A tailings dam safety monitoring system and monitoring equipment
By adding flood discharge monitoring module and data comparison module to the tailings dam safety monitoring system, the problem of the lack of flood discharge monitoring and data comparison functions in the existing system is solved, and more comprehensive safety monitoring and faster response measures are achieved.
Patent Information
- Application Number
- CN202411569737.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2025-07-01
- Estimated Expiration
- 2044-11-01
AI Technical Summary
The existing tailings dam safety monitoring system lacks flood discharge monitoring functions and cannot deal with landslide risks caused by heavy rain and flood discharge system failures in a timely manner. At the same time, it lacks the function of comparing with previous years' data, resulting in a long time of layout of response measures.
A tailings dam safety monitoring system has been designed and a flood discharge monitoring module has been added. Through the data storage module and data comparison module, the monitoring data in previous years can be processed and compared, alarms are promptly reported and staff can be helped to formulate protective measures.
It effectively prevents landslides caused by heavy rain and undesirable flood discharge, improves the scope and accuracy of tailings dam safety monitoring, and saves time in the layout of response measures.
Smart Images

Figure CN119290074B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tailings dam safety monitoring, and specifically to a tailings dam safety monitoring system and monitoring equipment. Background Art
[0002] The tailings dam is one of the important facilities in the uranium hydrometallurgy plant, which has the functions of stacking tailings, leaching slag, clarifying liquid waste, and providing recycled water. To ensure the safety of the tailings dam, a corresponding monitoring system is generally installed to monitor the situation of the tailings dam in real time. The Chinese invention patent with the publication number CN114942041B discloses a tailings pond safety monitoring system and method, which realizes real-time automatic monitoring of the dry beach slope and dry beach length of the tailings dam, the seepage flow in the tailings dam, the settlement amount, displacement amount of the tailings dam, the rainfall in the tailings pond area, and the water level information of the reservoir area through a dry beach detection device, a phreatic line detection device, a settlement detection device, a displacement detection device, a rainfall detection device, and a water level detection device. When the monitoring information is abnormal, it can alarm in time, saving the trouble of manual regular inspection, and being unaffected by the weather, with accurate and reliable monitoring data.
[0003] In the related art, the existing tailings dam safety monitoring system generally monitors the dry beach slope and dry beach length of the tailings dam, the seepage flow in the tailings dam, the settlement amount, displacement amount of the tailings dam, the rainfall in the tailings pond area, and the water level information of the reservoir area in real time, lacking the function of flood discharge monitoring. As a result, when the rainfall is too large and the flood discharge system fails, the flood discharge work cannot be carried out in time, leading to various safety hazards such as rolling stones and landslides in the reservoir area. Moreover, when monitoring the tailings dam, it lacks the function of corresponding to the data of previous years. As a result, when hidden dangers occur, the staff cannot layout the corresponding countermeasures in time. Summary of the Invention
[0004] (1) Technical Problems to be Solved
[0005] Aiming at the deficiencies of the prior art, the present invention provides a tailings dam safety monitoring system and monitoring equipment. Through the setting of the flood discharge monitoring module, the flood discharge situation of the tailings dam can be detected, preventing the problem of landslides caused when the precipitation is large and the flood discharge situation is not ideal, further improving the scope of tailings dam safety monitoring. Moreover, through the setting of the data storage module, the monitoring data of previous years can be processed, facilitating the comparison of the currently monitored data with the previous years' data through the data comparison module, enabling the staff to timely understand the situation of the currently monitored data and make corresponding protective countermeasures, saving the time for finding countermeasures for the tailings dam and solving the problem that the existing monitoring system still needs to spend time on layout of countermeasures after monitoring the tailings dam.
[0006] (2) Technical Solutions
[0007] To achieve the above object, the present invention provides the following technical solution: A tailings dam safety monitoring system, including a deformation monitoring module for detecting the deformation of the tailings dam, a density monitoring module for detecting the density of the tailings dam, a precipitation monitoring module for detecting the precipitation in the tailings reservoir area, a flood discharge monitoring module for detecting the flood discharge volume of the tailings reservoir, a seepage monitoring module for detecting the seepage of the tailings dam and the tailings reservoir, and a control and processing center for obtaining the detection data of the deformation monitoring module, the density monitoring module, the precipitation monitoring module, the flood discharge monitoring module, and the seepage monitoring module, processing the data, and alarming through an alarm module;
[0008] The seepage monitoring module includes a seepage pressure monitoring unit for detecting the seepage pressure inside the tailings dam and a seepage flow monitoring unit for detecting the seepage flow volume inside the tailings dam.
