Mounting and adjusting system of free-form surface ceramic tile roof and construction method of mounting and adjusting system
By setting up long holes and bolt connections in the free curved surface terracotta roof installation system, the problems of high installation difficulty and low accuracy in the prior art are solved, and efficient and precise installation results are achieved.
Patent Information
- Application Number
- CN202411980149.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2044-12-31
AI Technical Summary
The existing installation method of prefabricated components on-site assembly of free curved terracotta roofs increases the difficulty of processing and installation of components, and it is difficult to control the installation accuracy, which cannot meet the positioning and installation requirements of purlins.
An installation and adjustment system is provided that includes a purlin support, a positioning purlin, a main keel and a secondary keel. By setting long holes between the purlin support and a positioning purlin, as well as between the secondary keel and the main keel and connecting them with bolts, the position adjustment of any angle between each component is achieved.
It improves the flexibility and adaptability of the assembly and construction of positioning purlins and purlin support, realizes the efficiency and high accuracy of the installation of free curved terracotta tile roofs, and meets the positioning and installation requirements of purlins.
Smart Images

Figure CN119664055A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building decoration construction, and in particular to an installation and adjustment system for a free-curved ceramic tile roof and a construction method thereof. Background Art
[0002] The main building of Jiaxing Nanhu Future Plaza adopts a large-span special-shaped space steel structure arch truss system with a white ceramic tile curved curtain wall roof, combined with the greening of each layer of the terrace space, to form a patchwork of buildings. Since the shape of the ceramic tile roof is a complex special-shaped curved surface, the actual height, installation direction and installation angle of the purlin vary greatly. The existing installation method of using factory prefabricated components and transporting them to the site for assembly not only increases the difficulty of component processing and installation, but also makes it difficult to control the installation accuracy, and cannot meet the positioning and installation requirements of the purlins in the free-form ceramic tile roof. Summary of the invention
[0003] The existing installation method of free-form ceramic tile roofs using prefabricated components on site not only increases the difficulty of component processing and installation, but also makes it difficult to control the installation accuracy and cannot meet the positioning and installation requirements of the purlins. The purpose of the present invention is to provide an installation and adjustment system for free-form ceramic tile roofs and a construction method thereof.
[0004] The technical solution adopted by the present invention to solve the technical problem is: an installation and adjustment system for a free-form ceramic tile roof, which includes: a purlin support, a positioning purlin, a main keel and a secondary keel, the purlin support includes a column and an adapter, the bottom of the column is connected to the main steel structure of the building, the adapter is composed of a sleeve and a chassis vertically connected to the top of the sleeve, the sleeve of the adapter is embedded and fixed to the top of the column, and at least one pair of long strip holes is symmetrically arranged on the chassis along its axis; the positioning purlin includes a base plate and a pair of spaced holes arranged in the middle of the base plate The side panels are arranged on the main keel, the main keel is embedded in the groove formed by a pair of side panels, the screw rod transversely penetrates the bolt holes corresponding to the main keel and the side panels and is locked and fixed by a nut, at least one pair of long holes two corresponding to the position of the long hole one is symmetrically arranged on the base plate along the axis, and the long axis of the long hole two is perpendicular to the long axis of the long hole one, a plurality of bolts penetrate the long holes corresponding to the base plate and the chassis and are locked and fixed, a plurality of pairs of long holes three are arranged at intervals along the length extension direction of the secondary keel, and the secondary keel is threadedly connected to the top of the main keel by the bolts penetrating the long hole three.
