Method and system for optimizing closure jacking force of multi-span continuous rigid frame bridge
By combining fuzzy mathematical solutions with finite element models, the problem of large solution errors in traditional jacking force optimization methods in deep water environments was solved, the stability optimization of multi-span continuous rigid frame bridges was achieved, and the optimal solution for jacking force was provided.
Patent Information
- Application Number
- CN202511214581.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-28
- Publication Date
- 2025-09-30
- Estimated Expiration
- 2045-08-28
AI Technical Summary
Traditional jacking force optimization methods fail to effectively consider the degradation effect of pile-soil constraints caused by deep-water scouring and the influence of water flow loads on stress during the construction phase. This makes it difficult to accurately control the long-term stability of multi-span continuous rigid frame bridges, especially in complex hydrological environments where large solution errors occur.
The multi-objective optimization problem is transformed into a single-objective linear programming problem using a fuzzy mathematical method. The finite element model is used to simulate the soil constraint degradation and the influence of water flow loads. The optimal solution for the jacking force is calculated by determining the closure sequence and construction steps.
The solution process is simplified, the error is reduced, the optimal solution of the jacking force is accurately solved, and the long-term linear control accuracy of multi-span continuous rigid frame bridges in complex hydrological environments is improved.
Smart Images

Figure CN120724561A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of bridge construction, and in particular to a method and system for optimizing the closure thrust of a multi-span continuous rigid frame bridge. Background Art
[0002] Multi-span continuous rigid-frame bridges face severe long-term stability challenges in deepwater, rapid-flow environments, particularly in coastal and estuarine regions with complex hydrological conditions, such as Southeast Asia. Heavy monsoon rainfall and tidal action cause scouring rates on bridge pier foundations to be significantly higher than those of conventional land-based bridges. Deepwater foundations are subjected to continuous scouring during operation, and the effective embedment depth of pile foundations degrades year by year, leading to a significant decrease in the soil's horizontal thrust stiffness. Simultaneously, the periodic impact of water flow on the pier cross-section, coupled with concrete shrinkage, creep, and temperature effects, creates a time-varying coupling effect, exacerbating the cumulative displacement of the piers and stress concentration at the pier base. The long-term effects of this multi-factor coupling present a severe challenge to traditional jacking design methods: if the jacking pre-deflection is insufficient, the pier top displacement may exceed the limit ten years after completion; if the jacking amount is too large, the tensile stress during construction may easily exceed the allowable value specified in the code.
[0003] Current research on jacking force optimization is largely limited to conventional terrestrial bridge environments and suffers from significant drawbacks: 1) It fails to consider the degradation of pile-soil constraints caused by deepwater scouring, and the soil spring stiffness is still calculated based on the initial embedment depth, overestimating the pier's restraining capacity. 2) It ignores the persistent impact of water flow loads on stress and displacement during construction, especially under high-velocity conditions during flood season, where the pier's water-blocking area increases with scouring depth, creating a positive feedback effect. 3) Existing trial-and-error algorithms struggle to quantify the cross-effects of jacking force combinations on pier displacements in multi-span systems (n ≥ 5). Multiple displacement constraint objectives and stress control conditions form a high-dimensional, nonlinear relationship in deepwater environments, leading to solution errors of up to 20%-30% using traditional trial-and-error methods. Therefore, establishing a multi-objective jacking force optimization system that considers deepwater hydrological factors has become an urgent need for deepwater bridge construction in mountainous areas. Summary of the Invention
[0004] The purpose of the present invention is to provide a method and system for optimizing the closure thrust of a multi-span continuous rigid frame bridge, so as to accurately solve the optimal solution of the closure thrust.
[0005] To achieve the above-mentioned object, the present invention provides a method for optimizing the closure thrust of a multi-span continuous rigid frame bridge, the method comprising: Determine the closure sequence for multi-span continuous rigid frame bridges; Determining the construction steps corresponding to the closure sequence plan according to the closure sequence plan; Perform soil constraint degradation simulation according to the closure sequence plan and the corresponding construction steps to establish a finite element model of the entire bridge; Based on the finite element model, the parameters corresponding to applying a unit thrust force and not applying a unit thrust force to each closure mouth are calculated to obtain a first parameter and a second parameter respectively; Constructing a function to be solved based on the first parameter and the second parameter; the function to be solved includes an objective function M and a constraint condition equation; The fuzzy mathematical solution is used to transform the multi-objective optimization problem corresponding to the function to be solved into a single-objective linear programming problem to obtain the optimal solution of the thrust force.