[0009] Preferably, the deformation monitoring module includes a horizontal displacement monitoring unit for detecting the horizontal displacement of the tailings dam and a vertical displacement monitoring unit for detecting the vertical displacement of the tailings dam. The deformation monitoring module further includes a three-dimensional displacement monitoring unit for synchronously detecting the horizontal displacement and the vertical displacement of the tailings dam.
[0010] Preferably, the tailings dam safety monitoring system further includes a data storage module for storing the data processed and analyzed by the control and processing center, and a data comparison module for comparing the data processed and analyzed by the control and processing center with the historical data in the data storage module, and alarming the comparison data through the alarm module.
[0011] A tailings dam safety monitoring device, the monitoring device includes a hollow measuring rod and a fastening anchor rod fixed to the bottom end of the measuring rod. A control system capable of wirelessly transmitting and receiving signals is installed at the top end of the measuring rod. A vertical detection component is provided at the bottom end of the measuring rod, and at least one horizontally adjustable detection component is provided on the outer surface of the measuring rod;
[0012] The vertical detection component includes a vertical cylinder slidably connected to the outer surface of the measuring rod, and a force receiving plate is fixedly connected to the outer surface of the vertical cylinder. A first tensiometer for detecting the driving force of the vertically moving vertical cylinder is provided inside the measuring rod;
[0013] The horizontal detection component includes a hinge block connected to the outer surface of the measuring rod. One side of the hinge block is rotatably connected to a monitoring tube through a rotating shaft, and an angle sensor for monitoring the angle of the rotating shaft is fixedly installed on the hinge block.
[0014] Preferably, a threaded frame and a sliding frame are sequentially and slidably connected inside the measuring rod from top to bottom. The first tensiometer is fixed to the bottom of the threaded frame, and the sliding frame is fixedly connected to the vertical cylinder. Moreover, the tension end of the first tensiometer is fixedly connected to the sliding frame through a connecting rod;
[0015] The bottom end of the measuring rod is rotatably connected with a threaded rod, and the outer surface of the bottom end of the threaded rod is threadedly connected with the inside of the threaded frame;
[0016] A plurality of loose connecting ropes are fixedly connected between the threaded frame and the sliding frame.
[0017] Preferably, a sliding sleeve is slidably connected to the outer surface of one end of the monitoring tube, and a row of force-receiving blocks are fixedly connected to the outer surface of the sliding sleeve. A transmission frame is slidably connected to the inside of the monitoring tube, and the transmission frame is fixedly connected to the sliding sleeve. A second tensiometer is fixedly connected to one end inside the monitoring tube. The tension end of the second tensiometer is fixedly connected with a safety rope, and one end of the safety rope is fixedly connected to the transmission frame.
[0018] Preferably, at least three unfolding frames are arranged on the outer surface of the other end of the monitoring tube. A stretchable protective screen is fixedly connected between at least three unfolding frames. One end of at least three unfolding frames is respectively hinged to the other end of the monitoring tube through hinge members. One side of the transmission frame is hinged with at least three driving frames, and one end of at least three driving frames is respectively hinged to the inner side surface of the corresponding unfolding frame.
[0019] Preferably, a U-shaped block is fixedly connected to the outer surface of the measuring rod. The hinge block is slidably connected inside the U-shaped block in a vertical sliding manner. Two rows of locking holes are formed inside the U-shaped block, and one group of locking holes is fixed to the vertically adjusted hinge block through a fastening bolt.
[0020] (III) Beneficial effects
[0021] Compared with the prior art, the present invention provides a tailings dam safety monitoring system and monitoring equipment, which have the following beneficial effects:
[0022] 1. Through the arrangement of the flood discharge monitoring module, the present invention can detect the flood discharge situation of the tailings dam, prevent the problem of landslide caused by large precipitation and unsatisfactory flood discharge situation, further improve the scope of tailings dam safety monitoring. Moreover, through the arrangement of the data storage module, the monitoring data of previous years can be processed, which is convenient for comparing the currently monitored data with the previous year's data through the data comparison module, and giving an alarm through the alarm module to inform, so that the staff can timely understand the situation of the currently monitored data and make corresponding protective countermeasures, saving the time for finding countermeasures for the tailings dam and solving the problem that the existing monitoring system still needs to spend time on layout of countermeasures after monitoring the tailings dam.
