even in the event of a system failure. Storing tunnel data in a structured form in the database can facilitate data classification and organization. By implementing data security protection measures, data leakage and illegal access can be effectively prevented. Regular cloud backup can ensure the high availability and elasticity of tunnel data.

[0135] Example 2

[0136] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.

[0137] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0138] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0139] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, any one of the following technologies known in the art or a combination thereof can be used to implement: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

Claims

1. A tunnel deformation prediction method based on multi-source data fusion, characterized by: include, Collect tunnel data for preprocessing, and fuse the preprocessed tunnel data; Extract tunnel features and build a tunnel deformation prediction model to predict tunnel deformation; Evaluate and warn the results of real-time prediction, build a visual interface to display tunnel data in real time, and store, collect and analyze the generated tunnel data.

2. The tunnel deformation prediction method based on multi-source data fusion according to claim 1, characterized in that: The collection of tunnel data for preprocessing refers to laying out fiber grating sensors inside the tunnel, setting the data collection frequency to once per second, collecting sensor data, including displacement and strain of the tunnel, using a geological radar system GPR to detect underground structures, obtaining tunnel soil compressive strength data, laying out meteorological monitoring stations in and around the tunnel area, collecting meteorological data in real time, and laying out a data recording system at the construction site to collect excavation length data; The collected tunnel data are cleaned, the median filter and moving average methods are used to smooth the tunnel data, the linear interpolation method is used to fill the missing values ​​in the collected tunnel data, the tunnel data are standardized, the tunnel soil compressive strength and sensor data are spatially aligned using interpolation and supplementation methods, and the collected tunnel data are synchronized according to timestamps using the timestamp alignment algorithm.

3. The tunnel deformation prediction method based on multi-source data fusion according to claim 2, characterized in that: The fusing of the pre-processed tunnel data refers to calculating the correlation between the historical sensor and meteorological data and the tunnel deformation using the Pearson correlation coefficient. i , the formula is: where x i is the observed value of the i-th historical sensor and meteorological data, y i is the observed value of the i-th historical tunnel deformation, and is the average of historical sensor and meteorological data and historical tunnel deformation; The weighted fusion weight is calculated as: where ω i is the weight of sensor and meteorological data, r i is the Pearson correlation coefficient between sensor and meteorological data and tunnel deformation, r j is the sum of correlation coefficients of data types, and n is the total number of sensors and meteorological data; Perform weighted linear fusion on sensor and meteorological data, the formula is: Where D linear is the linear fusion of sensor and meteorological data, D i is the i-th sensor and meteorological data; The Gaussian kernel function is used to perform kernel PCA on the tunnel soil compressive strength and excavation length data. The formula is: Where k(u,v) is the kernel function value between data points u and v, and σ is the broadband parameter of the kernel function; Select the best σ value through cross-validation; Calculate the kernel function values ​​between all data point pairs to form the kernel matrix K; The kernel matrix K is centralized, and the formula is: K ′ =K-1 o K-K1 o +1 o K1 o , Where K ′ is the centralized kernel matrix, 1 o is an o×o matrix, 1 o K is the column mean matrix, K1 o is the row mean matrix, 1 o K1 o is the adjustment item; The centralized kernel matrix K ′ Perform eigendecomposition and select the top three eigenvectors as the main components according to the cumulative contribution rate; The original data are mapped to a low-dimensional space using the selected principal components to obtain the tunnel soil compressive strength and excavation length data D after nonlinear fusion. kernel ; The sensor and meteorological data after linear fusion are combined with the tunnel soil compressive strength and excavation length data after nonlinear fusion to form comprehensive tunnel data. The formula is: D fusion =α·D linear +(1-a)·D kernel , Where D fusion is the comprehensive tunnel data, α is the adjustment parameter; Collect the historical linear fusion of sensor and meteorological data and the nonlinear fusion of tunnel soil compressive strength and excavation length data, sort them according to the size of the data, and assign corresponding ranks. If the data are the same, assign the average rank; Calculate the linear fusion data D linear and nonlinear fusion data D kernel The Spearman rank correlation coefficient r s , if r s When the value is close to +1, it is a strong correlation, so increase the adjustment parameter α. s When the value is close to 0, it is a weak correlation, so the adjustment parameter α is reduced. s =0.5, the adjustment parameter α remains unchanged; The initial adjustment parameter α is set to 0.

5. The historical linear fusion of sensor and meteorological data and the nonlinear fusion of tunnel soil compressive strength and excavation length data are input into the formula. The adjustment parameter α is adjusted according to the actual application feedback. It is adjusted iteratively until the optimal adjustment parameter α is found. The linear fusion data D linear and nonlinear fusion data D kernel Substitute into the formula to get the comprehensive tunnel data D fusion .