[0006] Optionally, performing soil constraint degradation simulation according to the closure sequence plan and the corresponding construction steps to establish a finite element model of the entire bridge specifically includes: According to the closure sequence scheme and the corresponding construction steps, the deep water foundation scouring area of the pile foundation is scoured according to the most unfavorable scouring depth H S Conduct soil constraint degradation simulation to obtain the effective embedment correction depth of the pile foundation; Calculate the reduction degree of soil horizontal anti-thrust stiffness according to the effective embedded correction depth of the pile foundation; Establishing a pile-soil interaction spring stiffness matrix according to the soil horizontal thrust stiffness reduction; A finite element model of the entire bridge is constructed according to the pile-soil interaction spring stiffness matrix.
[0007] Optionally, the first parameter includes: the change in longitudinal horizontal displacement of the top of the pier No. i ten years after the bridge is completed due to the unit thrust of the jth closure after the scouring state; The stress variation of the cross section of pier No. i during the construction phase caused by the unit thrust of the jth closure after the scouring state ; The second parameter includes: the total displacement of the top of pier No. i caused by the deadweight of the main beam and the shrinkage and creep of concrete ten years after the bridge is completed , displacement of the top of pier No. i caused by water flow load ten years after the bridge was completed , Total displacement of the top of pier No. i caused by temperature difference ten years after the bridge was completed and the cross-sectional stress of pier No. i caused by various loads during the construction phase .
[0008] Optionally, the fuzzy mathematical solution is used to convert the multi-objective optimization problem corresponding to the function to be solved into a single-objective linear programming problem to obtain the optimal solution for the thrust force, specifically including: Constructing a multi-objective linear programming model according to the function to be solved, wherein the multi-objective linear programming model includes a multi-objective objective function and multi-objective constraints; Standardizing the multi-objective linear programming model to obtain standardized objective functions and constraints; By performing fuzzy processing on the objective function and constraint conditions after the standardization process, the multi-objective problem is converted into a single-objective problem; The single-objective problem was solved using MATLAB software to obtain the optimal solution for the thrust force of the entire bridge.
[0009] Optionally, the specific formula of the objective function M is: min ; in, is the longitudinal horizontal displacement of the pier No. i, Apply unit thrust to the jth closure.
[0010] Optionally, the specific formula of the constraint equation is: ; in, Allowable tensile stress.
[0011] The present invention also provides a multi-span continuous rigid frame bridge closure thrust optimization system, the system comprising: The closure sequence determination module is used to determine the closure sequence of multi-span continuous rigid frame bridges; A construction step determination module, configured to determine the construction steps corresponding to the closure sequence scheme according to the closure sequence scheme; a finite element model building module, configured to perform soil constraint degradation simulation according to the closure sequence plan and the corresponding construction steps, and to build a finite element model of the entire bridge; a parameter solving module, configured to calculate parameters corresponding to each closure mouth with and without unit thrust force applied based on the finite element model, to obtain first parameters and second parameters respectively; A module for constructing a function to be solved, configured to construct a function to be solved based on the first parameter and the second parameter; the function to be solved includes an objective function M and a constraint condition equation; The module for determining the optimal solution of the thrust force is used to convert the multi-objective optimization problem corresponding to the function to be solved into a single-objective linear programming problem by using a fuzzy mathematical solution to obtain the optimal solution of the thrust force.
[0012] Optionally, the finite element model building module specifically includes: The soil constraint degradation simulation unit is used to simulate the deep water foundation scouring area of the pile foundation according to the most unfavorable scouring depth H according to the closure sequence plan and the corresponding construction steps. S Conduct soil constraint degradation simulation to obtain the effective embedment correction depth of the pile foundation; a soil horizontal anti-thrust stiffness reduction calculation unit, configured to calculate the soil horizontal anti-thrust stiffness reduction according to the effective embedded correction depth of the pile foundation; a spring stiffness matrix calculation unit, configured to establish a pile-soil interaction spring stiffness matrix according to the soil horizontal thrust stiffness reduction degree; The finite element model building unit is used to build a finite element model of the entire bridge according to the pile-soil interaction spring stiffness matrix.
