Intelligent management method and intelligent management system for metalworking production

By negotiating batch demand information and generating metalworking production instructions through an intelligent management system, the problem of production deviations caused by unreasonable cooperation between product demanders and independent design teams has been solved, enabling the production of high-quality commemorative products, reducing deviations and improving production efficiency.

CN120952428APending Publication Date: 2025-11-14SHENZHEN SHANSHUI METALWORKING GIFTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511076500.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-01
Publication Date
2025-11-14

AI Technical Summary

Technical Problem

During the metalworking process, the lack of coordination between the product demander and the independent design team led to production deviations, affecting the final display effect of the commemorative products. Furthermore, due to the tight schedule, it was difficult to make significant adjustments, resulting in a discrepancy between the actual production and the initial requirements.

Method used

Through the intelligent management system, preset conditions are determined, batch demand information is negotiated and confirmed with the product demand side, and metalworking production instructions are generated based on this to ensure that the production process meets the requirements. This includes generating standardized text and confidential documents, which are distributed to different production ends to match the requirements of independent design and product needs.

Benefits of technology

It effectively reduces deviations in metalworking production, ensures the quality of commemorative products, meets high-quality requirements, avoids overall deviations caused by misunderstandings, and improves the accuracy and efficiency of production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120952428A_ABST
    Figure CN120952428A_ABST
Patent Text Reader

Abstract

The invention relates to an intelligent management method and an intelligent management system for metalworking production, and relates to the field of metalworking intelligent production, the method is used for the intelligent management system, and the method comprises the following steps: S1, judging whether a preset condition is met, and if the preset condition is met, entering a next step; s2, obtaining batch demand information through negotiation and confirmation with a product demand end; and S3, promoting a batch metalworking production end to carry out production according to the batch demand information. Souvenirs of large-scale activities not only are entity carriers for activity propaganda, but also bear brand images and cultural connotation, so that high requirements on memorial products are inevitable; however, in the actual production process, unreasonable deviation is prone to occurring in production of metalworking commemorative products, so that the final display effect of the products is not expected. On the basis of the scheme provided by the invention, the occurrence of deviation of enterprises in the aspect of metalworking production can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of intelligent manufacturing of metalworking equipment, and in particular to an intelligent management method and intelligent management system for metalworking production. Background Technology

[0002] Large-scale events typically require advance preparation, and a large number of commemorative items need to be produced by metalworking during the preliminary work. High-quality commemorative products are beneficial to the promotion and enhancement of the event. In other words, commemorative items for large-scale events are not only physical carriers of event promotion, but also embody brand image and cultural connotations, thus inevitably requiring high standards for commemorative products.

[0003] However, in actual production, unreasonable deviations can easily occur in the production of metalworking commemorative products, resulting in the final product display effect falling short of expectations. Therefore, the industry needs to design an intelligent management solution for metalworking production to solve the above-mentioned technical problems. Summary of the Invention

[0004] The technical problem solved by this invention is how to design an intelligent management method and intelligent management system for metalworking production, which can reduce the occurrence of deviations in metalworking production.

[0005] The inventors discovered during their work that if there are discrepancies in the collaboration between the product demander (who is closely connected to the organizer) and the independent design team, it can affect the production of metalworking companies, and consequently, the final production and delivery of commemorative products. Since large-scale events often have specific timelines, even if discrepancies occur (such as the first metalworking product falling short of expectations), remedial measures that take little time are likely to be taken rather than significant adjustments. This inevitably leads to a deviation between actual production and initial demand. Therefore, the industry needs to design an intelligent management solution for metalworking production to address the aforementioned technical problems.

[0006] In the first aspect, this application proposes an intelligent management method for metalworking production. The method is used in an intelligent management system and includes: S1, determining whether preset conditions are met, and if the preset conditions are met, proceeding to the next step; S2, obtaining batch demand information through negotiation and confirmation with the product demand side; and S3, using the batch demand information to drive batch metalworking production.