[0005] The installation and adjustment system of the free-form ceramic tile roof of the present invention comprises a purlin support fixedly connected to the top of the main steel structure of the building, a positioning purlin movably connected to the purlin support, and a main keel and a secondary keel bolted to the top of the positioning purlin in sequence. The adapter of the purlin support and the base plate of the positioning purlin are provided with long strip holes corresponding to each other and perpendicular to each other. According to the installation requirements of the main keel, when the two positioning purlins need to be arranged at an angle, the positions of the bolts in the adapter and the corresponding long strip holes of the base plate of the positioning purlin are adjusted to achieve the adjustment of the installation position and installation direction of the positioning purlin. The utility model improves the flexibility and adaptability of the assembly construction of the positioning purlin and the purlin support; the secondary keel is connected to the main keel by bolts penetrating the long holes, and the installation position and angle of the secondary keel can be adjusted at any angle by adjusting the position of the bolts in the long holes of the secondary keel; therefore, the installation adjustment system realizes the position adjustment of any angle between the components by setting long holes between the positioning purlin and the purlin support, and between the secondary keel and the main keel and cooperating with bolt connections, thereby adapting to the installation requirements of the free-form ceramic tile roof and improving the installation efficiency and installation accuracy.
[0006] Furthermore, a protrusion is provided at the bolt hole on the inner side of the side plate of the positioning purlin, and the positioning purlin also includes a gasket arranged between the side plate and the main keel, and a washer arranged between the nuts of the side plate. The screw passes through the main keel, gasket, washer and side plate and is locked and fixed by the nut.
[0007] Furthermore, a cushion block is provided between the base plate for positioning the purlin and the chassis for supporting the purlin.
[0008] Furthermore, the area on the base plate of the positioning purlin where the second long hole is provided is also provided with a serrated surface.
[0009] Furthermore, the exposed parts of the columns and the parts where the chassis and the base plate are bolted are sprayed with a polyurethane insulation layer.
[0010] Furthermore, the secondary keel is provided with a plurality of pairs of three long holes at intervals along its length extension direction. The secondary keel is placed on top of the main keel. One side of the secondary keel overlapping with the main keel is connected by a bolt passing through a pair of three long holes. After the secondary keel is in place, the other side of the secondary keel overlapping with the main keel is connected to the main keel by a self-tapping screw.
[0011] Furthermore, when two adjacent main purlins are arranged at an angle ɑ, positioning purlin one and positioning purlin two with the angle ɑ are used, and two pairs of long holes one are set along the axis of the chassis of the purlin support, and each positioning purlin is provided with a pair of long holes two, and bolts penetrate the long holes two of the positioning purlin one and the long holes one on one side of the purlin support and are locked together, and bolts penetrate the long holes two of the positioning purlin two and the long holes one on the other side of the purlin support and are locked together, and the two adjacent main purlins are bolted to the positioning purlin one and the positioning purlin two respectively.
[0012] In addition, the present invention also provides a construction method for an installation and adjustment system of a free-form ceramic tile roof, the steps of which are as follows:
[0013] S1: Use 3D scanning technology to re-measure the main steel structure of the building that has been installed on site, accurately adjust the 3D model of the main steel structure of the building according to the re-measurement data, extract the position information and connection data between the 3D model of the free-form ceramic tile roof and the 3D model of the main steel structure of the building, and determine the size and processing technology of each component of the installation adjustment system; determine the center coordinates of the disk at the intersection of the roof rods according to the 3D model of the main steel structure of the building, determine the ceramic tile installation positioning curve according to the 3D model of the free-form ceramic tile roof, establish a longitudinal section with the ceramic tile installation positioning curve as the path, and the intersection line of the longitudinal section and the 3D model of the main steel structure of the building is the reference line for the installation of the positioning purlin. Select several points on the reference line for the installation of the positioning purlin at intervals as the installation points of the purlin support, calculate the positioning coordinates of the two ends of each purlin support, and determine the installation direction of each purlin support according to the extension direction of the ceramic tile installation positioning curve;
[0014] S2: According to the purlin support positioning coordinates obtained in step S1, the bottom of the column of the purlin support is connected to the main steel structure of the building. After the installation direction of the adapter is adjusted in place, its sleeve is embedded and fixed to the top of the column. The installation direction of the positioning purlin is adjusted according to the ceramic tile installation positioning curve, and the positioning purlin is erected on the top of the purlin support. Multiple bolts pass through the corresponding long holes of the positioning purlin and the purlin support and are locked by nuts;
[0015] S3: Connect the main keel bolts to the top of the positioning purlin, and the secondary keel bolts to the top of the main keel, so that the curvature of the secondary keel is consistent with the tile installation positioning curve.
