Bag type well drilling leakage plugging device capable of being used in combined mode and using method of bag type well drilling leakage plugging device
By combining the use of a bag-type drilling leakage sealing device, the combined sealing technology of the first and second capsules is used to solve the problem of sealing instability caused by the change in fracture size in salt mine drilling, achieving rapid and effective sealing effect and simplicity of construction.
Patent Information
- Application Number
- CN202510758217.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-09
- Publication Date
- 2025-08-12
AI Technical Summary
In existing salt mine drilling, the traditional sealing method has poor adaptability to cracks with large size changes, which can easily cause secondary leakage, complex and time-consuming construction, and may contaminate the reservoir.
A combined bag-type drilling leakage sealing device is adopted. Through the combination of the first capsule and the second capsule, a closed area is first formed to inject cement slurry to seal the leakage point, and the second capsule is used to isolate the cement slurry to prevent drilling and adapt to cracks of different sizes.
It achieves a fast and effective sealing effect, reduces the number of construction times, improves the flexibility and practicality of sealing, prevents drilling and ensures drilling flatness.
Smart Images

Figure CN120465878A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of salt mine drilling plugging, and in particular to a bag-type drilling leakage plugging device that can be used in combination and a use method thereof. Background Art
[0002] In the drilling construction of salt mines, the existing mining of mineral deposits is all done by drilling water solution mining. In the process of geological exploration drilling, drilling loss is a common and complex problem. This problem also exists in the drilling process of brine wells in the early stage of salt mining, especially in fractured strata, porous permeable strata or high-pressure sections, which need to be sealed.
[0003] Currently, traditional plugging methods generally use physical filling, such as cement slurry plugging or fast-setting and solidifying materials. However, the effect is unstable in formations with large variations in fracture size. After plugging, it is easy to cause plugging material loss or secondary leakage. The construction is complicated and very time-consuming and labor-intensive, affecting the construction period. At the same time, the drill may get stuck when the cement slurry solidifies, and chemical plugging agents may contaminate the reservoir, which has major limitations.
[0004] Therefore, to address the above problems, a bag-type drilling leakage plugging device that can be used in combination can be designed, with an additional bag structure. Through the combined use of the bags, cracks with large size variations can be easily plugged. Summary of the Invention
[0005] In order to overcome the problem that the existing sealing method has poor adaptability to cracks with large size changes, it is easy to cause secondary leakage and requires multiple injections, resulting in a long construction period.
[0006] The technical solution of the present invention is as follows: a bag-type drilling leakage plugging device that can be used in combination, including a drilling well and a drill pipe installed in the drilling well, and also including a connecting sleeve composed of two plates, the surfaces of the connecting sleeve and the drill pipe are fitted and connected, the outer side of the connecting sleeve surface is provided with a first bag, two connecting sleeves are provided, the surface of the connecting sleeve is provided with a grouting seat, a second bag is provided between the two grouting seats, and the top of the connecting sleeve surface is provided with a filling channel and a grouting channel, a grouting connector is provided between the two grouting seats, a grouting port is opened on the surface of the grouting seat, a discharge assembly is provided in the grouting port, and the bottom of the drill pipe is detachably connected to a logging seat;
[0007] Both ends of the plate body are provided with connecting ear plates, and bolt holes for installing bolts are opened on the connecting ear plates. The two plate bodies are fixed by bolt connection, and the filling channel and the grouting channel are respectively located on the two plate bodies.
[0008] Preferably, the liquid filling channel is formed through the plate body from top to bottom, and the liquid filling channel is connected to the liquid filling equipment through a pipeline, and the grouting channel is formed through the plate body from top to bottom, and the grouting channel is connected to the grouting equipment through a pipeline.
[0009] Preferably, a liquid filling port is provided on the surface of the connecting sleeve, and the liquid filling channel is connected to the first capsule through the liquid filling port, and liquid can be injected into the first capsule through the liquid filling port.
[0010] Preferably, the grouting seat is a split structure, and the grouting seat and the plate body are fixedly connected, and a through-connecting channel is opened on the two grouting seats, and the connecting channel is connected to the liquid filling channel and the grouting channel respectively, and the grouting port is connected to the grouting channel through the connecting channel on one side.
[0011] Preferably, the second bladder is a double-layer composite structure, comprising an inner bladder and an outer bladder, the inner bladder is made of impermeable canvas, and the upper and lower ends of the second bladder are respectively connected to the grouting seat.
[0012] Preferably, the grouting connector includes two connecting pipes, which are respectively connected to the grouting channel and the grouting channel. Liquid or slurry can enter the lower grouting seat through the connecting pipes.