[0007] The further technical solution is as follows: Step S1, determining whether the preset conditions are met, if the preset conditions are met, proceeding to the next step, including: S11, determining whether voice text from the product demand side is received, and determining whether product documents from the independent design side are received, and proceeding to the next step if both voice text and product documents are received.

[0008] The further technical solution is that step S2, by negotiating and confirming with the product demand side, obtains batch demand information, including: S21, sending preliminary demand information to the product demand side, then receiving feedback from the product demand side, and then confirming the batch demand information.

[0009] The further technical solution is that step S3, which promotes batch metalworking production based on batch demand information, includes: S31, generating metalworking production instructions based on batch demand information, and sending the metalworking production instructions to the batch metalworking production end for production.

[0010] The further technical solution is as follows: Step S21, sending preliminary requirement information to the product requirement end, then receiving feedback from the product requirement end, and then confirming the batch requirement information, includes: S201, generating preliminary requirement information based on voice text and product documents, and sending the preliminary requirement information to the product requirement end; S202, determining whether requirement confirmation information from the product requirement end has been received; S203, if requirement confirmation information from the product requirement end has been received, setting the requirement confirmation information as batch requirement information.

[0011] The further technical solution is as follows: Step S201, generating preliminary requirement information based on voice text and product documents, and sending the preliminary requirement information to the product requirement end, includes: reducing the voice text to standardized text of no more than a preset number of characters; splitting the standardized text into three groups of standardized sub-documents based on the semantics of the product documents; after splitting, classifying and filling the three groups of standardized sub-documents into the product documents to form a first confidential document including the three groups of standardized sub-documents and the three groups of product documents arranged in a corresponding manner; sending the first confidential document to the first metalworking production end, and keeping it confidential to the second metalworking production end with the same function; determining whether the first piece of metalworking data from the first metalworking production end has been received, such as... If received, the presentation materials (excluding professional materials) from the first metalworking first document are transmitted to the product request end; the product document is split into at least five product sub-documents based on the semantics of the voice text; after splitting, the at least five product sub-documents are categorized and filled into the voice text, forming a second confidential document consisting of at least five product sub-documents and at least three voice text sub-documents interspersed; the second confidential document is sent to the second metalworking production end, and is kept confidential from the first metalworking production end; it is determined whether the second metalworking first document from the second metalworking production end has been received; if received, the presentation materials (excluding professional materials) from the second metalworking first document are transmitted to the product request end.

[0012] A further technical solution is that step S31, generating metalworking production instructions based on batch demand information and sending the metalworking production instructions to the batch metalworking production end for production, includes: receiving confirmation results from the product demand end selected from the first and second metalworking first piece data as batch demand information; generating only the metalworking production instructions corresponding to the first metalworking first piece data or only the metalworking production instructions corresponding to the second metalworking first piece data based on the batch demand information, and sending them to the batch metalworking production end for production.

[0013] In summary, souvenirs for large-scale events are not only physical carriers of event promotion, but also embody brand image and cultural connotations, thus inevitably requiring high standards for commemorative products. However, in the actual production process, unreasonable deviations are prone to occur in the production of metal commemorative products, resulting in the final display effect of the products falling short of expectations. Based on this, the solution described in this application can reduce the occurrence of deviations in metal production for enterprises. Attached Figure Description

[0014] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0015] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0016] Figure 1 This is a flowchart of an intelligent management method for metalworking production provided in an embodiment of the present invention.

[0017] Figure 2 Another flowchart of an intelligent management method for metalworking production provided in an embodiment of the present invention.

[0018] Figure 3 This is another flowchart of an intelligent management method for metalworking production provided in an embodiment of the present invention.

[0019] Figure 4 A simplified diagram of the electronic device provided in an embodiment of the present invention. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] It should be understood that, when used in this specification and the appended claims, the terms "comprising" and "including" indicate the presence of the described features, integrals, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integrals, steps, operations, elements, components and / or collections thereof.