[0023] 2. The present invention is provided with fastening bolts for installing the monitoring device inside the tailings dam. Through the setting of a control system capable of wirelessly transmitting and receiving signals, the data monitored by the monitoring device can be transmitted and alarmed by wireless communication, facilitating the staff to be informed in a timely manner and take corresponding measures. Through the setting of a vertical detection component, the vertical displacement of the tailings dam can be monitored. Through the setting of a horizontal detection component, the horizontal displacement of the tailings dam can be detected. The monitoring of vertical displacement and horizontal displacement is effectively linked and combined, with multi-faceted monitoring functions, further improving the functionality and practicality of the monitoring device.
[0024] 3. In the present invention, three deployment frames are hinged to a drive frame and a transmission frame in an inclined shape. When the transmission frame is driven horizontally, it can drive the three drive frames to deploy, indirectly causing the three deployment frames to deploy. Through the deployment of the three deployment frames, the tailings moving horizontally in the tailings dam can be limited, reducing the force of its horizontal displacement. A stretchable protective screen is fixedly connected between the three deployment frames, facilitating the synchronous deployment of the protective screen with the three deployment frames, further expanding the scope of horizontal displacement protection and improving the horizontal displacement protection effect, having a good monitoring and protection function. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 is a system block diagram of a tailings dam safety monitoring system of the present invention;
[0026] Figure 2 is a structural schematic diagram of a tailings dam safety monitoring device of the present invention;
[0027] Figure 3 of the present invention Figure 2 side view of the structure;
[0028] Figure 4 of the present invention Figure 2 cross-sectional schematic diagram of the measuring rod in;
[0029] Figure 5 of the present invention Figure 4 structural schematic diagram of the vertical detection component in;
[0030] Figure 6 of the present invention Figure 2 installation schematic diagram of the horizontal detection component in;
[0031] Figure 7 of the present invention Figure 6 structural schematic diagram of the measuring rod in;
[0032] Figure 8 of the present invention Figure 7 cross-sectional schematic diagram of the measuring rod in.
[0033] In the figure: 1. Measuring rod; 2. Fastening bolt; 3. Control system;
[0034] 4. Vertical detection component; 41. Vertical cylinder; 42. Stress plate; 43. First tensiometer; 44. Threaded frame; 45. Sliding frame; 46. Threaded rod; 47. Connecting rope;
[0035] 5. Horizontal detection component; 51. Hinge block; 52. Monitoring tube; 53. Angle sensor; 54. Sliding sleeve; 55. Stress block; 56. Transmission frame; 57. Second tensiometer; 58. Safety rope; 59. Deployment frame; 510. Protective screen; 511. Driving frame;
[0036] 6. U-shaped block; 7. Locking hole; 8. Fastening bolt. Specific implementation mode
[0037] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
[0038] Embodiment 1:
[0039] Referring to the attached Figure 1 , a tailings dam safety monitoring system includes a deformation monitoring module for detecting the deformation of the tailings dam, a density monitoring module for detecting the density of the tailings dam, a precipitation monitoring module for detecting the precipitation in the tailings reservoir area, a flood discharge monitoring module for detecting the flood discharge volume of the tailings reservoir, a seepage monitoring module for detecting the seepage of the tailings dam and the tailings reservoir, and a control processing center for acquiring the detection data of the deformation monitoring module, the density monitoring module, the precipitation monitoring module, the flood discharge monitoring module, and the seepage monitoring module, processing the data, and alarming through an alarm module;
[0040] Through the setting of the flood discharge monitoring module, the flood discharge situation of the tailings dam can be detected, preventing the problem of landslides caused by large precipitation and unsatisfactory flood discharge conditions, and further improving the scope of tailings dam safety monitoring;
[0041] The seepage monitoring module includes a seepage pressure monitoring unit for detecting the seepage pressure inside the tailings dam and a seepage flow monitoring unit for detecting the seepage flow volume inside the tailings dam;
[0042] The seepage monitoring module includes seepage pressure monitoring and seepage flow monitoring. The main methods for seepage pressure monitoring are piezometers, piezometric tubes, and piezometric holes. Among them, piezometers can be further divided into four types according to the measurement principle: vibrating wire type, inductive type, resistive type, and piezoresistive type; the measurement methods for seepage flow include volumetric method, weir method, flow velocity measurement method, and remote observation method.