[0013] Preferably, a diversion channel is opened inside the grouting seat on the side of the connecting channel, the inner side of the second capsule is connected to the connecting channel on one side through the diversion channel, and a valve body is provided in the diversion channel. When the valve body is opened, the liquid flows into the second capsule through the diversion channel.
[0014] Preferably, the discharge assembly includes a transmission rod installed in the grouting port, a servo motor is provided inside the grouting seat, the output end of the servo motor is fixedly connected to the transmission rod, a spiral blade is fixedly installed on the surface of the transmission rod, and the servo motor is used to drive the transmission rod to rotate. When the spiral blade rotates, the slurry can be pushed outward.
[0015] Preferably, an acoustic wave data acquisition module and an information processing module are provided inside the logging seat, and the logging seat is connected via wires and a connecting sleeve.
[0016] A method for using a bag-type drilling lost circulation plugging device that can be used in combination, using the bag-type drilling lost circulation plugging device that can be used in combination, comprises the following steps:
[0017] S1. First, measure and locate the leak points at the cracks in the well, and confirm the installation position of the connecting sleeve according to the number and size of the leak points;
[0018] S2. Fit the two plates to the surface of the drill pipe and secure them together using the connecting lugs. Adjust the positions of the two connecting sleeves, then secure the two ends of the second bladder to the two grouting seats. Simultaneously, connect the delivery pipe of the grouting device to the grouting channel, and the delivery pipe of the grouting device to the grouting channel.
[0019] S3. After installing the logging base to the bottom of the drill pipe, lower the drill pipe into the well, confirm the location of the leak through the logging base, and then move the first capsule to both sides of the leak;
[0020] S4. First, the filling device is turned on to deliver high-pressure liquid into the filling channel. The liquid enters the first bladder through the filling port, causing the first bladder to swell and adhere to the inner wall of the wellbore, thereby sealing the wellbore area between the two first bladders.
[0021] S5. Start the grouting equipment and send the cement slurry into the grouting port through the grouting channel so that the cement slurry is injected into the closed area of the wellbore area to seal the leak point. At the same time as the grouting, the diversion channel can be opened through the valve. At this time, the high-pressure liquid enters the second capsule through the diversion channel.
[0022] Beneficial effects of the present invention:
[0023] 1. This solution adopts a bag structure and forms a combination of them. The first bag seals both sides of the leak point to form a closed area. Cement slurry is injected into the closed area to seal the leak point. At the same time, the second bag isolates the cement slurry from the drill pipe to prevent the drill from getting stuck, thus improving practicality.
[0024] 2. The combined use of the first capsules facilitates the spacing between the two first capsules, thereby adapting to the sizes of cracks of different sizes. In addition, multiple cracks can be covered synchronously and sealed at one time, reducing the number of sealing times and making construction simpler and faster.
[0025] 3. The second bladder isolates the drill pipe so that the cement slurry is located outside the second bladder. This makes it easier to get rid of stuck drills while injecting liquid into the second bladder. The second bladder swells to form a cavity, which makes the drilling smoother after sealing. This facilitates subsequent drill pipe work and improves practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 Shown is a schematic diagram of the internal structure of the drilling well of the bag-type drilling loss plugging device that can be used in combination according to the present invention;
[0027] Figure 2 Shown is a schematic diagram of the connecting sleeve structure of the bag-type drilling lost circulation plugging device that can be used in combination according to the present invention;
[0028] Figure 3 The present invention is shown Figure 2 A in the middle is an enlarged schematic diagram of the structure;
[0029] Figure 4 Shown is a schematic diagram of a top view of the connecting sleeve of the bag-type drilling leakage plugging device that can be used in combination according to the present invention;
[0030] Figure 5 Shown is a schematic diagram of the cross-sectional structure of the connecting sleeve of the bag-type drilling leakage plugging device that can be used in combination according to the present invention;
[0031] Figure 6 Shown is a schematic cross-sectional structure diagram of a grouting seat of a bag-type drilling leakage plugging device that can be used in combination according to the present invention;
[0032] Figure 7 Shown is a schematic diagram of the internal structure of the grouting seat of the bag-type drilling leakage plugging device that can be used in combination according to the present invention.
[0033] Explanation of the accompanying symbols: 1. Drilling; 2. Drill pipe; 3. Connecting sleeve; 301. Connecting ear plate; 302. Filling port; 4. First bladder; 5. Second bladder; 6. Grouting seat; 601. Communication channel; 602. Connecting pipe; 603. Diversion channel; 7. Grouting port; 701. Transmission rod; 702. Servo motor; 703. Spiral blade; 8. Logging seat. DETAILED DESCRIPTION
[0034] The present invention will be further described below with reference to the accompanying drawings and examples.