[0022] It should also be understood that the terminology used in this specification is for the purpose of describing particular embodiments only and is not intended to limit the invention. As used in this specification and the appended claims, the singular forms “a,” “an,” and “the” are intended to include the plural forms unless the context clearly indicates otherwise.

[0023] It should also be further understood that the term "and / or" as used in this specification and the appended claims refers to one or any combination of the associated listed items and all possible combinations, and includes such combinations.

[0024] As used in this specification and the appended claims, the term "if" may be interpreted, depending on the context, as "when," "once," "in response to determination," or "in response to detection." Similarly, the phrases "if determined" or "if [the described condition or event] is detected" may be interpreted, depending on the context, as "once determined," "in response to determination," "once [the described condition or event] is detected," or "in response to detection of [the described condition or event]."

[0025] In this specification and the appended claims, there may be multiple ways of expressing the same technical feature or technical term, such as using a superordinate generalization, a subordinate limitation, or a synonym substitution. Those skilled in the art can clearly understand the essentially the same technical meaning referred to by different expressions based on their professional knowledge and in conjunction with the overall content of the specification and the drawings. The differences between the different expressions are only reflected in the diversity of the words and do not constitute a substantial modification or limitation to the technical solution, nor will they affect the certainty of the scope of protection of this patent claim or the full disclosure of the technical content of the specification.

[0026] Example 1

[0027] Please see Figures 1 to 3The diagram illustrates an intelligent management method for metalworking production proposed in an embodiment of the present invention. The method is used in an intelligent management system and includes: S1, determining whether preset conditions are met; if the preset conditions are met, proceeding to the next step; S2, obtaining batch demand information through negotiation and confirmation with the product demand side; and S3, using the batch demand information to drive production in the batch metalworking production end. In the above scheme, the intelligent management system includes interconnected product demand sides, independent design sides, and a metalworking production master module; further, the metalworking production master module includes a first metalworking production end, a second metalworking production end, and a batch metalworking production end.

[0028] In one embodiment, step S1, determining whether a preset condition is met, and if the preset condition is met, proceeding to the next step, includes: S11, determining whether voice text from the product demand side is received, and determining whether product documents from the independent design side are received; if both voice text and product documents are received, proceeding to the next step.

[0029] In one embodiment, step S2, obtaining batch demand information through negotiation and confirmation with the product demander, includes: S21, sending preliminary demand information to the product demander, then receiving feedback from the product demander, and then confirming the batch demand information.

[0030] In one embodiment, step S3, which uses batch demand information to drive batch metalworking production, includes: S31, generating metalworking production instructions based on the batch demand information and sending the metalworking production instructions to the batch metalworking production end for production. In the above scheme, the specific metalworking production instructions generated based on the batch demand information may include a confirmed template to ensure that the product or template can be received by the department or team performing batch metalworking production.

[0031] In one embodiment, step S21, which involves sending preliminary requirement information to the product requirement end and then receiving feedback from the product requirement end to confirm batch requirement information, includes: S201, generating preliminary requirement information based on voice text and product documents, and sending the preliminary requirement information to the product requirement end; S202, determining whether requirement confirmation information has been received from the product requirement end; and S203, if requirement confirmation information has been received from the product requirement end, setting the requirement confirmation information as batch requirement information. In the above scheme, the determination of whether requirement confirmation information has been received from the product requirement end is not affected by the process of this patent; if no requirement confirmation information has been received, the process continues until requirement confirmation information from the product requirement end is received.