[0013] Optionally, the first parameter includes: the change in longitudinal horizontal displacement of the top of the pier No. i ten years after the bridge is completed due to the unit thrust of the jth closure after the scouring state; The stress variation of the cross section of pier No. i during the construction phase caused by the unit thrust of the jth closure after the scouring state ; The second parameter includes: the total displacement of the top of pier No. i caused by the deadweight of the main beam and the shrinkage and creep of concrete ten years after the bridge is completed , displacement of the top of pier No. i caused by water flow load ten years after the bridge was completed , Total displacement of the top of pier No. i caused by temperature difference ten years after the bridge was completed and the cross-sectional stress of pier No. i caused by various loads during the construction phase .
[0014] Optionally, the thrust force optimal solution determination module specifically includes: A multi-objective linear programming model construction unit is used to construct a multi-objective linear programming model according to the function to be solved, and the multi-objective linear programming model includes a multi-objective objective function and multi-objective constraints; A standardization processing unit, configured to perform standardization processing on the multi-objective linear programming model to obtain a standardized objective function and constraint conditions; a problem conversion unit, configured to convert a multi-objective problem into a single-objective problem by performing fuzzy processing on the objective function and constraint conditions after the standardization processing; The solving unit is used to solve the single-objective problem using MATLAB software to obtain the optimal solution of the thrust force of the entire bridge.
[0015] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects: The present invention discloses a method and system for optimizing the closure jacking force of a multi-span continuous rigid frame bridge. First, the construction steps corresponding to the closure sequence scheme are determined according to the closure sequence scheme; secondly, soil constraint degradation simulation is performed according to the closure sequence scheme and the corresponding construction steps, and a finite element model of the entire bridge is established; then, based on the finite element model, the parameters corresponding to applying a unit jacking force and not applying a unit jacking force to each closure mouth are respectively calculated, and a function to be solved is constructed based on the first parameter and the second parameter; finally, a fuzzy mathematical solution is used to convert the multi-objective optimization problem corresponding to the function to be solved into a single-objective linear programming problem, and the optimal solution for the jacking force is obtained. The solution disclosed by the present invention comprehensively simulates the soil constraint degradation effect, and at the same time converts the multi-objective problem in a deep-water environment into a single-objective linear programming problem, which not only simplifies the solution process, but also accurately solves the optimal solution for the jacking force and reduces the solution error. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0017] Figure 1 This is a flow chart of a method for optimizing the closure thrust of a multi-span continuous rigid frame bridge according to an embodiment of the present invention; Figure 2 This is the elevation view of the multi-span continuous rigid frame bridge before closure; Figure 3 This is a schematic diagram of the sequence of side span-middle span-secondary middle span closure. DETAILED DESCRIPTION
[0018] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0019] The purpose of the present invention is to provide a method and system for optimizing the closure thrust of a multi-span continuous rigid frame bridge, so as to accurately solve the optimal solution of the closure thrust.
[0020] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0021] like Figure 1 As shown, the present invention discloses a method for optimizing the closure thrust of a multi-span continuous rigid frame bridge, the method comprising: Step S1: Determine the closure sequence of a multi-span continuous rigid frame bridge.
[0022] Step S2: Determine the construction steps corresponding to the joint closure sequence plan according to the joint closure sequence plan.
[0023] Step S3: Perform soil constraint degradation simulation according to the closure sequence plan and corresponding construction steps to establish a finite element model of the entire bridge.
[0024] Step S4: Calculate parameters corresponding to each closure mouth with and without unit thrust force applied based on the finite element model to obtain first parameters and second parameters, respectively.
[0025] Step S5: constructing a function to be solved based on the first parameter and the second parameter; the function to be solved includes the objective function M and constraint condition equations.
[0026] Step S6: Using fuzzy mathematical solution, the multi-objective optimization problem corresponding to the function to be solved is transformed into a single-objective linear programming problem to solve the optimal solution of the thrust force.
[0027] The following describes each step in detail: Step S1: Determine the closure sequence of a multi-span continuous rigid frame bridge; the closure sequence in the present invention includes side span-middle span-secondary middle span, middle span-secondary middle span-side span, secondary middle span-side span-middle span, etc. The above is only an example and does not mean a specific limitation.
