Concrete containment post-accident protection structure, arrangement method and containment
By setting up barrier components at the construction joints of the concrete containment shell, the problem of radioactive substance leakage in accident conditions is solved, the sealing and leakage prevention effect of the containment shell are improved, the accident handling time is delayed and environmental pollution is reduced.
Patent Information
- Application Number
- CN202510386602.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-28
- Publication Date
- 2025-07-01
AI Technical Summary
Existing concrete containment may have radioactive substance leakage in accident conditions, mainly due to the quality defects in the construction joints and the difficulty in completely repairing.
A protective structure after accident of concrete containment is designed. By setting up barrier members at the construction joints, including strip-shaped jumpers and strip-shaped piezoresistive members, the anchor section of the barrier member is embedded inside the concrete structure, and a protective structure is formed at the construction joints through the barrier section to block the interior and exterior of the concrete containment.
It effectively improves the enclosure of concrete containment shells, reduces or avoids leakage of radioactive substances, delays the treatment time of nuclear safety issues after accidents, and reduces the pollution of nuclear radiation to the environment.
Smart Images

Figure CN120236795A_ABST
Abstract
Description
Technical Field
[0001] The present invention specifically relates to a post-accident protection structure, an arrangement method and a containment for a concrete containment. Background Art
[0002] In the nuclear island building of a nuclear power plant, the containment, as an important part of the reactor building, is the main item that encloses the nuclear steam supply system. It can provide effective radiation protection to the environment under accident conditions and is the third and last barrier for nuclear safety. Therefore, the structural design of the containment is an important part of nuclear safety protection in the design of nuclear power plants.
[0003] The overall height of a concrete (or prestressed concrete) containment is relatively high and the total amount of concrete is large. In actual projects, it can only be manufactured by combining a steel lining, steel bars, prestressed steel tendons, etc. with layered construction and layered pouring of concrete. Therefore, dozens of construction joints are preset during the design process. Common quality defects such as honeycombing and slag inclusion may exist in traditional construction joints in actual projects. Moreover, due to the relatively thick thickness of the concrete containment, it is very difficult to completely repair the defects inside the concrete at the construction joints during the treatment of quality defects.
[0004] These common quality defects do not affect the application of the containment under normal conditions after conventional repair. However, it is found in the structural performance test of the containment that the positions with obvious test leakage are concentrated at the construction joints during the construction and installation stage, indicating that under extreme accident conditions, radioactive substances may leak along the concrete construction joint positions from the steel lining welds or other damaged and defective positions. Summary of the Invention
[0005] The technical problem to be solved by the present invention is to provide a post-accident protection structure for a concrete containment aiming at the above deficiencies existing in the prior art. This protection structure effectively improves the sealing performance of the containment through reasonable layout, thereby reducing or avoiding the leakage of radioactive substances and gaining time for dealing with post-accident nuclear safety issues. The present invention also provides an arrangement method for a post-accident protection structure of a concrete containment and a concrete containment.
[0006] The present invention provides a post-accident protection structure for a concrete containment, which is arranged at the construction joint between adjacent two-side concrete structures and includes a barrier member. The barrier member has a continuous strip structure, and the axial extension direction is consistent with the trend of the construction joint. In the cross-sectional structure of the barrier member, there is a barrier section and at least one anchoring section. The anchoring section is embedded inside the concrete structure and forms a mechanical interlock with the concrete structure. The barrier section extends from the concrete structure where the anchoring section is embedded towards the construction joint and is connected to the concrete structure on the other side to block the construction joint to form a protection structure.
[0007] Further, the barrier member is a strip-shaped bridging member, and the cross-sectional structure of the strip-shaped bridging member includes a barrier section and two anchoring sections. The two anchoring sections are symmetrically distributed on both sides of the strip-shaped bridging member and are respectively embedded in the concrete structures on both sides to form a two-way mechanical interlock. The barrier section is connected between the two anchoring sections to form a continuous shielding surface that coincides with the orientation of the construction joint after the concrete structures on both sides are poured.
