Visual test method for stress evolution of tunnel surrounding rock
By using samples and strain monitoring units of similar materials in the surrounding rock stress evolution test of tunnel surrounding rock, the problems of fixedness and dense arrangement of monitoring elements are solved, and detailed data on surrounding rock stress changes are obtained, providing a more intuitive tunnel Analysis of excavation damage area and affected area.
Patent Information
- Application Number
- CN202410933930.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-11-22
AI Technical Summary
The existing tunnel surrounding rock stress evolution test methods have problems such as expensive monitoring elements, inability to fix, limited number of monitoring points, and inability to intensively arrange, resulting in the inability to effectively obtain the internal stress change information of surrounding rock.
The samples of similar materials were determined based on the parameters of the engineering site and the test machine, and the samples were cast in two parts along the axial direction of the tunnel, and a strain monitoring unit was arranged on the contact surface. The strain data was obtained through the data acquisition instrument and data analysis was carried out to obtain the stress/strain cloud diagram. .
It realizes the fixed monitoring element without adding fixed components, obtains the main stress/main strain evolution process of tunnel surrounding rock, provides more intuitive data on the damage area and affected area of tunnel excavation, filling the existing fields blank.
Smart Images

Figure CN119000267A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a tunnel surrounding rock stress evolution visualization test method, which is applicable to the surrounding rock construction technology field. Background Art
[0002] With the rapid development of the economy and society, infrastructure projects such as transportation tunnels, water conservancy and hydropower, and energy mining are constantly developing deep into the earth. Deep buried projects are located in high-altitude stress environments. Under the disturbance of engineering excavation, the balance of the original rock stress field is broken, and stress redistribution can easily cause large deformation of the surrounding rock, rock bursts and other engineering disasters. Therefore, it is necessary to explore the changes in surrounding rock stress during engineering excavation and its influence and mechanism on the surrounding rock of the cavern, so as to provide technical support for the stability analysis of deep engineering and cavern support design.
[0003] Among many test methods, model test has become one of the most commonly used research methods due to its strong operability, wide applicability, and ability to directly obtain internal information of surrounding rocks. In the process of conducting tests, internal information is usually obtained by pre-embedded monitoring components. Common monitoring methods or components include digital image processing, earth pressure cells, grating optical fibers, strain bricks, etc. However, in-depth research has found that the existing test methods have the following shortcomings:
[0004] (1) The digital image correlation method can only process the surface changes of the surrounding rock by processing the speckle, and is affected by the size of the speckle spots. When the surrounding rock surface peels off, the test cannot be continued;
[0005] (2) Pre-embedded monitoring components are expensive, and the specimens are pre-embedded in similar materials during casting, which cannot guarantee a high survival rate of the monitoring components;
[0006] (3) The monitoring element cannot be fixed. Without adding a fixing component, it cannot be guaranteed that the monitoring element will not rotate during the pouring process. Adding a fixing component will destroy the integrity and uniformity of the sample, which will have a certain impact on the test results.
[0007] (4) The number of monitoring points is limited. Since the monitoring elements themselves have a certain volume, they cannot be densely arranged to obtain the continuous stress distribution around the tunnel. Summary of the invention
[0008] The technical problem to be solved by the present invention is: in view of the above-mentioned problems, a visualization test method for stress evolution of surrounding rock in a tunnel is provided.
[0009] The technical solution adopted by the present invention is: a tunnel surrounding rock stress evolution visualization test method, characterized by comprising:
[0010] Determining similar materials for casting a specimen based on the project site parameters and the testing machine parameters, wherein the specimen has a tunnel passing through the specimen;
[0011] Divide the sample into at least two parts along the axial direction of the tunnel, cast each sample part in sequence from one end to the other end of the axial direction of the tunnel, and arrange a plurality of strain monitoring units on the contact surface between the sample part and the next sample part after the casting of the sample part is completed;
[0012] The casted specimen is installed on the testing machine, and the strain monitoring unit in the specimen is connected to the strain signal acquisition instrument and the data acquisition instrument through the data acquisition line;
[0013] The test specimen is subjected to a loading test by means of a testing machine, and strain data collected by each strain monitoring unit is obtained by means of a data acquisition instrument;
[0014] Data analysis and processing are performed based on the strain data obtained by the data acquisition instrument.
