Ruler for geological mapping
By designing a geological map ruler including a back-shaped ruler, a moving bar and a positioning block, the problems of inconvenient operation and inaccurate marking in the prior art are solved, and fast and accurate geological point marking and circle drawing are achieved.
Patent Information
- Application Number
- CN202510197121.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-21
- Publication Date
- 2025-05-02
AI Technical Summary
The existing geological map method requires carrying triangle plates, dot compass and ink, which is inconvenient to operate, the marked geological points are inaccurate, and the circles drawn are not very standardized.
A ruler for geological drawing is designed, including a back-shaped ruler body, a first moving bar and a second moving bar. Through the coordinated readings of the main scale line and the vernier scale line, the geological points are accurately positioned, and a 2mm circle is quickly drawn through the positioning block and the circular hole.
It realizes the rapid, accurate and standardized labeling of geological points on the field hand map of geological maps, which is simple to operate and easy to carry.
Smart Images

Figure CN119911027A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of geological mapping, in particular to a ruler for geological mapping. Background Art
[0002] Geological mapping is a basic working method for mineral exploration. According to the requirements of each exploration stage, the distribution and characteristics of various geological bodies such as strata, structures, magmatic rocks, alteration zones, and mineral (chemical) bodies in the exploration area are studied through field investigations, and geological maps of different scales are filled in to provide basic geological data for mineral exploration. During the field investigation, it is necessary to carry a field hand map with you, and the positions of the geological points determined during the investigation are placed on the field hand map, that is, the geological points need to be marked on the field hand map with a circle with a diameter of 2mm according to the coordinates of the geological points obtained by GPS. At present, the method of projecting geological points is mostly based on the horizontal and vertical coordinates of the geological points obtained by GPS, first using a triangle to measure the geological points on the field hand map, and then using a compass to draw a circle with a diameter of 2mm for marking. However, this method requires carrying a triangle, a compass, and ink, etc., which is inconvenient to operate, the marked geological points are inaccurate, and the drawn circles are not very standardized. Summary of the invention
[0003] The purpose of the present invention is to provide a ruler for geological mapping, by which the geological points determined in geological mapping can be marked on a field hand map quickly, accurately and in a standardized manner, and the ruler is simple to operate and easy to carry.
[0004] The embodiment of the present invention is achieved as follows:
[0005] The present application provides a ruler for geological mapping, comprising a circular ruler body, a first moving bar and a second moving bar.
[0006] The four sides of the circular ruler body are all provided with main scale lines, and the zero scale line of the circular ruler body is located at the intersection of two adjacent right-angle sides;
[0007] The first moving strip and the second moving strip cross each other and are respectively parallel to different groups of opposite sides of the circular ruler body, and the ends of the first moving strip and the second moving strip are respectively slidably connected to the circular ruler body through a vernier ruler block, and the vernier ruler block is provided with a vernier scale line, and the minimum division of the vernier scale line is smaller than the minimum division of the main scale line;
[0008] Both the first moving bar and the second moving bar are provided with a strip hole along their length direction; wherein, the width of the strip hole is not less than 2 mm; the second moving bar is located above the first moving bar, and a positioning block is slidably connected to the second moving bar, and the positioning block is provided with a circular hole connected to the strip hole and having a diameter of 2 mm.
[0009] Further, based on the aforementioned scheme, the main scale lines are arranged on the inner side of the circular ruler body; the vernier scale block is slidably sleeved on the circular ruler body, and an observation hole is opened on the top surface of the vernier scale block, and the observation hole is used to expose the main scale lines of the circular ruler body; the vernier scale lines are arranged on one side of the observation hole close to the inner side of the vernier scale block and are opposite to the main scale lines up and down.
[0010] Further, based on the aforementioned scheme, the zero scale line of the vernier scale is located on one side close to the zero scale line of the circular ruler body; the center line of the circular hole is opposite to the center line of the strip hole, and the center line of the strip hole is aligned with the zero scale line of the vernier scale corresponding thereto.
