Supporting system for rectangular pier column elevated cantilever bent cap and construction method

By adopting a support system for rectangular pier columns in the construction of bridge elevated cantilever cover beams, including cow leg components, lifting devices, support components and platform components, the foundation bearing capacity requirements and low construction efficiency in the existing construction methods are solved. With narrow scope of application and large safety hazards, efficient and safe installation of cover beams has been achieved.

CN119411489APending Publication Date: 2025-02-11CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411838737.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-13
Publication Date
2025-02-11

AI Technical Summary

Technical Problem

The existing bridge elevated cantilever cover beam construction methods have problems such as high foundation bearing capacity requirements, low construction efficiency, narrow application scope, and large safety hazards.

Method used

A support system for rectangular pier columns is adopted, including a horn assembly, a lifting device, a support assembly and a platform assembly. The ox leg assembly is slidably installed on the pier column through the connecting unit. The lifting device is used to adjust the installation position of the support assembly. The support assembly is used to support the cover beam. The platform assembly is located at the bottom end of the cover beam for easy construction.

Benefits of technology

It has achieved stable installation of elevated cantilever cover beams, with large load capacity, convenient installation, wide application range, improved construction efficiency and safety, and reduced construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119411489A_ABST
    Figure CN119411489A_ABST
Patent Text Reader

Abstract

The invention relates to a supporting system for a rectangular pier column elevated cantilever cover beam, which comprises a supporting assembly, a supporting rod assembly, a supporting rod assembly, a supporting rod assembly, a supporting rod assembly and a supporting rod assembly, and is characterized in that the supporting assembly is fixedly mounted on a pier column through a bracket assembly; the platform assembly is fixedly installed at the top end of the supporting assembly, located at the bottom end of the cover beam and suitable for construction; the bracket assembly comprises a bracket body and a connecting unit, one end of the connecting unit is embedded in the pier column, the bracket body is embedded in the other end of the connecting unit, and the bracket body is suitable for bearing the supporting assembly. The bracket body of the supporting system is accurate in mounting position and high in overall stress stability, and deformation and deviation are avoided; the supporting assembly is used for supporting the cover beam, has the advantages of being large in load capacity and good in interchangeability, can be suitable for construction of various elevated cover beams and is wide in application range. And the platform assembly is fixedly installed at the top end of the supporting assembly and the bottom end of the cover beam, construction of workers is facilitated, convenience and rapidness are achieved, a protective net is further arranged at the outer end of the platform assembly, and safety is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and relates to an elevated cantilever cap beam of a bridge, in particular to a support system and a construction method for an elevated cantilever cap beam of a rectangular pier column. Background Art

[0002] At present, the elevated cantilever cap beam of the bridge is mainly constructed by the bracket method, the through-core steel rod method, the hoop method, and the embedded climbing cone method, which has the following problems:

[0003] 1. The support method construction has high requirements on the bearing capacity of the foundation. The foundation needs to be processed before construction, which consumes a lot of manpower and material resources and has low construction efficiency. When the bottom mold height is high, the volume of the steel pipe support is very large and the cost is very high. At the same time, the support installation steps are cumbersome, time-consuming and labor-intensive.

[0004] 2. The through-core steel rod method requires the embedding of reserved holes in the pier column, which not only affects the appearance quality of the pier column, but also requires manual processing in sequence after the construction is completed, which is time-consuming and labor-intensive, and has low construction efficiency;

[0005] 3. The hoop method is suitable for round bridge piers and cannot be installed on rectangular bridge piers. The scope of application is narrow, and the friction force of ordinary hoops cannot meet the construction requirements, which poses a safety hazard.

[0006] 4. The embedded climbing cone method uses steel distribution beams as load-bearing components. When the cantilever cap beam is too long or the load is too heavy, the deformation often exceeds the limit and cannot meet the construction requirements. The climbing cone installation usually uses a hanging hammer line for positioning, which has a large error and unstable positioning results, which can easily affect the installation of subsequent cap beam corbels. In addition, the existing protective measures for cap beam construction are relatively simple, posing safety hazards.

[0007] Therefore, we propose a support system and construction method for rectangular pier elevated cantilever cap beam to solve the above problems. Summary of the invention

[0008] The purpose of the present invention is to overcome the deficiencies of the prior art and to provide a support system and a construction method for a rectangular pier elevated cantilever cap beam which has a large load capacity and is easy to install.