[0008] Further, the barrier member is a strip-shaped piezoresistive member, and the cross-sectional structure of the strip-shaped piezoresistive member includes an anchoring section and a barrier section. The anchoring section is embedded in a groove provided on the interface of the concrete structure on one side facing the construction joint, and the barrier section extends from the anchoring section to the concrete structure on the other side in a cantilever form and presses against the interface of the concrete structure on the other side facing the construction joint to fill the construction joint.
[0009] Further, the barrier member is made of steel, rubber or water-swellable material.
[0010] Further, in the construction joint, the barrier member is located at the position closest to the center of the thickness of the concrete containment after avoiding the reinforcing bars and prestressed steel tendons.
[0011] Further, a plurality of barrier members are provided, and the barrier members are arranged in sequence along the thickness direction of the concrete containment.
[0012] Further, the post-accident protection structure of the concrete containment further includes a closing member. The closing member has a flat continuous strip structure, and the axial extension direction thereof is consistent with the orientation of the construction joint. The surface of the closing member is attached to the outer surface of the concrete containment, and both ends of the surface are respectively anchored to the concrete structures on both sides of the construction joint to close the external opening of the construction joint.
[0013] The present invention also provides a layout method for the post-accident protection structure of a concrete containment, which is used to layout the above-mentioned post-accident protection structure of the concrete containment at the construction joint between adjacent concrete structures on both sides. The method includes the following steps:
[0014] Before the concrete structure is poured, arrange the barrier member along the orientation of the construction joint area, and embed the anchoring section of the barrier member in the pouring area of the concrete structure, and the barrier section extends to the construction joint area;
[0015] Pour concrete in the pouring area of the concrete structure so that the anchoring section is embedded inside the concrete structure and forms a mechanical interlock with the concrete structure, and the barrier section is connected from the concrete structure in which the anchoring section is embedded to another concrete structure to block the construction joint to form a protection structure.
[0016] Further, the method further includes the following steps:
[0017] Before the concrete structures on both sides of the construction joint are poured, the anchoring devices are respectively embedded in the pouring areas of the concrete structures on both sides of the construction joint;
[0018] After the concrete is successively poured in the pouring areas of the concrete structures on both sides, the surface of the sealing member is attached to the outer surface of the concrete containment, and both ends of the surface are respectively connected to the anchoring devices in the concrete structures on both sides to seal the external opening of the construction joint.
[0019] The present invention also provides a concrete containment, including a housing main body and the above-mentioned post-accident protection structure of the concrete containment. The housing main body is formed by the concrete structures of each part poured successively, and a construction joint is formed between the adjacent concrete structures on both sides; the post-accident protection structure of the concrete containment is arranged at the construction joint between the adjacent concrete structures on both sides for blocking the construction joint to isolate the inside and outside of the concrete containment.
[0020] The post-accident protection structure of the concrete containment of the present invention is arranged at the construction joint between the adjacent concrete structures on both sides. The end is embedded inside the concrete structure and forms a mechanical interlock with the concrete structure, and extends to contact the other concrete structure to block the construction joint between the concrete structures. The protection structure can effectively isolate the inside and outside of the concrete containment at the position of the construction joint, effectively increasing the anti-seepage and anti-leakage effects of the containment. In the case of a small-probability event of an actual accident condition, when there is a tendency for the radioactive liquid inside the containment to leak out, this protection structure can win a certain amount of time for subsequent accident handling and reduce the environmental pollution caused by nuclear radiation. Moreover, the protection structure is embedded in the concrete structure, that is, using the originally required concrete as a fulcrum, so there is no need to additionally set fixing devices, the cost of the measure materials themselves is not high, and the embedding process is not difficult. It can be seen that this structure effectively improves the accident containment ability of the concrete containment under the condition of low material and labor costs and little impact on the construction project. Description of the Drawings
[0021] Figure 1 is a schematic cross-sectional structure diagram of the existing concrete containment in the thickness direction;
[0022] Figure 2 is a layout schematic diagram of the strip-shaped cross-connecting member in the post-accident protection structure of the concrete containment in Embodiment 1 of the present invention;
[0023] Figure 3 is a layout schematic diagram of the strip-shaped piezoresistive member in the post-accident protection structure of the concrete containment in Embodiment 1 of the present invention;
[0024] Figure 4 is a schematic diagram of the layout of the strip-shaped cross-connecting member and the strip-shaped piezoresistive member together in the post-accident protection structure of the concrete containment in Embodiment 1 of the present invention;
[0025] Figure 5 It is a layout schematic diagram of the closing member in the post-accident protection structure of the concrete containment vessel in Embodiment 1 of the present invention;
[0026] Figure 6 It is a layout schematic diagram of another closing member in the post-accident protection structure of the concrete containment vessel in Embodiment 1 of the present invention.
