Coastal zone planning protection intelligent system

By constructing an intelligent system for coastal zone planning and protection, the problem of coastal ecological environment damage has been solved, the coordination of resource and environmental carrying capacity assessment and disaster risk assessment has been achieved, a multi-plan integrated information linkage platform has been formed, and the sustainable development capacity of the coastal zone has been enhanced.

CN118982313APending Publication Date: 2024-11-19FIRST INSTITUTE OF OCEANOGRAPHY MNR
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410976539.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-20
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The coastal ecological environment has been damaged, and intensive human activities have led to resource shortages and environmental degradation, requiring strengthened management and scientific development and utilization.

Method used

Construct an intelligent system for coastal zone planning and protection, including environmental protection zoning modules, spatial functional zoning modules, and disaster prevention zoning modules. Use GIS overlay technology to achieve resource and environmental carrying capacity assessment and disaster risk assessment, forming an information linkage platform that integrates multiple plans.

Benefits of technology

It has achieved comprehensive planning of the coastal zone, coordinated environmental protection and disaster prevention, and enhanced the carrying capacity of resources and environment as well as the capacity for sustainable development.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982313A_ABST
    Figure CN118982313A_ABST
Patent Text Reader

Abstract

The invention discloses a coastal zone planning protection intelligent system, which comprises an environment protection partition module, a space function partition module and a disaster prevention partition module, and is characterized in that the environment protection partition module is a functional area divided by taking a formulated coastal zone ecological protection red line as a control line; and the space function partition module is used for comprehensively considering natural and social economic conditions of the coastal zone and evaluating the resource environment bearing capacity, the development density and the development potential of the coastal zone by using an index evaluation method. A space function partition system, an environment protection partition system and a disaster prevention partition system are constructed and correspond to space planning, disaster prevention planning and environment protection planning of a coastal zone respectively, and a multi-rule-in-one information linkage platform is constructed on the basis of the space planning, the disaster prevention planning and the environment protection planning. And finally, a coastal zone comprehensive planning system is formed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coastal zone planning and protection, and in particular to an intelligent system for coastal zone planning and protection. Background Art

[0002] The coastal zone refers to the junction of land and sea. The intersection of the coastal beach and the average sea level is called the coastline. The coastal zone is a strip-shaped area where the coastline extends to a certain width on both sides of the land and sea. There is no unified standard for the width of the coastal zone, which varies with the coastal landform and research field. The comprehensive survey of China's national coastal zone and tidal flat resources stipulates that the width of the coastal zone is 10 kilometers from the shoreline to the land side and 15 meters deep to the sea. The coastal zone is also one of the important areas for human sustainable development. Reasonable planning, development and utilization of various resources in the coastal zone is an important way to solve the ecological environment of the region and solve the problems of population expansion and resource shortage faced by human society today. However, due to the increased intensity of human use and improper management and operation, the ecological environment of the coastal zone has been damaged to a certain extent, and the trend of deterioration has gradually worsened, restricting the ability of human society to develop sustainably. Therefore, it is necessary to strengthen the management of the coastal zone and scientifically develop and utilize marine resources. The coastal zone is the most intensive place for human activities at present. It is the zone where the ocean and land interact. It faces the dual impact of humans and nature. It is the most productive area on the earth and the only way to enter the land from the ocean. Some fish near the offshore ports taste like diesel. There are fewer and fewer trees and grasslands. There are tall buildings and hotels everywhere. Green space is reduced. There are fewer and fewer beaches on the coast. The color of the sand is gradually turning black. There are more and more cars on the road. The rivers are getting dryer and the precipitation is uneven. In recent years, some places have experienced water shortages. Therefore, an intelligent system for coastal planning and protection is provided to solve the above problems. Summary of the invention

[0003] In order to solve the problems in the above background technology, the technical solution adopted by the present invention to solve the technical problems is: a coastal zone planning and protection intelligent system, which includes: an environmental protection zoning module, a spatial function zoning module and a disaster prevention zoning module. The environmental protection zoning module is a functional area divided according to the established coastal ecological protection red line as the control line. The spatial function zoning module is used to comprehensively consider the natural and socio-economic conditions of the coastal area, and use the indicator evaluation method to evaluate the resource and environmental carrying capacity, development density and development potential of the coastal area. The disaster prevention zoning module is used to carry out disaster risk assessment in the coastal area, and establish a coastal disaster prevention zoning system based on this.

[0004] As a preferred technical solution of the present invention, the environmental protection zoning module includes marine environmental protection planning, water environmental protection planning, and terrestrial environmental protection planning. The marine environmental protection planning, water environmental protection planning, and terrestrial environmental protection planning are superimposed by GIS to achieve the integration of marine environmental protection with water environmental protection and terrestrial environmental protection.

[0005] As a preferred technical solution of the present invention, the spatial functional zoning module includes land use planning, urban master planning, and marine functional area planning. The land use planning, urban master planning, and marine functional area planning are integrated through GIS overlay to achieve land use, urban master planning, and marine functional area integration to generate a main functional zoning map of the coastal zone.