[0009] To solve the above problems, the technical solution of the present invention is:

[0010] A support system for a rectangular pier elevated cantilever cap beam, comprising:

[0011] A support assembly is fixedly mounted on the pier column through a corbel assembly and is suitable for supporting the cap beam;

[0012] The platform assembly is fixedly mounted on the top end of the support assembly and located at the bottom end of the cap beam, suitable for construction;

[0013] The corbel assembly comprises a corbel body and a connecting unit, one end of the connecting unit is buried in the pier column, and the other end of the connecting unit is embedded with the corbel body, and the corbel body is suitable for supporting the support assembly.

[0014] In a further embodiment, a lifting device is provided between the corbel body and the support assembly, and the lifting device is suitable for adjusting the installation position of the support assembly and for disassembling the support assembly.

[0015] In a further embodiment, the lifting device includes a pair of lifting blocks and a pair of adjusting blocks, the adjusting blocks are slidably mounted between the two ends of the pair of lifting blocks, the lifting blocks and the adjusting blocks are both trapezoidal structures, suitable for driving the pair of lifting blocks to lift when the pair of adjusting blocks move;

[0016] A limiting bolt is installed between a pair of adjusting blocks, and a pair of limiting nuts are installed on the limiting bolts, which are suitable for fixing the adjusting blocks.

[0017] In a further embodiment, the support assembly includes a plurality of Bailey plates, a plurality of lower reinforcing rods and a plurality of upper reinforcing rods. The plurality of Bailey plates are arranged in two layers and are respectively located on both sides of the pier. The lower reinforcing rods are fixedly installed at the bottom end of the Bailey plate, and the upper reinforcing rods are fixedly installed at the top end of the Bailey plate, which is suitable for improving the strength of the Bailey plate.

[0018] In a further embodiment, the two ends of the two lower reinforcing bars and the two ends of the two upper reinforcing bars on the same side of the pier are fixed together by connecting plates, and a pair of reinforcing diagonal bars are fixed between the connecting plates on both sides of the pier.

[0019] In a further embodiment, a distribution beam is fixedly mounted between the platform assembly and the upper reinforcement bar;

[0020] The platform assembly includes several platform bodies and several cap beam bottom molds. Two rows of platform bodies are fixedly installed on the top end of the distribution beam. A protective net is fixedly installed on the outer end of the platform body. Several cap beam bottom molds are installed between the two rows of platform bodies, which is suitable for constructing the cap beam.

[0021] In a further embodiment, the connecting unit of the corbel assembly includes a plurality of embedded parts, a plurality of embedded screws and a plurality of climbing cones, a plurality of climbing cones are fixedly installed on the corbel body, a plurality of embedded parts are embedded in the pier, and embedded screws are fixedly installed between the plurality of climbing cones and the plurality of embedded parts.

[0022] In a further embodiment, a pad is fixedly mounted on one end of the corbel body.

[0023] In a further embodiment, a plurality of positioning ribs are fixedly installed at intervals on the main ribs of the pier column, and pads are slidably installed between the plurality of positioning ribs.

[0024] A construction method for a support system of a rectangular pier elevated cantilever cap beam, comprising the following steps:

[0025] Step S101: Install the bracket assembly

[0026] Fix the corbel assembly on the pier column, and install the lifting device on the corbel assembly;

[0027] Step S103: Assembling support components

[0028] Assemble the support components, and hoist the assembled support components onto the lifting device for installation;

[0029] Step S105: Install platform components

[0030] The platform assembly is fixedly installed on the support assembly, which is suitable for constructing the cap beam.

[0031] Compared with the prior art, the present invention has the following beneficial effects:

[0032] 1. The corbel body of this support system is slidably installed on the pier through the connecting unit, and the connecting assembly is buried in the pier, which can ensure that the installation position of the corbel body is accurate and the overall force stability is high, avoiding deformation and displacement; the lifting device and the support assembly are fixedly installed on the corbel assembly in sequence, and the support assembly is used to support the cap beam. It has the advantages of large load capacity and good interchangeability, and can be applied to the construction of various types of elevated cap beams, with a wide range of applications; and the platform assembly is fixedly installed at the top end of the support assembly and the bottom end of the cap beam, which is convenient and quick for the staff to carry out construction. A protective net is also arranged on the outer end of the platform assembly, which has high safety.