[0028] Step S3: Perform soil constraint degradation simulation based on the closure sequence plan and corresponding construction steps to establish a finite element model of the entire bridge, specifically including: Step S31: According to the closure sequence plan and the corresponding construction steps, the deep water foundation scouring area of the pile foundation is scoured at the most unfavorable scouring depth H S The soil constraint degradation simulation is carried out to obtain the effective embedded correction depth of the pile foundation. The specific formula is: H 有效 = H 0- H s ;in, H s It is the most unfavorable scouring depth in deep-water foundation scouring area. H 有效 Correction depth for effective embedment of pile foundation, H 0 is the total depth of the pile foundation.
[0029] Step S32: Calculate the reduction degree of soil horizontal anti-thrust stiffness according to the effective embedded depth of the pile foundation. The specific calculation formula is: H 折减 = ab 1 mH 有效 ;in, a is the thickness of each soil layer, b 1 is the calculated width of the pile, m is the proportional coefficient of the foundation soil, H 有效 is the effective embedding depth of the pile foundation, that is, the distance between the midpoint of each soil layer and the maximum scouring soil layer. H 折减 It is the reduction degree of soil horizontal thrust stiffness.
[0030] Step S33: Establish the pile-soil interaction spring stiffness matrix K according to the soil horizontal anti-thrust stiffness reduction S .
[0031] Step S34: Based on the pile-soil interaction spring stiffness matrix K S Construct a finite element model of the entire bridge.
[0032] In this embodiment, a deepwater scour simulation system was constructed through steps S31-S33, correcting the constraints of pile soil after riverbed scour, breaking through the limitations of traditional static soil models. Furthermore, water flow loads were embedded in the finite element model to quantify the instantaneous impact of water flow on pier stress during construction and the cumulative displacement effect ten years after completion. The water flow load was calculated according to Article 4.3.9 of the "General Specification for Highway Bridge and Culvert Design" (JTG D60-2015), and its expression is: ; Where, Fw is the water flow load, is the cross-sectional shape coefficient of the pier, is the density of water, is the design flow velocity, and A is the water-blocking area of the pier.
[0033] Step S4: Based on the finite element model, the parameters corresponding to applying a unit jacking force and not applying a unit jacking force to each closure are calculated respectively to obtain a first parameter and a second parameter, respectively; the first parameter is the corresponding parameter obtained when a unit jacking force is applied to each closure, and the second parameter is the corresponding parameter obtained when no unit jacking force is applied to each closure.
[0034] The first parameter includes: the change in the longitudinal horizontal displacement of the top of pier No. i caused by the unit thrust of the jth closure after the scouring state, ten years after the bridge is completed The stress variation of the cross section of pier No. i during the construction phase caused by the unit thrust of the jth closure after the scouring state The stress change value of the cross section during the construction phase includes the stress change value of the cross section under the water flow load. If the unit thrust is 500KN, then The unit is mm / 500KN, The unit is MPa / 500KN.
[0035] The second parameter includes the total displacement of the top of pier No. i caused by the deadweight of the main beam and the shrinkage and creep of concrete ten years after the bridge is completed. , displacement of the top of pier No. i caused by water flow load ten years after the bridge was completed , Total displacement of the top of pier No. i caused by temperature difference ten years after the bridge was completed and the cross-sectional stress of pier No. i caused by various loads during the construction phase Among them, the various loads in the construction phase include water flow loads, permanent loads, variable loads and accidental loads.
[0036] Step S5: constructing a function to be solved based on the first parameter and the second parameter; the function to be solved includes an objective function M and a constraint equation; the constraint equation is constructed so that the stress of the cross section of each pier top and bottom meets the requirements of the construction stage.
[0037] Among them, the specific formula of the objective function M is: min ; in, is the longitudinal horizontal displacement of the i-th bridge pier, i=1~n, there are n bridge piers in total, Pj is the unit thrust applied to the j-th closure. The unit thrust Pj applied to the adjacent bridge piers is as follows: Figure 2 shown.
[0038] The above-mentioned objective function M is the displacement of the pier top 10 years after the completion of the bridge. By controlling multiple target values and making them as small as possible, the linear shape and stress of each pier can be effectively controlled.
[0039] The specific formula of the constraint equation is: ; in, Allowable tensile stress.