4. The tunnel deformation prediction method based on multi-source data fusion according to claim 3 is characterized in that: Extracting tunnel features refers to collecting comprehensive historical tunnel data for preprocessing and standardization to generate an autoencoder training set; Construct an autoencoder network, including input layer, hidden layer and output layer; Set the input layer to comprehensive tunnel data; Use the autoencoder training set to train the autoencoder network model, and use the loss function and Adam optimizer to iteratively optimize the model parameters; The integrated tunnel data D fusion Input it into the trained autoencoder network model to obtain the tunnel feature F.

5. The tunnel deformation prediction method based on multi-source data fusion according to claim 4, characterized in that: The construction of the tunnel deformation prediction model for tunnel deformation prediction refers to simulating the stress-strain state of the tunnel using the finite element method FEM, constructing a simulation model based on the actual tunnel soil compressive strength and excavation length data, running the simulation model, and obtaining the deformation data S of the tunnel under different engineering conditions; Collect historical tunnel data for preprocessing and standardization, and use the trained autoencoder network model to obtain historical tunnel features F ′ , generate model training set; Construct a long short-term memory network LSTM network model, including input layer, LSTM layer and output layer; Set the output layer to the historical tunnel feature F ′ ,Initially set up two layers of LSTM, each layer has 128 units; Use the model training set to train the LSTM network model, and use the loss function and Adam optimizer to iteratively optimize the model parameters; The tunnel feature F is input into the trained long short-term memory network LSTM network model to obtain the tunnel deformation prediction result P ′ ; The error E is defined as the difference between the result S of the pseudo model and the prediction result P of the LSTM network model at the same time point in the same tunnel. ′ The difference is: E=|S-P ′ |; Re-adjust the prediction results of the LSTM network model P ′ The adjusted prediction result P is obtained as follows: Where τ is the standard deviation of the error E, and γ is the weighted adjustment factor; Take P as the tunnel deformation prediction result.

6. The tunnel deformation prediction method based on multi-source data fusion according to claim 5, characterized in that: The evaluation and early warning of the real-time prediction results refers to setting the risk level threshold R(t) as low risk, medium risk, high risk and extremely high risk by statistically analyzing the relationship between tunnel deformation data and known risk events based on historical tunnel data and engineering standards; The risk level is evaluated using a logistic function, with the formula: Where R(t) is the risk level at time t, β and θ are adjustment parameters; If R(t) < 0.25, it is judged as low risk, the tunnel deformation is within the minimum acceptable range, and there is no sign of damage in the near future; If 0.25≤R(t)<0.5, it is judged as medium risk and a green warning is issued, indicating that the tunnel deformation exceeds the normal operating range but is not enough to cause immediate structural problems; If 0.5≤R(t)<0.75, it is judged as high risk and a yellow warning is issued, indicating that the tunnel is severely deformed and requires immediate inspection and intervention; If R(t)≥0.75, it is judged as extremely high risk and a red warning is issued. The tunnel deformation has reached a dangerous level and it is necessary to leave immediately.

7. The tunnel deformation prediction method based on multi-source data fusion according to claim 6, characterized in that: The said construction of a visualization interface to display tunnel data in real time refers to using the visualization software Tableau to construct a visualization interface, including a real-time data flow chart, displaying the current deformation condition and risk level of the tunnel, making a trend chart of historical data, displaying the change of tunnel deformation over time and designing an alarm indication interface, setting a prediction threshold, and displaying and warning the user when the prediction result P of the long short-term memory network LSTM network model exceeds the prediction threshold.

8. The tunnel deformation prediction method based on multi-source data fusion according to claim 7, characterized in that: The storing of the tunnel data generated by the collection and analysis refers to storing the tunnel data generated by the tunnel collection and analysis in a database, implementing data security protection measures, and performing cloud backup regularly.

9. A computer device comprising: Memory and processor; The memory stores a computer program, characterized in that: when the processor executes the computer program, the steps of the tunnel deformation prediction method based on multi-source data fusion described in any one of claims 1 to 8 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the tunnel deformation prediction method based on multi-source data fusion according to any one of claims 1 to 8 are implemented.

Citation Information

Patent Citations

  • Coal mine machinery motor state prediction method based on K-CNN-N-GRU

    CN115758187A

  • Industrial process soft measurement method based on weighted target feature regression neural network

    CN116644655A

  • Tunnel monitoring method and device for data fusion, computer equipment and storage medium

    CN117272232A

  • Novel tunnel deformation monitoring and predicting system

    CN117633963A

  • Substation communication network equipment monitoring and fault early warning method and system

    CN118200118A

Cited By

  • Comprehensive pipe gallery underground diaphragm wall deformation risk early warning system

    CN119287995A

  • Reservoir water conservancy monitoring system based on multi-sensor fusion technology

    CN119290084A

  • Stratum deformation early warning method and device based on multi-parameter dynamic monitoring

    CN119807750A

  • Tunnel deformation prediction method based on multi-source monitoring data fusion

    CN119830396A

  • Nuclear power electronic information multi-source data fusion and visual analysis method

    CN120086806A