[0043] The deformation monitoring module includes a horizontal displacement monitoring unit for detecting the horizontal displacement of the tailings dam and a vertical displacement monitoring unit for detecting the vertical displacement of the tailings dam. The deformation monitoring module also includes a three-dimensional displacement monitoring unit for synchronously detecting the horizontal and vertical displacements of the tailings dam;
[0044] By setting up the deformation monitoring module, not only can the vertical and horizontal displacements of the tailings dam be separately monitored to improve the monitoring effect, but also the vertical and horizontal displacements of the tailings dam can be synchronously monitored to improve the monitoring efficiency of the detection system;
[0045] The methods for horizontal displacement monitoring include sighting line method, tension wire method, laser collimation method, forward and reverse plumb line method, precise traverse method, and forward intersection method, etc.;
[0046] The main methods for vertical displacement monitoring are geometric leveling method, hydrostatic leveling method, and vertical height transfer method. The main methods for three-dimensional displacement monitoring of the dam are polar coordinate method, distance intersection method, three-dimensional laser scanning technology, GPS observation method, close-range photogrammetry method, aperture radar interferometry technology INSA, etc.
[0047] The tailings dam safety monitoring system also includes a data storage module for storing the data processed and analyzed by the control and processing center, and a data comparison module for comparing the data processed and analyzed by the control and processing center with the historical data in the data storage module and alarming the comparison data through the alarm module;
[0048] By setting up the data storage module, the monitoring data of previous years can be processed, which is convenient for comparing the currently monitored data with the previous years' data through the data comparison module, and alarming through the alarm module to inform the staff in time about the situation of the currently monitored data, enabling them to take corresponding protective countermeasures, saving the time for finding countermeasures for the tailings dam, and solving the problem that the existing monitoring system still needs to spend time on layout of countermeasures after monitoring the tailings dam.
[0049] Refer to the appendix Figures 2 to 8 A tailings dam safety monitoring device, the monitoring device includes a hollow measuring rod 1 and a fastening anchor rod 2 fixed to the bottom end of the measuring rod 1. A control system 3 capable of wirelessly transmitting and receiving signals is installed at the top end of the measuring rod 1. A vertical detection component 4 is arranged at the bottom end of the measuring rod 1. At least one horizontally adjustable detection component 5 is arranged on the outer surface of the measuring rod 1;
[0050] By setting the fastening bolt 2, the monitoring device is installed inside the tailings dam. Through the setting of the control system 3 that can wirelessly transmit and receive signals, the data monitored by the monitoring device can be transmitted and alarmed in a wireless communication manner, facilitating the staff to know in time and take corresponding measures;
[0051] By setting the vertical detection component 4, the vertical displacement of the tailings dam can be monitored. By setting the horizontal detection component 5, the horizontal displacement of the tailings dam can be detected. The vertical displacement and horizontal displacement monitoring are effectively linked and combined, with multi-faceted monitoring functions, further improving the functionality and practicality of the monitoring device;
[0052] The vertical detection component 4 includes a vertical cylinder 41 slidably connected to the outer surface of the measuring rod 1, and a force-bearing plate 42 is fixedly connected to the outer surface of the vertical cylinder 41. A first tensiometer 43 for detecting the driving force of the vertically downward moving vertical cylinder 41 is arranged inside the measuring rod 1;
[0053] By fixedly connecting a plurality of force-bearing plates 42 to the outer surface of the vertical cylinder 41, the driving force of the vertically downward displacement of the tailings dam can be detected through the force-bearing plates 42, so that the vertical cylinder 41 and the force-bearing plates 42 move synchronously following the vertically downward driving force of the tailings dam. Cooperating with the first tensiometer 43 to detect the driving force of the downward movement, the vertical displacement situation of the tailings dam can be understood;
[0054] The horizontal detection component 5 includes a hinge block 51 connected to the outer surface of the measuring rod 1. A monitoring tube 52 is rotatably connected to one side of the hinge block 51 through a rotating shaft, and an angle sensor 53 for monitoring the angle of the rotating shaft is fixedly installed on the hinge block 51;
[0055] By placing the monitoring tube 52 above or inside the tailings dam, the horizontal displacement of the tailings dam can be detected. By installing the monitoring tube 52 in a rotatable hinge manner, it is convenient for the monitoring tube 52 to drive the angle according to the angle of the horizontal displacement of the tailings dam. Then, cooperating with the angle sensor 53 to detect the angle change of the monitoring tube 52, the horizontal displacement data of the tailings dam can be further understood, facilitating the subsequent management work of the staff for the tailings dam.