[0011] Further, based on the above solution, the minimum graduation of the vernier scale line differs from the minimum graduation of the main scale line by 0.1 mm.
[0012] Further, based on the above solution, the zero scale line of the vernier scale is aligned with the edge of the vernier scale block.
[0013] Further, based on the above solution, the top surface of the vernier scale block is close to the zero scale line on one side thereof, extending along the zero scale line of the circular scale body to form an extension portion;
[0014] The extension length of the extension portion is not less than 1 / 2 of the width of the first moving bar / the second moving bar; the end of the first moving bar / the second moving bar is connected to the vernier scale block and the extension portion.
[0015] Further, based on the above solution, the top surfaces of the vernier scale blocks at both ends of the second moving bar are higher than the top surfaces of the vernier scale blocks at both ends of the first moving bar.
[0016] Further, based on the above solution, a sliding groove is provided on the top surface of the second movable bar, and the positioning block is slidably connected to the sliding groove.
[0017] Further, based on the above-mentioned solution, first locking bolts are threadedly penetrated on both sides of the positioning block, and the first locking bolts are opposite to the sliding groove.
[0018] Further, based on the above solution, a second locking bolt is passed through the outer side wall of the vernier scale block, and the second locking bolt is opposite to the outer side wall of the circular scale body.
[0019] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects:
[0020] The present application sets a circular ruler body, sets a main scale line on the circular ruler body, and sets its zero scale line at the intersection of two adjacent right-angle sides, so that the circular ruler body can be used to quickly determine a geological base point close to the positioning coordinates on a field hand map; by setting a first moving bar and a second moving bar perpendicular to each other on the circular ruler body, and slidingly connecting them to the circular ruler body through a vernier ruler block respectively, the first moving bar and the second moving bar can be slid respectively, and the first moving bar and the second moving bar can be moved to the precise coordinate position through the coordinated reading of the main scale line and the vernier scale line, and the intersection point is the geological point; by setting the second moving bar above the first moving bar, and opening a bar hole, the bar hole is slidably connected to the positioning block, and a circular hole with a diameter of 2mm is opened on the positioning block, the positioning block can be moved to the intersection after the geological point is determined, and a circle with a diameter of 2mm can be drawn through the circular hole to complete the geological point projection. The present application can quickly, accurately and standardizedly mark the geological point positions on the field hand map of geological mapping, and the operation is simple and easy to carry. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0022] Figure 1 A top view of the ruler for geological mapping provided by the present invention;
[0023] Figure 2 The present invention is an enlarged schematic diagram of a partial structure of a ruler for geological mapping provided by the present invention.
[0024] Icons: 1-reciprocating ruler body, 11-main scale line, 2-first moving bar, 3-second moving bar, 4-vernier ruler block, 41-observation hole, 42-vernier scale line, 43-extension part, 44-second locking bolt, 5-bar hole, 51-slide groove, 6-positioning block, 61-round hole, 62-first locking bolt. DETAILED DESCRIPTION
[0025] The embodiments of the present application are described in detail below in conjunction with the drawings in the embodiments of the present application.
[0026] Please refer to Figure 1-Figure 2 , which is a schematic diagram of the overall structure of a ruler for geological mapping.
[0027] This embodiment provides a ruler for geological mapping, comprising a circular ruler body 1, a first moving bar 2 and a second moving bar 3.
[0028] The four sides of the circular ruler body 1 are all provided with main scale lines 11, and the zero scale line of the circular ruler body 1 is located at the intersection of two adjacent right-angle sides;
[0029] The first moving strip 2 and the second moving strip 3 cross each other and are parallel to different opposite sides of the circular ruler body 1. The ends of the first moving strip 2 and the second moving strip 3 are slidably connected to the circular ruler body 1 through a vernier scale block 4. The vernier scale block 4 is provided with a vernier scale line 42. The minimum division of the vernier scale line 42 is smaller than the minimum division of the main scale line 11.