[0016] The construction method of the installation and adjustment system of the free-form surface ceramic tile roof of the present invention comprises the following steps: firstly, the three-dimensional model of the main steel structure of the building is accurately adjusted according to the on-site re-measurement data, the position information and connection data between the three-dimensional model of the free-form surface ceramic tile roof and the three-dimensional model of the main steel structure of the building are extracted, the length, angle, gap distance and other data of each component of the installation and adjustment system are determined, the points on the installation reference line of the positioning purlin are selected as the installation points of the purlin supports, the positioning coordinates of the two ends of each purlin support are calculated, the bottom of the column of the purlin support is connected to the main steel structure of the building, the installation direction of the positioning purlin is adjusted according to the ceramic tile installation positioning curve, the positioning purlin is erected on the top of the purlin support and is locked by bolts passing through the corresponding long strip holes; the main keel is bolted to the top of the positioning purlin, and the secondary keel is bolted to the top of the main keel, so that the curvature of the secondary keel is consistent with that of the ceramic tile installation positioning curve; the construction method utilizes BI M parametric technology performs data analysis on the main steel structure of the building, the free-form ceramic tile roof and the installation and adjustment system, providing accurate data support for the actual positioning and installation construction of each component of the installation and adjustment system, avoiding the mismatch of the handover of each component during the actual installation process, and ensuring the accurate and reliable connection of the connection nodes between the components; corresponding and mutually perpendicular long holes are set on the purlin supports and positioning purlins, which is convenient for construction personnel to adjust the installation direction and angle of the positioning purlins in multiple directions according to installation requirements, and by setting long holes on the secondary keels, the position adjustment of the main and secondary keels at any angle can be realized, which improves the installation efficiency and installation accuracy of the free-form ceramic tile roof.
[0017] Furthermore, step S3 also includes: a plurality of pairs of long holes three are arranged at intervals along the length extension direction of the secondary keel, the secondary keel is placed on the top of the main keel, and one side of the secondary keel overlapping the main keel is connected by a bolt passing through the long hole three. After the secondary keel is positioned, the other side of the secondary keel is connected to the main keel by a self-tapping screw.
[0018] Furthermore, step S2 also includes: when two adjacent main purlins are arranged at an angle ɑ, two split positioning purlins 1 and 2 at the angle ɑ are used, and two pairs of long holes 1 are set along the axis of the chassis of the purlin support, and each positioning purlin is provided with a pair of long holes 2, and bolts pass through the long holes 2 of the positioning purlin 1 and the long holes 1 on one side of the purlin support and are locked together, and bolts pass through the long holes 2 of the positioning purlin 2 and the long holes 1 on the other side of the purlin support and are locked together, and the two adjacent main purlins are bolted to the positioning purlin 1 and the positioning purlin 2 respectively. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of an embodiment of an installation and adjustment system for a free-form ceramic tile roof of the present invention;
[0020] Figure 2 for Figure 1 Side view of
[0021] Figure 3 It is a schematic diagram of an installation and adjustment system according to an embodiment of the present invention installed on the top of a building main body steel structure with a free-curved surface;
[0022] Figure 4 It is a schematic diagram of the connection relationship between the positioning purlin and the adapter in one embodiment of the present invention;
[0023] Figure 5 It is a structural schematic diagram of an integrated positioning purlin according to an embodiment of the present invention;
[0024] Figure 6 It is a structural schematic diagram of a split positioning purlin according to an embodiment of the present invention;
[0025] Figure 7 It is a structural schematic diagram of a purlin support in one embodiment of the present invention;
[0026] Figure 8 and Fig. 9 Schematic diagram of the connection relationship between the secondary keel and the main keel in one embodiment of the present invention.