[0056] Refer to the appendix Figure 5 Inside the measuring rod 1, a threaded frame 44 and a sliding frame 45 are slidably connected in sequence from top to bottom. The first tensiometer 43 is fixed to the bottom of the threaded frame 44, and the sliding frame 45 is fixedly connected to the vertical cylinder 41. And the tension end of the first tensiometer 43 is fixedly connected to the sliding frame 45 through a connecting rod;
[0057] The vertical cylinder 41 is fixedly connected to the sliding frame 45. When the vertical cylinder 41 moves downward, it can drive the sliding frame 45 to move downward. The driving force of the downward movement of the vertical cylinder 41 can be detected by the first tensiometer 43, so as to obtain the data of the vertical displacement of the tailings dam;
[0058] The bottom end of the measuring rod 1 is rotatably connected to a threaded rod 46, and the outer surface of the bottom end of the threaded rod 46 is threadedly connected to the inside of the threaded frame 44;
[0059] By rotating and driving the threaded rod 46, the position of the threaded frame 44 can be adjusted up and down. Through the up and down movement of the threaded frame 44, the first tensiometer 43 can be adjusted up and down, which is convenient for the reset of the stretching part of the first tensiometer 43, preventing the first tensiometer 43 from remaining in the extended state all the time. This will not only make it impossible to carry out subsequent vertical displacement detection work, but also easily cause damage to the first tensiometer 43;
[0060] A number of loose connecting ropes 47 are fixedly connected between the threaded frame 44 and the sliding frame 45;
[0061] By fixedly connecting the threaded frame 44 to the sliding frame 45 with a number of loose connecting ropes 47, it not only avoids damage to the first tensiometer 43 when the downward displacement distance of the sliding frame 45 exceeds the detection and stretching range of the first tensiometer 43, but also is convenient for the sliding frame 45 to rise and reset at the position of the phreatic line driven by the connecting rope 47 when the threaded frame 44 moves upward, and is convenient for driving the first tensiometer 43 to move downward when the threaded frame 44 moves downward, forming the reset of the stretching part of the first tensiometer 43, preventing the first tensiometer 43 from remaining in the extended state all the time. This will not only make it impossible to carry out subsequent vertical displacement detection work, but also easily cause damage to the first tensiometer 43;
[0062] Refer to the appendix Figures 6 to 8 One end of the monitoring pipe 52 is slidably connected to the outer surface of a sliding sleeve 54, and a row of force-receiving blocks 55 are fixedly connected to the outer surface of the sliding sleeve 54. A transmission frame 56 is slidably connected to the inside of the monitoring pipe 52, and the transmission frame 56 is fixedly connected to the sliding sleeve 54. One end inside the monitoring pipe 52 is fixedly connected to a second tensiometer 57. The pulling end of the second tensiometer 57 is fixedly connected to a safety rope 58, and one end of the safety rope 58 is fixedly connected to the transmission frame 56;
[0063] A row of force - receiving blocks 55 is fixedly connected to the outer surface of the sliding sleeve 54. Through the row of force - receiving blocks 55, full contact with the tailings of the tailings dam can be achieved. When the tailings dam undergoes horizontal displacement, the displacement driving force can drive the row of force - receiving blocks 55 to displace. Furthermore, the driving frame 56 can be driven to displace through the sliding sleeve 54. The displacement driving force of the driving frame 56 can be detected through the second tensiometer 57. The data is processed in cooperation with the control system 3, and alarm work is carried out through remote communication means;
[0064] The tension end of the second tensiometer 57 is fixedly connected to the driving frame 56 by a safety rope 58. So that when the horizontal displacement driving force exceeds the detection range of the second tensiometer 57, the safety rope 58 will break. This not only effectively protects the second tensiometer 57 and prevents damage to the second tensiometer 57 caused by excessive tension, but also can timely deploy the protective components of the horizontal detection assembly 5 to form the displacement protection work of the tailings dam.
