Novel split type single-phase intelligent electric energy meter applied to new energy battery test

By using the buffering and fixing mechanism of the split single-phase smart energy meter in new energy battery testing, the problems of cable damage and connector detachment are solved, and high-reliability and high-precision testing is achieved.

CN120761678AActive Publication Date: 2025-10-10JIANGSU SHENGDE ELECTRIC METER

Patent Information

Application Number
CN202511109947.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-08
Publication Date
2025-10-10
Estimated Expiration
2045-08-08

AI Technical Summary

Technical Problem

During existing new energy battery testing, frequent plugging and unplugging of cables and equipment vibration can cause cable damage and wiring detachment, affecting test accuracy and equipment reliability.

Method used

A split single-phase smart electricity meter was designed, which adopted a buffer mechanism and a fixing mechanism, including components such as a rotating shaft, an extrusion block, an annular airbag and a sleeve. Through eccentric rotation and airbag expansion, flexible energy absorption and multiple fixation of the cable were achieved, preventing the cable from breaking and the connector from falling off.

Benefits of technology

It effectively avoids cable breakage and connector detachment, improves the reliability and stability of cable connections, reduces the risk of equipment failure, and ensures the accuracy and safety of testing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120761678A_ABST
    Figure CN120761678A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of electric energy meters, in particular to a novel split type single-phase intelligent electric energy meter applying new energy battery testing, which comprises a main shell assembly, a mounting base is fixedly connected to the upper end of the main shell assembly, a buffer mechanism is arranged at one end of the base, the buffer mechanism comprises a rotating shaft, and an extrusion block is eccentrically connected to the surface of the rotating shaft assembly. An extrusion block is arranged in the base, a containing cavity used for containing a cable connector is constructed in the extrusion block, a fixing mechanism is arranged in the extrusion block and comprises an annular air bag, a tightening mechanism is arranged at one end of the extrusion block, a second sleeve is fixedly connected to the surface of the base, and the second sleeve limits the position of a cable at the same time; when the cable is pulled, the extrusion block drives the rotating shaft to compress the torsional spring for buffering, the rotating shaft rotates and inflates the annular air bag to clamp and tighten the cable joint, and the extrusion block eccentrically rotates and is matched with the sleeve to further fix one end, far away from the joint, of the cable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric energy meters, in particular to a novel split-type single-phase intelligent electric energy meter for testing new energy batteries. Background Art

[0002] The new split-type single-phase smart energy meter for new energy battery testing is an intelligent energy metering device designed specifically for new energy battery charging and discharging test scenarios. The split structure separates the metering detection module from the display module. The former is centrally installed in safe areas such as distribution boxes, and the latter can be flexibly deployed in the test area. The security of the metering module is improved through physical isolation to avoid data tampering or equipment damage caused by user accidental touch. It is optimized for the charging and discharging characteristics of new energy batteries and has high-precision measurement capabilities. It can accurately capture key parameters such as battery energy flow, voltage, current and power, and adapt to dynamic electricity prices and variable working conditions. Through the deep integration of split structure and intelligent functions, high-precision and high-reliability testing of the charging and discharging process of new energy batteries is achieved. Its role is not limited to data collection, but also extends to performance evaluation, system integration and technology development promotion. It is an important innovation in key testing equipment in the new energy field.

[0003] In the prior art, new split-type single-phase smart energy meters for new energy battery testing are frequently plugged and unplugged, or mobile devices are used, which stresses the wires. Long-term pulling causes metal fatigue within the wires, leading to signal or power interruptions. During new energy battery testing, dynamic loads, high-frequency charging and discharging, or mobile equipment installation generate vibrations that repeatedly stress the wires. During electric vehicle testing, connectors can become loose at the caulking due to vibration, causing circuit breakage and voltage anomalies. During new energy battery testing, the site is crowded and busy, and someone might accidentally trip over a cable on the ground or rub their elbow against it while picking up something, causing a sudden tug, which can cause a wire to become loose. If the meter's terminals are not tightened, a slight pull can reduce the "virtual connection" between the cable and the terminal, increasing the resistance. This is equivalent to adding an "invisible resistor" to the circuit, resulting in inaccurate current and voltage measurements, and ultimately inaccurate power and energy calculations. If the cable is tugged violently at the connection to the meter, the terminal may be torn from the meter case or even deform the circuit board inside the meter, damaging the meter. Summary of the Invention

[0004] In response to the problems in the prior art, the present invention provides a novel split-type single-phase smart energy meter that applies new energy battery testing.