[0027] The numbers in the figure are as follows:
[0028] The main steel structure of the building 1; sound-absorbing cotton 2; waterproof and heat-insulating foam glass bricks 3; asphalt waterproof membrane 4; spray waterproof layer 5; polyurethane insulation layer 6; purlin support 10; column 11; sleeve 14; chassis 15; long hole one 16; positioning purlin 20; positioning purlin one 20a; positioning purlin two 20b; base plate 21; side plate 24; protrusion 24a; long hole two 25; serrated surface 26; main keel 30; secondary keel 40; long hole three 41; self-tapping screw 42; support hanger 50; ceramic tile 60. DETAILED DESCRIPTION
[0029] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the drawings are all in very simplified form and use non-precise proportions, which are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the drawings, but this cannot be a limitation of the technical solution of the present invention.
[0030] Embodiment 1:
[0031] Combination Figures 1 to 9The installation and adjustment system of the free-form ceramic tile roof of the present invention is described, which includes: a purlin support 10, a positioning purlin 20, a main keel 30 and a secondary keel 40. The purlin support 10 includes a column 11 and an adapter. The bottom of the column 11 is connected to the main steel structure 1 of the building. The adapter consists of a sleeve 14 and a chassis 15 vertically connected to the top of the sleeve 14. The sleeve 14 of the adapter is embedded and fixed to the top of the column 11. At least one pair of long strip holes 16 are symmetrically arranged on the chassis 15 along its axis. The positioning purlin 20 includes a base plate 21 and a pair of spaced side plates 24 arranged in the middle of the base plate 21. The main keel 30 is embedded in the slot formed by a pair of side panels 24, and the screw rod transversely penetrates the bolt holes corresponding to the main keel 30 and the side panels 24 and is locked and fixed by a nut. At least one pair of long holes 25 corresponding to the position of the long hole 16 is symmetrically arranged on the base plate 21 along the axis, and the long axis of the long hole 25 is perpendicular to the long axis of the long hole 16. Multiple bolts penetrate the long holes corresponding to the base plate 21 and the chassis 15 and are locked and fixed. The secondary keel 40 is provided with multiple pairs of long holes 3 41 at intervals along the length extension direction, and the secondary keel 40 is threadedly connected to the top of the main keel 30 by bolts penetrating the long holes 3 41.
[0032] The installation and adjustment system of the free-form ceramic tile roof of the present invention comprises a purlin support 10 fixedly connected to the top of the main steel structure 1 of the building, a positioning purlin 20 movably connected to the purlin support 10, and a main keel 30 and a secondary keel 40 bolted to the top of the positioning purlin 20 in sequence. The adapter of the purlin support 10 and the base plate 21 of the positioning purlin 20 are provided with long strip holes corresponding to each other and perpendicular to each other. According to the installation requirements of the main keel 30, when the two positioning purlins 20 need to be arranged at an angle, the positions of the bolts in the adapter and the corresponding long strip holes of the base plate 21 of the positioning purlin 20 are adjusted to achieve the adjustment of the installation position and installation of the positioning purlin 20. The installation direction is improved, and the flexibility and adaptability of the assembly construction of the positioning purlin 20 and the purlin support 10 are improved; the secondary keel 40 is connected to the main keel 30 by bolts passing through the long holes, and the installation position and angle of the secondary keel 40 can be adjusted at any angle by adjusting the position of the bolts in the long holes of the secondary keel 40; therefore, the installation adjustment system realizes the position adjustment of any angle between the components by setting long holes between the positioning purlin 20 and the purlin support 10, and between the secondary keel 40 and the main keel 30 and cooperating with bolt connections, thereby adapting to the installation requirements of the free-form ceramic tile roof and improving the installation efficiency and installation accuracy.