[0015] The similar materials used for casting the specimens are determined based on the project site parameters and the testing machine parameters, including:
[0016] Determining the size of the specimen based on the testing machine parameters, and determining the radius of the tunnel on the specimen based on the size of the specimen;
[0017] Based on the tunnel radius in the engineering site parameters and the tunnel radius on the specimen, the geometric similarity ratio between the engineering site and the specimen is obtained;
[0018] Determine the material parameters of the specimen based on the parameters of the engineering site, the parameters of the testing machine, and the geometric similarity ratio between the engineering site and the specimen;
[0019] Based on the material parameters of the specimen, determine the material selection and material proportion of similar materials used to cast the specimen.
[0020] The step of determining the size of the sample based on the testing machine parameters, and determining the radius of the tunnel on the sample based on the size of the sample, comprises:
[0021] According to the parameters of the testing machine, the specimen is determined to be a cube with a side length of L, and according to L≥6r, the radius of the tunnel on the specimen is determined to be r.
[0022] The material parameters of the sample include stress similarity parameter, elastic modulus similarity ratio, bulk density similarity ratio and boundary stress similarity ratio.
[0023] The material parameters of the sample are determined based on the engineering site parameters, the testing machine parameters, and the geometric similarity ratio between the engineering site and the sample, including:
[0024]
[0025] Among them, C σ is the stress similarity parameter, C E is the elastic modulus similarity ratio, C γ is the bulk density similarity ratio, Cp is the boundary stress similarity ratio, C L is the geometric similarity ratio between the engineering site and the specimen;
[0026] Determine the boundary stress similarity ratio C according to the on-site ground stress level and the applied range of the testing machine p , and then determine the stress ratio C according to formula (1) σ , according to formula (2) to determine the bulk density similarity ratio C γ According to formula (3), the elastic modulus similarity ratio C is determined E .
[0027] After the casting of the sample part is completed, a plurality of strain monitoring units are arranged on the contact surface between the sample part and the next sample part, including:
[0028] A plurality of monitoring rings surrounding the tunnel are arranged on the contact surface, a plurality of monitoring points are evenly arranged on each monitoring ring, and strain monitoring units are arranged on the monitoring points.
[0029] After the strain monitoring unit is arranged, a layer of silicone rubber is applied to the corresponding contact surface.
[0030] The strain monitoring unit has an x-direction strain gauge and a z-direction strain gauge, and the excavation direction of the tunnel on the sample is the y-direction.
[0031] The data analysis and processing based on the strain data acquired by the data acquisition instrument includes:
[0032] Convert the measured strain data into stress data;
[0033] The strain data and stress data are used to obtain the stress / strain evolution curve of each monitoring point of the strain monitoring unit.
[0034] The data analysis and processing based on the strain data acquired by the data acquisition instrument includes:
[0035] Convert the measured strain data into stress data;
[0036] The stress / strain cloud diagram of the entire section is obtained by interpolation.
[0037] The beneficial effects of the present invention are as follows: the present invention divides the sample into at least two parts along the axial direction of the tunnel, and adopts phased casting. After the casting of the sample part is completed, a strain monitoring unit is arranged on the contact surface between the sample part and the next sample part, so that the monitoring element can be fixed and protected without adding a fixing component, and densely pasting strain gauges can be achieved.
[0038] The present invention embeds a strain monitoring unit inside the sample, so that the evolution process of the principal stress / principal strain of the surrounding rock during tunnel excavation can be directly obtained. Based on the close-fitting strain monitoring unit, the stress / strain cloud map of the entire monitoring section can be obtained by interpolation, and different evaluation indicators can be used for evaluation, so as to more intuitively determine the data such as the tunnel excavation damage area and the affected area, filling the gap in the existing field.
[0039] In the present invention, the strain gauges are arranged in a bidirectional manner, and the strain gauges at all monitoring points monitor the strains in the x-direction and the z-direction, which has strong operability, is convenient for correction, and has simple subsequent data processing.
[0040] The invention is simple to operate, widely applicable, and highly popularizable, and can be used to conduct tests for various working conditions, such as dynamic disturbance, blasting, excavation, etc. At the same time, the tunnel shape can be changed, and circular caverns, rectangular caverns, and horseshoe-shaped caverns are all possible, which helps to explore the entire process of surrounding rock stress adjustment during on-site construction and provide reference opinions for selecting support methods and support timing. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 Schematic diagram of the test machine in the embodiment.
[0042] Figure 2 Schematic diagram of the sample in the embodiment.
[0043] Figure 3 , 4 Schematic diagram of the arrangement of the strain monitoring unit in the embodiment.