[0005] The technical solution adopted by the present invention to solve the technical problem is: a new type of split single-phase smart energy meter for new energy battery testing, including a main housing assembly, the upper end of which is fixedly connected to a mounting base, one end of which is provided with a buffer mechanism for flexibly absorbing the tension of the cable, the buffer mechanism including a rotating shaft, and an extrusion block eccentrically connected to the surface of the rotating shaft assembly; A chamber for accommodating a cable connector is constructed in the extrusion block. The extrusion block forms an elastic swing structure with the base through a rotating shaft. The extrusion block rotates eccentrically around the rotating shaft assembly. A chamber is provided inside the extrusion block for accommodating the connector part of the new energy battery test cable. A fixing mechanism for limiting the joint of the cable is provided inside the extrusion block, and the fixing mechanism includes an annular airbag; One end of the extrusion block is provided with a tightening mechanism for tightening the cable joint, and the surface of the base is fixedly connected to a second sleeve; The extrusion block cooperates with the second sleeve fixed on the surface of the base to further fix the end of the cable away from the connector, and the second sleeve also limits the position of the cable.

[0006] Preferably, a first hollow groove is opened inside the base, and the extrusion block is movably arranged in the first hollow groove through a rotating shaft, and the first hollow groove and the extrusion block form a clearance fit.

[0007] Preferably, the buffer mechanism includes a rotating shaft, which is elastically connected to the base through a torsion spring, a second hollow groove is opened inside the rotating shaft, a hose is fixedly connected to the inside of the rotating shaft, a bolt is engaged inside the extrusion block, and a second wiring piece is provided at the end of the bolt which is electrically connected to the fixing mechanism.

[0008] Preferably, the fixing mechanism includes an annular airbag, which is fixedly connected to the interior of the extrusion block, and an elastic rubber tube is fixedly connected to the outer surface of the annular airbag.

[0009] Preferably, the fixing mechanism also includes a one-way pressure-relief rubber plug, the inside of the elastic rubber tube is tightly fitted with the one-way pressure-relief rubber plug, the inner surface of the annular airbag is fixedly connected to the first wiring plate, and the inner surface of the annular airbag is also fixedly connected to the second wiring plate. The elastic rubber tube and the annular airbag form a sealed connection to form a pressure-adjustable flexible limiting component.

[0010] Preferably, the tightening mechanism includes a first sleeve, the first sleeve is fixedly connected to the base, a sliding rod is slidably connected inside the first sleeve, an opening is opened inside the first sleeve, and one end of the sliding rod is rotatably connected to a rotating pin.

[0011] Preferably, the tightening mechanism includes a guide rod, one end of the rotating pin is fitted with the guide rod, the guide rod is fixedly connected to the rotating shaft, the bottom surface of the end of the first sleeve away from the sliding rod is fixedly connected to a connecting tube, the interior of the connecting tube is fixedly connected to a one-way valve, the interior of the first sleeve is slidably connected to a piston, and one end of the piston is fixedly connected to one end of the sliding rod.

[0012] Preferably, a plurality of protrusions are provided on the inner wall surface of the second sleeve, and the protrusions are distributed in an annular array on the inner wall of the second sleeve.

[0013] Beneficial effects of the present invention: (1) The novel split-type single-phase smart energy meter for new energy battery testing described in the present invention realizes dynamic absorption and protection of cable tension through the mechanical buffer design of the extrusion block eccentrically rotating to drive the rotating shaft to compress the torsion spring. When the cable is pulled, the eccentric rotation of the extrusion block triggers the deformation of the torsion spring, converting the instantaneous tension into elastic potential energy, effectively preventing the cable from being directly broken or the connector from falling off; at the same time, the reset characteristic of the torsion spring ensures that the cable automatically returns to a stable state after being stressed, thereby improving the reliability of the cable connection in the new energy battery test and significantly reducing the risk of equipment failure.