[0033] 2. A lifting device is fixedly installed on the corbel body of the support system. The lifting device includes a pair of lifting blocks and a pair of adjusting blocks. The adjusting blocks are slidably installed between the two ends of the pair of lifting blocks. The lifting blocks and the adjusting blocks are both trapezoidal structures. The sliding of the adjusting blocks drives the lifting blocks to move up and down, thereby adjusting the installation height of the support assembly, which is convenient for elevation adjustment, improves the installation accuracy of the support assembly, and is convenient and quick to dismantle, thereby improving construction efficiency.

[0034] 3. This support system has several positioning bars fixedly installed on the main reinforcement of the pier column at intervals. The positioning bars are all located around the pad, so that the pad and the corbel body are close to the positioning bars and can slide between the positioning bars, which is convenient and quick to install and remove the corbel body. The positioning bars are combined with embedded parts, embedded bolts, and climbing cones to avoid the displacement of the corbel body during concrete pouring, ensure installation accuracy, and improve construction quality.

[0035] 4. The support components of the present support system include a number of Bailey plates, which are double-layered. Upper reinforcing rods and lower reinforcing rods are fixedly installed at the top and bottom ends of the Bailey plates, respectively, to improve the bending resistance of the Bailey plates, strengthen the shear resistance of the Bailey plates, and further enhance the weighing capacity of the Bailey plates; connecting plates are fixedly installed between the upper and lower reinforcing rods of the double-layer Bailey plates to connect the double-layer Bailey plates into a whole, which can effectively prevent the Bailey plates from overturning; inclined reinforcing diagonal rods are fixedly installed between the connecting plates on both sides of the pier column to connect the Bailey plates on both sides of the pier column into a whole, thereby enhancing the lateral stability of the support component, and reinforcing vertical rods are fixedly installed on the Bailey plates at the pier column supports, which greatly reduces the stress concentration at the supports.

[0036] 5. This support system has a platform component fixedly installed at the top end of the support component, and the platform component is located at the bottom end of the cap beam, which is convenient for construction workers to work. A protective net is fixedly installed at the outer end of the platform body, which can provide safety protection measures for construction workers and avoid safety hazards. The protective net can be assembled and disassembled on site and reused, and can be combined with up and down ladders, which is convenient and quick to use; and a hinged cover plate is connected between the platform body and the bottom formwork of the cap beam to facilitate construction workers to install and remove the bolts of the support component below.

[0037] 6. This support system does not require the construction of load-bearing brackets, reduces the use of formwork and supports, thereby reducing the use of building materials, effectively shortening the construction period, improving construction efficiency, and reducing construction costs. It is suitable for various forms of cap beam construction, effectively improving the structural stress performance of the Bailey beam, and solving the problem of excessive stress and deformation. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a front view of a support system for a rectangular pier elevated cantilever cap beam;

[0039] Figure 2 for Figure 1 A in the enlarged view;

[0040] Figure 3 It is a side view of a support system for a rectangular pier elevated cantilever cap beam;

[0041] Figure 4 A schematic diagram of a corbel assembly for a support system of an elevated cantilever cap beam of a rectangular pier;

[0042] Figure 5 It is a schematic diagram of a lifting device for a supporting system of a rectangular pier elevated cantilever cap beam;

[0043] Figure 6 The present invention is a flow chart of a construction method for a support system of an elevated cantilever cap beam of a rectangular pier.

[0044] In the figure: 1. pier column; 11. main reinforcement; 2. corbel assembly; 21. corbel body; 211. reinforcement plate; 22. connection unit; 221. embedded parts; 222. embedded screws; 223. positioning ribs; 224. climbing cone; 23. pad; 3. support assembly; 31. lower reinforcement rod; 311. connection hole; 32. Bailey plate; 33. upper reinforcement rod; 34. reinforcement vertical rod; 35. connection plate; 36. reinforcement diagonal rod; 37. fastener; 4. platform assembly; 41. platform body; 42. bottom formwork of cap beam; 43. protection net; 5. lifting device; 51. lifting block; 52. adjustment block; 53. limit bolt; 54. limit nut; 6. distribution beam; 7. cap beam. DETAILED DESCRIPTION

[0045] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0046] Embodiment 1:

[0047] A support system for a rectangular pier elevated cantilever cap beam, such as Figures 1 to 5 As shown, a number of corbel assemblies 2 are fixedly installed on the side of the pier 1, a support assembly 3 is installed on the corbel assembly 2, a platform assembly 4 is fixedly installed on the top end of the support assembly 3, and the platform assembly 4 is located at the bottom end of the cap beam 7; the support assembly 3 is arranged horizontally and is the same length as the cap beam 7.