[0027] In the figure: 1, concrete structure; 11, groove; 12, steel bar; 13, prestressed steel tendon; 2, construction joint; 3, barrier member; 31, anchorage section; 32, barrier section; 33, strip-shaped cross-connector; 34, strip-shaped piezoresistive element; 4, closing member. Specific embodiments
[0028] Next, the technical solutions in the present invention will be clearly and completely described in conjunction with the accompanying drawings in the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by those of ordinary skill in the art without making creative efforts belong to the scope of the present invention.
[0029] In the description of the present invention, it should be noted that the terms "upper", "lower", etc. indicating the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience and simplification of description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention.
[0030] In the description of the present invention, the terms "first", "second", "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance.
[0031] In the description of the present invention, it should be noted that unless otherwise clearly specified and limited, the terms "connection", "setting", "installation", "fixing", etc. should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, and it can be the communication inside two elements. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] Embodiment 1
[0033] The post-accident protection structure of the concrete containment vessel in this embodiment can be used in the design field of building structures, specifically in the nuclear industry field, and belongs to the protection measures of the concrete containment vessel structure. Specifically, as Figures 2 to 4As shown in the figure, the post-accident protection structure of the concrete containment is arranged at the construction joint 2 between the adjacent two-side concrete structures 1, and includes a barrier member 3. The barrier member 3 is in a continuous strip structure, and the axial extension direction is consistent with the trend of the construction joint 2. In the cross-sectional structure of the barrier member 3, there is a barrier section 32 and at least one anchoring section 31. The anchoring section 31 is embedded in the concrete structure 1 and forms a mechanical interlock with the concrete structure 1. The barrier section 32 extends from the concrete structure 1 where the anchoring section 31 is embedded to the construction joint 2 and is connected to the concrete structure 1 on the other side to block the construction joint 2 to form a protection structure.
[0034] The protection structure of this embodiment can effectively block the connection between the inside and outside of the concrete containment at the position of the construction joint 2, and can effectively improve the anti-seepage and anti-leakage effects of the containment. In the case of a small-probability event of an actual accident condition, when there is a tendency for the radioactive liquid inside the containment to leak out, this protection structure can win a certain amount of time for subsequent accident handling and reduce the environmental pollution caused by nuclear radiation. Moreover, the protection structure is embedded in the concrete structure 1, that is, using the originally required concrete as a fulcrum, so there is no need to additionally set fixing devices. The cost of the measure materials themselves is not high, and the embedding process difficulty is not high. It can be seen that this structure effectively improves the accident containment ability of the concrete containment under the condition of low material and labor costs and little impact on the construction project.
[0035] In this embodiment, there are two types of barrier members 3. One type of barrier member 3 is a strip-shaped bridging member 33, such as Figure 2 As shown in the figure, the cross-sectional structure of the strip-shaped bridging member 33 includes a barrier section 32 and two anchoring sections 31. The two anchoring sections 31 are symmetrically distributed on both sides of the strip-shaped bridging member 33 and are respectively embedded in the concrete structures 1 on both sides to form a two-way mechanical interlock. The barrier section 32 is connected between the two anchoring sections 31 to form a continuous shielding surface that coincides with the trend of the construction joint 2 after the concrete structures 1 on both sides are poured. The above-mentioned mechanical interlock can be achieved by the friction between the anchoring section 31 and the concrete, or the anchoring effect can be further improved by setting a thicker structure at the end of the anchoring section 31.
