Wharf steel structure construction progress dynamic management and control and resource allocation system
Through real-time data perception and fusion, dynamic digital twins and multi-agent decision-making engines, the lack of planning staticity and risk prediction in dock steel structure construction is solved, and dynamic control of construction progress and resource allocation is achieved, which improves the real-time and safety of construction.
Patent Information
- Application Number
- CN202511023017.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-24
- Publication Date
- 2025-08-22
- Estimated Expiration
- 2045-07-24
AI Technical Summary
The existing dock steel structure construction management methods have static planning, lag in information and insufficient risk prediction, resulting in lag in construction progress adjustment, untimely resource allocation and inability to effectively identify compound risks, affecting construction safety and progress.
The real-time data perception and fusion module, the dynamic construction digital twin construction construction and evolution module, the multi-agent adaptive decision-making engine and the human-machine collaboration and closed-loop execution module are used to build a dynamic construction digital twin to realize real-time data fusion, risk quantification and adaptive decision-making, generate an adaptive construction plan and visually review and execution.
It realizes a high degree of consistency synchronization between the construction site status and digital information, dynamic identification of potential risks, adaptive adjustment of construction plans, improves the real-time and accuracy of construction progress and safety management, and solves the problems of information lag and insufficient risk prediction in the existing technology.