[0044] Figure 5 Schematic diagram of the structure of the strain monitoring unit in the embodiment.
[0045] Figure 6 : is the strain evolution curve of the monitoring point obtained in the embodiment.
[0046] Figure 7 This is the maximum principal stress cloud obtained by monitoring data and interpolating in the embodiment.
[0047] Figure 8 This is a FAI evaluation cloud diagram obtained based on the interpolation in the embodiment.
[0048] 1. Test loading unit;
[0049] 2. Sample;
[0050] 201, first sample part; 202, monitoring section; 203, second sample part; 204, tunnel; 205, sample direction mark; 206, strain monitoring unit;
[0051] 2061, z-axis strain gauge; 2062, x-axis strain gauge; 2063, strain gauge terminal; 2064, strain gauge connecting wire;
[0052] 3. Strain signal acquisition instrument;
[0053] 4. Data acquisition instrument;
[0054] 5. Data acquisition line. DETAILED DESCRIPTION
[0055] This embodiment is a tunnel surrounding rock stress evolution visualization test method, which specifically includes the following steps:
[0056] S1. Determine similar materials used for casting specimens based on the project site parameters and testing machine parameters.
[0057] S11. Determine the size of the sample based on the testing machine parameters, and determine the radius of the tunnel on the sample based on the size of the sample.
[0058] According to the parameters of the testing machine, the specimen is determined to be a cube with a side length of L. In this case, L = 0.5m. Combined with the engineering geological conditions and the range of the testing machine, r is the radius of the tunnel on the specimen in similar tests. The tunnel runs through the specimen and is located at the center of the specimen. In order to avoid the boundary effect of the specimen, according to Saint-Venant's theorem, L ≥ 6r must be satisfied. Based on this, the radius of the tunnel on the specimen, r, is determined. In this case, r = 0.05m.
[0059] S12. Based on the tunnel radius R in the engineering site parameters and the tunnel radius r on the specimen, the geometric similarity ratio C between the engineering site and the specimen is obtained. L , C L =r / R.
[0060] S13. Determine the material parameters of the sample based on the engineering site parameters, the testing machine parameters, and the geometric similarity ratio between the engineering site and the sample.
[0061] According to the similarity theory, the stress similarity parameter C σ , elastic modulus similarity ratio C E , bulk density similarity ratio C γ , boundary stress similarity ratio C p Formula (1) to (3) should be satisfied.
[0062]
[0063] Determine the boundary stress similarity ratio C by combining the on-site ground stress level and the applied range of the testing machine p , and then determine the stress ratio C according to formula (1) σ , according to formula (2) to determine the bulk density similarity ratio C γ According to formula (3), the elastic modulus similarity ratio C is determined E.
[0064] S14. Based on the material parameters of the specimen, determine the material selection and material ratio of similar materials used for casting the specimen.
[0065] Based on the determined material parameters, literature research is conducted to determine the material selection, such as cement, gypsum, quartz sand, etc. Orthogonal experiments or trial and error experiments are carried out to determine the ratio of similar materials.
[0066] S2. Divide the sample into two parts along the axial direction of the tunnel, namely, a first sample part and a second sample part. Cast the first sample part and the second sample part in batches, and arrange several strain monitoring units on the contact surface between the first sample part and the second sample part after the casting of the first sample part is completed.
[0067] S21. Prepare a sample mold according to the sample size determined in S11. To facilitate subsequent sample casting and demoulding, the mold is designed to be detachable on all sides.
[0068] S22. Cast the first sample part in the sample mold, apply engine oil in the mold and prepare corresponding materials according to the material ratio determined in S14. First, weigh and mix them to mix them evenly, put similar materials into the mold, and use a vibrator to continuously vibrate and stir to discharge the pores in the material.
[0069] S23. After pouring, place it in a constant temperature and humidity environment for curing. After reaching the initial setting strength in 24 hours, remove the mold around to avoid damage to the sample during subsequent sample removal, and then continue curing for 7 days.
[0070] S24. Grind the top surface of the cast first sample part (i.e., the contact surface between the first sample part and the second sample part), and disinfect the entire top surface with alcohol after grinding.
[0071] S25. Post a strain gauge monitoring unit on the top surface of the first sample part that has been cast, so as to form a monitoring section between the first and second sample parts. The strain gauge monitoring unit is posted on the top surface of the first sample part on a plurality of monitoring rings surrounding the tunnel, and a plurality of monitoring points are evenly arranged on each monitoring ring, and strain monitoring units are arranged on the monitoring points.