[0036] The strip-shaped bridging member 33 forms a structure similar to a "barrier" or "diaphragm" at the construction joint 2 through the continuous shielding surface, directly blocking the internal and external openings of the construction joint 2, thereby blocking the penetration path of radioactive substances along the construction joint 2. It not only has good airtightness, but also has better effects against air pressure and hydraulic pressure due to the formation of mechanical interlock structures on both sides, and can adapt to the deformation of the concrete structure 1 itself to ensure the integrity of the barrier.
[0037] In this embodiment, the other type of barrier member 3 is a strip-shaped pressure-resistant member 34, such as Figure 3As shown in the figure, the cross-sectional structure of the strip-shaped piezoresistive element 34 includes an anchoring section 31 and a blocking section 32. The anchoring section 31 is embedded in a groove 11 provided on the interface of the concrete structure 1 on one side facing the construction joint 2, and the blocking section 32 extends from the anchoring section 31 to the concrete structure 1 on the other side in the form of a cantilever, and presses against the interface of the concrete structure 1 on the other side facing the construction joint 2 to fill the construction joint 2.
[0038] Only one end of the strip-shaped piezoresistive element 34 is connected and embedded, and it is pressed tightly in the form of a cantilever shield, so that the end structure forms a geometric interference with the interface of the adjacent concrete structure 1, thereby forming a structure similar to an interference fit when filling and blocking the construction joint 2. This physical blocking form similar to a "wedge" or "plug" can better adapt to the width of the construction joint 2 or the concrete interface by means of contact pressing.
[0039] In this embodiment, the blocking member 3 is made of steel, rubber or water-swellable material. Specifically, the strip-shaped cross-connecting member 33 has a flat and long strip structure and can be made of steel plate or rubber or water-swellable material. The strip-shaped piezoresistive element 34 has a strip structure with a trapezoidal or rectangular cross-section and is made of rubber or elastic water-swellable material to ensure complete fitting during pressing through its elastic characteristics.
[0040] The water-swellable material can expand into a structure with a larger volume after contacting water, so as to seal the space by filling. When it is used in the construction joint 2 of the concrete containment that does not originally contact the rock and soil and has no waterproof requirement, once leakage occurs, the gaseous or liquid leakage can stimulate the material to expand. It can be seen that the structural layout is reasonable and ingenious, and the sealing performance is ensured with lower economic cost and construction cost. The water-swellable material can adopt the conventional water-swellable materials on the current market, which will not be elaborated here.
[0041] In this embodiment, the blocking member 3 is located at the position closest to the center of the thickness of the concrete containment after avoiding the reinforcing bars 12 and the prestressed steel tendons 13 in the construction joint 2.
[0042] In this embodiment, the strip-shaped cross-connecting member 33 can be a buried waterstop. The types of waterstops can include steel plate waterstop, steel-edge rubber waterstop, butyl rubber steel plate waterstop, rubber waterstop, etc.; the strip-shaped piezoresistive element 34 can be a water-swellable waterstop strip (or waterstop glue), and multiple channels can also be set in the concrete. The swelling surface of the strip-shaped piezoresistive element 34 should be close to the completed surface of the construction joint 2; the two waterproof structural measures of the strip-shaped cross-connecting member 33 and the strip-shaped piezoresistive element 34 should be arranged in the middle as much as possible without affecting the existing structure items, and the two can also be used in combination, such as Figure 4As shown in the figure. Specifically, a plurality of barrier members 3 are provided, and the barrier members 3 are arranged in sequence along the thickness direction of the concrete containment vessel. In this embodiment, three barrier members 3 can be provided, namely a strip-shaped cross-connector 33 and two strip-shaped piezoresistive members 34. Along the thickness direction of the concrete containment vessel, the two strip-shaped piezoresistive members 34 are respectively arranged on both sides of the strip-shaped cross-connector 33. This arrangement has a good protection effect and a smaller overall volume, which is convenient for avoiding the internal structure of the concrete.