[0032] Large-scale events typically require advance preparation, with a large number of commemorative items needing to be produced by metalworking during the initial stages. High-quality commemorative products are beneficial for event promotion. During the research process, the inventor discovered that if there are discrepancies in the cooperation between the product demander (closely related to the organizer) and the independent design team, it can affect the production of the metalworking company, thereby impacting the final production and delivery of the commemorative products. Since large-scale events often have specific timelines, even if discrepancies occur (e.g., the first metalworking product falls short of expectations), remedial measures are likely to be implemented quickly rather than making significant adjustments. This inevitably leads to a deviation between actual production and initial demand. Based on this, this application... The proposed solution first obtains a first confidential document arranged in a corresponding manner, ensuring that the first metalwork piece produced by the first metalwork production end better matches the independent designer's ideas and requirements (based on the semantics of the product document and reducing voice and text). Then, it obtains a second confidential document arranged in an interspersed manner, ensuring that the second metalwork piece produced by the second metalwork production end better matches the product demander's ideas and requirements (based on the semantics of voice and text). Even if the independent designer misunderstands the actual requirements, it will not cause deviation in the first piece production and lead to a complete deviation. In other words, the obtained metalwork first piece is less likely to deviate from the true intention of the product demander, which can effectively avoid deviations in metalwork production from the requirements and is more conducive to obtaining high-quality metalwork commemorative products.

[0033] In one embodiment, step S201, generating preliminary requirement information based on voice text and product documents, and sending the preliminary requirement information to the product requirement end, includes: reducing the voice text to standardized text of no more than a preset number of characters; splitting the standardized text into three sets of standardized sub-documents based on the semantics of the product documents; after splitting, classifying and filling the three sets of standardized sub-documents into the product documents to form a first confidential document including the three sets of standardized sub-documents and the three sets of product documents arranged in a corresponding manner; sending the first confidential document to the first metalworking production end, and keeping it confidential to the second metalworking production end with the same function; determining whether the first metalworking first piece data from the first metalworking production end has been received; if so... Upon receipt, the presentation materials (excluding professional materials) from the first metalworking document are transmitted to the product requester. Based on the semantics of the voice and text, the product document is divided into at least five product sub-documents. After the division, the at least five product sub-documents are categorized and filled into the voice and text, forming a second confidential document consisting of at least five product sub-documents and at least three voice and text sub-documents interspersed. The second confidential document is sent to the second metalworking production end, while remaining confidential to the first metalworking production end. It is then determined whether the second metalworking document from the second metalworking production end has been received. If received, the presentation materials (excluding professional materials) from the second metalworking document are transmitted to the product requester.

[0034] In the above solution, the reduction of voice text into standardized text of no more than a preset number of words refers to the voice text originating from the product demander's (closely connected to the organizer and familiar with the actual needs) linguistic description of the actual requirements. The standardized text is a text with a small reduced word count, such as no more than 100 or 200 words. Furthermore, the order of the steps after the above S201 breakdown is not unique; that is, it is not necessarily the case that the production of the first metalworking piece begins first, followed by the production of the second metalworking piece. Further, after the breakdown is completed, the three groups of standardized sub-documents are categorized and filled into the product document. Specifically, the categorization and filling into the product document can be achieved by dividing the standardized text into a first group, a second group, and a third group based on semantics, and then corresponding each of the first, second, and third group's standardized sub-documents, as understood by those skilled in the art.

[0035] In the above scheme, the first and second metalworking production ends belong to the same operating entity, for example, they may belong to the same metalworking production enterprise but be in different departments or different factory areas. Furthermore, the professional materials are those suitable for metalworking professionals, while the demonstration materials are those suitable for non-metalworking professionals (most people). This distinction is understandable to those skilled in the art.

[0036] In the above scheme, the product document is divided into at least five product sub-documents based on the semantics of the voice text. This can be done by splitting a voice into five semantic directions. If it is split into five groups, three of them match three voice sub-texts, one group does not match the voice sub-text but is oriented in one direction, and another group does not match the voice sub-text but is oriented in another direction (which can be understood as the second direction). The above content can be understood by those skilled in the art.