[0040] The present invention aims to minimize the total displacement of the pier top (including deadweight, creep, temperature difference and water flow load) 10 years after the completion of the bridge, and uses the tensile stress limit of the pier body during the construction phase as a constraint to establish the thrust influence coefficient matrix. The multi-objective optimization problem is transformed into a solvable single-objective linear programming problem through fuzzy membership weighting and displacement-stress transfer equation.
[0041] Step S6: Using fuzzy mathematical solution, the multi-objective optimization problem corresponding to the function to be solved is converted into a single-objective linear programming problem to solve the optimal solution for the thrust force, specifically including: Step S61: constructing a multi-objective linear programming model according to the function to be solved, wherein the multi-objective linear programming model includes a multi-objective objective function and multi-objective constraints; The multi-objective objective function is min , , , , , .
[0042] The multi-objective constraints are ; , , .
[0043] Step S62: Standardize the multi-objective linear programming model to obtain the standardized objective function and constraint conditions; the standardized objective function is max ;in, , , , .
[0044] The constraints after normalization are ; , , .
[0045] The specific derivation process is: min ,make , ,have , that is, max , the constraints are .
[0046] Step S63: By fuzzifying the standardized objective function and constraint conditions, the multi-objective problem is transformed into a single-objective problem. The specific formula is: ; Among them, zi* and zi- are the maximum and minimum values of the ith pier under the constraint conditions, respectively. , is the change in longitudinal horizontal displacement of the top of pier No. i caused by the unit thrust of the jth closure after scouring, ten years after the completion of the bridge, Pj is the unit thrust applied to the jth closure, is the stress change value of the cross section of the i-th pier during the construction phase caused by the unit thrust of the j-th closure after the scouring state, di is the expansion index, that is, di=zi*-zi-, To quantify the overall degree of compromise, To quantify the maximum value of the overall compromise.
[0047] For the single-objective problem formulation, combination, , To quantify the overall degree of compromise, that is, to measure the overall satisfaction index of all pier top displacement targets approaching the ideal at the same time, its value range is [0,1] ( =1 means all objectives are optimized at the same time. =0 means at least one target fails to meet the minimum requirements).
[0048] Step S64: Use MATLAB software to solve the single-objective problem and obtain the optimal solution for the thrust of the entire bridge. ,in, It is the fuzzy optimal solution to the multi-objective linear programming problem, that is, the optimal solution for the thrust of the entire bridge.
[0049] The solution disclosed in the present invention comprehensively simulates the soil constraint degradation effect, and at the same time transforms the multi-objective problem in the deep-water environment into a single-objective linear programming problem, which not only simplifies the solution process, but also accurately solves the optimal solution of the jacking force and reduces the solution error.
[0050] This study establishes a full-bridge finite element model that incorporates flow loads. This model considers the ongoing impact of flow loads on stresses during construction and displacements after completion, quantifying multiple environmental factors affecting pier top displacements during construction and ten years after completion. These factors include concrete shrinkage and creep, temperature differential effects, deepwater foundation scour, and dynamic flow loads. Incorporating deepwater scour and flow loads into the jacking force optimization system significantly improves the long-term alignment accuracy of multi-span continuous rigid frame bridges in complex hydrological environments.
[0051] The present invention also discloses a closure thrust optimization system for a multi-span continuous rigid frame bridge, the system comprising: The closure sequence determination module is used to determine the closure sequence of multi-span continuous rigid frame bridges.
[0052] The construction step determination module is used to determine the construction steps corresponding to the joint closure sequence scheme according to the joint closure sequence scheme.
[0053] The finite element model building module is used to perform soil constraint degradation simulation according to the closure sequence plan and the corresponding construction steps to build a finite element model of the entire bridge.
[0054] The parameter solving module is used to calculate the parameters corresponding to applying a unit thrust and not applying a unit thrust to each closure mouth based on the finite element model, and obtain a first parameter and a second parameter respectively.
[0055] The module for constructing a function to be solved is used to construct a function to be solved based on the first parameter and the second parameter; the function to be solved includes an objective function M and a constraint condition equation.
[0056] The module for determining the optimal solution of the thrust force is used to convert the multi-objective optimization problem corresponding to the function to be solved into a single-objective linear programming problem by using a fuzzy mathematical solution to obtain the optimal solution of the thrust force.