[0030] The first moving bar 2 and the second moving bar 3 are both provided with a strip hole 5 along their length direction; wherein, the width of the strip hole 5 is not less than 2 mm; the second moving bar 3 is located above the first moving bar 2, and a positioning block 6 is slidably connected to the second moving bar 3, and the positioning block 6 is provided with a circular hole 61 which is connected to the strip hole 5 and has a diameter of 2 mm.
[0031] Next, a ruler for geological mapping according to this exemplary embodiment will be further described.
[0032] In some embodiments, reference Figure 1 The circular ruler body 1 is a rectangular circular ruler body 1 formed by four rulers connected to each other. The four sides of the circular ruler body 1 are provided with main scale lines 11, and the minimum division of the main scale lines 11 is 1mm (one grid is shown as 2mm in the figure); the zero scale line of the circular ruler body 1 is located at the intersection of two adjacent right-angle sides, forming a two-dimensional plane ruler with horizontal and vertical coordinates with the intersection as the zero scale. When filling geological maps, the zero scale can be quickly located at the coordinate base point; specifically, Figure 1 The zero scale lines of the upper bottom edge and the lower bottom edge of the circular ruler body 1 are located on the left side, and the zero scale lines of the left side and the right side are located on the lower side.
[0033] When marking the location of geological points on a geological mapping field hand map, a coordinate base point can be determined first. The above coordinate base point is a point close to the approximate position of the coordinates of a geological point measured by GPS. For example, if the coordinates of a geological point measured by GPS are: ordinate 4590908, abscissa 548571, then the base point close to the coordinates is determined to be: ordinate 4590000, abscissa 548000.
[0034] By placing the zero scale line of the circular ruler body 1 at the base point, and then finding the corresponding position on the circular ruler body 1 according to the difference between the horizontal and vertical coordinates of the base point and the horizontal and vertical coordinates of the geological point, the geological point can be found and marked on the field hand map.
[0035] In some embodiments, the first moving bar 2 and the second moving bar 3 cross each other and are respectively parallel to different groups of opposite sides of the circular ruler body, and the ends of the first moving bar 2 and the second moving bar 3 are respectively slidably connected to the circular ruler body 1 through a vernier scale block 4, and the vernier scale block 4 is provided with a vernier scale line 42, and the minimum division of the vernier scale line 4 is smaller than the minimum division of the main scale line 11; so that the first moving bar 2 and the second moving bar 3 can slide on the circular ruler body 1 respectively, and can slide the first moving bar 2 and the second moving bar 3 to corresponding positions according to the horizontal and vertical coordinates of the base point and the horizontal and vertical coordinates of the geological point by moving the vernier scale block 4, so that the corresponding grids of the vernier scale line 42 are aligned with the corresponding grids of the main scale line 11, so that the first moving bar 2 and the second moving bar 3 can be accurately positioned, and at this time, the intersection of the first moving bar 2 and the second moving bar 3 is the geological point. For example, the coordinates of the base point are: 4590000 ordinate, 548000 abscissa; the coordinates of the geological point are: 4590908 ordinate, 548571 abscissa; on a hand map with a scale of 1:10,000, its coordinates relative to the base point are: 90.8 mm ordinate, 57.1 mm abscissa. Then move the first moving bar 2 that moves longitudinally from zero scale to the position with a 90.8 mm ordinate, and move the second moving bar 3 that moves transversely from zero scale to the position with a 57.1 mm abscissa, and the intersection is the coordinates of the geological point. Through the above structural design, geological points can be found quickly and accurately.
[0036] The first moving bar 2 and the second moving bar 3 are both provided with a strip hole 5 along their length direction; wherein, the width of the strip hole 5 is not less than 2 mm. The second moving bar 3 is located above the first moving bar 2, and a positioning block 6 is slidably connected to the second moving bar 3, and the positioning block 6 is provided with a circular hole 61 with a diameter of 2 mm. By providing the strip hole 5 and setting the positioning block 6, after locating the geological point, the positioning block 6 can be moved to the intersection of the first moving bar 2 and the second moving bar 3, and a 2 mm circle can be obtained by directly passing through the strip hole 5 through the circular hole 61 on the positioning block 6 to draw a circle, and the circle is the position of the geological point on the hand map. The width of the strip hole 5 is set to be not less than 2 mm, so that the strip hole 5 will not hinder the drawing of a circle through the circular hole 61. Through the above structural design, the geological point can be located quickly and accurately, and the circle specification used to represent the position of the geological point can be obtained.