[0006] As a preferred technical solution of the present invention, the marine functional area planning realizes the integration of land use, urban overall and marine functional areas, and classifies and summarizes the patches that conflict during the integration process, creates a patch conflict handling method through department coordination based on its causes and expected goals, and solves the planning conflict problem based on the method.

[0007] As a preferred technical solution of the present invention, the disaster prevention zoning includes geological disaster planning, flood control and drainage planning, and marine disaster prevention planning. The geological disaster planning, flood control and drainage planning, and marine disaster prevention planning are superimposed by GIS to achieve the integration of marine disaster prevention, flood control and drainage, and geological disasters.

[0008] As a preferred technical solution of the present invention, the superposition realizes the integration of marine disaster defense, flood control and drainage, geological disasters, and the integration of marine environmental protection, water environmental protection, and terrestrial environmental protection, and the result is superimposed on the main functional zoning map of the coastal zone to form a comprehensive planning map of the coastal zone.

[0009] As a preferred technical solution of the present invention, the environmental protection zoning module, the spatial function zoning module and the disaster prevention zoning module formulate planning deadlines, overall goals, spatial layouts, coordination mechanisms and management strategies through spatial control.

[0010] As a preferred technical solution of the present invention, the planning period, overall goal, spatial layout, coordination mechanism, and control strategy are interrelated and generate a coastal zone master plan.

[0011] As a preferred technical solution of the present invention, the coordination mechanism is the planning period, overall goal, spatial layout, coordination mechanism, and management and control strategy are its fundamental requirements and essential characteristics.

[0012] The present invention has the following advantages: the present invention regards the coastal zone as a unified spatial unit, constructs a spatial function zoning system, an environmental protection zoning system and a disaster prevention zoning system, which respectively correspond to the spatial planning, disaster prevention planning and environmental protection planning of the coastal zone, and constructs an information linkage platform integrating multiple plans on the basis of spatial planning, disaster prevention planning and environmental protection planning, ultimately forming a comprehensive coastal planning system. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the operating principle of the coastal zone planning and protection system of the preferred embodiment of the present invention. DETAILED DESCRIPTION

[0014] The technical solutions in the embodiments of the present invention are described clearly and completely below. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Many specific details are explained in the following description to facilitate a full understanding of the present invention. However, the present invention can also be implemented in other ways different from those described herein. Therefore, the scope of protection of the present invention is not limited by the specific embodiments disclosed below.

[0015] In order to more clearly understand the above-mentioned objects, features and advantages of the present invention, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0016] Please refer to Figure 1 The present invention provides an intelligent system for coastal zone planning and protection, including: an environmental protection zoning module, a spatial function zoning module and a disaster prevention zoning module. The environmental protection zoning module is a functional zone divided according to the formulated coastal zone ecological protection red line as the control line. The spatial function zoning module is used to comprehensively consider the natural and socio-economic conditions of the coastal zone, and use the indicator evaluation method to evaluate the resource and environmental carrying capacity, development density and development potential of the coastal zone. The disaster prevention zoning module is used to carry out disaster risk assessment in the coastal zone, and establish a coastal zone disaster prevention zoning system based on this. The environmental protection zoning module, the spatial function zoning module and the disaster prevention zoning module are aimed at the coastal land and the coastal sea.

[0017] The environmental protection zoning module includes marine environmental protection planning, water environmental protection planning, and terrestrial environmental protection planning. The marine environmental protection planning, water environmental protection planning, and terrestrial environmental protection planning are integrated through GIS superposition to achieve marine environmental protection, water environmental protection, and terrestrial environmental protection. The spatial functional zoning module includes land use planning, urban master planning, and marine functional area planning. Land use planning, urban master planning, and marine functional area planning are integrated through GIS superposition to achieve land use, urban master planning, and marine functional area integration to produce a coastal main functional zoning map. The natural and socio-economic conditions of the coastal area are comprehensively considered, and the indicator evaluation method is used to evaluate the resource and environmental carrying capacity, existing development density, and development potential of the coastal area. The optimal main functional zoning is divided accordingly. The indicator evaluation can coordinate the statistical caliber differences between different plans and try to unify the planning period. The coastal main functional zoning clarifies the main development functions, industrial layout, land, marine space utilization direction, coastline functions, etc. of the coastal area.

[0018] Among them, after the marine functional area planning realizes the integration of land use, urban overall and marine functional areas, the patches that conflict in the integration process are classified and summarized. According to their causes and expected goals, through departmental coordination, a patch conflict handling method is created, and the planning conflict problem is solved according to the method. The coastal zone regional environmental protection plan is a guiding document for guiding environmental protection in coastal areas. The coastal zone ecological protection red line formulated should be used as the control line for the division of main functional areas. In addition to the ecological red line of the spatial area, the ecological red line is also formulated for the total amount of pollutants control, natural coastline retention rate, cultivated land area retention rate, wetland area retention rate, etc., and an environmental protection zoning system can be constructed based on this. Geological disaster planning, flood control and drainage planning, and marine disaster defense planning realize the integration of marine disaster defense with flood control and drainage, and geological disasters through GIS superposition. The disaster defense zoning module is based on the current marine disaster defense planning, flood control and drainage planning, geological disaster defense planning, windbreak belt construction planning and other special plans in the coastal area, and conducts disaster risk assessment in the coastal area, and establishes a coastal disaster defense zoning system based on this, and predicts the resource and environmental carrying capacity, existing development density and development potential.