[0043] In this embodiment, the post-accident protection structure of the concrete containment vessel further includes a sealing member 4. The sealing member 4 has a flat continuous strip structure, and the axial extension direction is consistent with the direction of the construction joint 2. The surface of the sealing member 4 is attached to the outer surface of the concrete containment vessel, and both ends of this surface are respectively anchored to the concrete structures 1 on both sides of the construction joint 2 to seal the external opening of the construction joint 2. It can be seen that while adopting the barrier measure, this structure arranges a circle of sealing members 4 outside the construction joint 2 of the containment vessel to completely seal the outside of the construction joint 2, which can further improve the anti-leakage ability and provide a further protection barrier for the structure. The sealing member 4 can be a buried part such as a steel plate as shown in Figure 5 the figure, and the anchoring devices are the parts where both ends are anchored into the concrete structure 1; in other embodiments, a sealing member 4 similar to a steel liner plate as shown in Figure 6 the figure can also be used. Such sealing members 4 can be fixed outside the pouring area before concrete pouring in the same arrangement as the steel lining.
[0044] In this embodiment, a concrete interface agent can also be applied to the interface of the concrete structure 1 facing the construction joint 2, which can improve the performance of the polymer cement mortar bonding layer.
[0045] Generally speaking, the post-accident protection structure of the concrete containment vessel in this embodiment is improved according to the current construction structure of the concrete containment vessel. Facing the possibility that the steam (or liquid) inside the containment vessel under high pressure may overflow through the defects of the steel lining and the cracks at the concrete construction joint 2, when the horizontal or vertical construction joint 2 of the concrete containment vessel is left, closed water-stop materials (such as water-stop strips as the strip-shaped piezoresistive members 34 and water-stop belts as the strip-shaped cross-connectors 33) are buried in the concrete avoiding the steel bars 12 and prestressed steel tendons 13. A sealing item (such as a buried part or a member similar to a steel liner plate as the sealing member 4) is arranged outside the shell to prevent the concrete containment vessel from cracking at the construction joint 2 under pressure or having quality defects at the construction joint 2, and to prevent radioactive liquid from leaking from the construction joint 2 in the case of a severe accident.
[0046] These two measures have low costs and mature technologies. On the premise of not reducing the strength of the containment structure, they minimize the possibility of water vapor (or liquid) spilling out from the position of construction joint 2. At the same time, they also reduce the possibility of nuclear radiation leakage under severe accidents, better realizing the function of the last physical barrier for nuclear safety of the containment. In the case of the containment experiencing severe accidents, they can effectively reduce or avoid the leakage of radioactive substances, buying time for the handling of post-accident nuclear safety issues.
[0047] Embodiment 2
[0048] The layout method of the post-accident protection structure of the concrete containment in this embodiment is used to layout the post-accident protection structure of the concrete containment in Embodiment 1 at the construction joint 2 between two adjacent concrete structures 1. The method includes the following steps:
[0049] Before pouring the concrete structure 1, arrange the barrier member 3 along the trend of the construction joint 2 area, and embed the anchoring section 31 of the barrier member 3 in the pouring area of the concrete structure 1, and the barrier section 32 extends to the construction joint 2 area;
[0050] Pour concrete in the pouring area of the concrete structure 1 so that the anchoring section 31 is embedded inside the concrete structure 1 and forms a mechanical interlock with the concrete structure 1, and the barrier section 32 is connected from the concrete structure 1 where the anchoring section 31 is embedded to another concrete structure 1 to block the construction joint 2 to form a protection structure.
[0051] When the barrier member 3 is a strip-shaped cross-connecting member 33, before pouring the concrete structure 1, arrange the strip-shaped cross-connecting member 33 along the trend of the construction joint 2 area, and embed the two anchoring sections 31 of the strip-shaped cross-connecting member 33 in the pouring areas of the concrete structures 1 on both sides of the construction joint 2 respectively. The barrier section 32 is naturally blocked in the construction joint 2 area, and then pour concrete in the pouring areas of the two concrete structures 1 successively. The two anchoring sections 31 are respectively embedded inside the concrete structures 1 and form a two-way mechanical interlock with the concrete structures 1.