[0037] As a preferred embodiment, the main scale line 11 is arranged on the inner side of the circular ruler body 1, which is convenient for locating the base point and geological point, and avoids errors caused by being arranged on the outer side. The vernier scale block 4 is slidably mounted on the circular ruler body 1, and an observation hole 41 is opened on the top surface of the vernier scale block 4, and the observation hole 41 is used to expose the main scale line 11 of the circular ruler body 1; the vernier scale line 42 is arranged on one side of the observation hole 41 close to the inner side of the vernier scale block 4 and is opposite to the main scale line 11 up and down, so that the main scale line 11 and the vernier scale line 42 can be aligned, which is convenient for reading and avoids reading errors. Preferably, the vernier scale block 4 is only mounted on the top surface, inner side and outer side of the circular ruler body 1, and the bottom surface of the circular ruler body is not covered by the vernier scale block 4, so that the circular ruler body 1 can be more accurate when locating the base point, and the vernier scale block 4 avoids affecting the initial positioning of the circular ruler body 1 when moving.
[0038] As a preferred implementation method, refer to Figure 2 , the zero scale line of the above-mentioned vernier scale line 42 is located on the side close to the zero scale line of the circular ruler body 1; the above-mentioned main scale line 11 and the vernier scale line 42 are similar to the main scale and vernier scale of the vernier caliper in the prior art, and the minimum division of the vernier scale line 42 is smaller than the minimum division of the main scale line 11, which can improve the accuracy of positioning. The center line of the center of the circular hole 61 is aligned with the center line of the bar hole 5, and the center line of the bar hole 5 is aligned with the zero scale line of the vernier scale line 42 corresponding thereto. Since the center of the circular hole 61 is located on the center line of the bar hole 5, aligning the center line with the zero scale line of the vernier scale line 42 facilitates the rapid positioning between the vernier scale line 42 and the main scale line 11.
[0039] As a preferred embodiment, the minimum division of the main scale line 11 is 1mm, the minimum division of the vernier scale line 42 is 0.9mm, and the difference between the minimum division of the vernier scale line 42 and the minimum division of the main scale line 11 is 0.1mm. Specifically, when the horizontal coordinate is 57.1mm, because the accuracy is required to be 0.1mm, the vernier scale block 4 of the second moving bar 3 is moved to the position where the first grid of the vernier scale line 42 is aligned with 58mm on the main scale line 11. At this time, the difference between the 0 scale line of the vernier scale line 42 and its first grid is 0.9mm, and the reading of the 0 scale line of the vernier scale line 42 is 57.1mm; when the vertical coordinate is 90.8mm, the vernier scale block 4 of the first moving bar 2 is moved to The eighth grid of the vernier scale 42 is aligned with the position of 98mm on the main scale 11. At this time, the 0 scale line of the vernier scale 42 and its eighth grid differ by 7.2mm, and the reading of the 0 scale line of the vernier scale 42 is 90.8mm; the zero scale line of the vernier scale 42 on the first moving bar 2 and the second moving bar 3 is aligned with the center line of the bar hole 5, that is, aligned with the center of the circular hole 61. At this time, the circular hole 61 is moved to the intersection to circle the geological point. By setting the vernier scale 42 on the vernier ruler block 4, the positioning accuracy of the geological point can be improved, and the geological point position can be more accurately marked on the field hand map.
[0040] As a preferred implementation, the zero scale line of the vernier scale line 42 is aligned with the edge of the vernier scale block 4 , so that there is no error between the vernier scale line 42 and the main scale line 11 .