[0035] See also Figure 1-Figure 7The present invention provides an embodiment: a bag-type drilling leakage plugging device that can be used in combination, including a drilling well 1 and a drill pipe 2 installed in the drilling well 1, and also including a connecting sleeve 3 composed of two plates, the surface of the connecting sleeve 3 and the drill pipe 2 are fitted and connected, and a first bag 4 is provided on the outer side of the surface of the connecting sleeve 3 (a pressure sensor can be provided in the first bag 4, the pressure sensor is installed on the inner wall of the connecting sleeve 3, and its circuit is built into the connecting sleeve 3), two connecting sleeves 3 are provided, a grouting seat 6 is provided on the surface of the connecting sleeve 3, a second bag 5 (a pressure sensor can be installed in the second bag 5), and a filling channel and a grouting channel are provided on the top of the surface of the connecting sleeve 3, a grouting connector is provided between the two grouting seats 6, a grouting port 7 is provided on the surface of the grouting seat 6, a discharge assembly is provided in the grouting port 7, and the bottom of the drill pipe 2 is detachable The unloading connection is provided with a logging seat 8; connecting ear plates 301 are provided at both ends of the plate body, and bolt holes for installing bolts are opened on the connecting ear plates 301. The two plate bodies are fixed by bolt connection, and the filling channel and the grouting channel are respectively located on the two plate bodies. After the two first sacs 4 enter the well, they are swollen by the injection of high-pressure liquid, so that the two first sacs 4 fit on the upper and lower sides of the well, forming a closed area between the first sacs 4, and then cement slurry is injected into the closed area to seal the leakage point cracks, and the injected cement slurry can enter the cracks to solidify and seal, so that the sealing effect is better, and the two first sacs 4 form a closed area to avoid the loss of plugging materials. At the same time, by adjusting the spacing between the two first sacs 4, different crack sizes can be adapted, and single-point leakage points can also be sealed by the first sacs 4, forming a combined use with better flexibility.
[0036] See also Figure 1 、 Figure 2 and Figure 3 In this embodiment, a liquid filling channel is formed by running through the plate from top to bottom, and the liquid filling channel is connected to the liquid filling device through a pipeline. A grouting channel is formed by running through the plate from top to bottom, and the grouting channel is connected to the grouting device through a pipeline. A liquid filling port 302 is provided on the surface of the connecting sleeve 3. The liquid filling channel is connected to the first capsule 4 through the liquid filling port 302. Liquid can be injected into the first capsule 4 through the liquid filling port 302. The grouting seat 6 is a split structure, and the grouting seat 6 is fixedly connected to the plate. A through-going connecting channel 601 is provided on the two grouting seats 6. The connecting channel 601 is connected to the liquid filling channel and the grouting channel respectively, and the grouting port 7 is connected to the grouting channel through the connecting channel 601 on one side. The liquid filling device injects high-pressure liquid into the first capsule 4 to form a seal for the drilling area. After sealing, the first capsule 4 can be removed after the liquid is released or withdrawn for recycling and secondary use.
[0037] See also Figure 3 、 Figure 6 and Figure 7In this embodiment, the second capsule 5 is a double-layer composite structure. The second capsule 5 includes an inner capsule and an outer capsule. The inner capsule is made of anti-seepage canvas. The upper and lower ends of the second capsule 5 are respectively connected to the grouting seat 6. The grouting connector includes a connecting pipe 602. There are two connecting pipes 602. The two connecting pipes 602 are respectively connected to the grouting channel and the grouting channel. The liquid or slurry can enter the lower grouting seat 6 through the connecting pipe 602. The inside of the grouting seat 6 is located on the side of the connecting channel 601 and is provided with a diversion channel 603. The inner side of the second capsule 5 is connected to one side through the diversion channel 603. The channel 601 is connected, and a valve body is provided in the diversion channel 603. When the valve body is opened, the liquid flows into the second capsule 5 through the diversion channel 603. The second capsule 5 is made of an impermeable material to reduce the leakage of the internal liquid. Therefore, during grouting, the cement slurry is transported into the two grouting seats 6 through the grouting channel and the connecting pipe 602. Grouting can be performed on the outside of the second capsule 5 to form a seal. At the same time as grouting, high-pressure liquid can be injected into the second capsule 5 to balance the squeezing of the slurry on the second capsule 5. When the cement slurry solidifies, the hollow inner wall is smoother, which is convenient for subsequent work of the drill rod.