[0033] like Figure 4 As shown, the bolt holes on the inner side of the side plate 24 of the positioning purlin 20 are also provided with protrusions 24a, so that the positioning purlin 20 can clamp the main keel 30; preferably, as Figure 2As shown, the positioning purlin 20 also includes a gasket arranged between the side panel 24 and the main keel 30, a washer arranged between the nuts of the side panel 24, and the screw passes through the main keel 30, the gasket, the washer and the side panel 24 and is locked and fixed by the nut. The setting of the gasket and the washer increases the friction between the positioning purlin 20 and the main keel 30, making the connection between the positioning purlin 20 and the main keel 30 more stable.
[0034] like Figure 3 As shown, the height, installation direction and installation position of the column 11 of the purlin support 10 are determined according to the three-dimensional model of the building main steel structure 1 and the ceramic tile installation positioning curve, thereby improving the installation accuracy of the purlin support 10.
[0035] like Figures 1 to 3 As shown, a cushion block is further provided between the base plate 21 of the positioning purlin 20 and the chassis 15 of the purlin support 10. The cushion block is provided to further tighten the bolts to prevent the positioning purlin 20 and the purlin support 10 from loosening under the action of external force.
[0036] like Figure 4 and Figure 5 As shown, the area where the long hole 25 is provided on the base plate 21 of the positioning purlin 20 is also provided with a serrated surface 26, which can increase the friction between the gasket and the surface of the base plate 21, so that the connection between the positioning purlin 20 and the purlin support 10 is more stable.
[0037] like Figures 1 to 3 As shown, a 50 mm thick sound-absorbing cotton covered with non-woven fabric 2, a 10 mm thick SBS special composite veneer waterproof and heat-insulating foam glass brick 3, a 4 mm thick SBS modified asphalt waterproof membrane 4, and a 2 mm thick polyurethane spray waterproof layer 5 are laid on the top of the main steel structure 1 of the building from bottom to top; in order to ensure the waterproof effect of the component connection, the exposed part of the column 11 and the part where the chassis 15 and the base plate 21 are bolted are sprayed with a polyurethane insulation layer 6.
[0038] like Figure 8 and Fig. 9As shown, the secondary keel 40 is provided with a plurality of pairs of three long holes 41 at intervals along its length extension direction, and the secondary keel 40 is placed on top of the main keel 30. One side of the secondary keel 40 overlapping with the main keel 30 is connected by a bolt passing through a pair of three long holes 41, so that the secondary keel 40 can rotate around the connection point and adjust its installation direction and installation angle. When the secondary keel 40 is twisted or warped, it is ensured that one side has a reliable connection; after the secondary keel 40 is in place, the other side of the secondary keel 40 overlapping with the main keel 30 is connected to the main keel 30 by a self-tapping screw 42, so that the secondary keel 40 is limited to prevent it from slipping due to gravity. By providing long holes in the secondary keel 40 and cooperating with bolt connection, the secondary keel 40 can achieve a maximum twist of 15 mm, and can be spliced with the main keel 30 at any angle.
[0039] Embodiment 2:
[0040] like Figure 6 As shown, when two adjacent main keels 30 are arranged at an angle ɑ, two split positioning purlins 1 20a and positioning purlins 2 20b with an angle ɑ are used, and the chassis 15 of the purlin support 10 is provided with two pairs of long holes 16 along its axis, and each positioning purlin is provided with a pair of long holes 25, and bolts penetrate the long holes 25 of the positioning purlin 1 20a and the long holes 16 on one side of the purlin support 10 and are locked, and the bolts The long hole 25 of the second positioning purlin 20b and the long hole 16 on the other side of the purlin support 10 are penetrated and locked, and the two adjacent main purlins 30 are bolted to the positioning purlin 1 20a and the positioning purlin 2 20b respectively. The installation direction and installation angle of the two adjacent main purlins 30 can be adjusted by the split positioning purlin and the bolt connection, thereby improving the positioning and installation efficiency of the irregularly arranged main purlins 30.