[0014] (2) The new split-type single-phase smart energy meter for new energy battery testing described in the present invention will drive the piston to compress air and inflate the annular airbag through the one-way valve while the shaft rotates, so that the annular airbag expands and tightens the cable joint, ensuring that the first and second wiring pieces fit tightly with the cable joint, preventing the cable joint from falling off and leaking electricity; when the air pressure reaches the threshold, the one-way pressure relief rubber plug automatically releases the pressure to avoid overpressure damage.

[0015] (3) The new split-type single-phase smart energy meter for new energy battery testing described in the present invention clamps the second sleeve by eccentric rotation of the extrusion block, thereby achieving secondary fixation of the end of the cable away from the connector by the extrusion block. The extrusion block and the base cooperate to squeeze the second sleeve, driving the protrusion block to fit the surface of the cable. This not only strengthens the fixing effect by increasing friction, but also utilizes the flexible deformation of the protrusion block to buffer the extrusion force, avoiding damage to the cable due to hard contact, significantly improving the tensile strength and long-term stability of the cable connection in new energy battery testing, and effectively preventing leakage or equipment damage caused by loose cables. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention will be further described below with reference to the accompanying drawings and examples.

[0017] Figure 1 A schematic diagram of the overall structure provided by the present invention; Figure 2 A schematic diagram of the connection structure between the main shell assembly and the base; Figure 3 Schematic diagram of the connection structure between the rotating shaft and the extrusion block; Figure 4 Schematic diagram of the connection structure between the annular airbag and the elastic rubber tube; Figure 5 It is a schematic diagram of the connection structure between the shaft and the hose; Figure 6 is a schematic diagram of the connection structure between the bolt and the second terminal lug; Figure 7 Schematic diagram of the connection structure between the first sleeve and the sliding rod; Figure 8 Schematic diagram of the connection structure between the connecting pipe and the rotating shaft; Figure 9 This is a cross-sectional view of the interior of the second sleeve.

[0018] In the figure: 100, main shell assembly; 200, base; 201, first hollow groove; 300, buffer mechanism; 301, rotating shaft; 3011, second hollow groove; 302, extrusion block; 303, bolt; 304, hose; 400, fixing mechanism; 401, annular airbag; 402, elastic rubber tube; 403, one-way pressure relief rubber plug; 404, first wiring piece; 405, second wiring piece; 500, tightening mechanism; 501, first sleeve; 5011, opening; 502, sliding rod; 503, rotating pin; 504, guide rod; 505, connecting pipe; 506, one-way valve; 507, piston; 600, second sleeve; 601, protruding block. DETAILED DESCRIPTION

[0019] In order to make the technical means, creative features, objectives and effects achieved by the present invention easier to understand, the present invention is further described below in conjunction with specific implementation methods.

[0020] like Figures 1-9 As shown, the novel split-type single-phase smart energy meter for new energy battery testing according to the present invention includes a main housing assembly 100, the upper end of which is fixedly connected to a mounting base 200, one end of which is provided with a buffer mechanism 300 for flexibly absorbing the tension of the cable, the buffer mechanism 300 including a rotating shaft 301, and an extrusion block 302 eccentrically connected to the surface of the rotating shaft assembly 301; The extrusion block 302 has a chamber for accommodating a cable connector. The extrusion block 302 forms an elastic swing structure with the base 200 through the rotating shaft 301. The extrusion block 302 rotates eccentrically around the rotating shaft assembly 301. The extrusion block 302 has a chamber inside for accommodating the connector of the new energy battery test cable. A fixing mechanism 400 is provided inside the extrusion block 302 to limit the joint of the cable. The fixing mechanism 400 includes an annular airbag 401. One end of the extrusion block 302 is provided with a tightening mechanism 500 for tightening the cable joint, and a second sleeve 600 is fixedly connected to the surface of the base 200; The extrusion block 302 cooperates with the second sleeve 600 fixed on the surface of the base 200 to further fix the end of the cable away from the connector. The second sleeve 600 also limits the position of the cable.