[0038] See also Figure 3 and Figure 6 In this embodiment, the discharge assembly includes a transmission rod 701 installed in the grouting port 7, a servo motor 702 is provided inside the grouting seat 6, the output end of the servo motor 702 is fixedly connected to the transmission rod 701, and a spiral blade 703 is fixedly installed on the surface of the transmission rod 701. The servo motor 702 is used to drive the transmission rod 701 to rotate. When the spiral blade 703 rotates, the slurry can be pushed outward. During grouting, the servo motor 702 is used to drive the transmission rod 701 to rotate, and the spiral blade 703 pushes the slurry in the grouting port 7 to prevent blockage.
[0039] See also Figure 1 In this embodiment, an acoustic wave data acquisition module and an information processing module are provided inside the logging seat 8. The logging seat 8 is connected to the connecting sleeve 3 through an electric wire. The acoustic wave data acquisition module can collect information about the inner wall of the wellbore and transmit the data through the cable. Personnel can use the data to analyze the leakage point and the crack position (see patent number CN114876448A for details, in which the propagation time of the ultrasonic signal between the axial ultrasonic generator and the axial ultrasonic receiver is detected to obtain the distribution of the flow rate of the drilling fluid in the axial direction of the wellbore, so as to obtain the depth of the well leakage, which is the existing technology), making it convenient for personnel to adjust the position of the capsule.
[0040] A method for using a bag-type drilling lost circulation plugging device that can be used in combination, using the bag-type drilling lost circulation plugging device that can be used in combination, comprises the following steps:
[0041] S1. First, measure and locate the leak points at the cracks in the well. According to the number and size of the leak points, confirm the installation position of the connecting sleeve 3. The leak points can be located by drilling measurement.
[0042] S2. Fit the two plates to the surface of the drill pipe 2 and secure them together using the connecting lugs 301. Adjust the positions of the two connecting sleeves 3 (the spacing between the connecting sleeves 3 needs to be greater than the overall height of a single leak point or multiple cracks). Then, secure the two ends of the second bladder 5 to the two grouting seats 6 (the second bladder 5 can be secured using a clamp or lashing). Simultaneously, connect the delivery pipe of the filling device to the filling channel, and the delivery pipe of the grouting device to the grouting channel.
[0043] S3. After installing the logging base 8 at the bottom of the drill pipe 2, lower the drill pipe 2 into the well 1. After confirming the location of the leak using the logging base 8 (this measurement information is transmitted to the surface via a cable to facilitate location confirmation), move the first capsule 4 to both sides of the leak (i.e., the leak is located between the two first capsules 4).
[0044] S4. First, the filling device is turned on to deliver high-pressure liquid into the filling channel. The liquid enters the first bladder 4 through the filling port 302, causing the first bladder 4 to swell and fit against the inner wall of the well 1 (the pressure sensor can sense the pressure in the first bladder 4 to ensure the expansion of the first bladder 4). The wellbore area between the two first bladders 4 is sealed (the leak point or crack is located in the sealed area);
[0045] S5. Turn on the grouting equipment and send the cement slurry into the grouting port 7 through the grouting channel, so that the cement slurry is injected into the closed area of the wellbore area to seal the leak point. The cement slurry can directly enter the leak point or crack, and the sealing effect is better. At the same time of grouting, the diversion channel 603 can be opened through the valve. At this time, the high-pressure liquid enters the second capsule 5 through the diversion channel 603. The second capsule 5 can isolate the drill pipe 2 to avoid the formation of drill sticking when the cement slurry solidifies. At the same time, the second capsule 5 makes the inner wall of the plugged hole smoother, which is convenient for subsequent work of the drill pipe 2.
Claims
1. A bag-type drilling leakage plugging device that can be used in combination, characterized by: The invention comprises a drilling well (1) and a drill rod (2) installed in the drilling well (1), and also comprises a connecting sleeve (3) composed of two plates, the connecting sleeve (3) and the surface of the drill rod (2) are fitted and connected, a first capsule (4) is provided on the outer side of the surface of the connecting sleeve (3), two connecting sleeves (3) are provided, a grouting seat (6) is provided on the surface of the connecting sleeve (3), a second capsule (5) is provided between the two grouting seats (6), and a liquid filling channel and a grouting channel are provided on the top of the surface of the connecting sleeve (3), a grouting connector is provided between the two grouting seats (6), a grouting port (7) is provided on the surface of the grouting seat (6), a discharge assembly is provided in the grouting port (7), and a well logging seat (8) is detachably connected to the bottom of the drill rod (2); Both ends of the plate body are provided with connecting ear plates (301), and bolt holes for installing bolts are opened on the connecting ear plates (301). The two plate bodies are connected and fixed by bolts, and the liquid filling channel and the grouting channel are respectively located on the two plate bodies.