[0048] like Figure 2 , Figure 4As shown, the corbel assembly 2 includes a corbel body 21 and a connecting unit 22, one end of the connecting unit 22 is pre-embedded in the pier 1, and the other end of the connecting unit 22 is slidably embedded in the corbel body 21, and a plurality of reinforcing plates 211 are fixedly installed on the corbel body 21 at intervals to enhance the shear and bending resistance of the corbel body 21, and a plurality of circular holes are formed at intervals on the side end of the corbel body 21; the connecting unit 22 includes a plurality of embedded parts 221, a plurality of embedded screws 222, a plurality of climbing cones 224, and a pad 23, a plurality of embedded parts 221 are pre-embedded in the pier 1 at intervals, and a climbing cone 224 is welded at the circular hole of the corbel body 21 to prevent the climbing cone 224 from moving during the pouring of concrete, thereby ensuring accurate installation position and facilitating installation of the corbel body 21; the corbel body 21 and the pier A pad 23 is tightly arranged between the columns 1 to facilitate the installation of the corbel body 21; a plurality of circular holes are formed at intervals on the pad 23 for inserting climbing cones 224, and the sizes of the circular holes of the corbel body 21 and the pad 23 correspond to the sizes of the climbing cones 224, and the plurality of climbing cones 224 correspond to the plurality of embedded parts 221 one by one, and embedded screws 222 are inserted between the plurality of climbing cones 224 and the plurality of embedded parts 221, and the outer ends of the embedded screws 222 are closely attached to the concrete surface of the pier 1; a plurality of vertically arranged main reinforcements 11 are installed in the pier 1, and a plurality of positioning reinforcements 223 are fixedly installed at intervals on the main reinforcements 11, and the plurality of positioning reinforcements 223 are all located on the peripheral side of the pad 23, so that the pad 23 can slide between the plurality of positioning reinforcements 223, which is convenient for quick installation and removal of the corbel body 21. Preferably, the horizontal spacing between the centers of the several circular holes on the corbel body 21 and the several circular holes on the pad 23 is 23 cm, the vertical spacing between the centers of the holes is 20 cm, the diameter of the holes is 44 mm, and a total of six circular holes are arranged, which are divided into three rows and two columns; the installation position of the corbel assembly 2 can be accurately obtained by subtracting the thickness of the bottom formwork 42 of the cap beam, the distribution beam 6, the lower reinforcing rod 31, the Bailey plate 32, the upper reinforcing rod 33 and the height of the lifting device 5 from the top elevation of the pier 1; the climbing cone 224 adopts the M42D32~4-piece set; the corbel body 21 is made of Q235 steel material and 20 mm thick steel plate by welding; the positioning rib 223 adopts an L-shaped iron sheet.

[0049] like Figure 3 , Figure 5As shown, a lifting device 5 is arranged between the bracket assembly 2 and the support assembly 3, and the lifting device 5 includes a pair of lifting blocks 51 and a pair of adjusting blocks 52. The pair of adjusting blocks 52 are slidably installed between the two ends of the pair of lifting blocks 51. The lifting blocks 51 and the adjusting blocks 52 are both trapezoidal structures, and the contact surfaces of the lifting blocks 51 and the adjusting blocks 52 are both inclined surfaces, so that during the sliding process of the adjusting blocks 52, the height of the lifting blocks 51 changes accordingly, which is convenient for lowering the height of the support assembly 3 after the construction of the cap beam 7 is completed, so that the top end of the support assembly 3 is separated from the cap beam 7, thereby completing the support Disassembly of component 3; a limit bolt 53 is installed between a pair of adjusting blocks 52 to connect a pair of lifting blocks 51 and a pair of adjusting blocks 52 into a whole, and two groups of limit nuts 54 are also installed on the limit bolt 53, and the two groups of limit nuts 54 are respectively located on the outside of the pair of adjusting blocks 52, so as to fix the position of the adjusting blocks 52 and then fix the height of the support component 3. For example, when installing the support component 3, the pair of lifting blocks 51 are adjusted to the highest position, and when disassembling the support component 3, the pair of lifting blocks 51 are adjusted to the lowest position. The elevation adjustment is convenient and quick, and it is easy to install and disassemble, which improves the construction accuracy.