[0021] Specifically, a first hollow groove 201 is defined inside the base 200 , and the extrusion block 302 is movably disposed in the first hollow groove 201 via the rotating shaft 301 . The first hollow groove 201 and the extrusion block 302 form a clearance fit. Furthermore, the buffer mechanism 300 includes a rotating shaft 301, which is elastically connected to the base 200 through a torsion spring. A second hollow groove 3011 is opened inside the rotating shaft 301, and a hose 304 is fixedly connected to the inside of the rotating shaft 301. A bolt 303 is engaged with the inside of the extrusion block 302, and a second wiring piece 405 electrically connected to the fixing mechanism 400 is provided at the end of the bolt 303; the cable is inserted from the lower end of the second sleeve 600, and the cable is passed out from the upper end of the second sleeve 600 and bent and inserted into the annular airbag 401. At this time, the bolt 303 is rotated to engage with the extrusion block 302, and the bolt 303 will drive the second wiring piece 405 to move toward one end of the first wiring piece 404. The inward movement of the second wiring piece 405 will cooperate with the first wiring piece 404 to fix the cable connector.

[0022] In addition, when the cable is pulled, the cable will pull the extrusion block 302 to rotate eccentrically around the shaft 301. The eccentric rotation of the extrusion block 302 will drive the shaft 301 to rotate, and the rotation of the shaft 301 will compress the torsion spring inside the extrusion block 302. The rotation of the shaft 301 compresses the torsion spring, thereby buffering the tension when the cable is pulled, and preventing the cable from being directly broken or falling off. The mechanical buffering design of the extrusion block 302 driving the shaft 301 to compress the torsion spring by eccentric rotation realizes the dynamic absorption and protection of the cable tension. When the cable is pulled, the eccentric rotation of the extrusion block 302 triggers the deformation of the torsion spring, and converts the instantaneous tension into elastic potential energy, effectively preventing the cable from being directly broken or the connector from falling off. At the same time, the reset characteristic of the torsion spring ensures that the cable automatically returns to a stable state after being subjected to force, thereby improving the reliability of the cable connection in the new energy battery test and significantly reducing the risk of equipment failure.

[0023] It should be noted that the fixing mechanism 400 includes an annular airbag 401, which is fixedly connected to the inside of the extrusion block 302. An elastic rubber tube 402 is fixedly connected to the outer surface of the annular airbag 401, and a one-way pressure relief rubber plug 403 is tightly fitted inside the elastic rubber tube 402. A first wiring piece 404 is fixedly connected to the inner surface of the annular airbag 401, and a second wiring piece 405 is also fixedly connected to the inner surface of the annular airbag 401. The elastic rubber tube 402 and the annular airbag 401 form a sealed connection to form a pressure-adjustable flexible limit assembly. When the rotating shaft 301 rotates, the guide rod 504 will be driven to rotate. The rotation of the guide rod 504 will drive the rotating pin 503 to move toward one end. The movement of the rotating pin 503 to one end will drive the sliding rod 502 to move toward one end. The movement of the sliding rod 502 to one end will drive the piston 507 to move toward one end. The initial position of the piston 507 is close to one end of the sliding rod 502. The outside air enters the interior of the first sleeve 501 through the opening 5011. The movement of the piston 507 to one end will compress the air inside the first sleeve 501. The air inside the first sleeve 501 The air in the connecting tube 505 enters the second hollow groove 3011 in the rotating shaft 301 through the one-way valve 506. The air in the second hollow groove 3011 enters the annular airbag 401 through the hose 304. The annular airbag 401 is filled with air and expands. The expansion of the annular airbag 401 tightens the cable joint, so that the first terminal piece 404 and the second terminal piece 405 fit tightly with the cable joint, avoiding the cable joint from falling off and causing leakage, affecting the test of the new energy battery of the single-phase smart energy meter, and even The single-phase smart energy meter is damaged; when the air pressure in the annular airbag 401 reaches a certain value, the pressure will be released through the one-way pressure relief rubber plug 403 on the elastic rubber tube 402; while the rotating shaft 301 rotates, it will also drive the piston 507 to compress the air to inflate the annular airbag 401 through the one-way valve 506, so that the annular airbag 401 expands and tightens the cable joint, ensuring that the first wiring piece 404 and the second wiring piece 405 are tightly fitted to the cable joint to prevent the cable joint from falling off and leaking; when the air pressure reaches the threshold, the one-way pressure relief rubber plug 403 automatically releases the pressure to avoid overpressure damage.