[0041] Embodiment three:
[0042] Combination Figures 1 to 9 The construction method of the installation and adjustment system of the free-form ceramic tile roof of the present invention is described, and the specific steps are as follows:
[0043] S1: Use 3D scanning technology to re-measure the main steel structure 1 of the building installed on site, accurately adjust the 3D model of the main steel structure 1 of the building according to the re-measurement data, extract the position information and connection data between the 3D model of the free-form ceramic tile roof and the 3D model of the main steel structure 1 of the building through BIM parametric technology, and determine the size and processing technology of each component of the installation adjustment system; determine the center coordinates of the disk at the intersection of the roof rods according to the 3D model of the main steel structure 1 of the building, determine the ceramic tile installation positioning curve according to the 3D model of the free-form ceramic tile roof, establish a longitudinal section with the ceramic tile installation positioning curve as the path, and the intersection line of the longitudinal section and the 3D model of the main steel structure 1 of the building is the installation reference line of the positioning purlin 20, select several points on the installation reference line of the positioning purlin 20 at intervals as the installation points of the purlin support 10, calculate the positioning coordinates of both ends of each purlin support 10, and determine the installation direction of each purlin support 10 according to the extension direction of the ceramic tile installation positioning curve;
[0044] S2: According to the positioning coordinates of the purlin support 10 obtained in step S1, the bottom of the column 11 of the purlin support 10 is connected to the main steel structure 1 of the building. After the installation direction of the adapter is adjusted in place, its sleeve 14 is embedded and fixed to the top of the column 11. The installation direction of the positioning purlin 20 is adjusted according to the ceramic tile installation positioning curve, and the positioning purlin 20 is erected on the top of the purlin support 10. A plurality of bolts pass through the corresponding long holes of the positioning purlin 20 and the purlin support 10 and are locked by nuts;
[0045] S3: Bolt the main keel 30 to the top of the positioning purlin 20, and bolt the secondary keel 40 to the top of the main keel 30, so that the curvature of the secondary keel 40 is consistent with the ceramic tile installation positioning curve, install multiple support hangers 50 at intervals on the top of the secondary keel 40, and connect the ceramic tile to the support hangers 50.
[0046] The construction method of the installation and adjustment system of the free-form surface ceramic tile roof of the present invention comprises the following steps: firstly, accurately adjusting the three-dimensional model of the main steel structure 1 of the building according to the on-site re-measurement data, extracting the position information and connection data between the three-dimensional model of the free-form surface ceramic tile roof and the three-dimensional model of the main steel structure 1 of the building, determining the length, angle, gap distance and other data of each component of the installation and adjustment system, selecting the point on the installation reference line of the positioning purlin 20 as the installation point of the purlin support 10, calculating the positioning coordinates of both ends of each purlin support 10, connecting the bottom of the column 11 of the purlin support 10 to the main steel structure 1 of the building, adjusting the installation direction of the positioning purlin 20 according to the ceramic tile installation positioning curve, erecting the positioning purlin 20 on the top of the purlin support 10 and locking it by bolts passing through the corresponding long strip holes; the main keel 30 is bolted to the top of the positioning purlin 20, and the secondary keel 4 is bolted to the top of the positioning purlin 20. 0 bolts are connected to the top of the main keel 30, so that the curvature of the secondary keel 40 is consistent with the curvature of the ceramic tile installation positioning curve; the construction method uses BIM parametric technology to perform data analysis on the building main steel structure 1, the free-form ceramic tile roof and the installation adjustment system, and provides accurate data support for the actual positioning and installation construction of each component of the installation adjustment system, avoiding the mismatch of the handover of each component during the actual installation process, and ensuring the accurate and reliable connection of the connection nodes between the components; corresponding and mutually perpendicular long holes are set on the purlin support 10 and the positioning purlin 20, so that the construction personnel can adjust the installation direction and angle of the positioning purlin 20 in multiple directions according to the installation requirements, and the position adjustment of any angle between the main and secondary keels 40 is realized by setting long holes on the secondary keel 40, thereby improving the installation efficiency and installation accuracy of the free-form ceramic tile roof.