[0050] like Figures 1 to 3As shown, the support assembly 3 includes a plurality of lower reinforcing rods 31, a plurality of Bailey sheets 32 and a plurality of upper reinforcing rods 33. The plurality of Bailey sheets 32 are arranged in two layers and are respectively located at the front and rear sides of the pier 1. The Bailey sheets 32 adopt 321 double-piece Bailey sheets, and the standard segment length is 3 meters and the height is 1.5 meters. The lower ends of the plurality of Bailey sheets 32 located on the same side of the pier 1 are fixedly installed with the lower reinforcing rods 31, and the upper ends of the plurality of Bailey sheets 32 located on the same side of the pier 1 are fixedly installed with the upper reinforcing rods 33, which are suitable for improving the structural strength of the Bailey sheets 32 and improving the bearing capacity of the Bailey sheets 32. The upper and lower ends of the lower reinforcing rods 31, the upper reinforcing rods 33 and the Bailey sheets 32 are spaced apart with a plurality of connecting holes 311, and the connecting holes 311 are used for passing bolts for easy connection. The two ends of the two lower reinforcing rods 31 and the two ends of the two upper reinforcing rods 33 located on the same side of the pier 1 are fixed together by connecting plates 35, respectively, to enhance the lateral stability of the Bailey plate 32, and the connecting plates 35 are reinforced by tightening nuts; two reinforcing diagonal rods 36 are fixedly installed between the four connecting plates 35 on both sides of the pier 1, and the two reinforcing diagonal rods 36 are both inclined, and the two reinforcing diagonal rods 36 cross to form an X-shaped structure, and the upper and lower ends of the reinforcing diagonal rods 36 are both installed at the connecting holes 311; the vertically arranged reinforcing vertical rods 34 are fixedly installed on the Bailey plate 32 located at the position of the pier 1 to avoid excessive stress near the support of the lower reinforcing rod 31, enhance the vertical bearing capacity of the Bailey plate 32, and ensure that the support assembly 3 is stable and firm. Preferably, the reinforcing vertical rod 34 is made of No. 10 channel steel, and bolt holes are reserved on the reinforcing vertical rod 34 for installation in conjunction with the connecting holes 311; the reinforcing diagonal rod 36 is made of angle steel with a size of L70×5mm; the upper reinforcing rod 33 and the lower reinforcing rod 31 are both formed by combining two channel steels; a number of steel plates with round holes are welded on the upper reinforcing rod 33 and the lower reinforcing rod 31 at intervals, so that the Bailey piece 32 and the upper reinforcing rod 33 and the lower reinforcing rod 31 can be connected together by bolts, and the steel plate with round holes is reversely welded to one side of the rod, so that the nuts connecting the upper reinforcing rod 33, the lower reinforcing rod 31 and the Bailey piece 32 are not exposed, ensuring that they can pass through the roller smoothly during pushing out.

[0051] like Figure 1 , Figure 3As shown, a number of longitudinally arranged distribution beams 6 are fixedly installed at intervals on the upper reinforcing rod 33, and a platform assembly 4 is fixedly installed on the distribution beam 6. The platform assembly 4 includes a number of platform bodies 41 and a number of cap beam bottom molds 42. The number of platform bodies 41 are arranged in two rows and are respectively located at the two ends of the number of distribution beams 6. The two rows of platform bodies 41 are respectively located on the front and rear sides of the cap beam 7. A number of bolt holes are provided at intervals at the outer edges of the platform bodies 41 for inserting fasteners 37. The fasteners 37 are 32U-shaped fasteners with openings facing upward. The platform bodies 41 are firmly installed on the distribution beam 6 and tightened with bolts; a cap beam bottom mold 42 is fixedly installed at the bottom end of the cap beam 7. The cap beam bottom mold 42 is located between the two rows of platform bodies 41, and a movable cover plate is hingedly connected between the two rows of platform bodies 41 and the cap beam bottom mold 42, so as to facilitate the installation and removal of the bolts of the support assembly 3; protective nets 43 are fixedly installed on the outer ends of the number of platform bodies 41, which are suitable for protecting the safety of construction personnel, and the protective nets 43 can be assembled and disassembled on site and reused, and can be combined with up and down ladders, which is convenient and quick to use. Preferably, the distribution beam 6 is made of I-beam No. 20.