[0024] It is worth mentioning that the tightening mechanism 500 comprises a first sleeve 501 fixedly connected with the base 200, a sliding rod 502 slidingly connected in the first sleeve 501, an opening 5011 formed in the first sleeve 501, a rotating pin 503 rotatably connected to one end of the sliding rod 502, a guide rod 504 attached to one end of the rotating pin 503, the guide rod 504 being fixedly connected with the rotating shaft 301, a connecting pipe 505 fixedly connected to the bottom surface of the end of the first sleeve 501 away from the sliding rod 502, a one-way valve 506 fixedly connected in the connecting pipe 505, a piston 507 slidingly connected in the first sleeve 501, and the piston 507 being fixedly connected to one end of the sliding rod 502; while the rotating shaft 301 rotates to drive the eccentric rotation of the extrusion block 302, the eccentric rotation of the extrusion block 302 also gradually extrudes the second sleeve 600, the extrusion of the second sleeve 600 by the eccentric rotation of the extrusion block 302 cooperates with the base 200, the second sleeve 600 is clamped by the extrusion block 302 and the base 200, the extrusion of the second sleeve 600 by the eccentric rotation of the extrusion block 302 further drives the convex block 601 to adhere to the surface of the cable, and the second sleeve 600 drives the convex block 601 to further fix the end of the cable away from the connector, so as to avoid the leakage of electricity or the damage of the electric energy meter caused by the direct pulling of the cable connector.

[0025] Specifically, the inner wall surface of the second sleeve 600 is provided with a plurality of convex blocks 601, and the convex blocks 601 are arranged in an annular array on the inner wall of the second sleeve 600; a plurality of convex blocks 601 are arranged in the second sleeve 600, and the convex blocks 601 can buffer the extrusion force between the second sleeve 600 and the cable; the second sleeve 600 is clamped by the eccentric rotation of the extrusion block 302, so that the end of the cable away from the connector is fixed twice by the extrusion block 302, the second sleeve 600 is extruded by the extrusion block 302 and the base 200, the convex block 601 is driven to adhere to the surface of the cable, the fixing effect is strengthened by increasing the friction, the extrusion force is buffered by the flexible deformation of the convex block 601, the cable is prevented from being damaged by hard contact, the tensile strength and long-term stability of the cable connection in the new energy battery test are significantly improved, and the leakage or damage of the equipment caused by the loosening of the cable is effectively prevented.

[0026] Working principle: when the present application is used, the cable is inserted into the second sleeve 600 from the lower end of the second sleeve 600, the cable is inserted into the annular air bag 401 after being bent and being inserted out of the upper end of the second sleeve 600, the split structure separates the metering detection module and the display module, the former is concentratedly installed in a safe area such as a distribution box, and the latter can be flexibly deployed in a test area, the safety of the metering module is improved by physical isolation, and data tampering or equipment damage caused by user misoperation is avoided.

[0027] At this time, the bolt 303 is rotated to engage with the extrusion block 302, and the bolt 303 drives the second connecting piece 405 to move toward one end of the first connecting piece 404. The inward movement of the second connecting piece 405 cooperates with the first connecting piece 404 to fix the cable connector.

[0028] When the cable is pulled, the cable will pull the extrusion block 302 to rotate eccentrically around the shaft 301. The eccentric rotation of the extrusion block 302 will drive the shaft 301 to rotate. The rotation of the shaft 301 will compress the torsion spring inside the extrusion block 302. The rotation of the shaft 301 compresses the torsion spring, thereby buffering the tension when the cable is pulled, and preventing the cable from being directly broken or falling off. The mechanical buffering design of the extrusion block 302 driving the shaft 301 to compress the torsion spring by eccentric rotation realizes dynamic absorption and protection of cable tension. When the cable is pulled, the eccentric rotation of the extrusion block 302 triggers the deformation of the torsion spring, converting the instantaneous tension into elastic potential energy, effectively preventing the cable from being directly broken or the connector from falling off. At the same time, the reset characteristic of the torsion spring ensures that the cable automatically returns to a stable state after being subjected to force, thereby improving the reliability of cable connection in new energy battery testing and significantly reducing the risk of equipment failure.