[0065] Embodiment 2: The difference from Embodiment 1 is as follows;
[0066] Refer to the appendix Figure 7 and Figure 8 On the outer surface of the other end of the monitoring pipe 52, at least three deployment frames 59 are provided. A stretchable protective screen 510 is fixedly connected between at least three deployment frames 59. One end of at least three deployment frames 59 is respectively hinged to the other end of the monitoring pipe 52 through a hinge. On one side of the driving frame 56, at least three driving frames 511 are hinged, and one end of at least three driving frames 511 is respectively hinged to the inner side surface of the corresponding deployment frame 59;
[0067] Through the three deployment frames 59, the inclined driving frames 511 are hinged to the driving frame 56. When the driving frame 56 is driven horizontally, it can drive the three driving frames 511 to deploy, indirectly causing the three deployment frames 59 to deploy. Through the deployment of the three deployment frames 59, the tailings moving horizontally in the tailings dam can be limited, reducing the horizontal displacement force. Since a stretchable protective screen 510 is fixedly connected between the three deployment frames 59, it is convenient for the protective screen 510 to be deployed synchronously with the three deployment frames 59, further increasing the range of horizontal displacement protection and improving the horizontal displacement protection effect, having a good monitoring and protection function;
[0068] It solves the problem that in the prior art, when the monitoring equipment monitors the displacement of the tailings dam, if the displacement force is large, the monitoring equipment will not only be damaged, but also cannot protect the displaced tailings dam in the first place.
[0069] Embodiment 3: The difference from Embodiment 1 is as follows;
[0070] Refer to the appendix Figure 3 andFigure 6 On the outer surface of the measuring rod 1, a U-shaped block 6 is fixedly connected. The hinge block 51 is slidably connected inside the U-shaped block 6 in a vertical sliding manner. Two rows of locking holes 7 are formed inside the U-shaped block 6. One set of the locking holes 7 is fixed to the vertically adjusted hinge block 51 through a fastening bolt 8.
[0071] By installing the hinge block 51 inside the U-shaped block 6 in a vertical sliding manner, when the monitoring device is installed, the installation position of the horizontal detection assembly 5 can be adjusted according to the actual slope conditions, so as to facilitate the installation above the tailings dam or inside the tailings dam, and further meet the monitoring of the horizontal displacement on the surface of the tailings dam or the horizontal displacement inside the tailings dam, further improving its monitoring range. Through the setting of the fastening bolt 8, it is used to fix the horizontally adjusted detection assembly 5 to ensure its stability during subsequent monitoring.
[0072] It should be noted that the term "comprising" or any other variant thereof is intended to cover non-exclusive inclusion, so that a process, method, article or device comprising a series of elements not only includes those elements but also includes other elements not explicitly listed, or further includes elements inherent to such a process, method, article or device. Without further limitation, an element defined by the statement "comprising one..." does not exclude the existence of additional identical elements in the process, method, article or device comprising the said element.