[0037] In the above scheme, the formation of a second confidential document includes at least five sets of product sub-documents and at least three sets of voice sub-texts interspersed together. The voice sub-texts will be two fewer sets than the product sub-documents. Furthermore, the interspersed arrangement method is understandable to those skilled in the art, for example, the order is product sub-document, voice sub-text, product sub-document, voice sub-text, product sub-document. Furthermore, after the team at the first metalworking production end completes the first piece of metalworking, there will be corresponding first piece of metalworking data. Similarly, there will be corresponding first piece of metalworking data, and relevant personnel can upload the data.

[0038] In one embodiment, step S31, generating metalworking production instructions based on batch demand information and sending the metalworking production instructions to the batch metalworking production end for production, includes: receiving confirmation results from the product demand end selected from the first and second metalworking first-piece documents as batch demand information; generating only the metalworking production instructions corresponding to the first metalworking first-piece document or only the metalworking production instructions corresponding to the second metalworking first-piece document based on the batch demand information, and sending them to the batch metalworking production end for production. In the above scheme, the metalworking production instructions corresponding to the first and second metalworking first-piece documents are mutually exclusive, that is, only one of them exists and will be sent to the batch metalworking production end for production, to ensure that the metalworking production closely matches the demand and is less prone to deviation.

[0039] Secondly, this application proposes an intelligent management system for implementing the intelligent management method for metalworking production as described in any of the above embodiments. The technical effect of the intelligent management system is that it can reduce the occurrence of deviations in metalworking production.

[0040] In summary, the solution described in this application first obtains a first confidential document arranged in a corresponding manner, making the first metalworking prototype produced by the first metalworking production end more in line with the independent designer's ideas and requirements (based on the semantics of the product document and reducing voice and text). Then, it obtains a second confidential document arranged in an interspersed manner, making the second metalworking prototype produced by the second metalworking production end more in line with the product demander's ideas and requirements (based on the semantics of voice and text). Even if the independent designer misunderstands the real requirements, it will not cause deviation in the first piece production and lead to a complete deviation. That is, the obtained metalworking prototype is not likely to deviate from the true intention of the product demander, which can effectively avoid deviations in metalworking production from the requirements and is more conducive to obtaining high-quality metalworking commemorative products.

[0041] Example 2

[0042] Please see Figure 4 , Figure 4 This invention provides a block diagram of an electronic device. The electronic device can be a terminal or a server. The terminal can be a smartphone, tablet computer, laptop computer, desktop computer, personal digital assistant, wearable device, or other electronic device with communication capabilities. It includes a processor 111, a communication interface 112, a memory 113, and a communication bus 114. The processor 111, communication interface 112, and memory 113 communicate with each other via the communication bus 114.

[0043] Memory 113 is used to store computer programs.

[0044] In one embodiment of the present invention, the processor 111, when executing the program stored in the memory 113, implements the method provided in any of the foregoing method embodiments.

[0045] It should be understood that, in the embodiments of this application, the processor 111 may be a Central Processing Unit (CPU), or it may be other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor.

[0046] It will be understood by those skilled in the art that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program may be stored in a storage medium, which is a computer-readable storage medium. The computer program is executed by at least one processor in the computer system to implement the process steps of the embodiments of the above methods.

[0047] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of both. To clearly illustrate the interchangeability of hardware and software, the components and steps of the various examples have been generally described in terms of functionality in the foregoing description. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions, but such implementations should not be considered beyond the scope of this invention.

[0048] In the several embodiments provided by this invention, it should be understood that the disclosed apparatus and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative. For example, the division of each unit is only a logical functional division, and there may be other division methods in actual implementation. For example, units or components may be combined or integrated into another system, or some features may be ignored or not executed.

[0049] The steps in the method of this invention can be adjusted, merged, or reduced in order according to actual needs. The units in the device of this invention can be merged, divided, or reduced according to actual needs. Furthermore, the functional units in the various embodiments of this invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.

[0050] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, a terminal, or a network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present invention.

