Reinforced concrete structure construction method
By using a combination of autoclaved aerated concrete slabs and positioning/docking components in reinforced concrete structures, the problems of high complexity of existing construction methods and easy structure damage are solved, and a more efficient and safer structural construction process is achieved.
Patent Information
- Application Number
- CN202411959798.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-04-15
AI Technical Summary
The existing reinforced concrete structure construction methods have high complexity during splicing and fixing, which can easily lead to damage or deformation of the structure during handling and installation, and the docking accuracy requirements are high, which increases the construction complexity.
The main body of the autoclaved aerated concrete slab structure is adopted to reserve the positioning components and docking components installation positions. Through the docking of the positioning components and docking components, the fixation of the main body of the autoclaved aerated concrete slab structure and the continuous connection between adjacent plates is realized, simplifying the construction process.
The installation of external extended structures is reduced, construction operations are simplified, assembly degree and construction efficiency are improved, overall strength and stiffness of the structure are enhanced, and construction safety and reliability are ensured.