[0052] Example 2

[0053] A construction method for a support system of a rectangular pier elevated cantilever cap beam, such as Figure 6 As shown, the following steps are also included:

[0054] Step S101: Install the bracket assembly 2

[0055] Before pouring concrete of the pier 1, weld the climbing cone 224 to the circular hole of the corbel body 21 and the circular hole of the pad 23 to ensure that the weld is uniform and full. After the welding of the climbing cone 224 is completed, screw the embedded screw 222 into the climbing cone 224, and fix the pad 23, climbing cone 224 and embedded screw 222 together in the pier 1. During the installation process, stagger the main reinforcement 11 and the stirrups, and adjust the spacing between the stirrups when necessary.

[0056] After burying the embedded screw 222 and other components, a number of positioning ribs 223 are welded at intervals on the main reinforcement 11 of the pier 1. The positioning ribs 223 are all located on the circumferential side of the pad 23 and are close to the pad 23 to ensure that the pad 23 will not shift. At the same time, the pad 23 can move along the positioning ribs 223, which is convenient for quickly installing the pad 23 and the corbel body 21. At the same time, the embedded part 221 is screwed from the inside of the pier 1 onto the embedded screw 222 to complete the installation of the corbel assembly 2.

[0057] Step S103: Assembling support components 3

[0058] The Bailey piece 32 is formed by welding a vertical rod and an oblique rod. One end of the upper chord rod and the lower chord rod of the Bailey piece 32 are both female heads, and the other end are both male heads. Both the female head and the male head are provided with a latch hole. When assembling the Bailey piece 32, the male head of one Bailey piece 32 is inserted into the female head of the adjacent Bailey piece 32, the latch holes of the male head and the female head are aligned, and the latch is inserted to complete the connection of the adjacent Bailey pieces 32. A circular hole is formed at the end of the latch for inserting a safety pin to prevent the pin from falling off. A groove is formed at the pin head, and the direction of the groove is the same as that of the circular hole of the latch. The connection method of the remaining Bailey pieces 32 is the same. In order to ensure the rigidity of the Bailey piece 32, adjacent Bailey pieces 32 are connected by staggered joints, which greatly reduces the displacement of the main beam caused by deformation at the joint, improves the bending resistance of the Bailey piece 32, and gives full play to the shear resistance of the web of the Bailey piece 32.

[0059] After the assembly of a single Bailey plate 32 is completed, the lower reinforcing rod 31 and the upper reinforcing rod 33 are fixedly installed on the Bailey plate 32, and the Bailey plate 32 is set to two layers, and the two ends of the lower reinforcing rod 31 and the upper reinforcing rod 33 of the two layers of Bailey plates 32 are fixedly installed together through the connecting plate 35; the two Bailey plates 32 are firmly fixed by using an I-beam elevator, and two lifting points are set when the Bailey plate 32 is hoisted, and then the Bailey plate 32 is hoisted to the lifting device 5 by using a truck crane. During the hoisting process, the speed is kept slow and steady to reduce the vibration of the suspended part and prevent the bridge from overturning; after the Bailey plates 32 on both sides of the pier 1 are installed, the reinforcing diagonal rod 36 is fixedly installed at the node of each Bailey plate 32 through the operating platform provided by the truck crane, and the two ends of the reinforcing diagonal rod 36 are connected to the connecting hole 311 of the Bailey plate 32 by bolts.

[0060] Step S105: Install platform component 4

[0061] After the support assembly 3 is installed, a number of longitudinally arranged distribution beams 6 are fixedly installed on the upper reinforcing rod 33 at intervals, and the distance between two adjacent distribution beams 6 is adjusted according to the height of the cap beam 7. The cap beam bottom formwork 42 is fixedly installed on the distribution beam 6 and at the bottom end of the cap beam 7, and a number of platform bodies 41 are fixedly installed at both ends of the distribution beam 6. Two adjacent platform bodies 41 are fixed together by bolts, and the platform body 41 and the cap beam bottom formwork 42 are hingedly connected to facilitate the installation and removal of the bolts of the support assembly 3 below; and a protective net 43 is fixedly installed on the outer end of the platform body 41. After the installation is completed, the pier 1 and the cap beam 7 can be constructed.