[0041] As a preferred embodiment, the top surface of the vernier scale block 4 extends along the zero scale line of the circular ruler body 1 near the zero scale line to form an extension portion 43; the extension length of the extension portion 43 is not less than 1 / 2 of the width of the first moving bar 2 / the second moving bar 3; the ends of the first moving bar 2 / the second moving bar 3 are connected to the vernier scale block 4 and the extension portion 43. Since the edge of the vernier scale block 4 is aligned with the zero scale line, and the center line of the bar hole 5 is aligned with the zero scale line, in order to avoid the first moving bar 2 or the second moving bar 3 from interfering with the circular ruler body 1 and to ensure a stable connection with the vernier scale block 4, the top surface of the vernier scale block 4 extends a certain distance to the zero scale line side, and the distance is sufficient to connect and fix with the moving bar to improve its stability. Since the moving bar is connected to the top surface of the vernier scale block 4 and the vernier scale block 4 is sleeved on the circular ruler body 1, the moving bar does not affect the movement of the vernier scale block 4 and does not interfere with the circular ruler body 1.
[0042] As a preferred embodiment, the top surfaces of the vernier scale blocks 4 at both ends of the second moving bar 3 are higher than the top surfaces of the vernier scale blocks 4 at both ends of the first moving bar 2, so that the second moving bar 3 does not interfere with the first moving bar 2 when they cross. At the same time, it is only necessary to set the positioning block 6 on a higher moving bar to draw a circle.
[0043] As a preferred embodiment, a slide groove 51 is opened on the top surface of the second movable bar 3, and the positioning block 6 is slidably connected to the slide groove 51, so that the positioning block 6 can be limited in the slide groove 51 without falling off, and can slide along a fixed track without shifting.
[0044] Furthermore, first locking bolts 62 are threadedly penetrated on both sides of the positioning block 6, and the first locking bolts 62 are opposite to the slide groove 51. The positioning block 6 can be fixed by the first locking bolts 62, so as to mark the geological point position by drawing a circle.
[0045] As a preferred embodiment, the outer wall of the vernier scale block 4 is penetrated with a second locking bolt 44, and the second locking bolt 44 is opposite to the outer wall of the circular scale body 1. The vernier scale block 4 can be limited and fixed by the second locking bolt 44, so that the position of the vernier scale block 4 will not be affected when the positioning block 6 moves and draws a circle, thereby preventing it from accidentally moving and causing the position deviation of the geological point.
[0046] Working principle of the embodiment of the present application: Assuming a 1:10000 geological mapping, the ordinate of a geological point measured by a handheld GPS is 4590908 and the abscissa is 548571, then find the intersection of the ordinate 4590000 and the abscissa 548000 on the field hand map, and overlap the intersection with the zero scale line intersection of the circular ruler body 1, and take this point as the "base point". The abscissa of the geological point is theoretically located at a position 57.1mm from the base point, and slide the second moving bar 3 that moves left and right to the vernier scale. The first grid on the line 42 is aligned with the position 58mm away from the base point on the horizontal circular ruler body 1; the longitudinal coordinate of the geological point is theoretically located at a position 90.8mm away from the base point, and the first moving bar 2 that moves up and down is slid to the position where the eighth grid on the vernier scale line 42 is aligned with the position 98mm away from the base point on the longitudinal circular ruler body 1, and then the positioning block 6 is moved to the intersection of the first moving bar 2 and the second moving bar 3. Use a pencil to draw a circle along the circular hole 61 with an inner diameter of 2mm, which is the position of the geological point on the field hand map.
[0047] In addition, unless otherwise expressly specified or limited, in the embodiments of the present application, if the terms "installation" and "connection" appear, they should be understood in a broad sense. For example, "connection" can be a detachable connection or a non-detachable connection; it can be a direct connection or an indirect connection through an intermediate medium. If the terms "upper", "lower", "left", "right", "inner", "outer", "side" and other directional terms appear, they are only with reference to the direction of the accompanying drawings or the orientation in which the product is usually placed when in use. They are only for the purpose of clearly describing the present application, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and cannot be understood as a limitation on the present application. The terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance; "multiple" means at least two. In the embodiments of the present application, the limitations of relative positional relationships such as parallel, vertical, and aligned are all for the current technological level, rather than absolutely strict limitations. A small amount of deviation is allowed, and approximately parallel, approximately vertical, approximately aligned, etc. are all acceptable. For example, A and B are parallel, which means that A and B are parallel or approximately parallel, and the angle between A and B can be between 0 degrees and 10 degrees.