[0019] Among them, the integration of marine disaster prevention, flood control and drainage, geological disasters, and the integration of marine environmental protection, water environment protection, and terrestrial environmental protection are superimposed on the main functional zoning map of the coastal zone to form a comprehensive coastal planning map. The environmental protection zoning module, spatial function zoning module, and disaster prevention zoning module are used to formulate planning periods, overall goals, spatial layouts, coordination mechanisms, and management strategies through spatial control. The planning period, overall goals, spatial layouts, coordination mechanisms, and management strategies are interrelated and generate a general plan for the coastal zone. The coordination mechanism is the planning period, and the overall goals, spatial layouts, coordination mechanisms, and management strategies are its fundamental requirements and essential characteristics.

[0020] In summary, the present invention regards the coastal zone as a unified spatial unit, constructs a spatial function zoning system, an environmental protection zoning system and a disaster prevention zoning system, which correspond to the spatial planning, disaster prevention planning and environmental protection planning of the coastal zone respectively. These three plans are also the core components of the comprehensive coastal planning. On this basis, an information linkage platform of planning period, overall goal, spatial layout, coordination mechanism and management strategy (multiple plans in one) is constructed to finally form a comprehensive coastal planning system.

[0021] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0022] Other parts of the present invention not described in detail belong to the prior art and will not be described in detail here.

[0023] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. An intelligent system for coastal zone planning and protection, characterized in that: include: The environmental protection zoning module, the spatial function zoning module and the disaster prevention zoning module, the environmental protection zoning module is a functional zone divided according to the established coastal ecological protection red line as the control line, the spatial function zoning module is used to comprehensively consider the natural and socio-economic conditions of the coastal area, and use the indicator evaluation method to evaluate the resource and environmental carrying capacity, development density and development potential of the coastal area, and the disaster prevention zoning module is used to carry out disaster risk assessment in the coastal area and establish a coastal disaster prevention zoning system based on this.

2. The coastal zone planning and protection intelligent system according to claim 1, characterized in that: The environmental protection zoning module includes marine environmental protection planning, water environmental protection planning, and terrestrial environmental protection planning. The marine environmental protection planning, water environmental protection planning, and terrestrial environmental protection planning are integrated with marine environmental protection, water environmental protection, and terrestrial environmental protection through GIS superposition.

3. The coastal zone planning and protection intelligent system according to claim 1, characterized in that: The spatial functional zoning module includes land use planning, urban master planning, and marine functional area planning. The land use planning, urban master planning, and marine functional area planning are integrated through GIS overlay to achieve land use, urban master planning, and marine functional area integration to generate a main functional zoning map of the coastal zone.

4. The coastal zone planning and protection intelligent system according to claim 3, characterized in that: After the marine functional area planning realizes the integration of land use, urban overall and marine functional areas, the patches of conflict that arise during the integration process are classified and summarized, and a patch conflict handling method is created through departmental coordination based on their causes and expected goals, and planning conflicts are resolved based on the method.

5. The intelligent system for coastal zone planning and protection as claimed in claim 1, characterized in that: The disaster prevention zoning includes geological disaster planning, flood control and drainage planning, and marine disaster prevention planning. The geological disaster planning, flood control and drainage planning, and marine disaster prevention planning are superimposed by GIS to achieve the integration of marine disaster prevention, flood control and drainage, and geological disasters.

6. The intelligent system for coastal zone planning and protection as claimed in claim 3, characterized in that: The superposition realizes the integration of marine disaster defense, flood control and drainage, geological disasters, and the integration of marine environmental protection, water environmental protection, and terrestrial environmental protection. The result is superimposed on the main functional zoning map of the coastal zone to form a comprehensive planning map of the coastal zone.

7. The intelligent system for coastal zone planning and protection according to claim 1, characterized in that: The environmental protection zoning module, spatial function zoning module and disaster prevention zoning module formulate planning deadlines, overall goals, spatial layouts, coordination mechanisms and management strategies through spatial control.

8. The intelligent system for coastal zone planning and protection as claimed in claim 7, characterized in that: The planning period, overall objectives, spatial layout, coordination mechanism, and management and control strategies are interrelated and generate a coastal master plan.

9. The intelligent system for coastal zone planning and protection according to claim 7, characterized in that: The coordination mechanism mentioned above is the planning period, overall goal, spatial layout, coordination mechanism, and management and control strategy, which are its fundamental requirements and essential characteristics.

Citation Information

Cited By

  • Coastal zone geological stability evaluation system

    CN119226898A

  • Coastal zone planning method and system based on MaXent and hotspot analysis

    CN121390597A

  • Coastal zone planning method and system based on maXent and hotspot analysis

    CN121390597B