[0072] In this example, monitoring rings are set on circles with radii of 0.06m, 0.07m, 0.08m, 0.9m, 0.10m, 0.12m, 0.15m, 0.18m and 0.21m respectively, with the tunnel center as the center.
[0073] In this embodiment, the strain monitoring unit includes an x-axis strain gauge, a z-axis strain gauge, a strain gauge terminal, and a strain gauge connecting wire. The x-axis strain gauge and the z-axis strain gauge are connected to the strain gauge terminal via the strain gauge connecting wire. The monitoring unit adopts bidirectional strain monitoring, and the directions are fixed to the x-direction and the z-direction. It is simple to post and easy to calibrate, and the subsequent data processing is convenient.
[0074] When pasting, first use quick-drying glue to stick the x-axis and z-axis strain gauges and the strain gauge connection ends at the predetermined positions; then, connect the strain gauges to the data acquisition lines by soldering at the strain gauge connection ends and using the strain gauge connection wires.
[0075] In this example, when the strain gauge monitoring unit is posted, the x-direction strain gauge corresponds to the first direction, the z-direction strain gauge corresponds to the second direction, the first direction is perpendicular to the second direction, and the first direction and the second direction are both perpendicular to the tunnel axis on the sample.
[0076] S26. After all the strain monitoring units on the top surface of the first sample are pasted, a layer of silicone rubber is applied on the surface to protect it from damage during the subsequent pouring process. The resistance of each strain gauge is measured by a multimeter to ensure that it is in normal working condition.
[0077] S27. After all strain monitoring units are posted, reinstall the sample mold, route the data acquisition lines to both sides of the sample mold, and prepare to cast the second sample part.
[0078] S28. Re-apply engine oil in the mold. Similar materials are weighed and mixed and then transferred to the mold. At this time, when using a vibrator to vibrate and stir, avoid contact between the vibrator and the monitoring section to avoid damage to the strain monitoring unit.
[0079] S29. After the second sample is cast, mark the sample direction on the top surface of the sample and place the sample in a constant temperature and humidity environment for curing. After the initial setting strength is reached after 24 hours, all molds will be removed. After 28 days of curing, you can prepare to start the test.
[0080] S3. Install the cast sample on the testing machine, and connect the strain monitoring unit in the sample to the strain signal acquisition instrument and the data acquisition instrument through the data acquisition line.
[0081] The sample is installed on the testing machine, and the coordinate axis conforms to the right-hand screw rule, where the direction along the tunnel excavation is the y direction, and the opposite direction of gravity is the z direction (the second direction). The strain monitoring unit embedded in the sample is connected to the strain signal acquisition instrument and the data acquisition instrument through the data acquisition line, and the strain data collected by the strain monitoring unit is obtained through the data acquisition instrument.
[0082] S4. Perform a loading test on the sample through a testing machine, and obtain the strain data collected by each strain monitoring unit through a data acquisition instrument.
[0083] According to the boundary stress similarity ratio C determined in S13 p , determine the test boundary stress in combination with the on-site measured ground stress, and determine the test plan, including loading method, loading speed and loading path, etc. Based on the test plan, load the specimen through the test loading unit on the testing machine, and obtain the strain data collected by the specimen internal deformation monitoring unit in real time through the data acquisition instrument.
[0084] S5. Perform data analysis and processing based on the strain data obtained by the data acquisition instrument. The measured strain results are converted into stress for analysis according to the generalized Hoke's law, or they can be directly analyzed by strain. In this example, based on the dense arrangement of strain gauges, two data processing methods are provided, including:
[0085] 1. The stress / strain evolution curve of each monitoring point during the test can be obtained, and the stress-strain evolution of the point of concern can be analyzed.
[0086] Second, the existing monitoring points can be used as the basic monitoring units, and the monitoring results can be interpolated between two monitoring points to obtain the total stress / strain cloud map of the cavern surrounding rock and the excavation influence area and other results.
[0087] In this embodiment, various indicators such as FAI are used to evaluate the stability of the surrounding rock (the larger the FAI, the more dangerous it is, and when it is greater than 1, it enters the plastic stage). Accordingly, the influence range of the surrounding rock of the cavern during the experimental excavation process can be determined.
[0088] In this example, the monitoring section can be divided into several units according to the monitoring plan, and the data of the unmonitored part is obtained through interpolation, and then the stress / strain cloud diagram of the monitoring section at different times is drawn.