[0062] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A support system for a rectangular pier elevated cantilever cap beam, characterized in that: include: A support assembly (3) is fixedly mounted on the pier (1) through a corbel assembly (2) and is suitable for supporting a cap beam (7); A platform assembly (4) is fixedly mounted on the top end of the support assembly (3) and located at the bottom end of the cap beam (7), suitable for construction; The corbel assembly (2) comprises a corbel body (21) and a connecting unit (22), one end of the connecting unit (22) is buried in the pier (1), and the other end of the connecting unit (22) is embedded in the corbel body (21), and the corbel body (21) is suitable for supporting the support assembly (3).

2. The support system for the rectangular pier elevated cantilever cap beam according to claim 1, characterized in that: A lifting device (5) is arranged between the bracket body (21) and the support assembly (3), and the lifting device (5) is suitable for adjusting the installation position of the support assembly (3) and for disassembling the support assembly (3).

3. The support system for the rectangular pier elevated cantilever cap beam according to claim 2, characterized in that: The lifting device (5) comprises a pair of lifting blocks (51) and a pair of adjusting blocks (52); the adjusting blocks (52) are slidably mounted between the two ends of the pair of lifting blocks (51); the lifting blocks (51) and the adjusting blocks (52) are both of trapezoidal structure, and are suitable for driving the pair of lifting blocks (51) to lift when the pair of adjusting blocks (52) move; A limiting bolt (53) is installed between the pair of adjusting blocks (52), and a pair of limiting nuts (54) are installed on the limiting bolts (53) to fix the adjusting blocks (52).

4. The support system for the rectangular pier elevated cantilever cap beam according to claim 3, characterized in that: The support assembly (3) comprises a plurality of Bailey plates (32), a plurality of lower reinforcing rods (31) and a plurality of upper reinforcing rods (33). The plurality of Bailey plates (32) are arranged in two layers and are respectively located on both sides of the pier (1). The lower reinforcing rods (31) are fixedly mounted on the bottom end of the Bailey plate (32), and the upper reinforcing rods (33) are fixedly mounted on the top end of the Bailey plate (32), which is suitable for improving the strength of the Bailey plate (32).

5. The support system for the rectangular pier elevated cantilever cap beam according to claim 4, characterized in that: The two ends of the two lower reinforcing bars (31) and the two ends of the two upper reinforcing bars (33) located on the same side of the pier (1) are fixedly mounted together via connecting plates (35), and a pair of reinforcing oblique bars (36) are fixedly mounted between the connecting plates (35) located on both sides of the pier (1).

6. The supporting system for the rectangular pier elevated cantilever cap beam according to claim 5, characterized in that: A distribution beam (6) is fixedly installed between the platform assembly (4) and the upper reinforcing rod (33); The platform assembly (4) includes a plurality of platform bodies (41) and a plurality of cap beam bottom molds (42); two rows of the platform bodies (41) are fixedly installed at intervals on the top end of the distribution beam (6); a protective net (43) is fixedly installed on the outer end of the platform body (41); and a plurality of cap beam bottom molds (42) are installed between the two rows of the platform bodies (41), which are suitable for constructing the cap beam (7).

7. The support system for the rectangular pier elevated cantilever cap beam according to claim 6, characterized in that: The connection unit (22) of the corbel assembly (2) comprises a plurality of embedded parts (221), a plurality of embedded screw rods (222) and a plurality of climbing cones (224); the plurality of climbing cones (224) are fixedly mounted on the corbel body (21); the plurality of embedded parts (221) are embedded in the pier (1); and the embedded screw rods (222) are fixedly mounted between the plurality of climbing cones (224) and the plurality of embedded parts (221).

8. The support system for rectangular pier elevated cantilever cap beam according to claim 7, characterized in that: A pad (23) is fixedly mounted on one end of the corbel body (21).

9. The support system for the rectangular pier elevated cantilever cap beam according to claim 8, characterized in that: A plurality of positioning ribs (223) are fixedly installed at intervals on the main ribs (11) of the pier column (1), and the pad (23) is slidably installed between the plurality of positioning ribs (223).

10. A construction method for a support system of a rectangular pier elevated cantilever cap beam, characterized in that: The following steps are involved: Step S101: Install the bracket assembly (2) The corbel assembly (2) according to any one of claims 1 to 9 is fixedly installed on the pier (1), and the lifting device (5) is installed on the corbel assembly (2); Step S103: Assembling support components (3) Assembling the support assembly (3), and hoisting the assembled support assembly (3) onto the lifting device (5) for installation; Step S105: Install platform components (4) The platform assembly (4) is fixedly mounted on the support assembly (3), which is suitable for constructing the cap beam (7).