[0029] When the rotating shaft 301 rotates, the guide rod 504 is driven to rotate. The rotation of the guide rod 504 drives the rotating pin 503 to move toward one end. The movement of the rotating pin 503 to one end drives the sliding rod 502 to one end. The movement of the sliding rod 502 to one end drives the piston 507 to one end. The initial position of the piston 507 is at one end close to the sliding rod 502. The outside air enters the interior of the first sleeve 501 through the opening 5011. The movement of the piston 507 to one end compresses the air inside the first sleeve 501. The air inside the first sleeve 501 enters the interior of the connecting pipe 505. The air inside the connecting pipe 505 enters the second hollow groove 3011 inside the rotating shaft 301 through the one-way valve 506. The air in the second hollow groove 3011 enters the annular airbag 401 through the hose 304. The annular airbag 401 is filled with air and expands. The expansion of the annular airbag 401 tightens the joint of the cable, so that the first The wiring piece 404 and the second wiring piece 405 fit tightly with the cable joint to prevent the cable joint from falling off and causing leakage, affecting the test of the new energy battery of the single-phase smart electricity meter, or even damaging the single-phase smart electricity meter. When the air pressure in the annular airbag 401 reaches a certain value, the pressure will be released through the one-way pressure relief rubber plug 403 on the elastic rubber tube 402; when it is necessary to remove the cable joint, just pull the one-way pressure relief rubber plug 403 out of the elastic rubber tube 402. At this time, the gas in the annular airbag 401 will be discharged from the elastic rubber tube 402. When the rotating shaft 301 rotates, it will also drive the piston 507 to compress the air and inflate the annular airbag 401 through the one-way valve 506, causing the annular airbag 401 to expand and tighten the cable joint, ensuring that the first wiring piece 404 and the second wiring piece 405 are tightly fitted with the cable joint to prevent the cable joint from falling off and causing leakage; when the air pressure reaches the threshold, the one-way pressure relief rubber plug 403 automatically releases the pressure to avoid overpressure damage.

[0030] While the rotation of the rotating shaft 301 drives the extrusion block 302 to rotate eccentrically, the eccentric rotation of the extrusion block 302 will gradually squeeze the second sleeve 600. The eccentric rotation of the extrusion block 302 squeezes the second sleeve 600 to cooperate with the base 200. The extrusion block 302 cooperates with the base 200 to clamp the second sleeve 600. The eccentric rotation of the extrusion block 302 squeezes the second sleeve 600 and drives the protruding block 601 to fit the surface of the cable. The second sleeve 600 drives the protruding block 601 to further fix the end of the cable away from the connector, avoiding the cable connector from being directly pulled to cause leakage or even damage the electricity meter. The new energy battery is tested by the new split single-phase smart electricity meter.

[0031] Several protruding blocks 601 are provided inside the second sleeve 600. The protruding blocks 601 can buffer the squeezing force between the second sleeve 600 and the cable, and can also increase the friction between the second sleeve 600 and the cable. The second sleeve 600 is clamped by the eccentric rotation of the squeezing block 302, so that the squeezing block 302 can perform secondary fixation on the end of the cable away from the connector. The squeezing block 302 and the base 200 cooperate to squeeze the second sleeve 600, driving the protruding blocks 601 to fit the surface of the cable, which not only strengthens the fixing effect by increasing friction, but also uses the flexible deformation of the protruding blocks 601 to buffer the squeezing force, avoiding hard contact and damaging the cable, significantly improving the tensile strength and long-term stability of the cable connection in new energy battery testing, and effectively preventing leakage or equipment damage caused by loose cables.

[0032] The basic principles, main features, and advantages of the present invention are shown and described above. Those skilled in the art should understand that the present invention is not limited to the above-described embodiments. The above-described embodiments and descriptions are merely illustrative of the principles of the present invention. Various changes and modifications may be made to the present invention without departing from the spirit and scope of the present invention. Such changes and modifications are intended to fall within the scope of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A novel split-type single-phase smart energy meter for new energy battery testing, comprising a main housing assembly (100), wherein the upper end of the main housing assembly (100) is fixedly connected to a mounting base (200), and characterized in that: A buffer mechanism (300) for flexibly absorbing the tension of the cable is provided at one end of the base (200), the buffer mechanism (300) comprising a rotating shaft (301), and an extrusion block (302) is eccentrically connected to the surface of the rotating shaft assembly (301); A chamber for accommodating a cable connector is constructed in the extrusion block (302). The extrusion block (302) forms an elastic swing structure with the base (200) via the rotating shaft (301). The extrusion block (302) rotates eccentrically around the rotating shaft assembly (301). A chamber is provided inside the extrusion block (302) for accommodating a connector portion of a new energy battery test cable. A fixing mechanism (400) for limiting the position of the cable joint is provided inside the extrusion block (302), and the fixing mechanism (400) includes an annular airbag (401); One end of the extrusion block (302) is provided with a tightening mechanism (500) for tightening the cable joint, and a second sleeve (600) is fixedly connected to the surface of the base (200); The extrusion block (302) cooperates with the second sleeve (600) fixed on the surface of the base (200) to further fix the end of the cable away from the connector, and the second sleeve (600) also limits the position of the cable.