[0057] As an optional implementation manner, the finite element model building module of the present invention specifically includes: The soil constraint degradation simulation unit is used to simulate the deep water foundation scouring area of the pile foundation according to the most unfavorable scouring depth H according to the closure sequence plan and the corresponding construction steps. S Conduct soil constraint degradation simulation to obtain the effective embedment correction depth of pile foundation.
[0058] The soil horizontal anti-thrust stiffness reduction calculation unit is used to calculate the soil horizontal anti-thrust stiffness reduction according to the effective embedded correction depth of the pile foundation.
[0059] The spring stiffness matrix calculation unit is used to establish the pile-soil interaction spring stiffness matrix according to the soil horizontal anti-thrust stiffness reduction degree.
[0060] The finite element model building unit is used to build a finite element model of the entire bridge according to the pile-soil interaction spring stiffness matrix.
[0061] As an optional implementation manner, the module for determining the optimal solution of the thrust force of the present invention specifically includes: The multi-objective linear programming model construction unit is used to construct a multi-objective linear programming model according to the function to be solved. The multi-objective linear programming model includes a multi-objective objective function and multi-objective constraints.
[0062] The standardization processing unit is used to perform standardization processing on the multi-objective linear programming model to obtain the objective function and constraint conditions after standardization processing.
[0063] The problem conversion unit is used to convert the multi-objective problem into a single-objective problem by performing fuzzy processing on the objective function and constraint conditions after the standardization processing.
[0064] The solving unit is used to solve the single-objective problem using MATLAB software to obtain the optimal solution of the thrust force of the entire bridge.
[0065] For details on the same content as the method, please refer to the method and will not be repeated here.
[0066] For example, a 3.7-kilometer-long, ultra-large highway bridge located in the alluvial plain of the lower Mekong River in Cambodia features a five-span, single-unit prestressed concrete continuous rigid frame bridge system (95+3×170+95). The main girder utilizes a single-box, single-chamber box section with a top plate width of 12.5 m and a bottom plate width of 7.0 m. The box girder height at the root is 10.8 m, and the mid-span height is 4.0 m. The main girder was constructed using the cantilever casting method with a design closure temperature of 20-30°C. The main piers of the continuous rigid frame bridge are piers #15-18, all double-legged, thin-walled piers. The single-leg cross-section measures 7.0 m (transverse) x 2.0 m (longitudinal). C50 concrete is used for the main piers. The design flow velocity at the bridge site is 3.2 m / s, the 100-year flood level is 10.9 m, and the foundation is simulated based on a worst-case scour depth (Hs) of 8.6 m.
[0067] The closure sequence is side span-middle span-secondary middle span. The closure steps are as follows: Figure 3 shown.
[0068] The entire structure of this super-large bridge is symmetrical, the heights of the piers are similar, and the positions of the top thrust are symmetrical. According to the principles of structural mechanics, the horizontal displacement of the pier tops and the stress of the pier cross section of each bridge are also symmetrical at different stages. Therefore, only the right half of the bridge is analyzed, that is, the horizontal displacement of the pier tops of piers 17# and 18# 10 years after the completion of the bridge [z17, z18] is used to establish the objective function, and the stress of the pier top and pier bottom cross section during the construction stage is taken as the constraint condition to solve the optimal top thrust combination [P1, P2]. The design value of the tensile strength of the C50 concrete used in the main pier body is 1.89MPa, so [ ] is 1.89MPa. Combined with the finite element model, the unit thrust is taken as 500KN, and the calculation results are multi-objective linear programming model, that is, The objective function is: min ; The constraints are: (1) When the middle span is closed and pushed: only the push force P1 is involved, and only the 16# and 17# T-structures are subject to the push force. Therefore, the constraint conditions for the middle span push are: Pier top: ; Pier bottom: ; (2) During the jacking of the secondary mid-span: both jacking forces P1 and P2 are involved, and piers 15#, 16#, 17#, and 18# are all subject to the jacking force. Therefore, the constraint conditions for the jacking of the secondary mid-span are: Pier top: ; Pier bottom: ; According to the fuzzy mathematical solution, the minimum and maximum values of Piers 17# and 18# under the constraints are [z9 - ,z10 - ] = [2.162,3.686] mm, [z9 * ,z 10 * ]=[41.807,243.125]mm, and the expansion factor is [39.645,239.439]. The model is transformed into a single-objective linear programming problem, and the maximum satisfaction λ is obtained by solving it with MATLAB. * The optimal jacking force combination is [P1, P2] = [4.444, 5.802], which is a multiple of the unit jacking force. Therefore, the actual jacking force is [P1, P2] = [2222, 2901] kN. Based on the accuracy requirements of the construction equipment, the theoretical optimal solution of [2222, 2901] kN was adjusted to [2200, 2900] kN, with an error of less than 1%, which meets the project's tolerance.