2. The bag-type drilling leakage plugging device that can be used in combination according to claim 1 is characterized in that: The liquid filling channel is formed through the plate body from top to bottom, and the liquid filling channel is connected to the liquid filling equipment through a pipeline. The grouting channel is formed through the plate body from top to bottom, and the grouting channel is connected to the grouting equipment through a pipeline.
3. The bag-type drilling leakage plugging device that can be used in combination according to claim 2 is characterized in that: A liquid filling port (302) is provided on the surface of the connecting sleeve (3), and a liquid filling channel is connected to the first capsule (4) through the liquid filling port (302), so that liquid can be injected into the first capsule (4) through the liquid filling port (302).
4. The bag-type drilling leakage plugging device that can be used in combination according to claim 1 is characterized in that: The grouting seat (6) is a split structure, and the grouting seat (6) and the plate body are fixedly connected. The two grouting seats (6) are provided with a through-going communication channel (601), and the communication channel (601) is respectively connected to the liquid filling channel and the grouting channel, and the grouting port (7) is connected to the grouting channel through the communication channel (601) on one side.
5. The bag-type drilling leakage plugging device that can be used in combination according to claim 1 is characterized in that: The second bladder (5) is a double-layer composite structure, comprising an inner bladder and an outer bladder, wherein the inner bladder is made of an impermeable canvas material, and the upper and lower ends of the second bladder (5) are respectively connected to the grouting seat (6).
6. The bag-type drilling leakage plugging device that can be used in combination according to claim 1 is characterized in that: The grouting connector includes two connecting pipes (602). The two connecting pipes (602) are connected to the grouting channel and the grouting channel respectively. Liquid or slurry can enter the lower grouting seat (6) through the connecting pipes (602).
7. The bag-type drilling leakage plugging device that can be used in combination according to claim 1 is characterized in that: A diversion channel (603) is provided inside the grouting seat (6) on the side of the connecting channel (601). The inner side of the second capsule (5) is connected to the connecting channel (601) on one side through the diversion channel (603), and a valve body is provided in the diversion channel (603). When the valve body is opened, the liquid flows into the second capsule (5) through the diversion channel (603).
8. The bag-type drilling leakage plugging device that can be used in combination according to claim 1 is characterized in that: The discharge assembly comprises a transmission rod (701) installed in the grouting port (7); a servo motor (702) is provided inside the grouting seat (6); an output end of the servo motor (702) is fixedly connected to the transmission rod (701); a spiral blade (703) is fixedly installed on the surface of the transmission rod (701); the servo motor (702) is used to drive the transmission rod (701) to rotate; when the spiral blade (703) rotates, the slurry can be pushed outward.
9. The bag-type drilling leakage plugging device that can be used in combination according to claim 1 is characterized in that: An acoustic wave data acquisition module and an information processing module are arranged inside the well logging seat (8), and the well logging seat (8) is connected to the connecting sleeve (3) via an electric wire.
10. A method for using a bag-type drilling leakage plugging device that can be used in combination, characterized in that: The bag-type drilling loss plugging device that can be used in combination as described in claims 1 to 9 is used, comprising the following steps: S1. First, measure and locate the leak points at the cracks in the well, and confirm the installation position of the connecting sleeve (3) according to the number and size of the leak points; S2. Fit the two plates onto the surface of the drill rod (2) and connect and fix them via the connecting ear plates (301), adjust the positions of the two connecting sleeves (3), and then fix the two ends of the second bladder (5) onto the two grouting seats (6), while connecting the delivery pipe of the grouting device to the grouting channel, and the delivery pipe of the grouting device to the grouting channel; S3, after installing the well logging seat (8) to the bottom of the drill pipe (2), lowering the drill pipe (2) into the wellbore (1), confirming the location of the leak point through the well logging seat (8), and moving the first capsule (4) to both sides of the leak point; S4, first start the liquid filling device, send high-pressure liquid into the liquid filling channel, and the liquid enters the first capsule (4) through the liquid filling port (302), so that the first capsule (4) swells and fits the inner wall of the well (1), and the well area between the two first capsules (4) is sealed; S5. Start the grouting equipment and send the cement slurry into the grouting port (7) through the grouting channel, so that the cement slurry is injected into the closed area of the wellbore area to seal the leak point. At the same time as the grouting, the diversion channel (603) can be opened through the valve, and the high-pressure liquid enters the second capsule (5) through the diversion channel (603).
Citation Information
Cited By
Mechanical plugging device for water source well
CN121162217A
A mechanical sealing device for water source wells
CN121162217B