[0073] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tailings dam safety monitoring device, characterized in that: It includes a deformation monitoring module for detecting deformation of the tailings dam, a density monitoring module for detecting the density of the tailings dam, a precipitation monitoring module for detecting precipitation in the tailings pond area, a flood discharge monitoring module for detecting the flood discharge of the tailings pond, a seepage monitoring module for detecting seepage of the tailings dam and the tailings pond, and a control processing center for obtaining detection data of the deformation monitoring module, the density monitoring module, the precipitation monitoring module, the flood discharge monitoring module, and the seepage monitoring module for processing and alarming through the alarm module; The seepage monitoring module includes a seepage pressure monitoring unit for detecting the seepage pressure inside the tailings dam and a seepage flow monitoring unit for detecting the seepage flow inside the tailings dam; The monitoring device comprises a hollow measuring rod (1) and a fastening anchor rod (2) fixed to the bottom end of the measuring rod (1); a control system (3) capable of wirelessly transmitting and receiving signals is installed at the top end of the measuring rod (1); the device is characterized in that: a vertical detection component (4) is arranged at the bottom end of the measuring rod (1); and at least one angle-adjustable horizontal detection component (5) is arranged on the outer surface of the measuring rod (1); The vertical detection assembly (4) comprises a vertical cylinder (41) slidably connected to the outer surface of the measuring rod (1), and a force plate (42) is fixedly connected to the outer surface of the vertical cylinder (41), and a first dynamometer (43) for detecting the driving force of the vertical cylinder (41) moving downward is arranged inside the measuring rod (1); The horizontal detection assembly (5) comprises an articulated block (51) connected to the outer surface of the measuring rod (1); one side of the articulated block (51) is rotatably connected to a monitoring tube (52) via a rotating shaft; and an angle sensor (53) for monitoring the angle of the rotating shaft is fixedly mounted on the articulated block (51).
2. A tailings dam safety monitoring device according to claim 1, characterized in that: The deformation monitoring module includes a horizontal displacement monitoring unit for detecting the horizontal displacement of the tailings dam and a vertical displacement monitoring unit for detecting the vertical displacement of the tailings dam. The deformation monitoring module also includes a three-dimensional displacement monitoring unit for synchronously detecting the horizontal and vertical displacements of the tailings dam.
3. A tailings dam safety monitoring device according to claim 1, characterized in that: The tailings dam safety monitoring equipment also includes a data storage module for storing data processed and analyzed by the control processing center, a data comparison module for comparing the data processed and analyzed by the control processing center with the historical data of the data storage module, and alarming the compared data through the alarm module.
4. The tailings dam safety monitoring device according to claim 1, characterized in that: The measuring rod (1) is slidably connected with a threaded frame (44) and a sliding frame (45) in sequence from top to bottom, the first tensile gauge (43) is fixed to the bottom of the threaded frame (44), the sliding frame (45) is fixedly connected to the vertical cylinder (41), and the tension end of the first tensile gauge (43) is fixedly connected to the sliding frame (45) via a connecting rod; The bottom end of the measuring rod (1) is rotatably connected to a threaded rod (46), and the outer surface of the bottom end of the threaded rod (46) is threadably connected to the inner surface of the threaded frame (44); A plurality of loose connection ropes (47) are fixedly connected between the threaded frame (44) and the sliding frame (45).
5. The tailings dam safety monitoring device according to claim 1, characterized in that: The outer surface of one end of the monitoring tube (52) is slidably connected to a sliding sleeve (54), and the outer surface of the sliding sleeve (54) is fixedly connected to a row of force blocks (55); the interior of the monitoring tube (52) is slidably connected to a transmission frame (56), and the transmission frame (56) is fixedly connected to the sliding sleeve (54); one end of the interior of the monitoring tube (52) is fixedly connected to a second tension meter (57), a tension end of the second tension meter (57) is fixedly connected to a safety rope (58), and one end of the safety rope (58) is fixedly connected to the transmission frame (56).
6. A tailings dam safety monitoring device according to claim 5, characterized in that: At least three expansion frames (59) are arranged on the outer surface of the other end of the monitoring tube (52), and an extendable protective gauze (510) is fixedly connected between the at least three expansion frames (59), and one end of the at least three expansion frames (59) is hinged to the other end of the monitoring tube (52) through a hinge, and at least three drive frames (511) are hinged to one side of the transmission frame (56), and one end of the at least three drive frames (511) is respectively hinged to the inner side surface of the corresponding expansion frame (59).
7. The tailings dam safety monitoring device according to claim 1, characterized in that: A U-shaped block (6) is fixedly connected to the outer surface of the measuring rod (1); the hinge block (51) is slidably connected to the inside of the U-shaped block (6) in an up-and-down sliding manner; two rows of locking holes (7) are provided inside the U-shaped block (6); one group of the locking holes (7) is fixed to the hinge block (51) after being adjusted up and down by means of fastening bolts (8).
Citation Information
Patent Citations
Tailings pond safety monitoring system and method
CN114942041B
Safety monitoring system for tailing pond
CN109655103A