[0069] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. Reference can be made to the common and similar parts between the various embodiments. For the systems disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple, and the relevant parts can be referred to the method description.
[0070] This document uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only intended to help understand the method and core concept of the present invention. At the same time, those skilled in the art will find that the specific implementation methods and application scopes may vary based on the concept of the present invention. In summary, the contents of this specification should not be construed as limiting the present invention.
Claims
1. A method for optimizing the closure thrust of a multi-span continuous rigid frame bridge, characterized in that: The method comprises: Determine the closure sequence for multi-span continuous rigid frame bridges; Determining the construction steps corresponding to the closure sequence plan according to the closure sequence plan; Perform soil constraint degradation simulation according to the closure sequence plan and the corresponding construction steps to establish a finite element model of the entire bridge; Based on the finite element model, the parameters corresponding to applying a unit thrust force and not applying a unit thrust force to each closure mouth are calculated to obtain a first parameter and a second parameter respectively; Constructing a function to be solved based on the first parameter and the second parameter; the function to be solved includes an objective function M and a constraint condition equation; The fuzzy mathematical solution is used to transform the multi-objective optimization problem corresponding to the function to be solved into a single-objective linear programming problem to obtain the optimal solution of the thrust force.
2. The method for optimizing the closure thrust of a multi-span continuous rigid frame bridge according to claim 1 is characterized in that: The soil constraint degradation simulation is performed according to the closure sequence plan and the corresponding construction steps to establish a finite element model of the entire bridge, specifically including: According to the closure sequence scheme and the corresponding construction steps, the deep water foundation scouring area of the pile foundation is scoured according to the most unfavorable scouring depth H S Conduct soil constraint degradation simulation to obtain the effective embedment correction depth of the pile foundation; Calculate the reduction degree of soil horizontal anti-thrust stiffness according to the effective embedded correction depth of the pile foundation; Establishing a pile-soil interaction spring stiffness matrix according to the soil horizontal thrust stiffness reduction; A finite element model of the entire bridge is constructed according to the pile-soil interaction spring stiffness matrix.
3. The method for optimizing the closure thrust of a multi-span continuous rigid frame bridge according to claim 1 is characterized in that: The first parameter includes: the change in longitudinal horizontal displacement of the top of the pier No. i after the bridge is completed ten years after the completion of the bridge caused by the unit thrust of the jth closure after the scouring state The stress variation of the cross section of pier No. i during the construction phase caused by the unit thrust of the jth closure after the scouring state ; The second parameter includes: the total displacement of the top of pier No. i caused by the deadweight of the main beam and the shrinkage and creep of concrete ten years after the bridge is completed , displacement of the top of pier No. i caused by water flow load ten years after the bridge was completed , Total displacement of the top of pier No. i caused by temperature difference ten years after the bridge was completed and the cross-sectional stress of pier No. i caused by various loads during the construction phase .
4. The method for optimizing the closure thrust of a multi-span continuous rigid frame bridge according to claim 3 is characterized in that: The fuzzy mathematical solution is used to transform the multi-objective optimization problem corresponding to the function to be solved into a single-objective linear programming problem to obtain the optimal solution for the thrust force, specifically including: Constructing a multi-objective linear programming model according to the function to be solved, wherein the multi-objective linear programming model includes a multi-objective objective function and multi-objective constraints; Standardizing the multi-objective linear programming model to obtain standardized objective functions and constraints; By performing fuzzy processing on the objective function and constraint conditions after the standardization process, the multi-objective problem is converted into a single-objective problem; The single-objective problem was solved using MATLAB software to obtain the optimal solution for the thrust force of the entire bridge.
5. The method for optimizing the closure thrust of a multi-span continuous rigid frame bridge according to claim 3 is characterized in that: The specific formula of the objective function M is: min ; in, is the longitudinal horizontal displacement of the pier No. i, Apply unit thrust to the jth closure.