[0052] When the barrier member 3 is a strip-shaped piezoresistive member 34, the pouring of the concrete structure 1 on one side of the construction joint 2 can be completed first, and then the strip-shaped piezoresistive member 34 is placed on the completed concrete structure 1, and the barrier section 32 fits the interface of the completed concrete structure 1, and then pour the concrete structure 1 on the other side of the construction joint 2 to form a mechanical interlock between the anchoring section 31 and the concrete structure 1; it is also possible to pre-embed a mold at the interface position in the pouring area of the first-poured concrete structure 1 to form a groove 11 after pouring is completed, and then embed the strip-shaped piezoresistive member 34 in the groove 11, and then pour concrete in the pouring area of the later-poured concrete structure 1, so that the barrier section 32 of the strip-shaped piezoresistive member 34 abuts against the later-poured concrete structure 1.
[0053] In this embodiment, the method further includes the following steps:
[0054] Before pouring the concrete structures 1 on both sides of the construction joint 2, the anchoring devices are respectively embedded in the pouring areas of the concrete structures 1 on both sides of the construction joint 2.
[0055] After pouring the concrete in the pouring areas of the concrete structures 1 on both sides in sequence, the surface of the sealing member 4 is attached to the outer surface of the concrete containment, and both ends of this surface are respectively connected to the anchoring devices in the concrete structures 1 on both sides to seal the external opening of the construction joint 2.
[0056] Embodiment 3
[0057] The concrete containment of this embodiment includes a shell main body and the post-accident protection structure of the concrete containment in Embodiment 1. The shell main body is formed by the concrete structures 1 of each part poured successively, and a construction joint 2 is formed between the adjacent concrete structures 1 on both sides. As Figure 1 shown, according to the concrete pouring construction plan of the concrete containment and the actual engineering situation, construction joints 2 (horizontal or vertical) are set at the positions of the cylinder and the dome. It is temporarily unavoidable to set such construction joints 2 in the existing concrete project. Figure 1 Shown is a sectional view of the construction joint of the concrete containment in the nuclear island building of a nuclear power project. It can be seen that during the construction of the concrete containment, due to the need for segmented pouring of concrete, a joint is formed between the previously and subsequently poured concrete. Since the containment is a pressure-bearing building, prestressed concrete technology is mostly used for the concrete containment; the concrete in the containment includes structural items such as concrete, steel bars 12, prestressed steel tendons 13, and steel linings. The post-accident protection structure of the concrete containment is arranged at the construction joint 2 between the adjacent concrete structures 1 on both sides to block the construction joint 2 to isolate the inside and outside of the concrete containment.
[0058] It can be understood that the above embodiments are merely exemplary embodiments adopted to illustrate the principle of the present invention. However, the present invention is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and essence of the present invention, and these modifications and improvements are also regarded as the protection scope of the present invention.
Claims
1. A concrete containment post-accident protection structure, characterized in that: It is arranged at a construction joint (2) between two adjacent concrete structures (1), and comprises a blocking member (3). The barrier member (3) is in a continuous strip-shaped structure, and its axial extension direction is consistent with the direction of the construction joint (2). The cross-sectional structure of the barrier member (3) comprises a barrier section (32) and at least one anchoring section (31). The anchoring section (31) is embedded in the concrete structure (1) and forms a mechanical interlock with the concrete structure (1). The blocking section (32) extends from the concrete structure (1) in which the anchoring section (31) is embedded to the construction joint (2) and is connected to the concrete structure (1) on the other side to block the construction joint (2) to form a protective structure.
2. The concrete containment post-accident protection structure according to claim 1 is characterized by: The blocking member (3) is a strip-shaped cross-connecting member (33), and the cross-sectional structure of the strip-shaped cross-connecting member (33) includes a blocking section (32) and two anchoring sections (31). The two anchoring sections (31) are symmetrically distributed on both sides of the strip-shaped cross-connector (33), and are respectively embedded in the concrete structures (1) on both sides to form a bidirectional mechanical interlocking. The barrier section (32) is connected between the two anchoring sections (31) to form a continuous shielding curved surface that coincides with the direction of the construction joint (2) after the concrete structures (1) on both sides are poured.