[0051] In the above embodiments, the descriptions of each embodiment have different focuses. For parts that are not described in detail in a certain embodiment, please refer to the relevant descriptions in other embodiments.

[0052] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Since these modifications and variations fall within the scope of the claims and their equivalents, this invention also intends to include these modifications and variations.

[0053] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the technical scope disclosed in the present invention, and these modifications or substitutions should all be covered within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. An intelligent management method for metalworking production, characterized in that, The method is used in an intelligent management system, and the method includes: S1, determine whether the preset conditions are met; if the preset conditions are met, proceed to the next step. S2, obtain bulk demand information through negotiation and confirmation with the product demand side; S3 uses batch demand information to drive production in batch metalworking production.

2. The intelligent management method for metalworking production according to claim 1, characterized in that, Step S1 involves determining whether a preset condition is met. If the preset condition is met, the process proceeds to the next step, which includes: S11, determine whether voice text from the product requirement side has been received, and whether product documents from the independent design side have been received. If both voice text and product documents have been received, proceed to the next step.

3. The intelligent management method for metalworking production according to claim 2, characterized in that, Step S2, which involves negotiating and confirming with the product demand side to obtain batch demand information, includes: S21 sends the initial requirement information to the product requirement side, then receives feedback from the product requirement side, and then confirms the batch requirement information.

4. The intelligent management method for metalworking production according to claim 3, characterized in that, Step S3, which uses batch demand information to drive batch metalworking production, includes: S31 generates metalworking production instructions based on batch demand information and sends the metalworking production instructions to the batch metalworking production end for production.

5. The intelligent management method for metalworking production according to claim 4, characterized in that, Step S21 involves sending preliminary demand information to the product demander, receiving feedback from the product demander, and then confirming the batch demand information, including: S201: Generate preliminary requirement information based on voice, text, and product documents, and send the preliminary requirement information to the product requirement end. S202, Determine whether a requirement confirmation message has been received from the product demand side; S203, If a requirement confirmation message is received from the product demand side, the requirement confirmation message will be set as a batch requirement message.

6. The intelligent management method for metalworking production according to claim 5, characterized in that, Step S201, which generates preliminary requirement information based on voice text and product documents, and sends the preliminary requirement information to the product requirement end, includes: The voice text is reduced to a standardized text of no more than a preset number of words. Based on the semantics of the product document, the standardized text is split into three sets of standardized sub-documents. After the splitting is completed, the three sets of standardized sub-documents are classified and filled into the product document to form a first confidential document that includes the three sets of standardized sub-documents and the three sets of product documents arranged one by one. The first confidential document is sent to the first metalworking production end, and kept confidential from the second metalworking production end with the same function; Determine whether the first piece data from the first metalworking production end has been received. If so, transmit the display data (excluding professional data) from the first piece data to the product demand end. Based on the semantics of the voice text, the product document is split into at least five product sub-documents. After the split, the at least five product sub-documents are classified and filled into the voice text to form a second confidential document that includes at least five product sub-documents and at least three voice sub-texts interspersed. Send the second confidential document to the second metalworking production end, while keeping it confidential from the first metalworking production end. Determine whether the first piece data of the second metalworking process has been received from the second metalworking production end. If it has been received, then transmit the display data (excluding professional data) in the first piece data of the second metalworking process to the product demand end.

7. The intelligent management method for metalworking production according to claim 6, characterized in that, Step S31, generating metalworking production instructions based on batch demand information and sending the metalworking production instructions to the batch metalworking production terminal for production, includes: Receive confirmation results from the product demand side, which are filtered from the first and second metalworking first piece data, as batch demand information; Based on the batch demand information, generate only the metalworking production instruction corresponding to the first piece of metalworking data, or only the metalworking production instruction corresponding to the second piece of metalworking data, and send it to the batch metalworking production end for production.

8. An intelligent management system, characterized in that, The intelligent management system is used to implement the intelligent management method for metalworking production as described in any one of claims 1 to 7.