6. The method for optimizing the closure thrust of a multi-span continuous rigid frame bridge according to claim 5 is characterized in that: The specific formula of the constraint condition equation is: ; in, Allowable tensile stress.
7. A multi-span continuous rigid frame bridge closure thrust optimization system, characterized in that: The system comprises: The closure sequence determination module is used to determine the closure sequence of multi-span continuous rigid frame bridges; A construction step determination module, configured to determine the construction steps corresponding to the closure sequence scheme according to the closure sequence scheme; a finite element model building module, configured to perform soil constraint degradation simulation according to the closure sequence plan and the corresponding construction steps, and to build a finite element model of the entire bridge; a parameter solving module, configured to calculate parameters corresponding to each closure mouth with and without unit thrust force applied based on the finite element model, to obtain first parameters and second parameters respectively; A module for constructing a function to be solved, configured to construct a function to be solved based on the first parameter and the second parameter; the function to be solved includes an objective function M and a constraint condition equation; The module for determining the optimal solution of the thrust force is used to convert the multi-objective optimization problem corresponding to the function to be solved into a single-objective linear programming problem by using a fuzzy mathematical solution to obtain the optimal solution of the thrust force.
8. The multi-span continuous rigid frame bridge closure thrust optimization system according to claim 7 is characterized in that: The finite element model building module specifically includes: The soil constraint degradation simulation unit is used to simulate the deep water foundation scouring area of the pile foundation according to the most unfavorable scouring depth H according to the closure sequence plan and the corresponding construction steps. S Conduct soil constraint degradation simulation to obtain the effective embedment correction depth of the pile foundation; a soil horizontal anti-thrust stiffness reduction calculation unit, configured to calculate the soil horizontal anti-thrust stiffness reduction according to the effective embedded correction depth of the pile foundation; a spring stiffness matrix calculation unit, configured to establish a pile-soil interaction spring stiffness matrix according to the soil horizontal thrust stiffness reduction degree; The finite element model building unit is used to build a finite element model of the entire bridge according to the pile-soil interaction spring stiffness matrix.
9. The multi-span continuous rigid frame bridge closure thrust optimization system according to claim 7, characterized in that: The first parameter includes: the change in longitudinal horizontal displacement of the top of the pier No. i after the bridge is completed ten years after the completion of the bridge caused by the unit thrust of the jth closure after the scouring state The stress variation of the cross section of pier No. i during the construction phase caused by the unit thrust of the jth closure after the scouring state ; The second parameter includes: the total displacement of the top of pier No. i caused by the deadweight of the main beam and the shrinkage and creep of concrete ten years after the bridge is completed , displacement of the top of pier No. i caused by water flow load ten years after the bridge was completed , Total displacement of the top of pier No. i caused by temperature difference ten years after the bridge was completed and the cross-sectional stress of pier No. i caused by various loads during the construction phase .
10. The closure jacking force optimization system for a multi-span continuous rigid frame bridge according to claim 9 is characterized in that: The module for determining the optimal solution of the thrust force specifically includes: A multi-objective linear programming model construction unit is used to construct a multi-objective linear programming model according to the function to be solved, and the multi-objective linear programming model includes a multi-objective objective function and multi-objective constraints; A standardization processing unit, configured to perform standardization processing on the multi-objective linear programming model to obtain a standardized objective function and constraint conditions; a problem conversion unit, configured to convert a multi-objective problem into a single-objective problem by performing fuzzy processing on the objective function and constraint conditions after the standardization processing; The solving unit is used to solve the single-objective problem using MATLAB software to obtain the optimal solution of the thrust force of the entire bridge.
Citation Information
Patent Citations
Optimized algorithm for opposite jacking forces of final closure of multi-span continuous rigid frame bridge
CN107977498A
Method for detecting scouring depths of soil body around marine pile foundation
CN109610528A
Deepwater long and large trestle structure design method
CN114091138A
Multi-span continuous rigid frame bridge jacking force calculation method and closure sequence determination method
CN118094738A
Method for optimizing closure jacking force of curve unequal-height pier continuous rigid frame bridge
CN119167704A
Cited By
Method and system for optimizing jacking force of high-pier multi-span continuous rigid frame bridge