Claims
1. A tunnel surrounding rock stress evolution visualization test method, characterized in that: include: Determining similar materials for casting a specimen based on the project site parameters and the testing machine parameters, wherein the specimen has a tunnel passing through the specimen; Divide the sample into at least two parts along the axial direction of the tunnel, cast each sample part in sequence from one end to the other end of the axial direction of the tunnel, and arrange a plurality of strain monitoring units on the contact surface between the sample part and the next sample part after the casting of the sample part is completed; The casted specimen is installed on the testing machine, and the strain monitoring unit in the specimen is connected to the strain signal acquisition instrument and the data acquisition instrument through the data acquisition line; The test specimen is subjected to a loading test by means of a testing machine, and strain data collected by each strain monitoring unit is obtained by means of a data acquisition instrument; Data analysis and processing are performed based on the strain data obtained by the data acquisition instrument.
2. The tunnel surrounding rock stress evolution visualization test method according to claim 1 is characterized in that: The similar materials used for casting the specimens are determined based on the project site parameters and the testing machine parameters, including: Determining the size of the specimen based on the testing machine parameters, and determining the radius of the tunnel on the specimen based on the size of the specimen; Based on the tunnel radius in the engineering site parameters and the tunnel radius on the specimen, the geometric similarity ratio between the engineering site and the specimen is obtained; Determine the material parameters of the specimen based on the parameters of the engineering site, the parameters of the testing machine, and the geometric similarity ratio between the engineering site and the specimen; Based on the material parameters of the specimen, determine the material selection and material proportion of similar materials used to cast the specimen.
3. The tunnel surrounding rock stress evolution visualization test method according to claim 2 is characterized in that: The step of determining the size of the sample based on the testing machine parameters, and determining the radius of the tunnel on the sample based on the size of the sample, comprises: According to the parameters of the testing machine, the specimen is determined to be a cube with a side length of L, and according to L≥6r, the radius of the tunnel on the specimen is determined to be r.
4. The tunnel surrounding rock stress evolution visualization test method according to claim 2 is characterized by: The material parameters of the sample include stress similarity parameter, elastic modulus similarity ratio, bulk density similarity ratio and boundary stress similarity ratio.
5. The tunnel surrounding rock stress evolution visualization test method according to claim 2 is characterized in that: The material parameters of the sample are determined based on the engineering site parameters, the testing machine parameters, and the geometric similarity ratio between the engineering site and the sample, including: Among them, C σ is the stress similarity parameter, C E is the elastic modulus similarity ratio, C γ is the bulk density similarity ratio, C p is the boundary stress similarity ratio, C L is the geometric similarity ratio between the engineering site and the specimen; Determine the boundary stress similarity ratio C according to the on-site ground stress level and the applied range of the testing machine p , and then determine the stress ratio C according to formula (1) σ , according to formula (2) to determine the bulk density similarity ratio C γ According to formula (3), the elastic modulus similarity ratio C is determined E .
6. The tunnel surrounding rock stress evolution visualization test method according to claim 1 is characterized in that: After the casting of the sample part is completed, a plurality of strain monitoring units are arranged on the contact surface between the sample part and the next sample part, including: A plurality of monitoring rings surrounding the tunnel are arranged on the contact surface, a plurality of monitoring points are evenly arranged on each monitoring ring, and strain monitoring units are arranged on the monitoring points.
7. The tunnel surrounding rock stress evolution visualization test method according to claim 1 or 6, characterized in that: The strain monitoring unit has an x-direction strain gauge and a z-direction strain gauge, and the excavation direction of the tunnel on the sample is the y-direction.
8. The tunnel surrounding rock stress evolution visualization test method according to claim 1, characterized in that: After the strain monitoring unit is arranged, a layer of silicone rubber is applied to the corresponding contact surface.
9. The tunnel surrounding rock stress evolution visualization test method according to claim 1, characterized in that: The data analysis and processing based on the strain data acquired by the data acquisition instrument includes: Convert the measured strain data into stress data; The strain data and stress data are used to obtain the stress / strain evolution curve of each monitoring point of the strain monitoring unit.
10. The tunnel surrounding rock stress evolution visualization test method according to claim 1, characterized in that: The data analysis and processing based on the strain data acquired by the data acquisition instrument includes: Convert the measured strain data into stress data; The stress / strain cloud diagram of the entire section is obtained by interpolation.