2. The novel split-type single-phase smart energy meter for new energy battery testing according to claim 1 is characterized in that: A first hollow groove (201) is provided inside the base (200), and the extrusion block (302) is movably arranged in the first hollow groove (201) via the rotating shaft (301), and the first hollow groove (201) and the extrusion block (302) form a clearance fit.

3. The novel split-type single-phase smart energy meter for new energy battery testing according to claim 1 is characterized in that: The buffer mechanism (300) includes a rotating shaft (301), the rotating shaft (301) is elastically connected to the base (200) via a torsion spring, a second hollow groove (3011) is provided inside the rotating shaft (301), a hose (304) is fixedly connected inside the rotating shaft (301), a bolt (303) is engaged inside the extrusion block (302), and a second wiring piece (405) electrically connected to the fixing mechanism (400) is provided at the end of the bolt (303).

4. The novel split-type single-phase smart energy meter for new energy battery testing according to claim 3 is characterized in that: The fixing mechanism (400) comprises an annular airbag (401), the annular airbag (401) is fixedly connected to the interior of the extrusion block (302), and an elastic rubber tube (402) is fixedly connected to the outer surface of the annular airbag (401).

5. The novel split-type single-phase smart energy meter for new energy battery testing according to claim 4 is characterized in that: The fixing mechanism (400) further comprises a one-way pressure relief rubber plug (403), the one-way pressure relief rubber plug (403) being tightly fitted to the interior of the elastic rubber tube (402), a first wiring piece (404) being fixedly connected to the inner surface of the annular airbag (401), and a second wiring piece (405) being fixedly connected to the inner surface of the annular airbag (401), and the elastic rubber tube (402) and the annular airbag (401) forming a sealed connection to form a pressure-adjustable flexible limit assembly.

6. The novel split-type single-phase smart energy meter for new energy battery testing according to claim 5 is characterized in that: The tightening mechanism (500) includes a first sleeve (501), the first sleeve (501) is fixedly connected to the base (200), a sliding rod (502) is slidably connected inside the first sleeve (501), an opening (5011) is opened inside the first sleeve (501), and one end of the sliding rod (502) is rotatably connected to a rotating pin (503).

7. The novel split-type single-phase smart energy meter for new energy battery testing according to claim 6 is characterized in that: The tightening mechanism (500) includes a guide rod (504), one end of the rotating pin (503) is fitted with the guide rod (504), the guide rod (504) is fixedly connected to the rotating shaft (301), the bottom surface of one end of the first sleeve (501) away from the sliding rod (502) is fixedly connected to a connecting pipe (505), the inside of the connecting pipe (505) is fixedly connected to a one-way valve (506), the inside of the first sleeve (501) is slidably connected to a piston (507), and one end of the piston (507) is fixedly connected to one end of the sliding rod (502).

8. The novel split-type single-phase smart energy meter for new energy battery testing according to claim 7 is characterized in that: The inner wall surface of the second sleeve (600) is provided with a plurality of protruding blocks (601), and the protruding blocks (601) are distributed in a ring array on the inner wall of the second sleeve (600).

Citation Information

Patent Citations

  • Intelligent cable torque reducing equipment for communication technology

    CN113928928A

  • Intelligent manufacturing power cable anti-falling safety junction box

    CN114123090A

  • DC intelligent electric energy meter

    CN114487526A

  • Electricity larceny prevention integrated electric energy meter housing

    CN114778913A

  • Data line plugging test device

    CN115902715A

Cited By

  • Single-phase electric energy meter data encryption transmission method and system based on edge calculation

    CN121984786A

  • Single-phase electric energy meter data encryption transmission method and system based on edge computing

    CN121984786B