[0048] The above are only some embodiments and implementation methods of the present application. The protection scope of the present application is not limited thereto. In the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. Any combination of features in different embodiments is also within the protection scope of the present application. Any changes or substitutions that can be easily thought of by any technician familiar with the field within the technical scope disclosed in the present application should be covered within the protection scope of the present application.
Claims
1. A ruler for geological mapping, characterized in that: It includes a circular ruler body, a first moving bar and a second moving bar. The four sides of the circular ruler are all provided with main scale lines, and the zero scale line of the circular ruler is located at the intersection of two adjacent right-angle sides; The first moving strip and the second moving strip cross each other and are respectively parallel to different groups of opposite sides of the circular ruler body, and the ends of the first moving strip and the second moving strip are respectively slidably connected to the circular ruler body through a vernier ruler block, and the vernier ruler block is provided with a vernier scale line, and the minimum division of the vernier scale line is smaller than the minimum division of the main scale line; Both the first moving bar and the second moving bar are provided with a strip hole along their length direction; wherein, the width of the strip hole is not less than 2 mm; the second moving bar is located above the first moving bar, and a positioning block is slidably connected to the second moving bar, and the positioning block is provided with a circular hole connected to the strip hole and having a diameter of 2 mm.
2. The geological mapping ruler according to claim 1, characterized in that: The main scale line is arranged on the inner side of the circular ruler body; the vernier scale block is slidably sleeved on the circular ruler body, and an observation hole is opened on the top surface of the vernier scale block, and the observation hole is used to expose the main scale line of the circular ruler body; the vernier scale line is arranged on a side edge of the observation hole close to the inner side of the vernier scale block and opposite to the main scale line up and down.
3. The geological mapping ruler according to claim 2, characterized in that: The zero scale line of the vernier scale is located on one side close to the zero scale line of the circular ruler body; the center line of the circular hole is opposite to the center line of the strip hole, and the center line of the strip hole is aligned with the zero scale line of the vernier scale corresponding thereto.
4. The geological mapping ruler according to claim 3, characterized in that: The difference between the minimum graduation of the vernier scale and the minimum graduation of the main scale is 0.1 mm.
5. The geological mapping ruler according to claim 3, characterized in that: The zero scale line of the vernier scale is aligned with the edge of the vernier scale block.
6. The geological mapping ruler according to claim 5, characterized in that: The top surface of the vernier scale block is extended along the zero scale line of the circular scale body on one side close to the zero scale line to form an extension portion; The extension length of the extension portion is not less than 1 / 2 of the width of the first moving bar / the second moving bar; The ends of the first moving bar / the second moving bar are connected to the vernier block and the extension portion.
7. The geological mapping ruler according to claim 1, characterized in that: The top surfaces of the vernier scale blocks at both ends of the second moving bar are higher than the top surfaces of the vernier scale blocks at both ends of the first moving bar.
8. The geological mapping ruler according to claim 1, characterized in that: A sliding groove is formed on the top surface of the second moving bar, and the positioning block is slidably connected to the sliding groove.
9. The geological mapping ruler according to claim 8, characterized in that: First locking bolts are threadedly penetrated on both sides of the positioning block, and the first locking bolts are opposite to the sliding grooves.
10. The geological mapping ruler according to claim 2, characterized in that: A second locking bolt is passed through the outer side wall of the vernier scale block, and the second locking bolt is opposite to the outer side wall of the circular scale body.
Citation Information
Cited By
Interventional attitude guiding aiming method and system based on CT real-time perspective scanning
CN121400856A