[0047] like Figure 8 and Fig. 9 As shown, step S3 also includes: a plurality of pairs of long holes 41 are arranged at intervals along the length extension direction of the secondary keel 40, the secondary keel 40 is placed on the top of the main keel 30, and one side of the secondary keel 40 and the main keel 30 overlapping is connected by a bolt passing through the long hole 41, and the position of the secondary keel 40 is further adjusted by adjusting the position of the bolt on the long hole 41. After the secondary keel 40 is positioned, the other side of the secondary keel 40 is connected to the main keel 30 by a self-tapping screw 42.
[0048] like Figure 6As shown, the step S2 also includes: when two adjacent main keels 30 are arranged at an angle ɑ, two split positioning purlins 1 20a and positioning purlins 2 20b with an angle ɑ are used, the chassis 15 of the purlin support 10 is provided with two pairs of long holes 16 along its axis, each positioning purlin 20 is provided with a pair of long holes 25, and bolts penetrate the long holes 25 of the positioning purlin 1 20a and the long holes 16 on one side of the purlin support 10 and The bolts are inserted through the second long hole 25 of the second positioning purlin 20b and the first long hole 16 on the other side of the purlin support 10 and are locked. The two adjacent main purlins 30 are bolted to the first positioning purlin 20a and the second positioning purlin 20b respectively. The installation direction and installation angle of the two adjacent main purlins 30 are adjusted by the split positioning purlin 20 and the bolt connection, thereby improving the positioning and installation efficiency of the irregularly arranged main purlins 30.
[0049] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of the claims.
Claims
1. A free-form ceramic tile roof installation and adjustment system, characterized in that: include: Purlin supports, positioning purlins, main keels and secondary keels. The purlin supports include columns and adapters. The bottom of the columns is connected to the main steel structure of the building. The adapters are composed of a sleeve and a chassis vertically connected to the top of the sleeve. The sleeve of the adapter is embedded in and fixed to the top of the column. At least one pair of long holes one is symmetrically arranged on the chassis along its axis. The positioning purlin includes a base plate and a pair of side plates arranged at intervals in the middle of the base plate. The main keel is embedded in a slot formed by a pair of side plates. The screw rod transversely penetrates the bolt holes corresponding to the main keel and the side plates and is locked and fixed by nuts. At least one pair of long holes two corresponding to the position of the long hole one is symmetrically arranged on the base plate along the axis, and the long axis of the long hole two is perpendicular to the long axis of the long hole one. Multiple bolts penetrate the long holes corresponding to the base plate and the chassis and are locked and fixed. Multiple pairs of long holes three are arranged at intervals along the length extension direction of the secondary keel. The secondary keel is threadedly connected to the top of the main keel by bolts penetrating the long hole three.
2. The installation and adjustment system for free-form ceramic tile roof according to claim 1, characterized in that: The inner bolt holes of the side plates of the positioning purlins are also provided with protrusions. The positioning purlins also include gaskets arranged between the side plates and the main keel, washers arranged between the nuts of the side plates, and the screws penetrate the main keel, gaskets, washers and side plates and are locked and fixed by nuts.
3. The installation and adjustment system for free-form ceramic tile roof according to claim 1, characterized in that: A cushion block is also provided between the base plate for positioning the purlin and the chassis for supporting the purlin.
4. The installation and adjustment system for free-form ceramic tile roof according to claim 1, characterized in that: The area on the base plate of the positioning purlin where the second long hole is arranged is also provided with a serrated surface.
5. The installation and adjustment system for free-form ceramic tile roof according to claim 1, characterized in that: The exposed part of the column and the part where the chassis and the base plate are bolted are sprayed with a polyurethane insulation layer.
6. The installation and adjustment system for free-form ceramic tile roof according to claim 1, characterized in that: The secondary keel is provided with a plurality of pairs of three long holes at intervals along its length extension direction. The secondary keel is placed on the top of the main keel. One side of the secondary keel overlapping with the main keel is connected by a bolt passing through a pair of three long holes. After the secondary keel is in place, the other side of the secondary keel overlapping with the main keel is connected to the main keel by a self-tapping screw.