3. The concrete containment post-accident protection structure according to claim 1 is characterized by: The barrier member (3) is a strip-shaped piezoresistive member (34). The cross-sectional structure of the strip-shaped piezoresistive element (34) comprises an anchoring section (31) and a blocking section (32). The anchoring section (31) is embedded in a groove (11) provided on the interface of the concrete structure (1) on one side and facing the construction joint (2). The barrier section (32) extends from the anchoring section (31) to the other side concrete structure (1) in a cantilevered manner, and presses and contacts the interface of the other side concrete structure (1) toward the construction joint (2) to fill the construction joint (2).
4. The concrete containment post-accident protection structure according to any one of claims 1 to 3, characterized in that: The blocking member (3) is made of steel, rubber or a water-swellable material.
5. The concrete containment post-accident protection structure according to claim 1, characterized in that: The barrier member (3) is located in the construction joint (2) at a position closest to the thickness center of the concrete containment shell after avoiding the steel bars (12) and the prestressed steel strands (13).
6. The concrete containment post-accident protection structure according to claim 1 or 5, characterized in that: A plurality of the barrier components (3) are provided, and the barrier components (3) are arranged in sequence along the thickness direction of the concrete containment shell.
7. The concrete containment post-accident protection structure according to claim 1 is characterized by: It also comprises a closing member (4), which is in the form of a flat continuous strip structure, and has an axial extension direction that is consistent with the direction of the construction joint (2). The surface of the closing member (4) is attached to the outer surface of the concrete containment shell, and the two ends of the surface are respectively anchored to the concrete structure (1) on both sides of the construction joint (2) to close the external opening of the construction joint (2).
8. A method for arranging a protective structure after a concrete containment accident, characterized in that: The method is used for arranging the concrete containment post-accident protection structure according to any one of claims 1 to 7 at the construction joint (2) between the adjacent concrete structures (1), the method comprising the following steps: Before the concrete structure (1) is poured, the barrier component (3) is arranged along the direction of the construction joint (2) area, and the anchoring section (31) of the barrier component (3) is pre-buried in the pouring area of the concrete structure (1), and the barrier section (32) extends to the construction joint (2) area; Concrete is poured in the pouring area of the concrete structure (1) so that the anchoring section (31) is embedded in the concrete structure (1) and forms a mechanical interlock with the concrete structure (1). The barrier section (32) is connected from the concrete structure (1) in which the anchoring section (31) is embedded to another concrete structure (1) to block the construction joint (2) to form a protective structure.
9. The method for arranging a protective structure after a concrete containment accident according to claim 8, characterized in that: This method is used to arrange the concrete containment post-accident protection structure according to claim 7, and the method further comprises the following steps: Before pouring the concrete structure (1) on both sides of the construction joint (2), anchoring devices are pre-buried in the pouring areas of the concrete structure (1) on both sides of the construction joint (2); After concrete is poured in the pouring areas of the concrete structures (1) on both sides in sequence, the surface of the closing member (4) is attached to the outer surface of the concrete containment shell, and the two ends of the surface are respectively connected to the anchoring devices in the concrete structures (1) on both sides, so as to close the external opening of the construction joint (2).
10. A concrete containment vessel, characterized in that: It comprises a shell body and a concrete containment post-accident protection structure as claimed in any one of claims 1 to 7, The shell body is formed by successively cast concrete structures (1), and a construction joint (2) is formed between the concrete structures (1) on two adjacent sides; The concrete containment shell post-accident protection structure is arranged at the construction joint (2) between the adjacent concrete structures (1) on both sides and is used to block the construction joint (2) to isolate the inside and outside of the concrete containment shell.
Citation Information
Patent Citations
Tunnel lining structure joint treated by double-side self-adhesion waterproof adhesive strip and construction method
CN111005739A
Reactor single-layer safety shell and construction method thereof
CN111576950A
Waterproof construction method and waterproof structure for underground gas storage
CN118030133A
Water stop structure of high-water-head pressure water delivery tunnel
CN216477386U
Placement joint structure for concrete structure
JP2016199867A