7. The installation and adjustment system for free-form ceramic tile roof according to claim 1, characterized in that: When two adjacent main purlins are arranged at an angle ɑ, positioning purlin one and positioning purlin two with an angle ɑ are used, and two pairs of long holes one are set along the axis of the chassis of the purlin support, and each positioning purlin is provided with a pair of long holes two, and bolts penetrate the long holes two of the positioning purlin one and the long holes one on one side of the purlin support and are locked together, and bolts penetrate the long holes two of the positioning purlin two and the long holes one on the other side of the purlin support and are locked together, and the two adjacent main purlins are bolted to the positioning purlin one and the positioning purlin two respectively.
8. The construction method of the installation and adjustment system of the free-form ceramic tile roof according to any one of claims 1 to 7, characterized in that: Here are the steps: S1: Use 3D scanning technology to re-measure the main steel structure of the building that has been installed on site, accurately adjust the 3D model of the main steel structure of the building according to the re-measurement data, extract the position information and connection data between the 3D model of the free-form ceramic tile roof and the 3D model of the main steel structure of the building, and determine the size and processing technology of each component of the installation adjustment system; determine the center coordinates of the disk at the intersection of the roof rods according to the 3D model of the main steel structure of the building, determine the ceramic tile installation positioning curve according to the 3D model of the free-form ceramic tile roof, establish a longitudinal section with the ceramic tile installation positioning curve as the path, and the intersection line of the longitudinal section and the 3D model of the main steel structure of the building is the reference line for the installation of the positioning purlin. Select several points on the reference line for the installation of the positioning purlin at intervals as the installation points of the purlin support, calculate the positioning coordinates of the two ends of each purlin support, and determine the installation direction of each purlin support according to the extension direction of the ceramic tile installation positioning curve; S2: According to the purlin support positioning coordinates obtained in step S1, the bottom of the column of the purlin support is connected to the main steel structure of the building. After the installation direction of the adapter is adjusted in place, its sleeve is embedded and fixed to the top of the column. The installation direction of the positioning purlin is adjusted according to the ceramic tile installation positioning curve, and the positioning purlin is erected on the top of the purlin support. Multiple bolts pass through the corresponding long holes of the positioning purlin and the purlin support and are locked by nuts; S3: Connect the main keel bolts to the top of the positioning purlin, and the secondary keel bolts to the top of the main keel, so that the curvature of the secondary keel is consistent with the tile installation positioning curve.
9. The construction method of the installation and adjustment system of the free-form ceramic tile roof according to claim 8, characterized in that: The step S3 also includes: a plurality of pairs of three long holes are arranged at intervals along the length extension direction of the secondary keel, the secondary keel is placed on the top of the main keel, and one side of the secondary keel overlapping the main keel is connected by a bolt passing through the three long holes. After the secondary keel is positioned, the other side of the secondary keel is connected to the main keel by a self-tapping screw.
10. The construction method of the installation and adjustment system of the free-form ceramic tile roof according to claim 8, characterized in that: The step S2 also includes: when two adjacent main purlins are arranged at an angle ɑ, two split positioning purlins 1 and 2 at the angle ɑ are used, two pairs of long holes 1 are arranged along the axis of the chassis of the purlin support, each positioning purlin is provided with a pair of long holes 2, bolts penetrate the long holes 2 of the positioning purlin 1 and the long holes 1 on one side of the purlin support and are locked together, bolts penetrate the long holes 2 of the positioning purlin 2 and the long holes 1 on the other side of the purlin support and are locked together, and the two adjacent main purlins are bolted to the positioning purlin 1 and the positioning purlin 2 respectively.
Citation Information
Patent Citations
Hyperbolical variable point-supported three dimensional universal adjustable support
CN103422573A
Bottom plate direct-laying separation load-bearing high-performance metal roof and construction method thereof
CN113605607A
Adjustable round tube support
CN220100313U
Roof tile support metal fitting
JP1999124961A
A waterproof structure for steel roof of building
KR101766873B1